GOVERNMENT OF INDIA
MINISTRY OF POWER
RAJYA SABHA
UNSTARRED QUESTION NO.1102
ANSWERED ON 09.02.2026
PROGRESS UNDER REVAMPED DISTRIBUTION SECTOR SCHEME
1102 SHRI RYAGA KRISHNAIAH:
SHRI LAHAR SINGH SIROYA:
Will the Minister of POWER be pleased to state:
(a) the details and objectives of the Revamped Distribution Sector Scheme (RDSS);
(b) the current status and achievement of RDSS implementation and number of States that
have adopted the said scheme; and
(c) the total funds allocated under RDSS, State-wise, details thereof; and
(d) whether advanced technologies for reducing the distribution losses are being
implemented under the scheme; and
(e) if so, the details thereof?
A N S W E R
THE MINISTER OF STATE IN THE MINISTRY OF POWER
(SHRI SHRIPAD NAIK)
(a) to (c): Government of India (GoI) launched the Revamped Distribution Sector Scheme
(RDSS) in July 2021 with the objective of improving the quality and reliability of power supply to
consumers through a financially sustainable and operationally efficient distribution Sector. The
scheme has an outlay of Rs. 3,03,758 Cr. and estimated Gross Budgetary Support (GBS) from
Central Government of Rs. 97,631 Cr. Under the scheme, financial assistance is being provided to
the Distribution Utilities (excluding Private Sector Utilities) for loss reduction infrastructure works
and smart metering works. Projects worth Rs. 1.53 lakh crore for loss reduction infrastructure and
Rs. 1.31 lakh crore for smart metering works have been sanctioned under the scheme.
Sanctioned Loss reduction works include replacement of old/frayed conductors,
upgradation/augmentation of Distribution transformers (DT)/sub-stations, feeder segregation works
etc. Further, on-grid electrification works have been sanctioned for 13,65,139 households wherever
found feasible. This includes households belonging to Particularly Vulnerable Tribal Group (PVTG)
identified under PM-JANMAN (Pradhan Mantri Janjati Adivasi Nyaya Maha Abhiyan), households
belonging to Scheduled Tribes identified under DA-JGUA (Dharti Aabha Janjatiya Gram Utkarsh
Abhiyan), households belonging to Scheduled Caste identified under Pradhan Mantri Anusuchit
Jaati Abhyuday Yojna (PM-AJAY) and households in border areas under Vibrant Village
Programme (VVP). Overall, the physical progress of Loss reduction works achieved till date is
~37%.Further, smart metering works have been sanctioned for 19.79 crore consumers, 2.05 lakh
feeders and 52.53 lakh Distribution Transformers as part of Advanced Metering Infrastructure
(AMI). Till date, smart meters have been installed for 4.04 crore consumers, 1.63 lakh feeders and
13.57 lakh Distribution Transformers under the scheme. Overall, 5.59 crore smart meters have been
installed across the country under various schemes.
Up to January, 2026, funds amounting to Rs. 38,803 cr. have been released under RDSS as
per the scheme guidelines. The release of funds under the scheme is contingent on improvement in
operational and financial performance of the utilities which, in addition to other initiatives taken by
GoI, has helped in bringing discipline in payment of Government subsidies and Govt. department
dues to the utilities, regular issuance of tariff orders, timely publishing of accounts, non-creation of
regulatory assets, etc. As a result of collective efforts of the Centre and States/ UTs, the Aggregate
Technical and Commercial (AT&C) loss of distribution utilities at national level have reduced from
21.91% in FY21 to 15.04% in FY25 and ACS-ARR Gap has reduced from Rs. 0.69/kWh in FY21
to Rs. 0.06/kWh in FY25.
State/UT-wise physical and financial progress of works sanctioned under RDSS (up to January,
2026) is at Annexure (I to III).
(d) & (e) : RDSS aims to improve the efficiency and financial health of power distribution utilities by
leveraging advanced technologies. Key technologies include:
i. Implementation of SCADA (Supervisory Control and Data Acquisition)/ DMS (Distribution
Management System) works in 394 towns amounting to Rs. 2,389 Cr sanctioned under the
scheme. This will enable remote monitoring and control, help reduce outages and improve
response times to faults, thereby improving the efficiency and reliability of power distribution
networks.
ii. Smart meters, as part of Advanced Metering Infrastructure (AMI), provide real-time
consumption data, helping consumers manage their usage and enabling utilities to detect and
curb electricity theft. By analyzing data collected from smart meters, utilities can identify areas
of high loss, optimize grid operations, and improve billing and collection efficiency.
iii. Under the scheme, smart distribution works amounting to Rs 8,052 crore have been sanctioned
which includes works like GIS substations, Distribution Transformer (DT) health management,
undergrounding of HT/LT lines and system augmentation/ modernization works.
**********ANNEXURE-I
ANNEXURE REFERRED IN REPLY TO PARTS (a) TO (c) OF UNSTARRED QUESTION NO.
1102 ANSWERED IN THE RAJYA SABHA ON 09.02.2026
*************
Details of funds sanctioned under RDSS
Sanctioned cost (Rs. In Cr.)
State/UT
Smart metering Loss Reduction Total
Andaman and Nicobar Islands 54 462 516
Andhra Pradesh 4,128 10,708 14,836
Arunachal Pradesh 184 1,042 1,226
Assam 4,050 3,395 7,444
Bihar 2,021 10,559 12,581
Chhattisgarh 4,105 4,021 8,126
Delhi 13 324 337
Goa 469 247 716
Gujarat 10,642 6,089 16,731
Haryana 0 6,794 6,794
Himachal Pradesh 1,788 2,327 4,116
Jammu & Kashmir 1,064 5,034 6,098
Jharkhand 858 3,468 4,326
Karnataka 0 45 45
Kerala 8,231 3,108 11,339
Ladakh 0 876 876
Madhya Pradesh 8,911 9,738 18,649
Maharashtra 15,215 17,238 32,453
Manipur 121 627 748
Meghalaya 310 1,232 1,542
Mizoram 182 322 503
Nagaland 208 466 674
Puducherry 251 84 335
Punjab 5,769 3,873 9,642
Rajasthan 9,715 18,693 28,408
Sikkim 97 420 518
Tamil Nadu 19,235 9,568 28,803
Telangana 0 120 120
Tripura 319 598 917
Uttar Pradesh 18,956 21,782 40,739
Uttarakhand 1,106 2,371 3,477
West Bengal 12,670 7,223 19,893
Total 1,30,671 1,52,854 2,83,525
************ANNEXURE-II
ANNEXURE REFERRED IN REPLY TO PARTS (a) TO (c) OF UNSTARRED QUESTION NO.
1102 ANSWERED IN THE RAJYA SABHA ON 09.02.2026
*************
Physical progress of loss reduction works under RDSS
State Physical Progress
Andaman and Nicobar 0%
Andhra Pradesh 28%
Arunachal Pradesh 22%
Assam 53%
Bihar 49%
Chhattisgarh 51%
Delhi 0%
Goa 82%
Gujarat 51%
Haryana 16%
Himachal Pradesh 4%
Jammu and Kashmir 38%
Jharkhand 48%
Kerala 28%
Ladakh 8%
Madhya Pradesh 51%
Maharashtra 38%
Manipur 17%
Meghalaya 21%
Mizoram 51%
Nagaland 13%
Puducherry 29%
Punjab 18%
Rajasthan 16%
Sikkim 18%
Tamil Nadu 12%
Tripura 52%
Uttar Pradesh 43%
Uttarakhand 20%
West Bengal 58%
Total 37.05%
************ANNEXURE-III
ANNEXURE REFERRED IN REPLY TO PARTS (a) TO (c) OF UNSTARRED QUESTION NO.
1102 ANSWERED IN THE RAJYA SABHA ON 09.02.2026
*************
State/UT-wise Smart Metering works sanctioned and installed under RDSS (upto Jan., 2026)
Consumer Distribution Feeder
Total Meters
Meters(Nos.) Transformer Meters Meters(Nos.)
State/UTs
(Nos.)
Sanctioned Installed Sanctioned Installed Sanctioned Installed Sanctioned Installed
Andaman and 83,573 - 1,148 - 114 - 84,835 -
Nicobar
Andhra 56,08,846 22,88,414 2,93,140 85,577 17,358 8,438 59,19,344 23,82,429
Pradesh
Arunachal 2,87,446 52,179 10,116 311 688 263 2,98,250 52,753
Pradesh
Assam 63,64,798 48,38,045 77,547 57,731 2,782 2,879 64,45,127 48,98,655
Bihar 23,50,000 19,93,875 2,50,726 1,84,644 6,427 5,799 26,07,153 21,84,318
Chhattisgarh 59,62,115 33,84,390 2,10,644 70,888 6,720 5,963 61,79,479 34,61,241
Delhi - 766 - 2,755 - 3,521 -
Goa 7,41,160 - 8,369 - 827 650 7,50,356 650
Gujarat 1,64,87,100 36,75,132 3,00,487 1,36,242 - 1,67,87,587 38,11,374
Himachal 28,00,945 7,67,964 39,012 23,328 1,951 1,650 28,41,908 7,92,942
Pradesh
Jammu and 14,07,045 5,57,854 88,037 17,147 2,608 1,445 14,97,690 5,76,446
Kashmir
Jharkhand 13,41,306 5,90,010 19,512 936 1,226 842 13,62,044 5,91,788
Kerala 1,32,89,361 1,69,263 87,615 217 6,025 2,904 1,33,83,001 1,72,384
Madhya 1,29,80,102 31,83,005 4,19,396 1,44,110 29,708 25,636 1,34,29,206 33,52,751
PMraadheasrahs htra 2,35,64,747 85,34,398 4,10,905 2,69,116 29,214 30,790 2,40,04,866 88,34,304
Manipur 1,54,400 33,287 11,451 664 357 236 1,66,208 34,187
Meghalaya 4,60,000 - 11,419 - 1,324 - 4,72,743 -
Mizoram 2,89,383 27,919 2,300 393 398 295 2,92,081 28,607
Nagaland 3,17,210 30,571 6,276 845 392 105 3,23,878 31,521
Puducherry 4,03,767 11,747 3,105 7 180 - 4,07,052 11,754
Punjab 87,84,807 - 1,84,044 - 12,563 - 89,81,414 -
Rajasthan 1,42,74,956 23,76,944 4,34,608 31,015 27,128 25,391 1,47,36,692 24,33,350
Sikkim 1,44,680 80,767 3,229 1,469 633 471 1,48,542 82,707
Tamil Nadu 3,00,00,000 - 4,72,500 - 18,274 9,746 3,04,90,774 9,746
Tripura 5,47,489 1,61,835 14,908 6,199 473 473 5,62,870 1,68,507
Uttar Pradesh 2,69,79,056 66,92,131 15,26,801 2,66,836 20,874 25,466 2,85,26,731 69,84,433
Uttarakhand 15,87,870 4,40,201 59,212 8,084 2,602 2,496 16,49,684 4,50,781
West Bengal 2,07,17,969 5,51,499 3,05,419 51,150 11,874 10,811 2,10,35,262 6,13,460
RDSS Total 19,79,30,131 4,04,41,430 52,52,692 13,56,909 2,05,475 1,62,749 20,33,88,298 4,19,61,088
Note: Upto Jan., 2026, 4.19 Cr smart meters have been installed under RDSS and 5.59 Cr smart meters
under various schemes including RDSS.
***************