Home India Ministry of Rural Development Parliament Question: Rural areas connectivity made under PMG...
Date: 2026-03-13 Category: RAJYASABHA_QNA State: Union Government Country: India

Parliament Question: Rural areas connectivity made under PMGSY-IV

Issued by Ministry of Rural Development · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF RURAL DEVELOPMENT DEPARTMENT OF RURAL DEVELOPMENT RAJYA SABHA UNSTARRED QUESTION NO. 2546 TO BE ANSWERED ON 13/03/2026 RURAL AREAS CONNECTIVITY MADE UNDER PMGSY-IV 2546 Shri Nabam Rebia: Will the Minister of Rural Development be pleased to state: (a) whether the attention of Government is drawn to the rural areas connectivity programme made under Pradhan Mantri Gram Sadak Yojana (PMGSY-IV) in different parts of the country, particularly in Arunachal Pradesh; (b) whether any suggestions have been received by the Ministry for the establishment of connectivity to rural areas in the implementation of the PMGSY-IV guidelines, if so, the details thereof; and (c) the status of the progress made so far under PMGSY-IV? ANSWER MINISTER OF STATE IN THE MINISTRY OF RURAL DEVELOPMENT (SHRI KAMLESH PASWAN) (a): The Government is committed to enhancing rural infrastructure through the Pradhan Mantri Gram Sadak Yojana-IV (PMGSY-IV), launched for the period 2024-25 to 2028-29. The scheme specifically prioritises North Eastern States, including Arunachal Pradesh, by relaxing population eligibility criteria to ensure all-weather road access to smaller, geographically isolated habitations that were previously unconnected. (b): During the formulation of the PMGSY-IV guidelines, the Ministry conducted extensive consultations with State Governments and technical stakeholders. Key suggestions successfully incorporated into the final guidelines include: I. Cluster-Based Connectivity: Implementation of a "cluster approach" for habitations, allowing for the lowering of population thresholds in remote and international border- sharing blocks to ensure comprehensive coverage. II. Sustainable Construction: Mandating the use of "Green Technologies," such as waste plastics and "Cold Mix" technology, to minimise the carbon footprint and protect the fragile Himalayan ecosystem during road construction. Page 1 of 2(c): As of March 9, 2026, the implementation of PMGSY-IV has achieved significant momentum. The progress made so far is detailed below: Road Length No of Roads No of Bridge Works Sr.No. State Name Sanctioned Sanctioned Sanctioned (in km) 1 Assam 758 1,522.27 62 2 Chhattisgarh 774 2,426.88 0 3 Himachal Pradesh 294 1,538.06 0 Jammu And 4 316 1,781.33 0 Kashmir 5 Rajasthan 1,216 3,218.97 1 6 Sikkim 96 384.267 0 7 Uttarakhand 184 1,228.20 0 Total 3,638 12,099.98 63 ***** Page 2 of 2

Continue your research