PROPOSAL FOR CONSTRUCTION OF ROADS UNDER PMGSY
1476. Shri Bhausaheb Rajaram Wakchaure:
Will the Minister of RURAL DEVELOPMENT be pleased to state:
(a) whether any proposal has been received under the Pradhan
Mantri Gram Sadak Yojana (PMGSY) for the improvement or
construction of roads in the Sangamner and Akole talukas of
Ahilyanagar district in the State of Maharashtra;
(b) if so, the details thereof;
(c) whether the Government is aware of the pathetic condition of
these rural roads and the potential risks of accidents caused by
them, if so, the details thereof;
(d) whether important roads connecting to the Shirdi pilgrimage
site will be included in the special priority list, if so, the details
thereof;
(e) whether the necessary budget allocation for these road works
has been approved, if so, the details thereof; and
(f) the details of timeline set by the Government to commence the
construction work on these roads?
ANSWER
MINISTER OF STATE IN THE MINISTRY OF RURAL DEVELOPMENT
(SHRI KAMLESH PASWAN)
(a) & (b): The Pradhan Mantri Gram Sadak Yojana (PMGSY) was
launched in 2000, as a onetime special dispensation, for providing
connectivity to eligible unconnected habitations in the country. For
the state of Maharashtra, a total of 24,782 km road length has been
sanctioned under new connectivity and upgradation components
under PMGSY-I, out of which 24,184 km road length has been
completed till 23rd July, 2026. Under PMGSY-II, a total of 2619 km
road length has been sanctioned under the scheme and 2586 km has
been completed as on 23rd July, 2026. Under PMGSY-III, a total of
6,404 km road length has been sanctioned to the state of
Page 1 of 3Maharashtra and 5576 km road length has been completed till 23rd
July, 2026.
So far, under various verticals of PMGSY, 281 road works of
1819 km length and 26 bridges were sanctioned to Ahilyanagar
district (formerly Ahmednagar), out of which 256 road works of 1669
km road and 19 bridges have already been constructed. Under various
verticals of PMGSY, in Akole taluk 140 road works of 782 km length
and 21 bridges were sanctioned, out of which 140 road works of 767
km road and 20 bridges have already been constructed. Sangamner
Taluk is located in Ahilyanagar district.
In September 2024, the Government of India launched PMGSY
IV. The primary objective of PMGSY-IV is to provide all-weather road
connectivity to about 25,000 unconnected habitations of population
size (as per Census 2011) 500+ in plains, 250+ in Special Category
States (Arunachal Pradesh, Assam, Ladakh, Manipur, Meghalaya,
Mizoram, Nagaland, Sikkim, Tripura, Himachal Pradesh, Jammu
Kashmir and Uttarakhand), Special Category Areas [(Tribal Schedule-
V Areas, Desert Areas, Aspirational Blocks/ Districts and Hilly areas
as notified by the respective State Government (cross slope more
than 25% gradient and the elevation is more than 600 meters from
the Mean Sea Level)] and 100+ in LWE affected Districts including
Legacy & Thrust Districts identified by MHA from time to time. Under
PMGSY-IV, habitations identified under VVP-II are being prioritised for
all-weather road connectivity.
Under Batch-I of PMGSY-IV, for the state of Maharashtra,
sanction has been issued on 18.05.2026 for 35 roads (95.99 km)
costing Rs. 122.98 crore benefiting 35 habitations. Further, sanction
of 62 Long Span Bridges (2923.45 m) costing Rs. 252.21 crore has
been issued under Batch-I of PMGSY-III on 13.07.2026. The State-
wise, District-wise and Parliamentary Constituency-wise details of
rural road projects and the stages of construction under various
verticals of PMGSY may be accessed at the programme website
https://pmgsy.dord.gov.in/dbweb on a real-time basis.
(c): As per Pradhan Mantri Gram Sadak Yojana (PMGSY) guidelines,
maintenance of roads constructed under the programme is the
responsibility of the State/UT Governments. However, the Ministry on
its part has taken the following steps to ensure proper maintenance
of roads constructed under PMGSY:
(i) All road works sanctioned under the scheme are covered by
initial five-year maintenance contracts to be entered into along with
Page 2 of 3the construction contract, with the same contractor, as per the
Standard Bidding Document.
(ii) Maintenance funds to service the contract are required to be
provisioned for by the State Governments and placed at the disposal
of the State Rural Roads Development Agencies (SRRDAs) in a
separate maintenance account. On expiry of this 5-year post
construction maintenance, PMGSY roads are required to be placed
under Zonal maintenance contracts consisting of 5-year maintenance
including renewal as per maintenance cycle, from time to time, to be
funded by the State/UT Governments.
(iii) Further in order to ensure that States/UTs provide required
maintenance funds during the design life of the road being
constructed under PMGSY-III, a provision has been added in the
programme guidelines under which the states have to enter into a
Memorandum of Understanding with the Ministry of Rural
Development, Government of India before launching of the scheme in
the concerned State/UT for providing adequate funds for the
maintenance of roads constructed/upgraded under PMGSY for initial
five years routine maintenance, and for further five year routine
maintenance including periodic renewal as per requirement.
(iv) Release of maintenance funds is required to be certified by the
State/UT, as per PMGSY guidelines, while submitting fund release
proposals to the Central Government.
(v) Electronic Maintenance of PMGSY roads (e-MARG), an online
platform, has been implemented in all the States to monitor
maintenance of PMGSY works for five years from the date of
completion (i.e. under Defect Liability Period- DLP). Consequent upon
the introduction of e-MARG i.e. software module for maintenance
payments to the contractor during the defect liability period, such
payments have been made commensurate with the quality of roads
through a performance-based contract management system.
(d) to (f): As per the detailed guidelines for implementation of
Pradhan Mantri Gram Sadak Yojana (PMGSY) IV, the State/UT
Governments update the District Rural Roads Plan (DRRP) and
generate the Comprehensive New Connectivity Priority List (CNCPL)
of the unconnected habitations keeping in view, inter-alia, the
suggestions received from Hon'ble Members of Parliament. The unit
for connectivity under PMGSY IV is unconnected habitation. Shiridi
pilgrimage site falls in Ahilyanagar district. As per the Gram Sadak
Survey (GSS) conducted by the State Government of Maharashtra
there are no eligible unconnected habitations in the Ahilyanagar
district.
*****