Home India Ministry of New and Renewable Energy Parliament Question: National Bioenergy Programme...
Date: 2025-07-30 Category: Not Applicable State: Union Government Country: India

Parliament Question: National Bioenergy Programme

Issued by Ministry of New and Renewable Energy · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

Executive Summary: The Ministry of New and Renewable Energy (MNRE) is implementing the National Bioenergy Programme (NBP) to achieve renewable energy targets and self-reliance in the energy sector. The program supports various bioenergy projects, including waste-to-energy, biomass, and biogas plants. Phase I is likely to be completed by the financial year, and a third-party evaluation has been initiated as a prerequisite for Phase II preparation. Key Points / Main Content: Aims and Objectives of NBP: * Support waste-to-energy projects for biogas, compressed biogas, and power generation from urban, industrial, agricultural wastes and residues. * Support biomass briquette and pellet manufacturing plants and non-bagasse-based cogeneration projects. * Establish small and medium-sized biogas plants for cooking fuel and stationary thermal and small power applications. Bioenergy Projects in Andhra Pradesh (Phase I): * Waste to Energy: Chittoor (1680 Kg/day), Guntur (850 Kg/day), Kurnool (800 Kg/day), and Vishakhapatnam (850 Kg/day). * Biomass: West Godavari (8 MW Non-Bagasse Cogeneration), East Godavari (3.87 MW Biomass Non-Bagasse Cogeneration). * Biogas: Anamayya (1), Bapatla (7), Chittor (12), Guntur (9), Krishna (8), Palnadu (13), Prakasam (6). Phase II Preparations: * The Ministry has initiated a third-party evaluation of Phase I as a prerequisite for Phase II preparation. Central Financial Assistance (CFA) Pattern: * Waste to Energy: * Biogas generation: Rs 0.25 Crore per 12000 cum/day. * BioCNG generation: Rs 4.0 Crore per 4800 kg/day (new biogas plant); Rs 3.0 Crore per 4800 kg/day (existing biogas plant). * Power generation (new biogas plant): Rs 0.75 Crore/MW; (existing biogas plant): Rs 0.5 Crore/MW; bio-agro-industrial waste: Rs 0.4 Crore/MW. * Biomass Gasifier: Electrical applications range from Rs. 2,500 to Rs. 15,000 per kWe; thermal applications: Rs. 2 lakh per 300 kWth. * Biomass: * Briquette manufacturing plants: Rs. 9.00 Lakhs/TPH (max Rs. 45.00 Lakh per project). * Non-Torrefied Pellet: Rs. 21 lakhs/MTPH or 30% of capital cost (max Rs. 105 lakhs per project). * Torrefied Pellet: Rs. 42 lakhs/MTPH or 30% of capital cost (max Rs. 210 lakhs per project). * Non-Bagasse Cogeneration Projects: Rs. 40 Lakhs/Megawatt (max CFA Rs. 5.00 Crore per project). * Biogas: * Small biogas plants: Rs. 9,800 to Rs. 70,400 per plant based on size. * Power generation/thermal application: Rs. 35,000 to Rs. 45,000 per kilowatt; Rs. 17,500 to Rs. 22,500 per kilowatt equivalent for thermal applications. * Note: 20% higher CFA for NER, Island, Registered Gaushalas, and SC/ST beneficiaries. Impact Analysis: Government of Andhra Pradesh: * Impact: Receives financial assistance and support for implementing bioenergy projects across various districts. * Action Required: Facilitate the establishment and monitoring of bioenergy projects, potentially prepare for Phase II based on Phase I evaluation. Project Developers/Entrepreneurs: * Impact: Can avail Central Financial Assistance (CFA) for setting up waste-to-energy, biomass, and biogas projects. * Action Required: Prepare project proposals to avail CFA as per the specified guidelines and contribute to achieving renewable energy targets. Citizens of Andhra Pradesh: * Impact: Benefit from improved access to clean cooking fuel, power, and a cleaner environment due to waste management and renewable energy generation. * Action Required: Participate in waste segregation and support the adoption of biogas and other bioenergy solutions.

Key Entities Referenced

National Bioenergy Programme: A programme implemented by the Ministry of New and Renewable Energy (MNRE) to attain renewable energy targets and achieve self-reliance in the energy sector. Ministry of New and Renewable Energy: The Indian government ministry responsible for implementing the National Bioenergy Programme (NBP) and promoting renewable energy. Andhra Pradesh: A state in India where bioenergy projects are being installed under the National Bioenergy Programme. Waste to Energy Programme: A sub-component of the National Bioenergy Programme focused on setting up waste to energy projects for generation of biogas, compressed biogas and power from urban, industrial, agricultural wastes and residues. Biomass Programme: A sub-component of the National Bioenergy Programme focused on supporting the setting up of biomass briquette and pellet manufacturing plants and biomass non-bagasse based cogeneration projects. Biogas Programme: A sub-component of the National Bioenergy Programme focused on setting up small and medium size biogas plants for clean cooking fuel and meeting the stationary needs of thermal and small power applications. Chittoor, Andhra Pradesh: A district in Andhra Pradesh where bioenergy projects have been sanctioned under the Waste to Energy and Biogas programs. Central Financial Assistance: Financial assistance provided by the central government to support bioenergy projects under the National Bioenergy Programme.
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF NEW AND RENEWABLE ENERGY LOK SABHA UNSTARRED QUESTION NO. 1629 ANSWERED ON 30/07/2025 NATIONAL BIOENERGY PROGRAMME 1629. SHRI PRABHAKAR REDDY VEMIREDDY Will the Minister of NEW AND RENEWABLE ENERGY be pleased to state: (a) the details of aims and objectives of National Bioenergy Programme (NBP) being implemented in the country; (b) the details of bioenergy projects being installed in the State of Andhra Pradesh, district-wise; (c) the details of components under which bio-energy projects have been set up in Andhra Pradesh under Phase-I; (d) the details of preparations that the Government is making for Phase-II since Phase-I is likely to be completed by this financial year; and (e) the details of financial and other assistance extended to Andhra Pradesh to install bio- energy projects since the launch of NBP? ANSWER THE MINISTER OF STATE FOR NEW & RENEWABLE ENERGY AND POWER (SHRI SHRIPAD YESSO NAIK) (a) To attain the ambitious renewable energy targets and to achieve self-reliance in the energy sector, the National Bioenergy Programme (NBP) is being implemented by the Ministry of New and Renewable Energy (MNRE) with the following objectives: - i. To support the setting up of waste to energy projects for generation of biogas, compressed biogas and power from urban, industrial, agricultural wastes and residues; ii. To support setting up of biomass briquette and pellet manufacturing plants and to support biomass (non-bagasse) based cogeneration projects; and iii. Setting up of small and medium size biogas plants for clean cooking fuel and meeting the stationary needs of thermal and small power applications. (b) & (c) The district-wise details of bioenergy projects supported under the three sub- components of the NBP in the state of Andhra Pradesh are given in the Annexure-I. (d) The Ministry as a pre-requisite for Phase-II preparation, have initiated carrying out the third-party evaluation of Phase-I of NBP. (e) The Central Financial Assistance (CFA) pattern under NBP is given at Annexure-II. *****Annexure-I Annexure referred to in reply to part (b), and (c) of the Lok Sabha Unstarred Question No. 1629 to be answered on 30.07.2025 regarding “National Bioenergy Programme”. The district-wise details of bioenergy projects supported in the State of Andhra Pradesh:- (a) Under Waste to Energy Programme District Nos. of project Cumulative Installed Capacity sanctioned Chittoor 1 1680 Kg/day Guntur 1 850 Kg/day Kurnool 1 800 Kg/day Vishakhapatnam 1 850 Kg/day (b) Under Biomass Programme District Nos. of project Cumulative Installed Capacity sanctioned West Godavari 1 8 MW Non-Bagasse Cogeneration Power plant East Godavari 1 3.87 MW Biomass (Non-Bagasse) cogeneration project (c) Under Biogas Programme District Nos. of project sanctioned Anamayya 1 Bapatla 7 Chittor 12 Guntur 9 Krishna 8 Palnadu 13 Prakasam 6Annexure-II Annexure referred to in reply to part (e) of the Lok Sabha Unstarred Question No. 1629 to be answered on 30.07.2025 regarding “National Bioenergy Programme”. The CFA pattern for various sub-components under the NBP, may be seen below: Waste to Energy Programme CFA in Rs Crore Biogas generation Rs 0.25 Crore per 12000cum/day BioCNG generation Rs 4.0 Crore per 4800 kg/day (for BioCNG generation from new biogas plant) Rs 3.0 Crore per 4800 kg/day (for BioCNG generation from e xisting Biogas plant) Power generation based on Rs 0.75 Crore/MW (for power generation from new biogas plant) Biogas Rs 0.5 Crore/MW (for power generation from existing Biogas plant) Power based on bio & agro- Rs 0.4 Crore/MW industrial waste Biomass Gasifier Rs. 2,500 per kWe with dual fuel engines for electrical application Rs. 15,000 per kWe with 100% gas engines for electrical application R s. 2 lakh per 300 kWth for thermal applications Biomass Programme CFA Briquette manufacturing plants Rs. 9.00 Lakhs/ TPH (Maximum CFA- Rs. 45.00 Lakh per project). Non-Torrefied Pellet Rs. 21 lakhs/MTPH production capacity or 30% of the capital manufacturing plant cost considered for plant and machinery of 1 TPH plant, whichever is lower (Maximum Rs. 105 lakhs per project) Torrefied Pellet manufacturing Rs. 42 lakhs/MTPH production capacity or 30% of the capital plant cost considered for plant and machinery of 1 TPH plant, whichever is lower (Maximum Rs. 210 lakhs per project) Non-Bagasse Cogeneration Rs. 40 Lakhs/ Megawatt Projects Maximum CFA- Rs. 5.00 Crore per project). Biogas Programme CFA For small biogas plants (1-25 Rs. 9,800/- to Rs. 70,400/- per plant based on size of the plant in cubic meter/day plant cubic meter capacity): For Power generation and Rs. 35,000/- to Rs. 45,000/- per kilowatt for power generation thermal application (25 - 2500 Rs. 17,500/- to Rs. 22,500/- per kilowatt equivalent for thermal cubic meter/day plant applications. capacity): Note: 20% higher than Standard CFA in for NER, Island, Registered Gaushalas and SC/ST beneficiaries);

Continue your research