GOVERNMENT OF INDIA
MINISTRY OF COAL
LOK SABHA
UNSTARRED QUESTION NO. 6001
ANSWERED ON 01.04.2026
RENEWABLE ENERGY INITIATIVES BY COAL PSUS
6001. SHRI MANOJ TIWARI:
SHRI BALABHADRA MAJHI:
SMT. APARAJITA SARANGI:
SHRI VISHNU DAYAL RAM:
SHRI DILESHWAR KAMAIT:
SHRI KOTA SRINIVASA POOJARY:
SHRI KHAGEN MURMU:
SMT. KAMALJEET SEHRAWAT:
Will the Minister of COAL be pleased to state
(a) whether Coal India Limited (CIL) and other coal Public Sector Undertakings (PSUs) are
undertaking renewable energy projects as part of their diversification initiatives in various parts
of the country including the Nabarangpur Lok Sabha Constituency of Odisha;
(b) if so, the details of the total renewable energy capacity installed or under development by
these PSUs till date including the details of projects proposed or operational in Nabarangpur
Lok Sabha Constituency;
(c) the details of targets set by the Government for renewable energy capacity to be achieved
by coal PSUs by the year 2030;
(d) whether there are proposals to include projects in the Nabarangpur Lok Sabha Constituency
and if so, the details thereof; and
(e) the manner in which these initiatives are contributing to the objectives of sustainable mining
and energy transition particularly in promoting green energy and regional development in the
Nabarangpur Lok Sabha Constituency of Odisha?
ANSWER
MINISTER OF STATE FOR COAL AND MINES
(SHRI SATISH CHANDRA DUBEY)
(a) & (b): Public Sector Undertakings (PSUs), including Coal India Limited (CIL), NLC
India Limited (NLCIL), and Singareni Collieries Company Limited (SCCL), are undertaking
renewable energy projects as part of their diversification initiatives in line with the
1Government’s policy on energy transition and sustainability. However, no such project has
been undertaken in the Nabarangpur Lok Sabha Constituency of Odisha.
CIL has installed about 247 MW of renewable energy, and around 635 MW is under
development. NLCIL has installed 1,783 MW and has 1,762 MW under construction. SCCL
has installed 245.50 MW, and around 259 MW is under development.
(c): The targets for renewable energy by 2030 are CIL (9.5 GW), NLCIL (10 GW) and
SCCL (2.8 GW).
(d) & (e): Renewable energy initiatives by coal PSUs contribute to sustainable mining and
energy transition by reducing carbon footprint through adoption of clean energy, diversifying
the energy mix, enhancing energy security and supporting national climate goals, including
net-zero commitments. Though, no proposals are under consideration for renewable energy
projects within the Nabarangpur Lok Sabha Constituency of Odisha by the above-mentioned
PSUs, installing renewable energy projects will benefits all areas, including the Nabarangpur
Lok Sabha Constituency of Odisha.
*****