**Executive Summary** This document summarizes the status of gas infrastructure (Piped Natural Gas (PNG) and Compressed Natural Gas (CNG)) in specific districts of Punjab, India, as of November 30, 2025, in response to Lok Sabha Unstarred Question No. 1092, scheduled to be answered on February 5, 2026. It outlines the Minimum Work Programme (MWP) targets, achievements, reasons for delays, and the government's efforts to promote Compressed Biogas (CBG) plants. The document also includes an annexure detailing PNG connections and CNG stations for Rupnagar, SAS Nagar, Jalandhar, Kapurthala, SBS Nagar, Hoshiarpur and Gurdaspur Districts. **Key Points / Main Content** * **Gas Infrastructure Development:** * The development of City Gas Distribution (CGD) networks, including PNG connections, CNG stations, and pipeline infrastructure, is carried out by entities authorized by the Petroleum and Natural Gas Regulatory Board (PNGRB). * Authorized entities follow their Minimum Work Programme (MWP) and techno-commercial feasibility. * **Constituency and Geographical Areas:** * Anandpur Constituency includes the districts of Rupnagar, Hoshiarpur, and SAS Nagar (Mohali), Balachaur, Garhshankar, Chamkaur Sahib, and Kharar. * Specific Geographical Areas (GAs) are assigned to different entities: * Rupnagar District: Bharat Petroleum Corporation Limited (BPCL). * Hoshiarpur and Gurdaspur Districts: Gujarat Gas Limited. * SAS Nagar (Mohali), Patiala & Sangrur districts : Torrent Gas Limited. * Shaheed Bhagat Singh Nagar (SBS Nagar) District: Think Gas Ludhiana Private Limited. * **Minimum Work Programme (MWP) and Targets:** * MWP targets are defined at the GA level, not segment-wise. * Authorized CGD entities must achieve MWP targets within stipulated timelines. * Annexure provides GA-wise details for MWP targets of PNG (D) connections and CNG stations vis-à-vis cumulative achievements as on November 30, 2025. * **Delays and Monitoring:** * Delays in achieving MWP targets are attributed to delays in permissions from statutory authorities and high Right of Use (RoU)/Right of Way (RoW) charges. * The Government and PNGRB monitor the progress of CGD networks through reports and corrective actions, including meetings and statutory hearings. * **Compressed Biogas (CBG) Plants:** * The government promotes the setting up of CBG plants across the country, including Punjab, using a "Whole of Government" approach. * The establishment of CBG plants is undertaken by entrepreneurs based on their techno-commercial assessment. * As of the report, 10 CBG plants have been commissioned in Punjab, and 13 are under construction. **Impact Analysis** **Authorized CGD Entities** * **Impact:** * Responsible for developing City Gas Distribution (CGD) networks within their authorized geographical areas. * Required to achieve Minimum Work Programme (MWP) targets within the stipulated timelines. * Subject to monitoring by the Government and PNGRB regarding progress on CGD networks. * Liable to take corrective action if there are any delays or shortfalls. * **Action Required:** * Achieve MWP targets as per stipulated timelines in their authorizations. * Submit progress reports to the Government and PNGRB. * Address any delays or shortfalls by taking corrective actions as advised by PNGRB. **State Governments (specifically Punjab)** * **Impact:** * Responsible for facilitating the development of CGD networks within their respective States. * Involved in promoting the establishment of Compressed Biogas (CBG) plants. * **Action Required:** * Address challenges related to the development of CGD networks within their States. * Support the setup of Compressed Biogas (CBG) plants. **Citizens of Rupnagar, Hoshiarpur, and SAS Nagar (Mohali)** * **Impact:** * Potential beneficiaries of Piped Natural Gas (PNG) connections. * Potential beneficiaries of access to Compressed Natural Gas (CNG) stations. * **Action Required:** * No direct action required, but availability of PNG and CNG depends on infrastructure development by authorized entities.

Key Entities Referenced

Petroleum and Natural Gas Regulatory Board (PNGRB): Regulator responsible for authorizing City Gas Distribution (CGD) entities and monitoring their Minimum Work Programme (MWP). Minimum Work Programme (MWP): Targets set for City Gas Distribution (CGD) entities regarding Piped Natural Gas (PNG) connections and Compressed Natural Gas (CNG) stations. City Gas Distribution (CGD): Network for providing Piped Natural Gas (PNG) connections, establishing Compressed Natural Gas (CNG) stations, and laying pipeline infrastructure. Sustainable Alternative Towards Affordable Transportation (SATAT): Initiative to promote Compressed Bio-Gas (CBG) plants. Anandpur Sahib Lok Sabha Constituency: Lok Sabha constituency where the infrastructure gap is being addressed.
Official Source Record View Original Source →
See Full Document Text
LOK SABHA UNSTARRED QUESTION No. 1092 TO BE ANSWERED ON 5th February, 2026 STATUS OF GAS INFRASTRUCTURE AND TARGETS 1092. SHRI MALVINDER SINGH KANG: पेट(cid:332)ोिलयम और (cid:366)ाकृ ितक गैस मं(cid:361)ी Will the Minister of PETROLEUM AND NATURAL GAS be pleased to state: (a) the current status of Piped Natural Gas (PNG) and Compressed Natural Gas (CNG) infrastructure in the districts of Rupnagar, Hoshiarpur and SAS Nagar (Mohali) including in the Balachaur, Garhshankar, Chamkaur Sahib and Kharar segments; (b) the details of the Minimum Work Programme (MWP) targets and the actual cumulative achievements for domestic PNG connections and CNG stations in these segments as of January2026; (c) the reasons for the reported variations between the authorized targets and ground implementation by the concerned City Gas Distribution (CGD) entities; (d) the current status of applications for Compressed Bio-Gas (CBG) plants under the Sustainable Alternative Towards Affordable Transportation (SATAT) initiative in the stubble-burning prone areas of Balachaur and the steps taken to expedite these approvals; and (e) the timeframe fixed by which the Government expects to bridge the infrastructure gap in the Anandpur Sahib Lok Sabha Constituency to ensure hundred percent compliance with authorized MWP targets? ANSWER पेट(cid:332)ोिलयम और (cid:366)ाकृ ितक गैस मं(cid:361)ालय म(cid:336) रा(cid:475)मं(cid:361)ी ((cid:373)ी सुरेश गोपी) MINISTER OF STATE IN THE MINISTRY OF PETROLEUM AND NATURAL GAS (SHRI SURESH GOPI) (a) to (e) Providing Piped Natural Gas (PNG) connections, establishment of Compressed Natural Gas (CNG) stations and laying of pipeline infrastructure are part of the development of City Gas Distribution (CGD) Network which is carried out by the entities authorized by Petroleum and Natural Gas Regulatory Board (PNGRB) as per their Minimum Work Programme (MWP) and techno- commercial feasibility. Anandpur Constituency consists of districts of Rupnagar, Hoshiarpur and SAS Nagar (Mohali) Balachaur, Garhshankar, Chamkaur Sahib and Khararregion. Rupnagar is part of Rupnagar District Geographical Area (GA) authorized to Bharat Petroleum Corporation Limited (BPCL), Hoshiarpur is part of Hoshiarpur and Gurdaspur Districts GA authorized to Gujarat Gas Limited and SAS Nagar (Mohali) is part of SAS Nagar District (EAAA), Patiala & Sangrur districts GA authorized to Torrent Gas limited for development of CGD network.Balachaur falls in Shaheed Bhagat Singh Nagar (SBS Nagar) District, which is part of Jalandhar District (EAAA), Kapurthala & SBS Nagar Districts GA authorized to Think Gas Ludhiana Private Limited. Balachaur, Garhshankar, Chamkaur Sahib and Kharar segments fall within the respective authorised GAs. MWP targets are defined at GA level and not segment-wise. GA-wise details for MWP target of PNG (D) connections and CNG stations vis-à-vis cumulative achievements as on 30.11.2025 are at Annexure. Authorized CGD entities are required to achieve MWP targets within the timelines stipulated in their respective authorizations. As informed by authorized CGD entities, reasons for delay in achievement of MWP targets is attributed to inter alia delay in grant of permissions by the statutory authorities / bodies and higher Right of Use (RoU) / Right of Way (RoW) Charges. The Government and PNGRB monitor the progress of CGD networks based on reports submitted by the entities. If there are any delays or shortfalls, the PNGRB advises the entity to take corrective action. This includes calling them for progress review meetings or statutory hearings under existing regulations to discuss challenges and the latest updates on their MWP targets in authorized GAs. In addition, Government conducts regular interactions and meetings with State Governments for the development of CGD network in respective States and address challenges in this regard. Government, with a view to promoting the setting up of Compressed Biogas (CBG) plants across the country including in Punjab, has adopted a “Whole of Government” approach involving multiple Ministries and Departments under the GOBARdhan initiative. The role of the Government is to create an enabling ecosystem for CBG projects. The establishment of CBG plants is undertaken by entrepreneurs and other interested entities based on their own techno-commercial assessment.As reported on GOBARdhan portal, in Punjab 10 CBG plants have been commissioned, while 13 are under construction. ****ANNEXURE ANNEXURE REFERRED TO IN REPLY TO PART (a) TO (e) OF LOK SABHA UNSTARRED QUESTION NO. 1092 TO BE ANSWERED ON 05.02.2026 REGARDING STATUS OF GAS INFRASTRUCTURE AND TARGETS. Details of PNG Connections and CNG Stations - As on 31.11.2025. Sl. Uniq Geographical State/ Authorized Date of Date of PNG (Domestic) CNG Stations No ue Area/ Union CGD Entity Authorizati Target Connections GA CGD Territor on Complet MWP Achiev MWP Achieve ID Networks y ion Target ement Target ments s 1. 6.06 Rupnagar Bharat 10-Jun-16 30-Jun- 6782 9653 NA 19 District Petroleum 23 Corporation Limited 2. 9.52 SAS Nagar Torrent Gas 26-Sep-18 30-Sep- 52020 13548 54 36 District Limited 28 0 (EAAA), Patiala & Sangrur Districts Punjab 3. 9.54 Jalandhar Think Gas 26-Oct-18 31-Dec- 38614 15623 51 22 District Ludhiana Private 28 7 (EAAA), Limited Kapurthala & SBS Nagar Districts 4. 10.33 Hoshiarpur Gujarat Gas 29-Mar-19 31-Mar- 60012 7407 81 40 and Gurdaspur Limited 29 3 Districts Source: PNGRB