Home India Ministry of New and Renewable Energy Parliament Question: Renewable energy projects in the countr...
Date: 2026-03-24 Category: RAJYASABHA_QNA State: Union Government Country: India

Parliament Question: Renewable energy projects in the country

Issued by Ministry of New and Renewable Energy · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF NEW AND RENEWABLE ENERGY RAJYA SABHA UNSTARRED QUESTION NO. 3660 ANSWERED ON 24.03.2026 RENEWABLE ENERGY PROJECTS IN THE COUNTRY 3660. SHRI MASTHAN RAO YADAV BEEDHA Will the Minister of New and Renewable Energy be pleased to state: (a) the details of renewable energy projects sanctioned, under construction and operational in the country during the last five years, source-wise and State wise; (b) the details of the total renewable energy capacity added during the last five years, year-wise, source- wise and State-wise; (c) the details of the investment made and the funds sanctioned, released and utilised for renewable energy projects during the last five years, year-wise and State-wise; and (d) whether Government has set any renewable energy targets, if so, the details of targets along with the steps taken by Government to achieve them including strengthening grid integration and storage infrastructure? ANSWER THE MINISTER OF STATE FOR NEW & RENEWABLE ENERGY AND POWER (SHRI SHRIPAD YESSO NAIK) (a) to (c) Most of utility-scale renewable energy projects in the country are being set up by developers, selected through a transparent bidding process. However, the State-wise details of renewable energy projects sanctioned, commissioned and under Implementation under the major ongoing schemes/ programmes of the Ministry of New & Renewable Energy (MNRE) during the last five years are given at Annexure-I. The year-wise, source-wise and State-wise details of the renewable energy capacity added during the last five years are given at Annexure-II. The average capital cost (indicative) of setting up of renewable energy projects are as under: Average Capital Cost (indicative) Type of RE Power Plant (In Rs. Cr/MW) Solar Power ~ 4 Wind Power ~ 7 Bio-Power ~ 6-8 Small Hydro Power ~ 10 The cost of renewable energy projects may vary depending on factors such as technology, location, scale and resource availability. Further, the State-wise details of the funds released/ utilized as Central Financial Assistance for the renewable energy projects under the major ongoing schemes/ programmes of the Ministry during the last five years are given at Annexure-III. State-wise allocation/ sanction of the funds is not made by the Ministry and the funds are released in accordance with the respective scheme guidelines. (d) The Ministry is working towards achieving 500 GW of installed electricity capacity from non- fossil fuel-based sources by 2030. The Government has taken several steps and initiatives to promote and accelerate development and deployment of renewable energy capacity in the country including for development of the Energy Storage capacity and to strengthen grid integration, to realize the commitment of 500 GW non-fossil energy capacity by 2030, as given at Annexure-IV. *****Annexure-I Annexure-I referred to in reply of parts-(a) to (c) of the Rajya Sabha Unstarred Question No. 3660 to be answered on 24.03.2026 State-wise details of Renewable Energy projects sanctioned, commissioned and under Implementation under the major ongoing schemes/ programmes of MNRE during the last five years 1. Solar Parks: Solar Parks capacity Total projects commissioned in solar State sanctioned since 2020-21 parks since 2020-21, (in MW)* (in MW) Andhra Pradesh 300 1250 Chhattisgarh 100 100 Gujarat 10450 4451 Jharkhand 234 0 Jharkhand & West Bengal 310 0 Kerala 150 55 Madhya Pradesh 1708 1608 Maharashtra 355 100 Mizoram - 20 Rajasthan 6450 2096 Uttar Pradesh 3375 265 Total 23432 9945 *The commissioned capacity includes projects commissioned in solar parks sanctioned prior to 2020-21 2. PM Surya Ghar Muft Bijli Yojana (PMSGMBY): Number of applications submitted under PMSGMBY on the National Portal of the scheme and the installations done as on 19.03.2026: S. No. State/ UTs No. of applications No. of submitted Installations done 1 A&N Islands 722 229 2 Andhra Pradesh 1463525 114267 3 Arunachal Pradesh 83 1 4 Assam 533936 102128 5 Bihar 63762 16646 6 Chandigarh 1611 1111 7 Chhattisgarh 165606 39932 8 Goa 3679 2096 9 Gujarat 699350 594809 10 Haryana 134329 63886 11 Himachal Pradesh 13320 7940 12 Jammu & Kashmir 99303 26835 13 Jharkhand 9224 1939 14 Karnataka 158679 17206 15 Kerala 290328 209564 16 Ladakh 1775 1486 17 Lakshadweep 1343 930 18 Madhya Pradesh 168134 104406 19 Maharashtra 711088 490382 20 Manipur 1806 910 21 Meghalaya 1962 46 22 Mizoram 1127 977 23 Nagaland 648 186 24 NCT of Delhi 28881 6817S. No. State/ UTs No. of applications No. of submitted Installations done 25 Odisha 207485 50070 26 Puducherry 4041 2809 27 Punjab 21680 12010 28 Rajasthan 322415 159457 29 Sikkim 256 29 30 Tamil Nadu 75344 60127 31 Telangana 83087 32644 32 Dadra & Nagar Haveli 2470 627 and Daman & Diu 33 Tripura 9035 2649 34 Uttarakhand 112719 71724 35 Uttar Pradesh 1216832 420622 36 West Bengal 13299 1351 Total 6622884 2618848 3. PM-KUSUM: State/ UT-wise details of capacity allocation and capacity installed under PM-KUSUM during the last five years and current year, as on 28.02.2026: S. State/ UT Component-A Component-B Component-C No. Name (In MW) (No. of solar pumps) (No. of grid-connected pumps) Sanctioned Installed Sanctioned Installed Sanctioned Sanctioned Solarize Solarized Total (IPS) (FLS) d (IPS) (FLS) Solarized 1 A&N 0.00 0.00 0 0 0 0 0 0 0 Islands 2 Andhra 0.00 0.00 0 0 0 2,93,587 0 0 0 Pradesh 3 Arunachal 0.00 0.00 700 699 0 0 0 0 0 Pradesh 4 Assam 2.00 0.00 4,000 1,066 0 0 0 0 0 5 Bihar 0.00 0.00 0 0 0 1,40,300 0 0 0 6 Chhattisgarh 366.00 7.00 0 0 0 10,523 0 0 0 7 Goa 24.00 4.00 900 200 0 11,000 0 700 700 8 Gujarat 175.00 0.00 22,792 15,558 0 4,67,114 0 2,55,245 2,55,245 9 Haryana 158.00 29.21 1,97,655 1,85,582 0 2,899 0 0 0 10 Himachal 100.00 100.00 1,270 1,091 0 0 0 0 0 Pradesh 11 Jammu & 0.00 0.00 5,000 4,154 0 0 0 0 0 Kashmir 12 Jharkhand 0.00 0.00 86,985 52,607 0 0 0 0 0 13 Karnataka 0.00 0.00 41,365 5,533 0 7,63,588 0 86,827 86,827 14 Kerala 0.00 0.00 8 8 9,448 22,368 2,737 10,964 13,701 15 Ladakh 1.00 0.00 1,400 265 0 0 0 0 0 16 Madhya 1,400.00 75.10 59,400 7,672 0 2,52,000 0 46,811 46,811 Pradesh 17 Maharashtra 260.00 17.00 5,75,000 5,12,966 0 7,75,000 0 7,75,000 7,75,000 18 Manipur 0.00 0.00 450 150 0 0 0 0 0 19 Meghalaya 0.00 0.00 2,735 98 0 0 0 0 0 20 Mizoram 0.00 0.00 1,700 40 0 0 0 0 0 21 Nagaland 0.00 0.00 265 244 0 0 0 0 0 22 Odisha 90.00 0.00 18,441 13,229 0 5,223 0 0 0 23 Puducherry 0.00 0.00 72 0 0 0 0 0 0 24 Punjab 0.00 0.00 18,048 17,879 186 0 25 0 25 25 Rajasthan 5,618.00 597.09 1,44,752 1,25,711 2,138 4,00,000 2,138 1,65,520 1,67,658 26 Tamil Nadu 3.00 3.00 5,187 5,176 0 0 0 0 0 27 Telangana 1,797.00 6.00 20,000 0 28,000 0 0 0 0 28 Tripura 5.00 0.00 11,114 7,369 3,600 0 983 0 983 29 Uttar 1.00 1.00 1,07,266 67,186 12,000 3,70,000 6,900 825 7,725 PradeshS. State/ UT Component-A Component-B Component-C No. Name (In MW) (No. of solar pumps) (No. of grid-connected pumps) Sanctioned Installed Sanctioned Installed Sanctioned Sanctioned Solarize Solarized Total (IPS) (FLS) d (IPS) (FLS) Solarized 30 Uttarakhand 0.00 0.00 3,685 2,379 0 0 0 0 0 31 West Bengal 0.00 0.00 0 0 20 0 4 0 4 Total 10,000.00 839.40 13,30,190 10,26,862 55,392 35,13,602 12,787 13,41,892 13,54,679 4. CPSU Phase-II Scheme: Under CPSU Scheme Phase-II, a total of 6,200 MW solar power capacity has been awarded to Government entities during the last five financial years. The Government entities selected under the Scheme can set up their awarded solar power projects anywhere in the country. Based on the information provided by the selected entities, the State-wise details of capacity awarded during the last five financial years and the corresponding capacity commissioned and under implementation out of the said awarded capacities (as on 31.01.2026) are as follows: State Projects Awarded Capacity Under (MW) Commissioned Implementation (in MW) (in MW) Andhra Pradesh 400 0 400 Gujarat 2755 1162.5 1592.5 Karnataka 500 400 100 Madhya Pradesh 200 0 200 Rajasthan 2335 2335 0 Tamil Nadu 10 10 0 Total 6200 3907.5 2292.5 5. Biomass Programme: Sl Projects sanctioned during State Commissioned (in MW) No last five years (in MW) 1 Andhra Pradesh 13.26 13.26 2 Bihar 12.9 12.9 3 Haryana 19.1 19.1 4 Karnataka 83 83 5 Madhya Pradesh 1.99 1.99 6 Maharashtra 74.4 74.4 7 Odisha 0.8 0.8 8 Punjab 49.8 49.8 9 Tamil Nadu 3.5 3.5 10 Telangana 8.3 8.3 11 Uttarakhand 2.5 2.5 12 Uttar pradesh 19.75 19.75 13 West Bengal 4.2 4.2 Total 293.5 293.56. Waste to Energy Programme: Details of projects sanctioned during the last five years and the current year: Under Projects Sanctioned Commissioned Sl. Implementation State No. Capacity Capacity Capacity No. No. No. (MWeq) (MWeq) (MWeq) 1. Andhra Pradesh 8 31.83 8 31.83 0 0 2. Delhi 2 2.33 1 1.17 1 1.17 3. Goa 1 1.00 1 1.00 0 0 4. Gujarat 11 53.00 8 8.30 3 44.70 5. Haryana 12 16.76 11 16.14 1 0.62 6. Jharkhand 1 1.04 1 1.04 0 0 7. Karnataka 6 6.94 6 6.94 0 0 8. Madhya Pradesh 2 3.60 2 3.60 0 0 9. Maharashtra 10 20.02 8 15.27 2 4.75 10. Punjab 7 22.97 6 20.88 1 2.08 11. Rajasthan 2 0.98 2 0.98 0 0 12. Tamil Nadu 6 9.25 5 8.08 1 1.17 13. Telangana 7 5.69 6 4.99 1 0.70 14. Uttar Pradesh 19 30.68 19 30.68 0 0 15. Uttarakhand 2 4.46 2 4.46 0 0 16. West Bengal 3 3.06 3 3.06 0 0 Total 99 213.61 89 158.43 10 55.19Annexure-II Annexure-II referred to in reply of parts-(a) to (c) of the Rajya Sabha Unstarred Question No. 3660 to be answered on 24.03.2026 Year-wise, source-wise and state-wise details of the total renewable energy capacity added during the last five years (In MW) FY 2020-21 Small Large Wind Bio Solar S. No. STATES / UTs Hydro Hydro Total Power Power Power Power Power 1 Andhra Pradesh 0.00 4.20 7.49 593.02 0.00 604.71 2 Arunachal Pradesh 0.00 0.00 0.00 0.29 300.00 300.29 3 Assam 0.00 0.00 2.00 1.81 0.00 3.81 4 Bihar 0.00 0.00 3.50 8.04 0.00 11.54 5 Chhattisgarh 0.00 0.00 0.48 21.15 0.00 21.63 6 Goa 0.00 0.00 0.00 2.66 0.00 2.66 7 Gujarat 13.74 1020.30 3.34 1483.10 0.00 2520.48 8 Haryana 0.00 0.00 6.20 209.12 0.00 215.32 9 Himachal Pradesh 24.60 0.00 2.00 10.10 111.00 147.70 10 Jammu & Kashmir 5.50 0.00 0.00 1.50 0.00 7.00 11 Jharkhand 0.00 0.00 0.00 14.41 0.00 14.41 12 Karnataka 0.00 148.00 5.50 77.70 0.00 231.20 13 Kerala 8.00 0.00 1.55 115.02 0.00 124.57 14 Madhya Pradesh 3.80 0.00 2.00 235.42 0.00 241.22 15 Maharashtra 0.00 0.00 72.41 488.17 0.00 560.59 16 Manipur 0.00 0.00 0.00 1.41 0.00 1.41 17 Meghalaya 0.00 0.00 0.00 0.00 0.00 0.00 18 Mizoram 0.00 0.00 0.00 0.93 0.00 0.93 19 Nagaland 0.00 0.00 0.00 0.07 0.00 0.07 20 Odisha 24.01 0.00 0.00 5.25 0.00 29.26 21 Punjab 0.00 0.00 156.35 20.59 0.00 176.94 22 Rajasthan 0.00 27.10 -0.05 650.33 0.00 677.38 23 Sikkim 0.00 0.00 0.00 0.00 0.00 0.00 24 Tamil Nadu 0.00 303.70 18.22 565.91 0.00 887.83 25 Telangana 0.00 0.00 21.30 332.44 0.00 353.74 26 Tripura 0.00 0.00 0.00 0.66 0.00 0.66 27 Uttar Pradesh 24.00 0.00 10.35 627.75 0.00 662.10 28 Uttarakhand 0.00 0.00 -0.28 52.56 99.00 151.28 29 West Bengal 0.00 0.00 0.00 35.41 0.00 35.41 30 A&N Islands 0.00 0.00 0.00 17.03 0.00 17.03 31 Chandigarh 0.00 0.00 0.00 4.61 0.00 4.61 Dadra & Nagar Haveli 32 0.00 0.00 0.00 20.69 0.00 20.69 and Daman & Diu 33 Delhi 0.00 0.00 0.00 27.81 0.00 27.81 34 Lakshadweep 0.00 0.00 0.00 0.00 0.00 0.00 35 Puducherry 0.00 0.00 0.00 3.82 0.00 3.82 36 Others 0.00 0.00 0.00 0.00 0.00 0.00 Total (MW) 103.65 1503.30 312.36 5628.78 510.00 8058.09 FY 2021-22 Small Large S. Wind Bio Solar STATES / UTs Hydro Hydro Total No. Power Power Power Power Power 1 Andhra Pradesh 0.00 0.00 30.00 95.42 0.00 125.42 2 Arunachal Pradesh 0.00 0.00 0.00 1.07 0.00 1.07 3 Assam 0.00 0.00 0.00 66.38 0.00 66.38 4 Bihar 0.00 0.00 0.32 10.40 0.00 10.72 5 Chhattisgarh 0.00 0.00 29.69 72.87 0.00 102.56 6 Goa 0.00 0.00 0.00 12.39 0.00 12.39 7 Gujarat 6.70 647.40 9.39 2710.16 0.00 3373.65 8 Haryana 0.00 0.00 41.25 438.37 0.00 479.62FY 2021-22 Small Large S. Wind Bio Solar STATES / UTs Hydro Hydro Total No. Power Power Power Power Power 9 Himachal Pradesh 18.00 0.00 0.00 25.88 343.00 386.88 10 Jammu & Kashmir 0.00 0.00 0.00 12.60 0.00 10.94 11 Jharkhand 0.00 0.00 0.00 18.93 0.00 18.93 12 Karnataka 0.00 192.30 0.23 206.93 45.00 444.46 13 Kerala 12.50 0.00 0.00 85.78 0.00 98.28 14 Madhya Pradesh 0.00 0.00 3.67 173.24 0.00 176.91 15 Maharashtra 1.50 12.50 0.00 307.23 0.00 321.23 16 Manipur 0.00 0.00 0.00 0.86 0.00 0.86 17 Meghalaya 0.00 0.00 0.00 0.30 0.00 0.30 18 Mizoram 0.00 0.00 0.00 0.92 0.00 0.92 19 Nagaland 0.00 0.00 0.00 0.13 0.00 0.13 20 Odisha 18.00 0.00 0.00 25.71 12.30 56.01 21 Punjab 2.55 0.00 0.00 117.77 0.00 120.32 22 Rajasthan 0.00 0.00 0.00 6639.27 0.00 6639.27 23 Sikkim 0.00 0.00 0.00 2.74 113.00 115.74 24 Tamil Nadu 0.00 258.33 2.79 539.71 0.00 800.83 25 Telangana 0.00 0.00 9.26 558.94 0.00 568.20 26 Tripura 0.00 0.00 0.00 1.33 0.00 1.33 27 Uttar Pradesh 0.00 0.00 13.89 408.16 0.00 422.05 28 Uttarakhand 4.50 0.00 0.00 193.41 0.00 197.91 29 West Bengal 0.00 0.00 1.36 3.35 0.00 4.71 30 A&N Islands 0.00 0.00 0.00 0.03 0.00 0.03 31 Chandigarh 0.00 0.00 0.00 9.20 0.00 9.20 Dadra & Nagar Haveli 32 0.00 0.00 0.00 0.17 0.00 0.17 and Daman & Diu 33 Delhi 0.00 0.00 7.00 16.69 0.00 23.69 34 Lakshadweep 0.00 0.00 0.00 0.00 0.00 0.00 35 Pondicherry 0.00 0.00 0.00 4.18 0.00 4.18 36 Others 0.00 0.00 0.00 0.00 0.00 0.00 Total (MW) 63.75 1110.53 148.85 12760.52 513.30 14595.29 FY 2022-23 Small Large Wind Bio Solar S. No. STATES / UTs Hydro Hydro Total Power Power Power Power Power 1 Andhra Pradesh 1.20 0.00 0.00 147.43 0.00 148.62 2 Arunachal Pradesh 2.00 0.00 0.00 0.41 0.00 2.41 3 Assam 0.00 0.00 0.00 29.99 0.00 29.99 4 Bihar 0.00 0.00 0.00 2.25 0.00 2.25 5 Chhattisgarh 0.00 0.00 0.00 430.74 0.00 430.74 6 Goa 0.00 0.00 0.00 6.54 0.00 6.54 7 Gujarat 2.25 769.70 1.47 2074.53 0.00 2847.95 8 Haryana 0.00 0.00 1.43 118.53 0.00 119.96 9 Himachal Pradesh 15.60 0.00 0.00 11.33 0.00 26.93 10 Jammu & Kashmir 2.00 0.00 0.00 2.51 0.00 4.51 11 Jharkhand 0.00 0.00 0.00 17.05 0.00 17.05 12 Karnataka 0.00 164.05 0.00 650.59 0.00 814.64 13 Kerala 24.00 0.00 0.00 398.25 7.65 429.90 14 Ladakh 1.35 0.00 0.00 0.00 0.00 1.35 15 Madhya Pradesh 24.00 324.40 3.61 84.19 0.00 436.20 16 Maharashtra 0.00 0.00 8.54 2091.88 0.00 2100.42 17 Manipur 0.00 0.00 0.00 0.03 0.00 0.03 18 Meghalaya 0.00 0.00 0.00 0.00 0.00 0.00 19 Mizoram 9.00 0.00 0.00 20.12 0.00 29.12 20 Nagaland 2.00 0.00 0.00 0.00 0.00 2.00 21 Odisha 9.00 0.00 0.00 1.93 0.00 10.93 22 Punjab 0.00 0.00 30.62 67.19 0.00 97.81 23 Rajasthan 0.00 866.60 0.00 4490.83 0.00 5357.43 24 Sikkim 3.00 0.00 0.00 0.01 0.00 3.01 25 Tamil Nadu 0.00 150.80 1.00 1669.25 0.00 1821.05FY 2022-23 Small Large Wind Bio Solar S. No. STATES / UTs Hydro Hydro Total Power Power Power Power Power 26 Telangana 0.00 0.00 0.63 145.55 0.00 146.18 27 Tripura 0.00 0.00 0.00 2.71 0.00 2.71 28 Uttar Pradesh 0.00 0.00 26.74 270.79 0.00 297.53 29 Uttarakhand 0.00 0.00 0.00 1.99 120.00 121.99 30 West Bengal 0.00 0.00 20.65 13.97 0.00 34.62 31 A&N Islands 0.00 0.00 0.00 0.42 0.00 0.42 32 Chandigarh 0.00 0.00 0.00 3.52 0.00 3.52 Dadra & Nagar 33 Haveli and Daman 0.00 0.00 0.00 0.29 0.00 0.29 & Diu 34 Delhi 0.00 0.00 25.00 7.14 0.00 32.14 35 Lakshadweep 0.00 0.00 0.00 0.00 0.00 0.00 36 Pondicherry 0.00 0.00 0.00 21.84 0.00 21.84 37 Others 0.00 0.00 0.00 0.00 0.00 0.00 Total (MW) 95.40 2275.55 119.69 12783.80 127.65 15402.08 FY 2023-24 Small Large Wind Bio Solar S. No. STATES / UTs Hydro Hydro Total Power Power Power Power Power (MW) (MW) (MW) (MW) (MW) (MW) 1 Andhra Pradesh 0.00 0.00 8.36 50.79 0.00 59.15 2 Arunachal Pradesh 0.00 0.00 0.00 0.15 0.00 0.15 3 Assam 0.00 0.00 0.00 8.25 0.00 8.25 4 Bihar 0.00 0.00 14.20 46.35 0.00 60.55 5 Chhattisgarh 0.00 0.00 0.00 263.57 0.00 263.57 6 Goa 0.00 0.00 1.60 16.99 0.00 18.59 7 Gujarat 0.00 1743.80 1.75 4290.32 0.00 6035.87 8 Haryana 0.00 0.00 24.27 446.56 0.00 470.83 9 Himachal Pradesh 0.00 0.00 0.00 7.74 18.00 25.74 10 Jammu & Kashmir 23.25 0.00 0.00 16.00 0.00 39.25 11 Jharkhand 0.00 0.00 14.80 56.56 0.00 71.36 12 Karnataka 0.00 724.66 5.57 303.28 0.00 1033.51 13 Kerala 10.00 1.00 0.00 261.36 0.00 272.36 14 Ladakh 2.00 0.00 0.00 0.00 0.00 2.00 15 Madhya Pradesh 0.00 0.00 0.00 1193.29 0.00 1193.29 16 Maharashtra 1.20 195.15 2.50 1526.77 0.00 1725.62 17 Manipur 0.00 0.00 0.00 0.76 0.00 0.76 18 Meghalaya 22.50 0.00 0.00 0.09 0.00 22.59 19 Mizoram 0.00 0.00 0.00 2.29 0.00 2.29 20 Nagaland 0.00 0.00 0.00 0.13 0.00 0.13 21 Odisha 0.00 0.00 0.00 42.46 0.00 42.46 22 Punjab 0.00 0.00 44.98 157.01 0.00 201.99 23 Rajasthan 0.00 2.40 0.56 4291.88 0.00 4294.84 24 Sikkim 0.00 0.00 0.00 2.35 0.00 2.35 25 Tamil Nadu 0.00 586.37 1.75 1474.95 0.00 2063.07 26 Telangana 0.00 0.00 1.30 92.13 0.00 93.43 27 Tripura 0.00 0.00 0.00 0.86 0.00 0.86 28 Uttar Pradesh 0.00 0.00 9.41 405.11 0.00 414.52 29 Uttarakhand 0.00 0.00 2.80 0.00 60.00 62.80 30 West Bengal 0.00 0.00 5.26 14.10 0.00 19.36 31 A&N Islands 0.00 0.00 0.00 0.00 0.00 0.00 32 Chandigarh 0.00 0.00 0.00 6.83 0.00 6.83 Dadra & Nagar 33 Haveli and Daman 0.00 0.00 0.00 0.00 0.00 0.00 & Diu 34 Delhi 0.00 0.00 0.00 38.25 0.00 38.25 35 Lakshadweep 0.00 0.00 0.00 1.70 0.00 1.70 36 Pondicherry 0.00 0.00 0.00 14.38 0.00 14.38 37 Others 0.00 0.00 0.00 0.00 0.00 0.00FY 2023-24 Small Large Wind Bio Solar S. No. STATES / UTs Hydro Hydro Total Power Power Power Power Power Total (MW) 58.95 3253.38 139.11 15033.26 78.00 18562.70 MW = Megawatt FY 2024-25 Small Large Wind Bio Solar S. No. STATES / UTs Hydro Hydro Total Power Power Power Power Power 1 Andhra Pradesh 0.00 280.50 19.63 785.02 0.00 1085.15 2 Arunachal Pradesh 7.51 0.00 0.00 3.06 0.00 10.57 3 Assam 0.00 0.00 0.00 40.36 0.00 40.36 4 Bihar 0.00 0.00 0.00 89.11 0.00 89.11 5 Chhattisgarh 0.00 0.00 10.42 134.65 0.00 145.07 6 Goa 0.00 0.00 0.00 12.96 0.00 12.96 7 Gujarat 15.00 954.76 9.77 4951.78 0.00 5931.31 8 Haryana 0.00 0.00 27.77 589.25 0.00 617.02 9 Himachal Pradesh 31.00 0.00 0.00 109.03 700.00 840.03 10 Jammu & Kashmir 20.00 0.00 0.00 9.05 0.00 29.05 11 Jharkhand 0.00 0.00 1.04 37.47 0.00 38.51 12 Karnataka 4.00 1331.49 5.23 1134.98 0.00 2475.70 13 Kerala 0.00 7.77 0.00 516.15 100.00 623.92 14 Ladakh 2.80 0.00 0.00 0.00 0.00 2.80 15 Madhya Pradesh 0.00 350.86 20.52 1122.95 0.00 1494.33 16 Maharashtra 2.00 76.63 355.11 4437.60 0.00 4871.34 17 Manipur 0.00 0.00 0.00 0.75 0.00 0.75 18 Meghalaya 0.00 0.00 0.00 0.04 0.00 0.04 19 Mizoram 0.00 0.00 0.00 0.08 0.00 0.08 20 Nagaland 0.00 0.00 0.00 0.00 0.00 0.00 21 Odisha 0.00 0.00 5.00 128.81 0.00 133.81 22 Punjab 0.00 0.00 9.34 97.16 0.00 106.50 23 Rajasthan 0.00 12.93 80.63 6938.89 0.00 7032.45 24 Sikkim 0.00 0.00 0.00 0.52 0.00 0.52 25 Tamil Nadu 0.00 1136.37 1.17 1942.20 0.00 3079.74 26 Telangana 0.00 0.00 0.00 83.94 0.00 83.94 27 Tripura 0.00 0.00 0.00 2.78 0.00 2.78 28 Uttar Pradesh 0.00 0.00 83.00 443.74 0.00 526.74 29 Uttarakhand 15.00 0.00 6.29 17.54 0.00 38.83 30 West Bengal 0.00 0.00 3.50 126.55 0.00 130.05 31 A&N Islands 0.00 0.00 0.00 0.00 0.00 0.00 32 Chandigarh 0.00 0.00 0.00 13.33 0.00 13.33 Dadra & Nagar Haveli and 33 0.00 0.00 3.75 1.65 0.00 5.40 Daman & Diu 34 Delhi 0.00 0.00 0.00 56.89 0.00 56.89 35 Lakshadweep 0.00 0.00 0.00 0.00 0.00 0.00 36 Puducherry 0.00 0.00 0.00 4.60 0.00 4.60 37 Others 0.00 0.00 0.00 0.00 0.00 0.00 Total (MW) 97.31 4151.31 642.17 23832.89 800.00 29523.68Annexure-III Annexure-III referred to in reply of parts-(a) to (c) of the Rajya Sabha Unstarred Question No. 3660 to be answered on 24.03.2026 State-wise details of funds released/ utilized as Central Financial Assistance for the renewable energy projects under the major ongoing schemes/ programmes of the Ministry during the last five years (Rs. in Crore) FY 2020-21 Waste Solar Rooftop PM- States/ UTs CPSU to GEC Biomass Biogas Parks Solar KUSUM Energy Andaman & Nicobar 0.4 0.06 Islands Andhra Pradesh 33.1 23.53 5.50 Arunachal Pradesh Assam 3.10 Bihar 1.5 Chandigarh 0.8 Chhattisgarh Dadra & Nagar Haveli and Daman & Diu Delhi 1.05 22.2 Goa 0.05 Gujarat 26.60 52.3 3.95 4.72 24.57 0.17 Haryana 4.1 51.33 Himachal Pradesh 20.6 2.80 48.54 Jammu & Kashmir 4.9 Jharkhand 16.05 Karnataka 1.26 57.35 2.25 4.63 Kerala 6.74 11.7 0.65 Ladakh Lakshadweep Madhya Pradesh 31.3 5.03 Maharashtra 58.3 2.53 3.97 3.73 Manipur 4 0.36 Meghalaya 0.28 0.10 Mizoram Nagaland Odisha 0.77 0.35 Puducherry Punjab 6.9 8.28 3.08 Rajasthan 61.44 485.10 22 52.06 5.53 0.22 Sikkim Tamil Nadu 80.50 4.4 2.56 Telangana 27.00 20.7 0.32 Tripura 0.5 3.96 Uttar Pradesh 19.9 15.34 0.35 Uttarakhand 4.6 0.46 West Bengal Total 68.18 620.25 324.20 156.44 7.57 159.52 6.22 30.04 FY 2021-22 Waste Solar Rooftop PM- States/ UTs CPSU to GEC Biomass Biogas Parks Solar KUSUM Energy Andaman & Nicobar Islands Andhra Pradesh 2.1 50.55 0.99 0.88 Arunachal Pradesh Assam 0.4 0.31 Bihar 1.75 0.15FY 2021-22 Waste Solar Rooftop PM- States/ UTs CPSU to GEC Biomass Biogas Parks Solar KUSUM Energy Chandigarh Chhattisgarh 1.2 1.97 Dadra & Nagar Haveli and Daman & Diu Delhi 26.2 Goa 3.6 Gujarat 28.00 1214.7 13.96 1.29 Haryana 7.7 161.12 5.05 1.05 Himachal Pradesh 13.8 Jammu & Kashmir 20.2 Jharkhand 6.6 Karnataka 40.00 0.93 2.70 0.34 Kerala 36.3 0.79 0.45 Ladakh Lakshadweep Madhya Pradesh 50.84 73.16 1.27 1.66 Maharashtra 63.1 9.60 2.47 0.75 0.18 Manipur 4.7 Meghalaya Mizoram 0.48 Nagaland Odisha 0.13 Puducherry Punjab 16.6 23.70 Rajasthan 87.16 10.4 153.49 2.25 Sikkim Tamil Nadu 20.30 59.26 0.02 Telangana 27.37 16.1 2.02 1.20 Tripura 7.36 Uttar Pradesh 0.85 5.9 13.73 0.04 3.83 Uttarakhand 10.6 West Bengal 0.02 Total 207.33 27.37 1460.20 389.30 75.04 134.67 14.48 7.23 FY2022-23 Waste Solar Rooftop PM States/ UTs CPSU Biomass Biogas to GEC Parks Solar KUSUM Energy Andaman & Nicobar Islands Andhra Pradesh 5.6 50.47 Arunachal Pradesh 0.82 Assam 4.9 0.11 Bihar 1.75 Chandigarh 2 Chhattisgarh 3.3 3.70 Dadra & Nagar Haveli 1.50 and Daman & Diu Delhi 10.85 Goa Gujarat 522.17 1040.21 7.83 1.38 27.97 Haryana 14.72 137.95 3.53 Himachal Pradesh 11.7 5.85 4.02 Jammu & Kashmir 1.2 15.69 Jharkhand 3 20.04 Karnataka 9.93 0.12 17.50 Kerala 2.52 104.45 Ladakh Lakshadweep Madhya Pradesh 109.36 32.25 35.47 0.29 96.77FY2022-23 Waste Solar Rooftop PM States/ UTs CPSU Biomass Biogas to GEC Parks Solar KUSUM Energy Maharashtra 12 58.95 247.60 1.75 3.04 5.08 Manipur 0.23 Meghalaya Mizoram 1.28 0.8 Nagaland 0.20 Odisha 0.6 0.40 0.47 Puducherry 0.01 Punjab 46.2 31.11 1.73 2.11 Rajasthan 96.31 247.63 0.10 10.85 Sikkim Tamil Nadu 20.54 1.03 0.34 87.81 Telangana 43.9 0.33 Tripura 0.12 Uttar Pradesh 28.78 5.92 82.30 1.82 Uttarakhand 1.84 4.00 West Bengal 10.2 0.07 Total 676.11 35.50 1532.60 801.37 4.91 10.28 57.60 250.00 FY 2023-24 Waste Solar Rooftop PM States/ UTs CPSU Biomass Biogas to GEC Parks Solar KUSUM Energy Andaman & Nicobar 0.01 Islands Andhra Pradesh 22.45 4.5 2.74 47.54 Arunachal Pradesh 2.12 0.39 Assam 2.11 1.26 Bihar 9.8 Chandigarh 3.34 Chhattisgarh 14.3 1.43 0.95 Dadra & Nagar Haveli 0.11 and Daman & Diu Delhi 6.12 0.23 Goa 0.3 3.00 Gujarat 505.13 145.91 644.91 28.72 8.14 23.85 Haryana 24.64 429.78 Himachal Pradesh 2.4 40.50 Jammu & Kashmir Jharkhand 2.36 Karnataka 112.35 11.68 2.38 6.77 6.61 147.12 Kerala 199.89 28.53 Ladakh Lakshadweep Madhya Pradesh 59.26 31.39 0.80 6.97 0.84 22.26 Maharashtra 314.75 326.22 0.07 13.02 0.56 Manipur 0.9 0.17 0.22 Meghalaya 0.31 0.22 Mizoram Nagaland 0.18 0.18 Odisha 3.08 3.44 0.32 Puducherry 0.39 Punjab 23.83 5.41 2.34 Rajasthan 97.51 692.07 104.08 49.41 1.97 0.35 53.73 Sikkim Tamil Nadu 80.97 13.94 2.59 0.47 2.36 Telangana 27.39 23.24 0.29 Tripura 0.04 17.81 0.70 Uttar Pradesh 39.30 61.06 92.13 1.84 4.71 Uttarakhand 10.77 0.77 West Bengal 2.14FY 2023-24 Waste Solar Rooftop PM States/ UTs CPSU Biomass Biogas to GEC Parks Solar KUSUM Energy Total 715.50 1081.14 1498.60 992.36 4.18 45.54 20.82 334.99 FY 2024-25 PM- Waste Solar PM PM States/ UTs CPSU Surya Biomass Biogas to GEC Parks KUSUM JANMAN Ghar Energy Andaman & Nicobar 0.09 Islands Andhra Pradesh 83.90 111.42 0.37 1.84 0.72 0.25 Arunachal Pradesh 1.91 0.31 Assam 64.33 Bihar 0.70 53.76 Chandigarh 6.28 Chhattisgarh 2.80 8.80 0.72 Dadra & Nagar Haveli 0.67 and Daman & Diu Delhi 0.41 10.75 Goa 14.47 0.03 Gujarat 342.20 3251.13 59.95 3.06 17.77 Haryana 207.42 303.40 2.04 0.11 7.43 Himachal Pradesh 18.41 1.73 Jammu & Kashmir 59.85 12.90 Jharkhand 19.37 48.73 6.43 Karnataka 81.01 0.89 0.63 4.00 0.95 8.30 24.65 Kerala 7.40 801.27 1.72 0.04 Ladakh 2.67 Lakshadweep 1.97 Madhya Pradesh 73.9 266.92 3.83 10.20 Maharashtra 1248.62 1619.00 27.77 10.20 Manipur 2.56 0.17 Meghalaya 0.08 Mizoram 2.24 1.46 0.84 Nagaland 0.16 Odisha 25.30 0.26 Puducherry 5.11 Punjab 81.18 13.09 7.60 2.21 Rajasthan 48.5 211.30 321.04 295.20 1.69 Sikkim 0.02 Tamil Nadu 1.76 172.64 6.48 4.95 15.18 10.47 Telangana 1.30 89.52 0.44 0.85 5.37 Tripura 1.14 9.31 5.96 0.91 Uttar Pradesh 155.1 684.83 173.01 0.51 0.58 23.79 292.93 Uttarakhand 163.26 15.60 1.29 0.20 West Bengal 0.10 0.01 Total 373.84 557.67 7777.61 2563.93 13.83 15.99 44.79 86.17 346.07Annexure-IV Annexure-IV referred to in reply of part-(d) of the Rajya Sabha Unstarred Question No. 3660 to be answered on 24.03.2026 The Government of India has taken several steps and initiatives to promote and accelerate renewable energy capacity in the country including for development of the Energy Storage capacity and to strengthen grid integration, to realize the commitment of 500 GW non-fossil energy capacity by 2030. These include, inter-alia, the following: • Standard Bidding Guidelines for tariff based competitive bidding process for procurement of Power from Grid Connected Solar, Wind, Wind-Solar Hybrid and Firm & Dispatchable Renewable Energy (FDRE) projects have been issued. • To boost RE consumption, Renewable Purchase Obligation (RPO) followed by Renewable Consumption Obligation (RCO) trajectory has been notified till 2029-30. The RCO which is applicable to all designated consumers under the Energy Conservation Act 2001 will attract penalties on non-compliance. RCO also includes specified quantum of consumption from Decentralized Renewable Energy sources. • Foreign Direct Investment (FDI) has been permitted up to 100 percent under the automatic route. • Schemes such as Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-KUSUM), PM Surya Ghar Muft Bijli Yojana, National Programme on High Efficiency Solar PV Modules, New Solar Power Scheme (for Tribal and PVTG Habitations/Villages) under Pradhan Mantri Janjati Adivasi Nyaya Maha Abhiyan (PM JANMAN) and Dharti Aabha Janjatiya Gram Utkarsh Abhiyan (DA JGUA), National Green Hydrogen Mission, Viability Gap Funding (VGF) Scheme for Offshore Wind Energy Projects have been launched. • Scheme for setting up of Solar Parks and Ultra Mega Solar Power projects is being implemented to provide land and transmission to RE developers for installation of RE projects at large scale. • Waiver on Inter State Transmission System (ISTS) charges for renewable energy projects including green hydrogen projects, with certain timelines and conditions. • Laying of new transmission lines and creating new sub-station capacity has been funded under the Green Energy Corridor Scheme for evacuation of renewable power. • Quality Control Orders for Solar Photovoltaic products (i.e., Solar PV Modules, Solar PV Inverters & Storage Battery) and Solar Water Heating systems notified. • Issued Guidelines for Resource Adequacy Planning Framework for India. • Electricity (Rights of Consumers) Rules, 2020 has been issued for net-metering up to five hundred Kilowatt or up to the electrical sanctioned load, whichever is lower. • “National Repowering and Life Extension Policy for Wind Power Projects, 2023” has been issued. • The Offshore Wind Energy Lease Rules, 2023 have been notified vide Ministry of External Affairs notification dated 19th December 2023, to regulate the grant of lease of offshore areas for development of offshore wind energy projects. • The Revised Guidelines for installation of prototype wind turbine models issued on 12th June 2025. • Procedure for inclusion/updating Wind Turbine Model in the Revised List of Models and Manufacturers of Wind Turbines (RLMM) issued on 31st July 2025. The amendment renames RLMM as Approved List of Models and Manufacturers [ALMM (Wind)] and mandates usage of listed components such as Blade, Tower, Generator, Gearbox and Special Bearings (Main, Pitch and Yaw Bearing) along with mandatory relocation of data centres within India and prohibition of real-time data transfer outside India. • The Standard Operating Procedure (SOP) for ALMM-Wind and ALMM – Wind Turbine Components (ALMM-WTC) issued on 29th October 2025, detailing the end-to-end process for application, verification, factory inspection, component evaluation and model enlistment.• Standard & Labelling (S&L) programs for Solar Photovoltaic modules and Grid-connected Solar Inverters have been launched. • “The Electricity (Late Payment Surcharge and related matters) Rules (LPS rules) have been notified. • Electricity (Promoting Renewable Energy Through Green Energy Open Access) Rules, 2022, notified on 06th June 2022 with objective of ensuring access to affordable, reliable, and sustainable green energy for all. Green Energy Open Access is allowed to any consumer with contract demand of 100 kW or above through single or multiple single connection aggregating Hundred kW or more located in same electricity division of a distribution licensee. • Green Term Ahead Market (GTAM) has been launched to facilitate sale of Renewable Power through exchanges. • Government has issued orders that power shall be dispatched against Letter of Credit (LC) or advance payment to ensure timely payment by distribution licensees to RE generators. Various steps/ initiatives taken for development of the Energy Storage capacity and to strengthen grid integration include, inter alia, the following: • Notified Guidelines for Procurement and Utilization of Battery Energy Storage System (BESS) as part of Generation, Transmission and Distribution assets, along with Ancillary Services. • Issued National Framework to promote Energy Storage Systems in the country. • Issued Guidelines to promote Pumped Storage Projects (PSP). • Granted 100% waiver of Inter-State Transmission System (ISTS) charges for PSP for which construction work is awarded on or before June 30, 2028 • Granted 100% ISTS charges waiver for co-located BESS projects, commissioned on or before 30th June 2028, with certain conditions. • Approved a Viability Gap Funding (VGF) Scheme for the development of large-scale BESS with an outlay of ₹3,760 crore for the development of 13,220 MWh. Approved another VGF Scheme for 30 GWh, funded through ₹5,400 crore from the Power System Development Fund (PSDF). • Issued an Advisory on ‘Co-locating Energy Storage Systems with Solar Power Projects to enhance grid stability and cost efficiency’. • Central Electricity Authority (CEA) has published a plan for Transmission System for Integration of over 500 GW renewable energy capacity by 2030 covering all renewable energy rich States. • Central Electricity Authority (Technical Standards for Connectivity to the Grid) Regulations lay down the minimum technical requirements for the RE generating plants to ensure safe, secure and reliable operation of the grid. The compliances to the said regulations by RE plants are verified jointly by Central Transmission Utility (CTUIL) and Grid-India/Regional Load Despatch Centres (RLDCs) before granting connectivity/ interconnection to the national grid. • Indian Electricity Grid Code mandates that RE plants participate in the primary and secondary frequency control in case of contingencies. • Establishment of Renewable Energy Management Centres (REMCs) for real-time forecasting, scheduling, and monitoring of RE generation across 12 RE-rich regions.

Continue your research