**Executive Summary** This document reports on the status of EV charging station (EVPCS) installations in the Hisar and Sonipat Lok Sabha constituencies under the FAME-II scheme, in response to questions raised in the Lok Sabha. As of December 16, 2025, Oil Marketing Companies (OMCs) have installed 67 EVPCS in these districts, with varying levels of operational readiness. The Ministry of Power issued guidelines for EV charging infrastructure on September 17, 2024. **Key Points / Main Content** * **EVPCS Installation Status:** * 45 EVPCS installed in Hisar, with 36 operational. * 22 EVPCS installed in Sonipat, with all 15 operational. * **Assessment of Charging Network:** * The Ministry of Heavy Industries (MHI) has not conducted an assessment on whether the charging network is hindering the use of E-vehicles * **Policy and Financial Assistance:** * The Ministry of Power issued "Guidelines for Installation and Operation of Electric Vehicle Charging Infrastructure-2024." * Setting up EVCS is an unlicensed activity; private entities can set up EVCS across India. * MHI allocated Rs. 2,000 crore under the PM E-DRIVE Scheme for EVPCS installation on a pan-India basis. * **Regional EV Charging Hub Plans:** * MHI has no current plans to make Hisar a regional EV charging hub or Sonipat an EV-friendly zone. * **Project Stalls:** * 16 EVPCS installed by OMCs in Hisar and Sonipat under FAME-II are not commissioned due to the unavailability of electrical connections. **Impact Analysis** **Stakeholder: Oil Marketing Companies (OMCs)** * **Impact:** OMCs are responsible for installing and operating EVPCS under the FAME-II scheme. * **Action Required:** Resolve issues related to electrical connections for the 16 uncommissioned EVPCS in Hisar and Sonipat. **Stakeholder: Ministry of Power** * **Impact:** Responsible for formulating guidelines for EV charging infrastructure. * **Action Required:** Continue to support public-private partnerships to expand the EV charging infrastructure. **Stakeholder: Ministry of Heavy Industries (MHI)** * **Impact:** Oversees FAME-II scheme and provides financial assistance for EVPCS installation. * **Action Required:** Continue to oversee funding allocation under the PM E-DRIVE Scheme. **Stakeholder: Private Entities** * **Impact:** Can freely set up EVCS across India. * **Action Required:** Invest in setting up EVCS in India. **Stakeholder: Residents of Hisar and Sonipat Lok Sabha Constituencies** * **Impact:** Increased availability of EV charging stations enables more electric vehicle usage. * **Action Required:** Utilize available public charging stations.

Key Entities Referenced

FAME (Faster Adoption and Manufacturing of Electric Vehicles) scheme: Scheme aimed at promoting the adoption and manufacturing of electric vehicles, used to set up EV charging stations. Ministry of Heavy Industries (MHI): The ministry responsible for matters related to Heavy Industries and implementing the FAME scheme. Haryana: State where EV charging stations are being set up under the FAME scheme. Guidelines for Installation and Operation of Electric Vehicle Charging Infrastructure-2024: Guidelines issued by the Ministry of Power regarding the installation and operation of electric vehicle charging infrastructure. PM E-DRIVE Scheme: Scheme for installation of EVPCS on a pan-India basis.
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF HEAVY INDUSTRIES LOK SABHA UNSTARRED QUESTION NO. 2539 ANSWERED ON 16.12.2025 SETTING UP OF EV CHARGING STATIONS UNDER FAME IN HARYANA †2539. SHRI JAI PARKASH: SHRI SATPAL BRAHAMCHARI: Will the Minister of HEAVY INDUSTRIES be pleased to state: (a) whether the number of existing EV charging stations and the process of setting up EV charging stations under FAME (Faster Adoption and Manufacturing of Electric Vehicles) scheme is very low/slow in Hisar and Sonipat Lok Sabha constituencies respectively; (b) if so, the number of public charging stations approved in the region so far and actually operational among them; (c) whether lack of charging network on urban and rural routes is hindering the use of e-vehicles and whether any roadmap has been formulated in coordination with the Haryana Government to expand the EV charging network in the region; (d) whether the Government has formulated any incentive policy financial assistance or pilot project to increase private sector participation in setting up charging stations; (e) whether there is any concrete action plan to make Hisar the regional EV charging hub of Haryana and to make Sonipat an EV-friendly zone in the future; and (f) whether projects are stalled in Municipal Council and Highways areas due to lack of land allotment and electricity connection? ANSWER THE MINISTER OF STATE FOR HEAVY INDUSTRIES (SHRI BHUPATHIRAJU SRINIVASA VARMA) (a) & (b): The Oil Marketing Companies (OMCs) have installed 45 EV public charging stations (EVPCS) in Hisar and 22 EVPCS in Sonipat under FAME-II scheme out of which 36 EVPCS in Hisar and all 15 EVPCS in Sonipat have been commissioned. District No. of installed EVPCS under FAME-II No. of Operational EVPCS under FAME-II Hisar 45 36 Sonipat 22 15 Total 67 51 (c): No such assessment has been carried out by Ministry of Heavy Industries (MHI) so far. (d): The Ministry of Power has issued “Guidelines for Installation and Operation of Electric Vehicle Charging Infrastructure-2024” on 17.09.2024. These guidelines emphasize the role of public-private partnerships in expanding the EV charging infrastructure. Setting up of EV charging stations (EVCS) is an unlicensed activity and private entities are free to setup EVCS across India.-2- (e): MHI has no such plan at the moment. However, MHI has also made an allocation of Rs.2,000 crore under the PM E-DRIVE Scheme for installation of EVPCS on a pan-India basis. (f): As per information received from OMCs, out of 67 EVPCS installed by OMCs in Hisar and Sonipat under FAME-II, 16 EVPCS are not commissioned yet due to non-availability of electrical connection. *********