O.I.H.
GOVERNMENT OF INDIA
MINISTRY OF RURAL DEVELOPMENT
DEPARTMENT OF RURAL DEVELOPMENT
LOK SABHA
UNSTARRED QUESTION NO. 1448
ANSWERED ON 28/07/2026
LACK OF ALL WEATHER ROADS IN UTTAR PRADESH
1448. Shri Jitendra Kumar Dohare:
Will the Minister of RURAL DEVELOPMENT be pleased to state:
(a) whether several revenue villages and hamlets are still deprived
of all-weather road facilities in various rural areas of the Etawah
Lok Sabha constituency in Uttar Pradesh despite having road
connectivity under the Pradhan Mantri Gram Sadak Yojana
(PMGSY), if so, the details thereof;
(b) whether the Government proposes to conduct a survey of such
deprived villages and connect them in a phased manner under
PMGSY or any other Central scheme; and
(c) if so, the details thereof?
ANSWER
MINISTER OF STATE IN THE MINISTRY OF RURAL DEVELOPMENT
(SHRI KAMLESH PASWAN)
(a): The Pradhan Mantri Gram Sadak Yojana (PMGSY) was launched
as a one-time special intervention to provide single all-weather road
connectivity to eligible unconnected habitations of designated
population sizes.
The primary unit for providing connectivity under the Pradhan
Mantri Gram Sadak Yojana (PMGSY) is an 'Unconnected Habitation'
(a cluster of population). Accordingly, single all-weather road
connectivity under PMGSY is planned and executed to provide access
to eligible, previously unconnected habitations as per the prescribed
population criteria and scheme guidelines.
As per the PMGSY Programme Guidelines, habitations situated
within 500 metres of an all-weather road in plain areas including
Page 1 of 3those in Uttar Pradesh are deemed to be connected and do not qualify
for separate road connectivity under the scheme.
As per data available on the Online Management, Monitoring
and Accounting System (OMMAS), a total of 189 roads spanning a
length of 589 km have been sanctioned for the districts/constituency
components falling under the Etawah Lok Sabha Constituency. Out of
these, 188 roads measuring 573 km have been completed, leaving a
balance of only 1 road of 4 km length. Details are as under:
Net Sanctioned Completed Balance
Sr Etawah
No. Road No No. Road No No. Road No
. Constituenc
Of Lengt Of Of Lengt Of Of Lengt Of
No y Districts
Road h LSB Road h LSB Road h LSB
. details
s (Km.) s s (Km.) s s (Km.) s
1 Auraiya 68 222 0 67 215 0 1 4 0
2 Etawah 99 289 0 99 281 0 0 0 0
Kanpur
3 Dehat 22 78 0 22 77 0 0 0 0
Grand Total 189 589 0 188 573 0 1 4 0
* Note: The balance length will not be equal to sanctioned length
minus the completed length because some roads get completed at
shorter distance than sanctioned distance due to change in
alignment and other issues.
(b) & (c): The Union Cabinet approved Pradhan Mantri Gram Sadak
Yojana-IV (PMGSY-IV), for implementation during FY 2024–25 to FY
2028–29 with the target to provide all-weather road connectivity
(construction of 62,500 km of roads) to 25,000 eligible unconnected
habitations across the country with a total outlay of Rs.70,125 crore.
There is no separate state-wise target under PMGSY-IV. The
eligibility criteria of the habitations to be provided connectivity under
PMGSY-IV based on population norms of Census 2011 are as follows:
i. Habitations with a population of 500 and above in plains,
ii. Habitations with a population of 250 and above in Special
Category States (Arunachal Pradesh, Assam, Ladakh,
Manipur, Meghalaya, Mizoram, Nagaland, Sikkim, Tripura,
Himachal Pradesh, Jammu Kashmir and Uttarakhand),
Special Category Areas [Tribal Schedule-V Areas, Desert
Areas, Aspirational Blocks/ Districts and Hilly areas as
notified by the respective State Government (cross slope
more than 25% gradient and the elevation is more than
600 metres from the Mean Sea Level)] and
Page 2 of 3iii. Habitations with a population of 100 and above in LWE
affected Districts including Legacy & Thrust Districts
identified by MHA from time to time.
The identification and GIS-mapping of eligible unconnected
habitations under PMGSY-IV have been carried out by States and
Union Territories, including Uttar Pradesh, through the designated
survey process utilizing the Gram Sadak Survey App, PM Gati Shakti
Spatial Planning Platform and verification on OMMAS.
Eligible unconnected habitations identified during this
process—including those falling under the Etawah Lok Sabha
constituency—are considered for sanction in a phased manner in
accordance with programme guidelines, availability of funds, and
approval by the competent authority. Under PMGSY-IV, a meeting of
Empowered Committee (EC) of the Ministry of Rural Development was
held on 20.07.2026 to consider project proposals submitted by the
State of Uttar Pradesh.
*****
Page 3 of 3