2546 Shri Nabam Rebia:
Will the Minister of Rural Development be pleased to state:
(a) whether the attention of Government is drawn to the rural areas connectivity programme
made under Pradhan Mantri Gram Sadak Yojana (PMGSY-IV) in different parts of the
country, particularly in Arunachal Pradesh;
(b) whether any suggestions have been received by the Ministry for the establishment of
connectivity to rural areas in the implementation of the PMGSY-IV guidelines, if so, the
details thereof; and
(c) the status of the progress made so far under PMGSY-IV?
ANSWER
MINISTER OF STATE IN THE MINISTRY OF RURAL DEVELOPMENT
(SHRI KAMLESH PASWAN)
(a): The Government is committed to enhancing rural infrastructure through the Pradhan
Mantri Gram Sadak Yojana-IV (PMGSY-IV), launched for the period 2024-25 to 2028-29. The
scheme specifically prioritises North Eastern States, including Arunachal Pradesh, by relaxing
population eligibility criteria to ensure all-weather road access to smaller, geographically isolated
habitations that were previously unconnected.
(b): During the formulation of the PMGSY-IV guidelines, the Ministry conducted extensive
consultations with State Governments and technical stakeholders. Key suggestions successfully
incorporated into the final guidelines include:
I. Cluster-Based Connectivity: Implementation of a "cluster approach" for habitations,
allowing for the lowering of population thresholds in remote and international border-
sharing blocks to ensure comprehensive coverage.
II. Sustainable Construction: Mandating the use of "Green Technologies," such as waste
plastics and "Cold Mix" technology, to minimise the carbon footprint and protect the
fragile Himalayan ecosystem during road construction.
Page 1 of 2(c): As of March 9, 2026, the implementation of PMGSY-IV has achieved significant
momentum. The progress made so far is detailed below:
Road Length
No of Roads No of Bridge Works
Sr.No. State Name Sanctioned
Sanctioned Sanctioned
(in km)
1 Assam 758 1,522.27 62
2 Chhattisgarh 774 2,426.88 0
3 Himachal Pradesh 294 1,538.06 0
Jammu And
4 316 1,781.33 0
Kashmir
5 Rajasthan 1,216 3,218.97 1
6 Sikkim 96 384.267 0
7 Uttarakhand 184 1,228.20 0
Total 3,638 12,099.98 63
*****