Home India Ministry of Ports, Shipping and Waterways Parliament Question: National Waterways in West Bengal...
Date: 2025-08-08 Category: Not Applicable State: Union Government Country: India

Parliament Question: National Waterways in West Bengal

Issued by Ministry of Ports, Shipping and Waterways · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

Executive Summary: This document summarizes the steps taken by the Indian government to develop and enhance National Waterways (NWs) in West Bengal to boost transportation and trade, including progress on NW44 and NW86. It details specific projects initiated to upgrade waterway infrastructure and the collaboration between the Union Government and the Government of West Bengal for effective project implementation. The information was provided in response to Lok Sabha Unstarred Question No. 3300, answered on August 8, 2025. Key Points / Main Content: * **National Waterways Declaration:** * 17 waterways in West Bengal declared as National Waterways under the National Waterways Act, 2016. * **Developmental Activities:** * Developmental activities undertaken on NW1 (Ganga-Bhagirathy-Hooghly River System), NW44 (Ichamati River), and NW86 (Rupnarayan River). * Activities include fairway development, terminals, navigation lock construction, and navigation aids installation. * **Completed Projects in West Bengal:** * Development of Multimodal Terminal (MMT) at Haldia (completed in Q3 2023). * Development of New Navigational Lock Gate in Farakka (operational). * Fairway Development Farakka Kahalgaon LAD based dredging for 5 years (completed) * Development of community jetties completed at 15 locations * Hydrographic survey River Ichamati NW44 (completed) * Removal of Water Hyacinth from Tentulia to Kalanchi stretch for 23.38 km on Ichamati river in NW44 (completed) * Construction installation of Gangway pontoon completed in River Rupnarayan NW86 * Bank protection works in River Rupnarayan NW 100m length at Kolaghat 86 terminal (completed) * Procurement Supply of 2NM LED lights Solar completed Operated in the river Rupnarayan NW86 * Construction of road from Kolaghat terminal to NH Completed 41 for a length of 3.9 Km except 01 no RCC culvert in the river Rupnarayan NW86 * Fairway development, 24 hour navigation, Maintenance of Integrated Office ComplexCustoms, ImmigrationState police and IWAI at Hemnagar in IBP route of Sunderban Waterways * Supply and installation of 04 nos. navigational buoys near Ghoramora island * **Ongoing Projects in West Bengal:** * Development of community jetties under construction at 7 locations. * Onshore facilities for community Under constructionat 8 locations jetties * Renovation Modernization of Under Implementation existing Navigational Lock at Farakka 2 * Fairway Maintenance Farakka Kahalgaon Farakka Katwa Katwa Tribeni MMTHaldia Access Channel * Works in Ichamati River NW44 Dredging by departmental Amphibian dredger Night Navigational facilities from BansjahariMallikpur to Bashirhat Bridge 7.0 km Design and Construction of Single Lane Bridge at Swarupnagar, WB including Approach Road and RE wall * Works in Rupnarayan River NW86 OM of navigational lighted posts, snag caution marks with retro reflective sticker project sign board * **Collaboration Mechanisms:** * Project Oversight Committee (POC) constituted with representatives from Uttar Pradesh, Bihar, Jharkhand, and West Bengal for projects on NW1. * Inland Waterways Development Council (IWDC) constituted under the Chairmanship of the Minister of Ports, Shipping and Waterways, with representation from States/Union Territories. Impact Analysis: * **State Governments (Uttar Pradesh, Bihar, Jharkhand, West Bengal):** * *Impact:* Directly involved in the development and oversight of NW1 projects through the POC, ensuring coordinated efforts and addressing state-specific concerns. * *Action Required:* Actively participate in the POC, provide necessary support for project implementation, and coordinate with the Union Government. * **Government of West Bengal:** * *Impact:* Key stakeholder in the development of NWs within the state, requiring close collaboration with the Union Government for effective project implementation. * *Action Required:* Collaborate with the Union Government, participate in the POC, and provide necessary support for project implementation. * **Inland Waterways Authority of India (IWAI):** * *Impact:* Responsible for undertaking developmental activities on NWs, including fairway development, terminal construction, and navigation aid installation. * *Action Required:* Continue to execute developmental activities on NWs as planned, coordinate with state governments, and ensure project milestones are achieved. * **Ministry of Ports, Shipping and Waterways:** * *Impact:* Oversees the development of NWs across the country and facilitates collaboration between the Union Government and State/Union Territories. * *Action Required:* Provide necessary guidance and support for the development of NWs, chair the IWDC, and ensure effective implementation of projects. * **Users of National Waterways (transportation, trade):** * *Impact:* Benefit from enhanced infrastructure and improved navigability, leading to increased efficiency and reduced transportation costs. * *Action Required:* Utilize the improved waterways for transportation and trade, contributing to economic growth and development.

Key Entities Referenced

Jal Marg Vikas Project: Also known as JMVP. A project related to the development of NW1. Ministry of Ports, Shipping and Waterways: A ministry of the Government of India responsible for ports, shipping, and waterways. West Bengal: A state in eastern India where National Waterways are being developed. National Waterway 44: Also known as NW44 and Ichamati River. A National Waterway in West Bengal. National Waterway 86: Also known as NW86 and Rupnarayan River. A National Waterway in West Bengal. National Waterways Act, 2016: An act of the Government of India under which waterways are declared as National Waterways. Inland Waterways Authority of India: Also known as IWAI. An organization undertaking developmental activities on National Waterways. GangaBhagirathyHoohgly River System: Also known as NW1. A river system covering West Bengal, Uttar Pradesh, Bihar and Jharkhand.
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF PORTS, SHIPPING AND WATERWAYS LOK SABHA UNSTARRED QUESTION NO. 3300 ANSWERED ON 08.08.2025 NATIONAL WATERWAYS IN WEST BENGAL 3300. SHRIJAGANNATH SARKAR: Will the Minister of PORTS, SHIPPING AND WATERWAYS be pleased to state: प(cid:517)न, पोत प(cid:303)रवहन और जलमाग(cid:330) मं(cid:361)ी (a) the steps being taken to develop and enhance National Waterways in the State of West Bengal to boost transportation and trade, including the progress on National Waterway 44 (NW-44) and National Waterway 86 (NW-86); (b) the specific projects initiated to upgrade the infrastructure of National Waterways in the State, particularly for the said waterways, along with their current status; and (c) the manner in which the Union Government is collaborating with the Government of West Bengal to ensure the effective implementation of these projects? ANSWER MINISTER OF PORTS, SHIPPING AND WATERWAYS (SHRI SARBANANDA SONOWAL) (a) & (b) Government declared 17 waterways in the State of West Bengal as National Waterways (NWs) under the National Waterways Act, 2016 (17 of 2016). Central Government through Inland Waterways Authority of India (IWAI) has undertaken various developmental activities on NW-1 (the Ganga-Bhagirathy-Hoohgly River System) which covers West Bengal, Uttar Pradesh, Bihar and Jharkhand, NW-44 (Ichamati River) and NW-86 (Rupnarayan River). These include development of fairway, terminals, navigation lock and navigation aids for smooth navigation of inland vessels. Details of projects undertaken on the NWs in West Bengal along with status are given in Annex-I. (c) A Project Oversight Committee (POC) has been constituted with representatives from the States of Uttar Pradesh, Bihar, Jharkhand, and West Bengal for projects under implementation on NW-1 under Jal Marg Vikas Project (JMVP) to collaborate with State Governments. Further, for holistic development of Inland Waterways Transport (IWT) across the country, Inland Waterways Development Council (IWDC)has been constituted under the Chairmanship of the Hon'ble Minister of Ports, Shipping and Waterways with representation from States/Union Territories.Annex-I Annexure referred to in reply to part (a) & (b) of Lok Sabha Unstarred Question No. 3300 for 08.08.2025. PROJECTS IN WEST BENGAL A. Completed Projects S.No. Name of Project Details 1 Development of Multimodal Terminal (MMT) at Completed in Q3-2023 Haldia 2 Development of New Navigational Lock Gate in Operational Farakka 3 Fairway Development Farakka – Kahalgaon (LAD based dredging for 5 years completed) 4 Development of community jetties Completed at 15 locations 5 Hydrographic survey (River Ichamati NW-44) Completed 6 Removal of Water Hyacinth from Tentulia to Completed Kalanchi stretch for 23.38 km on Ichamati river in NW-44 7 Construction & installation of Gangway & pontoon Completed in River Rupnarayan NW-86 8 Bank protection works in River Rupnarayan NW- 100m length at Kolaghat 86 terminal – Completed 9 Procurement & Supply of 2NM LED lights Solar Completed Operated in the river Rupnarayan NW-86 10 Construction of road from Kolaghat terminal to NH Completed 41 for a length of 3.9 Km (except 01 no RCC culvert) in the river Rupnarayan NW-86 11 Fairway development, 24 hour navigation, Completed Maintenance of Integrated Office Complex(Customs, Immigration-State police and IWAI) at Hemnagar in IBP route of Sunderban Waterways 12 Supply and installation of 04 nos. navigational Completed buoys near Ghoramora island B. Ongoing Projects S.No. Name of Project Details 1 Development of community jetties Underconstruction at 7 locations 2 Onshore facilities for community Under constructionat 8 locations jetties3 Renovation/ Modernization of Under Implementation existing Navigational Lock at Farakka 2 Fairway Maintenance  Farakka – Kahalgaon  Farakka – Katwa  Katwa – Tribeni  MMT-Haldia Access Channel 3 Works in Ichamati River (NW-44)  Dredging by departmental Amphibian dredger  Night Navigational facilities from Bansjahari-Mallikpur to Bashirhat Bridge - 7.0 km  Design and Construction of Single Lane Bridge at Swarupnagar, (WB) including Approach Road and RE wall 4 Works in Rupnarayan River (NW-86) O&M of navigational lighted posts, snag/ caution marks with retro reflective sticker & project sign board *****

Continue your research