GOVERNMENT OF INDIA
MINISTRY OF RURAL DEVELOPMENT
DEPARTMENT OF RURAL DEVELOPMENT
LOK SABHA
UNSTARRED QUESTION NO. 1570
ANSWERED ON 28/07/2026
PROJECTS UNDER PMGSY IN ASSAM
1570. Md. Rakibul Hussain:
Will the Minister of RURAL DEVELOPMENT be pleased to state:
(a) the number of road works sanctioned, completed and currently
under implementation under the Pradhan Mantri Gram Sadak
Yojana (PMGSY) in the Dhubri Lok Sabha Constituency of Assam
during the last five years, district-wise;
(b) the total funds sanctioned, released and utilized for the projects
during the said period;
(c) whether the Government is aware that several PMGSY roads in
the Dhubri Lok Sabha Constituency remain incomplete or have
suffered damage due to recurrent floods and river erosion, if so,
the details thereof and the reasons for the delay in completion
or restoration; and
(d) the corrective measures taken or proposed to ensure the timely
completion, quality maintenance and climate-resilient
reconstruction of PMGSY roads in the Dhubri Lok Sabha
Constituency?
ANSWER
MINISTER OF STATE IN THE MINISTRY OF RURAL DEVELOPMENT
(SHRI KAMLESH PASWAN)
(a): Dhubri Lok Sabha Constituency of Assam consists of four
Districts namely Dhubri, some parts of Barpeta, Bongaigaon and
Goalpara. District-wise details of road and bridge works sanctioned
and completed during last five years and works currently under
progress under Pradhan Mantri Gram Sadak Yojana (PMGSY) in the
Dhubri Lok Sabha Constituency are below:
Page 1 of 4Sanctioned Completed Ongoing
Roa Roa Roa
No. No. No.
d No. of d No. of d No. of
District of of of
leng bridge leng bridge leng bridge
roa roa roa
th s th s th s
ds ds ds
(km) (km) (km)
Barpeta
6 35 5 3 31 2 3 5 3
(part)
Bongaiga
on 32 73 1 3 28 0 29 45 1
(part)
Dhubri 23 43 7 1 3 0 22 40 7
Goalpara
6 16 0 1 8 0 5 9 0
(part)
Total 67 167 13 8 70 2 59 99 11
(b): Under PMGSY, funds are released to States/ UTs as a whole and
not to Constituencies/ Districts separately. During Financial Year
2021-22 to 2026-27 (till 23.07.2026), Central funds of Rs. 3,044.62
crore have been released to State of Assam under PMGSY. During the
same period, expenditure of Rs. 4,763.54 crore (including State
share) has been incurred by State on PMGSY projects.
(c): As reported by the State, most parts of Dhubri Constituency are
flood prone, however, no PMGSY road has suffered any major flood
damage. Construction of balance PMGSY roads along with minor
restoration works, is in progress.
(d): As per PMGSY programme guidelines, execution of PMGSY
projects is the responsibility of the State Government within the
timeline of the scheme. However, the Ministry of Rural Development
has taken a number of initiatives to expedite completion of road
works sanctioned under PMGSY, some of which are given below:-
i. Programme is regularly monitored by way of Regional Review
Meetings (RRMs), Performance Review Committee (PRC)
Meetings, Monthly review meetings and Pre-
Empowered/Empowered Committee Meetings with the States.
ii. The State Governments are also regularly advised to convene
meetings with the concerned authorities to expedite matters
relating to land issues, forest clearances etc., to expedite
completion of works.
Page 2 of 4iii. States have been requested to augment execution capacity and
contracting capacity, and their compliance in this regard is
regularly reviewed.
iv. Training is imparted to field engineers and contractors, as well
as their staff, for capacity building.
v. The Ministry has also conducted a number of Contractor’s
Outreach Programmes in the States to attract the contractors
in the implementation of PMGSY projects.
As per PMGSY guidelines, ensuring the quality of road works is the
responsibility of the State Governments who are implementing the
programme. The Government has established a robust three-tier
Quality Assurance Mechanism to independently verify that PMGSY
roads meet prescribed technical standards, including durability and
resilience to climatic stress:
First Tier (In-house): The Programme Implementation Units
(PIUs) are responsible for process control through mandatory
tests on materials and workmanship at field laboratories
established by contractors.
Second Tier (Independent State Level): Independent State
Quality Monitors (SQMs) conduct structured inspections at
three critical stages: initial, middle, and final stages of
construction.
Third Tier (Independent Central Level): The National Quality
Monitors (NQMs), who are retired senior engineers, perform
unannounced, random inspections across districts. Their role is
to provide an objective third-party audit of the work quality and
the effectiveness of the state’s quality control system.
Further, as per programme guidelines, maintenance of roads
constructed under the programme is the responsibility of the State
Governments. All road works sanctioned under the scheme are
covered by initial five year maintenance contracts to be entered into
along with the construction contract, with the same contractor, as
per the Standard Bidding Document. Maintenance funds are to be
provided by the States/ UTs. Even after 5 years, the roads are to be
maintained by the States/UTs. Ministry has implemented Electronic
Maintenance of Rural Roads under PMGSY (e-MARG) in all States/UTs
to enhance focus on maintenance of roads constructed under PMGSY
Page 3 of 4and also to streamline the delivery of routine maintenance of PMGSY
roads.
Further, to ensure Climate Resilience & Durability the following
measures are in place:
Design Vetting: All Detailed Project Reports (DPRs) are vetted
by State Technical Agencies (STAs) (like NITs/IITs) to ensure
structural designs are suitable for the specific terrain and local
climate (e.g., higher embankments in flood-prone districts).
Green Technology Mandate: Since 2013, It has been made
mandatory for the States to use New/Green technologies (like
Waste Plastic, Cold Mix, and Cell Filled Concrete) for
constructions of roads sanctioned under the scheme. These
technologies, particularly Waste Plastic, have proven to
increase resistance to water-induced damages.
IRC Standards: Road designs follow the Indian Roads Congress
(IRC) codes, which include specific provisions for drainage and
durability in high-rainfall zones.
*****