Executive Summary & Key Takeaways

Executive Summary: This document addresses power shortages in India, particularly in the Union Territory of Dadra and Nagar Haveli, in response to Lok Sabha Unstarred Question No. 1935. It details the country's power supply position from FY 2019-20 to FY 2025-26, highlighting increased generation capacity and the government's measures to ensure adequate power availability. The report confirms that Dadra and Nagar Haveli has not experienced electricity shortages during this period. The document outlines steps taken to further improve power availability and eliminate shortages across the country. Key Points / Main Content: Power Availability: * India has moved from a power deficit to a power-sufficient nation with an installed generation capacity of 484.819 GW. * 260.784 GW of fresh generation capacity has been added since April 2014. * Energy supplied has been commensurate with the energy requirement, decreasing the gap from 0.5% in FY2019-20 to almost 0.0% in FY2025-26 (up to June 2025). * No electricity shortage has been reported in Dadra and Nagar Haveli from FY 2019-20 to FY 2025-26 (up to June 2025). Government Measures: * 526.4 MW of Firm Power and 1,208.7 MW of power from the unallocated quota of Central Generating Stations have been allocated to Dadra and Nagar Haveli and Daman Diu. * Installed generation capacity is projected to be 874 GW by 2031-32, including conventional and renewable sources. * States have prepared Resource Adequacy Plans (RAPs) in consultation with the CEA, dynamic 10-year rolling plans including generation and procurement. Capacity Addition Programs: * Thermal coal and lignite capacity requirement by 2034-35 is estimated at approximately 307,000 MW with an additional minimum 97,000 MW capacity planned. * 11,680 MW of thermal capacities commissioned since April 2023 till June 2025, with 38,935 MW under construction. * Contracts for 15,440 MW thermal capacity awarded in FY 2024-25 and 35,460 MW of coal and lignite based candidate capacity is at various stages of planning. * 13,463.5 MW of Hydro Electric Projects are under construction and 9802 MW are in various stages of planning, targeted for completion by 2031-32. * 6,600 MW of Nuclear Capacity is under construction and targeted to be completed by 2029-30, with 7,000 MW in planning and approval stages. * 1,58,450 MW of Renewable Capacity is under construction while 62,000 MW is at various stages of planning, targeted for completion by 2029-30. * 8250 MW/49500MWh Pumped Storage Projects (PSPs) are under construction, with 5780 MW/34680 MWh concurred and yet to be taken up. Transmission and Distribution: * Inter and Intra-State Transmission Systems are being implemented in line with generation capacity addition. * Approximately 1,91,474 ckm of transmission lines and 1274 GVA of transformation capacity planned for addition between 2022-23 and 2031-32. * Government supports States/UTs via schemes like DDUGJY, IPDS, and SAUBHAGYA, with Rs. 1.85 lakh Cr. executed for distribution infrastructure. Renewable Energy Promotion: * MNRE has issued a bidding trajectory for 50 GW/annum of RE power procurement bids from FY 2023-24 to FY 2027-28. * 100% FDI permitted under the automatic route. * ISTS charges waived for interstate sale of solar and wind power for projects commissioned by 30th June 2025. * Renewable Purchase Obligation (RPO) followed by Renewable Consumption Obligation (RCO) trajectory notified until 2029-30. Impact Analysis: Central Government: *Impact:* Responsible for planning, policy-making, and funding to increase power generation and improve distribution infrastructure. *Action Required:* Continue implementing capacity addition programs, transmission planning, distribution system improvements, and renewable energy promotion schemes. State Governments/UTs: *Impact:* Responsible for implementing central government schemes and developing their own Resource Adequacy Plans (RAPs). *Action Required:* Coordinate with CEA to develop and implement RAPs, initiate generation capacity creation, and improve distribution infrastructure. Power Generation Companies: *Impact:* Expected to increase power generation capacity through various sources including thermal, hydro, nuclear, and renewable energy. *Action Required:* Participate in capacity addition programs, construct new power plants, and meet renewable energy targets. Power Distribution Companies: *Impact:* Responsible for improving the quality and reliability of power supply to consumers. *Action Required:* Implement infrastructure works sanctioned under RDSS, improve grid electrification, and ensure adequate power supply to all consumers. Consumers: *Impact:* Will benefit from improved power availability and reliability. *Action Required:* No direct action required, but should utilize power efficiently and support renewable energy initiatives.

Key Entities Referenced

Ministry of Power: The Indian government ministry responsible for power generation, transmission, and distribution. Dadra and Nagar Haveli and Daman and Diu: A union territory in India that is the subject of the power shortage inquiry. Initially mentioned separately and later merged. Shri Shripad Naik: The Minister of State in the Ministry of Power who provided the answer to the Lok Sabha question. Central Electricity Authority (CEA): An organization in consultation with which states prepare their Resource Adequacy Plans (RAPs). Resource Adequacy Plans (RAPs): Dynamic 10-year rolling plans prepared by states in consultation with CEA, including power generation and procurement planning. Revamped Distribution Sector Scheme (RDSS): A Government of India scheme launched in July 2021 to improve the quality and reliability of power supply through a financially sustainable and operationally efficient distribution sector. Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan (PMKUSUM): A scheme for promotion of renewable energy generation. Renewable Purchase Obligation (RPO): Requirement for certain entities to purchase a proportion of their electricity from renewable sources.
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA UNSTARRED QUESTION NO.1935 ANSWERED ON 31.07.2025 SHORTAGE OF POWER IN DADRA AND NAGAR HAVELI †1935. SMT. DELKAR KALABEN MOHANBHAI: Will the Minister of POWER be pleased to state: (a) the details of the power shortage situation in the country during the last five years, State- wise; (b) the major issues responsible for such a situation in the country particularly in the Union Territory of Dadra and Nagar Haveli; and (c) the steps taken or proposed to be taken by the Government to reduce or eliminate power shortage in the country particularly in the Union Territory of Dadra and Nagar Haveli? A N S W E R THE MINISTER OF STATE IN THE MINISTRY OF POWER (SHRI SHRIPAD NAIK) (a) & (b) : There is adequate availability of power in the country. Present installed generation capacity of the country is 484.819 GW. Government of India has addressed the critical issue of power deficiency by adding 260.784 GW of fresh generation capacity since April, 2014 transforming the country from power deficit to power sufficient. The details of States/UTs/Regions-wise Power Supply Position of the country including the Union Territory of Dadra and Nagar Haveli in terms of Energy for the period from FY 2019-20 to FY 2024-25 and current FY 2025–26 (upto June, 2025) are given at Annexure. These details indicate that the Energy Supplied in the country has been commensurate to the Energy Requirement and the gap between the two has decreased from 0.5% in FY2019-20 to 0.1% in FY 2024-25 and almost 0.0% in current FY 2025-26 (upto June, 2025). Further, no shortage of electricity has been reported in the Union Territory of Dadra and Nagar Haveli from FY 2019-20 to FY 2025-26 (upto June, 2025). (c): For supplementing the power requirement, the Government of India has allocated 526.4 MW of Firm Power and 1,208.7 MW of power from unallocated quota of Central Generating Stations to Union Territory of Dadra & Nagar Haveli and Daman & Diu. Further, Government of India has taken following measures to improve the availability of power and to eliminate power shortages in the country: 1. Generation Planning: (i) Installed generation capacity in 2031-32 is likely to be 874 GW. This includes capacity from conventional sources- Coal, Lignite etc., renewable sources- Solar, Wind and Hydro. ……..2.- 2 - (ii) With a view to ensure generation capacity remains ahead of projected peak demand, all the States, in consultation with CEA, have prepared their “ Resource Adequacy Plans (RAPs)”, which are dynamic 10 year rolling plans and includes power generation as well as power procurement planning. (iii) All the States were advised to initiate process for creation of generation capacities; from all generation sources, as per their Resource Adequacy Plans. (iv) In order to augment the power generation capacity, the Government of India has initiated following capacity addition programme: (A) The projected thermal (coal and lignite) capacity requirement by the year 2034–35 is estimated at approximately 3,07,000 MW as against the 2,11,855 MW installed capacity as on 31.03.2023. To meet this requirement, Ministry of Power has envisaged to set up an additional minimum 97,000 MW coal and lignite based thermal capacity. Several initiatives have already been undertaken. Thermal capacities of around 11,680 MW have already been commissioned since April 2023 till June 2025. In addition, 38,935 MW (including 5,695 MW of stressed thermal power projects) of thermal capacity is currently under construction. Further, contracts for 15,440 MW thermal capacity have been awarded in FY 2024-25 and is due for construction. To meet the projected demand in the country, 35,460 MW of coal and lignite based candidate capacity has been identified, which is at various stages of planning in the country. (B) 13,463.5 MW of Hydro Electric Projects are under construction. Further, 9802 MW of Hydro Electric Projects are under various stage of planning and targeted to be completed by 2031-32. (C) 6,600 MW of Nuclear Capacity is under construction and targeted to be completed by 2029-30. 7,000 MW of Nuclear Capacity is under various stages of planning and approval. (D) 1,58,450 MW Renewable Capacity including 74,150 MW of Solar, 30,080 MW of Wind and 53,750 MW Hybrid power is under construction while 62,000 MW of Renewable Capacity including 46,010 MW of Solar and 15,990 MW Hybrid Power is at various stages of planning and targeted to be completed by 2029-30. (E) In energy storage systems, 8250 MW/49500MWh Pumped Storage Projects (PSPs) are under construction. Further, a total of 5780 MW/34680 MWh capacity of Pumped Storage Projects (PSPs) are concurred and yet to be taken up for construction. Out of these, 3500 MW/21000 MWh capacity of Pumped Storage Projects (PSPs) are under bidding and 15,829 MW/51,106 MWh Battery Energy Storage System (BESS) are currently under various stages of construction/bidding 2. Transmission Planning: Inter and Intra-State Transmission System has been planned and implementation of the same is taken up in matching time frame of generation capacity addition. As per the National Electricity Plan, about 1,91,474 ckm of transmission lines and 1274 GVA of transformation capacity is planned to be added (at 220 kV and above voltage level) during the ten year period from 2022- 23 to 2031-32. ……..3.- 3 - 3. Distribution System Planning: (i) Government of India has been supporting the States/ UTs through schemes like Deen Dayal Upadhyaya Gram Jyoti Yojana (DDUGJY), Integrated Power Development Scheme (IPDS), Pradhan Mantri Sahaj Bijli Har Ghar Yojana (SAUBHAGYA) to improve access and quality of power supply to all consumers. Under these scheme, projects worth Rs. 1.85 lakh Cr. were executed for strengthening of power distribution infrastructure. A total of 18,374 villages were electrified under the DDUGJY and 2.86 Cr households were electrified during SAUBHAGYA. (ii) Further, Government of India launched Revamped Distribution Sector Scheme (RDSS) in July, 2021 with the objective of improving the quality and reliability of power supply to consumers through a financially sustainable and operationally efficient Distribution Sector. Under the scheme, infrastructure works worth Rs. 2.82 lakh Cr. have been sanctioned for the distribution utilities. (iii) Government of India is further supporting States for grid electrification of left- out households during SAUBHAGYA, under RDSS. In addition, all Particularly Vulnerable Tribal Group (PVTG) households identified under PM-JANMAN (Pradhan Mantri Janjati AdivasiNyaya Maha Abhiyan), tribal households under DA-JGUA (Dharti Aaba Janjatiya Gram Utkarsh Abhiyan),Scheduled Caste households under Pradhan MantriAnusuchit Jaati Abhyuday Yojna (PM-AJAY) and remote & border households under Vibrant Villlage Program (VVP) are being sanctioned for on-grid electrification under RDSS as per the scheme guidelines. Till date, works amounting to Rs. 6,486 Cr. have been sanctioned for electrification of 13.59 lakh households under RDSS. (iv) With collective efforts of Centre and States/UTs, the average hours of supply in rural and urban areas have improved to 22.6 hrs and 23.4 hrs, respectively, in FY 2025. 4. Promotion of Renewable Energy Generation: (i) Ministry of New & Renewable Energy (MNRE) has issued Bidding Trajectory for issuance of RE power procurement bids of 50 GW/annum by Renewable Energy Implementing Agencies (REIAs) from FY 2023-24 to FY 2027-28. (ii) Foreign Direct Investment (FDI) has been permitted up to 100 percent under the automatic route. (iii) Inter State Transmission System (ISTS) charges have been waived for inter-state sale of solar and wind power for projects to be commissioned by 30th June 2025, for Green Hydrogen Projects till December 2030 and for offshore wind projects till December 2032. ………4.- 4 - (iv) To boost RE consumption, Renewable Purchase Obligation (RPO) followed by Renewable Consumption Obligation (RCO) trajectory has been notified till 2029- 30. The RCO which is applicable to all designated consumers under the Energy Conservation Act 2001 will attract penalties on non-compliance. RCO also includes specified quantum of consumption from Decentralized Renewable Energy sources. (v) Standard Bidding Guidelines for tariff based competitive bidding process for procurement of Power from Grid Connected Solar, Wind, Wind-Solar Hybrid and Firm & Dispatchable RE (FDRE) projects have been issued. (vi) Schemes such as Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-KUSUM), PM Surya Ghar Muft Bijli Yojana, National Programme on High Efficiency Solar PV Modules, New Solar Power Scheme (for Tribal and PVTG Habitations/Villages) under Pradhan Mantri Janjati Adivasi Nyaya Maha Abhiyan (PM JANMAN) and Dharti Aabha Janjatiya Gram Utkarsh Abhiyan (DA JGUA), National Green Hydrogen Mission, Viability Gap Funding (VGF) Scheme for Offshore Wind Energy Projects have been launched. (vii) Scheme for setting up of Solar Parks and Ultra Mega Solar Power projects is being implemented to provide land and transmission to RE developers for installation of RE projects at large scale. (viii) Laying of new transmission lines and creating new sub-station capacity has been funded under the Green Energy Corridor Scheme for evacuation of renewable power. (ix) “Strategy for Establishments of Offshore Wind Energy Projects” has been issued. (x) To augment transmission infrastructure needed for steep RE trajectory, transmission plan has been prepared till 2032. (xi) Green Term Ahead Market (GTAM) has been launched to facilitate sale of Renewable Energy Power through exchanges. (xii) To achieve the objective of increased domestic production of Solar PV Modules, the Govt. of India is implementing the Production Linked Incentive (PLI) scheme for High Efficiency Solar PV Modules. This will enable manufacturing capacity of Giga Watt (GW) scale in High Efficiency Solar PV Module. ***********ANNEXURE ANNEXURE REFERRED IN REPLY TO PARTS (a) & (b) OF UNSTARRED QUESTION NO. 1935 ANSWERED IN THE LOK SABHA ON 31.07.2025 ************* Details of States/UTs/Regions-wise Power Supply Position of the Country including the Union Territory of Dadra and Nagar Haveli in terms of Energy for the period from FY 2019-2020 to FY 2020-2021: State/ April, 2019 -March, 2020 April, 2020 - March, 2021 Energy Energy Energy not Energy Energy Energy not System / Requirement Supplied Supplied Requirement Supplied Supplied Region ( MU ) ( MU ) ( MU ) ( % ) ( MU ) ( MU ) ( MU ) ( % ) Chandigarh 1,732 1,732 0 0 1,523 1,523 0 0 Delhi 33,086 33,077 9 0 29,560 29,555 4 0 Haryana 54,505 54,492 13 0 53,161 53,108 53 0.1 Himachal Pradesh 10,424 10,353 71 0.7 10,186 10,130 56 0.5 Jammu & Kashmir 20,025 16,259 3,767 18.8 19,773 17,222 2,551 12.9 Punjab 56,776 56,770 6 0 58,445 58,377 67 0.1 Rajasthan 81,281 81,222 58 0.1 85,311 85,205 106 0.1 Uttar Pradesh 1,22,549 1,21,004 1,545 1.3 1,24,367 1,23,383 984 0.8 Uttarakhand 14,472 14,376 96 0.7 13,827 13,818 8 0.1 Northern Region 3,94,851 3,89,285 5,566 1.4 3,96,151 3,92,323 3,829 1 Chhattisgarh 30,111 30,107 4 0 30,472 30,449 22 0.1 Gujarat 1,13,940 1,13,939 1 0 1,11,622 1,11,622 0 0 Madhya Pradesh 76,172 76,172 0 0 83,437 83,437 0 0 Maharashtra 1,55,167 1,55,166 0 0 1,50,679 1,50,663 16 0 Daman & Diu 2,574 2,574 0 0 2,223 2,223 0 0 Dadra & Nagar Haveli 6,528 6,528 0 0 5,497 5,497 0 0 Goa 4,350 4,350 0 0 4,083 4,083 0 0 Western Region 3,88,841 3,88,836 5 0 3,88,013 3,87,975 38 0 Andhra Pradesh 65,452 65,414 38 0.1 62,080 62,076 4 0 Telangana 68,306 68,303 3 0 66,998 66,994 4 0 Karnataka 72,799 72,796 3 0 68,851 68,831 19 0 Kerala 26,315 26,265 50 0.2 25,118 25,102 16 0.1 Tamil Nadu 1,08,816 1,08,812 4 0 1,01,194 1,01,189 5 0 Puducherry 2,847 2,846 1 0 2,644 2,644 0 0 Lakshadweep (#) 46 46 0 0 56 56 0 0 Southern Region 3,44,535 3,44,436 99 0 3,26,885 3,26,836 48 0 Bihar 31,627 31,533 94 0.3 34,171 34,018 153 0.4 DVC 22,429 22,427 2 0 21,368 21,368 0 0 Jharkhand 8,941 8,872 69 0.8 9,953 9,675 278 2.8 Odisha 29,692 29,692 0 0 29,848 29,848 0 0 West Bengal 52,948 52,824 124 0.2 51,644 51,543 100 0.2 Sikkim 554 554 0 0 546 546 0 0 Andaman- Nicobar (#) 346 323 23 6.7 346 323 23 6.7 Eastern Region 1,46,191 1,45,902 289 0.2 1,47,530 1,46,999 531 0.4 Arunachal Pradesh 753 749 4 0.5 719 714 5 0.7 Assam 9,804 9,288 516 5.3 10,192 9,815 377 3.7 Manipur 924 917 6 0.7 974 969 5 0.5 Meghalaya 2,112 2,064 48 2.3 2,031 2,005 26 1.3 Mizoram 647 643 4 0.7 728 723 4 0.6 Nagaland 814 809 5 0.7 826 822 4 0.5 Tripura (*) 1,538 1,515 23 1.5 1,484 1,481 3 0.2 North-Eastern Region 16,591 15,984 607 3.7 16,955 16,531 424 2.5 All India 12,91,010 12,84,444 6,566 0.5 12,75,534 12,70,663 4,871 0.4 (#) Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these, does not form part of regional requirement and supply. (*) Excludes energy exported to Bangladesh. Note: Power Supply Position Report has been compiled based on the data furnished by State Utilities/ Electricity Departments. The MU figures has been rounded off to nearest unit place.Details of States/UTs/Regions-wise Power Supply Position of the Country including the Union Territory of Dadra and Nagar Haveli in terms of Energy for the period of FY 2021-22: State/ April, 2021 - March, 2022 System / Energy Requirement Energy Supplied Energy not Supplied Region ( MU ) ( MU ) ( MU ) ( % ) Chandigarh 1,606 1,606 0 0 Delhi 31,128 31,122 6 0 Haryana 55,499 55,209 290 0.5 Himachal Pradesh 12,115 12,088 27 0.2 Jammu & Kashmir 19,957 18,434 1,524 7.6 Punjab 62,846 62,411 436 0.7 Rajasthan 89,814 89,310 504 0.6 Uttar Pradesh 1,29,448 1,28,310 1,138 0.9 Uttarakhand 15,521 15,426 94 0.6 Northern Region 4,17,934 4,13,915 4,019 1 Chhattisgarh 31,908 31,872 35 0.1 Gujarat 1,23,953 1,23,666 287 0.2 Madhya Pradesh 86,501 86,455 46 0.1 Maharashtra 1,72,823 1,72,809 14 0 Daman & Diu 2,594 2,594 0 0 Dadra & Nagar Haveli 6,839 6,839 0 0 Goa 4,448 4,448 0 0 Western Region 4,29,065 4,28,683 383 0.1 Andhra Pradesh 68,413 68,219 194 0.3 Telangana 70,539 70,523 16 0 Karnataka 72,437 72,417 20 0 Kerala 26,579 26,570 9 0 Tamil Nadu 1,09,816 1,09,798 18 0 Puducherry 2,894 2,893 1 0 Lakshadweep (#) 56 56 0 0 Southern Region 3,50,678 3,50,421 258 0.1 Bihar 36,216 35,761 455 1.3 DVC 23,741 23,736 4 0 Jharkhand 11,148 10,590 558 5 Odisha 38,339 38,332 7 0 West Bengal 54,001 53,945 57 0.1 Sikkim 610 609 0 0 Andaman- Nicobar (#) 335 327 8 2.3 Eastern Region 1,64,054 1,62,973 1,081 0.7 Arunachal Pradesh 875 874 1 0.1 Assam 10,844 10,825 19 0.2 Manipur 1,019 1,018 1 0.1 Meghalaya 2,256 2,243 13 0.6 Mizoram 656 644 12 1.8 Nagaland 852 851 1 0.1 Tripura (*) 1,578 1,578 0 0 North-Eastern Region 18,079 18,033 47 0.3 All India 13,79,812 13,74,024 5,787 0.4 (#) Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these, does not form part of regional requirement and supply. (*) Excludes energy exported to Bangladesh. Note: Power Supply Position Report has been compiled based on the data furnished by State Utilities/ Electricity Departments. The MU figures have been rounded off to nearest unit place.Details of States/UTs/Regions-wise Power Supply Position of the Country including the Union Territory of Dadra and Nagar Haveli in terms of Energy for the period from FY 2022-23 to FY 2023-24: State/ April, 2022 - March, 2023 April, 2023 - March, 2024 Energy Energy Energy Energy System / Requirement Supplied Energy not Supplied Requirement Supplied Energy not Supplied Region ( MU ) ( MU ) ( MU ) ( % ) ( MU ) ( MU ) ( MU ) ( % ) Chandigarh 1,788 1,788 0 0 1,789 1,789 0 0 Delhi 35,143 35,133 10 0 35,501 35,496 5 0 Haryana 61,451 60,945 506 0.8 63,983 63,636 348 0.5 Himachal Pradesh 12,649 12,542 107 0.8 12,805 12,767 38 0.3 Jammu & Kashmir 19,639 19,322 317 1.6 20,040 19,763 277 1.4 Punjab 69,522 69,220 302 0.4 69,533 69,528 5 0 Rajasthan 1,01,801 1,00,057 1,745 1.7 1,07,422 1,06,806 616 0.6 Uttar Pradesh 1,44,251 1,43,050 1,201 0.8 1,48,791 1,48,287 504 0.3 Uttarakhand 15,647 15,386 261 1.7 15,644 15,532 112 0.7 Northern Region 4,63,088 4,58,640 4,449 1 4,76,852 4,74,946 1,906 0.4 Chhattisgarh 37,446 37,374 72 0.2 39,930 39,872 58 0.1 Gujarat 1,39,043 1,38,999 44 0 1,45,768 1,45,740 28 0 Madhya Pradesh 92,683 92,325 358 0.4 99,301 99,150 151 0.2 Maharashtra 1,87,309 1,87,197 111 0.1 2,07,108 2,06,931 176 0.1 Dadra & Nagar Haveli and Daman & Diu 10,018 10,018 0 0 10,164 10,164 0 0 Goa 4,669 4,669 0 0 5,111 5,111 0 0 Western Region 4,77,393 4,76,808 586 0.1 5,17,714 5,17,301 413 0.1 Andhra Pradesh 72,302 71,893 410 0.6 80,209 80,151 57 0.1 Telangana 77,832 77,799 34 0 84,623 84,613 9 0 Karnataka 75,688 75,663 26 0 94,088 93,934 154 0.2 Kerala 27,747 27,726 21 0.1 30,943 30,938 5 0 Tamil Nadu 1,14,798 1,14,722 77 0.1 1,26,163 1,26,151 12 0 Puducherry 3,051 3,050 1 0 3,456 3,455 1 0 Lakshadweep (#) 64 64 0 0 64 64 0 0 Southern Region 3,71,467 3,70,900 567 0.2 4,19,531 4,19,293 238 0.1 Bihar 39,545 38,762 783 2 41,514 40,918 596 1.4 DVC 26,339 26,330 9 0 26,560 26,552 8 0 Jharkhand 13,278 12,288 990 7.5 14,408 13,858 550 3.8 Odisha 42,631 42,584 47 0.1 41,358 41,333 25 0.1 West Bengal 60,348 60,274 74 0.1 67,576 67,490 86 0.1 Sikkim 587 587 0 0 544 543 0 0 Andaman- Nicobar (#) 348 348 0 0.12914 386 374 12 3.18562 Eastern Region 1,82,791 1,80,888 1,903 1 1,92,013 1,90,747 1,266 0.7 Arunachal Pradesh 915 892 24 2.6 1,014 1,014 0 0 Assam 11,465 11,465 0 0 12,445 12,341 104 0.8 Manipur 1,014 1,014 0 0 1,023 1,008 15 1.5 Meghalaya 2,237 2,237 0 0 2,236 2,066 170 7.6 Mizoram 645 645 0 0 684 684 0 0 Nagaland 926 873 54 5.8 921 921 0 0 Tripura (*) 1,547 1,547 0 0 1,691 1,691 0 0 North-Eastern Region 18,758 18,680 78 0.4 20,022 19,733 289 1.4 All India 15,13,497 15,05,914 7,583 0.5 16,26,132 16,22,020 4,112 0.3 (#) Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these, does not form part of regional requirement and supply. (*) Excludes energy exported to Bangladesh. Note: Power Supply Position Report has been compiled based on the data furnished by State Utilities/ Electricity Departments. The MU figures has been rounded off to nearest unit place.Details of States/UTs/Regions-wise All India Power Supply Position of the Country including the Union Territory of Dadra and Nagar Haveli in terms of Energy for the period from FY 2024-25 to FY 2025-26 (upto June, 2025): State/ April, 2024 - March, 2025 April, 2025 - June, 2025 Energy Energy Energy Energy System / Requirement Supplied Energy not Supplied Requirement Supplied Energy not Supplied Region ( MU ) ( MU ) ( MU ) ( % ) ( MU ) ( MU ) ( MU ) ( % ) Chandigarh 1,952 1,952 0 0 555 555 0 0 Delhi 38,255 38,243 12 0 11,303 11,299 4 0 Haryana 70,149 70,120 30 0 18,816 18,757 59 0.3 Himachal Pradesh 13,566 13,526 40 0.3 3,387 3,375 11 0.3 Jammu & Kashmir 20,374 20,283 90 0.4 4,853 4,847 6 0.1 Punjab 77,423 77,423 0 0 20,885 20,860 25 0.1 Rajasthan 1,13,833 1,13,529 304 0.3 28,036 28,036 0 0 Uttar Pradesh 1,65,090 1,64,786 304 0.2 46,028 46,022 6 0 Uttarakhand 16,770 16,727 43 0.3 4,426 4,417 10 0.2 Northern Region 5,18,869 5,17,917 952 0.2 1,38,697 1,38,576 121 0.1 Chhattisgarh 43,208 43,180 28 0.1 11,474 11,472 2 0 Gujarat 1,51,878 1,51,875 3 0 41,752 41,752 0 0 Madhya Pradesh 1,04,445 1,04,312 133 0.1 25,168 25,166 2 0 Maharashtra 2,01,816 2,01,757 59 0 52,395 52,393 1 0 Dadra & Nagar Haveli and Daman & Diu 10,852 10,852 0 0 2,845 2,845 0 0 Goa 5,411 5,411 0 0 1,486 1,486 0 0 Western Region 5,28,924 5,28,701 223 0 1,38,472 1,38,466 6 0 Andhra Pradesh 79,028 79,025 3 0 20,471 20,471 0 0 Telangana 88,262 88,258 4 0 19,690 19,690 0 0 Karnataka 92,450 92,446 4 0 22,945 22,945 0 0 Kerala 31,624 31,616 8 0 8,015 8,015 0 0 Tamil Nadu 1,30,413 1,30,408 5 0 34,817 34,817 0 0 Puducherry 3,549 3,549 0 0 948 946 2 0.2 Lakshadweep (#) 68 68 0 0 20 20 0 0 Southern Region 4,25,373 4,25,349 24 0 1,06,899 1,06,897 2 0 Bihar 44,393 44,217 176 0.4 12,716 12,713 4 0 DVC 25,891 25,888 3 0 6,368 6,367 1 0 Jharkhand 15,203 15,126 77 0.5 3,931 3,930 1 0 Odisha 42,882 42,858 24 0.1 11,830 11,828 2 0 West Bengal 71,180 71,085 95 0.1 20,645 20,626 18 0.1 Sikkim 574 574 0 0 128 128 0 0 Andaman- Nicobar (#) 425 413 12 2.9 107 104 3 2.8 Eastern Region 2,00,180 1,99,806 374 0.2 55,637 55,611 26 0 Arunachal Pradesh 1,050 1,050 0 0 283 283 0 0 Assam 12,843 12,837 6 0 3,506 3,506 0 0 Manipur 1,079 1,068 10 0.9 274 272 2 0.9 Meghalaya 2,046 2,046 0 0 494 494 0 0 Mizoram 709 709 0 0 177 177 0 0 Nagaland 938 938 0 0 243 243 0 0 Tripura (*) 1,939 1,939 0 0 512 512 0 0 North-Eastern Region 20,613 20,596 16 0.1 5,492 5,490 2 0 All India 16,93,959 16,92,369 1,590 0.1 4,45,197 4,45,040 157 0 (#) Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these, does not form part of regional requirement and supply. (*) Excludes energy exported to Bangladesh. Note: Power Supply Position Report has been compiled based on the data furnished by State Utilities/ Electricity Departments. The MU figures has been rounded off to nearest unit place. ***************