GOVERNMENT OF INDIA
MINISTRY OF NEW AND RENEWABLE ENERGY
LOK SABHA
UNSTARRED QUESTION NO. 557
ANSWERED ON 22.07.2026
REDUCTION IN SMALL BIOGAS PLANTS IN MAHARASHTRA
557. SHRI VISHALDADA PRAKASHBAPU PATIL
ADV GOWAAL KAGADA PADAVI
DR. BACHHAV SHOBHA DINESH
MS. PRANITI SUSHILKUMAR SHINDE
Will the Minister of NEW AND RENEWABLE ENERGY be pleased to state:
(a) whether the Government is aware of the observed reduction in the number of small biogas
plants installed in Maharashtra from 5180 in the year 2022-23 to 4581 in 2024-25 under the
Biogas Programme;
(b) if so, the reason for such decline in installations thereof;
(c) the details of the measures being taken by the Government to accelerate adoption among
households in Maharashtra particularly in districts with high cattle population and agricultural
waste generation such as Solapur, Nandurbar, Bhandara, Sangli and Dhule; and
(d) the details of the number of biogas plants linked to toilets set up in Maharashtra along with
their capacity, faecal sludge generation and current utilisation during the last five years, district-
wise?
ANSWER
THE MINISTER OF STATE FOR NEW & RENEWABLE ENERGY AND POWER
(SHRI SHRIPAD YESSO NAIK)
(a) & (b) The details of small biogas plants installed in the State of Maharashtra during Phase-I of
National Bioenergy Programme from FY 2022-23 to FY 2024-25 may be seen below:
FY No. of Biogas plants installed
2022-23 5180
2023-24 4707
2024-25 4581As reported by the Government of Maharashtra, the lower number of installations during 2024-25
was mainly due to increase in the construction cost of biogas plants, reduced availability of cattle
dung owing to decline in livestock at the household level, increasing use of alternative cooking
fuels, water scarcity in certain areas, shortage of trained technicians, and reduced interest among
beneficiaries in operation and maintenance of biogas plants.
(c) To accelerate the adoption of biogas plants among households in Maharashtra, including
districts with high cattle population and agricultural waste generation such as Solapur, Nandurbar,
Bhandara, Sangli and Dhule, the Ministry of New and Renewable Energy (MNRE) is providing
Central Financial Assistance (CFA) under the Biogas Programme during Phase-I of the National
Bioenergy Programme.
In addition, awareness and publicity campaigns, training of beneficiaries and technicians, and
coordination with the State Government/implementing agencies for identification of eligible
beneficiaries are undertaken to facilitate wider adoption of biogas plants.
(d) The district-wise number of toilet-linked biogas plants established in Maharashtra is given at
Annexure.
However, the information regarding faecal sludge generation and its current utilization is not being
maintained separately.
*****Annexure
Annexure referred to in reply to part (d) of the Lok Sabha Unstarred Question No. 557 to be
answered on 22.07.2026 regarding “Reduction in Small Biogas Plants in Maharashtra”
District-wise details of Biogas plants linked to toilets set up in Maharashtra during last five
years (FY 2021-22 to FY 2025-26):
Sl. No. District Number of biogas plants
1. Thane 17
2. Palghar 168
3. Raigad 12
4. Ratnagiri 61
5. Sindhudurg 43
6. Nashik 9
7. Dhule 0
8. Nandurbar 25
9. Jalgaon 46
10. Ahilyanagar 15
11. Pune 55
12. Satara 55
13. Sangli 74
14. Solapur 2
15. Kolhapur 1725
16. C.Sambhajinagar 5
17. Jalna 0
18. Parbhani 72
19. Hingoli 0
20. Beed 14
21. Nanded 022. Dharashiv 0
23. Latur 0
24. Amravati 32
25. Buldhana 0
26. Akola 7
27. Washim 0
28. Yavatmal 0
29. Nagpur 76
30. Wardha 0
31. Bhandra 78
32. Gondiya 16
33. Chandrapur 75
34. Gadchiroli 48
Total 2730