GOVERNMENT OF INDIA
MINISTRY OF POWER
LOK SABHA
UNSTARRED QUESTION NO.3079
ANSWERED ON 06.08.2026
OVERLOADED TRANSFORMERS IN SONIPAT
†3079. SHRI SATPAL BRAHAMCHARI:
SHRI JAI PARKASH:
Will the Minister of POWER
be pleased to state:
(a) whether due to overloaded transformers, dilapidated power lines and
excess load capacity, frequent transformer breakdowns, power outages and risk
of accidents persist in several villages and urban colonies of Sonipat and Hisar
Lok Sabha Constituencies;
(b) if so, the details of the sanctioned projects and funds allocated for the
replacement and capacity enhancement of such transformers and dilapidated
power lines in the said constituencies during the last three years;
(c) whether the Government is implementing any special scheme for working
on the expansion of separate agricultural feeders, modernization and
implementation of smart distribution systems to ensure uninterrupted power
supply to farmers for irrigation within stipulated timelines;
(d) if so, the details of the proposed works, timelines thereof and the expected
benefits therefrom in Sonipat Lok Sabha Constituency; and
(e) the details of the proposed agricultural feeders, the present progress of the
works and the likely timeframe for the completion thereof in the Hisar Lok Sabha
Constituency?
A N S W E R
THE MINISTER OF STATE IN THE MINISTRY OF POWER
(SHRI SHRIPAD NAIK)
(a) Electricity is a concurrent subject and power distribution is handled by
distribution utilities that function under the guidance of the respective State
Electricity Regulatory Commissions (SERCs) and State Governments. As per the
Electricity Act, 2003, distribution of electricity is a licensed activity and it is the
duty of the respective distribution licensee to develop and maintain an efficient
and safe distribution system in its area of supply. Hence, the responsibility for
taking necessary measures for the upgradation and maintenance of thedistribution system to ensure quality power supply, including transformers and
distribution lines, rests with the respective distribution utilities.
As reported by the distribution utilities of Haryana, details regarding overloaded
Distribution Transformers (DTRs), dilapidated/overloaded power lines identified,
transformer breakdown cases during the last three years; major reasons for such
breakdowns and the action taken in respect of Hisar and Sonipat Lok Sabha
Constituencies are given at Annexure-I.
(b) to (e): The Government of India launched Revamped Distribution Sector
Scheme (RDSS) in the year 2021 to supplement the efforts of States to help them
provide quality supply of power to consumers through a financially sustainable
and operationally efficient distribution sector. Loss reduction infrastructure and
smart metering works worth Rs 1.53 lakh crores and Rs 1.31 lakhs crores,
respectively, have been sanctioned under RDSS. The loss reduction and smart
distribution works sanctioned under RDSS include:
i. Works for creation of new/upgradation of substations including Gas
Insulated Switchgear (GIS) Substations
ii. Installation of new Distribution Transformers (DT) and augmentation of
existing DTs
iii. Replacement of old conductors
iv. Underground of HT/LT lines
v. Supervisory Control and Data Acquisition (SCADA) works
vi. Smart metering works covering 19.79 crore consumers and smart system
metering works for 2.11 lakh feeders and 52.53 lakh DTs have been
sanctioned. Till date, 5.83 crore smart meters have been installed under
RDSS, and overall, 7.34 crore smart meters have been installed across the
country under various schemes.
The above sanction includes works for loss reduction infrastructure
amounting to Rs 6,693.15 crores under RDSS for the state of Haryana. Further, as
reported by the State, all agricultural feeders have already been segregated since
2021. The smart metering works were undertaken by the State under its own plan
in the districts of Gurugram, Panchkula, Karnal, Panipat and Faridabad for 8.74
lakh consumers.
The details regarding works undertaken under RDSS in Hisar and Sonipat
Lok Sabha constituencies are given at Annexure-II. The sanctioned works are
expected to complete with the scheme period i.e. March 2028. The works once
executed would lead to improvement in quality of power supply and enhanced
consumer services.
************ANNEXURE-I
ANNEXURE REFERRED IN REPLY TO PART (a) OF UNSTARRED QUESTION NO.
3079 ANSWERED IN THE LOK SABHA ON 06.08.2026
*************
Constituency and details Action Taken
Hisar (DHBVNL) Over loading of transformers was
addressed by providing additional 346
No. of Overloaded DTRs: 1099
nos. of transformers along with
No. of Dilapidated/ overload Lines
augmentation of 406 nos. of
identified: 78
transformers. (Implemented by DHBVN
No. of T/F Breakdown Cases (Last 3
departmentally)
Years): 16976
Major Reasons: Internal fault/Over Total 16 nos. of feeders to be bifurcated
loading and Heavy wind storm out of which 9 feeders completed, 7
nos. feeders are under progress under
RDSS. Further, 68 nos. of feeders have
been upgraded departmentally.
Sonipat (DHBVNL and UHBVNL) Over loading of transformers was
addressed by providing additional 250
No. of Overloaded DTRs: 1776
nos. of transformers along with
No. of Dilapidated/ overload Lines
augmentation of 1080 nos. of
identified: 111
transformers, while the remaining
No. of T/F Breakdown Cases (Last 3
works are being completed in a phased
Years): 6372
Major Reasons: Internal fault and manner.
Heavy wind storm
Feeder bifurcation of 90 nos.
overloaded feeders has been
completed; 40 nos. presently under
progress under RDSS, while 18 nos. will
be bifurcated departmentally.
**************ANNEXURE-II
ANNEXURE REFERRED IN REPLY TO PARTS (b) TO (e) OF UNSTARRED QUESTION
NO. 3079 ANSWERED IN THE LOK SABHA ON 06.08.2026
*************
Works sanctioned in Hisar Constituency under RDSS
Financial progress
(Amount in Rs crore)
Approved Project Cost 145.73
Approved GoI grant 87.48
GoI grant released 23.27
Physical Progress
Overall physical progress: 40 %
Approved
Project Completed
Major Head Particular UoM Sanctioned Awarded
Cost (Rs
crore)
HT lines ckm 382.81 312.81 58.65
Feeder
25.63 LT lines ckm
bifurcation
DTs nos.
Cabling works HT cables ckm - - -
16.74
(AB + UG) LT cable ckm 183.92 183.83 121.58
Augmentation/ 29.26 HT lines ckm 607.25 577.26 312.34
reconductoring
12.20 LT lines ckm 227.62 227 126.81
of lines
New
nos. 3 3 0
substation
Augmentation
Substation 61.49 nos. 8 8 6
of substation
Additional
nos. 14 14 6
Power X-mer
VCB at VCB at
0.42 Nos 8 8 0
Substation Substation
Total 145.73Works sanctioned in Sonipat Constituency under RDSS
Financial progress
(Amount in Rs crore)
DHBVNL UHBVNL Total
(Partial Jind area in (Balance area in
Sonipat Sonipat
constituency) Constituency)
Approved Project 66.09 140.93 207.02
Cost
Approved GoI 39.65 84.56 124.21
grant
GoI grant 10.55 44.74 55.29
released
Physical Progress (Overall physical progress: 81.51 %)
Approved
Project
Major Head Particular UoM Sanctioned Awarded Completed
Cost (Rs
Cr.)
HT lines ckm 481.73 481.72 288.48
Feeder
56.51 VCB Nos. 61 127 60
bifurcation
DTs nos.
Cabling works
38.43 LT Cable ckm 437.82 437.82 313.14
(AB + UG)
New HT lines ckm 62.30 97.20 62.30
8.65
Lines/cable LT lines ckm
28.99 HT lines ckm 492.36 570.22 479.25
Augmentation/
re- 39 LT lines ckm 1084.84 1088.88 447.82
conductoring
Augmentation
of lines/cable 11.70 nos. 240 240 240
of DTs
New
Substation 30.56 nos. 5 5 5
substation
Total 207.02
***************