Home India Ministry of New and Renewable Energy Revised Guidelines for series approval of SPV Modules for co...
Date: 2025-12-19 Category: Not Applicable State: Union Government Country: India

Revised Guidelines for series approval of SPV Modules for conducting testing in Test Labs for implementation of Solar Systems, Devices and Components Goods Order, 2025

Issued by Ministry of New and Renewable Energy · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** The document outlines revised guidelines for series approval of Solar Photovoltaic (SPV) Modules, intended for testing in test labs. These guidelines will be used for the implementation of the Solar Systems, Devices and Components Goods Order, 2025. These guidelines are effective as of December 19, 2025, and supersede the guidelines from August 13, 2025. **Key Points / Main Content** * **Scope and Purpose:** * These guidelines facilitate labs/manufacturers in creating series of products for approval, covering changes in design and materials. * They apply to performance testing of SPV Modules in test labs for compulsory registration with BIS under the Quality Control Order (QCO), 2025. * **SPV Module Testing:** * SPV Modules of capacities ranging from 0.2 to 20W used in solar luminaries applications, Modules of capacities up to 5W used for solar lantern applications will be tested as per IS 16476(Part I) and for testing modules in the range 5-20W appropriate standard will be brought out by BIS. * SPV Modules (crystalline and thin film, including bifacial type) will be tested according to these guidelines. * **Definition of Product Family:** * A product family is defined by the maximum configuration of components/sub-assemblies and how models are constructed from that configuration. * All models in a family must share common design, construction, parts, or assemblies essential for conformity. * **Testing Requirements:** * At least two modules from each of the lower, median, and higher-end power classes must be tested. * Testing charges apply only to these specific modules, but the test report can cover the entire wattage range of the family. * Product labels of each series model must be in the test report. * **Changes and Retesting:** * Changes in the Bill of Materials (BOM) require retesting according to specific guidelines. * **Power Class Extension:** * If a median power class doesn't exist, the next higher class should be used. * If a single power class extends to further bins of power classes within the boundaries given in IEC TS 62915, then at least 2 modules each, from the lower end and higher end power class shall be used for label verification. * **Efficiency Criteria:** * Lowest and highest samples of the family must meet the minimum efficiency criteria as per the QCO, 2025, for license approval. * If the median module belongs to the same product family as defined in IEC 62915, and if the efficiencies of the highest and lowest power modules in that family are measured, the efficiency measurement for the median-power PV module may not be required. * **Marking Requirements:** * Modules must have clear and indelible markings laminated inside the glass, including: * Name/Trademark of manufacturer * Model number * Unique serial number * Nominal wattage and tolerance * Year and Country of Origin * Efficiency at STC * Brand name (if applicable) * Tolerance up to ±3% will be acceptable. * **Standards and Test Procedures:** * Testing should follow the latest versions of relevant Indian Standards. * Labs may follow separate test sequences for IS 14286 and IS/IEC 61730 or combined test flow of IS/IEC 61730 and IS 14286 /IEC 61215 as provided in IS/IEC TS 62915. However separate test reports have to be issued for IS/IEC 61730 and IS 14286 /IEC 61215. * **Retesting Guidelines:** * Changes in BOM or process modifications require retesting as per IS/IEC 62915: 2023. **Impact Analysis** **Stakeholder: Test Labs** * **Impact:** Required to implement the revised guidelines for SPV module testing and ensure adherence to testing standards. Must only charge for the tested modules in the family. * **Action Required:** Update testing procedures to align with the new guidelines. Ensure proper documentation and reporting. Do not accept modules without the required detail. Strictly follow the testing sequence and pass criterion in accordance with the test standard. **Stakeholder: SPV Module Manufacturers** * **Impact:** Must comply with the new guidelines for product family formation, testing, and marking requirements. * **Action Required:** Adjust manufacturing processes and product documentation to meet the new requirements. Submit appropriate modules for testing. Must self-declare the efficiency through marking in laminate for fewer cell models. **Stakeholder: Bureau of Indian Standards (BIS)** * **Impact:** Responsible for the compulsory registration of SPV Modules and the overall implementation of the Quality Control Order, 2025. * **Action Required:** Enforcement of the revised guidelines and updates of the Quality Control Order as necessary. Decide the transition period to the revised/latest standard.

Key Entities Referenced

Solar Systems, Devices and Components Goods Order, 2025: A quality control order (QCO) mandating compulsory registration with BIS for solar systems, devices, and components, including SPV modules. Ministry of New & Renewable Energy: The ministry responsible for issuing the guidelines for SPV module testing. BIS: Bureau of Indian Standards, the organization for compulsory registration for implementation of the Solar Systems, Devices and Components Goods Order, 2025. IS 16476(Part I): Indian Standard for testing modules for solar lantern applications. IS 14286: Indian Standard which specifies details, including clauses, to be provided for PV module marking.
Official Source Record View Original Source →
See Full Document Text
File No. 313-12/5/2025-S AND QC Ministry of New & Renewable Energy (Standards & Quality Control Division) Dated: 19th December 2025 Revised Guidelines for series approval of SPV Modules for conducting testing in Test Labs for implementation of Solar Systems, Devices and Components Goods Order, 2025 The guidelines are issued to facilitate labs/manufacturers in formation of series of products for approval of product family including change in design, materials, etc. for performance testing of SPV Modules in test labs for compulsory registration with BIS for implementation of the Solar Systems, Devices and Components Goods Order, 2025 (Quality Control Order, 2025). The following series guidelines will now be followed for conducting tests on SPV Modules by test labs. However, in the case of SPV Modules of capacities ranging from 0.2 to 20W used in solar luminaries applications, it has been decided that Modules of capacities up to 5W used for solar lantern applications will be tested as per IS 16476(Part I) and for testing modules in the range 5- 20W appropriate standard will be brought out by BIS. This item will be included in the revised Quality Control Order for notification. Till such time SPV Modules of capacities ranging from 0.2 to 20 W used in solar luminaries are excluded in the series guidelines for BIS registration. The following series guidelines will now be followed for conducting tests on SPV Modules (crystalline and thin film, including bifacial type) by test labs. Definition of Product Family A product family can be defined by the maximum configuration of components/sub- assemblies plus a description of how the models are constructed from the maximum configuration using these component and sub-assemblies. All models which are included in the family typically have common design, construction, parts or assemblies essential to ensure conformity with applicable requirements. Out of the entire range of models intended to be covered under registration, at least 2 modules each, from the lower end, median and higher end power class shall be tested to cover the entire range of family. The lab will be required to charge the cost of testing only for these modules and test report can be issued to all such sets of other wattage covered under the family. Product label of each series model shall be placed in the test report. If there is a change in BOM in the family then the retesting guidelines will be followed for submitting samples to test Labs, and for which appropriate testing charges will be made by test lab. If median power class does not exist the next higher class shall be used. If qualification of a single power class shall be extended to further bins of power classes within the boundaries given in IEC TS 62915 (then at least 2 modules each, from the lower end and higher end power class shall be used for label verification (Gate No.1). If a power class is extended only towards higher (or lower) bins, then modules only from the higher (or lower) bins, respectively, shall be used for verification of rated label values.Provided that if there is no change from the design, materials, components, material combinations, manufacturers or processing of the fully tested PV module type family, fewer cells in module shall not require retesting. The Indian Standards (IS) mentioned in Quality Control Order, 2025 inter-alia includes testing procedure/reference to test procedure. Such testing procedure standards covers detailed Scope, Normative references, Terms and definitions, Test samples, Sampling, Test procedures, Pass criteria, Marking and documentation etc. to be followed by testing labs. Minimum Efficiency criteria: For the purpose of the passing minimum efficiency of Solar PV modules; lowest, highest sample of the family should pass the minimum efficiency criteria as per the Solar Systems, Devices and Components Goods Order, 2025 for grant of licence to the entire family. The methodology for calculating efficiency is defined in the abovementioned QCO. Provided that if the median module belongs to the same product family as defined in IEC 62915, and if the efficiencies of the highest and lowest power modules in that family are measured, the efficiency measurement for the median-power PV module may not be required. However, the module area of the median-power range must be identical to that of the lowest- and highest-power modules. For fewer cell models, manufacturer shall self-declare the efficiency through marking in laminate. The calculated efficiency based on module area and calculated output power shall be reported by Laboratory. For this, Manufacturer shall submit the relevant drawings of electrical circuitry to the laboratory which shall be annexed to the test report. Marking All the modules should contain the following clear and indelible marking laminated inside the glass i. Name, Registered Trade Name, or Registered trademark of manufacturer ii. Model number iii. Unique serial number iv. Nominal wattage and tolerance % v. Year and Country of Origin vi. Efficiency of module at STC (as per QCO) vii. Brand name if applicable Tolerance up to ±3% will be acceptable. Other details as per IS 14286 (Part 1) :2023 clause 5.1 and IS/IEC 61730-1 clause 6.2.2 should be provided at appropriate place. The actual Power Output Pmax shall be mentioned on the label pasted on the back side of PV Module. In case of thin film modules information need not be provided laminated inside the glass, however, it should be provided as per IS 14286 (Part 1) :2023 clause 5.1 and IS/IEC 61730-1 clause 6.2.2 at an appropriate place with clear and indelible marking.The Test laboratory should not accept the modules for testing without above detail. The testing sequence and the pass criterion should be strictly followed in accordance with the test standard. Retesting guidelines: In case of any changes in BOM of the PV module or process modifications to maintain the certification retesting as per IS/IEC 62915: 2023 is required. Note: For the purpose of these guidelines, latest version of Indian Standards including the amendments issued thereof and notified by BIS from time to time, shall be applicable by providing suitable transition period. The transition period to the revised/latest standard will be decided by the Bureau of Indian Standards (BIS). The labs may follow separate test sequence for IS 14286 and IS/IEC 61730 or combined test flow of IS/IEC 61730 and IS 14286 /IEC 61215 as provided in IS/IEC TS 62915. However separate test reports have to be issued for IS/IEC 61730 and IS 14286 /IEC 61215. These revised guidelines supersede the Guidelines for series approval of SPV Modules for conducting testing in Test Labs for implementation of Solar Systems, Devices and Components Goods Order, 2025 dated 13th August 2025.