See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF NEW AND RENEWABLE ENERGY
RAJYA SABHA
UNSTARRED QUESTION NO. 3659
ANSWERED ON 24.03.2026
UTILISATION OF OFF-GRID SOLAR PUMPS UNDER PM-KUSUM SCHEME
3659. SHRI SANJAY SINGH
Will the minister of new and renewable energy be pleased to state:
(a) the total number of off-grid standalone solar pumps installed under the PM-KUSUM scheme
(Component B) since its launch in 2019 and the year-wise budget allocations, actual releases and
utilisation of these funds;
(b) the actual utilisation data of these solar pumps based on reports of remote monitoring system
(RMS), including days of operation per year and solar energy generated versus utilised;
(c) whether it is a fact that a significant proportion of these pumps remain idle for half the year or
more, leading to under-utilisation of installed solar capacity and if so, the reasons therefor; and
(d) the State-wise details of utilisation rates?
ANSWER
THE MINISTER OF STATE FOR NEW & RENEWABLE ENERGY AND POWER
(SHRI SHRIPAD YESSO NAIK)
(a) PM-KUSUM is a demand-driven scheme, and capacities are allocated based on the demand raised by the
state. The responsibility of beneficiary selection and implementation is of the State Implementing Agency
(SIA). As reported by SIAs, as on 28.02.2026, a total of 10,26,282 solar pumps has been installed under PM
KUSUM scheme since its inception.
The funds under the scheme are released based on the progress of installation reported by the State
Implementing Agencies (SIA) and as per provisions of the scheme guidelines. The year-wise details of budget
allocation and fund released under PM-KUSUM Scheme, as on 28.02.2026, is as follows:
(Rs in Crore)
Financial Budget Revised Expenditure
Year Estimate Estimate till date
2019-20 - - 151.26
2020-21 1000.00 210.00 156.43
2021-22 997.30 690.26 406.04
2022-23 1715.90 1325.00 801.36
2023-24 1996.46 1100.00 996.33
2024-25 1996.00 2681.20 2,564.14
2025-26 2600.00 5000.00 3,826.43
(b) to (d) Solar agricultural pumps are used as per the irrigation needs of crops and, therefore, their utilisation
varies during the year. It is estimated that the solar pumps are operated 150 days in a year and mainly operated
during crop seasons. The usage is relatively lower during non-irrigation periods and also depends on various
factors such as cropping pattern, rainfall and seasonal water requirement etc. The PM KUSUM Scheme also
have the provisions of Universal Solar Pump Controller (USPC), through which farmers can use excess solar
power generated from the solar pumps for other activities like operating chaff cutter, floor mill, cold storage,
drier, etc. during the non-irrigation period.
The state wise solar pumps synced on the national portal is placed at Annexure I. The analysis of available
solar generation data indicates that more than 87% of solar pumps are used/operational during last one year.
*****Annexure I
Annexure I referred to in reply to part (b) – (d) of Rajya Sabha Unstarred Question No.
3659 for 24.03.2026
Solar pumps under PM KUSUM which are synced on national portal through Remote
Monitoring System
(As on 28.02.2026)
Sr No. State Name Component-B (No. of pumps Installed)
Installations Synced on National
Portal
1 Arunachal Pradesh 6,99
561
2 Assam 1,066 -
3 Goa 200
-
4 Gujarat 15,558 15,558
5 Haryana 1,85,582
1,85,451
6 Himachal Pradesh 1,091
261
7 Jammu And Kashmir 4,154 2,783
8 Jharkhand 52,607
46,632
9 Karnataka 5,533 2,843
10 Kerala 8
8
11 Ladakh 265 -
12 Madhya Pradesh 7,672
7,100
13 Maharashtra-MEDA 2,17,966
2,02,880
14 Maharashtra-MSEDCL 2,95,000 2,15,139
15 Manipur 150
121
16 Meghalaya 98 1
17 Mizoram 40
-
18 Nagaland 244
65
19 Odisha 13,229 8,515
20 Punjab 17,879
15,676
21 Rajasthan 1,25,711 99,596
22 Tamil Nadu 5,176
5,152
23 Tripura 7,369 5,014
24 Uttar Pradesh 67,186
65,851
25 Uttarakhand 2,379
318
Total 10,26,862 8,79,525