Home India Part III-Section 2 TAMIL NADU POLLUTION CONTROL BOARD, CHENNAI - Amendments to ...
Date: 2018-02-28 Category: Not Applicable State: Tamil Nadu Country: India

TAMIL NADU POLLUTION CONTROL BOARD, CHENNAI - Amendments to the Tamil Nadu Pollution Control Board General Subordinate Service Regulations in Part II of the Tamil Nadu Pollution Control Board Revised Service Regulations, 2010

Issued by Part III-Section 2 · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** This document from the Tamil Nadu Government Gazette, dated March 1, 2017, notifies the public about the energization of overhead equipment (OHE) on a newly laid track of the Southern Railway. The section is part of the doubling between Manaparai and Tamaraipadi stations. The notification includes warnings to road users about height restrictions due to the new electrical traction system. **Key Points / Main Content** * **Energization of Overhead Equipment (OHE)** * The OHE is energized on the newly laid track as part of doubling between Manaparai and Tamaraipadi Stations. * The energized section spans from OHE Mast Location No. 377/13 (km/ch: 377/189.00) to OHE Mast Location No. 423/30 (km/ch: 423/923.30). * The system operates at 25KV, 50 Hz, AC single-phase. * The energized section is located in the Manaparai - Dindigul Section within the Madurai Division of Southern Railway. * The date for energization is specified as 01-12-2016. * **Public Safety Warning** * The overhead traction line is considered "LIVE" at all times after the specified date. * Unauthorized personnel are prohibited from approaching or working near the overhead line. * **Warning to Road Users** * Height gauges have been installed at all level crossings along the Manaparai - Dindigul Junction Section. * The clear height at level crossings is 4.67 meters above road level. * Road users must ensure that vehicle loads do not exceed the specified height to avoid contact with live traction wires. * Dangers of excessive height loads include: * Damage to height gauges, obstructing the road and railway line. * Damage to materials or the vehicle itself. * Risk of fire due to contact with conductors. **Impact Analysis** **Railway Users** *Impact:* The energized OHE system affects railway operations and safety in the specified section of the Southern Railway. *Action Required:* Ensure adherence to safety protocols and awareness of the "LIVE" overhead traction line. **Road Users** *Impact:* Road users, especially those operating vehicles with high loads, are affected by the height restrictions at level crossings. *Action Required:* Observe the specified height limit of 4.67 meters at level crossings to prevent accidents and damage. **Local Communities** *Impact:* Potentially impacted due to safety regulations and warnings associated with the electrical system. *Action Required:* Be aware of safety protocols. Avoid trespassing near railways.

Key Entities Referenced

Indian Railways: The railway operator undertaking energization work. Southern Railway: A zonal railway of Indian Railways in Chennai, executing the energization project. Tamil Nadu Government Gazette: Official state government publication carrying notifications. Chennai: Location of Southern Railway headquarters and place of publication. Manaparai - Dindigul Section: The railway section where overhead equipment is being energized.
Official Source Record View Original Source →
See Full Document Text
© [Regd. No. TN/CCN/467/2012-14. GOVERNMENT OF TAMIL NADU [R. Dis. No. 197/2009. 2017 [Price : Re. 0.80 Paise..... TAMIL NADU GOVERNMENT GAZETTE PUBLISHED BY AUTHORITY No. 9] CHENNAI, WEDNESDAY, MARCH 1, 2017 Maasi 17, Thunmugi, Thiruvalluvar Aandu–2048 Part III—Section 2 Statutory Notifications and Orders issued by Heads of Departments. NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC. CONTENTS Pages. \ INDIAN RAILWAYS Energisation of Overhead Equipment on the newly laid track, as part of doubling between Manaparai and Tamaraipadi Stations, from OHE Mast Location No. 377/13 (km/ch: 377/189.00) to OHE Mast Location No. 423/30 (km/ch:423/923.30) at 25KV, 50 Hz, ac single phase system on Manaparai - Dindugul Section in Madurai Division of Southern Railway .. .. .. 14 DTP—III-2 (9) [ 13 ]14 TAMIL NADU GOVERNMENT GAZETTE [Part III—Sec. 2 NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC. INDIAN RAILWAYS Energisation of Overhead Equipment on the newly laid track, as part of doubling between Manaparai and Tamaraipadi Stations, from OHE Mast Location No. 377/13 (km/ch: 377/189.00) to OHE Mast Location No. 423/30 (km/ch:423/923.30) at 25KV, 50 Hz, ac single phase system on Manaparai - Dindugul Section in Madurai Division of Southern Railway. (No. RVNL/MAS/Elec/X/1) Proforma 10-01 “PUBLIC NOTIFICATION” No. SRO C-3/2017. Notice is hereby given to all users of Railway lines and premises situated on the completed section of the under-noted section of the Southern Railway that the 25000 Volt. 50 Hz, ac, single phase overhead traction wires will be energised on or after the date specified against the Section. On and from the same date the overhead traction line shall be treated as ”LIVE” at all times and no unauthorised person shall approach or work in the proximity of the said overhead line. Section Date Energisation of Overhead Equipment on the newly laid track, as part of doubling between Manaparai and Tamaraipadi Stations, from OHE Mast Location No.377/13 (km/ch:377/189.00) to OHE Mast Location No.423/30 01-12-2016 (km/ch:423/923.30) at 25 KV, 50 Hz, ac single phase system on the Manaparai - Dindigul Junction Section in Madurai Division of Southern Railway. Chennai-600 008, P.K. SELVAN, 22nd February 2017. Deputy Chief Electrical Engineer/OHE, for Chief Electrical Engineer/Construction, Southern Railway, Chennai Egmore. (No. RVNL/MAS/Elec/X/1) INTRODUCTION OF ac 25 kV TRACTION Proforma 10-02 "WARNING TO ROAD USERS". No. SRO C-4/2017. It is notified for information of the public that in connection with introduction of 25 KV ac electric traction on the newly laid track, as part of doubling between Manaparai and Tamaraipadi Stations, from OHE Mast Location No.377/13 (km/ch:377/189.00) to OHE Mast Location No.423/30 (km/ch:423/923.30) at 25 KV, Hz, ac single phase system on Manaparai - Dindigul Junction Section in Madurai Division of Southern Railway, height gauges have been erected at all the level crossings with clear height of 4.67 m above road level with a view to prevent loads of excessive height from coming into contact or dangerous proximity to live traction wires. Public are hereby notified to observe the height specified above for the purpose of loading vehicles and to see that the loads carried in road vehicles do not infringe the height gauges under any circumstances. The dangers of a load of excessive height are as follows: (i) Danger to the height gauge and consequent obstruction to the road as well as the railway line. (ii) Danger to the materials or equipment carried or for the vehicle itself. (iii) Danger of fire and risk of line due to contact with or dangerous proximity to the conductors. P.K. SELVAN, No. E. 320/RVNL/CRS Deputy Chief Electrical Engineer/OHE, Chennai-600 008, for Chief Electrical Engineer/Construction, 22nd February 2017. Southern Railway, Chennai Egmore. PRINTED AND PUBLISHED BYTHE DIRECTOR OF STATIONERY AND PRINTING, CHENNAI ON BEHALF OF THE GOVERNMENT OF TAMIL NADU

Continue your research