Executive Summary:
The Ministry of Rural Development addresses initiatives to improve rural infrastructure in Assam, focusing on road networks, electricity, and water access. The Pradhan Mantri Gram Sadak Yojana (PMGSY) aims to provide all-weather road connectivity to eligible habitations, with ongoing phases and targeted programs to enhance rural connectivity, particularly in tea garden and tribal regions. The government is also implementing schemes for electricity and water supply, along with housing under Pradhan Mantri Awaas Yojana-Gramin (PMAYG).
Key Points / Main Content:
Road Connectivity (PMGSY):
* PMGSY launched on December 25, 2000, to provide all-weather road connectivity to unconnected habitations (population of 500+ in plain areas, 250+ in North-Eastern, Himalayan states, desert, tribal areas).
* PMGSY includes PMGSY-II (upgrading 50,000 km of rural roads), RCPLWEA (roads in Left Wing Extremism areas), and PMGSY-III (consolidating 1,25,000 km of Through Routes and Major Rural Links).
* PMGSY-IV aims to connect 25,000 habitations, considering 2011 census data (500 population in plain areas; 250 in NorthEastern and Hilly States/UTs, Special Category Areas Schedule V Tribal Areas, Aspirational Districts/Blocks, Desert Areas; and 100 in LWE affected areas).
* In Assam, 9,269 road works (32,911 km) and 1,466 bridge works have been sanctioned, with 9,124 road works (32,034 km) and 1,423 bridges completed, spending Rs. 22,933.67 crore.
* Road work completion timeline is 12 working months (18 calendar months for packages); 21-24 months for bridges exceeding 25 meters.
* PMGSY-IV prioritizes habitations with significant Scheduled Tribe (ST) or Scheduled Caste (SC) populations in convergence with DAJGUA and PMAJAY initiatives.
Electricity Supply:
* Government supplements states' efforts through schemes like DDUGJY, IPDS, SAUBHAGYA, and RDSS to improve power supply quality.
* Under RDSS, Rs. 3,394.65 crore for distribution infrastructure and Rs. 4,049.54 crore for smart metering have been sanctioned for Assam.
* RDSS includes grid electrification of left-out households; Rs. 785.55 crore sanctioned for electrifying 127,111 households in Assam.
Water Access:
* Jal Jeevan Mission (JJM) aims to provide tap water supply to every rural household since August 2019.
Housing (PMAYG):
* PMAYG aims to construct 2.95 crore houses by assisting eligible rural households and has approved an additional 2 crore rural houses during FY 2024-25 to FY 2028-29.
* Assam has a target of 29,87,868 houses, with 28,80,057 sanctioned and 20,74,118 completed.
* PMAYG focuses on convergence with other schemes, with 21,25,950 houses provided with electricity and 16,86,943 with water connections in Assam.
Impact Analysis:
State Governments/UTs:
* Impact: Responsible for supply and distribution of electricity, planning, approval, implementation, operation, and maintenance of drinking water supply schemes. Must adhere to PMGSY timelines and coordinate with the Ministry for project implementation.
* Action Required: Finalize and sanction PMGSY-IV proposals, ensure adherence to timelines for project completion, and coordinate with central ministries and state departments.
Ministry of Rural Development:
* Impact: Responsible for overseeing and coordinating the implementation of PMGSY, JJM and PMAYG.
* Action Required: Conduct regular monitoring and review meetings with States/UTs, coordinate with stakeholders to resolve bottlenecks, and ensure timely implementation of projects.
Rural Population of Assam:
* Impact: Improved road connectivity, electricity supply, water access, and housing.
* Action Required: Participate in government schemes and programs to avail benefits.
Key Entities Referenced
Assam: A state in northeastern India, focus of the rural development initiatives discussed in the document.
Ministry of Rural Development: The Indian government ministry responsible for rural development programs, including road construction, electricity supply, and water access.
Pradhan Mantri Gram Sadak Yojana (PMGSY): A rural road construction scheme in India, aimed at providing all-weather road connectivity to unconnected habitations.
Deen Dayal Upadhyaya Gram Jyoti Yojana (DDUGJY): An Indian government scheme to improve electricity supply in rural areas.
Jal Jeevan Mission (JJM): A government of India initiative to provide tap water supply to every rural household.
Pradhan Mantri Awaas Yojana Gramin (PMAYG): An affordable rural housing scheme by the Government of India.
NorthEastern States: Group of states in India with special consideration in rural development programs.
Ministry of Home Affairs: A ministry of the Government of India responsible for internal security and policy.
GOVERNMENT OF INDIA
MINISTRY OF RURAL DEVELOPMENT
DEPARTMENT OF RURAL DEVELOPMENT
LOK SABHA
UNSTARRED QUESTION NO. 2702
ANSWERED ON 05/08/2025
ROAD NETWORKS IN RURAL ASSAM
2702. Md. RakibulHussain:
Will the Minister of RURAL DEVELOPMENT be pleased to state:
(a) whether any specific initiatives are being undertaken to
improve rural road networks, electricity supply and water
access in the villages of Assam;
(b) the details of the measures taken by the Government to ensure
the timely implementation of the Pradhan Mantri Gram
SadakYojana (PMGSY) and other infrastructure schemes in the
remote and inaccessible areas of Assam;
(c) whether there are any targeted programs to enhance rural
connectivity for the tea gardens and tribal regions of Assam;
and
(d) if so, the details thereof and if not, the reasons therefor?
ANSWER
MINISTER OF STATE IN THE MINISTRY OF RURAL DEVELOPMENT
(SHRI KAMLESH PASWAN)
(a) & (b): Rural Roads is a State subject. Pradhan Mantri Gram
SadakYojana (PMGSY) was launched on 25th December, 2000, as a
one-time special intervention to assist the States in providing all-
weather road connectivity to the eligible unconnected habitations
as per core-network with a population of 500+ persons in plain
areas, 250+ in North-Eastern States, Himalayan States, the Desert
areas (as identified in Desert Development programme), Tribal
(Schedule-V) areas and Selected Tribal and Backward Districts
(as identified by the Ministry of Home Affairs and erstwhile
Planning Commission), as per census 2001.
Subsequently, new interventions/ verticals, namely PMGSY-II,
Road Connectivity Project for Left Wing Extremism Areas
(RCPLWEA) and PMGSY-III were added under the ambit of PMGSY
Page 1 of 4for upgradation of 50,000 Km rural roads; construction of
strategically important roads in LWE Areas; and for consolidation of
1,25,000 Km Through Routes and Major Rural Links connecting
habitations to Gramin Agricultural Markets (GrAMs) Higher
Secondary Schools and Hospitals; respectively.
Further, the Government has launched PMGSY-IV to provide
all-weather road connectivity to 25,000 unconnected habitations,
which have become eligible due to their population increase. As per
population norms of the programme, unconnected habitations
having 500+ population in plain areas; 250+ in North-Eastern and
Hilly States/UTs, Special Category Areas (Schedule V Tribal Areas,
Aspirational Districts/Blocks, Desert Areas); and 100+ in LWE-
affected areas (as notified by MHA), as per Census 2011, are eligible
for coverage under PMGSY-IV.
Since the inception of PMGSY, 9,269 road works of 32,911 Km
and 1,466 bridge works have been sanctioned in Assam State, out of
which, construction of 9,124 road works of 32,034 Km and 1,423
bridges (more than 97%) has been completed with an expenditure of
Rs. 22,933.67 crore, including State share.
As regards PMGSY-IV, the preliminary identification of eligible
habitations under PMGSY-IV has been completed, and the Ministry
is working in close coordination with the State Government to
finalise and sanction proposals accordingly.
As per programme guidelines, the timeline for completion of
road work is 12 working months from the date of issue of the work
order. However, where a package comprises more than one
roadwork, the total time given for completion of the package is 18
calendar months. Similarly, a period of 21-24 months has been
allowed for completion of bridge works exceeding 25 meters in
length, depending on site conditions. States have been instructed to
adhere to the timelines for completion of sanctioned projects.
Further, the Ministry conducts regular monitoring and review
meetings with States/UTs to track the progress of the projects and
resolve the pending issues. The Ministry coordinates with other
stakeholders, viz. Ministry of Home Affairs, Ministry of Environment,
Forest & Climate Change, Nodal Departments of the State
Governments, State Forest Departments and executing agencies to
resolve the bottlenecks in project execution and to ensure timely
implementation of the projects.
Page 2 of 4Electricity is a concurrent subject and therefore, supply and
distribution of electricity to the consumers is within the purview of
the respective State Government/ Power Utility. However, the
Government of India has supplemented the efforts of the States
earlier under the schemes like DeenDayalUpadhyaya Gram
JyotiYojana (DDUGJY), Integrated Power Development Scheme
(IPDS), Pradhan MantriSahajBijliHarGharYojana (SAUBHAGYA), etc.,
and presently under Revamped Distribution Sector Scheme (RDSS)
to help improve the quality and reliability of power supply to
consumers. Under the scheme, distribution infrastructure works
amounting to Rs. 3,394.65 crore and smart metering works
amounting to Rs. 4,049.54 crore have been sanctioned for the state
of Assam. Furthermore, under RDSS, grid electrification of left-out
households has been taken up. To date, works amounting to Rs.
785.55 crore have been sanctioned for the electrification of
1,27,111 households in the state of Assam.
The Government of India has been implementing the
JalJeevan Mission (JJM) since August 2019, in partnership with
States, to make provision of tap water supply to every rural
household of the Country. Drinking water is a State subject and
hence, the responsibility of planning, approval, implementation,
operation and maintenance of drinking water supply schemes,
including those under JalJeevan Mission, lies with the State / UT
Government. The Government of India supports the States by
providing technical and financial assistance.
Pradhan MantriAwaasYojana- Gramin (PMAY-G) is being
implemented w.e.f. 1st April, 2016, to construct 2.95 crore houses
by assisting eligible rural households with basic amenities. The
government has approved an additional 2 crore rural houses under
PMAY-G to be constructed during FY 2024-25 to FY 2028-29 to meet
the arising housing requirements. As of the date, the target of
29,87,868 houses has been allocated to the state of Assam, with
which its Permanent Wait List (both SECC and Awaas+2018 list) is
now saturated. Of the total allocated target, 28,80,057 houses have
been sanctioned, and 20,74,118 houses have been completed under
PMAY-G. PMAY-G focuses on the provision of houses along with the
basic needs of households through convergence with other
Government Schemes. The Ministry aims at saturation of benefits
provided through convergence with schemes to all PMAY-G
beneficiaries. In the state of Assam, 21,25,950 houses have been
provided with electricity connection, and 16,86,943 houses have
Page 3 of 4been provided with water connection under convergence with other
schemes.
(c) & (d): PMGSY is designed as an area development programme,
with the ‘habitation’ as the unit, and aims to provide all-weather
road connectivity to eligible habitations, thereby ensuring access
for the entire population, those living in and around farm and non-
farm production centres. To ensure inclusive and equitable access
in backwards and marginalised areas, PMGSY-IV is being
implemented in convergence with two flagship inclusion-focused
initiatives, namely:
(i) DhartiAabaJanjatiya Gram UtkarshAbhiyan (DA-JGUA):
Habitations with 500+ population and 50% or more ST population,
or habitations with 50+ ST population in the 250+ category in
Aspirational Districts, as per Census 2011, are given priority under
PMGSY IV;
(ii) Pradhan MantriAnusuchitJaatiAbhyudayYojana (PM-AJAY):
Habitations with 500+ population and 40% or more SC population
are given priority under PMGSY-IV.
*****
Page 4 of 4