GOVERNMENT OF INDIA
MINISTRY OF NEW AND RENEWABLE ENERGY
LOK SABHA
UNSTARRED QUESTION NO. 4094
ANSWERED ON 12.08.2026
PORTAL FOR PM-KUSUM
4094. Dr. RAJESH MISHRA
Will the minister of new and renewable energy be pleased to state:
(a) the percentage of achievement of the Pradhan Mantri-Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-
KUSUM) at the national level;
(b) whether the online portal created for solar pump subsidy applications under the PM-KUSUM remain closed
most of the time on account of server problems and other reasons as a result, the rural farmers get deprived of
registration and if so, the details thereof;
(c) whether the targets set by the Government under PM-KUSUM for Madhya Pradesh during the years 2024-
25 and 2025-26 have been achieved particularly in Sidhi Lok Sabha Constituency and if so, the details thereof;
(d) whether the Government is formulating any plan to upgrade the national database to maintain a 24 hour
service with an open-ended window for the convenience of the farmers and if so, the details thereof; and
(e) whether there is any scheme for offline applications in villages where network connectivity is unavailable
and if so, the details thereof?
ANSWER
THE MINISTER OF STATE FOR NEW & RENEWABLE ENERGY AND POWER
(SHRI SHRIPAD YESSO NAIK)
(a) The state wise progress under PM KUSUM is placed at Annexure I. As on 31.07.2026, total of 15.81 GW has been
installed under the scheme.
(b) PM-KUSUM is a demand-driven scheme, and capacities are allocated based on the demand raised by the state. The
beneficiary selection through respective state portals and implementation of the scheme is the responsibilities of the State
Implementing Agency (SIA).
The National portal of PM KUSUM is for the effective monitoring of the scheme where state wise solar pumps are
synced based on the installation and as per the provisions of the scheme guidelines.
(c) The Ministry allocate targets to the SIA which in turns allocate to various districts, as per their demand.
As reported by the SIA for the state, the progress under Sidhi Lok Sabha Constituency is as follows:
Applications Installed
received
Component A 26 1.5
(MW)
Component B 706 334
(number of pumps)
Component C (number NIL NIL
of pumps)
(d) & (e) No proposal under consideration.
*****Annexure I referred to in reply to part (a) of Lok Sabha Unstarred Question No. 4094
for 12.08.2026
Progress under PM KUSUM scheme till 31.07.2026
Component-A (MW) Component-B (Nos) Component-C (Nos)
NS o.
. State Name Sanctione Installed Sanctioned Installed Sanctioned Insta lled Sanctioned Insta lled Insta lled
d (IPS) (FLS)
(IPS) (FLS) (Total)
Arunachal
1 0 0 700 699 0 0 0 0 0
Pradesh
2 Assam 2 0 4000 1695 0 0 0 0 0
3 Chhattisgarh 366 19 0 0 0 0 10523 622 622
4 Bihar 0 0 0 0 0 0 140300 6070 6070
5 Gujarat 175 0 22792 22792 0 0 467114 304948 304948
6 Goa 24 4 900 200 0 0 11000 700 700
7 Haryana 158 75.21 197655 195521 0 0 2899 0 0
Himachal
8 100 100 1270 1103 0 0 0 0 0
Pradesh
Jammu &
9 0 0 5000 4873 0 0 0 0 0
Kashmir
10 Jharkhand 0 0 86985 74201 0 0 0 0 0
11 Karnataka 0 0 41365 29513 0 0 763588 150490 150490
12 Kerala 0 0 8 8 9448 4063 22368 11809 15872
13 Ladakh 0 0 1400 315 0 0 0 0 0
14 Madhya Pradesh 1401 230.66 59400 26478 0 0 175000 71934 71934
15 Maharashtra 260 21 575000 559409 0 0 875000 875000 875000
16 Manipur 0 0 450 160 0 0 0 0 0
17 Meghalaya 0 0 2735 98 0 0 0 0 0
18 Mizoram 0 0 1700 613 0 0 0 0 0
19 Nagaland 0 0 265 265 0 0 0 0 0
20 Odisha 90 6 18441 16052 0 0 5223 0 0
21 Puducherry 0 0 72 0 0 0 0 0 0
22 Punjab 0 0 18048 17928 186 25 0 0 25
23 Rajasthan 5618 1442.43 134752 127639 2138 2138 400000 229994 232132
24 Tamil Nadu 3 3 5187 5186 0 0 0 0 0
25 Telangana 1797 84 7000 0 28000 0 0 0 0
26 Tripura 5 0 11114 9401 3600 1375 0 0 1375
27 Uttar Pradesh 1 1 107266 71538 12000 8654 370000 2477 11131
28 Uttarakhand 0 0 3685 2980 0 0 0 0 0
29 West Bengal 0 0 0 0 20 4 0 0 4
Andaman &
30 0 0 0 0 0 0 0 0 0
Nicobar Islands
31 Andhra Pradesh 0 0 0 0 0 0 293587 0 0
Total 10000 1986.30 1307190 1168667 55392 16259 3536602 1654044 1670303