GOVERNMENT OF INDIA
MINISTRY OF NEW AND RENEWABLE ENERGY
LOK SABHA
UNSTARRED QUESTION NO. 523
ANSWERED ON 22.07.2026
NON-FOSSIL FUEL BASED ENERGY CAPACITY
523. SMT. MALVIKA DEVI
Will the Minister of NEW AND RENEWABLE ENERGY be pleased to state:
(a) the progress made towards achieving the target of 500 GW of non-fossil fuel-based energy
capacity by the year 2030 along with the details of capacity added during the last financial year;
(b) the details of solar and wind energy projects sanctioned under the Pradhan Mantri Surya Ghar
Muft Bijli Yojana (PM-SGMBY), State-wise; and
(c) the details of challenges being faced in grid integration of renewable energy and the measures
taken by the Government to address them?
ANSWER
THE MINISTER OF STATE FOR NEW & RENEWABLE ENERGY AND POWER
(SHRI SHRIPAD YESSO NAIK)
(a) As on 30.06.2026, a total of 297.36 GW non-fossil fuel sources-based electricity capacity has been
installed. During the financial year 2025-26, total 55.29 GW non-fossil capacity has been added.
(b) PM Surya Ghar: Muft Bijli Yojana (PM-SGMBY) is being implemented with the target of
installation of rooftop solar systems in one crore households in the country by 2026-27. State-wise
details of the applications for installation of rooftop solar systems submitted on the national portal of
the scheme and the installation done as on 16.07.2026 are given in Annexure-I.
(c) Renewable energy sources particularly wind and solar are variable and intermittent in nature, and
integrating a substantial share of such generation into the Grid presents challenges related to grid
security, stability, and safety. Government has taken several steps to ensure grid stability and
integration of renewable energy (RE) which, inter alia, include as given at Annexure-II:
****Annexure-I
Annexure-I referred to in reply of part (b) of the Lok Sabha Unstarred Question No. 523 to be
answered on 22.07.2026
State-wise number of applications and installations under PM-SGMBY as on 16.07.2026
State/UT No. of No. of
Sl.No
applications installations
1. Andaman and Nicobar Islands 681 378
2. Andhra Pradesh 913019 231280
3. Arunachal Pradesh 83 1
4. Assam 465130 154710
5. Bihar 82545 23498
6. Chandigarh 1701 1351
7. Chhattisgarh 188688 78821
8. Goa 4660 3290
9. Gujarat 1160527 751644
10. Haryana 191602 110169
11. Himachal Pradesh 17305 11499
12. Jammu and Kashmir 91593 38262
13. Jharkhand 11251 3134
14. Karnataka 60773 22383
15. Kerala 410578 296795
16. Ladakh 2592 1989
17. Lakshadweep 1367 1174
18. Madhya Pradesh 219104 151506
19. Maharashtra 1426117 675518
20. Manipur 3161 1483
21. Meghalaya 1303 58
22. Mizoram 1515 1324
23. Nagaland 888 425
24. NCT of Delhi 47970 10145
25. Odisha 289912 132892
26. Puducherry 6262 4570
27. Punjab 27011 16833
28. Rajasthan 446248 262336
29. Sikkim 176 57
30. Tamil Nadu 102574 83377
31. Telangana 85769 52992
32. Dadra & Nagar Haveli and Daman & Diu 3263 1073
33. Tripura 8331 4318
34. Uttarakhand 140406 94230
35. Uttar Pradesh 1142459 677363
36. West Bengal 44224 2737
Total 76,00,788 39,03,615Annexure-II
Annexure-II referred to in reply of part (c) of the Lok Sabha Unstarred Question No. 523 to be
answered on 22.07.2026
Measures being taken to address grid stability and grid integration challenges
i. Central Electricity Authority (CEA) published a plan for Transmission System for
Integration of over 500 GW RE Capacity by 2030 covering all RE rich States.
ii. Inter and intra-State transmission network is being expanded to keep pace with RE capacity
addition. Strong inter connection of transmission networks to ensure better reliability.
iii. Encouraging setting up of RE projects with storage facilities for optimal utilization of
transmission facilities.
iv. Round-the-clock Renewable Energy (RTC-RE) and Firm and Dispatchable Renewable
Energy (FDRE) tenders conducted by Renewable Energy Implementation Agencies
(REIAs) will provide stable and firm power.
v. CEA (Technical Standards for Connectivity to the Grid) Regulations lay down the
minimum technical requirements for the RE generating plants to ensure the safe, secure and
reliable operation of the grid. The compliance to the said regulations by RE plants are
verified jointly by Central Transmission Utility (CTUIL) and Grid India / RLDCs before
granting connectivity/interconnection to the national grid.
vi. Indian Electricity Grid Code mandates that RE plants participate in the primary and
secondary frequency control in case of contingencies. Hybrid RE power plants, Energy
Storage Systems such as BESS (Battery Energy Storage System) and PSP (Pump Storage
Project) are being promoted for mitigating variability in RE generation and provide
adequate frequency support to the grid.
vii. Government has set up thirteen Renewable Energy Management Centres (REMCs) for
better forecasting and real time monitoring of RE generation.
viii. Load dispatch centres ensure that electricity demand is fully met using dispatchable sources
such as hydro and thermal power when the wind does not blow and sun does not shine.
ix. Installation of Static Synchronous Compensators (STATCOMs) to improve the grid
reliability and voltage stability limit. A STATCOM acts as a voltage controller for the
electricity grid, quickly adding or removing extra power to keep the system running
smoothly.
x. Central Electricity Authority (Technical Standards for Connectivity to the Grid)
Regulations lay down the minimum technical requirements for RE generating plants to