GOVERNMENT OF INDIA
MINISTRY OF COAL
RAJYA SABHA
UNSTARRED QUESTION NO. 1806
ANSWERED ON 09.03.2026
SUSTAINABLE COAL MINING OPERATIONS
1806 SHRI DHANANJAY BHIMRAO MAHADIK:
Will the Minister of COAL be pleased to state:
(a) the status of coal mining operations in the State of Maharashtra, particularly in
Chandrapur, Nagpur and Yavatmal districts;
(b) whether environmental and forest clearance issues have affected production levels;
(c) the details of measures taken to balance coal extraction with environmental
protection and rehabilitation of affected communities; and
(d) whether any mine closures or capacity reductions have been proposed and the steps taken
to ensure compliance with environmental norms and sustainable mining practices in the
State?
ANSWER
MINISTER OF STATE FOR COAL AND MINES
(SHRI SATISH CHANDRA DUBEY)
(a) Coal mining operations in the State of Maharashtra are carried out by Western Coalfields
Limited (WCL), a subsidiary of Coal India Limited (CIL) and other companies having coal
blocks allocated by the Ministry of Coal. The details of coal mines and the status of mining
operations is given as Annexure.
(b) Overall coal production levels have not been affected due to Forest Clearance (FC) or
Environmental Clearance (EC) issues.
(c) Coal extraction is undertaken with due consideration to environmental protection and
rehabilitation of affected communities through a comprehensive framework of regulatory
compliance, environmental management, and social responsibility measures. Land acquisition
for coal mining projects is undertaken under the Right to Fair Compensation and Transparency
in Land Acquisition, Rehabilitation and Resettlement Act, 2013; and the Coal Bearing Areas
(Acquisition and Development) Act, 1957, which ensures fair and transparent processes for
acquiring agricultural and other lands.
Mining projects are undertaken only after preparation of Environmental Impact Assessment
(EIA) and Environmental Management Plans (EMP), which assess impacts on air, water, soil,
1forest cover, and biodiversity, and prescribe mitigation measures. Public consultation through
Public Hearings ensures participation of local communities and incorporation of their concerns
into project planning and implementation.
In compliance with Environmental Clearance (EC) and consent conditions, extensive pollution
control and environmental protection measures are implemented. These include air pollution
control through fixed and mobile sprinklers, fog cannons, mechanical road sweeping, enclosed
coal handling plants, truck washing systems, tarpaulin-covered transportation, continuous
ambient air quality monitoring stations, wind barriers, and adoption of technologies such as
surface miners and First Mile Connectivity projects.
Water pollution is addressed through sedimentation ponds, effluent treatment plants, sewage
treatment plants, groundwater monitoring, and rainwater harvesting structures. Soil
conservation and ecological restoration are undertaken through topsoil preservation, bio-
reclamation of overburden dumps, large-scale plantation drives, and reclamation of mined-out
areas in consultation with State Forest Departments.
Additionally, noise pollution is mitigated through engineering controls, development of green
belts around mining areas, and provision of protective equipment to workers, with regular
monitoring through accredited laboratories.
(d) Mining operations, including closure or capacity adjustments, are carried out in
accordance with statutory provisions and environmental safeguards to ensure sustainable
mining practices. Environmental Clearance (EC) for coal mining projects is granted by the
Ministry of Environment, Forest and Climate Change after appraisal and recommendation by
the Expert Appraisal Committee (EAC) under the Environment Impact Assessment (EIA)
Notification, 2006, issued under the Environment (Protection) Act, 1986. During appraisal, the
EAC considers the approved Mine Plan, including the Mine Closure Plan, which ensures
scientific and sustainable mining operations. The process involves screening, scoping, and
detailed scientific appraisal before grant of EC. The terms and conditions of EC as well as
approved Mine Plans incorporate provisions for environmental protection, safety measures,
protection of flora and fauna, and restoration of mined-out areas.
Annexure
A. List of WCL mines -
STATUS
SN NAME OF MINE DISTRICT (producing / REMARKS
Non-Producing)
Durgapur Rayatwari
1 Chandrapur Producing
Colliery
2Production stopped and
2 Mahakali Chandrapur Non-Producing protective works for stability are
in progress.
3 Nandgaon Incline Chandrapur Producing
Production stopped and
Hindustan Lalpeth
4 Chandrapur Non-Producing protective works for stability are
Colliery- I
in progress.
5 Bhatadi Expansion Chandrapur Producing
6 Durgapur Expansion Chandrapur Producing
Hindustan Lalpeth
7 Chandrapur Producing
Scheme
8 Ballarpur RO Chandrapur Producing
Dhoptala OC (Sasti UG
9 Chandrapur Producing
to OC)
10 Ballarpur OC Chandrapur Producing
11 Gouri Pauni Expansion Chandrapur Producing
Gouri Deep /Gouri
12 Chandrapur Producing
Central
13 Pauni-II Expansion Chandrapur Producing
14 Sasti Expansion Chandrapur Producing
Reserve Exhausted and used for
New Majri - II (A)
15 Chandrapur Non-Producing backfilling of NMUG to OC
Expn.
Mine.
16 New Majri UG to OC Chandrapur Producing
Amalgamated Yekona I
17 Chandrapur Producing
& II
18 Penganga OC Chandrapur Producing
19 Kolgaon OC Yavatmal Producing
3Bellora-Naigaon Deep
20 Yavatmal Producing
OC
Mungoli Nirguda
21 Yavatmal Producing
Extention Deep
22 Niljai Deep OC Yavatmal Producing
Bhandewara Incline /
23 Yavatmal Producing
Rajur
24 Ghonsa Yavatmal Producing
25 Junad Yavatmal Producing
26 Kolarpimpri Yavatmal Producing
27 Ukni Deep Yavatmal Producing
Amalgamated Ukni-Pimpalgaon
28 Pimpalgaon Yavatmal Non-Producing OC has been approved on cost
plus basis for commissioning.
29 Patansaongi Nagpur Producing
30 Saoner-I Nagpur Producing
31 Saoner-II Nagpur Producing
32 Saoner-III Nagpur Producing
33 Silewara Nagpur Producing
Development activities (Incline
34 Waghoda Nagpur Non-Producing
Drivage etc) are in progress.
35 Adasa UG to OC Nagpur Producing
Amalgamated
36 Nagpur Producing
Gondegaon-Ghatrohana
Amalgamated Inder
37 Nagpur Producing
Kamptee Deep
38 Bhanegaon Nagpur Producing
439 Singhori Nagpur Producing
40 Gokul Nagpur Producing
41 Makardhokra -I Nagpur Producing
42 Makardhokra - III Nagpur Producing
B. List of Allocated Mines
Allottee STATUS (producing /
SN NAME OF MINE DISTRICT
Non Producing)
1 Baranj I, Baranj II, Chandrapur Karnataka Power Producing
to Baranj III, Baranj IV, Corporation
6 Manora Deep & Kiloni Limited (KPCL)
7 Belgaon Nagpur Sunflag Iron and Producing
Steel Company
Ltd.
8 Marki Mangli III Yavatmal B.S. Ispat Ltd. Producing
9 Marki Mangli I Yavatmal Topworth Urja and Producing
Metals Ltd.
10 Takli-Jena-Bellora Chandrapur Aurobindo Reality Producing
(North) & Takli-Jena- And Infrastructure
Bellora (South) Private Ltd.
11 Gondkhari Nagpur Adani Power Works for drivage of
Maharashtra Ltd. entries is in progress
12 Marki Mangli II Yavatmal Yazdani Non-Operational
International
Yet to obtain the
Private Ltd.
permissions/clearances
required for
13 Marki Mangli IV Yavatmal Sobhagya
Mercantile Ltd.
5commencement of mining
14 Bhivkund Chandrapur Sunflag Iron and
operations
Steel Company
Ltd.
15 Dahegaon-Gowari Nagpur Ambuja Cements
Ltd.
16 Kalambi Kalmeshwar Nagpur Samlok Industries
(Western Part) Private Ltd.
17 Marki-Zari-Jamani- Yavatmal Nilkanth Infra
Adkoli Mining Ltd.
18 Dahegaon/Makardhokra- Nagpur Western Coalfields
IV Limited (WCL)
19 Bhandak West Chandrapur New Era
Cleantech Solution
Private Limited
*****
6