Parliament Question: Status of Implementation and Outcomes of AMRUT

Issued by HOUSING AND URBAN AFFAIRS · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** This document reports on the status of implementation and outcomes of the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) and AMRUT 2.0 as of November 20, 2025. It includes details on project progress, funds allocated and utilized, and the impact assessment conducted by NITI Aayog. The Lok Sabha question number is 3064, due to be answered on December 18, 2025. **Key Points / Main Content** * **AMRUT Project Progress:** * 6,008 projects worth ₹83,463 crore have been grounded. * ₹80,469 crore worth of works have been physically completed. * Water supply sector: 1,403 projects worth ₹43,359.78 crore taken up, with ₹42,073.22 crore completed. * Sewerage and septage management: 890 projects worth ₹34,459.46 crore taken up, with ₹33,013.53 crore completed. * Stormwater drainage: 838 projects worth ₹3,016.82 crore taken up, with ₹2,828.71 crore completed. * **AMRUT 2.0 Project Approvals:** * 8,804 projects worth ₹1,93,427.02 crore have been approved. * Water supply sector: 3,516 projects worth ₹1,18,226.61 crore approved. * Sewerage/septage management: 588 projects worth ₹67,840.59 crore approved. * 2,859 water supply projects worth ₹77,504.05 crore grounded. * 433 sewerage/septage management projects worth ₹38,739.90 crore grounded. * **Specific District/Constituency Progress:** * *Dakshin Kannada, Karnataka (Mangalore):* Completed one water supply and one stormwater drainage project. Three sewerage projects are grounded with significant progress. Six water supply projects are grounded under AMRUT 2.0 with physical works underway. * *Ratlam Lok Sabha Constituency, Madhya Pradesh:* Completed one sewerage/septage and one stormwater drainage project under AMRUT. 15 water supply projects have been approved and grounded and one sewerage and septage management project approved under AMRUT 2.0 with physical works underway. * *Jalgaon Lok Sabha Constituency, Maharashtra:* Two water supply projects have been grounded under AMRUT with significant works completed. Under AMRUT 2.0, 13 water supply projects have been approved of which 12 projects have been grounded. * *Palghar District, Maharashtra:* 3 water supply projects have been grounded under AMRUT of which works nearly complete. Under AMRUT 2.0, 3 water supply projects approved and grounded and one sewerage/ septage management project has been grounded and physical works have been completed. * **NITI Aayog Impact Assessment:** * NITI Aayog conducted a review in June 2020. * Scheme performance was reported satisfactory. * The Mission has increased coverage, improved water supply duration and usage pattern, and achieved infrastructure milestones. * **Water Body and Green Space Rejuvenation:** * Under AMRUT, 9 water body rejuvenation projects were taken up, and 8 have been completed. * Under AMRUT 2.0, 3,031 water body rejuvenation projects have been approved, and 705 have been completed. * 2,529 park projects worth ₹1,606.31 crore have been taken up under AMRUT, with 1,669 projects worth ₹1,089.31 crore approved under AMRUT 2.0. * **Financial Allocations:** * Central Assistance is allocated at the beginning of the Missions and is not year-wise. * Details of funds allocated and released in the last three financial years are given in annexures for both AMRUT and AMRUT 2.0. **Impact Analysis** **State Governments/Union Territories** * **Impact:** Responsible for reporting project progress, and utilizing allocated funds effectively. * **Action Required:** Continue to implement and monitor projects under AMRUT and AMRUT 2.0. Provide accurate and timely updates on the AMRUT portal. **Citizens/Urban Residents** * **Impact:** Improved access to water supply, sewerage, and stormwater drainage. Better quality of life through rejuvenated water bodies and green spaces. * **Action Required:** Benefit from the improved infrastructure and sustainable urban development initiatives. **Ministry of Housing and Urban Affairs (MoHUA)** * **Impact:** Accountable for the overall implementation and monitoring of AMRUT and AMRUT 2.0. Responsible for addressing questions raised in Lok Sabha. * **Action Required:** Monitor progress across states/UTs, address challenges in implementation, and provide necessary support and guidance. **NITI Aayog** * **Impact:** Tasked with evaluating the effectiveness of the AMRUT scheme. * **Action Required:** Continue monitoring impact and providing guidance to improve the scheme. **Members of Parliament (Specifically those mentioned in the document)** * **Impact:** Represent constituents who are impacted by the implementation of AMRUT in their respective constituencies. * **Action Required:** Monitor the progress of AMRUT projects in their constituencies and raise concerns or suggestions in the Lok Sabha. **Annexures** * **Impact**: States/UTs can verify status of progress within their regions. * **Action Required**: Use information in the annexures to improve governance over projects.

Key Entities Referenced

Atal Mission for Rejuvenation and Urban Transformation (AMRUT): A government scheme aimed at urban infrastructure development, especially water supply and sewerage, and its later versions. AMRUT 2.0: The evolved version of the AMRUT scheme, focusing on water security and urban development. Ministry of Housing and Urban Affairs: The central ministry responsible for administering AMRUT and AMRUT 2.0, and answering questions in Lok Sabha. NITI Aayog: The government think tank that conducted a review of the AMRUT scheme, evaluating its performance in urban transformation. Lok Sabha: The lower house of the Indian Parliament, where the question regarding the implementation of AMRUT and AMRUT 2.0 was raised.
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF HOUSING AND URBAN AFFAIRS LOK SABHA UNSTARRED QUESTION NO. 3064 TO BE ANSWERED ON DECEMBER 18, 2025 STATUS OF IMPLEMENTATION AND OUTCOMES OF AMRUT NO. 3064. SHRI ANUP SANJAY DHOTRE: SHRI VISHWESHWAR HEGDE KAGERI: SHRI MANOJ TIWARI: SHRI MUKESHKUMAR CHANDRAKAANT DALAL: SHRI P C MOHAN: DR. HEMANT VISHNU SAVARA: SMT. MAHIMA KUMARI MEWAR: SMT. ANITA NAGARSINGH CHOUHAN: SHRI DAMODAR AGRAWAL: SHRI CAPTAIN BRIJESH CHOWTA: MS. KANGNA RANAUT: SHRI BHARTRUHARI MAHTAB: SHRI ANIL FIROJIYA: SHRI YOGENDER CHANDOLIA: SHRI PRATAP CHANDRA SARANGI: SHRI BIBHU PRASAD TARAI: SHRI JUGAL KISHORE: SHRI GODAM NAGESH: SMT. SMITA UDAY WAGH: DR. VINOD KUMAR BIND: SMT. APARAJITA SARANGI: SHRI NABA CHARAN MAJHI: SHRI KHAGEN MURMU: SHRI DHAVAL LAXMANBHAI PATEL: SHRI YADUVEER WADIYAR: Will the Minister of HOUSING AND URBAN AFFAIRS be pleased to state: (a) the present status of implementation of the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) and AMRUT 2.0 along with the latest progress of water supply, sewerage, septage management and storm- water drainage projects, State/UT-wise including the National Capital Territory of Delhi, Karnataka, particularly for Dakshina Kannada district and Mangalore City Corporation, Madhya Pradesh, particularly for Ratlam Lok Sabha Constituency and Maharashtra, particularly for Jalgaon Lok Sabha Constituency and Palghar district; …2/--2- (b) the details of the funds allocated, released and utilised under AMRUT and AMRUT 2.0 during each of the last three financial years, project and State/UT-wise including Karnataka, particularly for Bengaluru and Dakshina Kannada, Jammu and Kashmir, Himachal Pradesh and Maharashtra, particularly for Jalgaon Lok Sabha Constituency; (c) whether the Government has carried out any assessment of the impact of AMRUT and AMRUT 2.0 on expanding access to piped water supply, improving water quality and enhancing sewerage coverage in urban areas; (d) if so, the key findings of such assessments and the improvements recorded State/UT-wise including Karnataka, particularly for Bengaluru and other cities and Maharashtra, particularly for Jalgaon Lok Sabha Constituency; and (e) the number of water bodies and green spaces rejuvenated or developed under AMRUT and AMRUT 2.0, State/UT-wise and district-wise including Karnataka, particularly for Bengaluru, Dakshin Kannada district and other urban local bodies, Rajasthan, Himachal Pradesh, Delhi and Maharashtra, particularly for Jalgaon Lok Sabha Constituency? ANSWER THE MINISTER OF STATE IN THE MINISTRY OF HOUSING AND URBAN AFFAIRS (SHRI TOKHAN SAHU) (a) & (b): As reported by the State/ Union Territories (UTs) on Atal Mission for Rejuvenation and Urban Transformation (AMRUT) portal, States/UTs have grounded 6,008 projects worth ₹83,463 crore under AMRUT, of which works worth ₹80,469 crore have been physically completed. In water supply sector, States/ UTs have taken up 1,403 projects worth ₹43,359.78 crore of which physical works worth ₹42,073.22 crore have been completed; in sewerage and septage management sector, 890 projects worth ₹34,459.46 crore have been taken up of which physical works worth ₹33,013.53 crore have been completed; and in storm water drainage sector, 838 projects worth ₹3,016.82 crore have been taken up of which physical works worth ₹2,828.71 crore have been completed. State/ UT-wise details of the progress in water supply, sewerage, septage management and stormwater drainage projects under AMRUT including Delhi, Karnataka, Madhya Pradesh and Maharashtra, are given in Annexure – I. Under AMRUT 2.0, a total of 8,804 projects worth ₹1,93,427.02 crore submitted by States/UTs have been approved which includes 3,516 water supply projects worth ₹1,18,226.61 crore and 588 sewerage/ septage management projects worth ₹67,840.59 crore. In water supply sector, …2/--2- 2,859 projects worth ₹77,504.05 crore and in sewerage/ septage management sector 433 projects worth ₹38,739.90 crore have been grounded. The remaining projects are at various stages of tender/ Detailed Project Report (DPR) stage. State-wise details of the progress in water supply and sewerage/ septage management projects under AMRUT 2.0 including Delhi, Karnataka, Madhya Pradesh and Maharashtra, are given in Annexure – II. In Dakshin Kannada district of Karnataka, Mangalore city is covered under AMRUT in which one water supply project worth ₹35.52 crore and one storm water drainage project worth ₹3.66 crore were taken up, which have been completed. Three sewerage projects worth ₹160.19 crore taken up under AMRUT have been grounded of which works worth ₹98.31 crore have been completed. Under AMRUT 2.0, 6 water supply projects worth ₹325.11 crore have been grounded of which physical works worth ₹185.94 crore have been completed. In Ratlam Lok Sabha constituency of Madhya Pradesh, Ratlam city is covered under AMRUT in which one sewerage and septage management project worth ₹141.44 crore and one storm water drainage project worth ₹13.53 crore were taken up, which have been completed. Under AMRUT 2.0, 15 water supply projects worth ₹199.54 crore have been approved and grounded with physical works worth ₹75.06 crore have been completed; one sewerage and septage management project worth ₹48.40 crore have been approved and grounded with physical works worth ₹1.19 crore has been completed so far. In Jalgaon Lok Sabha constituency of Maharashtra, two water supply projects worth ₹344.09 crore have been grounded under AMRUT of which works worth ₹341.36 crore have been completed. Two sewerage projects worth ₹205.93 crore taken up under AMRUT have been completed. Under AMRUT 2.0, 13 water supply projects worth ₹987.48 crore have been approved of which 12 projects worth 841.81 crore have been grounded. In Palghar district of Maharashtra, 3 water supply projects worth ₹547.53 crore have been grounded under AMRUT of which works worth ₹545.25 crore have been completed. Under AMRUT 2.0, 3 water supply projects worth ₹634.67 crore have been approved and grounded with physical works worth ₹240.68 crore have been completed. One sewerage/ septage management project worth ₹529.74 crore approved under AMRUT 2.0 has been grounded of which works worth ₹86.82 crore have been physically completed. …3/--3- Under AMRUT and AMRUT 2.0, Central Assistance have been allocated at the beginning of the Missions and not year-wise. State-wise details of Central Assistance allocated for projects under these Missions and funds released during the last three financial years is at Annexure – III and IV for AMRUT and AMRUT 2.0 respectively. (c) & (d): NITI Aayog had conducted a review in June 2020 on the evaluation of Centrally Sponsored Schemes in the Urban Transformation Sector, including AMRUT. The study assessed key parameters such as coverage, incorporation of universal design, gender mainstreaming, pro- poor design, migration, and beneficiary targeting. The performance under the scheme was reported satisfactory as it aims to improve the quality of life of all including the poor and disadvantaged. NITI Aayog has also evaluated the Mission during the year 2025. The evaluation report indicates that the Mission has led to increased coverage, improved water supply duration and usage pattern. For sewerage and septage management, significant infrastructure milestones were achieved. (e): Under AMRUT, 9 water body rejuvenation projects have been taken up of which 8 projects have been completed. Under AMRUT 2.0, 3,031 water body rejuvenation projects have been approved of which 705 projects have been completed. State-wise details of water body rejuvenation projects completed under AMRUT and AMRUT 2.0 including Karnataka, Rajasthan, Himachal Pradesh, Delhi and Maharashtra is at Annexure – V. In parks and green spaces sector, under AMRUT, State/UTs have taken up 2,529 projects worth ₹ 1,606.31 crore for development of parks and green spaces. Under AMRUT 2.0, 1,669 projects worth ₹1,089.31 crore have been approved under parks and green spaces sector. State-wise details of park projects completed and area of parks developed so far including Karnataka, Rajasthan, Himachal Pradesh, Delhi and Maharashtra are given in Annexure – VI. In Bengaluru, Dakshin Kannada district and other urban local bodies of Karnataka, 180 park projects and one water body rejuvenation project have been completed under AMRUT. In Jalgaon Lok Sabha Constituency of Maharashtra, 7 park projects have been completed under AMRUT/ AMRUT 2.0. *****ANNEXURE – I REFERRED TO IN REPLY TO PART (a) AND (b) OF UNSTARRED QUESTION NO. 3064 REGARDING “STATUS OF IMPLEMENTATION AND OUTCOMES OF AMRUT”, DUE FOR ANSWER IN THE LOK SABHA ON 18.12.2025 State-wise details of the progress on water supply, sewerage, septage management and stormwater drainage projects under AMRUT (as on 20.11.2025) Sl. State/ UT Sector Projects Grounded Works Physically No. completed No. Amount in ₹ cr Amount in ₹ cr 1 Andaman and Water Supply 68 6.61 6.35 Nicobar Islands Drainage 8 4.02 4.02 2 Andhra Pradesh Water Supply 73 2319.77 2,126.71 Sewerage and Septage Management 40 590.78 362.11 Drainage 14 342.72 198.76 3 Arunachal Pradesh Water Supply 4 33.12 33.12 Sewerage and Septage Management 2 53.5 42.08 Drainage 3 40.37 40.37 4 Assam Water Supply 4 609.73 609.73 5 Bihar Water Supply 37 2306.63 2,266.85 Drainage 3 237.99 211.00 6 Chandigarh Water Supply 7 35.87 35.87 Sewerage and Septage Management 2 20.2 20.20 7 Chhattisgarh Water Supply 84 2048.35 2,038.85 Sewerage and Septage Management 30 379.17 379.17 8 Dadra and Nagar Water Supply 1 41.28 41.28 Haveli and Daman Sewerage and Septage Management 2 21.96 21.96 and Diu 9 Delhi Water Supply 9 245.64 244.26 Sewerage and Septage Management 7 408.79 386.88 Drainage 3 5.38 5.38 10 Goa Water Supply 3 96.63 92.43 Sewerage and Septage Management 3 117.53 117.53 11 Gujarat Water Supply 132 1718.92 1,717.02 Sewerage and Septage Management 98 2943.89 2,942.26 Drainage 36 224.49 224.03 12 Haryana Water Supply 40 770.19 732.61 Sewerage and Septage Management 44 1655.23 1,602.68 Drainage 19 452.37 442.04 13 Himachal Pradesh Water Supply 25 83.3 82.98 Sewerage and Septage Management 14 99.71 99.71 Drainage 10 31.91 31.91 14 Jammu and Kashmir Water Supply 2 26 26.00 Sewerage and Septage Management 15 137.26 135.98 Drainage 36 184.73 184.73 15 Jharkhand Water Supply 15 1334.18 1,069.68 Sewerage and Septage Management 9 251.5 200.08 16 Karnataka Water Supply 44 2213.09 2,113.08 Sewerage and Septage Management 55 2499.92 2,403.01 Drainage 83 238.06 238.06 17 Kerala Water Supply 216 1518.22 1,448.07 Sewerage and Septage Management 152 385.93 340.46 Drainage 535 363.4 358.38 18 Ladakh Water Supply 9 32.15 20.63 Sewerage and Septage Management 2 4.96 4.93 19 Lakshadweep Water Supply 3 2.34 2.34 20 Madhya Pradesh Water Supply 32 2280.8 2,277.93 Sewerage and Septage Management 29 3882.63 3,658.33 Drainage 23 248.32 248.32 21 Maharashtra Water Supply 43 4446.06 4,330.77 Sewerage and Septage Management 36 3294.03 3,200.37 Drainage 1 94.06 94.06 22 Manipur Water Supply 3 207.37 199.08 23 Meghalaya Water Supply 5 22.7 22.52 Sewerage and Septage Management 2 57.13 57.13 24 Mizoram Water Supply 3 51.68 51.68 Sewerage and Septage Management 3 13.73 13.73 Drainage 3 57.2 57.20 25 Nagaland Water Supply 2 8 8.00 Sewerage and Septage Management 2 8 7.95 Drainage 8 79.75 78.40 26 Odisha Water Supply 130 1535.57 1,535.57 Sewerage and Septage Management 13 138.21 138.21Sl. State/ UT Sector Projects Grounded Works Physically No. completed No. Amount in ₹ cr Amount in ₹ cr 27 Puducherry Water Supply 5 51.03 50.83 Sewerage and Septage Management 9 11.43 11.07 28 Punjab Water Supply 58 1242.28 1,039.97 Sewerage and Septage Management 62 1504.65 1,449.03 29 Rajasthan Water Supply 31 1008.22 995.06 Sewerage and Septage Management 30 2360.19 2,328.55 Drainage 6 63.07 63.07 30 Sikkim Water Supply 2 5 5.00 Drainage 25 14.91 14.91 31 Tamil Nadu Water Supply 18 7436.02 7,330.96 Sewerage and Septage Management 18 5670.8 5,301.12 32 Telangana Water Supply 27 1424.09 1,424.09 Sewerage and Septage Management 4 203.3 203.30 33 Tripura Water Supply 6 145.19 145.19 Sewerage and Septage Management 1 11.42 11.42 34 Uttar Pradesh Water Supply 169 4237.56 4,177.38 Sewerage and Septage Management 159 7353.01 7,196.96 35 Uttarakhand Water Supply 47 355.23 352.05 Sewerage and Septage Management 44 188.1 184.81 Drainage 15 32.57 32.57 36 West Bengal Water Supply 46 3460.96 3,419.28 Sewerage and Septage Management 3 192.5 192.50 Drainage 7 301.5 301.50 Total 3131 80836.06 77,915.45ANNEXURE – II REFERRED TO IN REPLY TO PART (a) AND (b) OF UNSTARRED QUESTION NO. 3064 REGARDING “STATUS OF IMPLEMENTATION AND OUTCOMES OF AMRUT”, DUE FOR ANSWER IN THE LOK SABHA ON 18.12.2025 State-wise details of the progress on water supply and sewerage, septage management projects under AMRUT 2.0 (as on 20.11.2025) Sl. State/ UT Water Supply Sewerage/Septage Management No. Projects approved Projects grounded Projects approved Projects grounded No Amount No Amount Works No Amount No Amount Works (₹ cr) (₹ cr) physically (₹ cr) (₹ cr) physically completed (₹ completed (₹ cr) cr) 1 Andaman and 56 33.94 45 18.85 4.47 Nicobar Islands 2 Andhra Pradesh 240 6,524.47 117 2,003.69 315.96 70 2,468.12 41 525.89 272.35 3 Arunachal Pradesh 7 169.27 7 169.27 23.34 4 Assam 25 876.16 24 818.87 264.84 2 67.34 2 66.42 0.00 5 Bihar 22 3,232.73 3 357.24 0.00 17 5,195.36 6 Chandigarh 2 60.00 1 27.14 1.63 4 115.08 3 78.54 53.49 7 Chhattisgarh 45 2,362.15 31 1,570.46 538.47 5 645.37 4 495.87 0.00 8 Dadra and Nagar Haveli and Daman 1 63.47 1 63.47 39.15 and Diu 9 Delhi 2 314.39 38 4,832.35 13 491.17 292.90 10 Goa 26 149.36 20 124.20 70.45 1 21.26 1 18.47 10.34 11 Gujarat 441 8,670.65 413 8,479.82 4,679.69 167 6,877.24 162 5,734.33 3,240.21 12 Haryana 61 2,470.30 53 1,202.96 604.52 16 1,353.24 13 305.10 53.34 13 Himachal Pradesh 17 298.87 17 275.81 143.94 2 11.60 2 11.60 3.87 14 Jammu and Kashmir 65 621.90 62 341.31 65.76 3 373.35 3 330.44 22.70 15 Jharkhand 17 1,782.03 12 1,526.93 74.79 1 2,284.02 16 Karnataka 227 9,574.39 214 8,559.59 2,478.22 17 Kerala 248 2,412.79 191 1,417.35 654.71 45 1,147.34 28 140.15 34.90 18 Ladakh 2 707.89 2 192.05 1 61.23 6.07 19 Madhya Pradesh 297 6,877.53 268 5,965.19 1,256.01 36 5,432.04 17 2,849.57 164.26 20 Maharashtra 116 15,814.93 102 12,170.24 5,492.90 46 12,510.96 34 8,011.87 2,385.01 21 Manipur 44 186.85 1 1.48 1.13 22 Meghalaya 1 121.00 1 121.00 105.27 23 Mizoram 19 105.81 19 105.81 49.61 1 39.22 1 38.16 7.18 24 Nagaland 23 111.16 23 97.00 0.00 2 93.92 1 61.63 36.98 25 Odisha 212 3,848.76 201 3,577.62 2,057.47 26 Puducherry 6 79.48 5 62.50 47.37 4 107.14 3 87.42 56.85 27 Punjab 152 2,980.78 129 1,104.98 408.92 12 541.86 3 189.92 11.08 28 Rajasthan 178 5,099.47 81 1,161.39 80.48 43 5,673.70 37 4,497.72 2,487.23 29 Sikkim 5 47.37 5 47.36 33.92 30 Tamil Nadu 201 7,721.59 198 5,993.26 4,347.00 30 6,623.40 29 5,974.67 2,662.70 31 Telangana 98 3,429.04 98 3,429.04 855.92 12 5,775.11 12 5,901.35 201.95 32 Tripura 9 169.07 9 158.25 133.92 33 Uttar Pradesh 416 21,209.76 308 9,374.08 4,100.86 26 5,054.93 21 2,719.96 1,264.38 34 Uttarakhand 27 711.19 18 285.57 99.63 35 West Bengal 209 9,451.54 183 6,955.79 2,634.18 2 341.11 1 84.94 24.91 Grand Total 3,516 1,18,226.61 2,859 77,504.05 31,625.39 588 67,840.59 433 38,739.90 13,331.85 *Lakshadweep has not submitted any project for approval.ANNEXURE – III REFERRED TO IN REPLY TO PART (a) AND (b) OF UNSTARRED QUESTION NO. 3064 REGARDING “STATUS OF IMPLEMENTATION AND OUTCOMES OF AMRUT”, DUE FOR ANSWER IN THE LOK SABHA ON 18.12.2025 State-wise details of funds allocated and released to States during the last three financial years under AMRUT (as on 20.11.2025) (Amount in ₹ crore) CA released for Total Central projects during the S.No. State / UT Assistance for projects last 03 financial under AMRUT years 1 Andaman and Nicobar Islands* 10.82 - 2 Andhra Pradesh 1,056.62 183.5 3 Arunachal Pradesh 126.22 17.37 4 Assam 591.42 258.84 5 Bihar 1,164.80 90.28 6 Chandigarh* 54.09 - 7 Chhattisgarh* 1,009.74 - Dadra and Nagar Haveli* 10.82 - 8 Daman and Diu 18.03 14.43 9 Delhi 802.31 155.53 10 Goa 104.58 41.84 11 Gujarat 2,069.96 300 12 Haryana 764.51 9.43 13 Himachal Pradesh* 274.07 - 14 Jammu and Kashmir* 500.62 - 15 Ladakh 79.19 1.8 16 Jharkhand* 566.17 - 17 Karnataka* 2,318.79 - 18 Kerala 1,161.20 207.23 19 Lakshadweep* 3.61 - 20 Madhya Pradesh* 2,592.86 - 21 Maharashtra 3,534.08 249.94 22 Manipur* 162.28 - 23 Meghalaya 72.12 39.42 24 Mizoram 126.22 5.65 25 Nagaland 108.19 30.69 26 Odisha* 796.97 - 27 Puducherry 64.91 19.66 28 Punjab 1,204.47 204.87 29 Rajasthan 1,541.95 53.26 30 Sikkim 36.06 2.97 31 Tamil Nadu 4,756.58 828.95 32 Telangana* 832.6 - 33 Tripura* 133.43 - 34 Uttar Pradesh 4,922.46 1,027.09 35 Uttarakhand* 533.72 - 36 West Bengal* 1,929.32 - Total 36,035.79 3,742.73 * No CA has been released for AMRUT projects to these States /UTs in the past three financial years (FY 22-23, 23-24 & 24-25)ANNEXURE – IV REFERRED TO IN REPLY TO PART (a) AND (b) OF UNSTARRED QUESTION NO. 3064 REGARDING “STATUS OF IMPLEMENTATION AND OUTCOMES OF AMRUT”, DUE FOR ANSWER IN THE LOK SABHA ON 18.12.2025 State-wise details of funds allocated and released to States during the last three financial years under AMRUT 2.0 (as on 20.11.2025) (Amount in ₹ crore) Committed Central CA released for projects Sl. No. State Assistance for Projects During the last three under AMRUT 2.0 financia l years 1 Andaman And Nicobar Islands 36 5.51 2 Andhra Pradesh 2948 589.55 3 Arunachal Pradesh 226 29.5 4 Assam 775 165.68 5 Bihar 2628 410.77 6 Chandigarh 170 33 7 Chhattisgarh 1303 182.52 8 Dadra And Nagar Haveli And Daman And Diu 30 6 9 Delhi 2885 282.66 10 Goa 85 15.76 11 Gujarat 4512 1305.47 12 Haryana 1496 245.14 13 Himachal Pradesh 256 127.67 14 Jammu And Kashmir 867 158.6 15 Jharkhand 1183 38.99 16 Karnataka 4628 1294.04 17 Kerala 1374 205.44 18 Ladakh 128 11.7 19 Lakshadweep* 2 0 20 Madhya Pradesh 4065 153.77 21 Maharashtra 9310 2133.66 22 Manipur 170 17.05 23 Meghalaya 111 86.77 24 Mizoram 143 28 25 Nagaland 176 35.19 26 Odisha 1373 396.57 27 Puducherry 150 47.04 28 Punjab 1836 254.69 29 Rajasthan 3552 695.45 30 Sikkim 40 8 31 Tamil Nadu 4942 1614.93 32 Telangana* 2789 0 33 Tripura 157 79.11 34 Uttar Pradesh 8161 1296.67 35 Uttarakhand 585 75.92 36 West Bengal 3658 495.65 Total 66,750 12,526.47 *- No CA has been released for AMRUT 2.0 projects to these States /UTs in the past three financial years (FY 22-23, 23-24 & 24-25)ANNEXURE – V REFERRED TO IN REPLY TO PART (e) OF UNSTARRED QUESTION NO. 3064 REGARDING “STATUS OF IMPLEMENTATION AND OUTCOMES OF AMRUT”, DUE FOR ANSWER IN THE LOK SABHA ON 18.12.2025 State-wise number of water body rejuvenation projects completed under AMRUT (as on 20.11.2025) Sl. State/ UT No. of completed water body rejuvenation projects No. 1 Bihar 1 2 Delhi 1 3 Karnataka 1 4 Kerala 4 5 Uttar Pradesh 1 Grand Total 8 State-wise number of water body rejuvenation projects completed under AMRUT 2.0 Sl. No. State/ UT No. of completed water body rejuvenation projects 1 Andhra Pradesh 69 2 Arunachal Pradesh 2 3 Assam 13 4 Delhi 15 5 Gujarat 49 6 Himachal Pradesh 10 7 Jammu And Kashmir 15 8 Jharkhand 24 9 Kerala 77 10 Madhya Pradesh 120 11 Maharashtra 11 12 Odisha 4 13 Puducherry 3 14 Rajasthan 18 15 Sikkim 1 16 Tamil Nadu 269 17 Tripura 2 1 8 West Bengal 3 Grand Total 705ANNEXURE – VI REFERRED TO IN REPLY TO PART (e) OF UNSTARRED QUESTION NO. 3064 REGARDING “STATUS OF IMPLEMENTATION AND OUTCOMES OF AMRUT”, DUE FOR ANSWER IN THE LOK SABHA ON 18.12.2025 State-wise details of park projects completed and area of parks developed (as on 20.11.2025) Sl. No. State/ UT Completed AMRUT park Completed AMRUT 2.0 park projects projects No Area of parks (in No Area of parks (in acre) a cre) 1 Andaman and Nicobar Islands 3 0.22 2 Andhra Pradesh 97 204.44 3 Arunachal Pradesh 2 1.95 8 988.42 4 Assam 13 13.31 5 Bihar 25 65.52 6 Chandigarh 3 0.77 7 Chhattisgarh 191 349.79 8 Dadra and Nagar Haveli and Daman and 2 0.69 Diu 9 Delhi 7 195.62 2* 3.27* 10 Goa 2 1.98 11 Gujarat 124 997.20 60 839.56 12 Haryana 33 15.40 13 Himachal Pradesh 9 2.84 7 57.82 14 Jammu and Kashmir 14 5.13 15 Jharkhand 35 84.86 16 Karnataka 180 347.76 17 Kerala 78 55.21 18 Ladakh 6 25.06 19 Lakshadweep 3 1.27 20 Madhya Pradesh 110 422.04 188 904.37 21 Maharashtra 128 454.92 2 1.47 22 Manipur 1 3.65 23 Meghalaya 8 1.76 24 Mizoram 4 8.49 25 Nagaland 10 5.10 26 Odisha 48 116.69 27 Puducherry 9 4.10 28 Punjab 35 54.32 29 Rajasthan 77 298.02 1 0.47 30 Sikkim 3 0.03 31 Tamil Nadu 409 337.64 469 383.02 32 Telangana 35 442.43 33 Tripura 3 4.51 34 Uttar Pradesh 320 470.08 35 Uttarakhand 42 36.00 36 West Bengal 420 241.65 1 1.73 *As reported by the UT on 04.12.2025