Executive Summary & Key Takeaways

## Policy Summary: Widening of Border Roads under Pradhan Mantri Gram Sadak Yojana (PMGSY) in Gurdaspur and Pathankot, Punjab This document summarizes the response provided by the Minister of State in the Ministry of Rural Development, Shri Kamlesh Paswan, to Lok Sabha Unstarred Question No. 394, answered on July 22, 2025, regarding the widening of roads constructed under the Pradhan Mantri Gram Sadak Yojana (PMGSY) in the border areas of Gurdaspur and Pathankot districts in Punjab. The question was raised by Shri Sukhjinder Singh Randhawa, citing concerns about insufficient road width hindering vehicle movement, particularly noted during "Operation Sindoor," and its implications for international security. The Minister's response clarifies that PMGSY road construction adheres to established guidelines and Indian Road Congress (IRC) specifications, where carriageway width is determined by projected traffic volume, measured in Passenger Car Units (PCU). Widths typically range from 3.75 meters to 5.5 meters, with potential restrictions to 3 meters for roads serving habitations with populations below 500 and low projected traffic. Minimum road formation width is mandated at 7.5 meters for plain/rolling terrain and 6 meters for mountainous/steep terrain, specifically for single-lane carriageways (3m-3.75m). The Ministry reports, based on information from the State of Punjab, that the majority of roads constructed/upgraded in Gurdaspur and Pathankot districts under PMGSY have carriageway widths varying between 3.05 meters, 3.75 meters and 5.5 meters. These roads were designed to accommodate normal traffic levels based on proposals received from the State. As of July 22, 2025, there are no active proposals under PMGSY for widening border roads within Gurdaspur and Pathankot. The completion timeline for ongoing works under PMGSY-III is March 2026.

Key Entities Referenced

Pradhan Mantri Gram Sadak Yojana (PMGSY): A rural road connectivity program in India, under which roads are constructed in rural areas. Gurdaspur, Punjab: A district in the state of Punjab, India, where the width of roads constructed under PMGSY is being reviewed. Pathankot, Punjab: A district in the state of Punjab, India, where the width of roads constructed under PMGSY is being reviewed. Ministry of Rural Development: The Indian government ministry responsible for rural development programs, including PMGSY. SHRI SUKHJINDER SINGH RANDHAWA: Member of LOK SABHA who raised a question regarding the widening of border roads under PMGSY. SHRI KAMLESH PASWAN: Minister of State in the Ministry of Rural Development who answered the question regarding the widening of border roads. IRC Specifications: Guidelines followed for road construction under PMGSY. Operation Sindoor: A security operation during which the road width problem in the border areas was observed.
Official Source Record View Original Source →
See Full Document Text
O.I.H. GOVERNMENT OF INDIA MINISTRY OF RURAL DEVELOPMENT DEPARTMENT OF RURAL DEVELOPMENT LOK SABHA UNSTARRED QUESTION NO. 394 ANSWERED ON 22/07/2025 WIDENING OF BORDER ROADS 394. SHRI SUKHJINDER SINGH RANDHAWA: Will the Minister of RURAL DEVELOPMENT be pleased to state: (a) whether the roads constructed under the Pradhan Mantri Gram SadakYojana (PMGSY) in the border areas of Gurdaspur and Pathankot in Punjab have very little width leading to problems in the movement of two vehicles and the said problem was observed during Operation Sindoor; (b) if so, whether the Government proposes to widen the roads in the border areas keeping in view the international security; and (c) if so, the details thereof and if not, the reasons therefor? ANSWER MINISTER OF STATE IN THE MINISTRY OF RURAL DEVELOPMENT (SHRI KAMLESH PASWAN) (a): As per PMGSY guidelines and IRC Specifications, carriageway width of PMGSY roads are constructed based on the projected traffic in terms of Passenger Car Unit (PCU) plying on the roads. The carriageway width may be 3.75 m/ 5.5 m depending upon the traffic plying on the roads. In case of roads leading to habitations below 500 (where eligible), where the projected traffic is likely to be very low, the carriageway may further be restricted to 3 m. There is a minimum required road width (formation width) which should not be less than 7.5 m in case of plain/rolling terrain and 6 m in case of mountainous/steep terrain for single lane carriage way i.e. 3 m/3.75 m. Page 1 of 2The carriageway width of road constructed/upgraded under the Pradhan Mantri Gram SadakYojana is determined based on comprehensive automated traffic census data and axle load survey on proposed roads. (b) & (c): As reported by the State of Punjab, in Gurdaspur and Pathankot districts, most of the roads constructed/upgraded are having the carriageway width varying from 3.05 m to 3.75 m and 5.5 m. The roads are designed for normal traffic, based on the proposal received from the State. Currently, there is no proposal under PMGSY for the widening of Border Roads within the district of Gurdaspur and Pathankot. The timeline for completion of ongoing works under PMGSY III is March, 2026. ***** Page 2 of 2