Parliament Question: Solar Capacity under PM-KUSUM

Issued by NEW AND RENEWABLE ENERGY · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF NEW AND RENEWABLE ENERGY LOK SABHA UNSTARRED QUESTION NO. 5297 ANSWERED ON 25.03.2026 SOLAR CAPACITY UNDER PM-KUSUM 5297. SHRI VARUN CHAUDHRY Will the minister of new and renewable energy be pleased to state: (a) the solar capacity achieved under Pradhan Mantri-Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-KUSUM) vis a vis the target of 35 GW; (b) the achievements made under Grid connected solar power plants and grid connected solar pumps and the reasons for low achievements along with the measures being taken by the Government to improve the situation; (c) whether there is any proposal under consideration to include solar pumps with capacities above 7.5 HP under the PM-KUSUM and if so, the details thereof and if not, the reasons therefor; and (d) the achievements under grid connected solar power plants and grid connected solar pumps in the State of Haryana along with the set targets? ANSWER THE MINISTER OF STATE FOR NEW & RENEWABLE ENERGY AND POWER (SHRI SHRIPAD YESSO NAIK) (a) The Government has launched PM-KUSUM scheme in March 2019, which has been scaled-up in January 2024 and aims to add capacity of 34.8 GW. As on 28.02.2026, as reported by state implementing agencies (SIAs), a total of 12.164 GW capacity has been installed under the scheme. (b) PM KUSUM progress under Grid connected solar power plants and grid connected solar pumps, as on 28.02.2026 is as follows: Component Sanction Installation Eq MW A (MW) 10,000 839 839 C (no of 35,68,994 13,54,679 6,702 pumps) Despite initial setbacks due to COVID-19 pandemic and supply chain disruptions, the scheme has picked up as the Ministry has taken proactive steps and issued simplified and comprehensive revised guidelines in January 2024. Currently all the targets are fully subscribed. With the gestation period of 18 months from the date of LOA, it is expected that most of the capacities will come in year 2026. (c) Installation/ solarization of agriculture pumps of capacity higher than 7.5 HP is allowed under Component-B and Component C(IPS) of PM KUSUM scheme. However, the Central Financial Assistance (CFA) is limited to the CFA applicable for pumps of 7.5 HP. Besides, in North-Eastern region (NER); Hilly region (Jammu & Kashmir, Ladakh, Uttarakhand and Himachal Pradesh) and Islands (Andaman & Nicobar, Lakshadweep), the CFA is available for pump capacity up to 15 HP, however the CFA for pumps up to 15 HP is restricted to 10% of total installations. (d) The progress under Grid connected solar power plants and grid connected solar pumps, in the state of Haryana, as on 28.02.2026 is as follows: Component Sanction Installation Eq MW A (MW) 158 29.21 29.21 C (no of 2899 0 0 pumps) *****

Continue your research