See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF POWER
LOK SABHA
UNSTARRED QUESTION NO.1935
ANSWERED ON 31.07.2025
SHORTAGE OF POWER IN DADRA AND NAGAR HAVELI
†1935. SMT. DELKAR KALABEN MOHANBHAI:
Will the Minister of POWER
be pleased to state:
(a) the details of the power shortage situation in the country during the last five years,
State- wise;
(b) the major issues responsible for such a situation in the country particularly in the
Union Territory of Dadra and Nagar Haveli; and
(c) the steps taken or proposed to be taken by the Government to reduce or eliminate
power shortage in the country particularly in the Union Territory of Dadra and Nagar
Haveli?
A N S W E R
THE MINISTER OF STATE IN THE MINISTRY OF POWER
(SHRI SHRIPAD NAIK)
(a) & (b) : There is adequate availability of power in the country. Present installed
generation capacity of the country is 484.819 GW. Government of India has addressed
the critical issue of power deficiency by adding 260.784 GW of fresh generation capacity
since April, 2014 transforming the country from power deficit to power sufficient.
The details of States/UTs/Regions-wise Power Supply Position of the country
including the Union Territory of Dadra and Nagar Haveli in terms of Energy for the period
from FY 2019-20 to FY 2024-25 and current FY 2025–26 (upto June, 2025) are given at
Annexure.
These details indicate that the Energy Supplied in the country has been
commensurate to the Energy Requirement and the gap between the two has decreased
from 0.5% in FY2019-20 to 0.1% in FY 2024-25 and almost 0.0% in current FY 2025-26
(upto June, 2025).
Further, no shortage of electricity has been reported in the Union Territory of Dadra
and Nagar Haveli from FY 2019-20 to FY 2025-26 (upto June, 2025).
(c): For supplementing the power requirement, the Government of India has allocated
526.4 MW of Firm Power and 1,208.7 MW of power from unallocated quota of Central
Generating Stations to Union Territory of Dadra & Nagar Haveli and Daman & Diu.
Further, Government of India has taken following measures to improve the
availability of power and to eliminate power shortages in the country:
1. Generation Planning:
(i) Installed generation capacity in 2031-32 is likely to be 874 GW. This includes
capacity from conventional sources- Coal, Lignite etc., renewable sources- Solar,
Wind and Hydro.
……..2.- 2 -
(ii) With a view to ensure generation capacity remains ahead of projected peak
demand, all the States, in consultation with CEA, have prepared their “ Resource
Adequacy Plans (RAPs)”, which are dynamic 10 year rolling plans and includes
power generation as well as power procurement planning.
(iii) All the States were advised to initiate process for creation of generation
capacities; from all generation sources, as per their Resource Adequacy Plans.
(iv) In order to augment the power generation capacity, the Government of India has
initiated following capacity addition programme:
(A) The projected thermal (coal and lignite) capacity requirement by the year
2034–35 is estimated at approximately 3,07,000 MW as against the 2,11,855 MW
installed capacity as on 31.03.2023. To meet this requirement, Ministry of Power
has envisaged to set up an additional minimum 97,000 MW coal and lignite based
thermal capacity.
Several initiatives have already been undertaken. Thermal capacities of
around 11,680 MW have already been commissioned since April 2023 till June 2025.
In addition, 38,935 MW (including 5,695 MW of stressed thermal power projects) of
thermal capacity is currently under construction. Further, contracts for 15,440 MW
thermal capacity have been awarded in FY 2024-25 and is due for construction. To
meet the projected demand in the country, 35,460 MW of coal and lignite based
candidate capacity has been identified, which is at various stages of planning in
the country.
(B) 13,463.5 MW of Hydro Electric Projects are under construction. Further, 9802
MW of Hydro Electric Projects are under various stage of planning and targeted to
be completed by 2031-32.
(C) 6,600 MW of Nuclear Capacity is under construction and targeted to be
completed by 2029-30. 7,000 MW of Nuclear Capacity is under various stages of
planning and approval.
(D) 1,58,450 MW Renewable Capacity including 74,150 MW of Solar, 30,080 MW of
Wind and 53,750 MW Hybrid power is under construction while 62,000 MW of
Renewable Capacity including 46,010 MW of Solar and 15,990 MW Hybrid Power is
at various stages of planning and targeted to be completed by 2029-30.
(E) In energy storage systems, 8250 MW/49500MWh Pumped Storage Projects
(PSPs) are under construction. Further, a total of 5780 MW/34680 MWh capacity
of Pumped Storage Projects (PSPs) are concurred and yet to be taken up for
construction. Out of these, 3500 MW/21000 MWh capacity of Pumped Storage
Projects (PSPs) are under bidding and 15,829 MW/51,106 MWh Battery Energy
Storage System (BESS) are currently under various stages of construction/bidding
2. Transmission Planning: Inter and Intra-State Transmission System has been
planned and implementation of the same is taken up in matching time frame of
generation capacity addition. As per the National Electricity Plan, about 1,91,474
ckm of transmission lines and 1274 GVA of transformation capacity is planned to
be added (at 220 kV and above voltage level) during the ten year period from 2022-
23 to 2031-32.
……..3.- 3 -
3. Distribution System Planning:
(i) Government of India has been supporting the States/ UTs through schemes like
Deen Dayal Upadhyaya Gram Jyoti Yojana (DDUGJY), Integrated Power
Development Scheme (IPDS), Pradhan Mantri Sahaj Bijli Har Ghar Yojana
(SAUBHAGYA) to improve access and quality of power supply to all consumers.
Under these scheme, projects worth Rs. 1.85 lakh Cr. were executed for
strengthening of power distribution infrastructure. A total of 18,374 villages
were electrified under the DDUGJY and 2.86 Cr households were electrified
during SAUBHAGYA.
(ii) Further, Government of India launched Revamped Distribution Sector Scheme
(RDSS) in July, 2021 with the objective of improving the quality and reliability
of power supply to consumers through a financially sustainable and
operationally efficient Distribution Sector. Under the scheme, infrastructure
works worth Rs. 2.82 lakh Cr. have been sanctioned for the distribution
utilities.
(iii) Government of India is further supporting States for grid electrification of left-
out households during SAUBHAGYA, under RDSS. In addition, all Particularly
Vulnerable Tribal Group (PVTG) households identified under PM-JANMAN
(Pradhan Mantri Janjati AdivasiNyaya Maha Abhiyan), tribal households under
DA-JGUA (Dharti Aaba Janjatiya Gram Utkarsh Abhiyan),Scheduled Caste
households under Pradhan MantriAnusuchit Jaati Abhyuday Yojna (PM-AJAY)
and remote & border households under Vibrant Villlage Program (VVP) are
being sanctioned for on-grid electrification under RDSS as per the scheme
guidelines. Till date, works amounting to Rs. 6,486 Cr. have been sanctioned
for electrification of 13.59 lakh households under RDSS.
(iv) With collective efforts of Centre and States/UTs, the average hours of supply
in rural and urban areas have improved to 22.6 hrs and 23.4 hrs, respectively,
in FY 2025.
4. Promotion of Renewable Energy Generation:
(i) Ministry of New & Renewable Energy (MNRE) has issued Bidding Trajectory for
issuance of RE power procurement bids of 50 GW/annum by Renewable Energy
Implementing Agencies (REIAs) from FY 2023-24 to FY 2027-28.
(ii) Foreign Direct Investment (FDI) has been permitted up to 100 percent under the
automatic route.
(iii) Inter State Transmission System (ISTS) charges have been waived for inter-state
sale of solar and wind power for projects to be commissioned by 30th June 2025,
for Green Hydrogen Projects till December 2030 and for offshore wind projects
till December 2032.
………4.- 4 -
(iv) To boost RE consumption, Renewable Purchase Obligation (RPO) followed by
Renewable Consumption Obligation (RCO) trajectory has been notified till 2029-
30. The RCO which is applicable to all designated consumers under the Energy
Conservation Act 2001 will attract penalties on non-compliance. RCO also
includes specified quantum of consumption from Decentralized Renewable
Energy sources.
(v) Standard Bidding Guidelines for tariff based competitive bidding process for
procurement of Power from Grid Connected Solar, Wind, Wind-Solar Hybrid and
Firm & Dispatchable RE (FDRE) projects have been issued.
(vi) Schemes such as Pradhan Mantri Kisan Urja Suraksha evam Utthaan
Mahabhiyan (PM-KUSUM), PM Surya Ghar Muft Bijli Yojana, National Programme
on High Efficiency Solar PV Modules, New Solar Power Scheme (for Tribal and
PVTG Habitations/Villages) under Pradhan Mantri Janjati Adivasi Nyaya Maha
Abhiyan (PM JANMAN) and Dharti Aabha Janjatiya Gram Utkarsh Abhiyan (DA
JGUA), National Green Hydrogen Mission, Viability Gap Funding (VGF) Scheme
for Offshore Wind Energy Projects have been launched.
(vii) Scheme for setting up of Solar Parks and Ultra Mega Solar Power projects is
being implemented to provide land and transmission to RE developers for
installation of RE projects at large scale.
(viii) Laying of new transmission lines and creating new sub-station capacity has been
funded under the Green Energy Corridor Scheme for evacuation of renewable
power.
(ix) “Strategy for Establishments of Offshore Wind Energy Projects” has been
issued.
(x) To augment transmission infrastructure needed for steep RE trajectory,
transmission plan has been prepared till 2032.
(xi) Green Term Ahead Market (GTAM) has been launched to facilitate sale of
Renewable Energy Power through exchanges.
(xii) To achieve the objective of increased domestic production of Solar PV Modules,
the Govt. of India is implementing the Production Linked Incentive (PLI) scheme
for High Efficiency Solar PV Modules. This will enable manufacturing capacity of
Giga Watt (GW) scale in High Efficiency Solar PV Module.
***********ANNEXURE
ANNEXURE REFERRED IN REPLY TO PARTS (a) & (b) OF UNSTARRED QUESTION
NO. 1935 ANSWERED IN THE LOK SABHA ON 31.07.2025
*************
Details of States/UTs/Regions-wise Power Supply Position of the Country including the Union Territory of Dadra
and Nagar Haveli in terms of Energy for the period from FY 2019-2020 to FY 2020-2021:
State/ April, 2019 -March, 2020 April, 2020 - March, 2021
Energy Energy Energy not Energy Energy Energy not
System / Requirement Supplied Supplied Requirement Supplied Supplied
Region ( MU ) ( MU ) ( MU ) ( % ) ( MU ) ( MU ) ( MU ) ( % )
Chandigarh 1,732 1,732 0 0 1,523 1,523 0 0
Delhi 33,086 33,077 9 0 29,560 29,555 4 0
Haryana 54,505 54,492 13 0 53,161 53,108 53 0.1
Himachal Pradesh 10,424 10,353 71 0.7 10,186 10,130 56 0.5
Jammu & Kashmir 20,025 16,259 3,767 18.8 19,773 17,222 2,551 12.9
Punjab 56,776 56,770 6 0 58,445 58,377 67 0.1
Rajasthan 81,281 81,222 58 0.1 85,311 85,205 106 0.1
Uttar Pradesh 1,22,549 1,21,004 1,545 1.3 1,24,367 1,23,383 984 0.8
Uttarakhand 14,472 14,376 96 0.7 13,827 13,818 8 0.1
Northern Region 3,94,851 3,89,285 5,566 1.4 3,96,151 3,92,323 3,829 1
Chhattisgarh 30,111 30,107 4 0 30,472 30,449 22 0.1
Gujarat 1,13,940 1,13,939 1 0 1,11,622 1,11,622 0 0
Madhya Pradesh 76,172 76,172 0 0 83,437 83,437 0 0
Maharashtra 1,55,167 1,55,166 0 0 1,50,679 1,50,663 16 0
Daman & Diu 2,574 2,574 0 0 2,223 2,223 0 0
Dadra & Nagar
Haveli 6,528 6,528 0 0 5,497 5,497 0 0
Goa 4,350 4,350 0 0 4,083 4,083 0 0
Western Region 3,88,841 3,88,836 5 0 3,88,013 3,87,975 38 0
Andhra Pradesh 65,452 65,414 38 0.1 62,080 62,076 4 0
Telangana 68,306 68,303 3 0 66,998 66,994 4 0
Karnataka 72,799 72,796 3 0 68,851 68,831 19 0
Kerala 26,315 26,265 50 0.2 25,118 25,102 16 0.1
Tamil Nadu 1,08,816 1,08,812 4 0 1,01,194 1,01,189 5 0
Puducherry 2,847 2,846 1 0 2,644 2,644 0 0
Lakshadweep (#) 46 46 0 0 56 56 0 0
Southern Region 3,44,535 3,44,436 99 0 3,26,885 3,26,836 48 0
Bihar 31,627 31,533 94 0.3 34,171 34,018 153 0.4
DVC 22,429 22,427 2 0 21,368 21,368 0 0
Jharkhand 8,941 8,872 69 0.8 9,953 9,675 278 2.8
Odisha 29,692 29,692 0 0 29,848 29,848 0 0
West Bengal 52,948 52,824 124 0.2 51,644 51,543 100 0.2
Sikkim 554 554 0 0 546 546 0 0
Andaman-
Nicobar (#) 346 323 23 6.7 346 323 23 6.7
Eastern Region 1,46,191 1,45,902 289 0.2 1,47,530 1,46,999 531 0.4
Arunachal
Pradesh 753 749 4 0.5 719 714 5 0.7
Assam 9,804 9,288 516 5.3 10,192 9,815 377 3.7
Manipur 924 917 6 0.7 974 969 5 0.5
Meghalaya 2,112 2,064 48 2.3 2,031 2,005 26 1.3
Mizoram 647 643 4 0.7 728 723 4 0.6
Nagaland 814 809 5 0.7 826 822 4 0.5
Tripura (*) 1,538 1,515 23 1.5 1,484 1,481 3 0.2
North-Eastern
Region 16,591 15,984 607 3.7 16,955 16,531 424 2.5
All India 12,91,010 12,84,444 6,566 0.5 12,75,534 12,70,663 4,871 0.4
(#) Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these,
does not form part of regional requirement and supply.
(*) Excludes energy exported to Bangladesh.
Note: Power Supply Position Report has been compiled based on the data furnished by State Utilities/ Electricity
Departments. The MU figures has been rounded off to nearest unit place.Details of States/UTs/Regions-wise Power Supply Position of the Country including the Union
Territory of Dadra and Nagar Haveli in terms of Energy for the period of FY 2021-22:
State/ April, 2021 - March, 2022
System / Energy Requirement Energy Supplied Energy not Supplied
Region ( MU ) ( MU ) ( MU ) ( % )
Chandigarh 1,606 1,606 0 0
Delhi 31,128 31,122 6 0
Haryana 55,499 55,209 290 0.5
Himachal Pradesh 12,115 12,088 27 0.2
Jammu & Kashmir 19,957 18,434 1,524 7.6
Punjab 62,846 62,411 436 0.7
Rajasthan 89,814 89,310 504 0.6
Uttar Pradesh 1,29,448 1,28,310 1,138 0.9
Uttarakhand 15,521 15,426 94 0.6
Northern Region 4,17,934 4,13,915 4,019 1
Chhattisgarh 31,908 31,872 35 0.1
Gujarat 1,23,953 1,23,666 287 0.2
Madhya Pradesh 86,501 86,455 46 0.1
Maharashtra 1,72,823 1,72,809 14 0
Daman & Diu 2,594 2,594 0 0
Dadra & Nagar Haveli 6,839 6,839 0 0
Goa 4,448 4,448 0 0
Western Region 4,29,065 4,28,683 383 0.1
Andhra Pradesh 68,413 68,219 194 0.3
Telangana 70,539 70,523 16 0
Karnataka 72,437 72,417 20 0
Kerala 26,579 26,570 9 0
Tamil Nadu 1,09,816 1,09,798 18 0
Puducherry 2,894 2,893 1 0
Lakshadweep (#) 56 56 0 0
Southern Region 3,50,678 3,50,421 258 0.1
Bihar 36,216 35,761 455 1.3
DVC 23,741 23,736 4 0
Jharkhand 11,148 10,590 558 5
Odisha 38,339 38,332 7 0
West Bengal 54,001 53,945 57 0.1
Sikkim 610 609 0 0
Andaman- Nicobar (#) 335 327 8 2.3
Eastern Region 1,64,054 1,62,973 1,081 0.7
Arunachal Pradesh 875 874 1 0.1
Assam 10,844 10,825 19 0.2
Manipur 1,019 1,018 1 0.1
Meghalaya 2,256 2,243 13 0.6
Mizoram 656 644 12 1.8
Nagaland 852 851 1 0.1
Tripura (*) 1,578 1,578 0 0
North-Eastern Region 18,079 18,033 47 0.3
All India 13,79,812 13,74,024 5,787 0.4
(#) Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these, does
not form part of regional requirement and supply.
(*) Excludes energy exported to Bangladesh.
Note: Power Supply Position Report has been compiled based on the data furnished by State Utilities/ Electricity
Departments. The MU figures have been rounded off to nearest unit place.Details of States/UTs/Regions-wise Power Supply Position of the Country including the Union
Territory of Dadra and Nagar Haveli in terms of Energy for the period from FY 2022-23 to FY 2023-24:
State/ April, 2022 - March, 2023 April, 2023 - March, 2024
Energy Energy Energy Energy
System / Requirement Supplied Energy not Supplied Requirement Supplied Energy not Supplied
Region ( MU ) ( MU ) ( MU ) ( % ) ( MU ) ( MU ) ( MU ) ( % )
Chandigarh 1,788 1,788 0 0 1,789 1,789 0 0
Delhi 35,143 35,133 10 0 35,501 35,496 5 0
Haryana 61,451 60,945 506 0.8 63,983 63,636 348 0.5
Himachal Pradesh 12,649 12,542 107 0.8 12,805 12,767 38 0.3
Jammu & Kashmir 19,639 19,322 317 1.6 20,040 19,763 277 1.4
Punjab 69,522 69,220 302 0.4 69,533 69,528 5 0
Rajasthan 1,01,801 1,00,057 1,745 1.7 1,07,422 1,06,806 616 0.6
Uttar Pradesh 1,44,251 1,43,050 1,201 0.8 1,48,791 1,48,287 504 0.3
Uttarakhand 15,647 15,386 261 1.7 15,644 15,532 112 0.7
Northern Region 4,63,088 4,58,640 4,449 1 4,76,852 4,74,946 1,906 0.4
Chhattisgarh 37,446 37,374 72 0.2 39,930 39,872 58 0.1
Gujarat 1,39,043 1,38,999 44 0 1,45,768 1,45,740 28 0
Madhya Pradesh 92,683 92,325 358 0.4 99,301 99,150 151 0.2
Maharashtra 1,87,309 1,87,197 111 0.1 2,07,108 2,06,931 176 0.1
Dadra & Nagar Haveli
and Daman & Diu 10,018 10,018 0 0 10,164 10,164 0 0
Goa 4,669 4,669 0 0 5,111 5,111 0 0
Western Region 4,77,393 4,76,808 586 0.1 5,17,714 5,17,301 413 0.1
Andhra Pradesh 72,302 71,893 410 0.6 80,209 80,151 57 0.1
Telangana 77,832 77,799 34 0 84,623 84,613 9 0
Karnataka 75,688 75,663 26 0 94,088 93,934 154 0.2
Kerala 27,747 27,726 21 0.1 30,943 30,938 5 0
Tamil Nadu 1,14,798 1,14,722 77 0.1 1,26,163 1,26,151 12 0
Puducherry 3,051 3,050 1 0 3,456 3,455 1 0
Lakshadweep (#) 64 64 0 0 64 64 0 0
Southern Region 3,71,467 3,70,900 567 0.2 4,19,531 4,19,293 238 0.1
Bihar 39,545 38,762 783 2 41,514 40,918 596 1.4
DVC 26,339 26,330 9 0 26,560 26,552 8 0
Jharkhand 13,278 12,288 990 7.5 14,408 13,858 550 3.8
Odisha 42,631 42,584 47 0.1 41,358 41,333 25 0.1
West Bengal 60,348 60,274 74 0.1 67,576 67,490 86 0.1
Sikkim 587 587 0 0 544 543 0 0
Andaman- Nicobar (#) 348 348 0 0.12914 386 374 12 3.18562
Eastern Region 1,82,791 1,80,888 1,903 1 1,92,013 1,90,747 1,266 0.7
Arunachal Pradesh 915 892 24 2.6 1,014 1,014 0 0
Assam 11,465 11,465 0 0 12,445 12,341 104 0.8
Manipur 1,014 1,014 0 0 1,023 1,008 15 1.5
Meghalaya 2,237 2,237 0 0 2,236 2,066 170 7.6
Mizoram 645 645 0 0 684 684 0 0
Nagaland 926 873 54 5.8 921 921 0 0
Tripura (*) 1,547 1,547 0 0 1,691 1,691 0 0
North-Eastern Region 18,758 18,680 78 0.4 20,022 19,733 289 1.4
All India 15,13,497 15,05,914 7,583 0.5 16,26,132 16,22,020 4,112 0.3
(#) Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position
of these, does not form part of regional requirement and supply.
(*) Excludes energy exported to Bangladesh.
Note: Power Supply Position Report has been compiled based on the data furnished by State
Utilities/ Electricity Departments. The MU figures has been rounded off to nearest unit place.Details of States/UTs/Regions-wise All India Power Supply Position of the Country including the Union
Territory of Dadra and Nagar Haveli in terms of Energy for the period from FY 2024-25 to FY 2025-26
(upto June, 2025):
State/ April, 2024 - March, 2025 April, 2025 - June, 2025
Energy Energy Energy Energy
System / Requirement Supplied Energy not Supplied Requirement Supplied Energy not Supplied
Region ( MU ) ( MU ) ( MU ) ( % ) ( MU ) ( MU ) ( MU ) ( % )
Chandigarh 1,952 1,952 0 0 555 555 0 0
Delhi 38,255 38,243 12 0 11,303 11,299 4 0
Haryana 70,149 70,120 30 0 18,816 18,757 59 0.3
Himachal Pradesh 13,566 13,526 40 0.3 3,387 3,375 11 0.3
Jammu & Kashmir 20,374 20,283 90 0.4 4,853 4,847 6 0.1
Punjab 77,423 77,423 0 0 20,885 20,860 25 0.1
Rajasthan 1,13,833 1,13,529 304 0.3 28,036 28,036 0 0
Uttar Pradesh 1,65,090 1,64,786 304 0.2 46,028 46,022 6 0
Uttarakhand 16,770 16,727 43 0.3 4,426 4,417 10 0.2
Northern Region 5,18,869 5,17,917 952 0.2 1,38,697 1,38,576 121 0.1
Chhattisgarh 43,208 43,180 28 0.1 11,474 11,472 2 0
Gujarat 1,51,878 1,51,875 3 0 41,752 41,752 0 0
Madhya Pradesh 1,04,445 1,04,312 133 0.1 25,168 25,166 2 0
Maharashtra 2,01,816 2,01,757 59 0 52,395 52,393 1 0
Dadra & Nagar Haveli
and Daman & Diu 10,852 10,852 0 0 2,845 2,845 0 0
Goa 5,411 5,411 0 0 1,486 1,486 0 0
Western Region 5,28,924 5,28,701 223 0 1,38,472 1,38,466 6 0
Andhra Pradesh 79,028 79,025 3 0 20,471 20,471 0 0
Telangana 88,262 88,258 4 0 19,690 19,690 0 0
Karnataka 92,450 92,446 4 0 22,945 22,945 0 0
Kerala 31,624 31,616 8 0 8,015 8,015 0 0
Tamil Nadu 1,30,413 1,30,408 5 0 34,817 34,817 0 0
Puducherry 3,549 3,549 0 0 948 946 2 0.2
Lakshadweep (#) 68 68 0 0 20 20 0 0
Southern Region 4,25,373 4,25,349 24 0 1,06,899 1,06,897 2 0
Bihar 44,393 44,217 176 0.4 12,716 12,713 4 0
DVC 25,891 25,888 3 0 6,368 6,367 1 0
Jharkhand 15,203 15,126 77 0.5 3,931 3,930 1 0
Odisha 42,882 42,858 24 0.1 11,830 11,828 2 0
West Bengal 71,180 71,085 95 0.1 20,645 20,626 18 0.1
Sikkim 574 574 0 0 128 128 0 0
Andaman- Nicobar (#) 425 413 12 2.9 107 104 3 2.8
Eastern Region 2,00,180 1,99,806 374 0.2 55,637 55,611 26 0
Arunachal Pradesh 1,050 1,050 0 0 283 283 0 0
Assam 12,843 12,837 6 0 3,506 3,506 0 0
Manipur 1,079 1,068 10 0.9 274 272 2 0.9
Meghalaya 2,046 2,046 0 0 494 494 0 0
Mizoram 709 709 0 0 177 177 0 0
Nagaland 938 938 0 0 243 243 0 0
Tripura (*) 1,939 1,939 0 0 512 512 0 0
North-Eastern Region 20,613 20,596 16 0.1 5,492 5,490 2 0
All India 16,93,959 16,92,369 1,590 0.1 4,45,197 4,45,040 157 0
(#) Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position
of these, does not form part of regional requirement and supply.
(*) Excludes energy exported to Bangladesh.
Note: Power Supply Position Report has been compiled based on the data furnished by State
Utilities/ Electricity Departments. The MU figures has been rounded off to nearest unit place.
***************