See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF NEW AND RENEWABLE ENERGY
LOK SABHA
UNSTARRED QUESTION NO. 4279
ANSWERED ON 18.03.2026
SOLAR ENERGY GENERATION IN ANDHRA PRADESH
4279. SHRI PUTTA MAHESH KUMAR
Will the Minister of NEW AND RENEWABLE ENERGY be pleased to state:
(a) the details of total quantity of solar energy generated during the last five years across the
country, State and district-wise in Andhra Pradesh particularly in Eluru district;
(b) the total area covered by solar panel grids at present across the country, State and district-wise
in Andhra Pradesh particularly in Eluru district;
(c) whether the Government has undertaken any schemes, initiatives and programme to increase
solar grid panel infrastructure in rural areas of the country especially in Andhra Pradesh;
(d) if so, the details thereof along with the regions in Andhra Pradesh identified to have high
irradiance, district-wise including Eluru district; and
(e) the total funds allocated, released and utilised for increasing solar power grid infrastructure
across the country, State and district-wise in Andhra Pradesh particularly in Eluru?
ANSWER
THE MINISTER OF STATE FOR NEW & RENEWABLE ENERGY AND POWER
(SHRI SHRIPAD YESSO NAIK)
(a) As per the information received from Central Electricity Authority (CEA), the total Solar
Energy Generated across the country during last five financial years and current financial year up
to January 2026 is at Annexure-I.
(b) The total installed solar energy capacity in the country as on 28.02.2026 is ~143.60 GW. The
details are at Annexure-II.
The area covered by solar power project is 3 to 5 acre per MW.
(c) & (d) The Government is implementing various schemes to increase solar grid panel
infrastructure in the rural areas of the country including Andhra Pradesh. The details of schemes
are given at Annexure-III.
As per the information received from National Institute of Solar Energy (NISE), the Global
Horizontal Irradiance (GHI) in Andhra Pradesh ranges between 4.22-5.56 kWh/m2/ day. The
Eluru district records a GHI in the range of 5.02-5.2 kWh/m2 / day.
(e) The Government has been implementing the Green Energy Corridor (GEC) scheme to
facilitate integration of large-scale renewable generation capacity in the country. The transmission
system under the Intra-State Transmission System GEC Phase-I (InSTS GEC-I) is being
implemented through the State Transmission Utilities of eight Renewable Energy (RE)-rich States
with Central Financial Assistance (CFA) amounting to 40% of the estimated project cost, i.e., Rs.
3164.70 crore. Out of this, Rs. 2839.10 crore has been released as on 28.02.2026.
In the State of Andhra Pradesh, the implementing agency is the Transmission Corporation of
Andhra Pradesh Limited (APTRANSCO). The eligible grant for Andhra Pradesh is Rs. 361.25
crore, out of which Rs. 302.48 crore has been released to APTRANSCO. All the projects under
GEC-I in Andhra Pradesh have been completed.
*****ANNEXURE-I REFERRED TO IN REPLY TO PART (a) OF LOK SABHA
UNSTARRED QUESTION NO. 4279 FOR 18.03.2026
Total Solar Energy Generated across the country during last five financial years and
current financial year up to January 2026
Name of State/UT Solar Energy (in Million Units)
Chandigarh 64.05
Delhi 1237.13
Haryana 5037.63
Himachal Pradesh 467.97
Jammu & Kashmir 11.13
Ladakh 0.00
Punjab 10776.86
Rajasthan 198370.95
Uttar Pradesh 21612.51
Uttarakhand 1903.14
Chhattisgarh 5382.10
Gujarat 75233.13
Madhya Pradesh 29842.47
Maharashtra 32485.07
Dadra and Nagar Haveli & Daman and Diu 201.79
Goa 196.95
Andhra Pradesh 45912.84
Telangana 39061.23
Karnataka 86086.47
Kerala 6424.68
Tamil Nadu 65944.26
Lakshadweep 1.12
Puducherry 65.55
Andaman & Nicobar Islands 136.18
Bihar 1277.90
Jharkhand 105.05
Orissa 4069.62
Sikkim 0.00
West Bengal 1123.99
Arunachal Pradesh 30.94
Assam 1202.30
Manipur 46.18
Meghalaya 0.47
Mizoram 61.41
Nagaland 0.00
Tripura 39.65
Total 634412.72ANNEXURE-II REFERRED TO IN REPLY TO PART (b) OF LOK SABHA
UNSTARRED QUESTION NO. 4279 FOR 18.03.2026
State-wise installed Solar Energy Capacity as on 28.02.2026
Sl. No. States/UTs Solar Energy Capacity (MW)
1 Andhra Pradesh 7208.18
2 Arunachal Pradesh 15.44
3 Assam 533.47
4 Bihar 435.34
5 Chhattisgarh 1755.40
6 Goa 76.24
7 Gujarat 27486.26
8 Haryana 2584.78
9 Himachal Pradesh 346.29
10 Jammu & Kashmir 79.48
11 Jharkhand 242.39
12 Karnataka 11029.94
13 Kerala 2150.25
14 Ladakh 12.02
15 Madhya Pradesh 5893.83
16 Maharashtra 19364.16
17 Manipur 17.52
18 Meghalaya 4.28
19 Mizoram 33.69
20 Nagaland 3.34
21 Odisha 779.32
22 Punjab 1566.91
23 Rajasthan 38728.22
24 Sikkim 7.56
25 Tamil Nadu 12352.50
26 Telangana 5065.10
27 Tripura 35.41
28 Uttar Pradesh 3846.45
29 Uttarakhand 837.89
30 West Bengal 320.62
31 Andaman & Nicobar 32.12
32 Chandigarh 78.85
33 DD & DNH 134.90
34 Delhi 413.90
35 Lakshadweep 6.57
36 Puducherry 80.71
37 Other-NABARD 45.01
Total 143604.37ANNEXURE-III REFFERED TO IN REPLY TO PART (c) OF LOK SABHA
UNSTARRED QUESTION NO. 4279 FOR 18.03.2026
Details of various schemes being implemented to increase Solar Grid panel
infrastructure in the country including rural areas
Schemes Incentives presently available as per the Scheme
a) PM Surya Ghar: Muft Bijli 1. Under the PMSG: MBY, the CFA for installation of
Yojana Yojana for installing Rooftop Solar in the Residential Sector is given below:
rooftop solar and providing
Type of CFA (Special
free electricity up to 300 units
Sl.
Residential CFA Category
every month for One Crore
No.
households. Segment States/UTs)
Residential Sector
(first 2 kWp of
1 Rooftop Solar Rs.30,000/kWp Rs.33,000/kWp
(RTS) capacity or
part thereof)
Residential Sector
(with additional
2 RTS capacity of 1 Rs.18,000/kWp Rs.19,800/kWp
kWp or part
thereof)
Residential Sector
(additional RTS No additional No additional
3
capacity beyond 3 CFA CFA
kWp)
Group Housing
Societies/
Residential
Welfare
Associations
4 (GHS/RWA) etc. Rs.18,000/kWp Rs.19,800/kWp
for common
facilities including
EV charging up to
500 kWp (@ 3
kWp per house)
2. The PMSG: MBY scheme includes the provision for
incentive to DISCOMs to motivate and help them in
activities such as create conducive regulatory and
administrative mechanisms, achieve targets for
implementation. The incentive is pegged at 5% of
applicable benchmark cost for capacity achieved above
10% and less than 15% of installed base capacity; 10% of
the applicable benchmark cost for capacity achieved
beyond 15% of installed base capacity.
3. To push the deployment of residential rooftop solar
system (RTS) and undertake local mobilization efforts,
the PMSG: MBY scheme also includes the provision for
incentive to the Urban Local Bodies (ULBs) andSchemes Incentives presently available as per the Scheme
Panchayat Raj Institutions (PRIs), at the rate of Rs.1000
for every installation of RTS in residential segment in the
jurisdiction of ULB/PRI, for which CFA has been
transferred to consumer.
Further, a fund of Rs. 800 crores have been provisioned
for developing a Model Solar Village in each district of
the country, with an assistance of Rs 1 crore per Model
Solar Village under PMSG: MBY scheme.
b) PM-KUSUM scheme for Component A: Setting up of 10,000 MW of Decentralized
setting up decentralized solar Ground/Stilt Mounted Solar Power Plants
or other renewable energy
Benefits available: Procurement Based Incentive (PBI) to the
power plants, installation of
DISCOMs @ 40 paise/kWh or Rs.6.60 lakhs/MW/year,
stand-alone solar agriculture
whichever is lower, for buying solar power under this scheme.
pumps, and solarization of
The PBI is given to the DISCOMs for a period of five years from
existing grid-connected
the Commercial Operation Date of the plant. Therefore, the total
agriculture pumps, including
PBI payable to DISCOMs is up to Rs. 33 Lakh per MW.
feeder-level solarization. The
scheme benefits not only Component B: Installation of 14 Lakh Stand-alone Solar Pumps
farmers but also the States
Benefits available: CFA of 30% of the benchmark cost or the
and DISCOMs.
tender cost, whichever is lower, of the stand-alone solar
agriculture pump is provided. However, in North Eastern States,
Sikkim, Jammu & Kashmir, Ladakh, Himachal Pradesh,
Uttarakhand, Lakshadweep and A&N Islands, CFA of 50% of the
benchmark cost or the tender cost, whichever is lower, of the
stand-alone solar pump is provided. Component B can also be
implemented without State share of 30%. The Central Financial
Assistance will continue to remain 30% and rest 70% will be
borne by the farmer.
Component C: Solarisation of 35 Lakh Grid Connected
Agriculture Pumps including through Feeder Level Solarisation
Benefits available:
(a) Individual Pump Solarization (IPS): CFA of 30% of the
benchmark cost or the tender cost, whichever is lower, of the solar
PV component will be provided. However, in North Eastern
States, Sikkim, Jammu & Kashmir, Ladakh, Himachal Pradesh,
Uttarakhand, Lakshadweep and A&N Islands, CFA of 50% of the
benchmark cost or the tender cost, whichever is lower, of the solar
PV component is provided. Component C (IPS) can also be
implemented without State share of 30%. The Central Financial
Assistance will continue to remain 30% and rest 70% will be
borne by the farmer.
(b) Feeder Level Solarization (FLS): Agriculture feeders can be
solarized by the State Government in CAPEX or RESCO mode
with CFA of Rs. 1.05 Crore per MW as provided by
MNRE. However, in North Eastern States, Sikkim, Jammu &
Kashmir, Ladakh, Himachal Pradesh, Uttarakhand, Lakshadweep
and Andaman & Nicobar Island, CFA of Rs. 1.75 crore per MW
is provided.Schemes Incentives presently available as per the Scheme
c) New Solar Power Scheme
(for Tribal and PVTG Components Central Share (100%)
Habitations/Villages) under Provision of 0.3 kW Solar Rs. 50,000 per HH or as per
Pradhan Mantri Janjati off-grid system for 1 lakh actual cost
Adivasi Nyaya Maha Tribal and PVTG HHs
Abhiyan (PM JANMAN) Solar street lighting and Rs. 1 lakh per MPC
and Dharti Aabha Janjatiya provision of lighting in 1500
Gram Utkarsh Abhiyan (DA MPCs of PVTG areas
JGUA) with a provision for (under PM JANMAN
providing off-grid Solar component only)
Lighting where electricity Solarisation of 2000 public
Rs 1 lakh per kW with
supply through grid is not institutions through off-grid
maximum solar PV capacity
techno-economically solar systems (under DA
of 20 kW per public
feasible. JGUA component only)