See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF NEW AND RENEWABLE ENERGY
LOK SABHA
UNSTARRED QUESTION NO. 6012
ANSWERED ON 01.04.2026
MOBILISING INVESTMENT FOR GREEN HYDROGEN PRODUCTION
6012. SHRI SELVAGANAPATHI T.M.
Will the Minister of NEW AND RENEWABLE ENERGY be pleased to state:
(a) whether it is a fact that the National Green Hydrogen Mission (NGHM) targets 5 million
tonnes of production by the year 2030 and if so, the details thereof;
(b) whether it is also a fact that the country’s plan to reach 500 GW of non-fossil capacity
by the year 2030 would require an investment of around Rs. 30 lakh crore and if so, the
details thereof;
(c) whether it is also a fact that the Government plans to mobilize the required investment
through green bonds, blended finance structures and multilateral participation alongside
growing interest from global investors seeking long term stable returns; and
(d) if so, the details thereof?
ANSWER
THE MINISTER OF STATE FOR NEW & RENEWABLE ENERGY AND POWER
(SHRI SHRIPAD YESSO NAIK)
(a) The Government of India is implementing the National Green Hydrogen Mission (NGHM),
with an objective to make India a global hub of production, usage and export of green hydrogen
and its derivatives.
The Mission aims to establish Green Hydrogen production capacity of 5 Million Metric Tonnes
(MMT) per annum by 2030.
(b) to (d) As per the Indian Renewable Energy Development Agency (IREDA) report “Investment
and Financing in Renewable Energy and Associated Infrastructure”, an estimated investment of
Rs.30.54 Lakh Crores is envisaged from year 2023-24 till year 2029-30, for achieving the target
of 500 GW non-fossil based power capacity by 2030. The details of estimated total investment
requirement, including generation, transmission, and manufacturing infrastructure are at
Annexure.
The Government has adopted a multi-pronged strategy to mobilize the required investment,
leveraging a mix of green bonds, blended finance mechanisms, multilateral and bilateral climate
finance, along with increasing participation from domestic and global investors seeking stable
long-term returns.
These measures have contributed to sustained investor interest, with foreign direct investment
(FDI) inflows of about USD 19.3 Billion received in renewable energy sector from year 2013-14
till year 2024-25. During the same period, total capital deployed in the sector is estimated at
around ₹ 10.79 lakh crore, reflecting the strong momentum in the investment and sectoral growth.
*****ANNEXURE
Overall expected investments in RE & enabling infrastructure (including Manufacturing
& Transmission) by 2030
To achieve India's 2030 ambitions, India needs to massively scale up funding for renewables.
Below are the projections for Investments in-line with India's 500 GW ambition:
Sector Capacity Additions Expected
Expected Investment (Crores)
Renewable Energy Estimates
Solar 226 GW ~1,147,000
Wind (Onshore + Offshore) 57 GW ~419,500
Large Hydro 12 GW ~146,000
Small Hydro 0.4 GW ~2,700
PSP 14 GW ~121,000
BESS 42 GW ~308,000
Biomass and WTE 4 GW ~38,000
Other Key technologies
Bioethanol 1,701 Cr liter pa ~41,000
Bio-Diesel 695 Cr liter pa
Compressed Biogas 15 MMT ~92,000
Manufacturing Investments (Solar, Under Solar PLI -48 GW ~199,000
Electrolyzer, Wind & Battery) Electrolyzer - 10 GW
Transmission 50,890 сKM + 433,575 ~260,000
MVA + Green Energy
Corridors
Green Hydrogen (excluding 5 MTPA ~280,000
Renewables)
Total expected investments (excluding large hydro) ~2,908,200
Total expected investments (including large hydro) ~3,054,200
This data has been compiled from multiple reports/documents published by Ministries (MNRE
and others), their respective agencies including CEA and secondary research on various topics.