See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF NEW AND RENEWABLE ENERGY
LOK SABHA
UNSTARRED QUESTION NO. 1756
ANSWERED ON 29.07.2026
INVESTMENT IN RENEWABLE ENERGY SECTOR
1756. SHRI BRIJMOHAN AGRAWAL
Will the Minister of NEW AND RENEWABLE ENERGY be pleased to state:
(a) the details of the total investment made by the Government and the private sector in the
renewable energy sector during each of the last two financial years, State-wise;
(b) the current share of renewable energy in the country's total power generation along with
the source-wise (solar, wind, hydro, bio-energy and others) details of installed capacity (GW)
and percentage contribution;
(c) the details of household installations completed under the Pradhan Mantri- Surya Ghar:
Muft Bijli Yojana (PM-SGMBY) against the target of one crore households by the year 2026-
27;
(d) the steps taken by the Government to reduce import dependence on solar modules and
batteries ensure their availability at affordable prices; and
(e) the details of renewable energy capacity targets set by the Government for the coming years
and the future plans to increase the share of renewable energy in the nation's total power
generation?
ANSWER
THE MINISTER OF STATE FOR NEW & RENEWABLE ENERGY AND POWER
(SHRI SHRIPAD YESSO NAIK)
(a) Most of renewable energy projects in the country are being set up by private sector
developers selected through a transparent bidding process. The Government of India
formulates policies at the national level for uniform implementation across the country.
During the last two financial years (FY 25 & FY 26), 12 Public sector banks, IREDA, PFC,
REC, NaBFID, IIFCL & SIDBI have cumulatively deployed approx. Rs. 5.08 Lakh Crores in
Renewable Energy sector.
Further, Indian Renewable Energy Development Agency (IREDA), has disbursed
Rs.30,167.87 Cr. and Rs. 34,945.67 Cr. during FY 25 and FY 26, respectively. The State-wise
break-up of such disbursements is given at Annexure-I.
(b) As on 30.06.2026, a total of 297.36 GW of non-fossil fuel-based installed electricity
generation capacity has been established in the country, accounting for 54.18% of the total
installed generation capacity of 548.85 GW. This includes 288.58 GW of renewable energy
capacity, comprising 162.15 GW of solar power, 57.44 GW of wind power, 52.06 GW of large
hydropower, 11.75 GW of bioenergy, and 5.18 GW of small hydropower, along with 8.78 GW
of nuclear power capacity.Renewable energy generation has increased significantly from 190.96 Billion Units (BU) in
2014–15 to 477.79 BU in 2025–26. Consequently, the share of renewable energy in the
country's total electricity generation increased from 17.00% in 2014–15 to 22.13% in 2024–
25, and further to 25.97% in 2025–26. During 2026–27 (up to 30.06.2026), renewable energy
generation stood at 87.46 BU out of the total electricity generation of 343.41 BU.
(c) Under the Pradhan Mantri- Surya Ghar: Muft Bijli Yojana (PMSG: MBY), a total of
48,02,717 households (with total installed capacity of 14,180.89 MW) has been covered till
22.07.2026.
(d) The Ministry of New and Renewable Energy (MNRE), Government of India, has been
consistently bringing out policies to promote domestic manufacturing of solar module. Various
initiatives taken, inter-alia, include those mentioned at Annexure-II. These measures have
contributed to reducing import dependence. As per the export–import databank of the
Department of Commerce, imports of solar modules have declined from around USD 4,354
million in financial year 2023-24 to around USD 994 million in financial year 2025-26.
For Battery Storage, Ministry of Heavy Industries (MHI), is having a Production Linked
Incentive (PLI) scheme, ‘National Programme on Advanced Chemistry Cell (ACC) Battery
Storage’ for implementation of giga-scale ACC manufacturing facilities in India, with an aim
to establish a competitive domestic manufacturing ecosystem for 50 GWh with a total
budgetary outlay of ₹18,100 crore. Out of 50 GWh capacity, 10 GWh has been earmarked for
grid scale stationary storage applications.
(e) The Government has set a target of achieving 500 GW of non-fossil fuel-based installed
electricity capacity by 2030. To increase the share of renewable energy in the nation's total
power generation, the Government is implementing a comprehensive set of measures,
including competitive bidding for renewable energy projects, expansion of transmission
infrastructure through the Green Energy Corridor and Inter-State Transmission System (ISTS),
implementation of Renewable Purchase Obligations (RPO) and Energy Storage Obligations
(ESO), promotion of Battery Energy Storage Systems (BESS) and pumped storage projects to
facilitate higher renewable energy integration, development of the National Green Hydrogen
Mission, promotion of offshore wind energy, implementation of PM Surya Ghar: Muft Bijli
Yojana and PM-KUSUM, and support for domestic manufacturing through the Production
Linked Incentive (PLI) Scheme for High Efficiency Solar PV Modules.
The Government has taken several steps and initiatives to promote and accelerate renewable
energy capacity in the country to realize the commitment of 500 GW non-fossil energy capacity
by 2030, as given at Annexure-III.
*****Annexure-I
Annexure referred to Lok Sabha Unstarred Parliament Question Admitted No. 1756 on
“Investment in Renewable Energy Sector” asked by Shri Brijmohan Agrawal to be
answered on 29/07/2026.
State-Wise Disbursement During Last Two Financial Years: (₹ in Crore)
S. No. Name of State/ Union Territory 2024-25 2025-26
A. States
1 Andhra Pradesh 1187.43 2539.12
2 Arunachal Pradesh 61.55 90.61
3 Bihar 68.28 36.00
4 Chhattisgarh 476.59 83.84
5 Gujarat 1532.72 3126.72
6 Haryana 695.67 364.17
7 Himachal Pradesh 440.66 71.58
8 Jharkhand 216.35 98.81
9 Karnataka 3309.93 2998.69
10 Madhya Pradesh 1134.67 2623.86
11 Maharashtra 1803.13 3244.28
12 NCT of Delhi 174.87 93.22
13 Odisha 759.24 323.54
14 Punjab 305.34 317.47
15 Rajasthan 6855.53 5314.65
16 Sikkim 1018.00 28.76
17 Tamil Nadu 3898.13 3946.10
18 Telangana 3987.63 7330.85
19 Uttar Pradesh 628.85 910.87
20 Uttarakhand 84.16 35.16
21 West Bengal 79.50 88.50
22 Multistate Projects 1113.89 1238.62
Total ‘A’ 29832.12 34905.42
B. Union Territory
1 Jammu & Kashmir 335.75 40.25
Total ‘B’ 335.75 40.25
C. Total ‘A’ + ‘B’ 30167.87 34945.67Annexure-II
Annexure referred to Lok Sabha Unstarred Parliament Question Admitted No. 1756 on
“Investment in Renewable Energy Sector” asked by Shri Brijmohan Agrawal to be
answered on 29/07/2026.
The following are the initiatives taken by the Government to promote domestic
manufacturing of solar module
(i) Production Linked Incentive (PLI) Scheme: The Government of India is implementing
the Production Linked Incentive (PLI) Scheme for High Efficiency Solar PV Modules, for
achieving domestic manufacturing capacity of Giga Watt (GW) scale in High Efficiency Solar
PV modules, with an outlay of Rs. 24,000 crore. Under the Scheme, Letters of Award have
been issued for setting up of 48,337 MW of fully/ partially integrated solar PV module
manufacturing units.
(ii) Domestic Content Requirement (DCR): Under some of the current schemes of the
MNRE, namely CPSU Scheme Phase-II, PM-KUSUM Components B & C, and PM Surya
Ghar: Muft Bijli Yojana, wherein government subsidy is given, it has been mandated to source
solar PV cells and modules from domestic sources.
(iii) Imposition of Basic Customs Duty on import of solar PV cells and modules: The
Government has imposed Basic Customs Duty (BCD) on import of solar PV cells and solar PV
modules.
(iv) Exemption of Custom Duty on capital goods for manufacture of Solar Cells and
Modules: The Government has exempted Basic Customs Duty on import of goods specified
in List 18 of Notification No. 45/2025-Customs dated 24th October 2025, for the manufacturer
of solar PV cells and modules.Annexure-III
Annexure referred to Lok Sabha Unstarred Parliament Question Admitted No. 1756 on
“Investment in Renewable Energy Sector” asked by Shri Brijmohan Agrawal to be
answered on 29/07/2026.
The Government of India has taken several steps and initiatives to promote and
accelerate renewable energy capacity in the country. These include, inter-alia, the
following:
• Standard Bidding Guidelines for tariff based competitive bidding process for
procurement of Power from Grid Connected Solar, Wind, Wind-Solar Hybrid and Firm &
Dispatchable Renewable Energy (FDRE) projects have been issued.
• Pilot scheme for Contract for Difference (CfD) for renewable energy projects of 500
MW capacity issued. The CfD mechanism, a globally proven framework, will provide an
alternative instrument (in addition to long term Power Purchase Agreements) for sale of
renewable energy, through power exchanges.
• To boost RE consumption, Renewable Purchase Obligation (RPO) followed by
Renewable Consumption Obligation (RCO) trajectory has been notified till 2029-30. The
RCO which is applicable to all designated consumers under the Energy Conservation Act
2001 will attract penalties on non-compliance. RCO also includes specified quantum of
consumption from Decentralized Renewable Energy sources.
• Foreign Direct Investment (FDI) has been permitted up to 100 percent under the
automatic route.
• Schemes such as Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan
(PM-KUSUM), PM Surya Ghar Muft Bijli Yojana, National Programme on High Efficiency
Solar PV Modules, New Solar Power Scheme (for Tribal and PVTG Habitations/Villages)
under Pradhan Mantri Janjati Adivasi Nyaya Maha Abhiyan (PM JANMAN) and Dharti
Aabha Janjatiya Gram Utkarsh Abhiyan (DA JGUA), National Green Hydrogen Mission,
Viability Gap Funding (VGF) Scheme for Offshore Wind Energy Projects, Small hydro
power development scheme have been launched.
• Scheme for setting up of Solar Parks and Ultra Mega Solar Power projects is being
implemented to provide land and transmission to RE developers for installation of RE
projects at large scale.• Waiver on Inter State Transmission System (ISTS) charges for renewable energy
projects including green hydrogen projects, with certain timelines and conditions.
• Laying of new transmission lines and creating new sub-station capacity has been
funded under the Green Energy Corridor Scheme for evacuation of renewable power.
• Quality Control Orders for Solar Photovoltaic products (i.e., Solar PV Modules, Solar
PV Inverters & Storage Battery) and Solar Water Heating systems notified.
• Issued National Framework for promoting & developing Energy Storage Systems.
• Issued Guidelines for Resource Adequacy Planning Framework for India.
• Electricity (Rights of Consumers) Rules, 2020 has been issued for net-metering up to
five hundred Kilowatt or up to the electrical sanctioned load, whichever is lower.
• “National Repowering and Life Extension Policy for Wind Power Projects, 2023” has
been issued.
• The Offshore Wind Energy Lease Rules, 2023 have been notified vide Ministry of
External Affairs notification dated 19th December 2023, to regulate the grant of lease of
offshore areas for development of offshore wind energy projects.
• The Revised Guidelines for installation of prototype wind turbine models issued on
12th June 2025.
• Procedure for inclusion/updating Wind Turbine Model in the Revised List of Models
and Manufacturers of Wind Turbines (RLMM) issued on 31st July 2025. The amendment
renames RLMM as Approved List of Models and Manufacturers [ALMM (Wind)] and
mandates usage of listed components such as Blade, Tower, Generator, Gearbox and Special
Bearings (Main, Pitch and Yaw Bearing) along with mandatory relocation of data centres
within India and prohibition of real-time data transfer outside India.
• The Standard Operating Procedure (SOP) for ALMM-Wind and ALMM – Wind
Turbine Components (ALMM-WTC) issued on 29th October 2025, detailing the end-to-end
process for application, verification, factory inspection, component evaluation and model
enlistment.
• Standard & Labelling (S&L) programs for Solar Photovoltaic modules and Grid-
connected Solar Inverters have been launched.• To augment transmission infrastructure needed for steep RE trajectory, transmission
plan has been prepared till 2030.
• “The Electricity (Late Payment Surcharge and related matters) Rules (LPS rules) have
been notified.
• Electricity (Promoting Renewable Energy Through Green Energy Open Access)
Rules, 2022, notified on 06th June 2022 with objective of ensuring access to affordable,
reliable, and sustainable green energy for all. Green Energy Open Access is allowed to any
consumer with contract demand of 100 kW or above through single or multiple single
connection aggregating Hundred kW or more located in same electricity division of a
distribution licensee.
• Green Term Ahead Market (GTAM) has been launched to facilitate sale of Renewable
Power through exchanges.
• Government has issued orders that power shall be dispatched against Letter of Credit
(LC) or advance payment to ensure timely payment by distribution licensees to RE
generators.