GOVERNMENT OF INDIA
MINISTRY OF NEW AND RENEWABLE ENERGY
LOK SABHA
UNSTARRED QUESTION NO. 5997
ANSWERED ON 01.04.2026
ROOFTOP SOLAR ADOPTION IN UTTAR PRADESH
5997. SHRI ZIA UR REHMAN
Will the minister of New and Renewable Energy be pleased to state:
(a) whether the Government has conducted any assessment of rooftop solar adoption and
renewable energy capacity addition in Western Uttar Pradesh;
(b) if so, the details of subsidies, awareness campaigns and grid integration measures
implemented in the said region;
(c) whether similar renewable energy adoption challenges exist in other States; and
(d) if so, the details of national targets and programmes to increase renewable energy capacity
across the country?
ANSWER
THE MINISTER OF STATE FOR NEW & RENEWABLE ENERGY AND POWER
(SHRI SHRIPAD YESSO NAIK)
(a) to (d) The Ministry of New and Renewable Energy (MNRE) has assessed the potential for
renewable energy generation, including Solar, Wind, Biomass etc. across the country, which
also includes Western Uttar Pradesh region and is promoting their development through various
policies and programmes in coordination with State Governments.
The MNRE is implementing various schemes/ programmes covering subsidies, awareness
campaigns and grid integration measures to promote development and deployment of renewable
energy in the country including the western Uttar Pradesh. The details are given at Annexure-
I.
The Government has also taken several steps and initiatives to promote and accelerate
development and deployment of renewable energy capacity across the country in order to realize
the commitment of 500 GW non-fossil energy capacity by 2030 and to increase the share of
renewable energy in the country’s total energy mix, the details of which are given at Annexure-
II.
*****Annexure-I referred to in reply of parts-(a) to (d) of the Lok Sabha Unstarred Question No.
5997 to be answered on 01.04.2026 regarding Rooftop Solar Adoption in Uttar Pradesh
Details of the ongoing major Renewable Energy Schemes / Programmes being implemented
by MNRE
1. PM-Surya Ghar: Muft Bijli Yojana launched in February, 2024 with the aim to achieve rooftop
solar installation in one crore households in the residential sector with an outlay of Rs. 75,021
crore. The subsidy provision under the scheme is as under:
CFA (Special
S.No. Type of Residential Segment CFA Category
States/UTs)
Residential Sector (first 2 kWp of Rooftop
1 Rs.30,000/kWp Rs.33,000/kWp
Solar (RTS) capacity or part thereof)
Residential Sector (with additional RTS
2 Rs.18,000/kWp Rs.19,800/kWp
capacity of 1 kWp or part thereof)
Residential Sector (additional RTS No additional No additional
3
capacity beyond 3 kWp) CFA CFA
Group Housing Societies/ Residential
Welfare Associations (GHS/RWA) etc.
4 for common facilities including EV Rs.18,000/kWp Rs.19,800/kWp
charging up to 500 kWp (@ 3 kWp per
house)
2. Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-KUSUM) for setting up
decentralized solar or other renewable energy power plants, installation of stand-alone solar
agriculture pumps, and solarization of existing grid-connected agriculture pumps, including
feeder-level solarization.
3. Scheme for Development of Solar Parks and Ultra-mega Solar Power Projects. Under the
scheme, the infrastructure such as land, roads, power evacuation system, water facilities are
developed with all statutory clearances/approvals, to help expeditious development of utility-
scale solar projects in the country.
4. Production Linked Incentive scheme ‘National Programme on High Efficiency Solar PV
Modules’ for achieving manufacturing capacity of Giga Watt (GW) scale in High Efficiency
Solar PV modules.
5. Central Public Sector Undertaking (CPSU) Scheme Phase-II (Government Producer Scheme) for
setting up 12,000 MW grid-connected Solar Photovoltaic (PV) Power Projects by Government
Producers, using domestically manufactured solar PV cells and modules, with Viability Gap
Funding (VGF) support, for self-use or use by Government/ Government entities, either directly
or through Distribution Companies (DISCOMS).6. National Green Hydrogen Mission launched with aim to make India a Global Hub for production,
utilization and export of Green Hydrogen and its derivatives.
7. Green Energy Corridors (GEC) to create intra-state transmission system for renewable energy
projects.
8. Bio-Energy Programme:
• Waste to Energy Programme : Programme on Energy from Urban, Industrial and
Agricultural Wastes/Residues
• Biomass Programme: Scheme to Support Manufacturing of Briquettes & Pellets and
Promotion of Biomass (non-bagasse) based cogeneration in Industries.
• Biogas Programme : for promotion of family type Biogas plants
9. New Solar Power Scheme [for Tribal and Particularly Vulnerable Tribal Groups (PVTG)
Habitations/Villages] under Pradhan Mantri Janjati Adivasi Nyaya Maha Abhiyan (PM
JANMAN) and Dharti Aabha Janjatiya Gram Utkarsh Abhiyan (DA JGUA) with a provision for
providing off-grid Solar Lighting where electricity supply through grid is not techno-
economically feasible.Annexure-II referred to in reply of parts-(a) to (d) of the Lok Sabha Unstarred Question No.
5997 to be answered on 01.04.2026 regarding Rooftop Solar Adoption in Uttar Pradesh
The Government of India has taken several steps and initiatives to promote and accelerate
renewable energy capacity in the country to realize the commitment of 500 GW non-fossil
energy capacity by 2030. These include, inter-alia, the following:
• Standard Bidding Guidelines for tariff based competitive bidding process for procurement
of Power from Grid Connected Solar, Wind, Wind-Solar Hybrid and Firm & Dispatchable
Renewable Energy (FDRE) projects have been issued.
• To boost RE consumption, Renewable Consumption Obligation (RCO) trajectory has been
notified till 2029-30. The RCO which is applicable to all designated consumers under the
Energy Conservation Act, 2001, will attract penalties on non-compliance. RCO also
includes specified quantum of consumption from Decentralized Renewable Energy
sources.
• Foreign Direct Investment (FDI) has been permitted up to 100 percent under the automatic
route.
• Schemes such as Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-
KUSUM), PM Surya Ghar Muft Bijli Yojana, National Programme on High Efficiency
Solar PV Modules, New Solar Power Scheme (for Tribal and PVTG Habitations/Villages)
under Pradhan Mantri Janjati Adivasi Nyaya Maha Abhiyan (PM JANMAN) and Dharti
Aabha Janjatiya Gram Utkarsh Abhiyan (DA JGUA), National Green Hydrogen Mission,
Viability Gap Funding (VGF) Scheme for Offshore Wind Energy Projects have been
launched.
• Scheme for setting up of Solar Parks and Ultra Mega Solar Power projects is being
implemented to provide land and transmission to RE developers for installation of RE
projects at large scale.
• Waiver on ISTS charges for renewable energy projects including green hydrogen projects,
with certain timelines and conditions.
• Laying of new transmission lines and creating new sub-station capacity has been funded
under the Green Energy Corridor Scheme for evacuation of renewable power.
• Quality Control Orders for Solar Photovoltaic products (i.e., Solar PV Modules, Solar PV
Inverters & Storage Battery) and Solar Water Heating systems notified.
• Issued National Framework for promoting & developing Energy Storage Systems.
• Issued Guidelines for Resource Adequacy Planning Framework for India.
• Electricity (Rights of Consumers) Rules, 2020 has been issued for net-metering up to five
hundred Kilowatt or up to the electrical sanctioned load, whichever is lower.
• “National Repowering and Life Extension Policy for Wind Power Projects, 2023” has been
issued.
• The Offshore Wind Energy Lease Rules, 2023 have been notified vide Ministry of External
Affairs notification dated 19th December 2023, to regulate the grant of lease of offshore
areas for development of offshore wind energy projects.• The Revised Guidelines for installation of prototype wind turbine models issued on 12th
June 2025.
• Procedure for inclusion/updating Wind Turbine Model in the Revised List of Models and
Manufacturers of Wind Turbines (RLMM) issued on 31st July 2025. The amendment
renames RLMM as Approved List of Models and Manufacturers [ALMM (Wind)] and
mandates usage of listed components such as Blade, Tower, Generator, Gearbox and
Special Bearings (Main, Pitch and Yaw Bearing) along with mandatory relocation of data
centres within India and prohibition of real-time data transfer outside India.
• The Standard Operating Procedure (SOP) for ALMM-Wind and ALMM – Wind Turbine
Components (ALMM-WTC) issued on 29th October 2025, detailing the end-to-end process
for application, verification, factory inspection, component evaluation and model
enlistment.
• Standard & Labelling (S&L) programs for Solar Photovoltaic modules and Grid-connected
Solar Inverters have been launched.
• To augment transmission infrastructure needed for steep RE trajectory, transmission plan
has been prepared till 2030.
• “The Electricity (Late Payment Surcharge and related matters) Rules (LPS rules) have been
notified.
• Electricity (Promoting Renewable Energy Through Green Energy Open Access) Rules,
2022, notified on 06th June 2022 with objective of ensuring access to affordable, reliable,
and sustainable green energy for all. Green Energy Open Access is allowed to any
consumer with contract demand of 100 kW or above through single or multiple single
connection aggregating Hundred kW or more located in same electricity division of a
distribution licensee.
• Green Term Ahead Market (GTAM) has been launched to facilitate sale of Renewable
Power through exchanges.
• Government has issued orders that power shall be dispatched against Letter of Credit (LC)
or advance payment to ensure timely payment by distribution licensees to RE generators.