SEZ
Compliance
FAQs Booklet
Issued by the office of Administrator (IFSCA)SEZ Compliance FAQ Booklet (v 1.1), June 2025
Abbreviations and Acronyms
Acronym Definition
APR Annual Performance Report
BLUT Bond-Cum-Legal Undertaking
BOA Board of Approval
DCP Date of Commencement of Production
DGFT Directorate General of Foreign Trade
EC Eligibility Certificate
FME Fund Management Entity
Gujarat International Finance Tec-City - International
GIFT-IFSC
Financial Services Centre
GOI Government of India
IEC Importer-Exporter Code
IFSCA International Financial Services Centres Authority
LOA Letter of Approval
MPR Monthly Performance Report
NDML National Depository Markup Limited
NSDL National Securities Depository Limited
PLOA Provisional Letter of Allotment
RCMC Registration-Cum-Membership Certificate
SEZ Special Economic Zone
SERF Service Exports Reporting Form
UAC Unit Approval Committee
FY Financial Year
Page 1 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
DISCLAIMER
This FAQ Booklet may be used only for general
guidance and reference purposes and shall not be
considered as legal advice. Any legal discrepancies (or)
factual errors (or) suggestions regarding the contents
of this Booklet may be communicated to ifsca-
admin@ifsca.gov.in. Any action taken based on this
Booklet shall not render IFSCA (or) the office of
Administrator (IFSCA) (or) its officers thereof liable
for any loss/damages to any entity.
Page 2 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
Contents
A. SEZ PROVISIONS AND ROLE OF ADMINISTRATOR (IFSCA) ....... 9
1. What is SEZ and how is it relevant for an IFSC unit? .............................................................. 9
2. Why is it necessary to get the SEZ approval for an IFSC unit? ................................................. 9
3. What is the role of Administrator (IFSCA)? ........................................................................... 9
4. What are the compliances required to be done by an IFSC unit under the SEZ Act/Rules? ..... 10
B. ISSUANCE OF LETTER OF APPROVAL ............................................. 11
5. What is the Letter of Approval (LOA) under the SEZ Act/Rules? ............................................ 11
6. What is the procedure to apply for LOA under SEZ Act? ...................................................... 11
7. Can the application for LOA be submitted in the SEZ Online portal directly instead of the SWIT
portal? ..................................................................................................................................... 11
8. What are the activities for which the application for LOA has to be submitted in the SEZ Online
portal directly? ......................................................................................................................... 11
9. What are the documents to be submitted along with the application for LOA? ...................... 12
10. What is the step-by-step process for approval of the LOA application? ............................ 12
11. What is the frequency and mode of the UAC meeting? ................................................... 13
12. After submitting the application for LOA, how will the applicant know if their application has
been taken up in the UAC meeting? ........................................................................................... 13
13. Is it mandatory for the applicant to appear physically before the UAC? ............................ 13
14. Who can appear before the UAC from the applicant side? .............................................. 13
15. What happens if the applicant has missed the deadline for submitting the application for
LOA? 14
16. What happens if the applicant missed the deadline for UAC because they encountered
technical errors/glitches while submitting the application? ......................................................... 14
17. What is expected from the applicant during the proceedings of the UAC meeting? ........... 14
18. Once the application is approved in the UAC meeting, what are the next steps for the
applicant to obtain the LOA? ..................................................................................................... 15
19. Is there any deadline for replying to deficiencies raised in the SEZ Online portal? ............. 15
20. When the application for LOA was made in the SWIT portal and not on the SEZ Online
portal. How will the applicant be able to login to the SEZ Online portal? ....................................... 15
21. What should the applicant do if they have not received the login credentials for the SEZ
Online portal? .......................................................................................................................... 15
22. How will the applicant know if the deficiency has been raised in the SEZ Online portal? ... 15
23. Can the applicant respond to the deficiencies by email/SWIT portal instead of the SEZ
Online portal? .......................................................................................................................... 16
24. How will the applicant know if the LOA has been issued for them? .................................. 16
C. BOND-CUM-LETTER OF UNDERTAKING (BLUT) ......................... 16
25. What is the meaning of Bond-cum-Letter of Undertaking (BLUT) in the SEZ Act/Rules? ..... 16
26. What is the format of the BLUT? .................................................................................... 16
27. How should the BLUT be executed? .............................................................................. 16
28. What are the key points to remember while executing the BLUT? .................................... 17
29. What is the meaning of Bond Value calculation sheet? ................................................... 18
Page 3 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
30. What is the process of approval of the BLUT? ................................................................. 18
31. What is the process of approval of the physical BLUT? ................................................... 18
32. After submitting the physical BLUT, how will the unit know if the same is approved? ......... 18
33. What is the process of approval of the BLUT in the SEZ Online portal? ............................. 19
34. Can the units file the BLUT directly in the SEZ Online portal without obtaining approval in the
physical copy first? ................................................................................................................... 19
35. What should the unit do if the unit wishes to top-up/increase the Bond amount? ............. 19
36. Why is it required to file the BLUT in the SEZ Online portal? ............................................. 19
37. After submitting the ‘New LUT’/‘Update LUT’ request in the SEZ Online portal, how will the
unit know if the same is approved? ............................................................................................ 20
38. If the unit does not have access to the SEZ Online portal, how should the ‘New LUT’/’Update
LUT’ request be submitted? ...................................................................................................... 20
D. ELIGIBILITY CERTIFICATE ................................................................ 20
39. What is the Eligibility Certificate (EC) and why is it required? ........................................... 20
40. How should the unit apply for getting the EC issued in their name? .................................. 21
E. LEASE DEED ............................................................................................. 21
41. What is the deadline for execution of Lease Deed for a unit under the SEZ Act/Rules? ...... 21
42. What will happen if the unit fails to submit the registered Lease Deed within six months from
the issuance of the LOA? ........................................................................................................... 21
43. What are the documents required for execution of the Lease Deed? ............................... 22
44. How can the unit register the Lease Deed if the LOA has expired? ................................... 22
45. How should the Lease Deed be submitted of office of Administrator?.............................. 22
46. If the unit does not have access to the SEZ Online portal, how should the Unit Lease Deed
request be submitted? .............................................................................................................. 22
F. CHANGE OF ADDRESS/ADDITION OF PREMISES/DELETION OF
PREMISES ........................................................................................................ 23
47. If a unit wishes to shift their premises to a different address (or) expand their office by
including a new premises in their address, can the unit proceed to do the same immediately? ...... 23
48. What are the steps to be followed by the unit for the change of address to another premises
from their existing premises? .................................................................................................... 23
49. What are the steps to be followed by the unit for the addition of address of another premises
to their existing address? .......................................................................................................... 23
50. After applying for change/addition of address in the SEZ portal, how will the unit know if the
application is complete? ........................................................................................................... 24
51. What are the conditions to be followed by the unit after the change/addition of address is
approved in the SEZ Online portal? ............................................................................................ 24
52. What are the steps to be followed by the unit for the deletion of address of a premises from
their existing address? .............................................................................................................. 25
53. After applying for deletion of address in the SEZ portal, how will the unit know if the
application is complete? ........................................................................................................... 25
54. What are the steps to be followed by the unit after the deletion of address is approved in the
SEZ Online portal? .................................................................................................................... 25
G. IMPORTER-EXPORTER CODE (IEC) ................................................. 26
55. What is the Importer-Exporter Code (IEC)? .................................................................... 26
Page 4 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
56. How can a unit obtain IEC code? ................................................................................... 26
57. Is an IEC code required for GIFT-IFSC units? .................................................................. 26
58. What are the steps to update the IEC in the SEZ portal? .................................................. 26
H. PROCUREMENT OF SAND .................................................................... 26
59. What is the process for procurement of sand to GIFT IFSC for interior construction by the
Unit? 26
I. BROADBANDING/CHANGE OF SERVICES ...................................... 27
60. If a unit wishes to obtain IFSCA approval for additional services, other than those authorized
in the LOA, what are the SEZ compliances required to be followed by the unit? ............................. 27
61. What is the procedure to apply for amendment/Broadbanding of the Authorized Operations
in the LOA?............................................................................................................................... 27
62. What is procedure for approval of amendment/Broadbanding of Authorized Operations in
the LOA? .................................................................................................................................. 28
63. After applying for amendment/Broadbanding of LOA Authorized Operations in the SEZ
portal, how will the unit know if the application is complete? ....................................................... 28
64. Should the unit submit the amendment/Broadbanding request in physical/email mode
also? 28
65. If the unit does not have access to the SEZ Online portal, how should the
amendment/Broadbanding application be submitted? ............................................................... 29
J. LOA EXTENSION ..................................................................................... 29
66. What is the validity of the Letter of Approval (LOA) issued under the SEZ Act? .................. 29
67. What happens to the LOA if the unit has not commenced business operations within one
year? 29
68. How should a unit apply for LOA Extension? .................................................................. 29
69. What if the unit has not registered the Lease Deed at the time of applying for an LOA
Extension? ............................................................................................................................... 30
70. What if the LOA of the unit has already expired? Can the unit still obtain an LOA Extension?
30
71. What are the consequences of expiry of LOA? ................................................................ 30
72. What happens if the unit has not been able to commence operations even after obtaining
LOA Extension for two years from the Administrator (IFSCA)? ...................................................... 31
73. What is the procedure for obtaining LOA Extension beyond two years from the expiry of
original LOA? ............................................................................................................................ 31
74. After applying for LOA Extension in the SEZ portal, how will the unit know if the application is
complete? ............................................................................................................................... 32
75. Should the unit submit the LOA Extension application in physical/email mode also? ........ 32
76. If the unit does not have access to the SEZ Online portal, how should the LOA Extension
application be submitted? ........................................................................................................ 32
K. COMMENCEMENT OF OPERATIONS ............................................... 33
77. What is the significance of Commencement under the SEZ Act? ..................................... 33
78. What is considered as Commencement of service activity under the SEZ provisions? ...... 33
79. Is the validity of the LOA automatically extended to 05 years from the date of
commencement once the unit submits an intimation to the Administrator (IFSCA)? ..................... 33
80. How should a unit intimate the Commencement of service activity? ............................... 34
Page 5 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
81. Is it mandatory to generate SERF ID and include the same in the ‘Free Form-Unit- Intimation
of DCP’ request that is filed on the SEZ Online portal?................................................................. 34
82. What if the unit has not registered the Lease Deed at the time of intimating the
Commencement of service activity? ......................................................................................... 34
83. What if the LOA of the unit has expired already? Can the unit still raise an invoice and
submit intimation of commencement? ...................................................................................... 34
84. The unit has commenced operations before the expiry of LOA and submitted intimation of
commencement in the SEZ Online portal. However, before the intimation is taken on record, the
LOA of the unit has expired. Should the unit apply for LOA Extension separately in the SEZ portal? . 35
85. The unit has commenced operations before the expiry of LOA. However, before submitting
the intimation of commencement in the SEZ Online portal, the LOA of the unit has expired. Should
the unit apply for LOA Extension separately in the SEZ portal? ..................................................... 35
86. What documents are considered as proof of Commencement for an IFSC unit? .............. 35
87. If the unit has obtained letter approving the Commencement in physical form but the same
is not updated in the SEZ Online portal. How should the unit get the dates updated in the SEZ Online
portal? 36
88. After submitting the intimation of commencement in the SEZ portal, how will the unit know
if the application is complete?................................................................................................... 36
89. Should the unit submit the intimation of Commencement in physical/email mode also? .. 36
90. If the unit does not have access to the SEZ Online portal, how should the intimation of
Commencement be submitted? ............................................................................................... 37
L. REPORTING – MPR, SERF, APR........................................................... 37
MONTHLY PERFORMANCE REPORT (MPR) .............................................................................................. 37
91. What is the Monthly Performance Report (MPR)? ........................................................... 37
92. How should the MPR be submitted? .............................................................................. 37
93. Should all the units submit the MPR? ............................................................................ 37
94. What is the deadline for submission of MPR? ................................................................. 37
95. A unit has missed out on submitting the MPR for a particular month before the deadline.
Can they submit it later? ........................................................................................................... 38
96. Should the unit submit the MPR in physical/email mode also? ........................................ 38
97. If the unit does not have access to the SEZ Online portal, how should the MPR be
submitted? .............................................................................................................................. 38
SERVICE EXPORTS REPORTING FORM (SERF) .......................................................................................... 38
98. What is the Service Exports Reporting Form (SERF)? ...................................................... 38
99. How should the SERF be submitted? ............................................................................. 38
100. Should all the units submit the SERF? ........................................................................... 39
101. What is the deadline for submission of SERF? ................................................................ 39
102. A unit has submitted intimation of commencement in the SEZ Online portal and the same is
under process for being taken on record. When should the unit file the SERF? .............................. 39
103. What are the consequences of not submitting the SERF? ............................................... 39
104. A unit has missed out on submitting the SERF for a particular month before the deadline.
Can they submit it later? ........................................................................................................... 39
105. Should the unit submit the SERF in physical/email mode also? ....................................... 40
106. If the unit does not have access to the SEZ Online portal, how should the SERF be
submitted? .............................................................................................................................. 40
ANNUAL PERFORMANCE REPORT (APR) ................................................................................................. 40
107. What is the Annual Performance Report (APR)? ............................................................. 40
108. What is the format of the APR? ...................................................................................... 40
Page 6 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
109. How should the APR be submitted? .............................................................................. 40
110. Should all the units submit the APR? ............................................................................. 41
111. What is the deadline for submission of APR? ................................................................. 41
112. What are the consequences of not submitting the APR? ................................................. 41
113. A unit has missed out on submitting the APR for a particular year before the deadline. Can
they submit it later? .................................................................................................................. 41
114. Should the unit submit the APR in physical/email mode also? ......................................... 41
115. If the unit does not have access to the SEZ Online portal, how should the APR be
submitted? .............................................................................................................................. 41
M. INTIMATIONS UNDER INSTRUCTION 109 ....................................... 42
116. What is Instruction 109 dated 18.10.2021 issued by the Ministry of Commerce and what are
the compliances required to be done by the units under this Instruction? .................................... 42
117. What is the procedure to intimate the compliances under Instruction 109? ..................... 42
118. What is procedure for approval of compliances under Instruction 109? ........................... 42
119. Should the unit intimate the compliances under Instruction 109 in physical/email mode
also? 42
120. If the unit does not have access to the SEZ Online portal, how should the intimation of
compliances under Instruction 109 be submitted? ..................................................................... 43
N. LOA RENEWAL ........................................................................................ 43
121. What is the meaning of LOA Renewal under the SEZ Act? ............................................... 43
122. How should a unit submit the application for LOA Renewal? ........................................... 43
123. When should a unit submit the LOA Renewal application? .............................................. 44
124. What if the LOA of the unit has already expired? Can the unit still submit the application for
LOA Renewal? .......................................................................................................................... 44
125. What are the criteria for approving the LOA Renewal? ..................................................... 44
126. Will the LOA be renewed if the unit has violated any of the above criteria? ....................... 44
127. After submitting the ‘LOA Renewal’ request in the SEZ portal, how will the unit know if the
application is complete? ........................................................................................................... 45
128. Should the unit submit the ‘LOA Renewal’ request in physical/email mode also? .............. 45
129. If the unit does not have access to the SEZ Online portal, how should the LOA Renewal
request be submitted? .............................................................................................................. 45
O. EXIT ............................................................................................................ 46
130. What is the further course of action available under SEZ Rules for a unit that does not wish
to continue their operations in IFSC? ......................................................................................... 46
131. What are the steps to be followed by a unit if they wish to surrender the LOA (or) do not wish
to start/continue operations in their IFSC unit (or) exit from SEZ? ................................................. 46
132. What are the documents to be submitted by the unit while applying for Exit under Rule 74 of
SEZ Rules? ............................................................................................................................... 46
133. What is the process of approval of Exit under Rule 74 of SEZ Rules? ................................ 46
134. What are the actions to be taken by the unit after exit? ................................................... 47
135. A unit had obtained SEZ LOA and IFSCA approval but is unable to (or) does not commence
their business operations. It surrenders the IFSCA approval and obtains Exit from SEZ. ................ 47
Subsequently, it wishes to obtain IFSCA Licence under same (or) different regulations after first exit.
For this, the unit enters into a mutual understanding with the Co-Developer to continue to pay rent
Page 7 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
to their premises even after Exit, and the Co-Developer has agreed to issue PLOA in the same
address to the unit for new activity. ............................................................................................ 47
In this scenario, can a unit continue to occupy their premises even after the Exit is approved so that
they may obtain new LOA in the same premises after some time? ............................................... 47
136. Can a unit continue to occupy their premises even after the Exit Approval, since they wish to
obtain IFSCA Licence in the near future and have already registered a long-term Lease Deed for the
premises? ................................................................................................................................ 48
P. MISCELLANEOUS ................................................................................... 48
137. What are the steps required to be followed after obtaining LOA? ..................................... 48
138. If there are any issues with the SEZ Online portal, how can the unit resolve them? ........... 48
139. What are the common reasons due to which a unit may lose access to the SEZ Online
portal? 48
140. What are some common issues to be noted by the unit while using SEZ Online portal? .... 49
141. While submitting any application in the SEZ Online portal, the unit receives an error
message stating ‘Could not establish elock connection.’ How should this error be resolved? ........ 49
Q. REGISTRATION-CUM-MEMBERSHIP CERTIFICATE (RCMC) .. 50
142. What is the Registration-Cum-Membership Certificate (RCMC)? ..................................... 50
143. How can a unit obtain RCMC certificate? ....................................................................... 50
144. Is an RCMC certificate required for GIFT-IFSC units? ...................................................... 50
145. What are the steps to update the RCMC certificate in the SEZ portal? .............................. 50
R. ANNEXURE - A – FORMAT OF BLUT [FORM-H] ............................. 51
S. ANNEXURE - B – FORMAT OF APR [FORM-I] ................................. 55
T. ANNEXURE - C – INDICATIVE LIST OF DOCUMENTS FOR
PROOF OF COMMENCEMENT ................................................................... 59
U. ANNEXURE - D – FORMAT OF FORM-F1 .......................................... 63
V. ANNEXURE - E – FORMAT OF FORM-L ............................................ 65
Page 8 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
A. SEZ provisions and role of Administrator (IFSCA)
1. What is SEZ and how is it relevant for an IFSC unit?
(i) SEZ stands for Special Economic Zone. In India, SEZs have been setup in
various parts of the country through the Special Economic Zones Act, 2005.
The SEZs are focussed primarily of export promotion and offer various tax
incentives.
(ii) International Financial Services Centres Authority (IFSCA) is a statutory
authority set up by an Act of Indian Parliament inter-alia to develop and
regulate the financial services market in the International Financial Services
Centres (IFSCs) in India.
(iii) Under Section 18 of the SEZ Act, an International Financial Services Centre
(IFSC) can be setup only within a SEZ. GIFT-IFSC is the first IFSC setup in
India.
(iv) By virtue of the same, every IFSC unit
approved/licenced/registered/authorized by IFSCA under the IFSCA Act is
an SEZ unit also and has to comply with the provisions of the SEZ Act/Rules
also.
2. Why is it necessary to get the SEZ approval for an IFSC unit?
A unit in IFSC has to be a unit under the SEZ Act also and hence it is mandatory for
every entity intending to setup a unit in IFSC, to obtain the Letter of Approval (LOA)
under the SEZ Act, before obtaining the IFSCA approval.
3. What is the role of Administrator (IFSCA)?
Every SEZ is administered by a Development Commissioner under the SEZ Act
who is overall in charge of the Special Economic Zone and exercises administrative
control and supervision over the Zone. In order to provide a unified regulatory
framework for IFSC units, the powers of the Development Commissioner for IFSC
units have been vested with an officer of IFSCA designated as ‘Administrator (IFSCA)’
vide Section 12 (7) of the SEZ Act.
Page 9 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
4. What are the compliances required to be done by an IFSC
unit under the SEZ Act/Rules?
The following chart depicts the life cycle of a SEZ unit and different requirements
to be complied with by it at different stages of its life cycle:
Figure 1 – SEZ Process Workflow
Page 10 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
B. Issuance of Letter of Approval
5. What is the Letter of Approval (LOA) under the SEZ
Act/Rules?
The Letter of Approval (LOA) is issued under SEZ Act to every unit for a specific
set of operations authorized to be performed by it in the SEZ. The unit must provide
only the services specified in the Authorized Operations and nothing beyond it.
6. What is the procedure to apply for LOA under SEZ Act?
IFSCA has launched the SWIT portal through which the applicants can submit
their application for obtaining IFSCA Regulatory approval. In the SWIT portal, the
applicant units are required to file a Common Application Form (CAF) for obtaining
IFSCA Regulatory approval. Section-D of the CAF pertains to the application for
obtaining the SEZ LOA. Once the CAF is submitted and signed using Digital Signature,
the application for SEZ LOA is submitted automatically on the SEZ Online portal.
Further processing of the application for LOA approval is done in the SEZ Online portal
only and not in the SWIT portal.
7. Can the application for LOA be submitted in the SEZ Online
portal directly instead of the SWIT portal?
For all the activities for which application filing is enabled through SWIT portal
by IFSCA, the SEZ LOA application must be filed only through the SWIT portal. Public
Notice issued in this regard may be found here. There are a very few activities requiring
IFSCA approval, which are not yet enabled under the SWIT portal. The application for
LOA for such activities is required to be filed in the SEZ Online portal directly in Form-
FA.
8. What are the activities for which the application for LOA has
to be submitted in the SEZ Online portal directly?
The Public Notice issued by IFSCA regarding SWIT portal may be found here.
Apart from the activities mentioned in this Public Notice, the LOA application for Funds
is also required to be filed in the SEZ Online portal. The applicants who file the
application for SEZ LOA directly in the SEZ Online portal must ensure that their
Page 11 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
application for the IFSCA Regulatory approval is also filed simultaneously. It may be
noted that the application for SEZ LOA is processed only after the corresponding
IFSCA Regulatory application is also filed.
9. What are the documents to be submitted along with the
application for LOA?
PUBLIC NOTICE No. 02/2024-25 dated 05.11.2024 issued by the office of
Administrator (IFSCA) in this regard may be found here.
10. What is the step-by-step process for approval of the LOA
application?
(i) For the activities for whom the application filing is enabled under the SWIT,
the application so filed under SWIT gets forwarded automatically to the
IFSCA’s regulatory team for regulatory approval, and also to the office of
Administrator (IFSCA) through SEZ portal, for processing for LOA.
(ii) For the activities for whom the application filing is not enabled under the
SWIT, application for LOA needs to be filed directly under SEZ online portal.
On receipt of such application in SEZ portal, confirmation from IFSCA
regulatory team is sought about filing of the regulatory application before
proceeding further in the matter.
(iii) After examination of the LOA applications received in SEZ online portal,
through either of the above modes [(i) or (ii)], the same are examined by the
office of Administrator (IFSCA) and any deficiencies/queries is raised in the
SEZ portal itself. The applicant must login to the SEZ Online portal and make
the necessary rectifications against the deficiencies so that the application
becomes complete.
(iv) The applications that are complete in all respects are then placed before the
Unit Approval Committee (UAC) for consideration, by including the
application in the Agenda for the UAC meeting. Once the application is
approved by the UAC, the same is recorded in the Minutes of the Meeting.
Once the Minutes of the Meeting are finalized and approved, the LOA is
issued on the SEZ Online portal itself.
Page 12 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
11. What is the frequency and mode of the UAC meeting?
The UAC normally meets once every week. The meetings are conducted in
hybrid mode – in person and through VC. The date of the meeting for each week along
with the deadline for submission of applications for that UAC is informed by way of a
Meeting Notice issued in the previous week. The Meeting Notices can be found here.
12. After submitting the application for LOA, how will the
applicant know if their application has been taken up in the UAC
meeting?
After examination of the LOA applications received in SEZ online portal, the
same are examined by the office of Administrator (IFSCA) and any deficiencies/queries
is raised in the SEZ portal itself. The applicant must login to the SEZ Online portal and
make the necessary rectifications against the deficiencies so that the application
becomes complete. The Agenda for each UAC meeting is published on the IFSCA
website one (or) two days before the UAC. The Agenda of the UAC meetings can be
found here. The office of Administrator (IFSCA) also sends email to the applicants who
are included in the Agenda. This email generally includes a copy of the Agenda and the
Meeting link to join the meeting via Video Conference. The applicants are expected to
send the return email communicating the name(s) of their authorized representatives to
attend the UAC meeting, along with Authorisation letters in their favour.
13. Is it mandatory for the applicant to appear physically before
the UAC?
The UAC meetings are conducted in hybrid mode and the authorized
representatives of the applicant may attend via Video Conference (or) in person, as per
their convenience, unless specifically advised to attend in a particular mode.
14. Who can appear before the UAC from the applicant side?
The person representing the applicant in the UAC meeting is required to submit
a valid Board Resolution/Authority Letter from the Board of Directors/Partners
authorizing him/her to appear before the UAC, along with identification documents.
The said authorization and ID shall be submitted to the office of Administrator (IFSCA)
Page 13 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
via email before the UAC. The authorized representatives are expected to be well-
versed about the proposal and be prepared to discuss both short-term and long-term
plans of the applicant.
15. What happens if the applicant has missed the deadline for
submitting the application for LOA?
If the deadline for submitting the application for LOA for a particular UAC
meeting is missed, all applications, if complete, are taken up in the next UAC meeting.
16. What happens if the applicant missed the deadline for UAC
because they encountered technical errors/glitches while
submitting the application?
Exceptions may be considered only in rare cases of genuine
glitches/malfunctions which are exclusively attributable to the SWIT portal (or) the SEZ
Online portal, and the applicant is able to demonstrate that there is a case where the
application needs to be taken up urgently and it can’t wait till next UAC. Any
mistakes/misunderstandings/oversight by the applicant shall not be considered as
technical errors/glitches.
17. What is expected from the applicant during the proceedings
of the UAC meeting?
(i) During the meeting, the applicant is expected to give a brief of their project
proposal and answer the questions, if any, asked by the UAC. UAC informs
the applicant whether the proposal is approved (or) not.
(ii) The Minutes of the meeting, detailing the decisions taken on each application
are published on the IFSCA website, normally within a week’s time. The
Minutes of the UAC meeting can be found here.
Page 14 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
18. Once the application is approved in the UAC meeting, what
are the next steps for the applicant to obtain the LOA?
Once the application is approved by the UAC, the decision is recorded in the
Minutes of the Meeting. Once the Minutes of the Meeting are finalized and approved,
the LOA is issued on the SEZ Online portal itself.
19. Is there any deadline for replying to deficiencies raised in the
SEZ Online portal?
It is the responsibility of the applicant to proactively and properly respond to and
rectify the deficiencies raised in the SEZ Online portal without any inordinate delay.
The application is placed before the UAC for consideration only after all the
deficiencies are rectified in the SEZ Online portal. Hence, it is in the interest of the
applicant that the deficiencies are rectified swiftly so that the application may be
included in the Agenda for the UAC.
20. When the application for LOA was made in the SWIT portal
and not on the SEZ Online portal. How will the applicant be able
to login to the SEZ Online portal?
Once the Common Application Form (CAF) is submitted and DSC signed in the
SWIT portal, the applicant automatically receives the login credentials for the SEZ
Online portal in their email address given in the SWIT portal.
21. What should the applicant do if they have not received the
login credentials for the SEZ Online portal?
In case the applicant has not received the login credentials, they may contact
NSDL using the details available here (or) write to deepakg@ndml.in.
22. How will the applicant know if the deficiency has been raised
in the SEZ Online portal?
The Deficiency is raised in the SEZ Online portal generally within 1-2 working
days after submission of application in the SWIT/SEZ Online portal. The applicant must
login to the SEZ Online portal, access the application request from the Inbox and find
Page 15 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
out about the deficiencies/discrepancies from the Remarks History link of the
application.
23. Can the applicant respond to the deficiencies by email/SWIT
portal instead of the SEZ Online portal?
No, the deficiencies must be rectified in the SEZ Online portal only.
24. How will the applicant know if the LOA has been issued for
them?
The applicant must login to the SEZ Online portal, access the application request
from the Inbox and download the LOA, once the LOA is issued in the SEZ Online
portal.
C. BOND-CUM-LETTER OF UNDERTAKING (BLUT)
25. What is the meaning of Bond-cum-Letter of Undertaking
(BLUT) in the SEZ Act/Rules?
As per Rule 22 of SEZ Rules, the BLUT is required to be executed by a SEZ unit
with regard to its obligations and compliances under the SEZ Act/Rules. Once executed,
the BLUT is required to be approved jointly by the Specified Officer of Customs and
the Administrator (IFSCA).
26. What is the format of the BLUT?
The BLUT is required to be executed in Form-H which is provided in SEZ Rules.
The format is attached herein as Annexure-A.
27. How should the BLUT be executed?
As per Instruction No. 02 dated 24.03.2006 issued by the Ministry of Commerce,
the BLUT is required to be executed on a non-judicial stamp paper of Rs. 100, notarized
Page 16 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
by a Notary Public registered only in Gujarat. The documentary requirements are as
follows.
a) Name and SEZ address of the unit shall be mentioned properly in the BLUT
without any mistake/typo errors.
b) Letter submitted by the unit accepting the LOA
c) Bond Value Calculation Sheet
d) Board Resolution authorizing the Obligor to execute and submit the BLUT
e) Signatures of Obligor and witnesses affixed on the BLUT along with their
name and address mentioned therein.
f) Recent passport-size photos of Obligor affixed on the BLUT
g) KYC documents (Aadhar/PAN card) of the Obligor and witnesses attached
to the BLUT
28. What are the key points to remember while executing the
BLUT?
The PUBLIC NOTICE No. 02/2024-25 dated 05.11.2024 issued by the office of
Administrator (IFSCA) in this regard may be found here. The key points to note are as
follows:
a) The BLUT shall be in the proper format, as specified in Form-H of SEZ
Rules, 2006 along with Instruction No. 2 dated 24.03.2006 of F. No.
5/1/2006-EPZ issued by Department of Commerce.
b) Letter from the entity accepting the terms and conditions of the LOA may
be attached with the BLUT.
c) Proper calculation sheet showing the amount for which BLUT is executed
shall be attached and the same shall be signed by the obligor. Care may be
taken to ensure that the amount for which the BLUT is executed is not less
than the amount shown in the calculation sheet.
d) Proper resolution authorizing the Obligor to sign/execute the BLUT under
SEZ Act and Rules.
e) Name, address and photo of the Obligor are properly mentioned/pasted in
the BLUT along with a proper ID proof attached.
Page 17 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
f) Name and address of the witnesses are properly mentioned in the BLUT
along with a proper ID proof attached.
29. What is the meaning of Bond Value calculation sheet?
The Bond Value calculation sheet enumerates the total Customs duties and GST
that the SEZ unit projects to save in the next 05 financial years. The amount for which
the BLUT is executed must not be less than the amount shown in the calculation sheet.
The calculation sheet has to be in the letterhead of the applicant unit and be signed by
the Obligor with proper seal and stamp.
30. What is the process of approval of the BLUT?
The BLUT is approved in two steps – first in physical form, then in the SEZ
Online portal (through a ‘New LUT’ request). The detailed procedure is explained
below.
31. What is the process of approval of the physical BLUT?
(i) The physical copy of the executed BLUT is required to be submitted to the
office of Administrator (IFSCA) by post with a covering letter addressed to
the Administrator (IFSCA). Once the same is received, the format, contents
and documents attached with the BLUT are verified by the office of
Administrator (IFSCA).
(ii) In case of any discrepancies/mistakes, the same are communicated to the unit
by the office of Administrator (IFSCA). After receipt of all the
proper/updated documentation, the BLUT is forwarded to the Specified
Officer of Customs for approval. After the approval of Specified Officer, the
BLUT is finally approved by the Administrator (IFSCA).
32. After submitting the physical BLUT, how will the unit know
if the same is approved?
Once the physical BLUT is approved by both the Specified Officer and the
Administrator (IFSCA), the pdf copy of the approved BLUT is sent to the unit by email
Page 18 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
along with an Eligibility Certificate. The original physical copy of the approved BLUT
is retained by the office of Administrator (IFSCA).
33. What is the process of approval of the BLUT in the SEZ
Online portal?
For approval of the BLUT in the SEZ Online portal, after approval of the BLUT
in physical form, the unit is required to file a ‘New LUT’ request in the portal, attaching
the pdf copy of the approved BLUT as a supporting document. While submitting the
‘New LUT’ request, the unit must ensure that the details of Bond amount, Obligor, etc.
as recorded in the approved BLUT are mentioned properly without any mistakes. Once
the ‘New LUT’ request is filed, the same is approved by Specified Officer and
Administrator (IFSCA) in the SEZ Online portal. Once approved, the Bond amount
along with LUT validity dates will be automatically updated for the unit in the SEZ
Online portal.
34. Can the units file the BLUT directly in the SEZ Online portal
without obtaining approval in the physical copy first?
No, the units are required to obtain approval first in the physical copy and then
upload the approved BLUT in the SEZ Online portal by filing a ‘New LUT’ request.
35. What should the unit do if the unit wishes to top-up/increase
the Bond amount?
The unit must submit another fresh BLUT, as explained above, in physical form
to the office of Administrator (IFSCA). Once the same is approved by both the Specified
Officer and Administrator (IFSCA), the pdf copy of the approved BLUT is sent to the
unit by email. The original copy of the approved BLUT is retained by the office of
Administrator (IFSCA). Then the unit must get the updated BLUT approved in the SEZ
Online portal by filing an ‘Update LUT’ request following the same process as
explained above.
36. Why is it required to file the BLUT in the SEZ Online portal?
The units will be able to execute any transaction in the SEZ Online portal related
to procurement of any goods/services only after the BLUT is approved in the SEZ
Page 19 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
Online portal. In many cases, it is noticed that the units submit the ‘New LUT’/’Update
LUT’ request many weeks/months after getting the physical copy approved. Care
should be taken by the unit to avoid such delays which may lead to procedural
complexities. Once the pdf copy of the approved BLUT is received by the unit via email,
the same should immediately be submitted in the SEZ Online portal through a ‘New
LUT’/’Update LUT’ request, as the case may be.
37. After submitting the ‘New LUT’/‘Update LUT’ request in the
SEZ Online portal, how will the unit know if the same is approved?
Once the unit has applied in the SEZ Online portal, any deficiencies/queries is
raised in the SEZ portal itself. The unit must login to the SEZ Online portal, access the
‘New LUT’/’Update LUT’ request from the Inbox and find out about the
deficiencies/discrepancies from the Remarks History link of the request. Once the ‘New
LUT’/’Update LUT’ request is approved in the portal, the Bond amount along with LUT
validity dates are automatically updated for the unit in the SEZ Online portal.
38. If the unit does not have access to the SEZ Online portal, how
should the ‘New LUT’/’Update LUT’ request be submitted?
If the unit does not have access to the SEZ Online portal, they may retrieve access
to the portal by contacting NSDL/NDML using the details available here (or) write to
abhisheka@ndml.in/aweinashj@ndml.in.
D. Eligibility Certificate
39. What is the Eligibility Certificate (EC) and why is it
required?
Under the Gujarat SEZ Act/Rules, the Eligibility Certificate issued by the
Administrator (IFSCA) is necessary to claim State tax exemptions such as stamp duty.
Page 20 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
40. How should the unit apply for getting the EC issued in their
name?
Once the BLUT is approved by both the Specified Officer and the Administrator
(IFSCA), the pdf copy of the approved BLUT is sent to the unit by email along with the
Eligibility Certificate. There is no requirement to make any separate application for the
EC.
E. Lease Deed
41. What is the deadline for execution of Lease Deed for a unit
under the SEZ Act/Rules?
As per Rule 18 (2) of SEZ Rules, a copy of the registered Lease Deed is required
to be furnished to the Administrator (IFSCA) within six months from the issuance of
LOA.
42. What will happen if the unit fails to submit the registered
Lease Deed within six months from the issuance of the LOA?
(i) As per Rule 18 (2) of SEZ Rules, if a unit fails to submit the registered Lease
Deed within six months from the issuance of LOA, the Unit Approval
Committee may take action to withdraw the LOA after giving an opportunity
of being heard.
(ii) If the unit is not able to register the Lease Deed within six months from the
issuance of LOA, the unit is required to send an email to ifsca-
admin@ifsca.gov.in requesting the UAC to condone the delay and seek an
extension of the deadline to submit the Lease Deed. The request is examined
by the office of Administrator (IFSCA) and placed before the UAC for its
consideration, by including the application in the Agenda for the UAC
meeting. The unit has to appear before the UAC and explain the reasons for
the delay.
(iii) After hearing the unit's case, the UAC may grant an extension for registering
and submitting the lease deed. If the UAC is not satisfied with the reasons
given for the delay, the UAC may decide to withdraw the LOA, which
effectively ceases the existence of the unit in the SEZ.
Page 21 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
43. What are the documents required for execution of the Lease
Deed?
While executing the Lease Deed, it is necessary for the unit to have the following
documents:
a) Valid LOA - As per Rule 18(2), the Co-Developer/Developer shall enter into a
lease agreement with the unit only after the issuance of LOA by the
Administrator (IFSCA).
b) Eligibility Certificate – Under Gujarat SEZ Act/Rules, the Eligibility Certificate
issued by the Administrator (IFSCA) is necessary to claim State tax exemptions
such as stamp duty. The EC will be issued to the unit along with approved copy
of the BLUT.
44. How can the unit register the Lease Deed if the LOA has
expired?
If the LOA is found to have expired at the time of registering the Lease Deed,
the unit must obtain LOA Extension by applying on the SEZ Online portal. Registering
the Lease Deed on an invalid/expired LOA is a violation of Rule 18(2) of SEZ Rules
and may attract monetary penalties.
45. How should the Lease Deed be submitted of office of
Administrator?
The unit must email a copy of the registered Lease Deed to ifsca-
admin@ifsca.gov.in. Simultaneously, the unit must submit a ‘Unit Lease Deed’ request
in the SEZ Online portal. The unit must ensure that the term of the Lease Deed and
address of the unit are properly mentioned in the ‘Unit Lease Deed’ request submitted
in the SEZ Online portal.
46. If the unit does not have access to the SEZ Online portal, how
should the Unit Lease Deed request be submitted?
If the unit does not have access to the SEZ Online portal, they may retrieve access
to the portal by contacting NSDL/NDML using the details available here (or) write to
abhisheka@ndml.in/aweinashj@ndml.in.
Page 22 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
F. Change of Address/Addition of premises/Deletion of
premises
47. If a unit wishes to shift their premises to a different address
(or) expand their office by including a new premises in their
address, can the unit proceed to do the same immediately?
No, the LOA is issued to a unit on a specific address based on the Provisional
Letter of Allotment issued by a Developer/Co-Developer. In case the unit wishes to
change their premises (or) add a new premises to their address, the unit has to obtain
prior approval of the Administrator (IFSCA). As per condition 13 of Form-H, the unit
shall not change the location of the premises except with the written permission of the
Administrator (IFSCA). Operating from a premises not approved in the LOA of the unit
is a violation of SEZ Act/Rules and may attract monetary penalties (or) cancellation of
LOA.
48. What are the steps to be followed by the unit for the change
of address to another premises from their existing premises?
The Unit is required to submit a request for the change of address on the SEZ
portal under ‘Free Form - Change of Area (Addition)’ and attach a copy of the
Provisional Letter of Allotment (PLOA) issued by the Developer (or) Co-Developer of
the new premises to which they intend to shift. In the Free Form request, the unit must
clearly mention if the request is for change of premises (or) addition of a new premises.
49. What are the steps to be followed by the unit for the addition
of address of another premises to their existing address?
The Unit is required to submit a request for the addition of address on the SEZ
portal under ‘Free Form - Change of Area (Addition)’ and attach a copy of the
Provisional Letter of Allotment (PLOA) issued by the Developer (or) Co-Developer for
the new premises to be added. In the Free Form request, the unit must clearly mention
if the request is for change of premises (or) addition of a new premises.
Page 23 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
50. After applying for change/addition of address in the SEZ
portal, how will the unit know if the application is complete?
(i) Once the unit has applied in the SEZ Online portal, any deficiencies/queries
are raised in the SEZ portal itself. The unit may login to the SEZ Online
portal, access the ‘Free Form - Change of Area (Addition)’ request from the
Inbox and find out about the deficiencies/discrepancies, if any, raised by the
office of Administrator from the Remarks History link of the request.
(ii) Once the ‘Free Form - Change of Area (Addition)’ request is approved in the
portal, the address details will be updated in the portal and a letter for
approval of change/addition of address will be issued in the SEZ Online
portal. The applicant unit may download the letter from the portal from the
SEZ Online ID of the ‘Free Form - Change of Area (Addition)’ request. After
approval in the SEZ Online portal, a fresh Eligibility Certificate incorporating
the changed/additional premises in the address is issued to the unit by email
separately.
51. What are the conditions to be followed by the unit after the
change/addition of address is approved in the SEZ Online portal?
The approval for change/addition of address is subject to the following conditions -
a) The unit has to submit a copy of the registered Lease Deed for the new
changed premises/added premises as required under Rule 18 (2) of SEZ
Rules, 2006.
b) In case of change of address, if the unit has registered a Lease Deed in the
old address, then the same has to be cancelled and a copy of the cancelled
Lease Deed is required to be submitted to the office of Administrator
(IFSCA).
c) The BLUT executed in the previous address, along with all its terms and
conditions, shall be applicable and binding on the unit in the new changed
address also. In case BLUT has not been executed by the unit in the previous
address, then the unit has to execute fresh BLUT for the new changed address
and submit the same to the office of Administrator (IFSCA) for
processing/approval.
Page 24 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
52. What are the steps to be followed by the unit for the deletion
of address of a premises from their existing address?
The Unit is required to submit a request for the deletion of address on the SEZ
portal under ‘Free Form - Change of Area (Deletion)’. In the Free Form request, the
unit must clearly mention the premises that they wish to delete from their address. The
unit must not apply for deletion of a premises which is the sole premises held by them
as that would make the LOA untenable under law.
53. After applying for deletion of address in the SEZ portal, how
will the unit know if the application is complete?
Once the unit has applied in the SEZ Online portal, any deficiencies/queries will
be raised in the SEZ portal itself. The unit may login to the SEZ Online portal, access
the ‘Free Form - Change of Area (Deletion)’ request from the Inbox and find out about
the deficiencies/discrepancies if any raised, from the Remarks History link of the
request. Once the ‘Free Form - Change of Area (Deletion)’ request is approved in the
portal, the address details will be updated in the portal and a letter for approval of
deletion of address will be issued in the SEZ Online portal. The applicant unit may then
download the letter from the portal from the SEZ Online ID of the ‘Free Form - Change
of Area (Deletion)’ request.
54. What are the steps to be followed by the unit after the deletion
of address is approved in the SEZ Online portal?
After the approval for deletion of address, the unit is required to take the following
actions -
a) If the unit has registered Lease Deed for the deleted premises, the unit is
required to submit copy of cancelled Lease deed for the same within 30 days
of approval in the SEZ Online portal.
b) The unit shall immediately vacate the deleted premises and, in any case, shall
not continue to occupy the deleted premises beyond 30 days of approval of
the deletion request.
Page 25 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
G. Importer-Exporter Code (IEC)
55. What is the Importer-Exporter Code (IEC)?
An Importer-Exporter Code (IEC) is a unique business identification number
issued by the Directorate General of Foreign Trade (DGFT). IEC is mandatory for every
entity involved in import (or) export activities from India.
56. How can a unit obtain IEC code?
To apply for an IEC, the Unit can directly visit the DGFT website by clicking
the following link:https://www.dgft.gov.in/CP/?opt=iec-profile-management
57. Is an IEC code required for GIFT-IFSC units?
Yes. Since the IFSC has been setup within the SEZ area, all the GIFT-IFSC units
must apply to DGFT and obtain an IEC.
58. What are the steps to update the IEC in the SEZ portal?
Once the IEC is issued by DGFT, the unit is required to file a ‘Free Form – IEC
Application’ request in the SEZ Online portal and attach therewith the pdf copy of IEC
Certificate. After approval of the Free Form request, the IEC is updated in the unit’s
profile data by the office of Administrator (IFSCA).
H. Procurement of Sand
59. What is the process for procurement of sand to GIFT IFSC
for interior construction by the Unit?
The unit willing to procure sand for interior construction purposes within the
GIFT IFSC, is required to submit a ‘Free Form-Others’ request in the SEZ Online
portal and upload a cover letter stating the requirement for sand for interior construction
along with the quantity of sand required. Once the ‘Free Form-Others’ request is
Page 26 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
approved in the portal, a letter for approval of procurement of sand is issued in the SEZ
Online portal. The applicant unit may download the letter from the portal from the SEZ
Online ID of the ‘Free Form-Others’ request filed by them.
I. Broadbanding/Change of services
60. If a unit wishes to obtain IFSCA approval for additional
services, other than those authorized in the LOA, what are the SEZ
compliances required to be followed by the unit?
If the unit wishes to diversify (i.e.) add more services to their LOA (or) change
the services they provide, it is called Broadbanding of services. For example, a unit may
have LOA for Aircraft Leasing services and may wish to provide Ship Leasing services
also. On another instance, a unit may have LOA for FME (Non-Retail) and may want
to become a FME (Retail). In both these cases, the unit has to get the Authorized
Operations in their LOA amended, which is, as stated above, also referred to as
Broadbanding. The unit must get the Authorized Operations in their LOA amended
before obtaining the IFSCA Regulatory approval for such new/changed services.
61. What is the procedure to apply for
amendment/Broadbanding of the Authorized Operations in the
LOA?
(i) The unit is required to submit a ‘Free Form-Broadbanding/Capacity
Enhancement’ request in the SEZ Online portal and upload proof of
submission of Regulatory application to IFSCA for the new/additional
services. In the ‘Item Details’ tab of the said Free Form request, the unit must
mention the amended set of services that will be provided by them, in the
section named ‘Proposed for Renewed period’.
(ii) Broadbanding applications sent over physical/email mode are not entertained
for processing/approval.
Page 27 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
62. What is procedure for approval of
amendment/Broadbanding of Authorized Operations in the LOA?
(i) Every application is examined by the office of Administrator (IFSCA) and
placed before the UAC for consideration, by including the application in the
Agenda for the UAC meeting. The unit is not required to appear before the
UAC.
(ii) Once the request is approved by the UAC, the approval is reflected in the
Minutes of the UAC meeting. Then, the ‘Free Form-Broadbanding/Capacity
Enhancement’ request is approved on the SEZ Online portal, and the
amended LOA is generated in the SEZ Online portal itself. The amended
LOA may be downloaded from the SEZ Online ID of the ‘Free Form-
Broadbanding/Capacity Enhancement’ request.
63. After applying for amendment/Broadbanding of LOA
Authorized Operations in the SEZ portal, how will the unit know
if the application is complete?
Once the unit has applied in the SEZ Online portal, any deficiencies/queries will
be raised in the SEZ portal itself. The unit must login to the SEZ Online portal, access
the ‘Free Form-Broadbanding/Capacity Enhancement’ request from the Inbox and find
out about the deficiencies/discrepancies if any raised, from the Remarks History link of
the request. Once the ‘Free Form-Broadbanding/Capacity Enhancement’ request is
approved in the portal, the amended LOA is generated in the SEZ Online portal itself.
The amended LOA may be downloaded from the SEZ Online ID of the ‘Free Form-
Broadbanding/Capacity Enhancement’ request.
64. Should the unit submit the amendment/Broadbanding
request in physical/email mode also?
The Broadbanding of services request is required to be submitted only in the SEZ
Online portal and there is no need to submit the application through physical/email
mode also.
Page 28 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
65. If the unit does not have access to the SEZ Online portal, how
should the amendment/Broadbanding application be submitted?
If the unit does not have access to the SEZ Online portal, they may retrieve access
to the portal by contacting NSDL/NDML using the details available here (or) write to
abhisheka@ndml.in/aweinashj@ndml.in. The office of Administrator (IFSCA) accepts
applications only through the SEZ Online portal and not in physical/email mode.
J. LOA Extension
66. What is the validity of the Letter of Approval (LOA) issued
under the SEZ Act?
As per Rule 19(4) of SEZ Rules, the Letter of Approval (LOA) remains valid for
one year from the date of original issuance, within which the Unit must commence their
business operations.
67. What happens to the LOA if the unit has not commenced
business operations within one year?
In case the Unit is unable to commence business operations before the expiry of
its LOA, it is required to make a request for the extension of LOA to the Administrator
(IFSCA). The Administrator (IFSCA) may grant an extension of validity of LOA for
valid reasons to be recorded in writing. As per Rule 19 (4), the Extension can be granted
for a further period of two years after the expiry of the original LOA.
68. How should a unit apply for LOA Extension?
Unit must submit an ‘LOA Extension’ request on the SEZ Online portal only,
with the following supporting documents merged in a single pdf.
a) Cover letter detailing the reasons why the Unit was unable to commence
operations before the expiration of the LOA and the steps taken so far to
commence operations.
b) Copy of the IFSCA Letter of Authorisation (or) Certificate of
Registration/Recognition (or) approval in any other form.
Page 29 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
c) Copy of the registered Lease Deed.
Unit must submit the ‘LOA Extension’ request on the portal with all these documents,
at least one month before the expiry of their LOA.
LOA Extension applications sent over physical/email mode are not entertained for
processing/approval.
69. What if the unit has not registered the Lease Deed at the time
of applying for an LOA Extension?
In the cover letter submitted along with the ‘LOA Extension’ request, the unit
must explain the reasons in detail as to why they were unable to register the Lease Deed
and request for condonation of delay in executing the Lease Deed. The request for
condonation of delay is taken up in the Unit Approval Committee (UAC), as per Rule
18 (2) of SEZ Rules. The ‘LOA Extension’ request is processed only after the UAC
decides whether the delay in submitting the registered Lease Deed is condoned (or)
otherwise.
70. What if the LOA of the unit has already expired? Can the
unit still obtain an LOA Extension?
It is strongly advised that the Unit must submit the LOA Extension request on
the portal with all the documents, at least one month before the expiry of the same.
However, the unit can apply in the SEZ portal for LOA Extension even after expiry of
LOA. In such cases, the unit must clearly mention in their cover letter the reasons for
delay in filing of the LOA Extension request. Further, if the LOA expires and the unit
does not take any steps to extend it, monetary penalties may follow.
71. What are the consequences of expiry of LOA?
(i) As per Rule 19 (5), if the Unit has not commenced business within the
validity period (or) the extended validity period of the LOA, then the LOA
shall be deemed to have been lapsed with effect from the date on which its
validity expired. This means that the entity is not an SEZ unit anymore once
the LOA has expired.
(ii) Under Rule 11 (5) of SEZ Rules, the validity of the Lease Deed and the lease
rights to the premises shall cease to exist upon the expiry of the LOA.
Page 30 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
(iii) Further, one of the necessary pre-conditions for an IFSC unit is being an SEZ
unit with a valid LOA. An entity without a valid SEZ LOA cannot do any
business, raise invoices, receive moneys, etc. in a SEZ, which will directly
impact their IFSC operations. Further, if the LOA expires and the unit does
not take any steps to extend it, monetary penalties may follow.
72. What happens if the unit has not been able to commence
operations even after obtaining LOA Extension for two years from
the Administrator (IFSCA)?
(i) Beyond two years after the expiry of the original LOA, further extension of
one year may be granted by the Administrator (IFSCA) in case the
Administrator (IFSCA) is satisfied that two-thirds of activities for setting up
the business has been completed by the unit. These activities include the
compliances under SEZ Act such as executing Lease Deed, etc. and also the
milestones towards the IFSC operations such as securing capital, executing
Contribution agreements, executing Lease agreements for aircrafts/vessels,
etc. as the case maybe.
(ii) In case the unit has not shown completion of various activities for setting up
the business, then the power to grant further extension of LOA rests with the
Board of Approval (BoA) setup by the Ministry of Commerce, GoI. The
Board of Approval may, upon being satisfied, grant further extension for a
further period not exceeding one year, at a time.
73. What is the procedure for obtaining LOA Extension beyond
two years from the expiry of original LOA?
The unit must submit an ‘LOA Extension’ request on the SEZ Online portal
with the following supporting documents merged in a single pdf.
a) Cover Letter: The cover letter shall highlight the initiatives taken by the unit to
commence business operations, including detailed reasons as to why the unit was
unable to commence the operations so far. The Cover letter shall highlight the
steps taken by the Unit to commence business operations.
b) Form-F1: A copy of the duly filled Form-F1 [Annexure-D] must be submitted
as part of the request.
c) Present Progress: The status of progress achieved by the unit on both SEZ
compliances and IFSC operations.
Page 31 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
d) Lease Deed: Copy of registered Lease Deed
e) IFSCA Approval: Copy of the IFSCA Letter of Authorisation (or) Certificate of
Registration/Recognition (or) approval in any other form
f) Additional Documents: Any other documents to highlight the steps taken by the
Unit to commence business operations such as NOCs, Agreements, invoices,
bank statements, etc.
Such requests for extension of LOA beyond two years after the expiry of original LOA
are examined by the office of Administrator (IFSCA) and forwarded to the Board of
consideration.
74. After applying for LOA Extension in the SEZ portal, how will
the unit know if the application is complete?
Once the unit has applied in the SEZ Online portal, any deficiencies/queries will
be raised in the SEZ portal itself. The unit must login to the SEZ Online portal, access
the ‘LOA Extension’ request from the Inbox and find out about the deficiencies/queries
if any raised, from the Remarks History link of the request. Once the ‘LOA Extension’
request is approved in the portal, the LOA dates are automatically updated in the portal
and a letter for approval of LOA Extension is issued in the portal. The applicant unit
may download the letter from the portal from the SEZ Online ID of the ‘LOA Extension’
request filed by them.
75. Should the unit submit the LOA Extension application in
physical/email mode also?
No, the ‘LOA Extension’ request must be submitted only in the SEZ Online
portal and there is no need to submit the application through physical/email mode also.
The LOA Extension application sent over physical/email mode are not entertained for
processing/approval.
76. If the unit does not have access to the SEZ Online portal, how
should the LOA Extension application be submitted?
If the unit does not have access to the SEZ Online portal, they may retrieve access
to the portal by contacting NSDL/NDML using the details available here (or) write to
Page 32 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
abhisheka@ndml.in/aweinashj@ndml.in. The office of Administrator (IFSCA) accepts
applications only through the SEZ Online portal and not in physical/email mode.
K. Commencement of Operations
77. What is the significance of Commencement under the SEZ
Act?
As per Rule 19 (4) and 19 (6) of the SEZ Rules, the LOA shall be valid for one
year from the date of its issuance within which period the Unit must commence service,
for the purposes of IFSC operations, and intimate the date of commencement to the
Administrator (IFSCA). The Letter of Approval is valid for five years from the date of
commencement of service.
78. What is considered as Commencement of service activity
under the SEZ provisions?
Commencement of service activity is as such not defined under the SEZ
Act/Rules. The issuance of first invoice is generally considered as commencement of
service activity. For certain IFSCA business verticals such as Funds, Broker-Dealers,
etc. invoice is not being issued in the normal course of business and in such cases,
commencement is decided based on the specific nature of the business.
79. Is the validity of the LOA automatically extended to 05 years
from the date of commencement once the unit submits an
intimation to the Administrator (IFSCA)?
No, the validity of the LOA is considered to be extended only after the office of
Administrator (IFSCA) takes on record the commencement of service activity in the
SEZ Online portal. Mere submission of intimation does not extend the validity of the
LOA.
Page 33 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
80. How should a unit intimate the Commencement of service
activity?
Unit must submit a ‘Free Form-Unit- Intimation of DCP’ request on the SEZ
Online portal with the following supporting documents merged in a single pdf.
a) Documents showing proof of Commencement
b) Copy of the IFSCA Letter of Authorisation (or) Certificate of
Registration/Recognition (or) approval in any other form.
c) Copy of the registered Lease Deed.
The intimation of commencement sent over physical/email mode is not entertained for
processing/approval.
81. Is it mandatory to generate SERF ID and include the same in
the ‘Free Form-Unit- Intimation of DCP’ request that is filed on
the SEZ Online portal?
No, the ‘Free Form-Unit- Intimation of DCP’ request can be submitted
without generating a SERF ID. There are many business verticals in IFSCA that do not
involve the issuance of an invoice, such as Funds, Broker-Dealers, etc. In those business
verticals where there is no invoice issued for commencement; SERF ID is not
mandatory.
82. What if the unit has not registered the Lease Deed at the time
of intimating the Commencement of service activity?
The intimation of Commencement is not taken on record without the registration
of Lease Deed. The unit must submit the intimation of Commencement in the SEZ
Online portal along with a copy of the registered Lease Deed.
83. What if the LOA of the unit has expired already? Can the
unit still raise an invoice and submit intimation of
commencement?
The unit must not raise invoices and receive payments against invoices when
their LOA is invalid/expired. The unit must apply for LOA Extension at least one month
Page 34 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
before expiry of their LOA, obtain approval for LOA Extension and then proceed with
the issuance of invoices.
84. The unit has commenced operations before the expiry of
LOA and submitted intimation of commencement in the SEZ
Online portal. However, before the intimation is taken on record,
the LOA of the unit has expired. Should the unit apply for LOA
Extension separately in the SEZ portal?
No, if the unit has submitted the intimation of commencement with the proper
documents before the expiry of LOA, then there is no need to apply for LOA Extension
separately. Once the commencement is taken on record, the LOA dates are
automatically updated in the SEZ Online portal.
85. The unit has commenced operations before the expiry of
LOA. However, before submitting the intimation of
commencement in the SEZ Online portal, the LOA of the unit has
expired. Should the unit apply for LOA Extension separately in the
SEZ portal?
Yes, the unit must obtain LOA Extension by applying on the SEZ Online portal.
The intimation of Commencement submitted after the expiry of LOA is not considered
for processing/approval.
86. What documents are considered as proof of Commencement
for an IFSC unit?
(i) Under the SEZ Act/Rules, commencement of service has not been defined.
However, in normal course of business, raising of first invoice by a unit (for
which payment is received) is considered as commencement. It may be
mentioned that there are different business verticals regulated by IFSCA
which do not issue invoices, such as Funds, etc. For all the business verticals
regulated by IFSCA, the indicative list of documents that are considered as
proof of Commencement along with the relevant Date of Commencement are
given in Annexure-C.
Page 35 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
(ii) It may be noted that these documents are listed only as a general guideline
and there could be use cases where additional/different set of documents may
be required to determine the commencement.
87. If the unit has obtained letter approving the Commencement
in physical form but the same is not updated in the SEZ Online
portal. How should the unit get the dates updated in the SEZ
Online portal?
Unit must submit a ‘Free Form-Unit- Intimation of DCP’ request on the SEZ
Online portal and upload the physical letter issued as proof of Commencement so that
the Commencement may be taken on record in the SEZ Online portal.
88. After submitting the intimation of commencement in the SEZ
portal, how will the unit know if the application is complete?
Once the unit has submitted the intimation of commencement in the SEZ Online
portal, any deficiencies/queries will be raised in the SEZ portal itself. The unit must
login to the SEZ Online portal, access the ‘Free Form-Unit- Intimation of DCP’ request
from the Inbox and find out about the deficiencies/queries if any raised, from the
Remarks History link of the request. Once the Commencement has been taken note of
in the portal, the LOA dates are automatically updated in the portal and a letter for
approval of the Commencement is issued in the portal. The applicant unit may
download the letter from the portal from the SEZ Online ID of the ‘Free Form-Unit-
Intimation of DCP’ request filed by them.
89. Should the unit submit the intimation of Commencement in
physical/email mode also?
No, the intimation of Commencement must be submitted only in the SEZ Online
portal and there is no need to submit the application through physical/email mode. The
intimation of commencement sent over physical/email mode is not entertained for
processing/approval.
Page 36 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
90. If the unit does not have access to the SEZ Online portal, how
should the intimation of Commencement be submitted?
If the unit does not have access to the SEZ Online portal, they may retrieve access
to the portal by contacting NSDL/NDML using the details available here (or) write to
abhisheka@ndml.in/aweinashj@ndml.in. The office of Administrator (IFSCA) accepts
applications only through the SEZ Online portal and not in physical/email mode.
L. Reporting – MPR, SERF, APR
Monthly Performance Report (MPR)
91. What is the Monthly Performance Report (MPR)?
MPR is a snapshot of the units’ data such as Employment, Investments, etc. for
each month.
92. How should the MPR be submitted?
The MPR must be submitted in the SEZ Online portal under the tab ‘Prepare
Monthly Reports’ found in the unit login.
93. Should all the units submit the MPR?
All IFSC units regulated by IFSCA who have obtained the LOA must submit the
MPR every month without fail, in the SEZ Online portal.
94. What is the deadline for submission of MPR?
The office of Administrator (IFSCA) has issued PUBLIC NOTICE No. 03/2024-
25 dated 23.12.2024 in this regard which may be found here.
Page 37 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
95. A unit has missed out on submitting the MPR for a particular
month before the deadline. Can they submit it later?
Yes, the SEZ Online portal allows for submission/updation of MPR for the past
03 months. However, it is strongly advised that the units must submit the MPR every
month without fail in the SEZ Online portal.
96. Should the unit submit the MPR in physical/email mode also?
No, the MPR must be submitted in the SEZ Online portal only and there is no
need to submit the MPR through physical/email mode also.
97. If the unit does not have access to the SEZ Online portal, how
should the MPR be submitted?
If the unit does not have access to the SEZ Online portal, they may retrieve access
to the portal by contacting NSDL/NDML using the details available here (or) write to
abhisheka@ndml.in/aweinashj@ndml.in. The office of Administrator (IFSCA) accepts
MPR only through the SEZ Online portal and not in physical/email mode.
Service Exports Reporting Form (SERF)
98. What is the Service Exports Reporting Form (SERF)?
SERF is the summary of details of invoices generated/issued by the unit in a
particular month.
99. How should the SERF be submitted?
The SERF must be submitted in the SEZ Online portal under the tab ‘Service
Exports Reporting Form’ found in the unit login.
Page 38 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
100. Should all the units submit the SERF?
All IFSC units regulated by IFSCA whose intimation of commencement has
been taken on record in the SEZ Online portal by Administrator (IFSCA) must submit
the SERF every month without fail in the SEZ Online portal.
101. What is the deadline for submission of SERF?
The office of Administrator (IFSCA) has issued PUBLIC NOTICE No. 03/2024-
25 dated 23.12.2024 in this regard which may be found here.
102. A unit has submitted intimation of commencement in the
SEZ Online portal and the same is under process for being taken
on record. When should the unit file the SERF?
(i) The unit must file SERF for all the months, starting from the month of
commencement, in the SEZ Online portal immediately after the intimation of
commencement has been taken on record in the SEZ Online portal by the
Administrator (IFSCA).
(ii) For example, if the unit generates its first invoice on 15.07.2024 and intimates
the commencement on the SEZ Online portal on 01.08.2024, which is taken
on record by the Administrator (IFSCA) on 15.09.2024, the unit must file the
SERF report for July and August immediately after the intimation has been
taken on record by the Administrator (IFSCA) and letter for the same is issued
in the SEZ Online portal.
103. What are the consequences of not submitting the SERF?
Failure to submit the SERF may attract monetary penalties under law.
104. A unit has missed out on submitting the SERF for a particular
month before the deadline. Can they submit it later?
Yes, the SEZ Online portal allows for submission/updation of SERF for the past
months also. However, it is strongly advised that the units must submit the SERF every
month without fail in the SEZ Online portal.
Page 39 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
105. Should the unit submit the SERF in physical/email mode
also?
No, the SERF must be submitted in the SEZ Online portal only and there is no
need to submit the SERF through physical/email mode also.
106. If the unit does not have access to the SEZ Online portal, how
should the SERF be submitted?
If the unit does not have access to the SEZ Online portal, they may retrieve access
to the portal by contacting NSDL/NDML using the details available here (or) write to
abhisheka@ndml.in/aweinashj@ndml.in. The office of Administrator (IFSCA) accepts
SERF only through the SEZ Online portal and not in physical/email mode.
Annual Performance Report (APR)
107. What is the Annual Performance Report (APR)?
As per Rule 22(3) of SEZ Rules, the unit must submit Annual Performance
Report (APR) in the Form-I to the Administrator (IFSCA).
108. What is the format of the APR?
The APR is to be prepared in Form-I which is part of the SEZ Rules. The format
is also attached herein as Annexure-B. It is to be noted that the information given in
the formats for Annual Performance Reports should be authenticated by the authorised
signatory of the unit and duly certified by an independent Chartered Accountant (or)
Cost Accountant.
109. How should the APR be submitted?
The APR must be submitted by filing a ‘APR’ request in the SEZ Online portal
and attaching the pdf copy of the certified APR with the said request.
Page 40 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
110. Should all the units submit the APR?
Yes, all the IFSC units whose intimation of commencement has been taken on
record in the SEZ Online portal, must submit the APR for every Financial Year,
including that of the commencement, without fail in the SEZ Online portal.
111. What is the deadline for submission of APR?
As per Condition 7 of Form-H of SEZ Rules, after the commencement of
operations, the unit must submit APR to the Administrator (IFSCA) and the Specified
Officer within 180 days following the close of Financial Year, in Form-I.
112. What are the consequences of not submitting the APR?
Failure to submit the SERF may attract monetary penalties under law.
113. A unit has missed out on submitting the APR for a particular
year before the deadline. Can they submit it later?
Yes, the SEZ Online portal allows for submission of APR for the past F.Y. also.
However, it is strongly advised that the units must submit the APR for every F.Y. within
the stipulated deadline without fail in the SEZ Online portal.
114. Should the unit submit the APR in physical/email mode also?
No, the APR is required to be submitted in the SEZ Online portal only and there
is no need to submit the APR through physical/email mode.
115. If the unit does not have access to the SEZ Online portal, how
should the APR be submitted?
If the unit does not have access to the SEZ Online portal, they may retrieve access
to the portal by contacting NSDL/NDML using the details available here (or) write to
abhisheka@ndml.in/aweinashj@ndml.in. The office of Administrator (IFSCA) accepts
APR only through the SEZ Online portal and not in physical/email mode.
Page 41 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
M. Intimations under Instruction 109
116. What is Instruction 109 dated 18.10.2021 issued by the
Ministry of Commerce and what are the compliances required to
be done by the units under this Instruction?
Instruction 109 deals with the guidelines regarding reorganization including
change of name, change of shareholding pattern, business transfer arrangements, court
approved mergers and demergers, change of constitution, change of Directors, etc. of
SEZ units. As per the Instruction, these changes must be approved by the UAC.
117. What is the procedure to intimate the compliances under
Instruction 109?
The unit must submit the request in the SEZ Online portal under the tab
‘Factsheet and UAC Applications’ and upload the relevant documents pertaining to
the intimation submitted by them. For example, in case of Change of Name, the unit
should submit the revised Certificate of Incorporation issued by the Ministry of
Corporate Affairs.
118. What is procedure for approval of compliances under
Instruction 109?
Once the intimation is filed, the same is examined by the office of Administrator
(IFSCA) and placed before the UAC for approval, by including the application in the
Agenda for the UAC meeting. The unit is not required to appear before the UAC. Once
the request is approved by the UAC, the approval is reflected in the Minutes of the UAC
Meeting. Then, the corresponding request will be approved on the SEZ Online portal.
In case of Change of Name, a separate letter is also issued to the unit by email.
119. Should the unit intimate the compliances under Instruction
109 in physical/email mode also?
No, the intimation of compliances under Instruction 109 must be submitted only
in the SEZ Online portal and there is no need to submit the application through
physical/email mode.
Page 42 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
120. If the unit does not have access to the SEZ Online portal, how
should the intimation of compliances under Instruction 109 be
submitted?
If the unit does not have access to the SEZ Online portal, they may retrieve access
to the portal by contacting NSDL/NDML using the details available here (or) write to
abhisheka@ndml.in/aweinashj@ndml.in. The office of Administrator (IFSCA) accepts
applications only through the SEZ Online portal and not in physical/email mode.
N. LOA Renewal
121. What is the meaning of LOA Renewal under the SEZ Act?
The LOA renewal of the Unit is governed as per Rule 19(6), 19(6A) and 19(6B)
of the SEZ Rules, 2006. Upon commencement of operations, the LOA of the unit
becomes valid for 05 years from the date of commencement. After completion of this
05-year period, the LOA is required to be renewed by the unit for continuing their
operations as an SEZ unit every 05 years.
122. How should a unit submit the application for LOA Renewal?
Unit must submit ‘LOA Renewal’ request on the SEZ Online portal with the
following supporting documents merged in a single pdf.
a) A copy of Form-F1, duly completed and signed, as per Rule 19(6A).
b) A copy of the Annual Performance Reports (APRs) for the last 05 completed
Financial Years filed in the SEZ Online portal.
The format of Form-F1 is also attached herein as Annexure-D.
LOA Renewal applications sent over physical/email mode is not entertained for
processing/approval.
Page 43 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
123. When should a unit submit the LOA Renewal application?
As per Rule 19(6A), the unit must apply for LOA Renewal before two months
from the date of expiry of the Letter of Approval. In case an application for LOA
Renewal is submitted after the said period of two months, the unit must submit a
covering letter giving detailed justification for the delay along with the LOA Renewal
request in the SEZ Online portal. Such delays and violations of the SEZ Rules may also
attract monetary penalties.
124. What if the LOA of the unit has already expired? Can the
unit still submit the application for LOA Renewal?
Yes. As per Rule 19(6A), the unit must apply for LOA Renewal before two
months from the date of expiry of the Letter of Approval. In case an application for
LOA Renewal is submitted after the expiry of LOA, the unit must submit a covering
letter giving detailed justification for the delay along with the LOA Renewal request in
the SEZ Online portal. Further, if the LOA expires and the unit does not take any steps
to renew it, monetary penalties may follow.
125. What are the criteria for approving the LOA Renewal?
As per Rule 19(6B) of the SEZ Rules, the process of LOA Renewal shall take
into account the status of the following criteria, namely,
a) Export performance of the Unit in the completed block of 05 years.
b) Employment generated.
c) Instance of violation of applicable statutes related to the functioning of
the Unit.
d) Cases of default, if any, of statutory payments.
e) Undertaking of any activity not sanctioned (or) approved by the
Development Commissioner.
126. Will the LOA be renewed if the unit has violated any of the
above criteria?
Rule 19(6A) of the SEZ Rules provides for approving LOA Renewal for a further
05 years (or) for a shorter period. Any violations of the above criteria may attract
Page 44 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
monetary penalties along with LOA Renewal for a period shorter than 05 years period
(or) even cancellation of LOA under Section 16 of SEZ Act.
127. After submitting the ‘LOA Renewal’ request in the SEZ
portal, how will the unit know if the application is complete?
Once the unit has submitted the ‘LOA Renewal’ request in the SEZ Online portal,
any deficiencies/queries will be raised in the SEZ portal itself. The unit shall login to
the SEZ Online portal, access the ‘LOA Renewal’ request from the Inbox and find out
about the deficiencies/queries if any raised, from the Remarks History link of the
request. Once the ‘LOA Renewal’ request has been approved in the portal, the LOA
dates shall be automatically updated in the portal and Form-F2, will be issued in the
SEZ Online portal itself. The applicant unit may download the Form-F2 from the portal
from the SEZ Online ID of the ‘LOA Renewal’ request filed by them.
128. Should the unit submit the ‘LOA Renewal’ request in
physical/email mode also?
The ‘LOA Renewal’ request must be submitted only in the SEZ Online portal
and there is no need to submit the application through physical/email mode. The LOA
Renewal application sent over physical/email mode shall not be entertained for
processing/approval.
129. If the unit does not have access to the SEZ Online portal, how
should the LOA Renewal request be submitted?
If the unit does not have access to the SEZ Online portal, they may retrieve access
to the portal by contacting NSDL/NDML using the details available here (or) write to
abhisheka@ndml.in/aweinashj@ndml.in. The office of Administrator (IFSCA) accepts
applications only through the SEZ Online portal and not in physical/email mode.
Page 45 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
O. Exit
130. What is the further course of action available under SEZ
Rules for a unit that does not wish to continue their operations in
IFSC?
If a unit does not wish to continue operations as an IFSC unit; under the SEZ
Rules, the unit must apply for Exit. The unit cannot just let their LOA expire but has to
obtain a proper approval for Exit under Rule 74 of SEZ Rules.
131. What are the steps to be followed by a unit if they wish to
surrender the LOA (or) do not wish to start/continue operations in
their IFSC unit (or) exit from SEZ?
The unit must apply for Exit as provided under Rule 74 of SEZ Rules.
132. What are the documents to be submitted by the unit while
applying for Exit under Rule 74 of SEZ Rules?
The Unit must submit a cover letter requesting exit from GIFT-SEZ, along with
a duly executed Form-L which is provided in SEZ Rules. The format is also attached
herein as Annexure-E. Both these documents are required to be submitted in physical
form to the office of Administrator (IFSCA). The Unit shall also submit a ‘Free Form
- Final Exit from SEZ Scheme’ request on the SEZ Online portal and attach these
documents in the said request as supporting documents.
133. What is the process of approval of Exit under Rule 74 of SEZ
Rules?
(i) Upon receiving the cover letter and Form-L in physical form, the office of
Administrator (IFSCA) seeks no dues/no objection letters for the exit of the
unit from the Specified Officer GIFT-SEZ, the Developer M/s. GIFT
Company Limited, the Co-Developer concerned, and the IFSCA Regulatory
team. The exit under SEZ Rules is approved only after the unit ceases to be
regulated by IFSCA.
Page 46 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
(ii) On receipt of the no dues/no objection letters, the office of Administrator
(IFSCA) shall process the application and, if satisfied, approve the exit. A
letter approving final exit is sent to the unit by email and the “Free Form -
Final Exit from SEZ Scheme” request filed in the SEZ Online portal is also
approved so that the exit of the unit is reflected in the SEZ Online portal.
134. What are the actions to be taken by the unit after exit?
The unit must cease all operations in the IFSC/SEZ, and they effectively cease
to be an IFSC unit once the exit approval is issued. Under Rule 11 (5) of SEZ Rules,
the validity of the Lease Deed and the lease rights to the premises shall cease to exist
upon the expiry of the LOA. Thus, the Lease Deed executed by the unit shall cease to
be valid on approval of the exit. The unit must also exit the premises on which the LOA
was issued and must initiate proceedings for cancellation of the Lease Deed.
135. A unit had obtained SEZ LOA and IFSCA approval but is
unable to (or) does not commence their business operations. It
surrenders the IFSCA approval and obtains Exit from SEZ.
Subsequently, it wishes to obtain IFSCA Licence under same (or)
different regulations after first exit. For this, the unit enters into a
mutual understanding with the Co-Developer to continue to pay
rent to their premises even after Exit, and the Co-Developer has
agreed to issue PLOA in the same address to the unit for new
activity.
In this scenario, can a unit continue to occupy their premises even
after the Exit is approved so that they may obtain new LOA in the
same premises after some time?
No, the unit must vacate the premises and not continue to occupy the premises
after the exit approval is issued. Under Rule 11 (5) of SEZ Rules, the validity of the
Lease Deed and the lease rights to the premises shall cease to exist upon the expiry of
the LOA. Hence, the Lease Deed executed by the unit before exit shall cease to be valid
on approval of the exit.
Page 47 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
136. Can a unit continue to occupy their premises even after the
Exit Approval, since they wish to obtain IFSCA Licence in the near
future and have already registered a long-term Lease Deed for the
premises?
No, the unit must vacate the premises and not continue to occupy the premises
after the exit approval is issued. Under Rule 11 (5) of SEZ Rules, the validity of the
Lease Deed and the lease rights to the premises shall stand voided upon the expiry of
the LOA. Hence, the Lease Deed executed by the unit before exit shall cease to be valid
on approval of the exit.
P. Miscellaneous
137. What are the steps required to be followed after obtaining
LOA?
The unit is required to make the necessary payments for SEZ Online portal to
activate their SEZ portal access, including any AMC fees that is required. The unit is
also required to apply to the office of DC, GIFT-SEZ for SEZ ID cards for their
employees.
138. If there are any issues with the SEZ Online portal, how can
the unit resolve them?
The unit may contact NSDL/NDML using the details available here (or) write to
abhisheka@ndml.in/aweinashj@ndml.in.
139. What are the common reasons due to which a unit may lose
access to the SEZ Online portal?
A unit may lose access to the SEZ Online portal if it-
a) Does not update their GSTIN in the SEZ portal
b) Does not pay their registration fees/AMC fees for access to SEZ Online
portal
Page 48 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
For such issues, the unit may contact NSDL/NDML using the details available here (or)
write to abhisheka@ndml.in/aweinashj@ndml.in.
140. What are some common issues to be noted by the unit while
using SEZ Online portal?
The units must
a) Timely check their SEZ portal Inbox to find the updated status of the requests
filed by them
b) The SEZ portal allows for submission of only one pdf. Hence, while
submitting any request, the unit shall merge all their new and old submissions
into a single pdf and submit on the SEZ Online portal.
c) The unit has multiple levels of user – Maker, Checker and Approver – to
ensure data integrity at the time of submission by the unit. It has been
observed many times that the unit sends a request from their Maker ID to
their Approver ID and assume that the request has been submitted to the
Administrator (IFSCA). Any request filed by the unit must be finally
submitted from their Approver ID so that the same is reflected in the menu of
Administrator (IFSCA) for further processing.
141. While submitting any application in the SEZ Online portal,
the unit receives an error message stating ‘Could not establish
elock connection.’ How should this error be resolved?
The unit must download and install the ‘E-Lock Super Signer tool’ under the
‘Manual and File Format’ section available here in the SEZ Online website. Once
installed, the unit must submit the application in the SEZ Online portal whilst running
the E-Lock software for successful submission of the application.
Page 49 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
Q. Registration-Cum-Membership Certificate (RCMC)
142. What is the Registration-Cum-Membership Certificate
(RCMC)?
As per Rule 2 (1) (zg) of SEZ Rules, the Registration-cum-Membership
Certificate (RCMC) means the membership certificate issued by Export Promotion
Council for Export Oriented Units and Special Economic Zones.
143. How can a unit obtain RCMC certificate?
To apply for an RCMC, the Unit can directly visit the DGFT website by clicking
the following link: https://www.dgft.gov.in/CP/?opt=e-rcmc
144. Is an RCMC certificate required for GIFT-IFSC units?
Yes. As per Rule 22 (1) (v) of SEZ Rules, an SEZ Unit must obtain a RCMC for
availing exemptions, drawbacks and concessions.
145. What are the steps to update the RCMC certificate in the
SEZ portal?
The list of units who have obtained RCMC is shared by EPCES periodically with
NSDL and the details are updated in the SEZ Online portal by NSDL from the backend.
The office of Administrator (IFSCA) is not involved in the process of issuing RCMC
(or) updating the same in the SEZ Online portal. The unit may contact NSDL/NDML
using the details available here (or) write to abhisheka@ndml.in/aweinashj@ndml.in
regarding any issues in updating their RCMC details in the SEZ Online portal.
Page 50 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
R. Annexure - A – Format of BLUT [Form-H]
Page 51 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
Page 52 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
Page 53 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
Page 54 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
S. Annexure - B – Format of APR [Form-I]
Page 55 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
Page 56 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
Page 57 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
Page 58 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
T. Annexure - C – Indicative List of Documents for Proof
of Commencement
S. Business Date of
Documents showing proof of Commencement
No. Vertical Commencement
1. Management Fees Invoice raised to the Fund Date of
2. Bank statement evidencing payment against the Management Fees
1. Fund
Management invoice Invoice raised to
Entity 3. IFSCA Registration Certificate the Fund
4. Registered Lease Deed of FME
1. Contribution Agreement (with proper date)
signed with Investor Date of
2. Bank Statement showing receipt of investment Contribution
2. Fund
based on the said Contribution Agreement Agreement signed
3. Letter of Acknowledgement issued by IFSCA with Investor
4. Registered Lease Deed of Fund
1. Letter from the Exchange showing proof of First
Trade executed by the Broker Dealer
2. In case of Global Access – Agreement signed
with the foreign Securities broker and letter from
3. Broker Dealer Date of First Trade
the foreign Securities broker communicating the
Date of First Trade
3. IFSCA Registration Certificate
4. Registered Lease Deed
Page 59 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
1. Lease Agreement for leasing-in the aircraft
2. Invoice raised by Lessor to IFSC unit for leasing-
in the aircraft
3. Bill of Entry filed by IFSC unit for import of the
Date of Bill of
Aircraft from Lessor through any designated port
Entry filed by
4. DGCA NOC for the aircraft
IFSC unit for
Aircraft
4. 5. Lease Agreement for leasing-out the aircraft
Leasing import of the
6. Invoice raised by IFSC unit to Lessee for leasing-
Aircraft from
out the aircraft
Lessor
7. Bill of Entry/Shipping Bill filed by IFSC
unit/Lessee for Leasing-out of the Aircraft
8. IFSCA Registration Certificate
9. Registered Lease Deed
1. Lease Agreement for leasing-in the ship
2. Invoice raised by Lessor to IFSC unit for leasing-
in the ship
Date of Bill of
3. Bill of Entry filed by IFSC unit for import of the
Entry filed by
Ship from Lessor at any designated port
IFSC unit for
4. Lease Agreement for leasing-out the ship
5. Ship Leasing
import of the Ship
5. Invoice raised by IFSC unit to Lessee for leasing-
from Lessor
out the ship
6. Bill of Entry/Shipping Bill filed by IFSC
unit/Lessee for leasing-out the ship
7. IFSCA Registration Certificate
8. Registered Lease Deed
1. Proof of first transaction – disbursal of loan,
account opening, etc.
2. Agreement signed with client, if any, for Date of first
6. IBU
disbursal of loan transaction
3. IFSCA Registration Certificate
4. Registered Lease Deed
1. First Invoice raised by the unit to their client
Date of first
7. IIO 2. Policy Certificate/Document issued to their
invoice
client
Page 60 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
3. Bank statement evidencing payment against the
invoice
4. IFSCA Registration Certificate
5. Registered Lease Deed
1. First Invoice raised by the unit to their client
2. Service Agreement signed with their client
3. Bank statement evidencing payment against the Date of first
Ancillary/BA
8.
TF Unit invoice invoice
4. IFSCA Registration Certificate
5. Registered Lease Deed
1. First Invoice raised by the unit to their client
2. Agreement signed with their client
3. Bank statement evidencing payment against the
Date of first
FinTech/Tech
9. invoice
Fin Entity invoice
4. IFSCA Letter of Authorization as
FinTech/TechFin Entity
5. Registered Lease Deed
1. First Invoice raised by the unit to their parent
office
2. Bank statement evidencing payment against the
Global
invoice Date of first
Administrativ
10.
3. Service Level Agreement signed with the parent invoice
e Office
office
4. IFSCA Registration Certificate
5. Registered Lease Deed
1. First Invoice raised to student for
admission/receipt of fees
2. Offer Letter/Admission Letter issued to the Date of first
11. University student for said fees invoice raised to
3. Bank statement evidencing payment of fees by the student
the student
4. Registered Lease Deed
Page 61 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
1. Disbursement Advice issued by the Unit to their
client
2. SWIFT Transaction regarding the above-stated
Date of
disbursement made to their client
Factoring and
12. Disbursement
Forfaiting 3. Bank statement showing receipt of money from
Advice
the other party
4. IFSCA Registration Certificate
5. Registered Lease Deed
1. Facility Agreement signed with Borrower
2. Bank statement evidencing disbursal against the
Global
Date of
13. Treasury Facility Agreement
Disbursement
Centre 3. IFSCA Registration Certificate
4. Registered Lease Deed
Page 62 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
U. Annexure - D – Format of Form-F1
Page 63 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
Page 64 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
V. Annexure - E – Format of Form-L
Page 65 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
Page 66 of 67SEZ Compliance FAQ Booklet (v 1.1), June 2025
March 2025
2nd and 3rd floor, Savvy Pragya,
Gujarat International Finance Tec-City,
Scan QR code to
Gujarat 382355
Download
Page 67 of 67
www.ifsca.gov.in