GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
STARRED QUESTION NO. 44
TO BE ANSWERED ON 23.07.2025
REDEVELOPMENT OF RAILWAY STATIONS
*44. SHRI P P CHAUDHARY:
SHRI CHAVDA VINOD LAKHAMSHI:
Will the Minister of RAILWAYS be pleased to state:
(a) whether the Government has initiated key project to develop major
railway stations in the country under Amrit Bharat Station Scheme;
(b) if so, the objectives and key features of the Amrit Bharat Station
Scheme;
(c) the current progress of the Amrit Bharat Station Scheme,
specifically regarding the number of stations taken up for
redevelopment and the timeline for completion of the first phase,
Statewise particularly in Rajasthan (Pali and Jalore Lok Sabha
Constituencies and Sirohi district), Maharashtra (Palghar district),
Madhya Pradesh (Sidhi Lok Sabha Constituency), Himachal Pradesh
and NCT of Delhi;
(d) the manner in which the Government ensures equitable distribution
of station redevelopment projects across regions and Lok Sabha
Constituencies;(e) the measures adopted to improve accessibility for persons with
disabilities under the scheme and their alignment with the ‘Sugamya
Bharat Abhiyan’;
(f) whether the scheme integrates the ‘One Station One Product’
initiative and its impact on promoting local artisans, crafts, culture,
handicrafts and indigenous industries at railway stations; and
(g) if so, the details thereof particularly Dakshina Kannada district of
Karnataka?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (g) A Statement is laid on the Table of the House.
*****STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (g) OF LOK
SABHA STARRED QUESTION NO. 44 TO BE ANSWERED ON 23.07.2025
(a) to (g) Ministry of Railways has launched Amrit Bharat Station
Scheme for development of Railway Stations covering 1337 Railway
stations on Indian Railways including 85 stations in Rajasthan, 132
stations in Maharashtra, 80 stations in Madhya Pradesh, 4 stations in
Himachal Pradesh, 13 stations in Delhi and 61 stations in Karnataka.
List of stations identified under this scheme in the state of Rajasthan,
Maharashtra, Madhya Pradesh, Himachal Pradesh, Delhi and
Karnataka is as under:
SNo State Count Name of Stations
Abu Road, Ajmer, Alwar, Anupgarh,
Asalpur Jobner, Balotra, Bandikui,
Baran, Barmer, Bayana, Beawar,
Bharatpur, Bhawani Mandi, Bhilwara,
Bijainagar, Bikaner, Bundi, Chanderiya,
Chhabra Gugor, Chittorgarh Jn., Churu,
1 Rajasthan 85 Dakaniya Talav, Dausa, Deeg, Degana,
Deshnoke, Dholpur, Didwana,
Dungarpur, Falna, Fatehnagar,
Fatehpur Shekhawati, Gandhinagar
Jaipur, Gangapur City, Gogameri,
Gotan, Govind Garh, Hanumangarh,
Hindaun City, Jaipur Jn, Jaisalmer,SNo State Count Name of Stations
Jalor, Jawai Bandh, Jhalawar City,
Jhunjhunu, Jodhpur, Kapasan,
Khairthal, Kherli, Kota Jn, Lalgarh Jn,
Mandal Garh, Mandawar Mahwa Road,
Marwar Bhinmal, Marwar Jn, Mavli Jn,
Merta Road Jn, Nagaur, Naraina, Nim
ka Thana, Nokha, Pali Marwar, Phalodi
Jn, Phulera Jn, Pindwara, Rai singh
nagar, Rajgarh, Ramdevra, Ramganj
Mandi Jn, Ranapratapnagar, Rani,
Ratangarh Jn, Ren, Ringas, Sadulpur,
Sanganer, Sawai Madhopur, Shri
Mahaveerji, Sikar, Sojat Road,
Somesar, Sri ganganagar, Sujangarh,
Suratgarh, Udaipur City
Ahmednagar, Ajni (Nagpur), Akalkot
Road, Akola, Akurdi, Amalner, Amgaon,
Amravati, Andheri, Badnera,
Balharshah, Bandra Terminus,
2 Maharashtra 132 Baramati, Belapur, Bhandara Road,
Bhokar , Bhusawal, Borivali, Byculla,
Chalisgaon, Chanda Fort, Chandrapur,
Charni Road, Chhatrapati Sambhaji
Nagar, Chhatrapati Shivaji MaharajSNo State Count Name of Stations
Terminus, Chinchpokli, Chinchwad,
Dadar (CR), Dadar (WR), Dahisar,
Daund, Dehu Road, Devlali,
Dhamangaon, Dharangaon, Dharashiv,
Dharmabad , Dhule, Diva, Dudhani,
Gangakher, Godhani, Gondia, Grant
Road, Hadapsar, Hatkanangale, Hazur
Sahib Nanded, Himayatnagar,
Hinganghat, Hingoli Deccan, Igatpuri,
Jalgaon, Jalna, Jeur, Jogeshwari,
Kalyan Jn, Kamptee, Kandivali, Kanjur
Marg, Karad, Katol, Kedgaon, Kinwat,
Kopargaon, Kurduwadi Jn, Kurla Jn,
Lasalgaon, Latur, Lokmanya Tilak
Terminus, Lonand Jn, Lonavla, Lower
Parel, Malad, Malkapur, Manmad Jn,
Manwath Road , Marine Lines,
Matunga, Miraj Jn, Mudkhed Jn,
Mumbai Central, Mumbra, Murtizapur
Jn, Nagarsol, Nagpur Jn, Nandgaon,
Nandura, Nandurbar, Narkher Jn,
Nashik Road, Netaji Subhash Chandra
Bose Itwari Junction, Pachora Jn,
Palghar, Pandharpur, Panvel Jn,SNo State Count Name of Stations
Parbhani Jn, Parel, Parli Vaijnath,
Partur , Phaltan, Prabhadevi, Pulgaon
Jn, Pune Jn, Purna Jn, Raver,
Rotegaon , Sainagar Shirdi, Sandhurst
Road, Sangli, Satara, Savda, Selu,
Sewagram, Shahad, Shegaon, Shivaji
Nagar Pune, Shri Chhatrapati Shahu
Maharaj Terminus Kolhapur, Solapur,
Talegaon, Thakurli, Thane, Titvala,
Tumsar Road, Umri, Uruli, Vadala
Road, Vidyavihar, Vikhroli, Wadsa,
Wardha, Washim, Wathar
Akodia, Amla, Anuppur, Ashoknagar,
Balaghat, Banapura, Bargawan,
Beohari, Berchha, Betul, Bhind,
Bhopal, Bijuri, Bina, Biyavra Rajgarh,
Chhindwara, Dabra, Damoh, Datia,
Madhya Dewas, Gadarwara, Ganjbasoda,
3 80
Pradesh Ghoradongri, Guna, Gwalior, Harda,
Harpalpur, Indore Jn, Itarsi Jn,
Jabalpur, Junnor Deo, Kareli, Katni Jn,
Katni Murwara, Katni South, Khachrod,
Khajuraho Jn, Khandwa, Khirkiya,
Laxmi Bai Nagar, Maihar, Maksi Jn,SNo State Count Name of Stations
Mandla Fort, Mandsor, MCS
Chhatarpur, Meghnagar, Morena,
Multai, Nagda Jn, Nainpur Jn,
Narmadapuram (Hoshangabad),
Narsinghpur, Nepanagar, Nimuch,
Orchha, Pandhurna, Pipariya, Ratlam,
Rewa, Ruthiyai, Sanchi, Sant Hirdaram
Nagar, Satna, Saugor, Sehore, Seoni,
Shahdol, Shajapur, Shamgarh, Sheopur
Kalan, Shivpuri, Shridham, Shujalpur,
Sihora Road, Singrauli, Tikamgarh,
Ujjain, Umaria, Vidisha, Vikramgarh
Alot
Himachal Amb Andaura, Baijnath Paprola,
4 4
Pradesh Palampur Himachal, Shimla
Adarshnagar Delhi, Anand Vihar,
Bijwasan, Delhi, Delhi Cantt., Delhi
5 Delhi 13 Safdarjung, Delhi Sarai Rohilla, Delhi
Shahadra, Hazrat Nizamuddin, Narela,
New Delhi, Sabzi Mandi, Tilak Bridge
Almatti, Alnavar, Arsikere Junction,
Badami, Bagalkot, Ballary, Bangalore
6 Karnataka 61
Cantt., Bangarpet, Bantawala,
Belagavi, Bidar, Chamaraja Nagar,SNo State Count Name of Stations
Channapatna, Channasandra,
Chikkamagaluru, Chikodi Road,
Chitradurga, Davangere, Dharwad,
Dodballapur, Gadag, Gangapur Road,
Gangavathi, Ghataprabha, Gokak
Road, Gubbi, Harihar, Hassan,
Hosapete, Kalaburagi Jn., Kengeri,
Koppal, Krantivira Sangolli Rayanna
(Bengaluru Station), Krishnarajapuram,
Malleswaram, Malur, Mandya,
Mangalore Central, Mangalore Jn,
Munirabad, Mysuru Jn (Mysore),
Raichur Jn, Ramanagaram,
Ranibennur, Raybag, Sagar
Jambagaru, Sakleshpur, Shahabad,
Shivamogga Town, Shravanabelgola,
Shree Siddharoodha Swamiji Hubballi
Jn, Subramanya Road, Talguppa,
Tiptur, Tumakuru, Udupi, Vijayapura,
Wadi, Whitefield, Yadgir, Yesvantpur
Development works at railway stations under Amrit Bharat Station
Scheme in the state of Rajasthan, Maharashtra, Madhya Pradesh,Himachal Pradesh, Delhi and Karnataka have been taken up at a good
pace. Details of phase-I works completed in the states are as under:
SNo State No. of Name of Stations
Stations
completed
Bundi, Deshnoke, Fatehpur
Shekhawati, Gogameri, Govind Garh,
1 Rajasthan 08
Mandal Garh, Mandawar Mahwa Road,
Rajgarh
Amgaon, Chanda Fort, Chinchpokli,
Devlali, Dhule, Kedgaon, Lasalgaon,
Lonand Jn, Matunga, Murtizapur Jn,
2 Maharashtra 15
Netaji Subhash Chandra Bose Itwari
Junction, Parel, Savda, Shahad,
Vadala Road
Katni South, Narmadapuram
Madhya
3 06 (Hoshangabad), Orchha, Seoni,
Pradesh
Shajapur, Shridham
Himachal
4 01 Baijnath Paprola
Pradesh
Bagalkot, Dharwad, Gadag, Gokak
5 Karnataka 05
Road, MunirabadThe works at other stations have also been taken up at good pace and
progress of some of the above stations is as given below:
Pali Lok Sabha Constituency:
• At Falna station, the work of main and second entry buildings,
circulating area, provision of platform shelter, improvement to
platform surfacing at platform no. 1, waiting hall, toilets have
been completed and the work for construction of new Foot
Over Bridge, improvement to parking area and platform
surfacing at platform no. 2 have been taken up.
• At Jawai Bandh station, the work of second entry building,
platform shelters at platform no. 1 have been completed and
the work of improvement to main building work, Foot Over
Bridge work, circulating area, toilet blocks including
Divyangjan facilities have been taken up.
• At Marwar Jn. station, the work of improvement to main entry
building waiting hall and construction of commercial block
have been completed and the work of improvement to main
entry building, station elevation, portico, platform surfacing
and toilets have been taken up.
• At Rani station, the work of second entry work, platform
shelters, toilet blocks at platform no. 2 and circulating area
works have been completed and the work of improvement tomain entry building, Divyangjan & other toilet at platform no.
1, tactile tiles work at platform no. 1 have been taken up.
• At Sojat Road station, the work of construction of new main
entry station building, structural works of second entry station
building and platform shelter have been completed and the
work of second entry station building finishing, improvement
to circulating area, toilets, platform surfacing, waiting hall,
construction of new Foot Over Bridge and provision of coach
indication work have been taken up.
• At Somesar station, the work of second entry, platform
shelters and platform no. 1 surfacing works have been
completed and the work of face upliftment to existing
building, circulating area on main entry side, toilet blocks,
tactile tile on platform no. 2 and Foot Over Bridge works have
been taken up.
Jalore Lok Sabha Constituency:
• At Jalor station, the work of main station building structural
work and toilet block have been completed and the work of
main station building finishing, construction of new Foot Over
Bridge, platform shelter, improvement to platform surfacing,
waiting hall, circulating and parking area have been taken up.
• At Marwar Bhinmal station, the work of main station building
structural work and toilet block have been completed and thework of main station building finishing, improvement to
circulating and parking area, waiting hall, platform surfacing,
provision of platform shelter and construction of new Foot
Over Bridge have been taken up.
Sirohi District:
• At Pindwara station, the work of main station building, second
entry station building, platform shelter, improvement to
platform surfacing at platform no. 2, waiting hall and toilets
have been completed and the work of construction of new
Foot Over Bridge, circulating and parking area at both entries
and platform surfacing at platform no. 1 and Divyangjan toilet
work have been taken up.
• Abu Road station is under master planning.
Palghar District:
• At Palghar station, the work of new platform shelter on
platform no. 2/3, platform surfacing, new coping blocks and
Divyangjan tactile tile work on platform no. 2/3 have been
completed and the work of site preparation for new station
building, new elevated deck and new Foot Over Bridge have
been taken up.
Sidhi Lok Sabha Constituency:• At Bargawan station, the work of construction of new station
building, entrance porch, circulating area, improvement to
waiting room, platform surfacing, platform shelter, parking,
toilet block have been completed and the work of 12m wide
Foot Over Bridge and second entry work have been taken up.
• At Beohari station, the work of construction of new station
building, entrance porch, circulating area, improvement to
waiting room, platform surfacing, platform shelter, parking,
toilet block, 12 m wide Foot Over Bridge work have been
completed and the work of lift and escalator at platform no. 2
& 3 have been taken up.
• Singrauli station is under master planning.
Himachal Pradesh:
• At Amb Andaura station, the work of improvement of station
building, development of circulating area, parking, executive
lounge with toilet, toilet block work, entry and exit gate,
façade lighting and signage have been completed and the
work of 12 m wide Foot Over Bridge with ramp and lift have
been taken up.
• Palampur Himachal and Shimla stations are under master
planning.
Delhi:• At Tilak Bridge station, the work of surfacing of platform no. 4
& 5, construction of temporary booking window, beautification
of approach road, cleaning and maintenance facility at line no.
7 have been completed and the work of excavation for new
building and Foot Over Bridge extension have been taken up.
• At Sabzi Mandi station, the work of construction of new
platform no. 4 & 5 along with washable apron and watering
facility, surfacing of platform no. 2 & 3, widening of entry road,
shifting of passenger reservation system and booking window
to renovated building have been completed and the work of
toilet block finishing, building footing casting have been taken
up.
• At Narela station, the work of replacement of coping of
platform no. 1 & 2, shifting of booking window, platform
shelter foundation and platform shelter fabrication, toilet
block, widening of platform no. 2 including retaining wall and
fencing have been completed and the work of plain cement
concrete work, flooring and platform shelter launching have
been taken up.
Dakshina Kannada District:
• At Bantawal station, the work of internal painting of the
station building, roof sheeting work on platform no. 1,
improvement of parking facility, paver block work and kerbstone work in circulating area have been completed and the
work of improvement of portico, surfacing of platform no. 1 &
2 and improvement of station entry gate have been taken up.
• At Subramanya Road station, the work of platform shelter
installation and improvement of flooring on platform no. 2/3
has been completed. The works of improvement of station
building, circulating area, portico, Foot Over Bridge and
improvement of platform no. 1 have been taken up.
• At Mangalore Jn. station, the work of new porch, station
approach road, improvement to circulating area and parking
area, improvement of station building, platform shelters,
renovation of booking office and concourse with arrangement
of Automatic Ticket Vending Machine facilities, coach
indication boards, light masts have been completed and the
work of the improvement to platform surfacing at platform no.
1, parcel office building, provision of signages and waiting hall
have been taken up.
• Mangalore Central station is under master planning.
Master Planning is an iterative process requiring optimization and the
time frame and other details for such optimization cannot be indicated
at this stage.
Amrit Bharat Station Scheme envisages development of stations on a
continuous basis with a long-term approach. It involves preparation ofmaster plans and their implementation in phases to improve the
amenities at the stations like improvement of station access,
circulating areas, waiting halls, toilets, lift/escalators as necessary,
platform surfacing and cover over platform, cleanliness, free Wi-Fi,
kiosks for local products through schemes like ‘One Station One
Product’, better passenger information systems, executive lounges,
nominated spaces for business meetings, landscaping, etc. keeping in
view the necessity at each station.
The scheme also envisages improvement of building, integrating the
station with both sides of the city, multimodal integration, amenities
for Divyangjans, sustainable and environment friendly solutions,
provision of ballastless tracks, etc. as per necessity, phasing and
feasibility and creation of city centre at the station in long term.
Indian Railways is committed to make its railway stations accessible
for Persons with Disabilities (Divyangjans) and passengers with
reduced mobility as part of “Sugamya Bharat Mission” or ‘Accessible
India Campaign’ of Government of India. In compliance of the Rights of
Persons with Disabilities Act, 2016, “Guidelines on accessibility of
Indian Railway stations and facilities at stations for differently abled
persons (Divyangjans) and passengers with reduced mobility” have
been circulated and notified in the Gazette of India. The guidelines
include provisions of facilities for Divyangjans and passengers with
reduced mobility such as entrance ramps, accessible parking, low
height ticket counters/help booths, toilets, drinking water booths,subways/foot over bridges with ramps/lifts, standard signages
including Braille signages and tactile pathways for visual impairment,
etc.
Upgradation / development / redevelopment of Railway Stations is
complex in nature involving safety of passengers & trains and requires
various statutory clearances such as fire clearance, heritage, tree
cutting, airport clearance etc. The progress also gets affected due to
brown field related challenges such as shifting of utilities (involving
water/sewage lines, optical fibre cables, gas pipe lines, power/signal
cables, etc.), infringements, operation of trains without hindering
passenger movement, speed restrictions due to works carried out in
close proximity of tracks and high voltage power lines, etc. and these
factors affect the completion time. Therefore, no time frame can be
indicated at this stage.
The spatial distribution of stations across states are reasonably
uniform and the scheme covers all states and union territories with rail
connectivity.
“One Station One Product” (OSOP) scheme is an independent scheme
of Ministry of Railways with the objective to promote ‘Vocal for Local’
vision of the Government of India, provide a market for indigenous
product and opportunity to railway passengers to experience the rich
heritage of India and to buy local/indigenous product. Under this
scheme, Indian Railways provide OSOP outlets (fixed stalls/ portabletrolleys) at railway stations across the country for showcasing, selling
and giving high visibility to indigenous/local products.
As on 14.07.2025, OSOP scheme has been implemented on 1996
stations with 2303 operational outlets across Indian Railways,
including 04 (four) outlets in Dakshina Kannada District of Karnataka
at Mangalore Central, Mangalore Jn., Bantawala and Subramanya Road
stations.
*****