GOVERNMENT OF INDIA
MINISTRY OF NEW AND RENEWABLE ENERGY
RAJYA SABHA
UNSTARRED QUESTION NO. 3661
ANSWERED ON 24.03.2026
NATIONAL BIO-ENERGY PROGRAMME
3661. SHRI MAHARAJA SANAJAOBA LEISHEMBA
Will the Minister of NEW AND RENEWABLE ENERGY be pleased to state:
(a) the progress achieved under Phase –I of the National Bio-Energy Programme
(NBP) including components relating to Waste-to-energy, Biomass and Biogas
programme; and
(b) the number of projects sanctioned, completed and currently under implementation
of phase-I in the Northeast region?
ANSWER
THE MINISTER OF STATE FOR NEW & RENEWABLE ENERGY AND
POWER
(SHRI SHRIPAD YESSO NAIK)
(a) Under the National Bioenergy Programme (NBP) Phase-I, Ministry of New and
Renewable Energy supports installation of Bioenergy Projects in the country by providing
Central Financial Assistance (CFA) for setting up of Waste-to-Energy projects, Biomass
projects and Biogas projects under following scheme components:
i. Waste to Energy Programme (Programme on Energy from Urban, Industrial and
Agricultural Wastes /Residues)
ii. Biomass Programme (Scheme to Support Promotion of Manufacturing of
Briquettes & Pellets and Biomass (Non-Bagasse) based cogeneration in
Industries in the Country)
iii. Biogas Programme (Programme to support setting up of small (1 m3 to 25 m3
biogas per day) and medium size Biogas plants i.e., above 25 m3 to 2500 m3
biogas generation per day).
As on 28.02.2026, the details of bioenergy projects installed during NBP Phase-I is
given at Annexure-I.
(b) The number of projects sanctioned, completed and currently under implementation in
the northeast region is given at Annexure-II.
*****Annexure-I
REFERRED TO IN REPLY TO THE RAJYA SABHA UNSTARRED QUESTION NO. 3661,
Part (a) TO BE ANSWERED ON 24.03.2026 on ‘National bio-energy programme’.
The details of bioenergy projects installed during NBP Phase-I is given as under:
Biomass based
Biomass Projects Waste to Small
Briquette/Pellet Medium
(Non-Bagasse Energy Biogas
manufacturing Biogas Plants
Cogeneration) Projects Plants
Projects
Capacity
Capacity (MW) Capacity (TPH) Nos. KW
(MWe)
384.02 1014.29 381.87 34913 4029
Annexure-II
REFERRED TO IN REPLY TO THE RAJYA SABHA UNSTARRED QUESTION NO. 3661,
Part (b) TO BE ANSWERED ON 24.03.2026 on ‘National bio-energy programme’.
The details of bioenergy projects sanctioned, completed and currently under implementation in
the northeast region under NBP Phase-I is given as under:
S. No. Name of the No. of projects No. of Projects No. of Projects under
Programme Sanctioned Completed Implementation
1 Waste to Energy
0 0 0
Programme
2 Biomass Programme 0 0 0
3 Biogas Programme* 829 829 0
* Note: Under the Biogas Programme, State-wise targets are issued to States/UTs Programme
Implementing Agencies and All Biogas Plants are commissioned.