Executive Summary:
This document is an answer provided by the Minister of State in the Ministry of Rural Development to the Lok Sabha concerning the Pradhan Mantri Gram Sadak Yojana (PMGSY) in Uttar Pradesh. It details road construction progress, village connectivity, and steps to increase rural road connectivity under PMGSY, including the launch of PMGSY-IV on September 11, 2024. Data is current as of July 16, 2025.
Key Points / Main Content:
Road Construction Progress:
* Road length sanctioned and constructed in Uttar Pradesh under PMGSY for the last four years (2021-22 to 2024-25) and the current year (2025-26, up to July 16, 2025) is specified.
* Specific figures are provided for road length sanctioned and constructed in Baghpat district during the same period.
* District-wise and year-wise details are available online at https:omms.nic.inProgress MonitoringMonthly Progress ReportFinancial Yearwise achievement.
Village Connectivity:
* District-wise details of habitations connected in Uttar Pradesh can be found at https:omms.nic.inProgress MonitoringState ProfileHabitation coverage report.
* The unit for implementation of PMGSY is a habitation.
Enhancement of Road Connectivity:
* A total of 21,125 road works (77,425 km) and 18 bridges have been sanctioned under PMGSY until July 16, 2025.
* PMGSY-IV was launched on September 11, 2024, focusing on all-weather connectivity to unconnected habitations based on population criteria (500 in plain areas, 250 in NE and Hill StatesUTs, etc. as per Census 2011).
* PMGSY-IV will be implemented from 2024-25 to 2028-29, with a total outlay of Rs. 70,125 crore, targeting 25,000 unconnected habitations.
Impact Analysis:
State Governments (Including Uttar Pradesh):
* Impact: Expected to facilitate the submission of proposals for PMGSY-IV.
* Action Required: Work in close coordination with the Ministry to submit proposals for PMGSY-IV.
Ministry of Rural Development:
* Impact: Responsible for overseeing and coordinating the implementation of PMGSY, including the new PMGSY-IV scheme.
* Action Required: Continue working in close coordination with the States to facilitate the submission of the proposals.
Rural Population (Specifically in Uttar Pradesh):
* Impact: Benefits from increased road connectivity, especially in previously unconnected habitations.
* Action Required: No direct action required; benefits are realized through improved infrastructure.
Key Entities Referenced
Pradhan Mantri Gram Sadak Yojana (PMGSY): A rural road connectivity program in India aimed at providing all-weather access to eligible unconnected habitations.
Uttar Pradesh: A state in India where the PMGSY scheme is being implemented and analyzed in the document.
Baghpat district, Uttar Pradesh: A district in Uttar Pradesh specifically mentioned in the context of road construction under PMGSY.
Ministry of Rural Development: The Indian government ministry responsible for the PMGSY program.
SHRI KAMLESH PASWAN: Minister of State in the Ministry of Rural Development.
PMGSY-IV: A new phase of the Pradhan Mantri Gram Sadak Yojana (PMGSY) launched on 11th September 2024.
Census 2011: The most recent census of India, used as a basis for determining eligible habitations under PMGSY-IV.
LWE affected districts: Areas affected by Left Wing Extremism, which are a special category for PMGSY-IV implementation with specific population criteria.
O.I.H.
GOVERNMENT OF INDIA
MINISTRY OF RURAL DEVELOPMENT
DEPARTMENT OF RURAL DEVELOPMENT
LOK SABHA
UNSTARRED QUESTION NO. 413
ANSWERED ON 22/07/2025
PMGSY IN UTTAR PRADESH
413. DR. RAJKUMAR SANGWAN:
Will the Minister of RURAL DEVELOPMENT be pleased to state:
(a) the total length of roads (in km) sanctioned and constructed in
Uttar Pradesh including those in Baghpat district under
Pradhan Mantri Gram SadakYojana during the last four years
and in the current year, district-wise;
(b) the number of villages which have been facilitated with the
said scheme in Uttar Pradesh so far, district-wise;
(c) the details of specific road development works sanctioned and
completed under PMGSY in Uttar Pradesh during the said
period, district-wise; and
(d) the details of steps taken by the Government to increase road
connectivity in the rural areas in Uttar Pradesh under PMGSY,
district-wise?
ANSWER
MINISTER OF STATE IN THE MINISTRY OF RURAL DEVELOPMENT
(SHRI KAMLESH PASWAN)
(a) to (c): The details of road length sanctioned and constructed
under Pradhan Mantri Gram SadakYojana (PMGSY), during the last
four years, in Uttar Pradesh are given as under:-
Year Road Length Road Length
sanctioned constructed
(in Km) (in Km)
2021-22 12274 3368
2022-23 0 5011
2023-24 454 6799
2024-25 22 2808
2025-26 0 238
(till 16.07.2025)
Page 1 of 2The details of road length sanctioned and constructed under
PMGSY in Baghpat district of Uttar Pradesh during the last four
years are given as under:-
Year Road Length Road Length
sanctioned constructed
(in Km) (in Km)
2021-22 10.30 18
2022-23 - 48
2023-24 - 7
2024-25 - -
2025-26 - -
(till 16.07.2025)
The details of road length sanctioned and constructed under
PMGSY in the State of Uttar Pradesh during the last four years and
in the current year, district-wise and year-wise, may be seen at
https://omms.nic.in>Progress Monitoring>Monthly Progress
Report>Financial Year-wise achievement.
The unit for implementation of PMGSY is a habitation. District-
wise details of habitations connected in the State of Uttar Pradesh
may be seen at https://omms.nic.in>Progress Monitoring>State
Profile>Habitation coverage report.
(d): To enhance road connectivity in the rural areas in Uttar
Pradesh, a total of 21,125 road works measuring 77,425 km and 18
bridges have been sanctioned under all interventions/verticals of
PMGSY till 16.07.2025.
A new scheme namely PMGSY-IV has been launched on 11th
September, 2024 by the Central Government to provide connectivity
to habitations which have become eligible due to population
increase, The scheme will focus on providing all-weather
connectivity to unconnected habitations of 500+ population in plain
areas and 250 + population in NE and Hill States/UTs, special
category areas (Tribal Schedule-V, Aspirational Districts/Blocks,
Desert Areas) and 100+ in Left Wing Extremism (LWE) affected
districts as per Census 2011. The scheme is being implemented
from 2024-25 to 2028-29, with a total outlay of Rs. 70,125 crore,
targeting connectivity to 25,000 unconnected habitations. The
Ministry is working in close coordination with the States, including
Uttar Pradesh, to facilitate the submission of the proposals.
*****