See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF RURAL DEVELOPMENT
DEPARTMENT OF RURAL DEVELOPMENT
LOK SABHA
UNSTARRED QUESTION NO. 1597
ANSWERED ON 28/07/2026
PENDING ROAD PROJECTS UNDER PMGSY
1597. Dr. Prashant Yadaorao Padole:
Will the Minister of RURAL DEVELOPMENT be pleased to state:
(a) whether the Government is aware that Bhandara and Gondia
districts are Naxal-affected and predominantly tribal districts
where road connectivity is vital for development, security,
education, healthcare and rural livelihoods, if so, the details
thereof;
(b) whether adequate funds have not been provided for several road
projects in these districts under the Pradhan Mantri Gram Sadak
Yojana (PMGSY) during the last four years, resulting in delays in
construction, maintenance and deterioration of road conditions;
(c) if so, the details of funds sanctioned, released and utilized under
PMGSY for Bhandara and Gondia districts during the last four
years, year-wise;
(d) whether poor road conditions are causing serious hardships to
villagers, students, farmers, patients and security forces in
these areas, if so, the details thereof; and
(e) whether the Government proposes to provide special financial
assistance and prepare a time-bound action plan for completion
of all pending and proposed road projects in Bhandara and
Gondia districts, if so, the details thereof and if not, the reasons
therefor?
ANSWER
MINISTER OF STATE IN THE MINISTRY OF RURAL DEVELOPMENT
(SHRI KAMLESH PASWAN)
(a) to (e): Under PMGSY, special emphasis is accorded for improving
rural road connectivity in Aspirational Districts, tribal areas, Left
Wing Extremism (LWE)-affected areas and other remote and difficult
regions, in accordance with the scheme guidelines and approved
framework in order to promote socio-economic development,
Page 1 of 3improving access to education, healthcare and agricultural markets,
and facilitating rural livelihoods. Accordingly, the Government has
adopted the following mechanisms to prioritize road connectivity in
such areas:
(i) Priority to eligible unconnected habitations located in
Aspirational Districts, tribal and remote areas while preparing
proposals under the relevant verticals of PMGSY, subject to eligibility
under the scheme by identifying such projects under Comprehensive
New Connectivity Priority List (CNCPL). The sanctions and
implementation of projects are done as per the CNCPL list.
(ii) Dedicated interventions such as the Road Connectivity Project
for Left Wing Extremism Affected Areas (RCPLWEA) to improve
connectivity in LWE-affected districts.
(iii) Under PMGSY-IV unconnected habitations of population size
(as per Census 2011) 500+ in plains, 250+ in Special Category States
(Arunachal Pradesh, Assam, Ladakh, Manipur, Meghalaya, Mizoram,
Nagaland, Sikkim, Tripura, Himachal Pradesh, Jammu Kashmir and
Uttarakhand), Special Category Areas [(Tribal Schedule-V Areas,
Desert Areas, Aspirational Blocks/ Districts and Hilly areas as notified
by the respective State Government (cross slope more than 25%
gradient and the elevation is more than 600 meters from the Mean
Sea Level)] and 100+ in LWE affected Districts including Legacy &
Thrust Districts identified by MHA from time to time.
(iv) Under PMGSY-IV, habitations identified under Vibrant Village
Program-II are being prioritised for all-weather road connectivity.
(v) Under PM-JANMAN, road connectivity is being provided to
eligible Particularly Vulnerable Tribal Group (PVTG) habitations with
a population of 100+, to improve access to essential services and
socio-economic opportunities.
In the district of Bhandara, since inception till date, a total of
171 roads covering 717.47 km and 9 bridges have been sanctioned
under various verticals of the PMGSY, out of which, 171 roads
covering 710.90 km and 9 bridges have already been constructed.
Similarly, in Gondia district, since inception till date, a total of 285
road works covering 1,130.24 km and 16 bridges have been
sanctioned. All the sanctioned road works and bridges have been
completed.
Page 2 of 3The funds for implementation of the schemes are released by the
Ministry to the States/UTs as a whole and not district-wise. Further,
the funds are released on the basis of works in hand, the progress
achieved in the project and after due submission of necessary
documents. Currently, the fund releases under PMGSY are through
the SNA SPARSH system. The funds released and expenditure
incurred by the State of Maharashtra, during the last four years and
current year, are as under: -
(Rs in crore)
Financial Year Release Expenditure
2022-23 742.995 1074.02
2023-24 1110.80 1507.37
2024-25 854.93 1524.10
2025-26 529.73 1402.23
2026-27 (as on 23.07.2026) 354.16 196.36
Under PMGSY-IV, the State Government has surveyed
unconnected habitations for providing connectivity through the Gram
Sadak Survey Application. However, the state has not surveyed any
habitation as unconnected in the Bhandara and Gondia districts. No
proposal for any special financial assistance or action plan in respect
of PMGSY projects in these districts is currently pending in the
Ministry.
*****
Page 3 of 3