See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF TOURISM
LOK SABHA
STARRED QUESTION NO.*11
ANSWERED ON 20.07.2026
SDS 2.0 AND PRASHAD SCHEMES
*11. SHRI SHASHANK MANI:
SHRI PRABHAKAR REDDY VEMIREDDY:
Will the Minister of TOURISM be pleased to state:
(a) the details of projects sanctioned under Swadesh Darshan 2.0 and
Pilgrimage Rejuvenation and Spiritual, Heritage Augmentation Drive
(PRASHAD) Schemes along with the total funds sanctioned, released
and utilised under the said schemes in the country, State/UT wise,
especially in Uttar Pradesh and Andhra Pradesh during the last five
years, year and component-wise;
(b) whether any proposal from Andhra Pradesh are pending for approval
under the said schemes and if so, the details thereof;
(c) whether the Government has put in place any monitoring mechanism
or outcome indicators to assess the PRASHAD schemes and whether
the completed PRASHAD sites have led to an increase in footfall and
if so, the details thereof;
(d) the details of footfall recorded at all PRASHAD sites in Andhra
Pradesh since their sanction, along with the latest status of each
project, site and year-wise;
(e) whether the Government has identified or assessed any heritage,
spiritual or cultural destinations in eastern Uttar Pradesh, including
Deoria district for integration with the existing Spiritual and BuddhistTourism Circuits under Swadesh Darshan 2.0 or any other Central
tourism scheme; and
(f) whether the Government proposes to improve tourism infrastructure,
visitor amenities and last-mile connectivity at such destinations to
promote regional tourism, increase tourist footfall and generate local
employment and if so, the details thereof?
ANSWER
THE MINISTER OF TOURISM (SHRI GAJENDRA SINGH SHEKHAWAT)
(a) to (f): A statement is laid on the Table of the House.
******STATEMENT IN REPLY TO PARTS (A) TO (F) OF LOK SABHA STARRED
QUESTION NO.*11 ANSWERED ON 20.07.2026 REGARDING SDS 2.0 AND
PRASHAD SCHEMES RAISED BY SHRI SHASHANK MANI AND SHRI
PRABHAKAR REDDY VEMIREDDY
(a): The Ministry of Tourism through its ongoing schemes of Swadesh
Darshan 2.0 and ‘Pilgrimage Rejuvenation and Spiritual, Heritage
Augmentation Drive (PRASHAD)’ complements the efforts of the State
Governments (SGs)/UT Administrations (UTs) by extending financial
assistance to them for developing tourism related infrastructure in the
country, including the State Government of Uttar Pradesh and Andhra
Pradesh.
The Ministry of Tourism revamped its Swadesh Darshan scheme in
the form of Swadesh Darshan 2.0 with a destination and tourist centric
approach. Under Swadesh Darshan 2.0, projects are sanctioned at
destination level in order to provide enhanced tourism amenities and
experience to the tourists. The Ministry of Tourism has sanctioned 53
projects under Swadesh Darshan 2.0 scheme having total sanctioned
cost of ₹2,207.08 Crore.
Since the launch of the PRASHAD Scheme in January 2015, the
Ministry has sanctioned 54 projects in 28 States/UTs with an estimated
cost of ₹1726.74 Crore. The details of the projects sanctioned under
Swadesh Darshan 2.0 and PRASHAD Scheme during the last five years
are given in the Annexure.
(b): Receiving proposals from the State Governments/UT
Administrations for financial assistance for tourism projects is a
continuous process. The proposals received are examined with referenceto the prescribed guidelines and financial assistance is extended for such
projects subject to fulfilment of the stipulated conditions and availability
of funds.
(c) & (d): The Central Sector Schemes of the Ministry of Tourism namely
Swadesh Darshan, Swadesh Darshan 2.0 and PRASHAD provides for the
development and augmentation of tourism infrastructure which aims to
improve tourism amenities and provide better visitor experience.
Although the projects are implemented by the respective State
Governments/UT Administrations, the Ministry of Tourism regularly
monitors their progress and actively encourages the concerned
authorities to complete them within the stipulated timeframe. In order to
monitor and expedite progress of the sanctioned projects and to guide
the State Governments/UT Administrations, the Ministry of Tourism holds
regular review meetings at different levels. In addition, Central
Sanctioning and Monitoring Committee and Mission Directorate meetings
are also held in accordance with the scheme guidelines.
Further, Ministry of Tourism undertakes third-party impact
evaluation of the Central Sector Schemes to assess the outcomes and
effectiveness of interventions. As per the Report on Evaluation of Central
Sector Scheme PRASHAD by IIM Rohtak in the year 2021, the Scheme
has helped in increasing the visitor satisfaction, ease of travel and
aesthetical aspects of the selected heritage sites. Also, the report
mentioned that the Scheme has led to increase in the positive overall
visitor user experience.
The details of footfall recorded at all PRASHAD sites in Andhra
Pradesh as furnished by the State Government is placed at Annexure-I.(e): The assessment, identification and subsequent infrastructure
development of the destinations is primarily the responsibility of the
concerned State Government/UT Administration. However, Ministry of
Tourism complements the efforts of tourism infrastructure development
by extending financial assistance to the State Governments/UT
Administrations; subject to adherence to scheme guidelines, submission
of Detailed Project Reports (DPRs), availability of funds, Government
directions, inter-se priority etc. Further, the Ministry of tourism has
sanctioned various projects at heritage, spiritual and cultural destinations
across the country including in Eastern Uttar Pradesh encompassing
Deoria district under the schemes of Swadesh Darshan, Swadesh Darshan
2.0 and PRASHAD to enhance the visitor experience and also to boost
tourist visits. The details of projects sanctioned in the State of Uttar
Pradesh under the above mentioned Scheme is placed at annexure-II.
(f): The Central Sector Schemes of the Ministry of Tourism namely
Swadesh Darshan, Swadesh Darshan 2.0 and PRASHAD aims to enhance
the experience of the tourists through availability of well- planned tourism
infrastructure enabling tourist convenience, accessibility, cleanliness,
last-mile connectivity among others. The development of tourism
infrastructure through the above mentioned Schemes is ensured in a
holistic manner with the objective of promoting regional tourism,
increasing tourist footfall and generating local employment.
*****ANNEXURE
STATEMENT IN REPLY TO PART (A) OF LOK SABHA STARRED QUESTION
NO.*11 ANSWERED ON 20.07.2026 REGARDING SDS 2.0 AND PRASHAD
SCHEMES RAISED BY SHRI SHASHANK MANI AND SHRI PRABHAKAR
REDDY VEMIREDDY
The details of projects sanctioned under Swadesh Darshan 2.0 Scheme
(in ₹ Crore)
Sn State Destinati Name of Major Sancti Sanct Amou
on the Components on ioned nt
Experience Date Cost Autho
rized
1 Andhra Bapatala Developm Arrival and 29.03. 97.52 48.76
Pradesh ent of visitor 2025
Suryalank experience
a Beach enhancement
Experience , shopping
street
development,
parking, canal
experience
development,
tourist
amenities at
beachside,
and others.
2 Andhra Araku- Borra Cave, 05.03. 29.88 14.94
Pradesh Lambasingi Cave entrance 2024
Experienc gate, parking,
e at Araku market street,
arrival plaza
development,
visitor center,
cave lighting,
projection
mapping, and
other.3 Arunachal Mechuka Mechuka entry plaza, 05.03. 18.48 9.24
Pradesh Cultural tonga drop off 2024
Haat and pick up
zone, parking
area, OAT,
signages,
toilets,
dustbins,
souvenir
shops, CCTV,
amenities for
tourist and
others.
4 Arunachal Mechuka Mechuka entry plaza, 05.03. 12.75 6.38
Pradesh Adventure drop off and 2024
Park pick up zone,
signages,
ticket area,
tourist
amenities,
wayfinding,
adventure
activity zone,
accommodati
on, pathways,
promenades,
camping,
CCTV,
souvenirs
shops and
others.
5 Arunachal Nacho Unlock drop off and 05.03. 14.02 7.01
Pradesh Nacho pick up zone, 2024
Expeditio tourist
n information
kiosks, ticket
counter,
souvenir
shops,
information
panel, way
findings,toilets,
drinking
water kiosks,
rented cycles,
eco cottages,
camping
spaces and
luxury tented
accommodati
on.
6 Assam Kokrajhar Kokrajhar parking, e- 05.03. 26.68 13.34
Wetland rickshaw 2024
Experience stand, battery
operated
carts,
ticketing,
tourist
amenities,
audio guides,
wayfinding,
eco cottages,
restaurant,
watch tower,
viewing deck,
jetty, CCTV,
interpretation
center, etc.
7 Assam Jorhat Reimaginin entry gate, 05.03. 23.88 11.94
g parking, 2024
Cinnamar battery
a Tea operated
Estate carts,
information
center, ticket
counter,
digital gallery,
guided tours,
wayfinding,
seating areas,
toilets,
dustbins,
cottages,glamping,
souvenir
shops,
restaurant,
tea tasting
kiosk, CCTV,
drinking
water kiosk
etc.
8 Bihar Bodh Developm meditation 29.03. 165.44 16.54
Gaya ent of the centre and 2025
Buddhist service block
Meditation building, site
& development,
Experienc landscaping,
e Centre, water
Bodh Gaya storage, etc.
9 Chhattisg Kawardha Bhoramde Bhoramdev 29.03. 146.0 14.6
arh o Corridor Temple, 2025 0
Developm beautification
ent, of Cherki
Kawardha Mahal and
Madwa Mahal,
Development
works at Ram
Chuwa Temple
and Saroda
Dam.
10 DNHDD Daman Daman Convention 29.03.147.13 -
Convention center civil 2025
Centre work, safety
works,
services,
interiors and
external
development.
11 Goa Porvorim Porvorim Tourist 20.08. 24.07 12.04
Creek Facilitation 2024
Experience Center, fish
angling deck,
food kiosks,
touristamenities, EV
charging,
Torda Lake
Development,
Creek
Promenade at
Torda,
Ambrina and
Paitona and
others.
12 Goa Colva Colva Arrival Plaza, 20.08. 19.89 9.95
Beach parking, 2024
Experience Hawker zone,
shopping
area,
gazebos,
tourist
security
block, CCTV,
signages,
street
furniture and
others
13 Haryana Panchkula Developm Parking, 29.03. 26.68 2.67
ent of ticket counter 2025
Adventure for adventure
Tourism park, food
Hub at kiosks, toilet
Tikkar block,
Taal and restaurant,
Adventure glass
Park observatory,
gazebos,
haunted
house, swiss
tents, viewing
tower, OAT,
lighting and
illumination,
etc.14 Haryana Panchkula Rejuvenat Parking, 29.03. 65.82 6.58
ion of lighting, 2025
Yadavindra illumination,
Garden shops, ticket
counter,
conservation
of sheesh
mahal, Rang
Mahal, Rani
Mahal,
convention
center, roof
top
restaurant,
revival of
fountain,
CCTV, etc.
15 Himachal Chintpurni Developm Q-Complex 04.07. 56.26 5.63
Pradesh ent of Maa with 2025
Chintpurni Pilgrimage
Devi Facilities for
Temple, Darshan,
Una Covered
pathway at
Temple Level,
R.O. Plant &
Drinking
Water Facility
for Q-
Complex,
Solid Waste
Management
Bins
Informational
Indoor
Signages
LED Façade
Illumination
for Q-
Complex,
LED Lighting
aroundComplex
Exterior,
Temple Pious
Waste to
Havan
Samagri,
Wayfinding
External
Signages etc
16 Karnataka Mysuru Ecological Entry Plaza, 05.03. 18.48 1.85
Experience Eco Tower, 2024
Zone Eco Bridge,
Lake Walk,
Canopy Walk,
Food Plaza &
Kiosks, Rope
Bridge, and
digital
installations.
17 Karnataka Mysuru Tonga ride Tonga Stand, 29.02. 2.72 0.27
Heritage Horse stable, 2024
experience and digital
zone interventions
18 Karnataka Hampi Setting up travelers 29.02. 25.64 2.56
of Nook (Tourist 2024
‘Traveller Convenience)
nooks’ of three
categories
Noble, Royal,
and imperial
and digital
installations.
19 Kerala Alappuzha Alappuzha beach front 29.03. 93.18 46.59
: A Global development, 2025
Water walkways,
Wonderlan parking,
d seatings,
parking,
signages,
event spaces,CCTV, boat
jetty
development,
public
amenities,
international
cruise
terminal
development,
etc.
20 Kerala Malampuzha Enhancem Malampuzha 29.03. 75.87 37.94
ent of garden 2025
Tourist redevelopment
Experience , theme parks,
at water
Malampuz fountains,
ha Garden recreational
and zone,
Leisure Governor
Park seat,
amusement
park, zen
bloom park,
caravan park,
CCTV, etc.
21 Kerala Kumarak Kumarako Pedestrian 05.03. 13.81 6.91
om m Bird bridge, 2024
Sanctuary upgradation
Experience of
interpretation
center, public
spaces, board
walkways,
watch tower,
digital kiosks,
signages, etc.
22 Ladakh Leh Julley Leh entry gate, 05.03. 23.17 2.32
Biodiversit parking, 2024
y Park ticket
counter,
information
center,biodiversity
zone
interpretation
center, tourist
facilities, e-
buggy stand,
cycle tracks,
battery
operated
carts, rented
cycles,
toilets,
souvenir
shops, food
courts,
restaurant,
boating
facility, etc.
23 Ladakh Kargil Exploring parking, 05.03. 11.91 5.96
LOC & pergola, 2024
Hundarman ticket
village counter,
Exp waiting area,
tourist
amenity
center,
promenade,
hanging
bridge, rope
bridge,
siganges,
seating,
toilets,
drinking
water facility,
glamping
tent, café,
apple orchard
experience,
open
museum,
CCTV,,lighting, audio
guides, etc.
24 Lakshad Bangara Developm Eco huts, 29.03. 81.18 8.12
weep m ent of Eco- wellness 2025
Retreat, center,
Adventure convention
, Beach hall for MICE,
and Mice visitor holding
Experience area, scuba
at dive center,
Bangaram water sports
center,
dormitory,
canteen, play
area, CCTV,
wayfinding,
tourist
facilities, etc.
25 Madhya Chitrakoot Spiritual Arrival, Parking 05.03. 27.22 13.61
Pradesh experience & traffic 2024
at management at
Chitrakoot arrival area, On-
Site Ticketing
and holding
area, provision
for
interpretation
centre, guided
tours, audio
guides,
information,
signages,
wayfinding,
Public
Conveniences,
Souvenir and
Other Retail,Food &
Beverage, etc.
26 Madhya Gwalior Phoolbagh Arrival, 29.02. 16.74 8.37
Pradesh Experience Parking & 2024
Zone traffic
management
at arrival
area, On-Site
Ticketing and
holding area,
Interpretation
Facility,
Public
Conveniences
, Souvenir &
Other Retail,
Food &
Beverage
27 Madhya Datia Developm Visitor 14.07. 44.24 22.12
Pradesh ent of Amenities 2025
Pitambara (Gardens,
Peeth Toilets &
Datia Drinking Water
Facilities),
Interpretation
Centre
(Dharmik Smriti
Mandir ki
Yatra),
Smart Display
Systems,
Rotary
Development,
Multi-Level
Parking
Complex with
Commercial
Shops,Open and
Covered
Pedestrian
Walkways,
Informatory
and Directional
Signages etc.
28 Maharashtra Pune Shivshrust replica of 21.09. 75.47 37.74
hi Theme Lohagad fort, 2024
Park Attraction
Centre which
offers
immersive
and
educational
experiences
through
interactive
simulations
and historical
recreations,
Tatbandhi
featuring a
1.5 km-long
pier-like
boundary
encircling the
entire
complex.
29 Meghalaya Sohra Waterfall nature trails, 05.03. 27.61 13.81
Trails Ticket Kiosk 2024
Experience & Shops,
Toilet Blocks,
Parking,
Pedestrian
bridges,
Signages &
Street
Furniture, Sitout decks,
etc.
30 Meghalaya Sohra Meghalay Meghalayan 04.03. 32.45 16.23
an Age Age 2024
Cave Experience
Experience Gallery,
Arrival, Pick
Up & Drop Off
Junction,
Roads, Soft
scaping, etc.
31 Mizoram Champhai Eco Cosmos 29.03. 38.85 19.43
Resort flower 2025
Experienc plantation &
e at Horticultural,
Keilunglia Walkway,
h, Zote, Boating Deck,
Ngur & Cottages,
Mualbuhv cafeteria,
um, Conference
Champhai Hall, Water
Sports
facilities,
Souvenir
Shops, etc.
32 Mizoram Champhai Heritage Multi-Purpose 29.03. 33.87 16.9
and Hall, Meeting 2025 4
Cultural Room,
Centre, Reception &
Champhai Business
Lounge,
cafeteria,
Viewing Deck,
Public
Convenience,
Landscaping,
etc.33 Mizoram Aizawl Constructi Main Building 10.11. 99.71 49.8
on of and 2025 6
Conference Associated
Centre Services
Dormitory
Accommodati
on Facilities
Staff Quarters
Internal Roads
and Parking
Infrastructure
Site
Development,
Retaining Wall
& Rainwater
Harvesting
System
Landscaping,
Footpaths and
Street Lighting
Interior
Furnishing,
Artworks and
Other
Supporting
Infrastructure
34 Nagaland Chumouke Adventure Ticketing 29.03. 32.54 16.2
dima Tourism Area/Receptio 2025 7
Experienc n, Log Huts,
e at Jacob Watch Tower,
Village, ZiP Line,
Chumouke Bamboo
diema Picnic Hut,
Craft Haat,
Souvenir
Shop,
Cafeteria,
Adventure
Equipment,
Parking,
Toilet, etc.35 Nagaland Chumouke Eco- Visitor Area, 20.08. 7.87 3.94
dima Tourism Souvenir 2024
Exp at Shop,
Chumouke Convenience
dima Kiosks,
viewpoint Viewpoint,
Trekking
Route,
Parking,
Toilet, etc.
36 Nagaland Chumouke Tribal Bamboo 05.03. 21.57 10.7
dima Cultural cottages, 2024 9
Experience Souvenir Shop
at Midway & Local
Retreat Marketing
Stall,
Cafeteria,
Tribal
showcase
area, Ticket
Counter, Open
Air Theatre,
Picnic Huts,
Toilets, etc
37 Puducherry Karaikal Karaikal Parking, 05.03. 20.3 -
beach and Glamping, 2024
waterfront Retail & Food,
experience Tourist
Facilitation
center &
Artificial
Surfing Area,
Public
Amenities &
Utilities,
lnteractive
Portal, Selfie
Point,
Children's
Play Area,
etc.38 Punjab Amritsar Border Entrance 20.08. 25.91 2.59
Tourism Gate, Mural & 2024
Experience Vehicular
at Attari check post,
Registration /
information
Counter,
Signage
Boards and
Maps, Toilet
blocks,
Medical
Facility,
Dustbins, etc,
Public
Announcement
system,
Parking with
boom barrier,
Digital Kiosks
for
registration,
lmmersive
Gallery, etc
39 Punjab Kapurthal Eco Arrival, 05.03. 19.56 1.96
a Tourism Parking & 2024
experienc traffic
e at Kanjli management,
wetland Ticketing,
interpretation
Facility,
information,
Signages,
Wayfinding,
Public
Conveniences
, Souvenir &
Retail, Food &
Beverage,
Accommodati
on, etc.40 Rajasthan Sikar Developm Interpretation 29.03. 87.87 8.79
ent works Centre 2025
at Shri (Digital
Khatu Museum/displ
Shyam Ji ay), Katha
Temple Pandal, Open
(Sikar) Air Theatre,
Sound & Light
Show, Mela
Ground,
Cafeteia,
Parking, Food
Court, Toilet,
Signage etc.
41 Rajasthan Bundi Spiritual Parking and 29.02. 21.65 2.17
Experience Entry Plaza, 2024
, Website
Keshavrai Development
patan for online
ticketing,
interpretation
Centre &
Ticketing
Area, Ghat
development
and & Aarti
platform,
Signages and
wayfinding,
Toilets and
Shower Area,
Bhoianalaya
and Tourist
Amenities,
Boat and
Jetty, etc.42 Rajasthan Bikaner Developm Tourist 14.07. 22.58 11.2
dist. ent Works Facilitation 2025 9
at Shri Centre
Karni Mela Ground
mata Development
mandir, Covered
Bikaner Temple
Pathway
Parking
Infrastructure
Pathway &
Approach
Road
Development
Open Air
Theatre (OAT)
Shops &
Kiosks
Public
Amenities and
Visitor
Facilities
Signages &
Wayfinding
Infrastructure
Electrical,
CCTV & Digital
Display
Infrastructure
43 Rajasthan Malaseri Developm Entrance & 14.07. 48.73 24.3
Dungari ent of Site 2025 7
(District Malaseri Development
Bhilwara Dungri, Infrastructure
) Bhilwara Parking
District Facilities
Landscaping &
Site
Beautification
Bhojanshala
and Kitchen
Facilities
MultipurposeBuilding
(Meditation
Hall, Katha
Pandal,
Conference
Hall &
Interpretation
Centre)
Sabhasthal
Ground and
Stage
Waiting Hall
Open Air
Theatre
Internal Roads
& Temple
Connectivity
Infrastructure
Boundary Wall
Development
Healthcare
Centre
Public
Amenities and
Visitor
Facilities
Signages &
Wayfinding
Infrastructure
Internal &
External
Electrical
Works
CCTV
Surveillance &
Networking
Infrastructure
44 Sikkim Gyalshing Eco- Himalayan 05.03. 15.41 7.71
Wellness Wellness 2024
Experienc Centre,
e at Village Trek,
etc.Yuksom
Cluster
45 Sikkim Gangtok Gangtok Ethnic Entry 29.02. 22.6 11.3
Cultural Gateway, 2024
Village Dropoff, pick up
point &
Entrance Plaza,
interpretation
Centre,
walkways,
Sikkim Organic
Haat,
Restaurant,
Landscaping,
etc.
46 Tamil Mamalla Immersive Entrance 29.02. 30.02 -
Nadu puram experienc Gate, Arrival 2024
e at Shore Plaza, Parking,
Temple Toilet,
lnterpretation
Centre,
Cafeteria &
Souvenir
Shops, Beach
Facilities &
Utilities, etc.
47 Telangana Ananatha Eco Glamping, 05.03. 38.01 19.0
giri tourism Parking, E- 2024 1
zone at Vehicle and
Ananathgi cha rging
ri forest station,
Cycles and
cycle parking,
etc
48 Telangana Bhongir Bhongir Entrance 29.02. 56.82 5.68
Fort Plaza, Site 2024
Experienti improvement
al Zone & tourism
amenities
Development,
Restoration of
Heritagestructure,
Development
of Ropeway,
etc.
49 Tripura Agartala Tripura Restaurant, 29.03. 48.95 24.4
Heritage Tribal 2025 8
Village & Huts/Log
Sangeet Huts, Retail
Experienc outlets,
e at Projection
Agartala Mapping,
(Phase-1 Information
&2) Kiosk,
Gazebo,
Website &
App, Garden
Café, Musical
Interpretaion
Block,
Landscaping,
Toilet, etc.
50 Uttar Naimisara Vedic- Tourist node, 05.03. 17.8 -
Pradesh nya wellness Vedic trail, 2024
Experience Decks, Jetty,
Light & Sound
Show, etc.
51 Uttar Prayagra Azad Park Tourist 05.03. 14.52 1.45
Pradesh j and Dekho Information 2024
Prayagraj Centre +
Trail AR/VR facility,
Experince Azad
Memorial
Plaza
upgradation,
landscaping,
Adventure
Park,
Travelers'
nook, Bus,
Parking,
Toilet, etc.52 Uttarakha Champa Tea Garden Entry Plaza, 05.03. 19.89 1.99
nd wat Experience Tea 2024
Experience,
Jungle Story
Trail, Eco
Stays,
Curation of
Tea Museum,
etc.
53 UttarakhaPithoragarh Rural Visitor's 05.03. 17.86 1.79
nd Tourism Center, Haat 2024
Cluster & Café,
Experienc Cottage with
e at Gunji Restaurant,
Cottages,
Toilet Block,
Curation of
Visitor Centre
& Audio
Guides, etc
Total 2207.0 645.83
8
The details of projects sanctioned under PRASHAD Scheme in last 5 years
(in ₹ Crore)
Sn State/UT Project Major Sanction Approved Amount
Name Components Year Cost Authorized
1. Andhra Sri Varaha • Pilgrimage 2022- 54.04 27.37
Pradesh Lakshmi Facilitation 23
Narsimha Centre
• Ghat road
Swami Vari
development
Devasthana
(Viewpoints &
m at
parking with
Simhachala
watch towers,
m in
Upgradation of
Vishakhapat
steps)
nam Temple
• Temple
Amenities andinfrastructure
with
Amphitheater(Ill
umination,
Development of
steps, Parking,
Yagyashaala)
• Kitchen
mechanization
• Multipurpose
hall
• Pan area
Development
(Multimedia
centre with
Augmented
Reality setup,
Electric mini
vans, Signage,
Baggage
screening, Door
Fame Metal
Detector
• New Ghat Road
Entrance( Site
Infra
Development
With 315
Running meter of
Storm Water
Drain)
2. Andhra Development • Construction of 2024- 25.33 13.79
Pradesh of Pilgrimage Annadanam 25
Tourism Dining hall
• Construction of
Infrastructur
queue complex
e in
• Retainingwall
Annavaram
• Infrastructure on
Temple Town
Satyagiri hill(Toilet blocks,
electrification,
Water supply and
sanitary works,
solar lights,
landscaping,
drinking water
ATM )
• STP of 0.5 MLD
capacity
• Electric
transport
(Electric vans,
EV buggy,
electric charging
stations )
• Fire Fighting and
Safety System
3. Bihar Development • Shops & 2024- 13.29 -
of Aami Kiosks, 25
Mandir, Dist.- • Ghat Extension
and Viewing
Saran
Decks
• Colonnade &
High Plinth,
• Parking and
associated
amenities,
• Widening of
Approach Road
along with
drains and
utility ducts
• Solar
Streetlights .4. Goa Development • Illumination 2024- 16.46 5.27
of Bom Jesus 25
Basilica
5. Gujarat Development • Intervention at 2022- 50 30
of Pilgrimage Ambaji temple 23
Facilities at (TFC, Approach
Road, Pathway,
Ambaji
Parking, Toilet
Temple,
block, Drainage)
Banaskantha
• Approach road to
, Gujarat
Gabbar Hill
(Toilet block,
Stone pathway,
drinking water
facility, Shaded
resting areas,
Electrical work,
Signage)
• CCTV, Public
announcement
system
6. K arnataka Development • Development at 2023- 45.38 13.33
of Pilgrimage Chamundi 24
Amenities at Temple
Premises (Queue
Sri
Mandapam
Chamundesh
Stretch,
wari Devi
Multipurpose
Temple,
Area & Stage,
Mysuru
Cloak room,
Illumination)
• Pilgrimage
Facilities
development at
Mahisasura
plaza(Amenities
block, Entrancestone arch,
Illumination)
• Development at
Devikere
(Handrails for
entire steps,
Steps and
mandapa
beautification)
• Nandi Statue
Pavilion
Development(Qu
eue Mandapam,
Paver area
development)
• Devi Pada
Redevelopment
(Steps and
mandapa
beautification,
Handrails for
entire steps )
• CCTV, Public
Announcement
System, Metal
Detector, Bag
Scanner, People
Counter
Solutions.
7. K arnataka Development • Construction of 2024- 18.37 -
of Sri Renuka Pilgrim Arrival 25
Yallamma Centre
• Construction of
Temple,
Waiting area
Saundatti,
for Pilgrims
Belagavi
• Pilgrimage
Information
Centre (3 nos).• Construction of
Canteen or
Cafeteria
• First Aid
Centre for
Pilgrims
• Construction
and
Installation of
Sewage
Treatment
Plant (2 nos ).
• External
Plumbing from
toilet to STP
• Solar Pannel
Installation
• Smart Display
• Informational
and Directional
Signages
• Landscaping
• Pathways
8. K arnataka Development • Shoe Stand 2024- 22.25 6.30
of Papnash Area, Cloak 25
Temple, room and toilet
block
Bidar District
• Development
of Parking Area
• Jatra Complex
(Prashad
Shops)
• Changing
Rooms near
Pond
• Upgradation of
Pond Area
• Prasada Nilaya• Cultural and
Recreation
Centre
• Public
Convenience
• Anna Dasoha
Building
• 1 Lakh Liters
Capacity Water
Tank & Pump
house
• Steps &
Walkways
• Landscape
work
• Main Entrance
gate
• Construction of
Compound Wall
and Barbed
Fencing
• STP unit and
Plumbing
Works
• Signage
Boards
• CCTV System
9. Mizoram Development • Heritage 2022- 44.89 35.54
of Congregation 23
Infrastructur Centre, Aizwal
• Prayer Mountain,
e for
Zuangtai (PFC
Pilgrimage
with viewing
and Heritage
gallery, signage,
Tourism in
Multipurpose
the State of
Hall & kitchen)
Mizoram
• Development at
Khuangchera
Cave (PFC,Safety
equipment
required for
visiting the cave)
• Development at
Kalvari Tiang,
Aizwal
(Protective
railing, PFC,
Lighting, Rain
shelter, Signage,
Wooden
benches)
• CCTV
10. Mi zoram Development • Vangchhia 2024- 5.47 1.56
of Basic Cultural & 25
Amenities Heritage
Centre
under
• Parking
PRASHAD
• Rainwater
scheme in
Harvesting
Vangchhia,
Tank
Champhai
• Compound Wall
district
• Gate with
Security Cabin
• Gate Door
• Security Cabin
• 3D Signage
• Waste
Collection &
Disposal
(Mention
Volume)
• Solar
Streetlights
• Benches
• Interpretative
Signage11. Na galan Development • Naga Entrance 2022- 18.18 15.45
d of Pilgrimage Gate 23
Tourism • Pilgrimage
Facilitation
Infrastructur
Centre
e at
• Illumination of
Zunheboto
Sumi Baptist
Church
• Multilevel Car
Parking
• CCTV
Surveillance
System
12. Pu njab Development • Development of 2021- 30.52 23.80
of Chamkaur Tourism 22
Sahib at Infrastructure at
Gurdwara Shri
Rupar,
Katalgarh Sahib
Punjab
(Façade lighting,
Construction of
Kitchen,
Interpretation
centre, Parking,
Façade
development)
• Development of
Walkways with
embankment on
the banks of the
canal from
Theme Park to
Heritage guest
house
• Development of
Tourism
Infrastructure at
Gurudwara Shri
Garhi Sahab,Gurudwara Sri
Damdma Sahib,
Gurudwara Sri
Raniitgarh Sahib,
Gurudwara Sri
Tarri Sahib
• Development of
Passenger
Terminal &
associated
infrastructure
• CCTV
13.P ud ucherr Development • Integrated 2024- 25.94 0
y of Pilgrim Pilgrim Plaza 25
Facilities & • Closed Parking
(Foundation +
Tourist
GF )& Open
attractions
parking
for Sri
development
Dharbaranye
• Battery
swarar
Operated vehicle
Temple &
–10 Nos
Spiritual
• Direction Boards
Park at
on the roads &
Thirunallar
Junctions 3. 6 x
2.4m
• Information
Boards at
Destinations 3.6
x 2.4m
• Charging Station
Board 0.9 x 1.2m
• CCTV
Surveillance
System with
Control room &
Audio
Announcement
System• Automatic Boom
barrier and Entry
/Exit Passes at
Parking
• Entrance & Exit
Control Software
for Boom Barrier
• Incinerator Plant
14. Ta mil Development • Waiting Lounge 2024- 40.94 11.75
Nadu of Navagraha (3 Nos ) 25
Temple • Cloak Room
(Type B)
Circuit )8
• Toilet (Type B)
Temples(
• Padithurai
(Ghats )
• Pedestrian
Pathway
• Parking
Pavement
• Lawn & Planter
Arrangements
• Provision for
Navagraha
celestial Park
• Rainwater
Harvesting
• External
Lighting
Arrangements
• Provision for
Directional
Signage,
Seating,
Drinking water,
trash
receptacles
15.T el angana Development • Interpretation 2022- 62 32.73
of Pilgrimage Centre 23and Heritage • Amphitheater
Tourism • 4D Movie Hall
Infrastructur • Sculpture Park
• Lakefront
e at
Development
Rudreshwara
• Bus and car
)Ramappa(
Parking Area
Temple,
• CCTV
Mulugu
Surveillance
System
16.T el angana Development • Development 2022- 41.38 16.30
of Pilgrimage works at Main 23
Infrastructur Temple (Change
of flooring, MS
e at
roofing
Bhadrachala
structure,
m, Bhadradri,
Mechanization
Kothagudem
for Prasadam
District
production)
• Development
around Main
Temple
(Approach Road,
Pilgrim
amenities
centre, Ghat
area
development -
Changing room,
Toilet, Jetty )
• Town Entrance
(Entrance bridge,
Washroom &
canteen
complex,
Compound wall,
Chain link
fencing, Battery
operated cars)• Development
works at
Parnasala and
Seethamma
Vaagu (Pilgrim
amenities
centre, Street
light, Kiosks,
Foot over bridge,
Toilet )
• Allied
development
works (Street
lighting,
Signage, CCTV)
17.T el angana Development • Annadanam 2024- 4.22 1.09
at Goddess Building 25
Renuka • Mechanical,
Electrical and
Yellamma
Plumbing
Devasthana
Services for
m,
Annadanam
Balkampet,
Building
Hyderabad
• CCTV
Surveillance
(Including
Internal &
External)
• DG Set for Lifts
Operation
18.U tt arakha Augmentatio • Development at 2021- 54.36 10.22
nd n of Gangotri Temple 22
Pilgrimage (Entry gate, LED
illumination,
Infrastructur
public amenities,
e Facilities
solid waste
and Gangotri
management
and
system, coveredYamunotri polycarbonate
Dham roof)
• Development at
Yamnotri(LED
illumination,
Solar LED street
lights, Solid
waste
management
plant, approach
road from
Jankichatti to
Kharsali )
• Dynamic crowd
management
system, public
digital address
system, CCTV
******ANNEXURE-I
STATEMENT IN REPLY TO PARTS (C) & (D) OF LOK SABHA STARRED
QUESTION NO.*11 ANSWERED ON 20.07.2026 REGARDING SDS 2.0 AND
PRASHAD SCHEMES RAISED BY SHRI SHASHANK MANI AND SHRI
PRABHAKAR REDDY VEMIREDDY
The details of footfall recorded at PRASHAD sites project-wise and year-
wise
Sl. Project Name Year Footfall
No.
1 Development of Amaravati as Pilgrimage 2022 4,73,620
Tourist Destination – Sri 2023 4,81,506
Amaralingeswara Swamy temple 2024 6,28,149
2025 6,25,126
2026 3,45,126
(Up to June)
2 Development of Srisailam Temple in 2022 39,77,510
Kurnool District 2023 39,57,032
2024 69,03,564
2025 62,40,665
2026 17,03,266
(Up to June)
3 Development of Sri Varaha Lakshmi 2022 36,76,656
Narasimha Swamy Temple, Simhachalam 2023 48,11,939
2024 56,05,595
2025 62,55,671
2026 42,73,410
(Up to June)
4 Development of Pilgrimage Infrastructure 2024 49,76,491
in Annavaram Temple Town 2025 55,73,669
2026 (Up to 39,01,569
June)
******ANNEXURE-II
STATEMENT IN REPLY TO PART (E) OF LOK SABHA STARRED QUESTION
NO.*11 ANSWERED ON 20.07.2026 REGARDING SDS 2.0 AND PRASHAD
SCHEMES RAISED BY SHRI SHASHANK MANI AND SHRI PRABHAKAR
REDDY VEMIREDDY
The details of projects sanctioned in Uttar Pradesh under PRASHAD
Scheme
Sr. Project Name Amount Sanctioned
No. (In ₹ Crore)
1. Development of Varanasi – Phase –I 18.73
Development of Mathura-Vrindavan as Me
2. 10.98
ga Tourist Circuit (Ph-II)
River Cruise Tourism in Ganga, Varanasi
3. 9.02
Construction of Tourist Facilitation Centr
4. 9.36
e at Vrindavan
5. Development of Varanasi – Phase –II 44.60
Development of Infrastructure facilities a
6. 37.59
t GovardhanThe details of the projects sanctioned under Swadesh Darshan Scheme in
Uttar Pradesh
Sr. Circuit/Year Name of the Project Amount
No. Sanctioned
(In ₹ Crore)
1. Buddhist Development of Srawasti, Kushinagar, &
2016-17 Kapilwastu 87.89
2. Ramayana Development of Chitrakoot and
2016-17 Shringverpur 69.45
3. Spiritual Development of Ahar-Aligarh-Kasganj-
2016-17 Sarosi (Unnao)-Pratapgarh Kausambi- 71.91
Mirzapur-Gorakhpur-Domariyaganj-Basti-
Barabanki-Azamgarh-Kairana- Baghpat-
Shahjahanpur
4. Spiritual Development of Bijnor-Meerut- Kanpur- 67.51
2016-17 Kanpur Dehat- Banda-Ghazipur- Salempur
-Ghosi- Balia- Ambedkar Nagar- Aligarh-
Fatehpur- Deoria- Mahoba- Sonbhadra-
Chandauli-Mishrikh-Bhadohi
5. Heritage Development of Kalinjar Fort (Banda)- 36.65
2016-17 Maghar Dham (Sant Kabir Nagar)- Chauri
Chaura, Shaheed Sthal (Fatehpur)- Mahuar
shaheed Sthal (Ghosi)- Shaheed Smarak
(Meerut)
6. Ramayana Development of Ayodhya 127.21
2017-18
7. Spiritual Development of Jewar-Dadri-Sikandrabad- 12.03
2018-19 Noida-Khurja-Banda
8. Spiritual Development of Gorakhnath Temple 18.30
2018-19 (Gorakhpur), Devipattan Temple
(Balrampur) and Vatvashni Temple
(Domariyagunj)
The details of the projects sanctioned under Swadesh Darshan 2.0 in Uttar
Pradesh
Sr. Destination Name of the Experience Amount
No. Sanctioned
(In ₹ Crore)
1. Naimisaranya Vedic- wellness Experience 17.82. Prayagraj Azad Park and Dekho Prayagraj Trail 14.52
Experince
The details of the projects sanctioned under Challenge Based Destination
Development (CBDD) in Uttar Pradesh
Sr. Destination/Category Name of the Experience Sanctioned Cost
No. (In ₹ Crore)
1. Mahoba (Culture & Development of Cultural Landscape 24.98
at Mahoba
Heritage)
The details of the projects sanctioned under special assistance to states for
capital investment (SASCI SCHEME) in Uttar Pradesh
Sr. No. Name of the Project Amount Sanctioned
(In ₹ Crore)
1. Development of Bateshwar in District-Agra 74.05
2. Integrated Buddhist Tourism 80.24
Development in Shrawasti
******