See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF NEW AND RENEWABLE ENERGY
RAJYA SABHA
UNSTARRED QUESTION NO. 3662
ANSWERED ON 24.03.2026
PROGRESS OF PM-KUSUM SCHEME
3662 # SHRI PRADIP KUMAR VARMA
WILL THE MINISTER OF NEW AND RENEWABLE ENERGY BE PLEASED TO STATE:
(a) the total number of solar agricultural pumps and solar plants installed under the Pradhan Mantri-Kusum
(PM-KUSUM) Scheme up to December 2025, along with the installed capacity in megawatts;
(b) the total number of farmers/entrepreneurs benefited under the scheme up to the said period, along with
the year-wise and State-wise amount of central assistance disbursed; and
(c) whether any modification or expansion has been made in the subsidy structure, target setting or
implementation guidelines under components-A, B and C of the scheme, if so, the details thereof?
ANSWER
THE MINISTER OF STATE FOR NEW & RENEWABLE ENERGY AND POWER
(SHRI SHRIPAD YESSO NAIK)
(a) PM-KUSUM is a demand-driven scheme, and capacities are allocated based on the demand
raised by the state and milestones achieved. The responsibility of beneficiary selection and
implementation is of the State Implementing Agency (SIA).
As reported by SIAs, details of solar agriculture pumps and solar plants installed, along with
installed capacity under PM-KUSUM till 31.12.2025 is as follows:
Sanctioned Installation MW
Component-A
(Solar power 10,000 720.91 720.91
plants in MW)
Component-B
13,15,190 9,75,227 4398.57
(No of Pumps)
Component-C
(No of Pumps 35,82,884 12,01,552 5829.98
& MW)
(b) The total numbers of farmers benefited in the country through the PM-KUSUM scheme as on
31.12.2025 is 21,77,369. The State/ UT-wise financial year-wise details of fund released under the
PM-KUSUM scheme is placed at Annexure I
(c) The Ministry has simplified the procedures and issued comprehensive revised guidelines on
17.01.2024 for ease of implementation of the scheme. The details of financial assistance provided
under the scheme is placed at Annexure II.
*****Annexure I referred to in reply to part (b) of Rajya Sabha Unstarred Question No. 3662# for 24.03.2026
State/ UT-wise financial year-wise details of fund Released under PM-KUSUM Scheme
(As on 31.12.2025)
(Amount in Rs. Crore)
S. No. State Name 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 Total
1. Arunachal Pradesh 0.00 0.00 0.00 0.82 2.12 1.91 0.00 4.84
2. Assam 0.00 0.00 0.00 0.00 0.00 0.00 1.41 1.41
3. Goa 0.00 0.00 0.00 0.00 0.00 0.00 0.43 0.43
4. Gujarat 0.00 3.95 0.00 7.83 28.72 59.95 230.42 330.86
5. Haryana 0.00 51.33 161.12 137.95 429.78 303.40 223.90 1,307.48
6. Himachal Pradesh 0.00 2.80 0.00 5.85 0.00 1.73 1.40 11.78
7. Jammu & Kashmir 0.00 0.00 0.00 15.69 0.00 12.90 0.00 28.59
8. Jharkhand 0.00 16.05 0.00 20.04 2.36 48.73 21.45 108.62
9. Karnataka 0.00 1.26 0.00 0.00 2.38 0.89 77.46 81.99
10. Kerala 0.00 0.00 0.00 0.00 28.53 1.72 18.98 49.23
11. Ladakh 0.00 0.00 0.00 0.00 0.00 0.00 1.53 1.53
12. Madhya Pradesh 71.07 0.00 0.00 0.00 0.80 0.00 7.95 79.82
13. Maharashtra 0.00 0.00 9.60 247.60 330.21 1,619.00 2,279.63 4,486.03
14. Manipur 0.00 0.36 0.00 0.23 0.17 0.17 0.78 1.71
15. Meghalaya 0.00 0.28 0.00 0.00 0.31 0.00 0.00 0.59
16. Mizoram 0.00 0.00 0.00 0.00 0.00 0.84 1.73 2.57
17. Nagaland 0.00 0.00 0.00 0.20 0.18 0.00 0.66 1.04
18. Odisha 0.00 0.77 0.00 0.00 3.44 0.00 4.09 8.29
19. Punjab 0.00 8.28 23.70 31.11 5.41 13.09 16.24 97.82
20. Rajasthan 68.98 52.06 153.49 247.63 49.41 295.20 90.44 957.21
21. Tamil Nadu 11.21 0.00 20.30 0.00 2.59 6.48 5.71 46.29
22. Tripura 0.00 3.96 7.36 0.12 17.81 9.31 7.48 46.04
23. Uttar Pradesh 0.00 15.34 13.73 82.30 92.13 173.01 43.37 419.88
24. Uttarakhand 0.00 0.00 0.00 4.00 0.00 15.60 7.10 26.71Annexure II referred to in reply to part (c) of Rajya Sabha Unstarred Question No. 3662# for 24.03.2026
Financial Assistance under PM-KUSUM Scheme
Component Financial Assistance available
Component A Procurement Based Incentive (PBI) is provided to the DISCOMs
@ 40 paise/kWh or Rs.6.60 lakhs/MW/year, whichever is lower,
for five years. There is no CFA under this Component.
Component B • CFA of 30% of the benchmark cost issued by MNRE or the
Component C (Individual Pump prices of the systems discovered in the tender, whichever is
Solarisation) lower is provided.
• However, in North Eastern States including Sikkim, Jammu &
Kashmir, Ladakh, Himachal Pradesh and Uttarakhand,
Lakshadweep and A&N Islands, CFA of 50% of the
benchmark cost issued by MNRE or the prices of the systems
discovered in the tender, whichever is lower, is provided.
• In addition, the respective state/UT has to provide at least 30%
financial support. Balance cost is to be contributed by
beneficiary.
• Component B and Component C (IPS) of PM KUSUM
scheme can also be implemented without State share of 30%.
The Central Financial Assistance will continue to remain 30%
and rest 70% will be borne by the farmer.
Component C (Feeder Level For agriculture feeder solarization, CFA of Rs 1.05 Crore per MW
Solarisation) (1.75 Cr. per MW for NER/ Hilly/ Islands) is provided. There is
no mandatory requirement of financial support from participating
State/UT. The feeder solarisation can be implemented in CAPEX
or RESCO mode.