See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF NEW AND RENEWABLE ENERGY
RAJYA SABHA
UNSTARRED QUESTION NO. 2061
ANSWERED ON 10.03.2026
PHASE-I OF NBP IN THE COUNTRY
2061. SHRI UJJWAL DEORAO NIKAM
SHRI DEEPAK PRAKASH
SHRI SHAMBHU SHARAN PATEL
SHRI ASHOKRAO SHANKARRAO CHAVAN
SHRI ADITYA PRASAD
SHRI MADAN RATHORE
SHRI SUBHASH BARALA
SHRI AMAR PAL MAURYA
Will the Minister of NEW AND RENEWABLE ENERGY be pleased to state:
(a) the progress achieved under Phase-I of the National Bioenergy Programme (NBP),
which includes components related to Waste-to-Energy, Biomass Programme, and
Biogas Programme;
(b) the total capacity installed under the Biogas and Bio-Compressed Natural Gas (Bio-
CNG), Briquettes and Pellets and Biomass Cogeneration Programme, State-wise;
(c) the number of projects approved, completed and currently under implementation in each
component of Phase I;
(d) whether the Ministry has conducted any assessment of the impact of the program on
rural income generation, waste utilization, and reduction in stubble burning or biomass
wastage; and
(e) if so, the details of the findings thereof?
ANSWER
THE MINISTER OF STATE FOR NEW & RENEWABLE ENERGY AND
POWER
(SHRI SHRIPAD YESSO NAIK)
(a) & (b) Under the National Bioenergy Programme (NBP) Phase I, Ministry of New and
Renewable Energy supports installation of Bioenergy Projects in the country by providing
Central Financial Assistance (CFA) for setting up of Waste-to-Energy, Biomass and Biogas
projects under following scheme components:
i. Waste to Energy Programme (Programme on Energy from Urban, Industrial and
Agricultural Wastes /Residues)
ii. Biomass Programme (Scheme to Support Manufacturing of Briquettes & Pellets
and Promotion of Biomass (non-bagasse) based cogeneration in Industries)
iii. Biogas Programme (Programme to support setting up of small (1 m3 to 25 m3
biogas per day) and medium size Biogas plants i.e., above 25 m3 to 2500 m3 biogas
generation per day).
The total installed capacity under the Waste to Energy, Biomass & Biogas components of
NBP Phase-I is given at Annexure-I.
(c) The number of projects approved, completed and currently under implementation is
given at Annexure-II.
(d) & (e) Yes, the Ministry has conducted a 3rd party evaluation of NBP Phase-I.
The key findings are summarized at Annexure-III.
*****ANNEXURE-I
REFERRED TO IN REPLY TO THE RAJYA SABHA UNSTARRED QUESTION NO.
2061, Part (a) to (b), TO BE ANSWERED ON 10.03.2026 on ‘Phase-I of NBP in the country’.
The details of bioenergy projects installed in the country under Phase-I of NBP is given as
under:
Biomass Biomass based
Waste to
Projects (Non- Briquette/Pellet Biogas
Energy
Bagasse manufacturing Plants
Projects
Cogeneration) Projects
Capacity Capacity
Sl No State Capacity (TPH) Nos.
(MW) (MWe)
Andhra
1 35 7.7 19.99 88
Pradesh
Arunachal
2 0 0 0 200
Pradesh
3 Assam 6 4 0 389
4 Bihar 19.2 4 0 255
Chhattisgar
5 0 8 10.42 546
h
6 Goa 0 0 1.6 11
7 Gujarat 0 117.49 20.59 3668
8 Haryana 47.2 130.75 33.48 439
Himachal
9 16.95 0 0 0
Pradesh
10 Jharkhand 5 2 1.04 11
11 Karnataka 0 17 13.09 1398
12 Kerala 0 0 0 637
Madhya
13 8 322.05 24.13 6260
Pradesh
Maharashtr
14 0 79.6 26.86 14468
a
15 Manipur 0 0 0 25
16 Meghalaya 0 2 0 1
17 Mizoram 0 0 0 1
18 Nagaland 0 0 0 52
19 Odisha 0 22 5 216
20 Punjab 77.86 41 27.09 3220
21 Rajasthan 2.5 106.3 67.54 567
22 Sikkim 0 0 0 0
Tamil
23 12 10 3.92 124
Nadu
24 Telangana 24.24 88.1 0.63 23
25 Tripura 0 0 0 161
Uttarakhan
26 36.22 1 7.63 1436
d
Uttar
27 56.45 42.3 86.9 540
Pradesh
West
28 32.4 9 5.81 159
BengalAndaman
and
29 0 0 0 0
Nicobar
Islands
30 Chandigarh 0 0 0
Dadra and
Nagar
31 Haveli and 0 0 0 18
Daman &
Diu
NCT of
32 0 0 26.17 0
Delhi
Jammu &
33 5 0 0 0
Kashmir
34 Ladakh 0 0 0 0
Lakshadwe
35 0 0 0 0
ep
36 Puducherry 0 0 0 0
Total 384.02 1014.29 381.87 34913
***Annexure-II
REFERRED TO IN REPLY TO THE RAJYA SABHA UNSTARRED QUESTION NO.
2061, Part (c), TO BE ANSWERED ON 10.03.2026 on ‘Phase-I of NBP in the country’.
The number of projects approved, completed and under implementation under each
component of Phase-I of NBP is given as under:
Name of the Programme Sanctioned Completed Under Implementation
Waste to Energy Programme 79 72 7
Biomass Programme 111 111 00
Biogas Programme 34913 34913 00
Annexure-III
REFERRED TO IN REPLY TO THE RAJYA SABHA UNSTARRED QUESTION NO.
2061, Part (d) to (e), TO BE ANSWERED ON 10.03.2026 on ‘Phase-I of NBP in the country’.
The details of the findings of the 3rd party evaluation of the implementation of NBP
Phase-I are summarized as under:
a) Rural Income Generation
The programme has contributed to rural income generation and employment across
the bioenergy value chain. Household level biogas plants under the National
Bioenergy Programme (NBP) Phase-I have generated an estimated 1.4–1.8 lakh
person-days of employment during construction and installation. Household biogas
plants also contribute to rural income through savings on conventional fuels and
fertilizers, with average annual savings of about Rs.6,000–Rs.7,000 per household
due to reduced expenditure on LPG, firewood and chemical fertilizers.
Further, on an average, Biomass-based briquetting and pellet units employ about 13
& 21 workers respectively, whereas non-bagasse-based biomass cogeneration and
waste-to-energy plants employs around 67 and 45 workers respectively.
b) Waste Utilization or Reduction in Stubble Burning or Biomass Wastage
The programme has facilitated the sustainable utilization of agricultural residues
through implementation of various sub-components of NBP Phase-I.
For a typical Waste-to-Energy plant utilizing agri-residue including paddy straw,
around 10 tons per day (TPD) of agri-residue is consumed to generate 1 TPD of
Compressed Biogas (CBG). Similarly, for a briquetting/pelletizing plant, around