Executive Summary & Key Takeaways

**Executive Summary** This document presents answers to Unstarred Question No. 2093 in Lok Sabha, answered on 12.02.2026, regarding the Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)-Accelerated Irrigation Benefits Programme (AIBP) in Andhra Pradesh. It details approved projects, funds allocated, project progress, and irrigation potential. Annexures provide project-specific data. **Key Points / Main Content** * **PMKSY and AIBP Overview:** * PMKSY is an umbrella scheme with components including AIBP and Har Khet Ko Pani (HKKP). * HKKP has four sub-components: Command Area Development & Water Management (CAD&WM); Surface Minor Irrigation (SMI); Repair, Renovation and Restoration (RRR) of Water Bodies; and Ground Water (GW) Development. * Implementation of PMKSY for 2021-22 to 2025-26 has been approved, with revisions to AIBP and CAD&WM. * **Project Details:** * Total number of approved projects, fund allocation, physical progress, and irrigation potential are detailed in Annexure I(a) to I(d). * Annexures break down information by state, project, districts benefited, and year. * **Project Delays and Monitoring:** * Delays are attributed to land acquisition, R&R issues, court cases, and contractual bottlenecks. * Projects are monitored by the Central Water Commission, Project Management Unit (PMU), and a dedicated dashboard. * Minister of Jal Shakti & Secretary take periodic reviews, and issues are flagged on the Project Monitoring Group (PMG) portal. * **ERM Projects:** * ERM projects approved under AIBP are marked in Annexure I(a). * No ERM project proposals have been received from Andhra Pradesh under the current AIBP component of PMKSY. **Impact Analysis** **Central Government (Ministry of Jal Shakti)** * **Impact:** Responsible for overseeing and monitoring the implementation of the PMKSY and AIBP schemes. * **Action Required:** Continue monitoring project progress, address issues and bottlenecks, and facilitate coordination with State Governments for timely project completion. **State Governments (including Andhra Pradesh)** * **Impact:** Responsible for implementing the approved irrigation projects within their respective states. * **Action Required:** Expedite project implementation, address delays due to land acquisition, R&R, and contractual issues. State governments need to respond to directions to resolve early resolution of issues. Andhra Pradesh needs to submit proposals for ERM irrigation projects. **Beneficiary Farmers and Local Communities** * **Impact:** Affected by delays in project completion, which impacts irrigation potential and agricultural productivity. * **Action Required:** No direct action is required, but they are the ultimate beneficiaries of the successful implementation of the projects.

Key Entities Referenced

Pradhan Mantri Krishi Sinchayee Yojana (PMKSY): An umbrella scheme consisting of two major components, aiming to improve water use efficiency and increase irrigation coverage. Accelerated Irrigation Benefits Programme (AIBP): A component of PMKSY focused on accelerating the completion of irrigation projects. Ministry of Jal Shakti: The central ministry responsible for water resources, river development, and Ganga rejuvenation, playing a key role in implementing the PMKSY scheme. Andhra Pradesh: The state where the projects and related delays are specifically examined, making it a focal point for the policy's impact assessment. Har Khet Ko Pani (HKKP): Another component of PMKSY focused on expanding irrigation access to every field.
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF JAL SHAKTI DEPARTMENT OF WATER RESOURCES, RIVER DEVELOPMENT & GANGA REJUVENATION LOK SABHA UNSTARRED QUESTION NO. 2093 ANSWERED ON 12.02.2026 PMKSY-AIBP IN ANDHRA PRADESH 2093. SHRI KESINENI SIVANATH: SHRI LAVU SRI KRISHNA DEVARAYALU: SHRI BASTIPATI NAGARAJU: SHRI B K PARTHASARATHI: Will the Minister of JAL SHAKTI be pleased to state: (a) the details of the total number of projects approved under the Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) including the Accelerated Irrigation Benefits Programme (AIBP) component and any other Union Government funded schemes including the name and type of each irrigation project (major, medium, minor, AIBP/PMKSY) in the country, State/UT-wise and district-wise for Andhra Pradesh; (b) the details of the funds allocated, sanctioned, released and utilised for these projects, project-wise, year- wise and State-wise; (c) the details of the physical progress and the current stage of completion of each of these projects including the projects under AIBP component, project-wise, State-wise and district-wise for Andhra Pradesh; (d) the details of the irrigation potential created and utilized through these projects so far; (e) whether any of the approved irrigation projects in Andhra Pradesh are delayed or stalled, if so, the reasons for such delays and the measures taken by the Government to expedite its completion; (f) the details of the number of Extension, Renovation and Modernisation (ERM) projects approved under the AIBP component along with the funds allocated and released for them, yearwise and State-wise; and (g) whether the Government has received any proposal from Andhra Pradesh for ERM irrigation projects under the AIBP component and if so, the details thereof? ANSWER THE MINISTER OF STATE FOR JAL SHAKTI (SHRI RAJ BHUSHAN CHOUDHARY) (a) to (d) Pradhan Mantri Krishi Sinchai Yojna (PMKSY) is an umbrella scheme, consisting of two major components being implemented by the Department of Water Resources, River Development & Ganga Rejuvenation, Ministry of Jal Shakti, namely, Accelerated Irrigation Benefit Programme (AIBP), and Har Khet Ko Pani (HKKP). HKKP, in turn, consists of four sub-components: (i) Command Area Development & Water Management (CAD&WM); (ii) Surface Minor Irrigation (SMI); (iii) Repair, Renovation and 1Restoration (RRR) of Water Bodies; and (iv) Ground Water (GW) Development. In 2016, with the launching of revised AIBP format, CAD&WM sub-component of HKKP was taken up for pari passu implementation with AIBP. Further, in December, 2021, implementation of PMKSY for the period 2021-22 to 2025-26 has been approved by Government of India. However, approval of Ground Water component under PMKSY-HKKP has provisionally been accorded till 2021-22 only for committed liabilities, which has been extended subsequently till completion of ongoing works. Also, Per Drop More Crop component, which was earlier a component of PMKSY, is now being implemented separately by DoA&FW under Pradhan Mantri Rashtriya Krishi Vikash Yojna (PM-RKVY). The details of the total number of projects approved including Extension, Renovation & Modernization (ERM);details of funds allocated/sanctioned/released; physical progress; current stage of implementation & details of irrigation potential created under the Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) including the Accelerated Irrigation Benefits Programme (AIBP) component and other schemes for irrigation projects of Union Government are annexed as Annexure I(a) to I(d). (e) Yes, the major reasons for the delayed progress include land acquisition constraints, Rehabilitation and Resettlement (R&R) issues, pending court cases, and contractual bottlenecks. To expedite completion, the projects are regularly monitored by Central Water Commission under DoWR, RD & GR, as well as by a dedicated Project Management Unit (PMU) under this Ministry. Physical and financial progress of these projects is also monitored through a dedicated dashboard, backed with a management information system maintained by DoWR, RD & GR. Apart from the above, implementation and progress of the projects is also monitored at the highest level in this Ministry. Hon’ble Minister of Jal Shakti & Secretary, Department of Water Resources, River Development & Ganga Rejuvenation, Ministry of Jal Shakti takes project-wise periodic reviews of physical and financial progress of the projects and actions to be taken by various State Governments are finalized for early resolution of issues. Issues and bottlenecks under the projects are flagged over Project Monitoring Group (PMG) portal and resolved in PMG meetings under Secretary (Coordination), Cabinet Secretariat. (f) & (g) The Extension, Renovation and Modernisation (ERM) projects approved under the AIBP component are star (*) marked in Annexure I(a). No proposal has been received from Government of Andhra Pradesh for ERM irrigation projects under the current AIBP component of PMKSY. *** 2ANNEXURE -I(a) ANNEXURE REFERRED TO IN REPLY TO PART (a) to (d) OF UNSTARRED QUESTION NO. 2093 TO BE ANSWERED IN LOK SABHA ON 12.02.2026 REGARDING “PMKSY-AIBP IN ANDHRA PRADESH”. Details of projects under PMSKY-AIBP scheme (2016-21) Central Assistance released in Crore Irrigatio Curren Allocated/ n t stage Sanctione Potentia S. 202 202 of State Project Name Districts Benefitted d Central 2016 2017- 2018- 2019 2020 2021 2022 l No. 3- 4- compl Assistance -17 18 19 -20 -21 -22 -23 Created 24 25 etion in Crore in Th. in % Ha 1 Maddigedda E.Godavari 0.31 - - - - - - - - - 1.42 100 2 Gundlakamma Prakasham 19.87 - 11.79 - - - - - - - 28.42 98.3 3 Tadipudi LIS W.Godavari - - - - - - - - - - 63.76 78.34 Srikakulam, 4 Thotapally - - - - - - - - - - 40.83 95.88 Vijayanagram Andhra 5 Musurumilli E.Godavari 14.52 7.4 - - - - - - - - 9.16 96 Pradesh E.Godavari, 6 Pushkara LIS - - - - - - - - - - 55.91 98.2 Vishakhapatnam 7 Yerracalva W.Godavari - - - - - - - - - - 5.47 97 Tarakaram 8 ViJayanagaram 25.04 - 3.44 - - - - - - - - 66.56 Teertasagaram Kokrajhar ,Chirang, 9 Champamati - - - - - - - - - - 24.72 100 Bongaigaon Assam 10 Dhansiri Darrang ,Udalgura - - - - - - - - - - 75.1 100 11 Borolia Baksa &Kamrup 9.97 - - - - - - - - - 3.3 55.44 11.9 14.1 12 Durgawati Rohtas, Kaimur 90.07 - 46.32 - - - - - 35.5 96 8 2 Bihar Patna, Arwal, 13 Punpun 106.02 - - 37.82 - - - - - - 3.68 44.45 Jehanabad Maniyari 14 Bilaspur 19.7 - 3.62 - - - - - - - 14.52 100 Tank* Chhattis 15 Kharung* Bilaspur - - - - - - - - - - 10.3 100 garh Raigarh, Jangir, 13.2 16 Kelo 51.5 13.63 - 4.09 6.45 3.12 1.85 3.57 - 18.52 92 Champa 9 3Central Assistance released in Crore Irrigatio Curren Allocated/ n t stage Sanctione Potentia S. 202 202 of State Project Name Districts Benefitted d Central 2016 2017- 2018- 2019 2020 2021 2022 l No. 3- 4- compl Assistance -17 18 19 -20 -21 -22 -23 Created 24 25 etion in Crore in Th. in % Ha 17 Goa Tillari( G) North Goa - - - - - - - - - - 21.06 100 Narmada, Vadodra, Bharuch, Chhota Udepur, Panchmahel, Ahmedabad, Gandhinagar, Kheda, 961. 1410. 1047. 485. 177. 357. 61.1 11.7 18 Gujarat Sardar Sarovar 4797.51 32.4 1725.9 96.13 Anand, Mehsana, 88 49 29 35 96 28 5 7 Surendranagar, Morbi, Botad, Bhavnagar, Kachchh, Banskantha, Patan 19 Rajpora Lift Pulwama 2.48 - - 2.3 - - - - - - 2.43 100 Jammu Restoration & Jammu, Samba & 20 & Mod. of Main 15.29 - 8.22 3.93 - 3.14 - - - - 50.75 100 Kathua Kashmir Ravi Canal* 21 Tral Lift Pulwama 28.49 - - 10.69 5.07 6.36 - - - - 5.12 100 West & East Jharkha Subernarekha 145. 305.8 22 Singhbhum, 1373.68 305.1 - - - - - - 158.42 69.13 nd Multipurpose 75 8 SaraikelaKharsawan Sri Rameswar 23 Belgaum - - - - - - - - - - 13.8 100 Irrigation 22.4 24 Bhima LIS Gulbarga 44.89 - - - 15.6 - 3.42 - - 24.29 100 4 25 Karnata Karanja Bidar 35.15 4.15 15.5 - 7.75 7.75 - - - - 27.65 100 ka NLBC System 368.8 155. 207. 26 Bijapur, Gulbarga 940.5 0 197 - - - - 104.7 100 Project (New)* 6 67 87 Upper Tunga Haveri, Simoga, 108. 27 Irrigation 217.76 75.16 - - - - - - - 78.73 100 Davengere 88 Project Idukki, Ernakulam & 28 Kerala Muvattupuzha 0 - - - - - - - - - 29.62 98.35 Kottayam 4Central Assistance released in Crore Irrigatio Curren Allocated/ n t stage Sanctione Potentia S. 202 202 of State Project Name Districts Benefitted d Central 2016 2017- 2018- 2019 2020 2021 2022 l No. 3- 4- compl Assistance -17 18 19 -20 -21 -22 -23 Created 24 25 etion in Crore in Th. in % Ha 29 Karapuzha Wayanand 14.05 - - - - - - - - - 1.62 31.64 Singhpur 30 Chhatarpur (B) 4.96 1.94 - - - - - - - - 10.2 100 Project 31 Mahuar Project Shivpuri 5.55 - - - - - - - - - 13.78 100 32 Sagad Project Vidisha 6.83 2.5 - - - - - - - - 17.06 100 Sindh Project Shivpuri, Gwalior, 35.5 33 39.46 - - - - - - - - 162.1 100 Phase II Datia (B), Bhind 2 Indira Sagar Project Canal 16.3 34 Phase - I & II Khandwa, Khargaon 40.96 7.33 - - - - - - - 62.2 100 5 (km. 0 to km. 142) Omkareshwar Project Canal Khandwa,Khargone 61.2 35 98.15 4.5 1.74 2.07 - - - - - 54.63 100 Phase-IV (OSP and Dhar 7 Madhya lift) Pradesh Indira Sagar Project Canal Khandwa, 36 Phase - V 39.28 9.51 - - - - - - - - 32 83.21 KhargaonBarwani (Khargone Lift ) Bansagar Unit Rewa, Satna, Sidhi, 37 91.47 - 68.02 - - - - - - - 154.54 92.19 2 Shahdol Barriyarpur 38 Chhatarpur (B) 18.28 6.62 - - - - - - - - 43.85 100 LBC Sanjay sagar 39 Vidisha 3.32 2.99 - - - - - - - - 17.81 98.18 (Bah) Project Bargi Diversion 40 Jabalpur, Satna, Rewa 9.51 5.66 - 1.92 0.96 - - - - - 21.19 100 Project Phase - I (km. 16 to km 5Central Assistance released in Crore Irrigatio Curren Allocated/ n t stage Sanctione Potentia S. 202 202 of State Project Name Districts Benefitted d Central 2016 2017- 2018- 2019 2020 2021 2022 l No. 3- 4- compl Assistance -17 18 19 -20 -21 -22 -23 Created 24 25 etion in Crore in Th. in % Ha 63) 41 Mahi Project Dhar, Jhabua 7.24 4.71 - - - 1.26 - - - - 33.47 99.01 42 Mahan Project Sidhi 11.88 2.38 1.8 - 3.85 0 - - - - 19.74 100 Omkareshwar Project Canal Khandwa, Khargaon, 10.9 43 Phase-II (RBC 36.65 5.92 - - - - - - - 15.8 97.7 Dhar 9 km. 9.70 to km 65.50) Omkareshwar Project Canal 14.0 44 Phase-III (RBC Dhar 46.86 12.88 2.5 2.5 - - - - - 41.26 100 5 km. 65.50 to km 142) Indira Sagar Project Canal 39.6 45 Badwani 146.53 51.29 14.97 - - - 4.42 - - 18.09 100 Phase - III (km. 5 143 to km. 206) Indira Sagar Project Canal 29.2 46 Barwani 115.7 24.55 31.7 - - - - - - 10.5 100 Phase - IV (km. 2 206 to km. 243) 10.4 47 Pench Project Seoni, Chindwara 25.99 - 4.99 - - - 5.25 - - 28.27 100 9 Bargi Diversion 11.6 48 Project Phase - Jabalpur, Satna, Rewa 12.94 - - 0.59 0 - - - - 31.42 98 5 II (km. 63 to km 104) Bargi 33.8 16.4 59.4 59.9 49 Diversion Jabalpur, Satna, Rewa 240.74 - 28.18 8.21 - - 3 79.46 5 8 7 1 Project Phase - 6Central Assistance released in Crore Irrigatio Curren Allocated/ n t stage Sanctione Potentia S. 202 202 of State Project Name Districts Benefitted d Central 2016 2017- 2018- 2019 2020 2021 2022 l No. 3- 4- compl Assistance -17 18 19 -20 -21 -22 -23 Created 24 25 etion in Crore in Th. in % Ha III (km. 104 to km 154) Bargi Diversion Jabalpur, Satna, Rewa, 11.2 18.2 40.6 50 Project Phase - 145.87 - - - - - - 26.34 78 Katni 8 9 2 IV (km. 154 to km 197) Bawanthadi 16.8 51 Bhandara (V) 27.23 9.99 - - - - - - - 27.71 100 (IS) 4 52 Lower Panzara Dhule 18.77 8.73 9.89 - - - - - - - 6.79 100 53 Dongargaon Chandrapur (V) 5.89 1.17 2.55 2.16 - - - - - - 2.77 100 54 Warna Kolhapur, Sangli 118.22 - - - - - - - - - 15.88 100 NandurMadh 16.0 55 Aurangabad (M) 17.24 0.25 0.95 - - - - - - 20.5 100 meshwar Ph-II 4 Upper 56 Beed (M) 15.09 1.01 7.04 1.56 1.31 - - - - - 2.8 100 Kundalika 39.6 57 Lower Dudhna Parbhani(M), Jalna (M) 56.26 5.27 4.48 3.43 - - - - - 44.01 96.3 2 Maharas 58 Khadakpurna Buldhana (V) 40.17 2.14 12 26.02 - - - - - - 23.86 97.28 htra Dhom 10.3 59 Pune / Satara 57.66 5.78 13.46 7.94 9.05 4.51 - - - 17.43 93.19 Balaakwadi 3 60 Wang project Satara 7.63 0.32 - - 3.64 0 - - - - 5.75 100 Krishna 23.0 77.1 36.4 29.7 85.6 61 Solapur, Sangli 337.78 29.27 22.46 - - 106.74 100 Koyana Lift 9 3 8 6 6 62 Gadnadi Ratnagiri 4.14 0.1 0.63 0.81 - - 1.95 - - - 5.18 97.75 11.9 63 Tillari Sindhudurg 17.91 - - - - - - - - 6.6 100 4 24.3 10.5 16.3 10.0 64 Tarali Satara 80.54 - 6.43 - 4.3 - 15.47 100 8 8 5 3 65 Arjuna Ratnagiri 17.69 1.01 4.73 3.36 - 8.58 - - - - 7.34 100 7Central Assistance released in Crore Irrigatio Curren Allocated/ n t stage Sanctione Potentia S. 202 202 of State Project Name Districts Benefitted d Central 2016 2017- 2018- 2019 2020 2021 2022 l No. 3- 4- compl Assistance -17 18 19 -20 -21 -22 -23 Created 24 25 etion in Crore in Th. in % Ha Sangola 66 Solapur, 33.72 1.31 2.45 5.1 5.23 4.14 8.17 4.73 1.29 - 11.02 95.01 Branch Canal 24.1 40.9 56.8 65.8 21.9 67 Bembla Yavatmal (V) 307.17 54.48 42.9 - - 51.73 98.85 8 6 7 3 4 Upper Pen Yavatmal (V), 12.2 50.1 12.2 16.4 34.6 68 241.97 26.19 55.3 0 - 41.58 100 Ganga (Nanded(M), Hingoli 6 3 7 3 9 102. 30.8 30.8 13.5 69 Lower Wardha Wardha (V) 230.2 - 38.94 - - - 63.33 100 47 3 3 6 113.3 70 Waghur Jalgaon 246.15 81.7 - - - - - - - 32.06 93 2 71 Aruna Sindhudurg - - - - - - - - - - 9.1 98 Morna 72 Satara 8.23 0.32 - - - - - - - - 1.52 33 (Gureghar) Amravati (V), Akola 73 Lower Pedhi 38.02 4.18 6.31 - 7.31 - - - 1.77 - - 95 (V) Nardave 74 (Mahamadwad Sindhudurg 25.78 1.27 10.8 - - - - - 1.65 - 1.09 75 i) 75 Kudali Satara 10.43 - 1.13 - 1.74 3.03 - - - - 0.23 85 Nagpur(V), Gosikhurd 166.5 195.8 50.3 135. 146. 101. 97.2 76 Bhandara(V), 1146.11 - - 180.72 79.64 (NP) 9 1 4 24 55 57 4 Chandrapur(V) Dolaithabi 21.4 77 Imphal, Senapati 35.27 13.8 - - - - - - - 7.13 99.46 Barrage 7 Manipur Imphal East, Kakching, 105. 23.5 11.7 78 Thoubal Senapati, Thoubal and 216.6 11.62 21.93 30.5 - - - 28.94 99 52 1 5 Ukhrul Upper 79 Indravati(KBK Kalahandi (KBK) 18 18 - - - - - - - - 85.95 100 Odisha ) 80 Rukura-Tribal Sundargarh 26.35 7.26 16.63 1.23 - - - - - - 7.65 100 8Central Assistance released in Crore Irrigatio Curren Allocated/ n t stage Sanctione Potentia S. 202 202 of State Project Name Districts Benefitted d Central 2016 2017- 2018- 2019 2020 2021 2022 l No. 3- 4- compl Assistance -17 18 19 -20 -21 -22 -23 Created 24 25 etion in Crore in Th. in % Ha 81 RET irrigation Kalahandi (KBK) 110.78 34.4 47.12 14.6 - - - - - - 8.5 100 58.3 131.6 82 Telengiri Koraput (KBK) 208.91 9.46 - - - - - - 15.18 100 2 6 Lower Indra Nuapada, Balangir 89.7 83 104.88 - - 7.55 7.55 - - - - 38.34 100 (KBK) (KBK) 5 200. 240.7 84 Subernarekha Mayurbhanj 642.33 45.27 77.8 38.9 - - - - 115.26 100 66 9 Anandpur Barr. Ph.-I / 16.3 85 Integrated Keonjhar, Bhadrak 61.32 - - 5.3 6.32 - - - - 6.16 62.84 9 Anandpur Barr. 32.9 23.6 86 Kanupur Keonjhar 270.28 28.51 48.82 - - - - - 15.24 79.55 6 2 Kandi Canal Hoshiarpur, Shaheed 45.7 87 Extension 45.76 - - - - - - - - 23.33 95.58 Bhagat Singh Nagar 6 (Ph.II) Rehabilitation Punjab of Ist Patiala Sangrur, Mansa & 88 Feeder and 6.66 6.66 - - - - - - - - 91.99 99.25 Bhatinda, Barnala Kotla Branch Project* Narmada 40.7 199.9 93.6 89 Jalore & Barmer 427.82 93.43 - - - - - 245.88 100 Rajastha Canal 9 9 1 n Mod. of Gang 90 Sriganganagar 32.37 5.1 16.88 1.72 7.04 - - - - - 69.69 100 Canal* Gollavagu 91 Mancherial 6.3 - - - - 4.78 - - - - 3.85 100 Project Telanga Rallivagu 92 na Mancherial - - - - - - - - - - 2.43 99.99 project 93 Mathadivagu Adilabad 5.35 2.67 - 2.67 - - - - - - 3.44 99.99 9Central Assistance released in Crore Irrigatio Curren Allocated/ n t stage Sanctione Potentia S. 202 202 of State Project Name Districts Benefitted d Central 2016 2017- 2018- 2019 2020 2021 2022 l No. 3- 4- compl Assistance -17 18 19 -20 -21 -22 -23 Created 24 25 etion in Crore in Th. in % Ha Project SriKomaram Komarambheem 94 - - - - - - - - - - 9.03 100 Bheem project Asifabad Palemvagu Jayashankar 95 - - - - - - - - - - 2.38 98.4 project Bhoopalapally Peddavagu @ 96 Neelwai Mancherial - - - - - - - - - - 3.65 100 project Warangal (Rural), Memboobabad, 17.0 97 SRSP St.II 48.36 13.24 - 9.04 - - - - - 168.32 97 Khammam, Nalgonda, 1 Jangaon and Suryapet Mahaboobnagar, Rajiv Bheema 54.4 10.2 98 Wanaparthy & 94.66 - - - - - - - 61.11 100 L.I. Scheme 8 7 Nagarkurnool Peddavagu @ KomarambheemAsifab 99 8.49 - - - - 2.29 - - - - - 81.95 Jagannathpur ad Rajanna Sircilla, Indiramma Karimnagar, Siddipet, 100 Flood Flow Warangal Urban, - - - - - - - - - - 21.2 92 Canal Jangaon, Jagtiyal & Peddapally Hanamkondla, Jayashankar Bhoopalpally, Jangaon, J. Chokha Rao 470. 145. 43.9 101 Siddipet, Yadadri, 966.64 - - 205 - - - 149.2 87.55 LIS 6 48 5 Suryapet and Karimnagar, Warangal, Mahboobabad, Mulugu Uttar Bansagar 64.6 102 Allahabad, Mirzapur 143.51 63.36 15.51 - - - - - - 150.13 100 Pradesh Canal 4 10Central Assistance released in Crore Irrigatio Curren Allocated/ n t stage Sanctione Potentia S. 202 202 of State Project Name Districts Benefitted d Central 2016 2017- 2018- 2019 2020 2021 2022 l No. 3- 4- compl Assistance -17 18 19 -20 -21 -22 -23 Created 24 25 etion in Crore in Th. in % Ha Baharaich, Basti,Gorakhpur, Saryu Gonda, Shravasti, 358. 358. 14.5 103 1228.58 62 - 305 - - - 1172.78 100 Nahar(NP) Balrampur, Sidharth 22 21 1 Nagar, Sant Kabir Nagar Mahoba (B), Hamirpur 31.6 15.8 104 Arjun sahayak 132.41 9 2.24 57.84 - - - - 57.64 100 (B), Banda (B) 6 3 Madhya Moradbad, Jyotibafule 105 Ganga canal 92 - - 18.81 17.8 17.8 - 9.4 - - 110 94 Nagar PH-II UT of PrakachikKho 106 Kargil 3.41 - 1.36 - 0.81 0.81 - - - - 1.5 93 Ladakh ws Canal Details of projects under PMSKY-AIBP scheme (2021-26) (National Projects marked as ‘@’ in the table) Central Assistance released in Irrigatio Current Allocated/Sanct Crore n stage of S. ioned Central State Project Name Districts Benefitted Potential comple No. Assistance in 2021 2022- 2023- 2024- Created tion in Crore -22 23 24 25 in Th. Ha % 1 JiheKathapur project Satara 247.34 6.48 32.54 26.81 141.92 9.99 88 BodwadParisarSinchan 2 Maharashtra Jalgaon, Buldhana 278.62 - - - 0 - 50 yojana Stage-I 3 Lower Tapi Stage-1 Project Jalgaon 859.22 - - - - - - 4 Nadaun project Hamirpur 11.41 2.25 - - 5.35 0.96 95 Himachal Phina Singh Multipurpose 5 Pradesh Kangara 282.47 - - - 11.99 - 54 Project 11Central Assistance released in Irrigatio Current Allocated/Sanct Crore n stage of S. ioned Central State Project Name Districts Benefitted Potential comple No. Assistance in 2021 2022- 2023- 2024- Created tion in Crore -22 23 24 25 in Th. Ha % Districts in Himachal pradesh, Uttrakhand, Uttar 1048. 6 Renukaji dam Project@ 5484.8 - 414.46 352.18 - - Pradesh, Haryana, NCT of 54 Delhi & Rajasthan Parwan multipurpose 7 Rajasthan Baran, Jhalawar, Kota 733.86 41.43 - 154.88 203.4 20.7 93.27 project 8 Tamil Nadu Kannadian channel Tirunelveli, Thoothukudi 44.22 9.04 25.7 - - 7.6 100 ERM of Sukla irrigation 9 Assam Tamulpur&Kamrup 232.62 - 41.98 - 42.46 3.2 72 project* 10 Manipur ERM of Loktak LIS (Ph-I)* Bishnupur, Imphal west 51.94 - 24.88 5.91 - 8.06 68 Nainital & Udham Jamrani Dam multipurpose singhnagar of Uttarakhand, 11 1557.18 - - - 405 - 21.04 project Rampur &bareilly of Uttar Pradesh Uttarakhand Districts in Himachal Lakhwar multipurpose pradesh, Uttrakhand, Uttar 12 3526.32 - 38.58 165.56 74.97 - 16 project@ Pradesh, Haryana, NCT of Delhi & Rajasthan Kosi-Mechi Intra State Link Araria, Purnea, Kishanganj 13 3652.56 - - - - - - Project & Katihar Bihar Aurangabad, Gaya, 14 North Koel 1836.41 - - - 49.82 - - Palamau&Garhwa Lift Irrigation Scheme & 15 Gujrat Surat 584.06 - - - - - - Tapi Barrage project Upper Siang Multipurpose Arunachal 16 storage project (Pre- Siang & Upper Siang 350 - - 16.05 - - - Pradesh construction activity)@ 12Other National/Special Projects (Special Projects marked as # in the table) Central Assistance released in Crore Curren Allocated/San Irrigation t stage S. ctioned Project Districts Potential of N State Central 2016 2017- 2018 2019 2020- 2021 2022 2023 2024 Name Benefitted Created comple o. Assistance in -17 18 -19 -20 21 -22 -23 -24 -25 in Th. Ha tion in Crore % East Godavari, 2514 Polavar Andhra Visakhapatnam, .16 2234. 1898 1671 727. 5512 1 am 27303.8 2000 1400 1850 - 85 Pradesh West Godavari (336 2 .8 .23 88 .4 Project and Krishna 4.16) Pathankot, Shahpu Gurudaspur, r Kandi Amritsar in 147.4 49.1 33.7 2 Dam Punjab and 485.38 - - - 60 74.4 - - 63.72 5 4 6 Project Kathua and # Samba in UT of J&K Ganganagar, Hanumangarh, Rajasth Churu, Bikaner, an 124. 170. 159. 3 Punjab Jodhpur, 620.41 - - - - - 24 82.37 80 Feeder 4 24 05 Jaisalmer and * # Barmer districts of Rajasthan Muktsar, Faridkot, Firozpur Sirhind in Punjab and 153. 25.4 4 Feeder Ganganager, 205.758 - - - - - - - 69.09 95.93 65 3 * # Hanumangarh districts of Rajasthan 13ANNEXURE -I(b) ANNEXURE REFERRED TO IN REPLY TO PART (a) to (d) OF UNSTARRED QUESTION NO. 2093 TO BE ANSWERED IN LOK SABHA ON 12.02.2026 REGARDING “PMKSY-AIBP IN ANDHRA PRADESH”. Details of projects under PMSKY-HKKP-CADWM scheme CCA Current Created stage of Sanctioned Central Assistance released and utilised in Crore S. in Th. completi State Project Name Districts Benefitted Central No. Ha on in % Assistance 2016 2017 2018 2019 2020 2021 2022- 2023- 2024 -17 -18 -19 -20 -21 -22 23 24 -25 Gundalakamm 1. Praksam 46.95 - - 3.64 - - - - - - 0.93 2.87 a 2. Tadipudi LIS West Godavari 100.58 - - 16.4 - - - - - - - - 3. Thotapally Srikakulam 58.51 - - 6.37 - - - - - - - - Andhra Tarakaram 4. Pradesh Vijayanagaram 10.15 - - 0.61 - - - - - - - - Teertasagaram 5. Musurumilli East Godavari 12.01 - - 4.49 - - - - - - - - 6. Pushkara LIS East Godavari 99.65 - - 35.85 - - - - - - - - 7. Yerracalva West Godavari 11.88 - - 1.82 - - - - - - - - 8. Dhansiri Udalguri 66.27 - - - - - - - - - 18.81 60.45 Kokrajhar, Chirang 9. Assam Champamati 13.85 - - 3.55 - 4 - - - - 6.59 100.04 (BTC), Bongaigaon 10. Borolia Baksa, Kamrup 16.52 - - - - - - - - - - - 11. Bihar Durgawati Kaimur, Rohtas 50.66 12.64 8.76 14.42 - - - - - - 19.13 62.71 2.565 12. Maniyari Tank Mungeli 22.63 - - 4.98 - - - - 5 6.71 58.25 49 Chhattisg Rajgarh, Janjgir 13. arh Kelo 40.51 - 11.78 - - - - - - - 2.1 9.19 Champa 14. Kharung Bilaspur 16.43 - - 4.95 - - - - 1.87 2.82 4.46 53.73 Talukas, Bicholim, 15. Goa Tillari 18.77 - - - - 3.84 - - - - 8.21 94.7 Bardez Vadodara, Bharuch, Narmada, Sardar Sarovar 681.6 690.4 347.0 16. Gujarat Panchmahal,Chhotaude 2510.88 - - - - - - 1048.79 76.9 Project 4 8 4 pur, Gandinagar,Ahmedaba 14CCA Current Created stage of Sanctioned Central Assistance released and utilised in Crore S. in Th. completi State Project Name Districts Benefitted Central No. Ha on in % Assistance 2016 2017 2018 2019 2020 2021 2022- 2023- 2024 -17 -18 -19 -20 -21 -22 23 24 -25 d, Mahesana, Patan,Banaskantha,Bot ad,Surendranagar,Morb i, Rajkot, Bhavnagar, Kutch(16) 17. Tral Lift Pulwama 3.01 - - 0.64 - 1.35 - - - - 1.23 86.98 PrakachikKho Jammu & 18. ws Canal Kargil 0.71 - - 0.21 - - - - - - 0.23 49.78 Kashmir (Kargil) 19. Rajpora Lift Pulwama. 1.52 - - 0.85 - 0.52 - - - - 0.59 100.51 Jharkhan East Singhbum, 20. Subernarekha 133.32 - - 0 - - - - - - - - d Saraikela, Kharsawan Upper Tunga Haveri, 2.973 21. Irrigation 44.11 21.04 - - - 7.56 - - - 17.06 68.48 Simoga,Davengere 5 Project Karnatak Sri Rameswar 22. Belgaum 22.71 10.38 2.5 3.87 - 1.09 - - - - 10.91 95.59 a Irrigation 23. Bhima LIS Kalaburagi 23.63 - 12.74 5.09 1.94 - - - - - 11.62 90.09 24. Karanja Bidar 11.23 - - 4.53 1.85 2.69 - - - - 3.35 59.95 25. NLBC Bijapur, Gulbarga 62.17 - - - - - - - - - - - Idukki, Ernakulam, 26. Kerala Muvattupuzha 48.72 - - - - 2.69 - - - - 13.28 71.89 Kottayam Sindh Project Shivpuri,Gwalior, Datia 27. 180.76 17.19 43.31 14.29 - 18.24 - - - - 88.53 97.75 Phase II & Bhind Indira Sagar Project Canal Khandwa, Khargone, 10.31 28. Phase - I & II 196.72 6.64 - - - - 3.75 3.125 8.44 36.02 40.94 Barwani 5 Madhya (km. 0 to km. Pradesh 142) 29. Mahi Project Dhar 64.28 2.34 8.72 6.05 - 3.98 - - - - 15.32 54.47 Barriyarpur 30. Chhatarpur 25.96 7.14 3.97 4.99 - - - - - - 30.82 162.18 LBC Bansagar Unit Rewa, Satna, Sidhi and 31. 224.3 22.35 15.97 18.24 - 11.87 1.64 - - - 110.77 114.15 2 Shahdol 15CCA Current Created stage of Sanctioned Central Assistance released and utilised in Crore S. in Th. completi State Project Name Districts Benefitted Central No. Ha on in % Assistance 2016 2017 2018 2019 2020 2021 2022- 2023- 2024 -17 -18 -19 -20 -21 -22 23 24 -25 32. Mahan Project Sidhi 27.26 2.14 6.38 3.09 - - - - - - 10.44 72.95 0.302 33. Pench Project Chhindwara, Seoni 51.22 5.35 8.6 5.9 - 4.25 0.444 - - 23.43 84.08 5 34. Sagad Project Vidisha 17.68 - 4.34 2.15 - 3.11 - - - - 8.69 91.72 Singhpur 35. Chhatarpur 10.36 2.06 2.2 0.66 - - - - - - 5.44 100 Project Sanjay sagar 36. Vidisha 18.09 - 4.02 - - 0.56 - - - - 8.9 92.05 (Bah) Project Mahuar 37. Shivpuri 16.79 2.92 5.28 0.6 - 0.87 - - - - 8.41 91.86 Project Indira Sagar Project Canal Khandwa, Khargone, 38. Phase – IV - - - - - - - - - - 6.69 - Barwani (km. 206 to km. 243) Omkareshwar Project Canal Phase-III Khandwa,Khargone,Dh 10.06 39. 323.57 9.61 - - - 0.44 2 2.5 2.5 66.56 46.43 (RBC km. ar 5 65.50 to km 142) Bargi Diversion Project Phase Jabalpur 41.18 - - 5.98 - - - - - - 0.16 0.75 - I(km. 16 to km 63) 40. Bargi Diversion Project Phase Jabalpur,Katani 60.87 - - 8.96 - - - - - - 0.7 2.19 - II(km. 63 to km 104) 6.378 41 Maharash Waghur Jalgaon 39.13 - 1.57 - - 9.07 - - - 13.5 75.09 4 tra 42. Bawanthadi Bhandara 7.41 - 0.52 - - - - 1.984 - - 1.81 72.4 16CCA Current Created stage of Sanctioned Central Assistance released and utilised in Crore S. in Th. completi State Project Name Districts Benefitted Central No. Ha on in % Assistance 2016 2017 2018 2019 2020 2021 2022- 2023- 2024 -17 -18 -19 -20 -21 -22 23 24 -25 (IS) 23 Lower 4.721 43. Parbhani, Jalana 72.26 - 8.1 - - 6.2 5.54 8.72 - 27.77 92.44 Dudhna 45 2.524 44. Tillari Sinsdhudurg 16.09 - 1.81 - - - - - 2.07 3.73 55.9 2 Lower 5.840 12.23 45. Wardha 98.85 15.17 - 5.46 - 9.55 - 3.735 42.9 70.09 Wardha 05 92 Lower 46. Dhule 13.05 - 2.15 3.97 - 2.52 - - - 0 6.36 93.74 Panzara NandurMadh 0.626 4.776 47. Sindhudurg 49.33 - - - - - 5.57 - 10.56 45.68 meshwarPh-II 55 5 Gosikhurd Nagpur, Bhandara, 2.536 39.44 33.40 48. 354.1 - - 9.38 - - - 69.42 39.42 (NP) Chandrapur 5 785 2 Upper Pen Nanded, Hingoli, 1.735 1.675 49. 34.83 - 3 - - 2.1 - - 12.67 73.26 Ganga Yavatmal 4 33 12.47 50. Bembla Yavatmal 64.49 - 5.99 3.51 - 6.13 2.615 - - 26.46 88.85 266 1.899 3.448 51. Tarali Satara 25.26 - 1.31 - - 2.94 - - 8.58 65.54 7 04 Dhom 52. Pune and Satara 8.18 - - 1.82 - - - - - - 3.93 97.02 Balkwadi 1.581 1.063 3.035 53. Arjuna Ratnagiri 11.19 - 0.81 - - 0.4 0.39 5.08 89.01 17 25 68 Upper 1.046 54. Beed 5.6 - 0.52 - - 0.57 - - - 2.8 100 Kundalika 3 55. Aruna Sindhudurg 9.6 - - - - - - - - - - - Krishna 56. Sangli. 67.38 - 3.82 - - 4.36 - - 6.348 - 31.08 58.84 Koyana Lift 0.121 57. Gadnadi Ratnagiri 6.1 - 0.03 - - - 0.27 - - 1.8 57.99 75 Sangola 58. Solapur 13.83 - 0.55 1.37 - - - - - - 2.1 30.52 Branch Canal 59. Khadakpurna Buldhana 31.46 - 2.65 - - 2.39 - - - - 7.21 45.87 60. Morna Satara 8.16 - - 0.28 - - - - - - 1.52 35.94 17CCA Current Created stage of Sanctioned Central Assistance released and utilised in Crore S. in Th. completi State Project Name Districts Benefitted Central No. Ha on in % Assistance 2016 2017 2018 2019 2020 2021 2022- 2023- 2024 -17 -18 -19 -20 -21 -22 23 24 -25 (Gureghar) 61. Lower Pedhi Amravati, Akola 20.5 - - - - - - - - - - - 62. Kudali Satara 10.7 - - - - - - - - - - - Imphal, Senapati, 63. Thoubal 45.37 - - - - - 1.6 - 5.88 - 12.75 77.1 Thoubal,Ukrul Manipur Dolaithabi 64. Imphal, Senapati, 15.05 - - - - - 0.485 - 1.857 - 4.32 78.55 Barrage Lower 65. Noapada 51.67 24.37 - - - 12.99 - - - - 29.9 100.01 Indra(KBK) Upper 66. Indravati(KB Kalahandi 44.03 8.5 30.83 - - - - - - - 23.83 99.98 K) 67. Rukura-Tribal Kalahandi 10.21 2.41 0.8 - - 3.11 - - - - 5.65 98.21 68. Subernarekha Sundargarh 126.03 - 16.28 - - - - - - - 21.22 30.81 Odisha Anandpur Barr. Ph.-I 69. /Integrated Keonjhar, Bhadrak 101.57 - 1.82 - - 1.17 - - - - 3 5 Anandpur Barr. 70. RET irrigation Kalahandi 16.55 - 4.11 - - 9.11 - - - - 10.04 118.15 71. Kanupur Kaeonjhar 53.44 - 1.89 3.65 - 0 - - - - 2.89 9.77 72. Telengiri Koraput 16.72 - 2.84 - - 8.09 - - - - 9.95 99.98 Rehabilitation of 1st Patiala Bhathinda, Mansa, 73. Punjab Feeder and 228.87 - - - - 18.08 - 9 55 20 101.72 71.3 Sangrur and Barnala Kotla Branch Project Narmada 74. Jalore & Barmer 54.06 - - - - 7.02 13.9 8.42 - 7.525 - - Canal Rajasthan Mod. of Gang 47.35 12.36 75. Sriganganagar 170.76 - 2.48 7.43 10.22 24.24 22.12 1.907 103.48 87.71 Canal 8 09 J. ChokhaRao Warangal, Nalgonda, 76. 380.35 - 10.22 - - - - - - - 10.68 4.29 Telangana LIS Karimnagar, Medak 77. SriKomaramB Komaram, Bheem 19.1 - - 5.89 - - - - - - - - 18CCA Current Created stage of Sanctioned Central Assistance released and utilised in Crore S. in Th. completi State Project Name Districts Benefitted Central No. Ha on in % Assistance 2016 2017 2018 2019 2020 2021 2022- 2023- 2024 -17 -18 -19 -20 -21 -22 23 24 -25 heem project Ashifabad Gollavagu 78. Mancherial 7.19 - - 1.03 - - - - - - - - Project Rallivagu 79. Mancherial 1.47 - - 0.28 - - - - - - - - project Mathadivagu 80. Adilabad 6.32 - - 1.8 - - - - - - - - Project Peddavagu @ 81. Neelwai Mancherial 6.67 - - 1.99 - - - - - - - - project Palemvagu 82. Khammam 2.6 - - 0.51 - - - - - - - - project Peddavagu @ Khammam, Bheem 83. 12.2 - - - - - - - - - - - Jagannathpur Ashifabad Warangal,Mahbubabad, 84. SRSP St.II Khammam, 103.24 - - 11.56 - - - - - - - - Suryapet,Jangaon Rajiv Bheema Mahaboobnagar, 85. 114.81 - - - - - - - - - - - L.I. Scheme Wanaparthy Indiramma 86. Flood Flow Warangal 48.26 - - 3.06 - - - - - - - - Canal 87. Arjunsahayak Mahoba, Hamirpur 77.87 - - - - - - - - - - - Baharaich, Basti, Uttar Gonda, Shravasti, SaryuNahar 88. Pradesh Balrampur,Sidharth 837.06 - - - 150 - - - - - 7.32 1.52 (NP) Nagar, Sant Kabir Nagar 19ANNEXURE -I(c) ANNEXURE REFERRED TO IN REPLY TO PART (a) to (d) OF UNSTARRED QUESTION NO. 2093 TO BE ANSWERED IN LOK SABHA ON 12.02.2026 REGARDING “PMKSY-AIBP IN ANDHRA PRADESH”. Details of Surface Minor Irrigation (SMI) &Repair, Renovation & Restoration (RRR) Scheme under PMSKY-HKKP Surface Minor Irrigation (SMI) Scheme Status of CA released ( Rs in Crore ) PMKSY 1.0 PMKSY 2.0 2016- Sl.No. State 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 17 1. Andhra Pradesh - - - - - - - - - - 2. Arunachal Pradesh 20.52 10.26 22.25 17.49 104.69 142.73 41.95 138.70 77.27 173.39 3. Assam 87.86 375.77 428.34 414.06 205.62 275.20 71.54 52.09 125.03 96.55 4. Bihar 32.28 16.14 10.65 4.48 5. Himachal Pradesh 1.13 49.28 66.20 147.91 59.80 60.31 40.50 142.30 38.63 99.25 6. J&K & Ladakh 104.48 31.71 68.58 97.59 7. Karnataka 30.00 37.50 37.50 111.53 8. Manipur 20.00 22.23 69.26 75.98 26.46 19.85 26.79 9. Meghalaya 44.44 31.50 22.22 57.07 100.47 46.52 74.21 57.09 51.79 10. Mizoram 8.25 11.34 7.65 4.66 0.81 4.42 11. Nagaland 18.50 9.25 35.33 20.46 35.99 40.89 21.01 87.10 47.68 19.72 12. Sikkim 9.00 16.61 9.13 9.33 9.71 12.88 29.25 9.40 43.89 13. Tripura 9.00 14. Uttarakhand 32.40 61.00 31.78 29.63 17.20 93.40 76.00 48.68 Repair, Renovation & Restoration (RRR) of WBs Scheme Status of CA released ( Rs in Crore ) PMKSY 1.0 PMKSY 2.0 2016- Sl No. State 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 17 1. Andhra Pradesh 2.70 9.00 2. Assam 54.00 3. Bihar 6.26 11.82 8.62 7.28 7.78 12.48 4. Chattishgarh 5. Gujarat 8.81 3.16 2.57 6. Manipur 24.26 3.70 7. Meghalaya 2.66 8. Nagaland 5.61 10.13 3.75 9. Odisha 3.00 34.54 11.10 56.25 46.67 57.00 2010. Rajasthan 14.30 11.96 9.30 10.46 35.99 40.50 11. Tamil Nadu 7.03 16.75 1.25 17.43 27.70 49.60 26.98 41.91 12. Telangana 59.68 Status of year wise Irrigation Potential (IP) created /Restored ( IP in Thousand hectare ) Surface Minor Irrigation (SMI) Scheme PMKSY 1.0 PMKSY 2.0 Sl No. State 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 1. Andhra Pradesh - - - - - - - - - 2. Arunachal Pradesh 1.66 0.51 3.31 0.00 4.82 4.54 2.82 4.87 3.96 3. Assam 47.12 10.56 13.39 11.00 23.06 3.20 11.39 17.57 4. Bihar 14.07 9.70 8.66 2.15 0.07 0.00 5. Chhattisgarh 3.57 0.80 0.50 6. Himachal Pradesh 1.61 2.15 5.46 7.76 3.62 1.62 0.35 10.94 7. J&K & Ladakh 7.12 2.71 12.34 2.24 8.69 1.17 8. Jharkhand 0.41 1.08 4.60 9. Karnataka 3.48 8.25 10. Madhya Pradesh 31.83 11. Manipur 1.00 0.80 0.70 5.79 9.64 12. Meghalaya 5.42 0.88 3.94 3.66 4.76 1.87 5.94 3.37 13. Mizoram 0.16 1.26 0.49 0.04 0.22 14. Nagaland 0.48 0.00 2.02 2.40 3.10 4.84 0.52 15. Sikkim 2.50 0.60 0.25 0.83 1.00 16. Uttarakhand 4.06 2.16 1.96 4.61 2.58 1.94 3.60 0.36 8.65 Repair, Renovation & Restoration (RRR) of WBs Scheme ( IP in Thousand hectare ) SlNo. State 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 1. Andhra Pradesh 1.47 2. Bihar 17.87 3.92 0.00 0.02 3. Gujarat 0.14 1.69 0.72 1.15 0.20 4. Madhya Pradesh 8.00 5. Manipur 0.00 0.00 0.62 6. Meghalaya 0.58 0.27 0.03 7. Odisha 21.00 2.51 1.46 0.45 2.50 12.44 8. Rajasthan 7.03 0.07 2.85 1.76 3.62 3.68 9. Tamil Nadu 1.73 0.72 0.74 0.61 0.82 0.10 1.56 5.99 1.69 10. Telangana 2.54 8.51 3.62 0.80 0.45 0.39 9.24 11. Uttar Pradesh 2.35 21ANNEXURE -I(d) ANNEXURE REFERRED TO IN REPLY TO PART (a) to (d) OF UNSTARRED QUESTION NO. 2093 TO BE ANSWERED IN LOK SABHA ON 12.02.2026 REGARDING “PMKSY-AIBP IN ANDHRA PRADESH”. Details of State/UT-wise projects sanctioned & Central fund released under WDC-PMKSY 2.0 (Rs. in Crore) Area S. No. States No of projects Total Project cost Central share Central Funds released (lakh ha) 1 Andhra Pradesh 59 2.44 555.31 333.19 228.45 2 Arunachal Pradesh 68 1.51 422.56 380.31 321.65 3 Assam 38 1.64 371.36 334.23 226.91 4 Bihar 35 1.72 440.97 264.58 171.96 5 Chhattisgarh 45 2.50 613.66 368.20 221.71 6 Goa 5 0.20 55.96 33.57 11.15 7 Gujarat 51 2.92 687.81 412.68 284.60 8 Haryana 9 0.31 80.59 48.36 20.47 9 Himachal Pradesh 35 0.67 187.24 168.51 99.70 10 Jharkhand 30 1.48 393.53 236.12 148.44 11 Karnataka 78 3.29 769.67 461.80 410.83 12 Kerala 6 0.26 73.26 43.95 32.94 13 Madhya Pradesh 91 5.49 1207.35 724.41 538.61 14 Maharashtra 140 5.26 1251.14 750.68 511.28 15 Manipur 13 0.59 164.33 147.90 45.00 16 Meghalaya 32 0.63 175.64 158.08 139.22 17 Mizoram 20 0.50 138.88 124.99 118.60 18 Nagaland 14 0.50 140.06 126.05 80.64 19 Odisha 60 3.24 842.06 505.24 401.41 20 Punjab 7 0.29 80.83 48.50 18.77 21 Rajasthan 159 8.05 1990.36 1194.22 769.95 22 Sikkim 9 0.30 84.98 76.49 34.32 23 Tamil Nadu 34 1.66 368.66 221.20 184.71 24 Telangana 35 1.47 368.07 220.84 112.76 25 Tripura 19 0.32 89.60 80.64 68.52 26 Uttar Pradesh 56 2.64 580.67 348.39 177.62 22Area S. No. States No of projects Total Project cost Central share Central Funds released (lakh ha) 27 Uttarakhand 15 0.84 232.26 209.03 96.38 28 West Bengal 27 1.29 350.60 210.36 140.60 29 UT of J&K 19 0.69 194.58 194.58 103.19 30 UT of Ladakh 11 0.22 60.86 60.86 29.92 The list of watershed development projects approved under the WDC-PMKSY2.0 in Andhra Pradesh No. of Funds utilized in Crore Funds Projects Funds Irrigation Sl. released District sanctioned Sanctioned/Allocated/approved 2021- 2022- 2023- 2024- 2025- Potential No. in during in Crore 22 23 24 25 26 created Crore FY2021-22 ALLURI 1 1 11 0 1.25 2.03 1.48 2.52 SITHARAMA RAJU 2 ANAKAPALLI 2 22 0 1.46 1.98 5.63 2.4 Under 3 ANANTHAPURAMU 7 63.47 0 7.81 7.71 11.24 12.68 WDC- PMKSY 4 ANNAMAYYA 10 103.88 0 9.15 16.01 15.99 27.14 2.0, an 5 CHITTOOR 7 60.59 0 4.81 15.19 10.9 14.03 area of 6 KURNOOL 5 53.41 0 6.11 7.9 8.7 11.61 23,780 7 NANDYAL 2 21.48 380.76 0 2.88 1.23 4.93 5.54 Ha. has PARVATHIPURAM 8 1 10.62 0 1.53 2.32 1.78 1.87 been MANYAM brought 9 PRAKASAM 8 67.48 0 6.16 8.41 16.32 15.03 under 10 SRI SATHYA SAI 3 25.28 0 3.43 3.09 8.37 5.36 protective 11 VISAKHAPATNAM 1 11 0 1.16 2.75 0.61 1.56 irrigation 12 VIZIANAGARAM 3 17.96 0 1.28 1.95 4.8 2.49 13 YSR KADAPA 9 87.15 0 11.03 11.85 10.87 15.69 ****** 23