**Executive Summary**
This document reports on the progress of the PM-KUSUM scheme as of November 30, 2025. It highlights that 10,203 MW have been installed and ₹7,106 crore have been released under the scheme. The information was submitted in a written reply in Lok Sabha on December 10, 2025.
**Key Points / Main Content**
* **Scheme Overview:**
* PM KUSUM is a demand-driven scheme.
* Capacities are allocated based on demand and progress shown by States.
* The scheme involves participation of farmers, farmer groups, FPOs, WUAs and PACS.
* **Implementation and Progress:**
* The scheme has been implemented in all states/UTs.
* As of 30.11.2025, a total of 10,203 MW capacity has been installed.
* ₹7,106 crore has been released under the scheme till 30.11.2025.
* State/UT-wise installation progress is placed at Annexure I.
* State/UT-wise details of beneficiaries is placed at Annexure II.
* **Guidelines and Priorities:**
* The Ministry simplified the procedures and issued revised guidelines on 17.01.2024 for easy implementation.
* Priority is given to small and marginal farmers and those using micro-irrigation techniques.
* **Outreach and Support:**
* The Ministry conducts extensive outreach and capacity-building workshops to increase the reach of the scheme.
* Periodic review and handholding meetings are conducted with the implementing states.
**Impact Analysis**
**Stakeholder: Farmers, Farmer Groups (FPOs), Water User Associations (WUAs), Primary Agriculture Credit Societies (PACS)**
* **Impact:** Access to solar power and irrigation, potential income generation through participation in the scheme.
* **Action Required:** Participate in the scheme according to the guidelines.
**Stakeholder: State Implementing Agencies (SIAs)**
* **Impact:** Responsible for reporting the installation progress under PM-KUSUM scheme.
* **Action Required:** Report installation progress under PM KUSUM as on 30.11.2025.
**Stakeholder: Ministry of New and Renewable Energy**
* **Impact:** Responsible for overseeing the scheme, conducting outreach, and providing support.
* **Action Required:** Conduct extensive outreach and capacity-building workshops to increase the reach of the scheme.
**Stakeholder: Implementing States**
* **Impact:** Responsible for easy implementation of the scheme
* **Action Required:** To attend review and handholding meetings.
Key Entities Referenced
PM-KUSUM: A demand-driven scheme aimed at promoting solar energy adoption among farmers.
Ministry of New and Renewable Energy: The central government body responsible for the scheme's implementation and oversight.
States/UTs: Indian states and union territories where PM-KUSUM is implemented.
Ministry of New and Renewable Energy
PM-KUSUM Registers Significant Progress:
10,203 MW Installed and ₹7,106 Crore Released
Till November 2025
प्रव तथ: 10 DEC 2025 11:56AM by PIB Delhi
PM KUSUM is a demand driven scheme. The capacities are allocated based on demand received and
progress shown by the States. The scheme allows participation of farmers, group of farmers including
farmer producer organizations (FPO)/ water user associations (WUA)/ primary agriculture credit societies
(PACS).
The scheme has been implemented in all the states/ UTs. As reported by State Implementing Agencies
(SIAs), State/UT wise installation progress under PM KUSUM, as on 30.11.2025, is placed at Annexure I.
The number of beneficiaries, including farmer producer organisations (FPOs) who have availed benefits
under PM KUSUM is placed at Annexure II.
As on 30.11.2025, a total of 10,203 MW has been installed under all components of PM KUSUM Scheme.
The funds under PM KUSUM scheme are released based on the demand received, progress reported by
the SIAs and as per provisions of the scheme guidelines. As per the demand received from the states, Rs.
7,106 crore has been released under PM KUSUM Scheme, till 30.11.2025.
The Ministry has simplified the procedures and issued comprehensive revised guidelines on 17.01.2024
for ease of implementation of the scheme. The Scheme guidelines mandate that priority would be given to
small and marginal farmers and farmers using micro irrigation techniques.
To increase the reach of PM KUSUM scheme, extensive outreach and capacity-building workshops are
conducted by the Ministry from time to time. This also includes periodic review and handholding
meetings with the implementing states.
This information was submitted by Union Minister of State for New and Renewable Energy Shri Shripad
Yesso Naik in a written reply Lok Sabha today.
*****
Annexure-I referred to in reply to part (a) of Lok Sabha Unstarred Question No. 1770 for
10.12.2025
State/UT-wise progress under PM-KUSUM Scheme (as on 30.11.2025)S. State/ UT Component-A Component-B (No.) Component-C (No.)
No. Name
(In MW)
Sanctioned Installed Sanctioned Installed Sanctioned Sanctioned Solarized
(FLS)
(IPS) (IPS+FLS)
1. A & N 0.00 0.00 34 0 436 0 0
Islands
2. Andhra 0.00 0.00 0 0 0 2,00,000 0
Pradesh
3. Arunachal 0.00 0.00 700 616 0 0 0
Pradesh
4. Assam 2.00 0.00 4,000 151 0 0 0
5. Bihar 0.00 0.00 0 0 0 1,40,300 0
6. Chhattisgarh 330.00 7.00 0 0 0 10,000 0
7. Goa 24.00 4.00 900 157 0 11,000 700
8. Gujarat 500.00 0.00 18,212 12,382 0 4,67,114 2,16,122
9. Haryana 158.00 26.61 1,97,655 1,80,564 0 2,899 0
10. Himachal 100.00 100.00 1,270 1,053 0 0 0
Pradesh
11. Jammu & 0.00 0.00 5,000 3,601 0 0 0
Kashmir
12. Jharkhand 0.00 0.00 86,985 43,693 0 0 0
13. Karnataka 0.00 0.00 26,365 2,573 0 7,78,588 57,814
14. Kerala 0.00 0.00 8 8 9,448 22,368 13,481
15. Ladakh 1.00 0.00 1,400 102 0 0 0
16. Madhya 1,790.00 54.95 59,400 7,325 0 3,45,000 30,329
Pradesh17. Maharashtra 260.00 4.00 5,75,000 4,66,719 0 7,75,000 6,54,695
18. Manipur 0.00 0.00 450 150 0 0 0
19. Meghalaya 0.00 0.00 2,735 98 0 0 0
20. Mizoram 0.00 0.00 1,700 40 0 0 0
21. Nagaland 0.00 0.00 265 140 0 0 0
22. Odisha 90.00 0.00 16,441 10,113 0 5,223 0
23. Puducherry 0.00 0.00 72 0 0 0 0
24. Punjab 0.00 0.00 18,048 17,592 186 0 0
25. Rajasthan 5,250.00 466.75 1,44,752 1,15,584 2,138 4,00,000 1,19,978
26. Tamil Nadu 3.00 3.00 5,187 4,948 0 0 0
27. Telangana 1,450.00 0.00 20,000 0 28,000 0 0
28. Tripura 5.00 0.00 11,114 6,359 3,600 0 702
29. Uttar 1.00 1.00 1,07,266 66,558 12,000 3,70,000 5,858
Pradesh
30. Uttarakhand 0.00 0.00 3,685 1,663 0 0 0
31. West Bengal 0.00 0.00 0 0 20 0 20
Total 9,964.00 667.31 13,08,644 9,42,189 55,828 35,27,492 10,99,699
Annexure-II referred to in reply to part (b) of Lok Sabha Unstarred Question No. 1770 for
10.12.2025
State/ UT-wise details of beneficiaries (including farmer producer organisations (FPOs) under PM
KUSUM Scheme
As on 30.11.2025S. State/ UT Name Total number of beneficiaries
No.
1. Arunachal Pradesh 616
2. Assam 151
3. Chhattisgarh 9
4. Goa 859
5. Gujarat 2,28,504
6. Haryana 1,80,582
7. Himachal Pradesh 1,193
8. Jammu & Kashmir 3,601
9. Jharkhand 43,693
10. Karnataka 60,387
11. Kerala 13,489
12. Ldakh 102
13. Madhya Pradesh 37,689
14. Maharashtra 11,21,416
15. Manipur 150
16. Meghalaya 98
17. Mizoram 40
18. Nagaland 140
19. Odisha 10,113
20. Punjab 17,592
21. Rajasthan 2,35,92422.. Tamil Nadu 4,950
23 Tripura 7,061
24. Uttar Pradesh 72,417
25. Uttarakhand 1,663
26. West Bengal 20
Total 20,42,459
*********