WIND ENERGY POTENTIAL IN TAMIL NADU
1630. SHRI NAVASKANI K:
Will the Minister of NEW AND RENEWABLE ENERGY be pleased to state:
(a) whether the Government is aware that Tamil Nadu being one of the leading wind energy
producing States has significant potential for repowering old wind turbines and
expanding offshore and onshore wind capacity and if so, the details thereof;
(b) the details of wind energy capacity installed in Tamil Nadu during the last five years,
year-wise along with the additional capacity targeted by the year 2030;
(c) whether any special financial assistance, viability gap funding, transmission
infrastructure support and incentives have been provided or proposed for Tamil Nadu to
facilitate achievement of the national target of 100 GW wind energy by the year 2030
and 155 GW by the year 2035 and if so, the details thereof;
(d) whether the Government has assessed issues relating to grid curtailment, evacuation
constraints and delayed payments affecting wind energy producers in Tamil Nadu; and
(e) if so, the corrective measures taken by the Government in this regard?
ANSWER
THE MINISTER OF STATE FOR NEW & RENEWABLE ENERGY AND POWER
(SHRI SHRIPAD YESSO NAIK)
(a) As per the wind resource assessment carried out by the National Institute of Wind Energy
(NIWE), the estimated onshore wind power potential in Tamil Nadu is 95.1 GW at 150 m hub
height. In addition, Government has identified through mesoscale studies 8 offshore wind
zones off the coast of Tamil Nadu having potential of 31 GW capacity.
As on 30.06.2026, the installed capacity of wind energy projects in Tamil Nadu is 12.27 GW.
Considering replacement of wind turbines with individual capacities up to 2 MW, Tamil Nadu
has an estimated repowering potential of about 7.3 GW.
(b) The details of wind energy capacity installed in Tamil Nadu during the last five years are
placed as Annexure-I.
In line with Hon’ble Prime Minister’s announcement at COP26, Ministry of New and
Renewable Energy is intended to achieve 500 GW of installed electricity capacity from non-
fossil fuel sources including wind energy by 2030. As per the Report on optimal generation
capacity mix for 2029-30 version 2.0 published by CEA, 100 GW of total wind capacity by
FY 2029-30 has been envisaged for all wind potential sites of India.
(c) Presently, the development of onshore wind projects carried out by private
developers/public sector enterprises based on techno-economic assessment. There is no central
financial assistance scheme for new onshore wind power projects. However, Government has
launched the 'Viability Gap Funding (VGF) scheme for offshore wind energy projects' with
total outlay of ₹ 7453 crore for installation and commissioning of 1 GW of offshore windenergy projects (500 MW each off the coast of Gujarat and Tamil Nadu) and upgradation of
two ports to meet logistics requirements for offshore wind energy projects.
(d) &(e) Grid curtailment and evacuation transmission delay is one of the challenges in
development of wind power capacity in the country including Tamil Nadu. In order to facilitate
the grid infrastructure development, Government has taken following initiatives;
• Government had declared 625.3 GW of Renewable Energy (RE) potential in the RE
rich states including Tamil Nadu.
• Central Electricity Authority (CEA) has prepared the Transmission System Plan for
Integration of over 500 GW Renewable Energy Capacity by 2030.
• Under the Intra-State Transmission System Green Energy Corridor Phase I & II, the
total targeted RE evacuation capacity was 43 GW, of which 29 GW of RE had been
evacuated as on 30.06.2026.
In order to facilitate timely payment to developers, Government has issued Electricity (Late
Payment Surcharge and Related Matters) Rules, 2022. Further under the REIAs Power
Purchase Agreements (PPAs), a mechanism of State Government Guarantee/ Tri-Partite
Agreement (TPA) signed between Reserve Bank of India, Central Government and State
Government of the Buying Entity is in place for covering security for payment of energy
charges.
*****
Annexure I
Details of wind energy capacity installed in Tamil Nadu during the last five years
S. No. Financial Year Annual Wind
Capacity Addition
(MW)
1 2021-22 258.32
2 2022-23 150.8
3 2023-24 586.37
4 2024-25 1136.37
5 2025-26 407.32
6 2026-27 (till 126.45
30.06.2026)