See Full Document Text
O.I.H.
GOVERNMENT OF INDIA
MINISTRY OF HOUSING AND URBAN AFFAIRS
LOK SABHA
UNSTARRED QUESTION NO. 3443
TO BE ANSWERED ON MARCH 12, 2026
STATUS OF AMRUT IN MADHYA PRADESH
NO. 3443. SHRI BUNTY VIVEK SAHU:
Will the Minister of HOUSING AND URBAN AFFAIRS be pleased to state:
(a) the details of the cities/urban local bodies where water supply and
sewerage projects have been initiated in Madhya Pradesh, particularly in
Chhindwara Lok Sabha Constituency under AMRUT 2.0 since January
2025 till date;
(b) the key criteria being adopted to measure progress in the expansion of
tap connections, reduction in non-revenue water and quality of service
under the said mission;
(c) the concrete steps taken by the Government to promote water reuse and
sustainable urban water management;
(d) whether any project in Madhya Pradesh or Chhindwara has faced delays
due to technical or financial reasons; and
(e) if so, the details thereof along with the measures being taken to ensure
long-term operation and maintenance?
ANSWER
THE MINISTER OF STATE IN THE
MINISTRY OF HOUSING AND URBAN AFFAIRS
(SHRI TOKHAN SAHU)
(a) to (c): Water and Sanitation is State subject. Government of India
supplements the efforts of the States through schematic interventions/
advisories. It provides financial and technical support to the States through
various schemes/ Missions such as Atal Mission for Rejuvenation and Urban
Transformation 2.0 (AMRUT 2.0). Under AMRUT/ AMRUT 2.0, the States/ Union
Territories are empowered to select, appraise, prioritise and implement the
projects.
Under AMRUT 2.0, the State Water Action Plans (SWAPs) of Madhya
Pradesh comprising of 1153 projects worth ₹12,951.10 crore have been
approved, which includes 297 water supply projects worth ₹ 6877.53 crore
and 36 sewerage/ septage management projects worth ₹5432.04 crore. As
reported by the State on AMRUT 2.0 portal, 79 water supply projects in 79
cities/ Urban Local Bodies (ULBs) and 18 sewerage/ septage management
projects in 18 cities/ ULBs have been awarded since January, 2025. The status
of projects under AMRUT 2.0 in Chhindwara Lok Sabha Constituency is given
in Annexure.
…2/--2-
The progress is measured in terms of household coverage of water
supply and sewerage connections. Through AMRUT/ AMRUT 2.0 and in
convergence with the States, 246 lakh water tap connections in the urban
areas have been provided so far. 182 lakh sewer connections (including
households covered through FSSM) have been provided through AMRUT/
AMRUT 2.0 and in convergence in AMRUT Cities. 93,457.51 km of water
pipeline network has been laid/ replaced and 26,995.61 km of sewer network
has been laid/ replaced. Around 6,535 MLD of treated water are reused by the
States in industries, horticulture, agriculture, etc. In Madhya Pradesh, 16.54
lakh water tap connections and 5.73 lakh sewer connections (including
households covered through Faecal Sludge and Septage Management (FSSM))
in the urban areas have been provided so far.
Under AMRUT 2.0, cities have prepared City Water Balance Plans
(CWBPs), which include as-is assessment of water supply systems which help
cities/ ULBs for sustainable urban water management. Water body
rejuvenation is one of the major components of AMRUT 2.0. So far, 2,991 water
body rejuvenation projects worth ₹6,083.32 crore have been approved under
this Mission, which include 430 water body rejuvenation projects worth
₹511.75 crore in Madhya Pradesh. Further, to promote groundwater recharge,
demonstration of variety of recharge structures and creating awareness
among city officials and citizens on importance of aquifer management,
Shallow Aquifer Management (SAM) initiative under AMRUT 2.0 was launched
as a pilot project across 9 diverse Indian cities. This has been further scaled
up under SAM 2.0 to 75 additional cities.
For addressing non-revenue water issues, States have taken up Drink
from Tap (DfT) projects and Smart Monitoring Systems such as Supervisory
Control and Data Acquisition (SCADA), meters, pressure valves, etc. under
AMRUT 2.0 to strengthen maintenance systems, digital monitoring, energy
efficiency, etc. States are encouraged to implement at least one DfT project
in a District Metered Area (DMA) or ward within each AMRUT city. 408 project
with 1,153 DMAs benefitting 16.72 lakh Households have been approved under
AMRUT 2.0. 258 water supply schemes under AMRUT have SCADA system and
1,422 water supply projects under AMRUT 2.0 has provision for SCADA system.
Mission has provision of ₹3000 per connection to enhance last mile
connectivity.
AMRUT 2.0 has been envisaged to promote circular economy of water
through development of city water balance plan for each city focusing on
recycle/ reuse of treated sewage, rejuvenation of water bodies and water
conservation, etc. Under Sewerage component of the AMRUT 2.0 for 500
AMRUT cities, tertiary treatment with end-to-end reuse plan (preferably in
Public Private Partnership mode); provision/ augmentation and rehabilitation
of sewerage systems with end-to-end treatment and reuse; tapping of used
water for recycling; identifying the bulk users of recycled used water and
facilitating sale of used water to potential users (e.g. industrial clusters such
as textile/ leather/ paper/ power plants/ railways, etc.) are admissible
components.
…3/--3-
Further, MoHUA has launched "Jal Hi AMRIT" initiative under AMRUT 2.0
reforms, which aims to incentivize States and Union Territories (UTs) to
efficiently manage sewage treatment plants for recyclable treated water
meeting environmental standards on sustained basis. The focus of this
initiative is building capacity and incentivizing qualitative improvements in the
treated discharge effluent. To institutionalize circularity, Water Resource
Recovery Cells (WRRCs) have been established in 25 States/ Union Territories
under this initiative to plan, monitor, and scale resource recovery
interventions.
(d) & (e): As reported by the State of Madhya Pradesh, some projects
may experience delays due to technical issues, land availability, contractor
performance, or local administrative constraints. The State has informed that
regular monitoring is done through State Level Technical Committee (SLTC)
and review meetings, improved contract management, timely release of funds
and inclusion of Operation and Maintenance (O & M) components in project
design.
The Mission guidelines advocates taking up projects with O&M cost for
at least five years, funded by way of levy of user charges or other revenue
streams. The Mission framework also emphasizes reforms such as levy and
collection of user charges, reduction of non-revenue water, reuse and
recycling of treated wastewater and improvement in financial management
practices to enhance the capacity of ULBs to sustainably operate and
maintain assets. Further under AMRUT 2.0 through various reform initiatives
such as Jal Hi Amrit and AMRUT Mitra, the Mission is supporting the States/
ULBs in management of Water Treatment Plants and Sewage Treatment
Plants.
*****ANNEXURE REFERRED TO IN REPLY TO PART (a) to (c) OF UNSTARRED QUESTION
NO. 3443 REGARDING “STATUS OF AMRUT IN MADHYA PRADESH”, DUE FOR
ANSWER IN THE LOK SABHA ON 12.03.2026.
STATUS OF PROJECTS IN CHHINDWARA LOK SABHA CONSTITUENCY
SI ULB Sector Project Approved Contract
N Cost (in ₹ award date
O crore)
1 SAUSAR Water AMRUT 2.0 - Installation 6.38 30-01-2026
Supply of Distribution, HSC,
SCADA in Sausar ULB
2 DONGAR Water Water Supply Dongar 22.84 10-06-2025
PARASIYA Supply Parasiya ULB
3 CHHINDWARA Water AMRUT 2.0-Water supply 70.40 09-10-2024
Supply project for Chhindwara
ULB
4 AMARWARA Water AMRUT 2.0 : Providing 4.09 07-10-2023
Supply Distribution network,
HSC, SCADA in
Amarwara ULB.
5 JUNNARDEO Water AMRUT 2.0 - Providing 8.07 13-03-2024
Supply Distribution, HSC, SCADA
in Junnardeo ULB.
6 PANDHURNA Water AMRUT 2.0- Water Supply 10.76 09-08-2024
Supply project for Pandhurna
ULB
7 CHHINDWARA Sewerage/ Amrut_2.0_MP_Sewerage 5.50 06-02-2025
Septage and Septage
Manageme Management Project of
nt Chhindwara ULB
8 CHORAI Water AMRUT 2.0 - Replacing 5.39 09-10-2024
Supply and upgrading
Distribution pipe
network, Providing HSC
& SCADA Automation