Executive Summary & Key Takeaways

**Executive Summary** This document is an official notification from the Government of Tamil Nadu, specifically from the Tamil Nadu Transmission Corporation Limited (TANTRANSCO). It details the sanctioning of transmission line erections to meet increasing power demands. The document also specifies that individuals can make representations regarding the scheme within one month of publication, while in another section it specifies a two-month period. **Key Points / Main Content** *New Transmission Line Projects Sanctioned:* * TANTRANSCO has approved the erection of several new transmission lines to transmit and distribute power. * The works will be taken up shortly to meet additional power demands. * 15 such projects in chennai have been sanctioned * 32 such projects in Madurai have been sanctioned *Chennai Projects - Main Provisions:* * Erection/conversion of 110 KV DC/SC lines and towers with Panther/Leopard conductors. * Making LILO (Line In Line Out) arrangements at various substations. * Stringing of ACSR Panther Conductor. * Various routes are specified for each transmission line, along with the route length in kilometers. * Administrative approval details are provided, including B.P. No. and the scheme cost in Lakhs. * One-month Representation Period: Interested parties may make representations regarding the scheme within one month of publication. *Madurai Projects - Main Provisions:* * Addition of numerous double-circuit power lines between existing electrical facilities * Installation of Hexa Zebara transmission lines between an already approved Koimbatore electrical sub facility and another electrical sub facility * Two-month Representation Period: Interested parties may make representations regarding the scheme within two months of publication. **Impact Analysis** **Stakeholder: TANTRANSCO** *Impact*: Responsible for executing the sanctioned transmission line projects to enhance power transmission and distribution. *Action Required*: Initiate the erection of the transmission lines as per the specified routes, materials, and administrative approvals. **Stakeholder: Public / Consumers** *Impact*: Benefit from improved power supply and reliability due to the expansion of the transmission network. *Action Required*: Review the proposed transmission line routes and make representations to the authorities within one/two month of the publication (depending on which project is being viewed) if there are any concerns or objections. **Stakeholder: Government of Tamil Nadu** *Impact*: Oversees the implementation of the power infrastructure development projects, contributing to the state's energy security and economic growth. *Action Required*: Ensure timely approvals and support for TANTRANSCO in the execution of the transmission line projects.

Key Entities Referenced

Tamil Nadu Transmission Corporation Limited (TANTRANSCO): The state-owned power transmission utility in Tamil Nadu, responsible for erection of transmission lines to transmit and distribute power. Tamil Nadu Government Gazette: Official publication used for notifications by government bodies and public sector undertakings in Tamil Nadu. Electricity Act, 2003: Referenced as the legal basis for affected individuals to make representations about the schemes. Chennai: Location of General Construction Circle-I, a division of TANTRANSCO, where some of the projects are based.
Official Source Record View Original Source →
See Full Document Text
© [Regd. No. TN/CCN/467/2012-14. GOVERNMENT OF TAMIL NADU [R. Dis. No. 197/2009. 2018 [Price : Rs. 4.80 Paise. TAMIL NADU GOVERNMENT GAZETTE PUBLISHED BY AUTHORITY No. 32] CHENNAI, WEDNESDAY, AUGUST 8, 2018 Aadi 23, Vilambi, Thiruvalluvar Aandu–2049 Part VI—Section 3(b) Notifications issued by Quasi - Government bodies and Public Sector undertakings. NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC. CONTENTS Pages. TAMIL NADU TRANSMISSION CORPORATION LIMITED General Construction Circle-I, Chennai - Erection of Transmission Lines .. 72-78 îI›ï£´ I¡ ªî£ìó¬ñй‚ èöè‹ ªð£¶ G˜ñ£í õ†ì‹, ñ¶¬ó .. .. .. .. .. 79-82 DTP—VI-3(b) (32) [ 71 ]7 2 TAMIL NADU GOVE RNMENT GAZETTE [Part VI—Sec.3(b) NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC. TAMIL NADU TRANSMISSION CORPORATION LIMITED GENERAL CONSTRUCTION CIRCLE-I, CHENNAI Erection of Transmission Lines (Lr.No.SE/GCC-I/CNI/AEE/Gen./CHD./F. /Notifi cation/D.1336/18.) No.VI-3(b)/31/2018.— TAN TRANSCO has sanctioned for erection of the following Transmission Lines to Transmit and Distribute Power so as to meetout additional demands. The work will be takenup shortly. Sl. Name of The Transmission Route Route Administative Approval No. Line Length in Km. B.P. No. Scheme Cost in Lakhs (1) (2) (3) (4) (5) (6) 1 Erection of 110KV DC Line Siruvadi, Kodipakkam, 14.434 (Per)CH 2087.17 Lakhs on DC Towers with Panther Asappur, Chettiar Palayam, Km. TANTRANSCO Gross & Nett. Conductor by Making LILO Alathur, Murumparam, Proceedings in 110KV. Achrapakkam – Kurumparam, Kanthadu, No. 196 Murukkeri Feeder at Proposed Kulathur, Adavallikuttan, Dt.10-11-2016 Marakkanam 110/33/11KV. Aminjikarai, Konavayan SS (UG) Kuppam, Ekkiar Kuppam, Naravakkom, Vidapakkam, Vilambattu, Adasal, Nadukuppam, Tirukanur, Pudukuppam, Devikulam, Agaram, Marakkanam. 2 Conversion of 110 KV. Manavalanagar, Ondikuppam, 4.20 (Per)CH Rs.251.05 Thiruvallur - Kakkalur Sc Line Vengathur. Kms. TANTRANSCO Lakhs on Sc. Towers with Leopard Proceedings Gross & Conductor into SC. Line On DC. No. 11 Rs.176.74 Towers With Panther Conductor. Dt. 08-01-2018 Lakhs Nett. 3 Erection of 110 KV. DC Line Thirumizahi, 1.110 (Per)FB 1138.88 Lakhs on DC. Towers with Panther Chembarambakkam Km. TANTRANSCO Gross & Nett Conductor by Making LILO Proceedings of the Existing 110 KV. No. 43 Sriperumbudur - Thiruverkadu Dt. 30-08-2017 Feeder 11 at the proposed SIDCO Chembarambakkam 110/11 KV. SS. 4 Erection of 110 KV. DC. Line Mambakkam, Kandigai 1.250 (Per)CH 899.04 Lakhs on DC. towers with Panther Km. TANTRANSCO Gross & Nett Conductor by Making LILO Proceedings of The Existing 110 KV. No. 310 Sriperumbudur – S.V. Chathiram Dt. 26-12-2017 Feeder at the Proposed Eta Star Mambakkam 110/11 KV. SS.Aug. 8, 2018] TAMIL NADU GOVERNMENT GAZETTE 73 Sl. Name of The Transmission Route Route Administative Approval No. Line Length in Km. B.P. No. Scheme Cost in Lakhs (1) (2) (3) (4) (5) (6) 5 Erection of 110KV. DC. Line Indalur, Kaavakkadu, 7.00 (Per)CH 1131.74 Lakhs on DC. Towers with Panther Kolathur, Kolathur Lake, Kms. TANTRANSCO Gross & Nett Conductor by Making LILO Puthamangalam, Arappedu, Proceedings in 110KV. Achrapakkam – Thozhuppedu No. 47 Murukkeri Feeder at proposed Dt. 30-08-2017. Indalur 110/11KV. SS. 6 Erection of 110KV. DC. Nedungundrum, 16.00 (Per)CH 1778.82 Lakhs Line on DC. Towers with Nedungundrum Lake, Kms. TANTRANSCO Gross & Nett Panther Conductor by Making Puthur, Mappedu, Proceedings LILO in 110KV. S.P.Koil – Mappedu Lake, Thirumalai No.314 Siruseri Feeder at Proposed Nagar, Pudhuvancheri, Dt. 28-12-2017. Nedugundram 110/11KV. SS. Madambakkam, Agram, Sathaya Nagar 7 Erection of 110 KV. SC. Line Veerapuram 1.00 on DC. Towers with Panther Kms. Conductor from take off point of Verapuram up to the Sanctioned 110 KV. Line of ENT Service to HLL and Delinking the Existing Line towards Verapuram 230 KV. SS. 8 Stringing of Second Circuit With Veerapuram Lake, 20.00 (Per)CH 1065.49 Lakhs Panther Conductor on the Free Malayampakkam, Kms. TANTRANSCO Gross & Nett Arm of the Sanctioned 110 KV. Anumanthai, Kolavai Lake, Proceedings Veerapuram – HLL Feeder With Ammanampakkam, Vallam, No. 291 SC. Line on DC. Towers. Vallam Lake, Pethel Nagar, Dt. 25-11-2017. Santhi Nagar, Navithar Nagar, Kaali Nagar 9 Erection of 110 KV. DC. Line Thirumani 1.00 on DC. Towers with Panther Kms. (Per)CH Conductor to terminate the TANTRANSCO 741.78 Lakhs above two lines at the proposed Proceedings Gross & Nett Thirumani 110/11 KV. SS. No. 292 Dt. 27-11-2017. 10 Erection of 110KV. DC. Line Veerapuram 0.75 on DC. Towers with Panther Kms. Conductor by Making LILO in 110KV. Veerapuram – S.P.Koil - II Feeder at proposed Veerapuram 110/11KV. SS. (U.G. From 33/11 -110/11 KV).7 4 TAMIL NADU GOVE RNMENT GAZETTE [Part VI—Sec.3(b) Sl. Name of The Transmission Route Route Administative Approval No. Line Length in Km. B.P. No. Scheme Cost in Lakhs (1) (2) (3) (4) (5) (6) 11 Erection of 110 KV. DC. Sittampoondi, Mavattampadi, 6.00 (Per)CH Gross & Nett- Tower with Pather Conductor Kadagampundi Kms. TANTRANSCO Rs.1020.91 by Making LILO in 110 KV. Proceedings Lakhs Villupuram - Thayanur - Echur No. 52 Feeder at the proposed Dt.25-02-2017 Sittampoondi 110 KV. SS. 12 Erection of Tower, Stringing of 6 Nandimangalam, Karapettu 1.50 (Per)FB Rs.722.77 Nos. ACSR Panther Conductor Kms. TANTRANSCO Lakhs Gross & with 1 No 7/3.55Mm. GI Earth Proceedings Rs.708.34 Wire from Loc.121 to 124 of No. 17, Lakhs Nett LILO off Existing Singarapet Dt. 04-04-2017 - Arani 110 KV. Feeder I at Proposed Karapet 110/33 KV. SS. 13 Replacement of Aged Dog Chengam,Quilam, 92.54 (Per)CH Rs.6595.42 Conductor with Panther Munnurmangalam, Kms. TANTRANSCO Lakhs Gross & Conductor in the 110 KV Pudupalayam, Proceedings Rs.4187.44 Singaraper - Arni I & II Feeder Nandimangalam, Panaiolapadi, No. 206, Lakhs Nett in Dounble Circuit Line From Karapattu, Pudupattu, Dt. 17-11-2014 Loc.70 to 296. Melpalur, Korattaampattur, Kilpalur, Kanji, Singaravadi, Kadaladi, Arunagirimangalam, Parvathamalai RF, Mampakkam, Thamaraipakkam, Thenmathimangalam, Mathimangalam, Sholavaram, Banambut, Eranamangalam, Koilmathimangalam, Villvarani, Elathur, Vanniyanur, Kappalur, Kangeyanoorkuppam, Kangeyanoorcolony, Pudupalayam, Vasur, Link Road Polur, Polur, Venmani, Selvampettai, Pappampadi, Kunnathur, Murugapadi, Ettivadi, Karikathur, Alampoondi, Othiyanthangal, Vadamathi Mangalam, Kilpattu, Kasthambady, Mukkurumbai, Enduvambady, Pulavanbadi, Pungambadi, Vadugasathu, ArniAug. 8, 2018] TAMIL NADU GOVERNMENT GAZETTE 75 Sl. Name of The Transmission Route Route Administative Approval No. Line Length in Km. B.P. No. Scheme Cost in Lakhs (1) (2) (3) (4) (5) (6) 14 Erection of Tower, Stringing of 6 Thachampattu, Periyakooapadi, 14.00 (Per)CH Rs.1752.26 Nos. ACSR Panther Conductor Chinnakallapadi, Veriyur, Kms. TANTRANSCO Lakhs Gross with 1 No. Earth wire for LILO Uraiyur, Thirukalau valavetti, Proceedings & Rs.1681.55 of Existing Thiruvannamalai - Su.valavetti, Thiruvanaimugam, No.145, Lakhs Nett Villupuram 110 KV. Feeder- I Andampallam, Thandari, Dt. 17-11-2014 at Proposed Thatchampattu Issukazhi Katteri, Annandal, 110/33 KV. SS. Pannaiynur, Anganam, Kilkaripur, Kallanai, Olaipadi, Aavur, Nariyaur, Sorathur, Agaram. 15 Replacement of SC. Line Vengikkal, Sananandal, 61.00 (Per)CH Rs.4856.80 on SC. Tower with Leopard Vaniyanthangal, Kilnatchipattu, Kms. TANTRANSCO Lakhs Gross Conductor by 110 KV. DC. Line Pallikondapattu, Proceedings & Rs.4734.25 on DC. Tower with Panther Nallanpillaipetral, Sorpanandal, No.313, Lakhs Nett Conductor from Thiruvannamalai Kalinagaleri, Arumpakkam, Dt. 28-12-2017 - Villupuram 110 KV. SS. Suriyanthangal, Konalur, Vellakulam, Pudur, Sanipondi, Rajanthangal, Illupanthangal, Avoor, Periyaolaipadi, Kallayisorathur, Viranglipuram, Kandachipuram, Madavilagam, Melvalai, Vaduvankuppam, Kaniyampattu, Chelankuppam, Agramchithamur, Venganthur, Arasankuppam, Cholaganur, Cholampundi, Tiruvamathur, Muttiyalupettai, Ayanampalaiyam, Shanantoppur, Ichchengadu, Villupuram Any person interested may make representation on the above scheme within 01 (One) month from the date of issue of the publication to the undersigned as per the Electricity Act. 2003. Chennai-600 032, ER. R. JEEVAN, 31st July 2018. Superintending Engineer, General Construction Circle - I.7 6 TAMIL NADU GOVE RNMENT GAZETTE [Part VI—Sec.3(b) îîII››ï´´ II¡¡ ªªîììóó¬¬ññŠŠ¹¹‚‚ èèööèè‹‹ LLIIªªì솆.. ªªð𣣶¶ è膆´´ññ££ùù õõ††ìì‹‹ -- I ªªêê¡¡¬¬ùù ÜÜPPMM‚‚¬¬èè (Lr.No.SE/GCC-I/CNI/AEE/Gen/CHD/F. /Notifi cation/D.1336/18.) TAN TRANSCO has sanctioned for erection of the following Transmission Lines to Transmit and Distribute Power so as to meetout additional demands. The work will be takenup shortly. Sl. Name of the Transmission Line Route Route Administative Approval No. Length in Km. B.P. No. Scheme Cost in lakhs (1) (2) (3) (4) (5) (6) 1 Ü„êóŠð£‚è‹-º¼‚«èK 110 A.«õ£ C¼õ£®, ªè£®ð£‚è‹, ÜêŠÌ˜, 14.434 Km. (Per) CH 2087.17 I¡ ð£¬îJ™ Þ¼‰¶ ñó‚è£í‹ ªê†®ò£˜ ð£öò‹, ÝôˆÉ˜, TANTRANSCO Lakhs Gross 110/33/11 A.«õ£ ¶¬í I¡ G¬ôò‹ º¼‹ðó‹, °¼‹ðó‹, è‰î£´, Proceedings & Nett («ñ‹ð´ˆ¶î™) õ¬ó Þó†¬ì ²ŸÁ °÷ˆÉ˜, Ýìõ™L°ˆî£¡, No. 196 Þó†¬ì «è£¹ó àò˜Ü¿ˆî I¡ð£¬î ÜI…Cè¬ó, «è£ùõ£ò¡ Dt.10-11-2016 ܬñ‚°‹ ðE. °Šð‹, â‚A˜ °Šð‹, ïóõ‚«è£‹, MìŠð£‚è‹, Mô‹ð†´, Üìê™, ï´°Šð‹, F¼‚è˜, ¹¶°Šð‹, «îM°÷‹, Üèó‹, ñó‚è£í‹. 2 F¼õœÙ˜-裂èÙ˜ 110 A.«õ£ ñíõ£÷ïè˜, 凮‚°Šð‹, 4.20 K.ms. (Per) CH Rs.251.05 埬ø ²ŸÁ 埬ø «è£¹ó I¡ ªõƒèˆÉ˜, ¹†Ö˜, 裂èÙ˜. TANTRANSCO Lakhs ð£¬î¬ò Þó†¬ì ²ŸÁ Þó†¬ì Proceedings Gross & «è£¹ó àò˜Ü¿ˆî I¡ð£¬îò£è No. 11 Rs.176.74 ñ£ŸP ܬñ‚°‹ ðE. Dt. 08-01-2018 Lakhs Nett. 3 F¼ªð¼‹¹É˜ - F¼«õŸè£´ - II F¼ñN¬ê, ªê‹ðó‹ð£‚è‹. 1.110 Km. (Per) FB 1138.88 110 A. «õ£ I¡ ð£¬îJ™ Þ¼‰¶ TANTRANSCO Lakhs Gross C†«è£ ªê‹ðó‹ð£‚è‹ 110/11 A.«õ£ Proceedings & Nett ¶¬í I¡ G¬ôò‹ õ¬ó Þó†¬ì No. 43 ²ŸÁ Þó†¬ì «è£¹ó àò˜Ü¿ˆî Dt. 30-08-2017 I¡ð£¬î ܬñ‚°‹ ðE. 4 F¼ªð¼‹¹É˜ - ²ƒ°õ£˜êˆFó‹ 110 ñ£‹ð£‚è‹, 臮¬è 1.250 Km. (Per) CH 899.04 A. «õ£ I¡ ð£¬îJ™ Þ¼‰¶ ETA TANTRANSCO Lakhs Gross v죘 ñ£‹ð£‚è‹ 110/11 A.«õ£ Proceedings & Nett ¶¬í I¡ G¬ôò‹ õ¬ó Þó†¬ì No. 310 ²ŸÁ, Þó†¬ì «è£¹ó àò˜Ü¿ˆî Dt. 26-12-2017 I¡ð£¬î ܬñ‚°‹ ðE. 5 Ü„êóŠð£‚è‹-º¼‚«èK 110 A.«õ£ Þ‰îÖ˜, è£õ‚裴, 7.00 K.ms. (Per) CH 1131.74 I¡ ð£¬îJ™ Þ¼‰¶ Þ‰îÙ˜ dì˜ ªè£÷ˆÉ˜, ªè£÷ˆÉ˜ TANTRANSCO Lakhs Gross 110/11 A.«õ£ ¶¬í I¡ G¬ôò‹ ãK, Ìîñƒèô‹, ÜóŠ«ð´, Proceedings & Nett õ¬ó Þó†¬ì ²ŸÁ, Þó†¬ì «è£¹ó ªî£¿Šªð´ No. 47 àò˜Ü¿ˆî I¡ð£¬î ܬñ‚°‹ ðE. Dt. 30-08-2017. 6 Cƒèªð¼ñ£œ«è£M™ - CÁ«êK 110 ªï´ƒ°¡ø‹, ªï´ƒ°¡ø‹ 16.00 (Per) CH 1778.82 A. «õ£ I¡ ð£¬îJ™ Þ¼‰¶ ãK, ¹É˜, ñŠ«ð´, ñŠ«ð´ K.ms. TANTRANSCO Lakhs Gross ªï´ƒ°¡ø‹ dì˜ 110/11 A.«õ£ ãK, F¼ñ¬ô ïè˜, ¹¶õ…«êK, Proceedings & Nett ¶¬í I¡ G¬ôò‹ õ¬ó Þó†¬ì ñ£ì‹ð£‚è‹, Üèó‹, êˆò£ No.314 ²ŸÁ, Þó†¬ì «è£¹ó àò˜Ü¿ˆî ïè˜ Dt. 28-12-2017. I¡ð£¬î ܬñ‚°‹ ðE.Aug. 8, 2018] TAMIL NADU GOVERNMENT GAZETTE 77 Sl. Name of the Transmission Line Route Route Administative Approval No. Length in Km. B.P. No. Scheme Cost in lakhs (1) (2) (3) (4) (5) (6) 7 ió£¹ó‹ 110 A.«õ£. I¡ G¬ôòˆF™ ió£¹ó‹ 1.00 Kms. Þ¼‰¶ HLL ¬ð«ò£ªì‚ EHT, àò˜Ü¿ˆî I¡ð£¬îò£è 埬ø ²ŸÁ 埬ø «è£¹ó I¡ ð£¬î¬ò Þó†¬ì ²ŸÁ Þó†¬ì «è£¹ó àò˜Ü¿ˆî I¡ð£¬î ܬñ‚°‹ ðE 8 ió£¹ó‹ 110 A.«õ£. I¡ G¬ôòˆF™ ió£¹ó‹ ãK, ñ¬ôò‹ð£‚è‹, 20.00 Kms. (Per) CH 1065.49 Þ¼‰¶ HLL ¬ð«ò£ªì‚ EHT, ÜÂñ‰¬î, ªè£ôõ£Œ ãK, TANTRANSCO Lakhs Gross àò˜Ü¿ˆî I¡ð£¬îò£è 埬ø ²ŸÁ Ü‹ñù‹ð£‚è‹, õ™ô‹, õ™ô‹ Proceedings & Nett 埬ø «è£¹ó I¡ ð£¬î¬ò Þó†¬ì ãK, ªð«î™ ïè˜, ꣉F ïè˜, No. 291 ²ŸÁ Þó†¬ì «è£¹ó àò˜Ü¿ˆî ï£Mî˜ ïè˜, è£O ïè˜ Dt. 25-11-2017. I¡ð£¬î ܬñ‚°‹ ðE 9 F¼ñE 110 A.«õ£. I¡ ð£¬îJ™ F¼ñE 1.00 Kms. Þ¼‰¶ 110/11 A. «õ£ ¶¬í I¡ G¬ôò‹ õ¬ó Þó†¬ì ²ŸÁ, Þó†¬ì «è£¹ó àò˜Ü¿ˆî I¡ð£¬î ܬñ‚°‹ ðE. 10 ió£¹ó‹ - Cƒèªð¼ñ£œ«è£M™ ió£¹ó‹ 0.75 Kms. (Per) CH 741.78 110 A. «õ£ I¡ ð£¬îJ™ Þ¼‰¶ TANTRANSCO Lakhs Gross ió¹ó‹ II - dì˜ 110/11 A.«õ£. Proceedings & Nett ¶¬í I¡ G¬ôò‹ õ¬ó Þó†¬ì No. 292 ²ŸÁ, Þó†¬ì «è£¹ó àò˜Ü¿ˆî Dt. 27-11-2017. I¡ð£¬î ܬñ‚°‹ ðE. 11 M¿Š¹ó‹ - î£ò˜ - â„Ř 110 C†ì£‹Ì‡®, ñ£õ†ì‹ð£®, 6.00 Kms. (Per) CH Gross & A. «õ£ I¡ ð£¬îJ™ Þ¼‰¶ èìè‹Ì‡® TANTRANSCO Nett - Cˆî£‹Ì‡® 110 A.«õ£. ¶¬í Proceedings Rs.1020.91 I¡ G¬ôò‹ õ¬ó Þó†¬ì ²ŸÁ No. 52 Lakhs Þó†¬ì «è£¹ó àò˜Ü¿ˆî I¡ð£¬î Dt. 25-02-2017 ܬñ‚°‹ ðE. 12 Cƒè£óŠ«ð†¬ì - ÝóE I¡ ð£¬î ï‰Fñƒèô‹, è£óŠð†´ 1.50 Kms. (Per) FB Rs.722.77 1-Þ™ Þ¼‰¶ ê£óŠð†´ 110/33 TANTRANSCO Lakhs A.«õ£. ¶¬í I¡ G¬ôò‹ õ¬ó Proceedings Gross & I¡ð£¬î «è£¹ó îì‹ â‡. 121 No. 17, Rs.708.34 Þ™ Þ¼‰¶ 124 õ¬ó àò˜Ü¿ˆî Dt. 04-04-2017 Lakhs Nett I¡ð£¬î ܬñ‚°‹ ðE. 13 Cƒè£óŠ«ð†¬ì - ÝóE I & II ªêƒè‹, °Jô‹, º¡Â˜- 92.54 Kms. (Per) CH Rs.6595.42 110 A.«õ£. 埬ø ²ŸÁ, 埬ø ñƒèô‹, ¹¶Šð£¬÷ò‹, TANTRANSCO Lakhs «è£¹ó I¡ ð£¬î¬ò Þó†¬ì ï‰Fñƒèô‹, ð¬ùæ¬ôŠð£®, Proceedings Gross & ²ŸÁ Þó†¬ì «è£¹ó ð£¬î «è£¹ó è£óŠð†´, ¹¶Šð†´, No. 206, Rs.4187.44 â‡. 70™ Þ¼‰¶ 296 õ¬ó - «ñ™ð£Ö˜, ªè£ó†ì£‹ð†´, Dt. 17-11-2014 Lakhs Nett àò˜Ü¿ˆî I¡ð£¬î ܬñ‚°‹ ðE. W›ð£Ö˜, 装C, Cƒè£óõ£®, è ì ô £ ® , Ü ¼ í A K ñƒèô‹, ð˜õîñ¬ô 裊¹‚裴, ñ£‹ð£‚è‹, î£ñ¬óŠð£‚è‹, ªî¡ñ£F ñƒèô‹, ñ£Fñƒèô‹, «ê£öõó‹, ð£í£‹ð†´, â˜íñƒèô‹, «è£J™ ñ£Fñƒèô‹, M™õ£óE, âôˆÉ˜, õœOò˜, 裊ðÖ˜, 裃«èò˜ °Šð‹, 裃«èò˜ è£ôQ, ¹¶Š ð£¬÷ò‹, õŘ,7 8 TAMIL NADU GOVE RNMENT GAZETTE [Part VI—Sec.3(b) Sl. Name of the Transmission Line Route Route Administative Approval No. Length in Km. B.P. No. Scheme Cost in lakhs (1) (2) (3) (4) (5) (6) «ð£Ù˜ - õŘ ê‰Fй ꣬ô, «ð£Ù˜, ªõ‡ñE, ªê™õ‹«ð†¬ì, ð£Šð‹ð£®, °¡ùˆÉ˜, ºóè£ð£®, ↴õ£®, èK‚裈ɘ, Ýô‹Ì‡®, æFò‰î£ƒè™, õìñFñƒèô‹, W›ð†´, èvî‹ð£®, º‚°Á‹¬ð, ㉶õ£‹ð£®, ¹ôõ¡ ð£®, ¹ƒè‹ð£®, õ´è꣈¶, ÝóE. 14 F¼õ‡í£ñ¬ô-M¿Š¹ó‹ I I¡ î„ê‹ð†´, ªðKòè™ôŠð£®, 14.00 Kms (Per) CH Rs.1752.26 ð£¬î Þ¼‰¶ î„ê‹ð†´ 110/33 C¡ùè™ôŠð£®, ªõ¬øÎ˜, TANTRANSCO Lakhs A.«õ£. ¶¬í I¡ G¬ôò‹ õ¬ó à¬øÎ˜, F¼‚è£Ö˜ Proceedings Gross & Þó†¬ì ²ŸÁ Þó†¬ì «è£¹ó õ£÷ªõ†®, ².õ£÷ªõ†®, No.145, Rs.1681.55 àò˜Ü¿ˆî I¡ð£¬î ܬñ‚°‹ ðE. F¼õ£¬ùºè‹, ܇ì‹ðœ÷ñ, Dt.17-11-2014 Lakhs Nett î‡ì¬ó, Þ²‚èN裆«ìK, Ü¡ù‰î™, ð¬ùΘ, ܃°í‹, W›èKŠÌ˜, è™ô¬ù, æ¬ôŠð£®, Ýט, óΘ, ªê£óˆÉ˜, Üèó‹ 15 F¼õ‡í£ñ¬ô - M¿Š¹ó‹ 110 «õƒA‚裙, ê£í£ù‰î™, 61.00 Kms (Per) CH Rs.4856.80 A.«õ£. 埬ø ²ŸÁ 埬ø «è£¹ó, õ£Eò‰î£ƒè™, W›ï£„CŠ- TANTRANSCO Lakhs àò˜Ü¿ˆî I¡ð£¬î Þó†¬ì ²ŸÁ, ð†´, ðœOªè£‡ìŠð†´, Proceedings Gross & Þó†¬ì «è£¹ó àò˜Ü¿ˆî I¡ð£¬î ï™ô£¡Hœ¬÷ ªðŸø£œ, No.313, Rs.4734.25 ܬñ‚°‹ ðE. ªê£˜Šðù‰î™, èLƒè«ôK, Dt.28-12-2017 Lakhs Nett ܼ‹ð£‚è‹, ÅKò‰î£ƒè™, «è£íÖ˜, ªõœ÷°÷‹, ó£ü‰î£ƒè™, Þ½Šð‰î£ƒè™, Ýט, ªðKò æ¬ôŠ ð£®, è™ô£Jªê£óˆÉ˜, MóƒèL¹ó‹, è‡ì£„C¹ó‹, ñìM÷£è‹, «ñ™õ£¬ô, õ´õ¡°Šð‹, èQò‹ ð†´, ªê™ôƒ°Šð‹, Üèó‹Cˆî£Í˜, ªõƒè‰îɘ, ÜóꃰŠð‹, «ê£ôèÛ˜, «ê£ö‹Ì‡®, F¼õ£ñˆÉ˜, ºˆFò£½Š «ð†¬ì, Üòù‹ð£¬÷ò‹, ê£í£‰ «î£ŠÌ˜, ß„êƒè£´, M¿Š¹ó‹. «ñŸ°PŠH†ì ðEèœ °Pˆ¶ âõ«ó‹ º¬øf´èœ ªîKM‚è M¼‹Hù£™ Þ‰î ÜP‚¬è ªõOJìŠð†ì 01 (å¡Á) ñ£îˆFŸ°œ W«ö °PŠHìŠð†´œ÷ ÜFè£K‚° 2003-¡ ð® º¬øf´ ªêŒòô£‹ ªê¡¬ù-600 032, ER. R. JEEVAN, 2018 ü¨¬ô 31. «ñŸð£˜¬õ ªð£Pò£÷˜, ªð£¶ 膴ñ£ù õ†ì‹ - I.Aug. 8, 2018] TAMIL NADU GOVERNMENT GAZETTE 79 îîII››ï´´ II¡¡ ªªîììóó¬¬ññŠŠ¹¹‚‚ èèööèè‹‹ ªªð𣣶¶ GG˜˜ññ££íí õõ††ìì‹‹//ññ¶¶¬¬óó ÜÜPPMM‚‚¬¬èè (Lr.No. SE/GCC/MDU/AEE/MONI/D.No. 1065/2018.) No. VI-3(b)/32/2018. ,t;twpf;if nghJ kf;fspd; eyd; fUjp 2003-Mk; Mz;;bd; kpd;rhu rl;lk; gphpT 185-d; fPo; cl;gphpT (2) (a)-tpd;gb Vw;fdNt je;jp Jiwf;F töq;fg;gl;Ls;s mjpfhuj;jpd;gb kpd;rhuj;ij nfhz;L nry;y 2003-k; Mz;L kpd;rhu gphpT 164-d; fPo; thhpaj;jpw;F ,e;jpa kpd;rhu rl;lj;jpd; fPo; mDkjp töq;fpAs;sJ. jkpo;ehL khepyk;> kJiu> jpz;Lf;fy;> ,uhkehjGuk;> rptfq;if> Njdp> ehfh;Nfhtpy;> jpUney;Ntyp> J}j;Jf;Fb> tpUJefh; khtl;lq;fspd; ÃLjy; kpd;Rikia epiwT nra;tjw;fhf fPo;f;fz;l ,lq;fspy; Gjpjhf Jiz kpd; epiyak; mikf;fTk;> mtw;NwhL Nrh;e;j kpd;ghijfisAk; 2017-2018-Mk; Mz;L kw;Wk; tUk; 2018-2019 Mz;Lfspy; epWTtjw;F jkpo;ehL kpd;rhu thhpaj;jplk; mDkjp ngw;Wk; cs;sJ. t.vz; Jiz kpd;epiyak; kw;Wk; kpd;ghij kpd;ghij ePsk; kpd;ghij nkhj;j kjpg;gPL (yl;rj;jpy;) fp.kP. mOj;jk; (1) (2) (3) (4) (5) 1. Vw;fdNt cs;s nrk;gl;b - nuq;fehjGuk; 110 fp.«th. kpd; 96.16 110 fp.«th. 2386.67 ghij-3y; cs;s ghd;jh; kpd; flj;jpia fow;wp> Gjpjhf HTLS kpd; flj;jpia nghUj;jp kpd;ghij mikj;jy; 2. Vw;fdNt cs;s 110 fp.«th. xw;iwr; Rw;W kpd; NfhGuk; 0.20 110 fp.«th. 13.382 kw;Wk; kpd; ghijapid ,ul;ilr;Rw;W kpd; NfhGuk; kw;Wk; ,ul;ilr;Rw;W kpd; ghijahf khw;wp> mjpy; ghd;jh; kpd; flj;jpia nghUj;jp> ghiug;gl;b 110 fp.«th. Jiz kpd; epiyaj;jpy; ,Ue;J kpd; NfhGuk; vz;.12 tiu kpd;ghij mikj;jy; 3. Vw;fdNt cs;s 110 fp.«th. mDg;gq;Fsk; - jp.fy;Yg;gl;b 21.50 110 fp.«th. 1438.565 kpd; ghijapy; cs;s xw;iwr; Rw;W kpd; NfhGuk; kw;Wk; kpd; ghijapid ,ul;ilr;Rw;W kpd; NfhGuk; kw;Wk; ,ul;ilr;Rw;W kpd; ghijahf khw;wp> mjpy; ghd;jh; kpd; flj;jpia nghUj;jp> kpd; NfhGuk; vz; 19-y; ,Ue;J kpd; NfhGuk; vz;.95 kw;Wk; tiyagl;b 110 fp.Nth. Jiz kpd; epiyak; tiu kpd;ghij mikj;jy; 4. Vw;fdNt cs;s 110 fp.«th. mDg;gq;Fsk; - jp.fy;Yg;gl;b 9.00 110 fp.«th. 73.710 kpd; ghijapy; cs;s ,ul;ilr; Rw;W kpd; NfhGuj;jpy; cs;s xw;iwr;Rw;W kpd; ghijapid ,ul;ilr;Rw;W kpd; ghijahf khw;wp> mjpy; ghd;jh; kpd; flj;jpia nghUj;jp> kpd; NfhGuk; vz;.95 Kjy; kpd; NfhGuk; vz;.132 tiu kpd;ghij mikj;jy; 5. mDg;gq;Fsk; - jp.fy;Yg;gl;b Gjpjhf 110 fp.«th. ,ul;ilr;Rw;W 7.00 110 fp.«th. 410.270 kpd; NfhGuk; mikj;J kpd; NfhGuk; vz; 132-y; ,Ue;J xw;iwr; Rw;W kpd; ghijapy; ghd;jh; kpd; flj;jpia nghUj;jp> vhpr;rej;jk; 110 fp.Nth. Jiz kpd; epiyak; tiu kpd;ghij mikj;jy; 6. Gjpjhf mikaTs;s xl;lg;gplhuk; 400 fp.«th. Jiz kpd; 70.00 400 fp.«th. 29300.60 epiyaj;jpypUe;J cld;Fb ,af;f epiy (Udangudi Switch Yard) tiu 400 fp.«th. ,ul;ilr;Rw;W kpd; NfhGuj;jpy; f;thl;%]; kpd; flj;jpiaf; nfhz;L ,ul;ilr;Rw;W kpd;ghij mikj;jy;;;8 0 TAMIL NADU GOVE RNMENT GAZETTE [Part VI—Sec.3(b) t.vz; Jiz kpd;epiyak; kw;Wk; kpd;ghij kpd;ghij ePsk; kpd;ghij nkhj;j kjpg;gPL (yl;rj;jpy;) fp.kP. mOj;jk; (1) (2) (3) (4) (5) 7. Gjpjhf mikaTs;s xl;lg;gplhuk; 400 fp.«th. Jiz kpd; 75.00 400 fp.«th. 31393.50 epiyaj;jpypUe;J fKjp 400 fp.«th. Jiz kpd; epiyak; tiu 400 fp.«th. ,ul;ilr;Rw;W kpd; NfhGuj;jpy; f;thlÍ; ]; kpd; flj;jpiaf; nfhz;L ,ul;ilr;Rw;W kpd;ghij mikj;jy;;; 8. Gjpjhf mikaTs;s xl;lg;gplhuk; 400 fp.«th. Jiz kpd; 25.00 400 fp.«th. 5757.50 epiyaj;jpypUe;J SEPC IPP jdpahh; kpd; cw;gj;jp epiyak; tiu 400 fp.«th. ,ul;ilr;Rw;W kpd; NfhGuj;jpy; f;thlÍ; ]; kpd; flj;jpiaf; nfhz;L ,ul;ilr;Rw;W kpd;ghij mikj;jy;;; 9. Gjpjhf 400 fp.«th. ,ul;ilr;Rw;W kpd; NfhGuj;jpy; ,ul;ilr; 25.00 400 fp.«th. 5757.50 Rw;W kpd; ghijapy; f;thlÍ; ]; kpd; flj;jpiaf; nfhz;L Gjpjhf mikaTs;s xl;lg;gplhuk; 400 fp.«th. Jiz kpd; epiyaj;jpypUe;J njd;dk;gl;b 400 fp.«th. Jiz kpd; epiyak; tiu kpd; ghij mikj;jy; 10. J}j;Jf;Fb rpg;fhl; - fhtD}h; 230 fp.«th. xw;iwr;Rw;W 16.00 230 fp.«th. 1644.32 kpd; ghijapy; ,Ue;J Gjpjhf mikaTs;s xl;lg;gplhuk; 400 fp.«th. Jiz kpd; epiyaj;jpw;F csª; tsp kpd;ghij mikj;jy;;; 11. J}j;Jf;Fb rpg;fhl; - rthrhGuk; 230 fp.«th. xw;iwr; Rw;W 11.00 230 fp.«th. 1130.47 kpd; ghijapy; Gjpjhf mikaTs;s xl;lg;gplhuk; 400 fp.«th. Jiz kpd; epiyaj;jpw;F csntsp kpd;ghij mikj;jy;;; 12. Vw;fdNt cs;s 110 fp.«th. xl;lg;gplhuk; - vg«; ghJk; 5.00 110 fp.«th. 334.55 ntd;whd; xw;iwr;Rw;W kpd; ghijapy; Gjpjhf mikaTs;s xl;lg;gplhuk; 400 fp.«th. Jiz kpd; epiyaj;jpw;F cs;ntsp kpd;ghij mikj;jy;;; 13. Gjpjhf mikaTs;s xl;lg;gplhuk; 400/110 fp.«th. Jiz 40.00 110 fp.«th. 2344.40 kpd; epiyaj;jpy; ,Ue;J tp[ahGhp 110 fp.«th. tiu 110 fp.«th. ,ul;ilr;Rw;W kpd; NfhGuj;jpy; xw;iwr;Rw;W kpd; ghij mikj;jy; 14. Vw;fdNt cs;s 110 fp.«th. J}j;Jf;Fb jhdpaq;fp kpd; 17.00 110 fp.«th. 1137.47 epiyak; - J}j;Jf;Fb rpg;fhl; xw;iwr;Rw;W kpd; ghijapy; Gjpjhf mikaTs;s xl;lg;gplhuk; 400 fp.«th. Jiz kpd; epiyaj;jpw;F cœntsp kpd;ghij mikj;jy;;; 15. Gjpjhf 400 fp.«th. ,ul;ilr;Rw;W kpd; NfhGuj;jpy; ,ul;ilr; 40.00 400 fp.«th. 22163.20 Rw;W kpd; ghijapy; f;thlÍ]; kpd; flj;jpiaf; nfhz;L Gjpjhf mikaTs;s rÍfnuq;fhGuk; 400 fp.«th. Jiz kpd; epiyaj;jpypUe;J cld;F® ,af;f epiy (Udangudi Switch Yard) tiu kpd; ghij mikj;jy; 16. Gjpjhf 230 fp.«th. ,ul;ilr;Rw;W kpd; NfhGuj;jpy; ,ul;ilr; 60.00 230 fp.«th. 6864.00 Rw;W kpd;ghijapy; pPg;uh kpd; flj;jp kw;W‹ OPGW kpd;tlj;jpid nghUj;jp> r%fnuq;fhGuk; 400 fp.«th. Jiz kpd; epiyaj;jpypUe;J Vw;fdNt cs;s nrz;gfuhkd;GJ}h; 230 fp.«th. Jiz kpd; epiyaj;jpw;F kpd;ghij mikj;jy; 17. Gjpjhf 230 fp.«th. ,ul;ilr;Rw;W kpd; NfhGuj;jpy; ,ul;ilr; 40.00 230 fp.«th. 4576.00 Rw;W kpd;ghijapy; pPg;uh kpd; flj;jp kw;Wk; OPGW kpd;tlj;jpid nghUj;jp> r%fnuq;fhGuk; 400 fp.«th. Jiz kpd; epiyaj;jpypUe;J Vw;fdNt cs;s Kg;ge;jy; 230 fp.«th. Jiz kpd; epiyaj;jpw;F kpd;ghij mikj;jy;Aug. 8, 2018] TAMIL NADU GOVERNMENT GAZETTE 81 t.vz; Jiz kpd;epiyak; kw;Wk; kpd;ghij kpd;ghij ePsk; kpd;ghij nkhj;j kjpg;gPL (yl;rj;jpy;) fp.kP. mOj;jk; (1) (2) (3) (4) (5) 18. Gjpjhf 110 fp.«th. ,ul;ilr;Rw;W kpd; NfhGuj;jpy; 5.00 110 fp.«th. 327.60 xw;iwr; Rw;W kpd;ghi¬î¬ò ghd;jh; kpd; flj;jp nghUj;jp> r%fnuq;fhGuk; 400 fp.«th. Jiz kpd; epiyaj;jpypUe;J Vw;fdNt cs;s «è£†¬ìè¼q;Fsk; 110 fp.«th. Jiz kpd; epiyaj;jpw;F kpd;ghij mikj;jy; 19. Gjpjhf 110 fp.«th. ,ul;ilr;Rw;W kpd; NfhGuj;jpy; xw;iwr; 17.00 110 fp.«th. 1113.84 Rw;W kpd;ghijapy; ghd;jh; kpd; flj;jpia nghUj;jp> r%fnuq;fhGuk; 400 fp.«th. Jiz kpd; epiyaj;jpypUe;J Vw;fdNt cs;s $lq;Fsk; 110 fp.«th. Jiz kpd; epiyaj;jpw;F kpd;ghij mikj;jy; 20. Gjpjhf 110 fp.«th. ,ul;ilr;Rw;W kpd; NfhGuj;jpy; xw;iwr; 20.00 110 fp.«th. 1310.40 Rw;W kpd;ghijapy; ghd;jh; kpd; flj;jpia nghUj;jp> r%fnuq;fhGuk; 400 fp.«th. Jiz kpd; epiyaj;jpypUe;J Vw;fdNt cs;s jz;ilahh;Fsk; 110 fp.«th. Jiz kpd; epiyaj;jpw;F kpd;ghij mikj;jy; 21. Gjpjhf 110 fp.«th. ,ul;ilr;Rw;W kpd; NfhGuj;jpy; xw;iwr; 28.00 110 fp.«th. 1834.56 Rw;W kpd;ghijapy; ghd;jh; kpd; flj;jpia nghUj;jp> r%fnuq;fhGuk; 400 fp.«th. Jiz kpd; epiyaj;jpypUe;J Vw;fdNt cs;s tlf;fd;Fsk; 110 fp.«th. Jiz kpd; epiyaj;jpw;F kpd;ghij mikj;jy; 22. Gjpjhf 110 fp.«th. ,ul;ilr;Rw;W kpd; NfhGuj;jpy; xw;iwr; 25.00 110 fp.«th. 1638.00 Rw;W kpd;ghijapy; ghd;jh; kpd; flj;jpia nghUj;jp> r%fnuq;fhGuk 400 fp.«th. Jiz kpd; epiyaj;jpypUe;J Vw;fdNt cs;s ehty® 110 fp.«th. Jiz kpd; epiyaj;jpw;F kpd;ghij mikj;jy; 23. Gjpjhf 765 fp.«th. ,ul;ilr;Rw;W kpd; NfhGuj;jpy; ,ul;ilr; 300.00 765 fp.«th. 184500.00 Rw;W kpd;ghijapy; ªý‚ê£pgðó£ kpd; flj;jpia nghUj;jp> ¹Fî£è ܬñò¾œ÷ 765 fp.«th. Jiz kpd; epiyaj;jpypUe;J Vw;fdNt ÜÂñF‚èŠð†´œ÷ «è£ò‹¹ˆÉ˜ 765 fp.«th. Jiz kpd; epiyaj;jpw;F kpd;ghij mikj;jy; 24. Gjpjhf 400 fp.«th. ,ul;ilr;Rw;W kpd; NfhGuj;jpy; ,ul;ilr; 80.00 400 fp.«th. 33486.40 Rw;W kpd;ghijapy; OPGW I¡õìˆF¬ù ªð£¼ˆF M¼¶ïè˜ 765 fp.«th. Jiz kpd; epiyaj;jpypUe;J Vw;fdNt cs;s èòˆî£˜ 400 fp.«th. Jiz kpd; epiyaj;jpw;F kpd;ghij mikj;jy; 25. Vw;fdNt mDkjpahfpAs;s fKjp 400 fp.«th. Jiz 10.00 400 fp.«th. 4185.80 kpd; epiyaj;jpypUe;J jg;gf;Fz;L 400 fp.«th. Jiz kpd; epiyak; tiuapyhd kpd;ghijapy; tpUJefh; mUfpy; cs;s Common Point-y; ,Ue;J Gjpjhf 400 fp.«th. ,ul;ilr;Rw;W kpd; NfhGuj;jpy; ,ul;ilr; Rw;W kpd;ghijapy; f;thlÍ; ]; kpd; flj;jp kw;Wk; OPGW kpd;tlj;jpid nghUj;jp> tpUJefh; 765 fp.«th. Jiz kpd; epiyaj;jpw;F kpd; ghij mikj;jy;8 2 TAMIL NADU GOVE RNMENT GAZETTE [Part VI—Sec.3(b) t.vz; Jiz kpd;epiyak; kw;Wk; kpd;ghij kpd;ghij ePsk; kpd;ghij nkhj;j kjpg;gPL (yl;rj;jpy;) fp.kP. mOj;jk; (1) (2) (3) (4) (5) 26. Vw;fdNt mDkjpahfpAs;s fKjp 400 fp.«th. Jiz 10.00 400 fp.«th. 2303.00 kpd; epiyaj;jpypUe;J jg;gf;Fz;L 400 fp.«th. Jiz kpd; epiyak; tiuapyhd kpd;ghijapy; tpUJefh; mUfpy; cs;s Common Point-y; ,Ue;J Gjpjhf 400 fp.«th. ,ul;ilr;Rw;W kpd; NfhGuj;jpy; ,ul;ilr; Rw;W kpd;ghijapy; LtpdÍ; ]; kpd; flj;jp kw;Wk; OPGW kpd;tlj;jpid nghUj;jp> tpUJefh; 765 fp.«th. Jiz kpd; epiyaj;jpw;F kpd; ghij mikj;jy; 27. Gjpjhf 230 fp.«th. ,ul;ilr; Rw;W kpd; NfhGuj;jpy; xw;iwr; 75.00 230 fp.«th. 6418.50 Rw;W kpd; ghijapy; pPg;uh kpd; flj;jpia nghUj;jp> Gjpjhf mikaTs;s tpUJefh; 765 fp.«th. Jiz kpd; epiyaj;jpypUe;J fpz;zpkq;fyk; 230 fp.«th. Jiz kpd; epiyaj;jpw;F kpd;ghij mikj;jy; 28. Gjpjhf 230 fp.«th. ,ul;ilr; Rw;W kpd; NfhGuj;jpy; 52.00 230 fp.«th. 4450.16 xw;iwr; Rw;W kpd; ghijapy; pPg;uh kpd; flj;jpia nghUj;jp> Gjpjhf mikaTs;s tpUJefh; 765 fp.«th. Jiz kpd; epiyaj;jpypUe;J Gjpjhf mikaTs;s ÿtpy;ypGj;J}h; 230 fp.«th. Jiz kpd; epiyaj;jpw;F kpd;ghij mikj;jy; 29. Gjpjhf 230 fp.«th. ,ul;ilr; Rw;W kpd; NfhGuj;jpy; xw;iwr; 75.00 230 fp.«th. 6418.50 Rw;W kpd; ghijapy; pPg;uh kpd; flj;jpia nghUj;jp> Gjpjhf mikaTs;s tpUJefh; 765 fp.«th. Jiz kpd; epiyaj;jypUe;J Jk;kf;Fz;L 230 fp.«th. Jiz kpd; epiyaj;jpw;F kpd;ghij mikj;jy; 30. Gjpjhf 230 fp.«th. ,ul;ilr; Rw;W kpd; NfhGuj;jpy; xw;iwr; 33.00 230 fp.«th. 2824.14 Rw;W kpd; ghijapy; pg;uh kpd; flj;jpia nghUj;jp> Gjpjhf mikaTs;s tpUJefh; 765 fp.«th. Jiz kpd; epiyaj;jypUe;J rthrhGuk; 230 fp.«th. Jiz kpd; epiyaj;jpw;F kpd;ghij mikj;jy; 31. Vw;fdNt cs;s 230 fp.«th. TTPS - Ãlq;Fsk; ,ul;ilr;Rw;W 10.00 230 fp.«th. 1027.70 kpd; ghijapy; Gjpjhf 230 fp.«th. ,ul;ilr; Rw;W kpd; NfhGuj;jpy; ,ul;ilr; Rw;W kpd; ghijapy; pPg;uh kpd; flj;jpia nghUj;jp> Gjpjhf mikaTs;s Þó£ü«è£ð£ô¹ó‹ 230/33 fp.«th. (GIS S.S.) Jiz kpd; epiyaj;jpw;F kpd;ghij mikj;jy;;; 32. Vw;fdNt cs;s faj;jhh; 400 fp.«th. Jiz kpd; 45.00 230 fp.«th. 3851.10 epiyaj;jpypUe;J Gjpjhf 230 fp.«th. xw;iwr; Rw;W kpd; NfhGuj;jpy; xw;iwr; Rw;W kpd; ghijapy; pPg;uh kpd; flj;jpia nghUj;jp> Gjpjhf mikaTs;s Þó£ü«è£ð£ô¹ó‹ 230/33 fp.«th. (GIS S.S.) Jiz kpd; epiyaj;jpw;F kpd;ghij mikj;jy;;; Nkw;Fwpg;gpl;l jpl;lq;fspy; cah; m¿j;j kpd;ghij nry;Yk; tNapy; V«jDk; KiwaPLfs; ,Ue;jhy;> tpUg;gk; cs;sth;fs; ,t;twpf;if ntspapl;l ehspypUe;J ,uz;L khjj;jpw;Fs; fPo;f; ifªahg;gkpl;l mjpfhhpaplk; 2003k; Mz;®d; kpd;rhuk; rl;lg; gphptpd;g® njhptpf;fntz;Lk;. kJiu, â¡. êCîó¡, 2018 Ýèv† 2. Nkw;ghh;it nghwpahsh;, nghJ eph;khd tl;lk;. PRINTED AND PUBLISHED BY THE DIRECTOR OF STATIONERY AND PRINTING, CHENNAI ON BEHALF OF THE GOVERNMENT OF TAMIL NADU