See Full Document Text
DRAFT RED HERRING PROSPECTUS
Dated: August 08, 2025
(This Draft Red Herring Prospectus will be updated upon filing with the RoC)
Please read Section 32 of the Companies Act, 2013)
100% Book Built Offer
(Please scan this QR Code to view
this Draft Red Herring Prospectus) TECHNOCRAFT VENTURES LIMITED
Corporate Identity Number: U70101DL1998PLC096763
REGISTERED OFFICE CORPORATE OFFICE CONTACT PERSON TELEPHONE AND EMAIL WEBSITE
S 553/54, Ground Floor, School B-137, Sector-2 Noida, Saket Surolia,
Tel: +91 9211252228 www.technocraftventures.com
Block, Shakarpur, New Delhi- Gautam Buddha Nagar, Company Secretary and
110092, India Uttar Pradesh-201301, Compliance Officer
Email: compliance@technocraftventures.com
India,
OUR PROMOTERS: SANJAY TYAGI, REKHA TYAGI, KARTIKEY TYAGI, KARTIKEY CONSTRUCTIONS (PARTNERSHIP FIRM) AND SANJAY TYAGI HUF
DETAILS OF THE OFFER TO THE PUBLIC
Type Fresh Offer Size Offer for Sale size Total Offer size Eligibility and Reservations
Fresh Issue and Up to 9,505,000 Up to 2,376,000 Up to 11,881,000 The Offer is being made pursuant to Regulation 6(1) of the Securities and Exchange Board of
Offer for Sale Equity Shares of Equity Shares of face Equity Shares of India (Issue of Capital and Disclosure Requirements) Regulations, 2018, as amended (“SEBI
face value of ₹10 value of ₹10 each face value of ₹10 ICDR Regulations”). For further details, kindly refer “Other Regulatory and Statutory
each aggregating up aggregating up to ₹ each aggregating Disclosures – Eligibility for the Offer” beginning on page 493. For details in relation to share
to ₹ [●] million [●] million up to ₹ [●] reservation among, Qualified Institutional Buyers (“QIBs”), Non-Institutional Investors
million (“NIIs”), and Retail Individual Investors (“RIBs”), kindly refer “Offer Structure” beginning
on page 514.
DETAILS OF OFFER FOR SALE
WEIGHTED AVERAGE COST OF
NAME OF PROMOTER SELLING NUMBER OF EQUITY SHARES OFFERED /
TYPE ACQUSITION PER EQUITY SHARE
SHAREHOLDER AMOUNT
(in ₹)*
Kartikey Constructions Up to 2,376,000 Equity Shares of face value of
Promoter Selling Shareholder ₹ 2.50
(Partnership Firm) ₹10 each aggregating up to ₹ [●] million
As certified by Rishi Kapoor & Company, Chartered Accountants, pursuant to their certificate dated August 04, 2025.
RISKS IN RELATION TO THE FIRST OFFER
This being the first public issue of our Company, there has been no formal market for the Equity Shares of our Company. The face value of our Equity Shares is ₹ 10 each. The Floor
Price, Cap Price and the Offer Price (to be determined and justified by our Company, in consultation with the BRLM by way of the Book Building Process, in accordance with SEBI ICDR
Regulations, and as stated in “Basis for Offer Price” beginning on page 134 should not be taken to be indicative of the market price of the Equity Shares after the Equity Shares are listed.
No assurance can be given regarding an active and/ or sustained trading in the Equity Shares nor regarding the price at which the Equity Shares will be traded after listing.
GENERAL RISK
Investments in equity and equity-related securities involve a degree of risk and investors should not invest any funds in the Offer unless they can afford to take the risk of losing their
entire investment. Investors are advised to read the risk factors carefully before taking an investment decision in this Offer. For taking an investment decision, investors must rely on their
own examination of our Company and the Offer including the risks involved. The Equity Shares offered in the Offer have not been recommended or approved by the Securities and
Exchange Board of India (“SEBI”), nor does the SEBI guarantee the accuracy or adequacy of the contents of this Draft Red Herring Prospectus. Specific attention of the investors is invited
to “Risk Factors” beginning on page 39.
ISSUER’S AND PROMOTER SELLING SHAREHOLDER ABSOLUTE RESPONSIBILITY
Our Company, having made all reasonable inquiries, accepts responsibility for and confirms that this Draft Red Herring Prospectus contains all information with regard to our Company
and the Offer, which is material in the context of the Offer, that the information contained in this Draft Red Herring Prospectus is true and correct in all material aspects and is not
misleading in any material respect, that the opinions and intentions expressed herein are honestly held and that there are no other facts, the omission of which makes this Draft Red Herring
Prospectus as a whole or any of such information or the expression of any such opinions or intentions, misleading in any material respect. Further, Promoter Selling Shareholder accepts
responsibility for only such statements specifically confirmed or made by the Promoter Selling Shareholder in this Draft Red Herring Prospectus to the extent such statements pertain to
Promoter Selling Shareholder and/or its Offered Shares and confirms that such statements are true and correct in all material respects and are not misleading in any material respect. The
Promoter Selling Shareholder assumes no responsibility for any other statements in this Draft Red Herring Prospectus, including, inter alia, any of the statements made by or relating to
our Company, the Promoter Selling Shareholder or any other person(s) in this Draft Red Herring Prospectus.
LISTING
The Equity Shares of face value of ₹10 each to be offered through the Red Herring Prospectus are proposed to be listed on the Stock Exchanges, being BSE Limited (“BSE”) and National
Stock Exchange of India Limited (“NSE”, together with BSE, the “Stock Exchanges”). For the purposes of the Offer, [●] is the Designated Stock Exchange.
BOOK RUNNING LEAD MANAGER
Name and logo of Book Running Lead Manager Contact Person Email And Telephone
Email: ipo@khambattasecurities.com
Chandan Mishra
Tel: +91 9953989693; 0120 4415469
Shubhra
KHAMBATTA SECURITIES LIMITED
REGISTRAR TO THE OFFER
Name and Logo of the Registrar Contact Person Email and Telephone
Email: ipo@bigshareonline.com
Babu Rapheal C
Tel.: +91 22 6263 8200
BIGSHARE SERVICES PRIVATE LIMITED
BID/ OFFER PROGRAMME
ANCHOR INVESTOR BID/ OFFER PERIOD [●]*
BID/OFFER OPENS ON [●]
BID/OFFER CLOSES ON** [●]**^
*Our Company, in consultation with the BRLM, may consider participation by Anchor Investors, in accordance with the SEBI ICDR Regulations. The Anchor Investor Bidding
Date shall be one Working Day prior to the Bid/ Offer Opening Date.
**Our Company, in consultation with the BRLM, may decide to close the Bid/ Offer Period for QIBs one Working Day prior to the Bid/ Offer Closing Date, in accordance with
the SEBI ICDR Regulations.
^UPI mandate end time and date shall be at 5:00 pm on the Bid/Offer Closing Date.DRAFT RED HERRING PROSPECTUS
Dated: August 08, 2025
(This Draft Red Herring Prospectus will be updated upon filing with the RoC)
(Please read Section 32 of the Companies Act, 2013)
100% Book Built Offer
TECHNOCRAFT VENTURES LIMITED
Our Company was originally incorporated as ‘Technocraft Construction Private Limited’ a private limited company under the Companies Act, 1956, pursuant to a
certificate of incorporation dated October 21, 1998, issued by the Registrar of Companies, NCT of Delhi & Haryana. Thereafter, the name of our Company was
changed from ‘Technocraft Construction Private Limited’ to ‘Technocraft Ventures Private Limited’ pursuant to a board resolution dated January 08, 2024, and a
special resolution passed by our Shareholders on January 10, 2024, and a fresh certificate of incorporation dated February 09, 2024, was issued pursuant to change
of name, by the Registrar of Companies, NCT of Delhi & Haryana. Subsequently, our Company was converted into a public limited company pursuant to a resolution
passed by our Board of Directors dated February 16, 2024, and a special resolution passed by our Shareholders on March 13, 2024. Consequently, the name of our
Company was changed to ‘Technocraft Ventures Limited’, and a fresh certificate of incorporation was issued to our Company by the Registrar of Companies, Central
Processing Centre, on June 11, 2024. The CIN of the Company is U70101DL1998PLC096763. For further details, kindly refer “Our History and Certain Corporate
Matters – Brief History of our Company” beginning on page 297.
Registered Office: S 553/54, Ground Floor, School Block, Shakarpur, New Delhi-110092, India, Corporate Office: B-137, Sector-2 Noida, Gautam Buddha
Nagar, Uttar Pradesh-201301, India, Contact Person: Saket Surolia, Company Secretary and Compliance Officer; Tel: +91 9211252228,
Email: compliance@technocraftventures.com; Website: www.technocraftventures.com; Corporate Identity Number: U70101DL1998PLC096763
OUR PROMOTERS: SANJAY TYAGI, REKHA TYAGI, KARTIKEY TYAGI, KARTIKEY CONSTRUCTIONS (PARTNERSHIP FIRM) AND
SANJAY TYAGI HUF
INITIAL PUBLIC OFFERING OF UP TO 11,881,000 EQUITY SHARES OF FACE VALUE OF ₹ 10 EACH (“EQUITY SHARES”) OF TECHNOCRAFT
VENTURES LIMITED (“OUR COMPANY” OR THE “ISSUER”) FOR CASH AT A PRICE OF ₹ [●] PER EQUITY SHARE (“OFFER PRICE”)
(INCLUDING A PREMIUM OF ₹ [●] PER EQUITY SHARE) AGGREGATING UP TO ₹ [●] MILLION (THE “OFFER”). THE OFFER COMPRISES
OF A FRESH ISSUE OF UP TO 9,505,000 EQUITY SHARES OF FACE VALUE OF ₹ 10 EACH AGGREGATING UP TO ₹ [●] MILLION BY OUR
COMPANY (THE “FRESH ISSUE”) AND AN OFFER FOR SALE OF UP TO 2,376,000 EQUITY SHARES BY KARTIKEY CONSTRUCTIONS
(PARTNERSHIP FIRM) (THE “PROMOTER SELLING SHAREHOLDER”) AND REFERRED TO AS, THE “SELLING SHAREHOLDER” (THE
“OFFER FOR SALE”). THE OFFER WOULD CONSTITUTE [●]% OF OUR POST-OFFER PAID-UP EQUITY SHARE CAPITAL.
THE FACE VALUE OF THE EQUITY SHARES IS ₹ 10 EACH AND THE OFFER PRICE IS [●] TIMES THE FACE VALUE OF THE EQUITY
SHARES. THE PRICE BAND AND THE MINIMUM BID LOT SIZE WILL BE DECIDED BY OUR COMPANY, IN CONSULTATION WITH THE
BOOK RUNNING LEAD MANAGER AND WILL BE ADVERTISED IN ALL EDITIONS OF [●] (A WIDELY CIRCULATED ENGLISH NATIONAL
DAILY NEWSPAPER), ALL EDITIONS OF [●] (A WIDELY CIRCULATED HINDI NATIONAL DAILY NEWSPAPER) AND [●] EDITION OF [●] (A
HINDI NEWSPAPER WITH WIDE CIRCULATION IN DELHI, HINDI BEING THE REGIONAL LANGUAGE OF DELHI, WHERE OUR
REGISTERED OFFICE IS LOCATED), AT LEAST 2 WORKING DAYS PRIOR TO THE BID/OFFER OPENING DATE AND SHALL BE MADE
AVAILABLE TO THE STOCK EXCHANGES FOR THE PURPOSE OF UPLOADING ON THEIR RESPECTIVE WEBSITES, IN ACCORDANCE
WITH THE SECURITIES AND EXCHANGE BOARD OF INDIA (ISSUE OF CAPITAL AND DISCLOSURE REQUIREMENTS) REGULATIONS,
2018, AS AMENDED (THE “SEBI ICDR REGULATIONS”).
In case of any revision in the Price Band, the Bid/ Offer Period shall be extended for at least three additional Working Days after such revision of the Price Band,
subject to the total Bid/ Offer Period not exceeding 10 Working Days. In cases of force majeure, banking strike or similar circumstances, our Company in
consultation with the BRLM, for reasons to be recorded in writing, extend the Bid / Offer Period for a minimum of One Working Day, subject to the Bid/ Offer
Period not exceeding 10 Working Days. Any revision in the Price Band, and the revised Bid/ Offer Period, if applicable, shall be widely disseminated by notification
to the Stock Exchanges by issuing a public notice and also by indicating the change on the respective websites of the BRLM and at the terminals of the members
of the Syndicate and by intimation to Designated Intermediaries and Sponsor Bank(s), as applicable.
The Offer is being made in terms of Rule 19(2)(b) of the Securities Contracts (Regulation) Rules, 1957, as amended (the “SCRR”), read with Regulation 31 of the
SEBI ICDR Regulations. The Offer is being made in accordance with Regulation 6(1) of the SEBI ICDR Regulations, through the Book Building Process wherein
not more than 50% of the Offer shall be available for allocation on a proportionate basis to Qualified Institutional Buyers (“QIBs”) (such portion referred to as
“QIB Portion”), provided that our Company in consultation with the BRLM may allocate up to 60% of the QIB Portion to Anchor Investors on a discretionary basis
in accordance with the SEBI ICDR Regulations (the “Anchor Investor Portion”), out of which one-third shall be reserved for domestic Mutual Funds only, subject
to valid Bids being received from domestic Mutual Funds at or above the price at which allocation is made to Anchor Investors (“Anchor Investor Allocation
Price”), in accordance with the SEBI ICDR Regulations. In the event of under-subscription or non-allocation in the Anchor Investor Portion, the balance Equity
Shares shall be added to the QIB Portion (excluding the Anchor Investor Portion) (the “Net QIB Portion”). Further, 5% of the Net QIB Portion shall be available
for allocation on a proportionate basis to Mutual Funds only, and the remainder of the Net QIB Portion shall be available for allocation on a proportionate basis to
all QIB Bidders (other than Anchor Investors), including Mutual Funds, subject to valid Bids being received at or above the Offer Price. However, if the aggregate
demand from Mutual Funds is less than 5% of the Net QIB Portion, the balance Equity Shares available for allocation in the Mutual Fund Portion will be added to
the remaining Net QIB Portion for proportionate allocation to all QIBs. Further, not less than 15% of the Offer shall be available for allocation on a proportionate
basis to Non-Institutional Investors out of which (a) one-third of such portion shall be reserved for applicants with application size of more than ₹2,00,000 and up
to ₹10,00,000 ; and (b) two third of such portion shall be reserved for applicants with application size of more than ₹10,00,000, provided that the unsubscribed
portion in either of such sub-categories may be allocated to applicants in the other sub-category of Non-Institutional Investors and not less than 35% of the Offer
shall be available for allocation to Retail Individual Investors in accordance with the SEBI ICDR Regulations, subject to valid Bids being received at or above the
Offer Price. All potential Bidders (except Anchor Investors) are required to mandatorily use the Application Supported by Blocked Amount (“ASBA”) process
providing details of their respective ASBA accounts, and UPI ID in case of UPI Bidders, if applicable, in which the corresponding Bid Amounts will be blocked
by the SCSBs or by the Sponsor Bank(s) under the UPI Mechanism, as applicable, to the extent of the respective Bid Amounts. Anchor Investors are not permitted
to participate in the Offer through the ASBA process. For further details, kindly refer ‘Offer Procedure’ beginning on page 520.
RISKS IN RELATION TO FIRST OFFER
This being the first public issue of our Company, there has been no formal market for the Equity Shares. The face value of the Equity Shares is ₹ 10. The Offer
Price/Floor Price/Cap Price, as determined and justified by our Company and, in consultation with the BRLM, by way of the Book Building Process, in accordance
with the SEBI ICDR Regulations and as stated in ‘Basis for Offer Price’ beginning on page 134 should not be taken to be indicative of the market price of the
Equity Shares after such Equity Shares are listed. No assurance can be given regarding an active and/or sustained trading in the Equity Shares nor regarding the
price at which the Equity Shares will be traded after listing.
GENERAL RISK
Investments in equity and equity-related securities involve a degree of risk and investors should not invest any funds in this Offer unless they can afford to take the
risk of losing their entire investment. Investors are advised to read the risk factors carefully before taking an investment decision in this Offer. For taking an
investment decision, investors must rely on their own examination of our Company and the Offer, including the risks involved. The Equity Shares have not been
recommended or approved by the SEBI, nor does SEBI guarantee the accuracy or adequacy of the contents of this Draft Red Herring Prospectus. Specific attention
of the investors is invited to “Risk Factors” beginning on page 39.DRAFT RED HERRING PROSPECTUS
Dated: August 08, 2025
(This Draft Red Herring Prospectus will be updated upon filing with the RoC)
(Please read Section 32 of the Companies Act, 2013)
100% Book Built Offer
ISSUER’S AND PROMOTER SELLING SHAREHOLDER ABSOLUTE RESPONSIBILITY
Our Company, having made all reasonable inquiries, accepts responsibility for and confirms that this Draft Red Herring Prospectus contains all information with
regard to our Company and the Offer, which is material in the context of the Offer, that the information contained in this Draft Red Herring Prospectus is true and
correct in all material aspects and is not misleading in any material respect, that the opinions and intentions expressed herein are honestly held and that there are no
other facts, the omission of which makes this Draft Red Herring Prospectus as a whole or any of such information or the expression of any such opinions or
intentions misleading in any material respect. Further, Promoter Selling Shareholder accepts responsibility for only such statements specifically confirmed or made
by the Promoter Selling Shareholder in this Draft Red Herring Prospectus to the extent such statements pertain to the Promoter Selling Shareholder and/or its
Offered Shares and confirms that such statements are true and correct in all material respects and are not misleading in any material respect. The Promoter Selling
Shareholder assumes no responsibility for any other statements in this Draft Red Herring Prospectus, including, inter alia, any of the statements made by or relating
to our Company, the Promoter Selling Shareholder or any other person(s) in this Draft Red Herring Prospectus.
LISTING
The Equity Shares of face value of ₹ 10 each offered through the Red Herring Prospectus are proposed to be listed on the Stock Exchanges. Our Company has
received in-principle approvals from BSE and NSE for listing of the Equity Shares pursuant to their letters dated [●] and [●], respectively. For the purposes of the
Offer, [●] shall be the Designated Stock Exchange. A signed copy of the Red Herring Prospectus and the Prospectus shall be filed with the RoC in accordance with
Section 26(4) and 32 of the Companies Act, 2013. For details of the material contracts and documents available for inspection from the date of the Red Herring
Prospectus up to the Bid/Offer Closing Date, kindly refer “Material Contracts and Documents for Inspection” beginning on page 562.
BOOK RUNNING LEAD MANAGER REGISTRAR TO THE OFFER
KHAMBATTA SECURITIES LIMITED BIGSHARE SERVICES PRIVATE LIMITED
806, World Trade Tower, Office No. S-62, 6th floor, Pinnacle Business Park, next to Ahura Centre,
Tower B, Noida Sector-16, Mahakali Caves Road, Andheri (East), Mumbai – 400093
Uttar Pradesh-201301, India Tel: +91 22 6263 8200
Tel.: +91 9953989693; 0120 4415469 E-mail: ipo@bigshareonline.com
E-mail : ipo@khambattasecurities.com Website: www.bigshareonline.com
Website: www.khambattasecurities.com Investor grievance e-mail: investor@bigshareonline.com
Investor grievance e-mail: mbcomplaints@khambattasecurities.com Contact person: Babu Rapheal C
Contact Person: Chandan Mishra SEBI Registration No.: INR000001385
Shubhra
SEBI Registration Number: INM000011914
BID/OFFER PROGRAMME
ANCHOR INVESTOR BID/ OFFER PERIOD [●]*
BID/ OFFER OPENS ON [●]
BID/ OFFER CLOSES ON [●]**^
*Our Company in consultation with the BRLM, may consider participation by Anchor Investors in accordance with the SEBI ICDR Regulations. The Anchor Investors
shall Bid during the Anchor Investor Bidding Date, i.e., one Working Day prior to the Bid/Offer Opening Date.
**Our Company in consultation with the BRLM, may consider closing the Bid/ Offer Period for QIBs one day prior to the Bid/ Offer Closing Date, in accordance
with the SEBI ICDR Regulations.
^UPI mandate end time and date shall be at 5:00 pm on the Bid/ Offer Closing DateCONTENTS
SECTION I – GENERAL 02
DEFINITIONS AND ABBREVIATIONS 02
CERTAIN CONVENTIONS, PRESENTATION OF FINANCIAL, INDUSTRY AND
22
MARKET DATA AND CURRENCY OF PRESENTATION
FORWARD - LOOKING STATEMENTS 26
SUMMARY OF OFFER DOCUMENT 28
SECTION II – RISK FACTORS 39
SECTION III – INTRODUCTION 82
THE OFFER 82
SUMMARY OF RESTATED CONSOLIDATED FINANCIAL INFORMATION 85
GENERAL INFORMATION 91
CAPITAL STRUCTURE 100
OBJECTS OF THE OFFER 121
BASIS FOR OFFER PRICE 134
STATEMENT OF SPECIAL TAX BENEFITS 144
SECTION IV – ABOUT THE COMPANY 152
INDUSTRY OVERVIEW 152
OUR BUSINESS 228
KEY INDUSTRY REGULATIONS AND POLICIES 287
OUR HISTORY AND CERTAIN CORPORATE MATTERS 297
OUR MANAGEMENT 303
OUR PROMOTERS AND PROMOTER GROUP 324
DIVIDEND POLICY 330
SECTION V – FINANCIAL INFORMATION 331
RESTATED CONSOLIDATED FINANCIAL INFORMATION 331
OTHER FINANCIAL INFORMATION 426
FINANCIAL INDEBTEDNESS 428
CAPITALISATION STATEMENT 442
RELATED PARTY TRANSACTIONS 443
MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITIONS AND
444
RESULTS OF OPERATIONS
SECTION VI – LEGAL AND OTHER INFORMATION 479
OUTSTANDING LITIGATIONS AND MATERIAL DEVELOPMENTS 479
GOVERNMENT AND OTHER STATUTORY APPROVALS 486
OUR GROUP COMPANIES 489
OTHER REGULATORY AND STATUTORY DISCLOSURES 492
SECTION VII – OFFER RELATED INFORMATION 506
TERMS OF THE OFFER 506
OFFER STRUCTURE 514
OFFER PROCEDURE 520
RESTRICTIONS ON FOREIGN OWNERSHIP OF INDIAN SECURITIES 546
SECTION VIII – DESCRIPTION OF EQUITY SHARES AND TERMS OF THE
548
ARTICLES OF ASSOCIATION
SECTION IX – OTHER INFORMATION 562
MATERIAL CONTRACTS AND DOCUMENTS FOR INSPECTION 562
DECLARATION 565
1SECTION I – GENERAL
DEFINITIONS AND ABBREVIATIONS
This Draft Red Herring Prospectus uses certain definitions and abbreviations which, unless the context otherwise
indicates or implies or unless otherwise specified, shall have the meanings as provided below. References to any
legislation, act, regulation, rules, guidelines, clarifications or policies or articles of association or memorandum of
association shall be to such legislation, act, regulation, rules, guidelines, clarifications or policies or articles of
association or memorandum of association as amended, updated, supplemented, re-enacted or modified from time
to time, and any reference to a statutory provision shall include any subordinate legislation made from time to
time under that provision.
The words and expressions used in this Draft Red Herring Prospectus but not defined herein shall have, to the extent
applicable, the same meanings ascribed to such terms under the SEBI ICDR Regulations, the SEBI Act, the
Companies Act, the SCRA, the Depositories Act and the rules and regulations notified thereunder. Further, the
Offer related terms used but not defined in this Draft Red Herring Prospectus shall have the meaning ascribed to
such terms under the General Information Document. In case of any inconsistency between the definitions given
below and the definitions contained in the General Information Document, the definitions given below shall
prevail.
Notwithstanding the foregoing, the terms used in “Objects of the Offer”, “Basis for Offer Price”, “Statement of
Special Tax Benefits”, “Industry Overview”, “Key Industry Regulations and Policies”, “Our History and Certain
Corporate Matters”, “Restated Consolidated Financial Information”, “Financial Indebtedness”, “Outstanding
Litigations and Material Developments”, “Other Regulatory and Statutory Disclosures” “Offer Procedure”,
“Restrictions on Foreign Ownership of Indian Securities”, and “Description of Equity Shares and Terms of
Articles of Association” beginning on pages 121, 134, 144, 152, 287, 297, 331, 428, 479, 492, 520, 546, and 548,
respectively, shall have the meanings ascribed to them in the relevant section.
General Terms
Term Description
“Technocraft”, “TVL”, “our Technocraft Ventures Limited, a public limited company incorporated
Company”, “the Company”, “the under the Companies Act, 1956 with its Registered Office at S 553/54,
Issuer Company” or “the Issuer” Ground Floor, School Block, Shakarpur, New Delhi-110092, India and its
Corporate Office at B-137, Sector-2 Noida, Gautam Buddha Nagar, Uttar
Pradesh-201301, India.
“we”, “us” or “our” Unless the context otherwise indicates or implies, refers to our Company
as at and during the relevant financial period as on the date of this Draft
Red Herring Prospectus.
Company Related Terms
Term Description
“Articles of Association” or Articles of association of our Company, as amended from time to time.
“AoA” or “Articles”
Audit Committee The audit committee of our Board, as described in “Our Management -
Committees of our Board – Audit Committee” beginning on page 311.
Associates As on the date of this Draft Red Herring Prospectus, our Company does
not have any associates but we have invested in a partnership firm namely
TESPL LRS TCPL JV.
“Board” or “Board of Directors” The Board of Directors of our Company, and where applicable or implied
by context, includes or a duly constituted committee thereof as described
in “Our Management – Board of Directors” beginning on page 303.
2“Chief Financial Officer” or
Chief Financial Officer of our Company, namely, Kartikey Tyagi.
“CFO”
Committee(s) Duly constituted committee(s) of our Board of Directors.
Company Secretary and Company Secretary and Compliance Officer of our Company, namely,
Compliance Officer Saket Surolia. For further details of our Company Secretary and
Compliance Officer, kindly refer “Our Management” beginning on page
321.
Corporate Office Corporate Office of our Company is situated at B-137, Sector-2 Noida,
Gautam Buddha Nagar, Uttar Pradesh-201301, India.
Corporate Social Responsibility The corporate social responsibility committee of our Board, as described
Committee in “Our Management - Committees of our Board – Corporate Social
Responsibility Committee” beginning on page 316.
Director(s) Director(s) on our Board, as appointed from time to time. For further
details kindly refer “Our Management – Board of Directors” beginning on
page 303.
Equity Shares Unless otherwise stated, equity shares of face value of ₹ 10 each of our
Company.
Executive Director(s) Executive director(s) of our Company. For further details of our
Executive Director(s), kindly refer “Our Management” beginning on page
303.
Group Companies The group companies of our Company in accordance with Regulation
2(1)(t) of SEBI ICDR Regulations, as described in “Our Group
Companies” beginning on page 489.
“Independent Director(s)” or The independent Directors of our Company, appointed as per the
“Non- Executive Independent Companies Act, 2013 and the SEBI Listing Regulations, as described in
Director(s)” “Our Management” beginning on page 303.
IPO Committee The IPO committee of our Board, as described in “Our Management -
Committees of our Board –IPO Committee” beginning on page 317.
Key Managerial Personnel/ KMP The key managerial personnel of our Company in terms of Regulation
2(1)(bb) of the SEBI ICDR Regulations, as described in “Our
Management - Key Managerial Personnel” beginning on page 321.
Managing Director/MD Managing Director of our Company, namely, Sanjay Tyagi.
“Memorandum of Association” The memorandum of association of our Company, as amended from time
or “MoA” to time.
“Nomination and Remuneration The nomination and remuneration committee of our Board, as described
Committee” or “NRC in “Our Management - Committees of our Board - Nomination and
Committee” Remuneration Committee” beginning on page 313.
Promoters Promoters of our Company, being Sanjay Tyagi, Rekha Tyagi, Kartikey
Tyagi, Kartikey Constructions (Partnership Firm) and Sanjay Tyagi HUF as
described in “Our Promoters and Promoter Group – Promoter Group”
beginning on page 325.
Promoter Group Individuals and entities constituting the promoter group of our Company
in terms of Regulation 2 (1) (pp) of the SEBI ICDR Regulations, as
described in “Our Promoters and Promoter Group – Promoter Group”
beginning on page 328.
Registered Office Registered Office of our Company is situated at S 553/54, Ground Floor,
School Block, Shakarpur, New Delhi-110092, India.
“Registrar of Companies” or
The Registrar of Companies, NCT of Delhi & Haryana.
“RoC”
Restated Consolidated The Restated Consolidated Financial Information of our Company, which
Financial Information/ Restated comprises the Restated Statement of assets and liabilities, the Restated
3Consolidated Financial Statement of profit and loss, the Restated Statement of cash flows for the
Statements/Restated Financial Financial Year ended on March 31, 2025, 2024 and 2023 and along with
Information/Restated Financial the summary statement of significant accounting policies read together
Statement with the annexures and notes thereto prepared in terms of the requirements
of Section 26 of Part I of Chapter III of the Companies Act, 2013, as
amended, the Securities and Exchange Board of India (Issue of Capital and
Disclosure Requirements) Regulations, 2018, as amended, and the
Guidance Note on Reports in Company Prospectuses (Revised 2019)
issued by the ICAI, as amended from time to time.
Risk Management Committee The risk management committee as described in “Our Management
Committees of our Board – Risk Management Committee” beginning on
page 316.
“Senior Management Personnel” Members of senior management of our Company in accordance with
or “Senior Management” or Regulation 2(1)(b) of the SEBI ICDR Regulations and as disclosed in “Our
“SMP” Management – Senior Management Personnel” beginning on page 321.
Shareholder(s) or members The holders of Equity Shares of our Company from time to time.
Stakeholders’ Relationship The stakeholders’ relationship committee as described in “Our
Committee Management - Committees of our Board – Stakeholders’ Relationship
Committee” beginning on page 315.
“Statutory Auditors” or Rishi Kapoor & Company, Chartered Accountants, the statutory auditors
“Auditors” of our Company.
VVIP Infratech Limited / Listed VVIP Infratech Limited is a listed company and is forming part of our
Group Company group companies due to the related party transactions in the past three
financial years but our Company and Promoters do not have any control
or voting rights in this group company.
“Whole-Time Director” or
A Whole-Time Director of our Company, namely, Kartikey Tyagi.
“WTD”
Offer Related Terms
Term Description
The memorandum containing such salient features of a prospectus as may
Abridged Prospectus
be specified by SEBI in this regard.
The slip or document issued by the relevant Designated Intermediary(ies)
Acknowledgement Slip
to a Bidder as proof of registration of the Bid cum Application Form.
Unless the context otherwise requires, allotment of the Equity Shares
“Allot” or “Allotment” or
pursuant to the Fresh Issue and transfer of the Offered Shares pursuant to
“Allotted”
the Offer for Sale to the successful Bidders.
A note or advice or intimation of Allotment sent to the successful Bidders
Allotment Advice who have been or are to be Allotted the Equity Shares after the Basis of
Allotment has been approved by the Designated Stock Exchange.
Allottee A successful Bidder to whom the Equity Shares are Allotted.
A Qualified Institutional Buyer, applying under the Anchor Investor
Portion in accordance with the requirements specified in the SEBI ICDR
Anchor Investor(s)
Regulations and the Red Herring Prospectus who has Bid for an amount
of at least ₹100 million.
Price at which Equity Shares will be allocated to the Anchor Investors in
terms of the Red Herring Prospectus and the Prospectus, which will be
Anchor Investor Allocation Price
decided by our Company, in consultation with the BRLM during the
Anchor Investor Bid/Offer Period.
4Application form used by an Anchor Investor to make a Bid in the Anchor
Anchor Investor Application Investor Portion and which will be considered as an application for
Form Allotment in terms of the requirements specified under the SEBI ICDR
Regulations and the Red Herring Prospectus and Prospectus.
One Working Day prior to the Bid/ Offer Opening Date, on which Bids
by Anchor Investors shall be submitted, prior to and after which the Book
Anchor Investor Bid/ Offer Period
Running Lead Manager will not accept any Bids from Anchor Investors,
and allocation to Anchor Investors shall be completed.
Final price at which the Equity Shares will be Allotted to Anchor
Investors in terms of the Red Herring Prospectus and the Prospectus,
Anchor Investor Offer Price which price will be equal to or higher than the Offer Price but not higher
than the Cap Price. The Anchor Investor Offer Price will be decided by our
Company, in consultation with the BRLM.
With respect to Anchor Investor(s), the Anchor Investor Bid/Offer Period,
and in the event the Anchor Investor Allocation Price is lower than the
Anchor Investor Pay-in Date
Anchor Investor Offer Price, not later than two Working Days after the
Bid/ Offer Closing Date.
Up to 60% of the QIB Portion which may be allocated by our Company,
in consultation with the BRLM, to Anchor Investors and the basis of such
allocation will be on a discretionary basis by our Company, in
consultation with the BRLM, in accordance with the SEBI ICDR
Anchor Investor Portion
Regulations. One- third of the Anchor Investor Portion shall be reserved
for domestic Mutual Funds, subject to valid Bids being received from
domestic Mutual Funds at or above the Anchor Investor Allocation Price,
in accordance with the SEBI ICDR Regulations.
Application, whether physical or electronic, used by ASBA Bidders to
make a Bid and to authorise an SCSB to block the Bid Amount in the
“Application Supported by
relevant ASBA Account and will include applications made by UPI
Blocked Amount” or “ASBA”
Bidders where the Bid Amount will be blocked by the SCSB upon
acceptance of the UPI Mandate Request by UPI Bidders.
Bank account maintained with an SCSB by an ASBA Bidder, as specified
in the ASBA Form submitted by ASBA Bidders for blocking the Bid
Amount mentioned in the relevant ASBA Form and includes the account
ASBA Account
of an UPI Bidders which is blocked upon acceptance of a UPI Mandate
Request in relation to a Bid made by the UPI Bidders using the UPI
Mechanism to the extent of the Bid Amount of the ASBA Bidder.
ASBA Bid A Bid made by an ASBA Bidder.
ASBA Bidders All Bidders except Anchor Investors.
Application form, whether physical or electronic, used by ASBA Bidders
ASBA Form to submit Bids, which will be considered as the application for Allotment
in terms of the Red Herring Prospectus and the Prospectus.
Collectively, Escrow Collection Bank(s), Public Offer Account
Bankers to the Offer
Bank(s), Sponsor Bank(s) and Refund Bank(s), as the case may be.
Basis on which Equity Shares will be Allotted to successful Bidders
Basis of Allotment under the Offer and which is described in “Offer Procedure” beginning
on page 520.
Indication to make an offer during the Bid/Offer Period by an ASBA
Bidder pursuant to submission of the ASBA Form, or during the Anchor
Investor Bid/ Offer Period by an Anchor Investor, pursuant to submission
Bid(s)
of the Anchor Investor Application Form, to subscribe to or purchase the
Equity Shares at a price within the Price Band, including all revisions and
modifications thereto in accordance with the SEBI ICDR Regulations and
5in terms of the Red Herring Prospectus and the relevant Bid cum
Application Form. The term “Bidding” shall be construed accordingly.
In relation to each Bid, the highest value of Bids indicated in the Bid cum
Application Form and, in the case of RIBs Bidding at the Cut off Price,
the Cap Price multiplied by the number of Equity Shares Bid for by such
Bid Amount
Retail Individual Bidder and mentioned in the Bid cum Application Form
and payable by the Bidder or blocked in the ASBA Account of the Bidder,
as the case may be, upon submission of the Bid.
The Anchor Investor Application Form or the ASBA Form, as the context
Bid cum Application Form
requires.
Bid Lot [●] Equity Shares and in multiples of [●] Equity Shares thereafter.
Except in relation to any Bids received from the Anchor Investors, the
date after which the Designated Intermediaries will not accept any Bids,
being [●], which shall be notified in all editions of [●], an English national
daily newspaper and all editions of [●], a Hindi national daily newspaper
(Hindi also being the regional language of Delhi, where our Registered
Office is located), each with wide circulation.
Our Company, in consultation with the BRLM, may consider closing the
Bid/ Offer Period for QIBs one Working Day prior to the Bid/ Offer
Bid/ Offer Closing Date
Closing Date in accordance with the SEBI ICDR Regulations. In case of
any revision, the extended Bid/ Offer Closing Date shall also be widely
disseminated by notification to the Stock Exchanges by issuing a public
notice, and also by notifying on the websites of the BRLM and at the
terminals of the Syndicate Members and communicating to the
Designated Intermediaries and the Sponsor Banks, which shall also be
notified in an advertisement in the same newspapers in which the
Bid/Offer Opening Date was published, as required under the SEBI ICDR
Regulations.
Except in relation to any Bids received from the Anchor Investors, the date
on which the Designated Intermediaries shall start accepting Bids, being
[●], which shall be notified in all editions of [●], an English national daily
newspaper and all editions of [●], a Hindi national daily newspaper
(Hindi also being the regional language of Delhi, where our Registered
Office is located), each with wide circulation.
Bid/ Offer Opening Date In case of any revisions, the extended Bid/Offer Closing Date will be
widely disseminated by notification to the Stock Exchanges, by issuing a
public notice, and also by indicating the change on the websites of the
Book Running Lead Manager and at the terminals of the other members
of the Syndicate and by intimation to the Designated Intermediaries and
the Sponsor Banks, which shall also be notified in an advertisement in
the same newspapers in which the Bid/Offer Opening Date was
published, as required under the SEBI ICDR Regulations.
Except in relation to Anchor Investors, the period between the Bid/Offer
Opening Date and the Bid/Offer Closing Date, inclusive of both days,
during which prospective Bidders can submit their Bids, including any
Bid/ Offer Period revisions thereof, in accordance with the SEBI ICDR Regulations and the
terms of the Red Herring Prospectus. Provided however, that the Bidding
shall be kept open for a minimum of three Working Days for all
categories of Bidders, other than Anchor Investors.
6Our Company, in consultation with the Book Running Lead Manager
may consider closing the Bid/Offer Period for QIBs one Working Day
prior to the Bid/Offer Closing Date in accordance with the SEBI ICDR
Regulations.
Any prospective investor who makes a Bid pursuant to the terms of the
“Bidder” or “Applicant” or Red Herring Prospectus and the Bid cum Application Form and unless
“Investor” otherwise stated or implied, which includes an ASBA Bidder and an
Anchor Investor.
Centres at which the Designated Intermediaries shall accept the Bid cum
Application Forms, i.e., Designated Branches for SCSBs, Specified
Bidding Centres Locations for the Syndicate, Broker Centres for Registered Brokers,
Designated RTA Locations for RTA and Designated CDP Locations for
CDPs.
Book building process, as provided in Part A of Schedule XIII of the
Book Building Process
SEBI ICDR Regulations, in terms of which the Offer is being made.
“Book Running Lead Manager” Book Running Lead Manager to the Offer, namely, Khambatta Securities
or “BRLM” Limited.
Broker centres notified by the Stock Exchanges where ASBA Bidders can
submit the ASBA Forms to a Registered Broker. The details of such
Broker Centres Broker Centres, along with the names and contact details of the Registered
Brokers are available on the respective websites of the Stock Exchanges
(www.bseindia.com and www.nseindia.com).
Notice or intimation of allocation of the Equity Shares sent to Anchor
“CAN” or “Confirmation of
Investors, who have been allocated the Equity Shares, on or after the
Allocation Note”
Anchor Investor Bid/ Offer Period.
Higher end of the Price Band, subject to any revisions thereto, above
which the Offer Price and the Anchor Investor Offer Price will not be
Cap Price finalised and above which no Bids will be accepted. The Cap Price shall
be at least 105% of the Floor Price and less than or equal to 120% of the
Floor Price.
The cash escrow and sponsor banks agreement to be entered into amongst
our Company, the Promoter Selling Shareholder, the BRLM, the Bankers
to the Offer, the Syndicate Member(s) and Registrar to the Offer for, inter
Cash Escrow and Sponsor
alia, collection of the Bid Amounts from Anchor Investors, transfer of
Bank Agreement
funds to the Public Offer Account and where applicable, refund of the
amounts collected from the Anchor Investors, on the terms and conditions
thereof, in accordance with the UPI Circulars.
Client identification number maintained with one of the Depositories in
Client ID
relation to dematerialised account.
A depository participant as defined under the Depositories Act, 1996
registered with SEBI and who is eligible to procure Bids from relevant
“Collecting Depository Bidders at the Designated CDP Locations in terms of circular no.
Participant” or “CDP” CIR/CFD/POLICYCELL/11/2015 dated November 10, 2015 and other
applicable circulars issued by SEBI as per the list available on the
respective websites of the Stock Exchanges, as updated from time to time.
CRISIL appointed by our Company pursuant to an engagement letter
CRISIL
dated April 10, 2025.
The industry report titled “Assessment of infrastructure construction
industry in India with focus on water and wastewater management” dated
CRISIL Report August 05, 2025, prepared and issued by CRISIL Intelligence (CRISIL)
and exclusively commissioned and paid by us in connection with the
Offer.
7Offer Price, finalised by our Company, in consultation with the BRLM,
which shall be any price within the Price Band. Only RIBs Bidding in the
Cut-off Price Retail Portion are entitled to Bid at the Cut-off Price. QIBs (including
Anchor Investors) and Non-Institutional Bidders are not entitled to Bid
at the Cut-off Price.
The demographic details of the Bidders including the Bidders’ address,
Demographic Details name of the Bidders’ father/husband, investor status, occupation, bank
account details, PAN and UPI ID, wherever applicable.
Such branches of the SCSBs which shall collect the ASBA Forms from
relevant Bidders, a list of which is available on the website of SEBI at
Designated Branches
https://www.sebi.gov.in/sebiweb/other/OtherAction.do?doRecognised=ye
s or at such other website as may be prescribed by SEBI from time to time.
Such locations of the CDPs where relevant ASBA Bidders can submit the
ASBA Forms. The details of such Designated CDP Locations, along with
names and contact details of the CDPs eligible to accept ASBA Forms
Designated CDP Locations
are available on the respective websites of the Stock Exchanges
(www.bseindia.com and www.nseindia.com), as updated from time to
time.
The date on which the Escrow Collection Bank(s) transfer funds from the
Escrow Account to the Public Offer Account or the Refund Account, as
the case may be, and/or the instructions are issued to the SCSBs (in case
of UPI Bidders, instruction issued through the Sponsor Banks) for the
Designated Date transfer of amounts blocked by the SCSBs in the ASBA Accounts to the
Public Offer Account or the Refund Account, as the case may be, in terms
of the Red Herring Prospectus and the Prospectus after finalization of the
Basis of Allotment in consultation with the Designated Stock Exchange,
following which Equity Shares will be Allotted in the Offer.
Collectively, the members of the Syndicate, sub-syndicate or agents,
SCSBs (other than in relation to RIBs using the UPI Mechanism),
Registered Brokers, CDPs and RTA, who are authorised to collect Bid
cum Application Forms from the relevant Bidders, in relation to the Offer.
In relation to ASBA Forms submitted by RIBs Bidding in the Retail
Portion by authorising an SCSB to block the Bid Amount in the ASBA
Account and NIBs bidding with an application size of up to ₹0.50 million
(not using the UPI Mechanism) by authorising an SCSB to block the Bid
Amount in the ASBA Account, Designated Intermediaries shall mean
Designated Intermediary(ies)
SCSBs.
In relation to ASBA Forms submitted by UPI Bidders where the Bid
Amount will be blocked upon acceptance of UPI Mandate Request by
such UPI Bidders, Designated Intermediaries shall mean Syndicate, sub-
syndicate/agents, Registered Brokers, CDPs, SCSBs and RTA.
In relation to ASBA Forms submitted by QIBs (excluding Anchor
Investors) and Non-Institutional Bidders (not using the UPI mechanism),
Designated Intermediaries shall mean Syndicate, sub- Syndicate/ agents,
SCSBs, Registered Brokers, the CDPs and RTA.
Such locations of the RTA where Bidders can submit the ASBA Forms to
RTA. The details of such Designated RTA Locations, along with names
Designated RTA Locations and contact details of the RTA eligible to accept ASBA Forms are
available on the respective websites of the Stock Exchanges
(www.bseindia.com and www.nseindia.com).
8Such branches of the SCSBs which shall collect the ASBA Forms, a list
of which is available on the website of SEBI at
Designated SCSB Branches
www.sebi.gov.in/sebiweb/other/OtherAction.do?doRecognised=yes or
at such other website as may be prescribed by SEBI from time to time.
Designated Stock Exchange [●]
This Draft Red Herring Prospectus dated August 08, 2025 issued in
accordance with the SEBI ICDR Regulations, which does not contain
“Draft Red Herring Prospectus”
complete particulars of the price at which the Equity Shares will be
or “DRHP”
Allotted and the size of the Offer, including any addenda or corrigenda
thereto.
FPI(s) that are eligible to participate in the Offer in terms of the applicable
law and from such jurisdictions outside India where it is not unlawful to
Eligible FPI(s) make an offer/invitation under the Offer and in relation to whom the Bid
cum Application Form and the Red Herring Prospectus constitutes an
invitation to subscribe to the Equity Shares offered thereby.
NRI(s) eligible to invest under Schedule 3 and Schedule 4 of the FEMA
Rules, from jurisdictions outside India where it is not unlawful to make
Eligible NRI(s) an offer or invitation under the Offer and in relation to whom the Bid cum
Application Form and the Red Herring Prospectus will constitute an
invitation to subscribe to or to purchase the Equity Shares.
The ‘no-lien’ and ‘non-interest bearing’ account(s) to be opened with the
Escrow Collection Bank(s) and in whose favour the Bidders (excluding
Escrow Account(s)
ASBA Bidders) will transfer money through NACH/direct
credit/NEFT/RTGS in respect of the Bid Amount when submitting a Bid.
The bank(s) which are clearing members and registered with SEBI as a
Escrow Collection Bank(s) banker to an issue under the SEBI BTI Regulations and with whom the
Escrow Account(s) will be opened, in this case being [●].
Bidder whose name shall be mentioned in the Bid cum Application Form
“First Bidder” or “Sole Bidder” or the Revision Form and in case of joint Bids, whose name shall also
appear as the first holder of the beneficiary account held in joint names.
The lower end of the Price Band, subject to any revision(s) thereto, not
being less than the face value of the Equity Shares of face value of ₹10
Floor Price
each, at or above which the Offer Price and the Anchor Investor Offer
Price will be finalised and below which no Bids will be accepted.
A company or person, as the case may be, categorised as a fraudulent
borrower by any bank or financial institution (as defined under the
Fraudulent Borrower Companies Act, 2013) or consortium thereof, in accordance with the
guidelines on fraudulent borrowers issued by the RBI and as defined
under Regulation 2(1)(lll) of the SEBI ICDR Regulations.
Fresh issue of up to 9,505,000 Equity Shares of face value of ₹10 for cash
Fresh Issue
at price of ₹ [●] each, aggregating up to ₹ [●] million by our Company.
An individual who is declared a fugitive economic offender under
Fugitive Economic Offender
Section 12 of the Fugitive Economic Offenders Act, 2018.
The General Information Document for investing in public issues,
prepared and issued in accordance with the SEBI circular
“General Information (SEBI/HO/CFD/DIL1/CIR/P/2020/37) dated March 17, 2020, the UPI
Document” or “GID” Circulars, as amended from time to time. The General Information
Document shall be available on the websites of the Stock Exchanges, and
the Book Running Lead Manager.
The gross proceeds of the Fresh Issue that will be available to our
Gross Proceeds
Company.
9The policy adopted by our Board in its meeting dated May 29, 2025 for
determining identification of Group Companies, material outstanding civil
Materiality Policy
litigation and outstanding dues to material creditors, in accordance with
the disclosure requirements under the SEBI ICDR Regulations.
Monitoring Agency [●], being a credit rating agency registered with SEBI.
The agreement to be entered into between and amongst our Company and
Monitoring Agency Agreement
the Monitoring Agency prior to filing of the Red Herring Prospectus.
Up to 5% of the Net QIB Portion or [●] Equity Shares which shall be
Mutual Fund Portion available for allocation only to Mutual Funds on a proportionate basis,
subject to valid Bids being received at or above the Offer Price.
The proceeds of the Fresh Issue less our Company’s share of the Offer
related expenses. For further details regarding the use of the Net Proceeds
Net Proceeds
and the Offer expenses, kindly refer “Objects of the Offer” beginning on
page 121.
The portion of the QIB Portion less the number of Equity Shares Allotted
Net QIB Portion
to the Anchor Investors.
All Bidders that are not QIBs, RIBs and who have Bid for Equity Shares
“Non-Institutional Bidders” or
for an amount of more than ₹ [●] million (but not including NRIs other
“NIBs”
than Eligible NRIs).
The portion of the Offer being not less than 15% of the Offer comprising
[●] Equity Shares which shall be available for allocation to Non-
Institutional Bidders in accordance with the SEBI ICDR Regulations,
subject to valid Bids being received at or above the Offer Price, in the
following manner:
(a) One-third of the portion available to Non-Institutional Bidders
shall be reserved for applicants with application size of more than
Non-Institutional Portion ₹0.20 million and up to ₹1.00 million; and
(b) Two-third of the portion available to Non-Institutional Bidders
shall be reserved for applicants with an application size of more
than ₹1.00 million.
Provided that the unsubscribed portion in either of the sub-categories
specified in clauses (a) or (b), may be allocated to applicants in the other
sub-category of Non-Institutional Bidders.
“Non-Resident Indians” or A non-resident Indian as defined under the FEMA Non-debt Instruments
“NRI(s)” Rules.
The initial public offer of up to 11,881,000 Equity Shares of face value
₹10 each for cash consideration at a price of ₹ [●] each, aggregating up
to ₹ [●] million comprising the Fresh Issue of up to 9,505,000 Equity
Shares of the face value ₹10 each aggregating up to ₹ [●] million by our
Offer
Company and the Offer for Sale of up to 2,376,000 Equity Shares of the
face value ₹10 each aggregating up to ₹ [●] million by our Promoter
Selling Shareholder. For further information, kindly refer “The Offer”
beginning on page 82.
The offer agreement dated June 23, 2025 entered amongst our Company,
Offer Agreement the Promoter Selling Shareholder and the BRLM, pursuant to which
certain arrangements have been agreed upon in relation to the Offer.
Offer for Sale of up to 2,376,000 Equity Shares of face value of ₹10
Offer for Sale each aggregating up to ₹ [●] million by the Promoter Selling
Shareholder.
10The final price at which Equity Shares will be Allotted to successful
ASBA Bidders (except for the Anchor Investors) in terms of the Red
Herring Prospectus and the Prospectus. Equity Shares will be Allotted to
Anchor Investors at the Anchor Investor Offer Price which will be
Offer Price decided by our Company, in consultation with the BRLM in terms of the
Red Herring Prospectus and the Prospectus. The Offer Price will be
decided by our Company, in consultation with the BRLM on the Pricing
Date in accordance with the Book Building Process and in terms of the
Red Herring Prospectus.
The proceeds of the Fresh Issue which shall be available to our Company
and the proceeds of the Offer for Sale (net of their respective portion of
Offer-related expenses and relevant taxes thereon) which shall be
Offer Proceeds
available to the Promoter Selling Shareholder. For further information
about use of the Offer Proceeds, kindly refer “Objects of the Offer”
beginning on page 121.
Up to 2,376,000 Equity Shares of face value of ₹10 each aggregating to
Offered Shares ₹ [●] million offered by the Promoter Selling Shareholder in the Offer for
Sale.
Price band of a minimum price of ₹ [●] per Equity Share (i.e., the Floor
Price) and the maximum price of ₹ [●] per Equity Share (i.e., the Cap
Price) including any revisions thereof.
The Price Band and the minimum Bid Lot for the Offer will be decided
Price Band by our Company, in consultation with the BRLM, and will be advertised,
at least two Working Days prior to the Bid/Offer Opening Date, all
editions of [●], an English national daily newspaper and all editions of [●],
a Hindi national daily newspaper (Hindi also being the regional language
of Delhi, where our Registered Office is located), each with wide
circulation.
The date on which our Company, in consultation with the BRLM will
Pricing Date
finalise the Offer Price.
“Promoter Selling Shareholder” Promoter Selling Shareholder or Selling Shareholder, being Kartikey
or “Selling Shareholder” Constructions (Partnership firm).
Prospectus to be filed with the RoC on or after the Pricing Date in
accordance with Section 26 of the Companies Act, 2013, and the SEBI
ICDR Regulations containing, inter alia, the Offer Price that is
Prospectus
determined at the end of the Book Building Process, the size of the Offer
and certain other information, including any addenda or corrigenda
thereto.
The ‘no-lien’ and ‘non-interest bearing’ account to be opened with the
Public Offer Account Bank, under Section 40(3) of the Companies Act,
Public Offer Account
2013 to receive monies from the Escrow Account and ASBA Accounts
maintained with the SCSBs on the Designated Date.
A bank which is a clearing member and which is registered with SEBI as
a banker to an issue and with which the Public Offer Account for
Public Offer Account Bank(s)
collection of Bid Amounts from Escrow Accounts and ASBA Accounts
will be opened, in this case being [●].
The portion of the Offer (including the Anchor Investor Portion) being
not more than 50% of the Offer consisting of [●] Equity Shares which
QIB Portion shall be available for allocation on a proportionate basis to QIBs
(including Anchor Investors in which allocation shall be on a
discretionary basis, as determined by our Company, in consultation with
11the BRLM), subject to valid Bids being received at or above the Offer
Price or Anchor Investor Offer Price.
“Qualified Institutional Buyers” Qualified institutional buyers as defined under Regulation 2(1)(ss) of the
or “QIBs” or “QIB Bidders” SEBI ICDR Regulations.
The Red Herring Prospectus to be issued in accordance with Section 32
of the Companies Act, 2013 and the provisions of the SEBI ICDR
Regulations, which will not have complete particulars of the Offer Price
“Red Herring Prospectus” or
and the size of the Offer, including any addenda or corrigenda thereto.
“RHP”
The Red Herring Prospectus will be filed with the RoC at least three
Working Days before the Bid/Offer Opening Date and will become the
Prospectus upon filing with the RoC on or after the Pricing Date.
The ‘no-lien’ and ‘non-interest bearing’ account to be opened with the
Refund Account(s) Refund Bank(s), from which refunds, if any, of the whole or part of the
Bid Amount to the Bidders shall be made.
Banker(s) to the Offer and with whom the Refund Account will be
Refund Bank(s)
opened, in this case being [●].
The stock brokers registered under the Securities and Exchange Board of
India (Stock Brokers) Regulations, 1992, as amended with the Stock
Registered Brokers Exchanges having nationwide terminals, other than the BRLM and the
Syndicate Members and eligible to procure Bids in terms of Circular No.
CIR/ CFD/ 14/ 2012 dated October 04, 2012 issued by SEBI.
The registrar agreement dated June 23, 2025 entered into amongst our
Company, the Promoter Selling Shareholder and the Registrar to the Offer
Registrar Agreement
in relation to the responsibilities and obligations of the Registrar to the
Offer pertaining to the Offer.
The registrar and share transfer agents registered with SEBI and eligible
to procure Bids from relevant Bidders at the Designated RTA Locations
“Registrar and Share Transfer
in terms of SEBI circular number CIR/CFD/POLICYCELL/11/2015
Agent” or “RTA”
dated November 10, 2015 issued by SEBI and available on the websites
of NSE at www.nseindia.com and BSE at www.bseindia.com.
“Registrar to the Offer” or
Bigshare Services Private Limited.
“Registrar”
Individual Bidders, who have Bid for the Equity Shares for an amount not
“Retail Individual Bidder(s)” or
more than ₹0.20 million in any of the bidding options in the Offer
“RIB(s)”
(including HUFs applying through their Karta and Eligible NRIs).
Resident Indian A person resident in India, as defined under FEMA.
Portion of the Offer being not less than 35% of the Offer consisting of
[●] Equity Shares which shall be available for allocation to Retail
Retail Portion
Individual Bidders (subject to valid Bids being received at or above the
Offer Price).
Form used by the Bidders to modify the quantity of the Equity Shares or
the Bid Amount in any of their Bid cum Application Form(s) or any
previous Revision Form(s), as applicable. QIB Bidders and Non-
Institutional Bidders are not allowed to withdraw or lower their Bids (in
Revision Form terms of quantity of Equity Shares or the Bid Amount) at any stage.
Anchor Investors are not allowed to withdraw their Bids after the Anchor
Investor Bidding Date. Retail Individual Bidders can revise their Bids
during the Bid/Offer Period and withdraw their Bids until Bid/Offer
Closing Date.
SEBI complaints redress system, a centralized web-based complaints
SCORES
redressal system launched by SEBI.
12The banks registered with SEBI, which offer the facility (i) in relation to
ASBA (other than through UPI Mechanism), a list of which is available
on the website of SEBI at
https://www.sebi.gov.in/sebiweb/other/OtherAction.do?doRecognisedF
pi=yes&intmId=34 or
https://www.sebi.gov.in/sebiweb/other/OtherAction.do?doRecognisedF
pi=yes&intmId=35, as applicable, or such other website as updated from
time to time, and (ii) in relation to ASBA (through UPI Mechanism), a list
of which is available on the website of SEBI at
https://sebi.gov.in/sebiweb/other/OtherAction.do?doRecognisedFpi=yes
&intmId=40 or such other website as may be prescribed by SEBI and
updated from time to time.
In relation to Bids (other than Bids by Anchor Investor) submitted to a
member of the Syndicate, the list of branches of the SCSBs at the
Specified Locations named by the respective SCSBs to receive deposits
of Bid cum Application Forms from the members of the Syndicate is
available on the website of the SEBI
“Self-Certified Syndicate (https://www.sebi.gov.in/sebiweb/other/OtherAction.do?doRecognisedF
Bank(s)” or “SCSB(s)” pi=yes&intmId=35) and updated from time to time. For more information
on such branches collecting Bid cum Application Forms from the
Syndicate at Specified Locations, see the website of the SEBI at
https://www.sebi.gov.in/sebiweb/other/OtherAction.do?doRecognisedF
pi=yes&intmId=35 as updated from time to time.
Applications through UPI in the Offer can be made only through the
SCSBs mobile applications (apps) whose name appears on the SEBI
website. A list of SCSBs and mobile application, which, are live for
applying in public issues using UPI Mechanism is provided as Annexure
‘A’ to the SEBI circular no. SEBI/HO/CFD/DIL2/CIR/P/2019/85 dated
July 26, 2019 and SEBI Circular No.
SEBI/HO/CFD/DIL2/CIR/P/2022/45 dated April 5, 2022, UPI Bidders
may apply through the SCSBs and mobile applications whose names
appears on the website of the SEBI
(https://www.sebi.gov.in/sebiweb/other/OtherAction.do?doRecognisedF
pi=yes&intmId=40) and
(https://www.sebi.gov.in/sebiweb/other/OtherAction.do?doRecognisedFpi
=yes&intmId=43) respectively, as updated from time to time.
Share Escrow Agent to be appointed pursuant to the Share Escrow
Share Escrow Agent
Agreement, namely, [●].
The Share Escrow Agreement to be entered into amongst our Company,
the Promoter Selling Shareholder, and the Share Escrow Agent in
connection with the transfer of the respective portion of the Offered
Share Escrow Agreement
Shares by the Promoter Selling Shareholder and credit of such Equity
Shares to the demat account of the Allottees in accordance with Basis of
Allotment.
Bidding Centres where the Syndicate shall accept ASBA Forms from
Specified Locations Bidders a list of which is available on the website of SEBI
(www.sebi.gov.in), and updated from time to time.
[●], being the Bankers to the Offer, appointed by our Company to act as
a conduit between the Stock Exchanges and NPCI in order to push the
Sponsor Banks
mandate collect requests and/or payment instructions of the UPI Bidders
and carry out other responsibilities, in terms of the UPI Circulars.
13Stock Exchanges BSE Limited and National Stock Exchange of India Limited.
The sub syndicate members, if any, appointed by the BRLM and the
Sub Syndicate
Syndicate Members, to collect ASBA Forms and Revision Forms.
“Syndicate” or “Members of
Collectively, the BRLM and the Syndicate Members.
the Syndicate”
The Syndicate Agreement to be entered into amongst our Company, the
Syndicate Agreement Promoter Selling Shareholder, the BRLM, the Syndicate Members and the
Registrar, in relation to collection of Bids by the Syndicate.
Intermediaries (other than BRLM) registered with SEBI who are
Syndicate Member(s) permitted to carry out activities in relation to collection of Bids and as
underwriters, namely, [●].
Underwriters [●]
The Underwriting Agreement to be entered into amongst our Company,
Underwriting Agreement the Promoter Selling Shareholder, and the Underwriters on or after the
Pricing Date, but prior to filing of the Prospectus with the RoC.
Unified payments interface, which is an instant payment mechanism,
UPI
developed by NPCI.
Collectively, individual investors applying as (i) Retail Individual
Bidders Bidding in the Retail Portion; and (ii) Non-Institutional Bidders
with an application size of up to ₹0.50 million, Bidding in the Non-
Institutional Portion, and Bidding under the UPI Mechanism through
ASBA Form(s) submitted with Syndicate Members, Registered Brokers,
Collecting Depository Participants and Registrar and Share Transfer
Agents. Pursuant to SEBI ICDR Master Circular, all individual investors
applying in public issues where the application amount is up to ₹0.50
UPI Bidders
million shall use UPI Mechanism and shall provide their UPI ID in the
bid-cum-application form submitted with: (i) a syndicate member, (ii) a
stock broker registered with a recognized stock exchange (whose name
is mentioned on the website of the stock exchange as eligible for such
activity), (iii) a depository participant (whose name is mentioned on the
website of the stock exchange as eligible for such activity), and (iv) a
registrar to an issue and share transfer agent (whose name is mentioned
on the website of the stock exchange as eligible for such activity).
SEBI circular number SEBI/HO/CFD/DIL2/CIR/P/2019/85 dated July
26, 2019, SEBI master circular read with circular number
SEBI/HO/MIRSD/POD-1/P/CIR/2024/37 dated May 07, 2024 (to the
extent that such circulars pertain to the UPI Mechanism), SEBI ICDR
Master Circular and any subsequent circulars or notifications issued by
UPI Circulars SEBI in this regard, along with the circulars issued by the Stock
Exchanges in this regard, including the circular issued by the NSE having
reference number 25/2022 dated August 03, 2022, and the circular issued
by BSE having reference number 20220803-40 dated August 03, 2022
and any subsequent circulars or notifications issued by SEBI or Stock
Exchanges in this regard.
ID created on the UPI for single-window mobile payment system
UPI ID
developed by the NPCI.
A request (intimating the UPI Bidders by way of a notification on the UPI
linked mobile application as disclosed by SCSBs on the website of SEBI
and by way of an SMS on directing the UPI Bidders to such UPI linked
UPI Mandate Request
mobile application) to the UPI Bidders initiated by the Sponsor Banks to
authorise blocking of funds on the UPI application equivalent to Bid
Amount and subsequent debit of funds in case of Allotment.
14The bidding mechanism that may be used by an UPI Bidders in
UPI Mechanism
accordance with the UPI Circulars to make an ASBA Bid in the Offer.
A company or person, as the case may be, categorised as a wilful defaulter
by any bank or financial institution (as defined under the Companies Act,
Wilful Defaulter or Fraudulent
2013) or consortium thereof, in accordance with the guidelines on wilful
Borrower
defaulters issued by the RBI and as defined under Regulation 2(1)(lll) of
the SEBI ICDR Regulations.
All days on which commercial banks in Mumbai are open for business. In
respect of announcement of Price Band and Bid/Offer Period, Working
Day shall mean all days, excluding Saturdays, Sundays, and public
holidays, on which commercial banks in Mumbai are open for business.
Working Day
In respect of the time period between the Bid/ Offer Closing Date and the
listing of the Equity Shares on the Stock Exchanges, Working Day shall
mean all trading days of the Stock Exchanges, excluding Sundays and
bank holidays in India, as per circulars issued by SEBI.
Technical, Industry and Business-Related Terms or Abbreviations
Term Description
ABC Aerial Bunched Cables
AC Mazza Asbestos Cement Mazza
ACSR Aluminium Conductor Steel Reinforced
ADB Asian Development Bank
AIR Act The Air (Prevention and Control of Pollution) Act, 1981
AMRUT Atal Mission for Rejuvenation and Urban Transformation
APFC Automatic Power Factor Control
BC Bituminous Concrete
BM Bituminous Macadam
CAGR Compound Annual Growth Rate
CAR Contractor’s All Risk
CBG Compressed Bio Gas
CETP Common Effluent Treatment Plant
COD Commercial Operation Date
CPCB Central Pollution Control Board
CPHEEO Central Public Health and Environmental Engineering Organisation
DAB Dispute Adjudication Board
DBM The Dense Bituminous Macadam
Debt to equity ratio Debt to equity ratio is calculated as total debt divided by total equity
DG Diesel Generator
DISCOM Distribution Company
DLT Data Logging Transmitter
DRB Dispute Resolution Board
DVVNL Dakshinanchal Vidyut Vitaran Nigam Limited
DWC Double Wall Corrugated
EBITDA EBITDA is calculated as profit or loss before tax (excluding other income)
for the period / year plus finance costs, depreciation and amortization
expense and before exceptional items
EBITDA Margin EBITDA Margin is calculated as EBITDA divided by revenue from
operations
EHT Extra High Tension
EPC Engineering, Procurement and Construction
15EPS Earnings per Share
ESIC Employee State Insurance Corporation
EOT Extension of Time
GIS Geographic Information System
GSB Granular Sub Base
GW Gigawatt
HAM Hybrid Annuity Model
HDD Horizontal Directional Drilling
HDPE High-Density Polyethylene
HT High Tension
JNNURM Jawaharlal Nehru National Urban Renewal Mission
JV Joint Ventures
KUSUM YOJANA Pradhan Mantri Kisan Urja Suraksha Evam Utthaan Mahabhiyan
LD Liquidated Damages
LT Low Tension
MLD Million Liters per Day
MS Mild Steel
MVA Megavolt-Ampere
MWPS Mechanical Wastewater Pumping Station
NAPCC National Action Plan on Climate Change
NBC 2016 National Building Code, 2016
Net debt Net debt is total debt less cash and cash equivalents. Total debt includes
current and non-current borrowings and lease liabilities
NIP National Infrastructure Pipeline
NH Act The National Highways Act, 1956
NHAI Act The National Highways Authority of India Act, 1988
O&M Operation and Maintenance
PAT Margin PAT Margin is calculated as restated profit after tax divided by revenue
from operations
PLC Programmable Logic Controller
PMGSY Pradhan Mantri Gram Sadak Yojana
PSU Public sector undertaking
PVVNL Paschimanchal Vidyut Vitaran Nigam Limited
PWD Public Works Departments
RAPDRP Restructured Accelerated Power Development and Reforms Programme
RCC Reinforced Cement Concrete
Return on Capital Employed or Return on capital employed is calculated as a percentage of EBIT (before
“ROCE” exceptional items) divided by capital employed. EBIT is calculated as
profit for the year plus tax expenses and finance costs. Capital employed
is calculated as sum of total equity plus total borrowings, total lease
liabilities, deferred tax liabilities, less deferred tax assets.
Return on Equity or “RoE” Return on equity is calculated as restated profit for the period divided by
average total equity. Average total equity is calculated as the sum of
opening total equity at the beginning of the period/year and closing total
equity at the end of the period/year, divided by two.
RGGVY Rajiv Gandhi Grameen Vidyutikaran Yojana
RUDSICO Rajasthan Urban Drinking Water Sewerage & Infrastructure Corporation
RUIDP Rajasthan Urban Infrastructure Development Project
SBR Sequencing Batch Reactors
SCADA Supervisory Control and Data Acquisition
SDBC Semi-Dense Bituminous Concrete
16SOR Schedule of Rates
SPS Sewage Pumping Station
STP Sewage Treatment Plants
TP Act The Transfer of Property Act, 1882
UASB Upflow Anaerobic Sludge Blanket
UIDSSMT Urban Infrastructure Development Scheme for Small and Medium Towns
UIDSST Urban Infrastructure Development Scheme in Satellite Towns
ULB Urban Local Bodies
UPVC Unplasticized Polyvinyl Chloride
Water Rules The Water (Prevention and Control of Pollution) Rules, 1975
WAPCOS Water and Power Consultancy Services (India) Limited
WMM Wet Mix Macadam
WSSPs Water Supply Scheme Projects
WWT Wastewater Treatment
WWTPs Wastewater Treatment Plants
XLPE cables Cross-Linked Polyethylene cable
Conventional and General Terms or Abbreviations
Term Description
“₹” or “Rs.” Or “Rupees” or
Indian Rupees
“INR”
Alternative Investments Funds, as defined in, and registered under the
AIFs
SEBI AIF Regulations.
AGM Annual general meeting
BSE BSE Limited
CAGR Compound annual growth rate
AIFs who are registered as “Category I Alternative Investment Funds”
Category I AIF
under the SEBI AIF Regulations.
FPIs who are registered as “Category I Foreign Portfolio Investors” under
Category I FPIs
the SEBI FPI Regulations.
AIFs who are registered as “Category II Alternative Investment Funds”
Category II AIF
under the SEBI AIF Regulations.
FPIs who are registered as “Category II Foreign Portfolio Investors” under
Category II FPIs
the SEBI FPI Regulations.
AIFs who are registered as “Category III Alternative Investment Funds”
Category III AIF
under the SEBI AIF Regulations.
CBDT Central Board of Direct Taxes
CDSL Central Depository Services (India) Limited
CGST Act Central Goods and Service Tax Act, 2017
CIN Corporate Identity Number
CLPR Act The Child Labour (Prohibition and Regulation) Act, 1986
The erstwhile Companies Act, 1956, along with the relevant rules,
Companies Act, 1956
regulations, clarifications and modifications made thereunder.
“Companies Act” or “Companies Companies Act, 2013, as applicable, along with the relevant rules,
Act, 2013” regulations, clarifications and modifications made thereunder.
Consolidated Foreign Direct Investment Policy notified by the DPIIT
Consolidated FDI Policy under DPIIT File Number 5(2)/2020-FDI Policy dated October 15, 2020,
effective from October 15, 2020.
CrPC Code of Criminal Procedure, 1973, as amended
17Depositories Together, NSDL and CDSL
Depositories Act Depositories Act, 1996, as amended
DIN Director Identification Number
DP ID Depository Participant’s Identification
“DP” or “Depository Participant” A depository participant as defined under the Depositories Act
Department for Promotion of Industry and Internal Trade, Ministry of
DPIIT
Commerce and Industry, Government of India.
EGM Extraordinary general meeting
EPFMP Act Employees Provident Fund and Miscellaneous Provisions Act, 1952
EPS Earnings per share
ESI Act Employees State Insurance Act, 1948
FDI Foreign direct investment
The Foreign Exchange Management Act, 1999, read with rules, regulations
FEMA
and modifications made thereunder.
Foreign Exchange Management (Non-debt Instruments) Rules, 2019, as
FEMA Rules or FEMA NDI Rules
amended.
“Financial Year” or “Fiscal” or Unless stated otherwise, the period of 12 months ending March 31 of that
“Fiscal Year” or “FY” particular year.
FIR First Information Report
FPI(s) Foreign portfolio investors as defined under the SEBI FPI Regulations
FTDR Act Foreign Trade Development and Regulation Act 1992
Foreign venture capital investors as defined and registered under the SEBI
FVCI(s)
FVCI Regulations.
“GoI” or “Government” or
Government of India
“Central Government”
GDP Gross domestic product
GST Goods and services tax Act, 2017
Hazardous Wastes Rules Hazardous and Other Wastes (Management and Transboundary
Movement) Rules, 2016.
HUF Hindu undivided family
ICAI The Institute of Chartered Accountants of India
International Financial Reporting Standards, as issued by the International
IFRS
Accounting Standards Board.
Income Tax Income Tax
Income Tax Act The Income Tax Act, 1961, as amended
Indian Accounting Standards notified under Section 133 of the Companies
“Ind AS” or “Indian
Act and referred to in the Companies (Indian Accounting Standards)
Accounting Standards”
Rules, 2015, as amended.
India Republic of India
Accounting Standards notified under Section 133 of the Companies Act
and referred to in the Companies (Accounting Standards) Rules, 2014, as
Indian GAAP/IGAAP
amended and Companies (Accounting Standards) Amendment Rules,
2016, as amended.
IPO Initial public offering
IRDAI Insurance Regulatory and Development Authority of India
IST Indian Standard Time
IT Information Technology
IT Act The Information Technology Act, 2000, as amended
KYC Know Your Customer
LLP Limited Liability Partnership
18MCA Ministry of Corporate Affairs, Government of India
MSMEs Micro, Small and Medium Enterprises
Mutual Fund(s) means mutual funds registered under the Securities and
Mutual Fund(s)
Exchange Board of India (Mutual Funds) Regulations, 1996, as amended.
N/A Not applicable
NACH National Automated Clearing House
NAV Net Asset Value
NEFT National Electronic Fund Transfer
NI Act Negotiable Instruments Act, 1881, as amended
NPCI National Payments Corporation of India
NRE Non- Resident External
NRI A non-resident Indian as defined under the FEMA NDI Rules
NRO Non-Resident Ordinary
NSDL National Securities Depository Limited
NSE National Stock Exchange of India Limited
A company, partnership, society or other corporate body owned directly or
indirectly to the extent of at least 60% by NRIs including overseas trusts,
in which not less than 60% of beneficial interest is irrevocably held by
“OCB” or “Overseas Corporate
NRIs directly or indirectly and which was in existence on October 03,
Body”
2003 and immediately before such date had taken benefits under the
general permission granted to OCBs under FEMA. OCBs are not allowed
to invest in the Offer.
p.a. Per annum
P/E Ratio Price to Earnings Ratio
PAN Permanent Account Number
PAT Profit after tax/ profit for the year
PBT Profit before tax
RBI Reserve Bank of India
Regulation S Regulation S under the U.S. Securities Act
ROU Right of Use
RTGS Real Time Gross Settlement
Rule 144A Rule 144A under the U.S. Securities Act
SCRA Securities Contracts (Regulation) Act, 1956, as amended
SCRR Securities Contracts (Regulation) Rules, 1957, as amended
SEBI Securities and Exchange Board of India constituted under the SEBI Act
SEBI Act Securities and Exchange Board of India Act, 1992, as amended
Securities and Exchange Board of India (Alternative Investment Funds)
SEBI AIF Regulations
Regulations, 2012, as amended.
Securities and Exchange Board of India (Bankers to an Issue) Regulations,
SEBI BTI Regulations
1994, as amended.
Securities and Exchange Board of India (Foreign Portfolio Investors)
SEBI FPI Regulations
Regulations, 2019, as amended.
Securities and Exchange Board of India (Fraudulent and Unfair Trade
SEBI FUTP Regulations
Practices relating to Securities Market) Regulations, 2003, as amended.
Securities and Exchange Board of India (Foreign Venture Capital
SEBI FVCI Regulations
Investors) Regulations, 2000, as amended.
SEBI master circular bearing number SEBI/HO/CFD/POD-
SEBI ICDR Master Circular
1/P/CIR/2024/0154 dated November 11, 2024.
Securities and Exchange Board of India (Issue of Capital and
SEBI ICDR Regulations
Disclosure Requirements) Regulations, 2018, as amended.
19Securities and Exchange Board of India (Listing Obligations and
SEBI Listing Regulations
Disclosure Requirements) Regulations, 2015, as amended.
SEBI Merchant Bankers Securities and Exchange Board of India (Merchant Bankers) Regulations,
Regulations 1992, as amended.
The SEBI master circular no. SEBI/HO/MIRSD/POD-1/P/CIR/2024/37
SEBI RTA Master Circular
dated May 7, 2024.
Securities and Exchange Board of India (Share Based Employee
SEBI SBEB & SE Regulations
Benefits and Sweat Equity) Regulations, 2021, as amended.
Securities and Exchange Board of India (Substantial Acquisition of
SEBI Takeover Regulations
Shares and Takeovers) Regulations, 2011, as amended.
Securities and Exchange Board of India (Venture Capital Fund)
SEBI VCF Regulations
Regulations, 1996 as repealed pursuant to the SEBI AIF Regulations.
SME Small and Medium Enterprises
Stamp Act The Indian Stamp Act, 1899, as amended
State Government The government of a state in India
Stock Exchanges BSE and NSE
STT Securities Transaction Tax
“Systemically Important NBFC” Systemically important non-banking financial company as defined under
or “NBFC-SI” Regulation 2(1)(iii) of the SEBI ICDR Regulations.
TAN Tax deduction account number
“U.K.” or “UK” United Kingdom
“U.S.” or “USA” or “United United States of America including its territories and possessions, any
States” State of the United States, and the District of Columbia.
U.S. GAAP Generally Accepted Accounting Principles in the United States
U.S. SEC Securities and Exchange Commission of the United States of America
U.S. QIBs “qualified institutional buyers”, as defined in Rule 144A
U.S. Securities Act U.S. Securities Act of 1933, as amended
“USD” or “US$” United States Dollars
Venture capital funds as defined in and registered with the SEBI under the
VCFs
SEBI VCF Regulations or the SEBI AIF Regulations, as the case may be.
Unless the context otherwise requires, shall mean the 12 month period
“Year” or “calendar year”
ending December 31.
Key Performance Indicators
KPI Explanation
Financial Indicators
Revenue from Operations is used by our management to track the revenue
Revenue from Operations profile of the business and in turn helps assess the overall financial
performance of our Company and size of our business.
Total income is used by the management to track revenue from operations
Total income
and other income.
EBITDA provides information regarding the operational efficiency of the
EBITDA
business.
EBITDA Margin (%) is an indicator of the operational profitability and
EBITDA Margin (%)
financial performance of our business.
Profit after tax provides information regarding the overall profitability of
PAT
the business.
PAT Margin (%) is an indicator of the overall profitability and financial
PAT Margin (%)
performance of our business.
20Operating Cash Operating cash flows activities provides how efficiently our company
Flows generates cash through its core business activities.
Net worth is used by the management to ascertain the total value created
Net Worth by the entity and provides a snapshot of current financial position of the
entity.
Net debt helps the management to determine whether a company is over
Net Debt
leveraged or has too much debt given its liquid assets.
The debt-to-equity ratio compares an organization's liabilities to its
Debt- Equity Ratio
shareholder’s equity and is used to gauge how much debt or leverage the
(times)
organization is using.
ROE provides how efficiently our Company generates profits from
ROE (%)
shareholders’ funds.
ROCE provides how efficiently our Company generates earnings from
ROCE (%)
the capital employed in the business.
Operational Indicators
Sewage Treatment Plant (STP) Indicates the total count of STP projects successfully executed by our
Projects Completed Company, either individually or through joint ventures, over a specified
period. This reflects our execution capacity in the wastewater sector.
Govt. Projects Completed Denotes the number of projects completed under various central and state
government schemes such as AMRUT, JJM, and NMCG, showcasing our
credentials in delivering public infrastructure.
Contract Secured in last 5 years Total number of contracts successfully secured, categorized by project
type (e.g., STPs, CETPs, water supply schemes, O&M contracts),
indicating our order acquisition performance across different verticals.
Order Book Represents the total number of unexecuted projects and the
corresponding aggregate contract value as of a particular date.
Tender Participation and Success Indicates the number of tenders participated in and the corresponding
Ratio number successfully won during a given period, highlighting our
competitive position and bid effectiveness.
EPC Volume under Government Denotes the aggregate contract value or executed volume of EPC projects
Schemes secured under key government schemes (such as AMRUT, JJM, NMCG),
underscoring our contribution to public infrastructure development.
21CERTAIN CONVENTIONS, PRESENTATION OF FINANCIAL, INDUSTRY AND MARKET DATA
AND CURRENCY OF PRESENTATION
Certain Conventions
All references to “India” contained in this Draft Red Herring Prospectus are to the Republic of India and its
territories and possessions. All references to the “Government”, “Indian Government”, “GOI”, “Central
Government” or the “State Government” are to the Government of India, central or state, as applicable. All
references to the “U.S.”, “US”, “U.S.A” or “United States” are to the United States of America and its territories
and possessions.
Unless otherwise specified, any time mentioned in this Draft Red Herring Prospectus is in Indian Standard Time
(“IST”). Unless indicated otherwise, all references to a year in this Draft Red Herring Prospectus are to a calendar
year.
Further, unless stated otherwise, all references to page numbers in this Draft Red Herring Prospectus are to the
page numbers of this Draft Red Herring Prospectus.
Financial Data
Unless stated or the context requires otherwise, the financial information in this Draft Red Herring Prospectus is
derived from the Restated Consolidated Financial Information of our Company.
The Restated Consolidated Financial Information of our Company included in this Draft Red Herring Prospectus
comprise the restated statement of assets and liabilities for the financial year as at March 31, 2025, March 31,
2024 and March 31, 2023 the restated statements of profit and loss (including other comprehensive income), the
restated statement of changes in equity, the restated cash flow statement for the financial year as at March 31,
2025, March 31, 2024 and March 31, 2023, the summary statement of significant accounting policies, and other
explanatory information, together with the annexures and the notes thereto, prepared in accordance with Section
26 of Part I of Chapter III of the Companies Act, 2013, the SEBI ICDR Regulations, as amended and the Guidance
Note on Reports in Company Prospectuses (Revised 2019) issued by the ICAI. kindly refer “Summary of Restated
Consolidated Financial Information” and “Restated Consolidated Financial Information” beginning on pages 85
and 331 respectively.
Our Company’s financial year commences on April 01 and ends on March 31 of that particular calendar year.
Accordingly, all references to a particular financial year or fiscal, unless stated otherwise, are to the 12 months
period ended on March 31 of such years. Unless stated otherwise, or the context requires otherwise, all references
to a “year” in this Draft Red Herring Prospectus are to a calendar year.
The degree to which the financial information included in this Draft Red Herring Prospectus will provide
meaningful information is entirely dependent on the reader’s level of familiarity with Indian accounting policies
and practices, Ind AS, the Companies Act and SEBI ICDR Regulations. Any reliance by persons not familiar with
the aforementioned policies and laws on the financial disclosures presented in this Draft Red Herring Prospectus
should be limited. There are significant differences between Ind AS, Indian GAAP, U.S. GAAP and IFRS. Our
Company does not provide a reconciliation of its financial statements with Indian GAAP, IFRS or U.S. GAAP
requirements. Our Company has not attempted to explain those differences or quantify their impact on the
financial data included in this Draft Red Herring Prospectus and it is urged that you consult your own advisors
regarding such differences and their impact on our financial data. For further details in connection with risks
involving differences between Ind AS and other accounting principles, kindly refer “Risk Factor No. 63 –
Significant differences exist between Ind AS and other accounting principles, such as U.S. GAAP and IFRS, which
investors may be more familiar with and may consider material to their assessment of our financial condition.”
on page 72.
22Unless the context otherwise requires or indicates, any percentage amounts (excluding certain operational
metrics), as set forth in “Risk Factors”, “Our Business”, “Management’s Discussion and Analysis of Financial
Conditions and Results of Operations” beginning on pages 39, 228 and 444, respectively, and elsewhere in this
Draft Red Herring Prospectus have been derived from the Restated Consolidated Financial Information of our
Company.
In this Draft Red Herring Prospectus, any discrepancies in any table between the total and the sums of the amounts
listed are due to rounding off. Except as otherwise stated, all figures in decimals have been rounded off to the
second decimal and all the percentage figures have been rounded off to two decimal places. In certain instances,
(i) the sum or percentage change of such numbers may not conform exactly to the total figure given; and (ii) the
sum of the numbers in a column or row in certain tables may not conform exactly to the total figure given for that
column or row.
Further, any figures sourced from third-party industry sources may be rounded off to other than two decimal points
to conform to their respective sources.
Non-GAAP Measures
Certain Non-GAAP Measures and certain other statistical information relating to our operations and financial
performance, like EBITDA, EBITDA Margin, Adjusted EBITDA, Adjusted EBITDA Margin, Gross Profit, Gross
Profit Margin, PAT Margin, CAGR, Net Asset Value per Equity Share, Return on Net worth, Return on equity,
Net worth, EBIT, Capital Employed, Return on Capital Employed and others (“Non-GAAP Measures”), have
been included in this Draft Red Herring Prospectus. We compute and disclose such Non-GAAP Measures and
such other statistical information relating to our operations and financial performance as we consider such
information to be useful measures of our business and financial performance. These Non-GAAP Measures are a
supplemental measure of our performance and liquidity that is not required by, or presented in accordance with,
Ind AS, Indian GAAP, IFRS or US GAAP. Further, these Non-GAAP Measures are not a measurement of our
financial performance or liquidity under Ind AS, Indian GAAP, IFRS or US GAAP and should not be considered
in isolation or construed as an alternative to cash flows, profit/ (loss) for the years/ period or any other measure
of financial performance or as an indicator of our operating performance, liquidity, profitability or cash flows
generated by operating, investing or financing activities derived in accordance with Ind AS, Indian GAAP, IFRS
or US GAAP. In addition, these Non-GAAP Measures are not standardised terms, hence a direct comparison of
these non-GAAP Measures between companies may not be possible. Other companies may calculate these Non-
GAAP Measures differently from us, limiting its usefulness as a comparative measure. Although such Non-GAAP
Measures are not a measure of performance calculated in accordance with applicable accounting standards.
Non-GAAP financial information is presented for supplemental informational purposes only, has limitations as
an analytical tool and should not be considered in isolation or as a substitute for financial information presented
in accordance with Ind AS. Non-GAAP financial information may be different from similarly titled Non-GAAP
measures used by other companies. The principal limitation of these non-GAAP financial measures is that they
exclude significant expenses and income that are required by Ind AS to be recorded in our financial statements,
as further detailed below. In addition, they are subject to inherent limitations as they reflect the exercise of
judgment by management about which expenses and income are excluded or included in determining these non-
GAAP financial measures. Investors are encouraged to review the related Ind AS financial measures and the
reconciliation of non-GAAP financial measures to their most directly comparable Ind AS financial measures
included below and to not rely on any single financial measure to evaluate our business.
Currency and Units of Presentation
All references to “Rupees” or “₹” or “Rs.” are to Indian Rupees, the official currency of the Republic of India.
23All references to “US$”, “US Dollar”, or “USD” are to United States Dollars, the official currency of the United
States of America.
In this Draft Red Herring Prospectus, our Company has presented certain numerical information. All figures have
been expressed in lakhs and millions. One lakh represents ‘lakh’ or 100,000 and one million represents ‘million’
or 1,000,000. However, where any figures that may have been sourced from third-party industry sources are
expressed in denominations other than million, such figures appear in this Draft Red Herring Prospectus expressed
in such denominations as provided in their respective sources.
Exchange Rates
This Draft Red Herring Prospectus contains conversion of certain other currency amounts into Indian Rupees that
have been presented solely to comply with the SEBI ICDR Regulations. These conversions should not be
construed as a representation that these currency amounts could have been, or can be converted into Indian Rupees,
at any particular rate or at all.
Unless otherwise stated, the exchange rates referred to for the purpose of conversion of foreign currency amounts
into Indian Rupee, are as follows.
(in ₹)
Exchange Rate as on
Currency
March 31, 2025 March 31, 2024 March 31, 2023
1 USD 85.58 83.37 82.22
Source: www.rbi.org.in
(1) All figures are rounded up to two decimals.
(2) If the RBI reference rate is not available on a particular date due to a public holiday or otherwise, exchange
rates of the previous working day have been disclosed.
Industry and Market Data
Unless stated otherwise, industry and market data used in this Draft Red Herring Prospectus is derived from the
CRISIL Report, prepared by CRISIL appointed by our Company pursuant to an engagement letter dated April 10,
2025, and such Report has been commissioned by our Company for an agreed fee, exclusively in connection with
the Offer for the purpose of understanding the industry in connection with this Offer, since no report is publicly
available which provides a comprehensive industry analysis, particularly for our Company’s services, that may be
similar to the CRISIL Report.
Industry publications generally state that the information contained in such publications has been obtained from
publicly available documents from various sources believed to be reliable but accuracy, completeness and
underlying assumptions of such third-party sources are not guaranteed. Industry sources and publications may base
their information on estimates and assumptions that may prove to be incorrect. The data used in these sources may
have been re-classified for the purposes of presentation. There are no parts, data or information of the CRISIL
Report which may be relevant for the Offer, that have been left out or changed in any manner. Data from these
sources may also not be comparable. Industry sources and publications are also prepared based on information as
of specific dates and may no longer be current or reflect current trends. Such data involves risks, uncertainties and
numerous assumptions and is subject to change based on various factors, including those discussed in “Risk Factor
No. 41 – Industry information included in this Draft Red Herring Prospectus has been derived from an industry
report issued by CRISIL Intelligence dated August 05, 2025 ("CRISIL Report"). There can be no assurance that
such third-party statistical, financial and other industry information is complete, reliable or accurate.” on page
64. Accordingly, investment decisions should not be based solely on such information.
The extent to which the market and industry data used in this Draft Red Herring Prospectus is meaningful depends
on the reader’s familiarity with and understanding of the methodologies used in compiling such data. There are no
standard data gathering methodologies in the industry in which business of our Company is conducted, and
24methodologies and assumptions may vary widely amongst different industry sources. Accordingly, no investment
decision should be made solely on the basis of such information
The CRISIL Report is also available at our Company’s website at www.technocraftventures.com.
In accordance with the SEBI ICDR Regulations, the section “Basis for Offer Price” beginning on page 134
includes information relating to our peer group companies, which has been derived from publicly available sources,
and accordingly, no investment decision should be made solely on the basis of such information.
25FORWARD - LOOKING STATEMENTS
This Draft Red Herring Prospectus contains certain “forward-looking statements”. All statements regarding our
expected financial condition and results of operations, business, plans and prospects are forward looking
statements, which may include statements with respect to our business strategy, our revenue and profitability, our
goals and other such matters discussed in this Draft Red Herring Prospectus regarding matters that are not historical
facts. These forward-looking statements generally can be identified by words or phrases such as “aim”,
“anticipate”, “believe”, “goal”, “expect”, “estimate”, “intend”, “likely to”, “objective”, “plan”, “projected”,
“should” “will”, “will continue”, “seek to”, “will pursue” or other words or phrases of similar import. Similarly,
statements that describe our expected financial conditions, results of operations, strategies, objectives, prospects,
plans or goals are also forward-looking statements. However, these are not the exclusive means of identifying
forward-looking statements. All forward-looking statements, whether made by us or any third parties in this Draft
Red Herring Prospectus are based on our current plans, estimates, presumptions and expectations and are subject
to risks, uncertainties and assumptions about us that could cause actual results to differ materially from those
contemplated by the relevant forward-looking statement.
Actual results may differ materially from those suggested by the forward-looking statements due to risks or
uncertainties associated with the expectations with respect to, but not limited to, regulatory changes pertaining to
the industry in which our Company has businesses and our ability to respond to them, our ability to successfully
implement our strategy, our growth and expansion, technological changes, our exposure to market risks, general
economic and political conditions in India and globally which have an impact on our business activities or
investments, the monetary and fiscal policies of India, inflation, deflation, unanticipated turbulence in interest
rates, foreign exchange rates, equity prices or other rates or prices, the performance of the financial markets in
India and globally, incidence of any natural calamities and/or acts of violence, changes in laws, regulations and
taxes and changes in competition in our industry.
Certain important factors that could cause actual results to differ materially from our expectations include, but are
not limited to, the following:
(i) We derive a significant portion of our revenue from government projects located in the states of Uttar Pradesh and
Rajasthan. For the Financial Years 2025, 2024 and 2023 our revenue from the customers located in these states
constituted 86.63%, 93.46% and 100.00% respectively, of our revenue from operations during the respective
periods. Any adverse developments related to competition, economic slowdown, inflationary trends, or changes in
regulatory and political conditions in these states may adversely affect our business, results of operations, cash
flows, and financial condition.
(ii) We generate a majority of our revenue through government tenders only. Any loss of, or a reduction in business
from, such governments i.e. Uttar Pradesh or Rajasthan, or our inability to maintain long-term relationships with
these customers could reduce our revenues and adversely affect our business, cash flows, financial condition and
results of operations.
(iii) Our business is dependent on the continued availability of government-funded water and wastewater projects,
including under schemes such as the Jal Jeevan Mission and AMRUT 2.0. Any reduction or delay in government
budgetary allocations for such programs may adversely affect the number of projects awarded, and consequently,
our order book and revenue.
(iv) We rely on our ability to qualify for, compete, and secure government contracts awarded through competitive
bidding. Failure to meet pre-qualification criteria, obtain requisite certifications, or maintain past performance
credentials may impact our eligibility and ability to win future projects.
(v) We depend on a team of skilled professionals for in-house design, engineering, procurement, and execution. Loss
of personnel with key domain expertise may impact project timelines, quality of execution, and ability to meet
client specifications.
26(vi) Our ability to remain competitive depends on adapting to technological changes and complying with government-
mandated technological standards, including in areas such as digital monitoring systems, renewable energy
integration, and trenchless micro tunnelling methods.
(vii) Our future growth depends on our ability to increase the scale and complexity of projects executed and to expand
our eligibility for larger and more technically demanding contracts. Failure to scale up execution capabilities or
pre-qualifications may restrict our ability to bid for high-value tenders.
(viii) We require significant working capital for project execution. Insufficient cash flows, delays in milestone-based
payments, or limited access to credit may impact our ability to procure materials, mobilize labour, and adhere to
construction timelines.
(ix) We undertake selective projects through joint ventures. The inability of our joint venture partners to perform
contractual obligations may result in additional liabilities, project delays, cost overruns, or financial losses, and
may impact our eligibility in future tenders.
(x) Increases in the cost of construction materials such as cement and steel, as well as labour costs and subcontractor
charges, may not be fully recoverable under our contracts and may impact our margins and profitability.
(xi) Premature termination, suspension, or non-renewal of projects, whether due to contractual breaches, changes in
government policy, or force majeure events, may adversely impact our revenue recognition and project pipeline.
For a further discussion of factors that could cause our actual results to differ from expectations, kindly refer “Risk
Factors”, “Our Business”, “Industry Overview”, and “Management’s Discussion and Analysis of Financial
Conditions and Results of Operations” beginning on pages 39, 228, 152 and 444, respectively. By their nature,
certain market risk disclosures are only estimating and could be materially different from what actually occurs in
the future.
We cannot assure Bidders that the expectations reflected in these forward-looking statements will prove to be
correct. Given these uncertainties, Bidders are cautioned not to place undue reliance on such forward-looking
statements and not to regard such statements as a guarantee of our future performance.
Neither our Company, our Promoters, Directors, nor the BRLM, or any of their respective affiliates have any
obligation to update or otherwise revise any statements reflecting circumstances arising after the date hereof or to
reflect the occurrence of underlying events, even if the underlying assumptions do not come to fruition.
In accordance with the SEBI ICDR Regulations and as prescribed under applicable law, our Company will ensure
that Bidders in India are informed of material developments, pertaining to our Company and the Equity Shares
forming part of the Offer from the date of this Draft Red Herring Prospectus until the time of the grant of listing
and trading approvals by the Stock Exchanges. In accordance with the requirements of SEBI and as prescribed
under the applicable law, the Promoter Selling Shareholder will ensure (through our Company and the BRLM)
that investors are informed of material developments in relation to the statements and undertakings specifically
undertaken or confirmed by the Promoter Selling Shareholder in the Draft Red Herring Prospectus, Red Herring
Prospectus and Prospectus until the receipt of final listing and trading approvals for the Equity Shares pursuant to
the Offer. Only statements and undertakings which are specifically confirmed or undertaken by the Promoter
Selling Shareholder to the extent of information pertaining to it in this Draft Red Herring Prospectus shall be
deemed to be statements and undertakings made by the Promoter Selling Shareholder.
27SUMMARY OF OFFER DOCUMENT
This section is a general summary of certain disclosures included in this Draft Red Herring Prospectus and is not
exhaustive, nor does it purport to contain a summary of all the disclosures in this Draft Red Herring Prospectus
or all details relevant to prospective investors. This summary should be read in conjunction with, and is qualified
in its entirety by, the more detailed information appearing elsewhere in this Draft Red Herring Prospectus,
including the sections titled “Risk Factors”, “The Offer”, “Capital Structure”, “Objects of the Offer”, “Industry
Overview”, “Our Business”, “Our Promoters and Promoter Group”, “Restated Consolidated Financial
Information”, “Management’s Discussions and Analysis of Financial Conditions and Results of Operations”,
“Outstanding Litigation and Material Developments”, “Offer Structure”, “Offer Procedure” and “ Description
of Equity Shares and Terms of the Articles of Association” beginning on pages 39, 82, 100, 121, 152, 228, 324,
331, 444, 479, 514, 520 and 548, respectively.
SUMMARY OF THE PRIMARY BUSINESS OF OUR COMPANY
We are a multidisciplinary EPC company specializing in public infrastructure projects across northern India, with
a focus on water supply, wastewater treatment, sewerage, roads and highways and electrification. Our services
span design, construction, and long-term O&M of urban infrastructure including STPs, WWTPs, drainage
networks, substations and roadworks. We operate across five verticals: water and wastewater infrastructure,
O&M, urban infrastructure, electrical works, and microtunnelling. Serving key government clients such as DJB,
RUDSICO, and UP Jal Nigam, we have a strong presence in multiple states and continue to grow, driven by major
schemes like AMRUT 2.0 and Jal Jeevan Mission.
For further details, kindly refer “Our Business” beginning on page 228.
SUMMARY OF THE INDUSTRY IN WHICH OUR COMPANY OPERATES
India’s infrastructure EPC sector is set for robust growth, with the construction industry projected to grow at a
CAGR of 7–9% between FY 2023 and 2028, supported by government initiatives like NIP, PM Gati Shakti, and
AMRUT 2.0. With ₹3.2 trillion earmarked for water supply and sanitation under the NIP, demand is rising for
EPC players with sectoral expertise, integrated O&M capabilities, and technology-driven execution. Our
Company, with proven experience in wastewater management, microtunnelling, and renewable integration, is
well-positioned to capitalize on these emerging opportunities. (Source: CRISIL Report)
For further information, kindly refer “Industry Overview” beginning on page 152.
PROMOTERS
As on the date of this Draft Red Herring Prospectus, Sanjay Tyagi, Rekha Tyagi, Kartikey Tyagi, Kartikey
Constructions (Partnership Firm) and Sanjay Tyagi HUF are the Promoters of our Company. For details, kindly
refer “Our Promoters and Promoter Group” beginning on page 324.
OFFER SIZE
The following table summarizes the details of the Offer. For further details, kindly refer “The Offer” and “Offer
Structure” beginning on pages 82 and 514, respectively.
Offer(1)(2) 11,881,000 Equity Shares of face value ₹10 each, aggregating up to ₹ [●] million
of which
Fresh Issue(1) 9,505,000 Equity Shares of face value ₹10 each, aggregating up to ₹ [●] million
Offer for Sale(2) 2,376,000 Equity Shares of face value ₹10 each, aggregating up to ₹ [●] million
(1) Our Board authorized the Offer, pursuant to their resolution dated May 29, 2025. Our Shareholders
28authorized the Fresh Issue pursuant to their resolution dated June 02, 2025. Further, the Promoter Selling
Shareholder has consented to participate in the Offer pursuant to its consent letters dated June 05, 2025. Our
Board has taken on record the consent of the Promoter Selling Shareholder to participate in the Offer for Sale
pursuant to a resolution passed at its meeting held on June 05, 2025.
(2) The Equity Shares being offered by the Promoter Selling Shareholder have been held by such Promoter selling
shareholder for a period of at least one year immediately preceding the date of this Draft Red Herring
Prospectus with the SEBI and are eligible for being offered for sale pursuant to the Offer in terms of the SEBI
ICDR Regulations. Further, the Promoter Selling Shareholder has confirmed that its Offered Shares are
compliant with Regulation 8 of the SEBI ICDR Regulations. For further details, kindly refer “Capital
Structure” beginning on page 100. For details of authorizations received for the Offer for Sale, kindly refer
“Other Regulatory and Statutory Disclosures” beginning on page 492.
The Offer shall constitute [●] %, of the post-offer paid up equity share capital of our Company. For further details,
kindly refer “The Offer” and “Offer Structure” beginning on pages 82 and 514 respectively.
OBJECTS OF THE OFFER (FRESH ISSUE)
Our Company proposes to utilise the Net Proceeds from fresh issue towards the following objects:
(₹ in million)
Particulars Amount
Working Capital Requirements 1,380.00
General Corporate Purpose (2) [●]
Net Proceeds (1)(2) [●]
(1) To be finalised on determination of the Offer Price and updated in the Prospectus prior to filing with the RoC.
(2) The amount proposed to be utilised for general corporate purpose shall not exceed 25% of the Gross Proceeds
from Fresh Issue.
For further details, kindly refer “Objects of the Offer” beginning on page 121.
AGGREGATE PRE-OFFER AND POST-OFFER SHAREHOLDING OF OUR PROMOTERS,
PROMOTER GROUP AND PROMOTER SELLING SHAREHOLDER AS A PERCENTAGE OF THE
PAID-UP SHARE CAPITAL
Pre-Offer Post-Offer**
Percentage Percentage
Number of Number of
Sr. of pre-offer of post-offer
Name of the Shareholder Equity Shares Equity Shares
No. Equity Equity
of face value of face value of
Share Share
of ₹10 each ₹10 each
Capital (%) Capital (%)
Promoters (also Promoter Selling Shareholder)
1. Sanjay Tyagi 1,212,000 4.03 [●] [●]
2. Rekha Tyagi 395,200 1.31 [●] [●]
3. Kartikey Tyagi 600,000 1.99 [●] [●]
4. Kartikey Constructions (Partnership
24,990,000 83.02 [●] [●]
Firm)*
5. Sanjay Tyagi HUF 2,114,200 7.02 [●] [●]
Total (A) 29,311,400 97.38 [●] [●]
Members of the Promoter Group
1. Vartika Tyagi 429,800 1.42 [●] [●]
2. Technocraft Developers Private
360,000 1.20 [●] [●]
Limited
Total (B) 789,800 2.62 [●] [●]
Total (C=A+B) 30,101,200 100.00 [●] [●]
*Promoter selling shareholder.
** to be updated at the Prospectus stage.
29Except as disclosed above in the table, as on the date of this Draft Red Herring Prospectus, none of the other
members of the Promoter Group hold any Equity Shares.
For further details, kindly refer “Capital Structure” beginning on page 100.
SHAREHOLDING OF OUR PROMOTERS, MEMBERS OF OUR PROMOTER GROUP AND
ADDITIONAL TOP 10 SHAREHOLDERS OF OUR COMPANY
The aggregate pre-offer and post-offer shareholding, of each of our Promoters (also acting as the Promoter Selling
Shareholder), members of the Promoter Group, and additional top 10 Shareholders (apart from Promoters) is set
forth below:
Pre-Offer Shareholding as on date of this
Post-Offer Shareholding as at Allotment*
Draft Red Herring Prospectus
Pre- At the lower end of the At the upper end of the
Offer price band (₹ [●]*) price band (₹ [●]*)
Number of
Sr. Sharehol Number of
Equity Number of
No. Name of the ding, on Equity
Shares of Post-offer Equity Post-offer
Shareholder a fully Shares of
face value Shareholdi Shares of Shareholdi
diluted face value
of ₹ 10 each ng (%)* face value ng (%)*
basis of ₹ 10
of ₹ 10 each*
(%) each*
Promoters
1. Sanjay Tyagi 1,212,000 4.03 [●] [●] [●] [●]
2. Rekha Tyagi 395,200 1.31 [●] [●] [●] [●]
3. Kartikey Tyagi 600,000 1.99 [●] [●] [●] [●]
4.Kartikey Constructions
24,990,000 83.02 [●] [●] [●] [●]
(Partnership Firm)
5. Sanjay Tyagi HUF 2,114,200 7.02 [●] [●] [●] [●]
Promoter Group
1. Vartika Tyagi 429,800 1.42 [●] [●] [●] [●]
2.Technocraft Developers
360,000 1.20 [●] [●] [●] [●]
Private Limited
*To be filled in at the Prospectus stage.
Except as disclosed above in the table, as on the date of this Draft Red Herring Prospectus, none of the other
members of the Promoter Group hold any Equity Shares.
QUALIFICATIONS BY THE STATUTORY AUDITORS WHICH HAVE NOT BEEN GIVEN EFFECT
TO IN THE RESTATED CONSOLIDATED FINANCIAL INFORMATION
There are no qualifications by the Statutory Auditor which have not been given effect to in the Restated
Consolidated Financial Information.
For further details, kindly refer “Risk Factors” and “Restated Consolidated Financial Information” beginning on
pages 39 and 331 respectively.
30SUMMARY OF OUTSTANDING LITIGATIONS
A summary of outstanding litigation proceedings involving our Company, Directors and Promoters, KMPs and SMPs, to the extent applicable and have material impact on our
company, as on the date of this Draft Red Herring Prospectus is provided below:
Number of Disciplinary
Number
Number of actions by the
Number of of Aggregate
Number of Tax Statutory or SEBI or Stock Exchanges
Name Criminal Material amount involved*
proceedings regulatory against our
proceedings civil (₹ in million)
actions Promoters in the last five
litigation**
years
Company
By our Company 05 05*** Nil Nil 3 284.30
Against our Company Nil 06 Nil Nil Nil 31.34
Directors other than Promoters
By our Directors Nil Nil Nil Nil Nil N.A.
Against our Directors Nil Nil Nil Nil Nil N.A.
Promoters
By the Promoters Nil Nil Nil Nil Nil N.A.
Against the Promoters 3 1 Nil Nil Nil 0.06
Key Managerial Personnel other than Promoters
By our Key Managerial Personnel Nil Nil Nil Nil Nil N.A.
Against our Key Managerial Personnel Nil Nil Nil Nil Nil N.A.
Senior Management
By our Senior Management Nil Nil Nil Nil Nil N.A.
Against our Senior Management 02 Nil Nil Nil Nil N.A.
*Amount to the extent quantifiable
**In accordance with the Materiality Policy
***These are income tax demand notices against our Company
For further details, kindly refer “Outstanding Litigations and Material Developments” beginning on page 479.
31RISK FACTORS
Investors are advised to read the risk factors carefully before taking an investment decision in the Offer. For detail
kindly refer “Risk Factors” beginning on page 39. Set out below is a summary of the top ten risk factors, in their
order of materiality.
SUMMARY OF CONTINGENT LIABILITIES AND COMMITMENTS
The details of our contingent liabilities (as per Ind AS 37) as at March 31, 2025, derived from the Restated
Consolidated Financial Information are as set out below:
(₹ in million)
As at March 31,
Particulars
2025
A) Disputed claims/levies in respect of Income tax against which Rectification application is filed except for
the Assessment year 2024-25 before jurisdictional Assessing Officer and demand will be deleted as told by the
Management of the Company.
For the Assessment year 2024-25, the rectification application is yet to be filed as the TDS from the principal
is not reflected in the 26AS of the Company, as told by the management of the company, they are pursuing
with the principal to show the TDS in the 26AS, after reflection in 26AS, the company will file the rectification
application with the Income Tax Department
A.Y 2024-25 7.34
A.Y 2023-24 1.16
A.Y 2018-19 0.13
B) Disputed claims/levies in respect of Goods and Services Tax)
Appeal filed of GST (Rajasthan) Interest Liability of FY 2023-2024 21.74
Appeals filed of GST (Rajasthan) Tax Assessment of FY 2018-2019 0.97
Gist Liability (U.P) on account of differential amount of GST @ 6% and 18% on
the supply/Services made to the department (UP Jal Nigam) in compliance to DGGI
Amount not quantifiable
Meerut Proceedings, against which writ petition is yet to be filed before the High
Court for the period Jan 2022 to July 2022.
Total 31.34
As certified by Rishi Kapoor & Company, Chartered Accountants pursuant to their certificate dated August 04,
2025 vide UDIN 25455362BMGILN1743.
(₹ in million)
GUARANTEES
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
A) Bank Guarantees 1,113.16 792.27 595.55
Total 1,113.16 792.27 595.55
As certified by Rishi Kapoor & Company, Chartered Accountants pursuant to their certificate dated August 04,
2025 vide UDIN 25455362BMGILN1743.
For further details, kindly refer “Restated Consolidated Financial Information– Annexure 46 – Contingent
Liabilities” beginning on page 398.
FINANCING ARRANGEMENTS
There have been no financing arrangements whereby our Promoters, members of our Promoter Group, our
Directors and their relatives have financed the purchase by any other person of securities of our Company other
than in the normal course of business of the relevant financing entity, during a period of six months immediately
preceding the date of this Draft Red Herring Prospectus.
PRE-IPO PLACEMENT
Our Company has not undertaken a Pre-IPO placement.
32SUMMARY OF RELATED PARTY TRANSACTIONS
A summary of related party transactions entered into by our Company with related parties and as disclosed in the Restated Consolidated Financial Information for the financial
years ended March 31, 2025, March 31, 2024 and March 31, 2023 as per Ind AS 24 – Related Party Disclosures read with SEBI ICDR Regulations are as follows is set forth
below:
(₹ in million, except for percentages)
As a Financial Year Ended
Sr.
Particulars Relationships Percentage 31-Mar-25 31-Mar-24 31-Mar-23
No.
of
Amount (%) Amount (%) Amount (%)
A. Transactions during the year
(i) Purchase & Job Work
Enterprises significantly influenced Cost of
Sanjay Tyagi HUF - - - - 1.59 0.09
by KMP & and their relatives Revenue
from
VVIP Infratech Limited
Operations
(Formerly Known as
Group Company 657.43 26.64 606.03 31.76 621.81 34.70
Vibhor Vaibhav Infra
Private Limited)
(ii) Salary paid
Key Managerial Personnel & Director
Mr. Kartikey Tyagi Director* 6.00 0.25 2.40 0.12 - -
Ms. Rekha Tyagi Executive Director 3.00 0.12 2.40 0.12 1.50 0.09
Mr. Sanjay Tyagi Managing Director 12.00 0.50 9.00 0.45 6.60 0.40
Relative of Key Managerial Personnel & Director
Total
Daughter of Mr. Sanjay Tyagi,
Ms. Vartika Tyagi Expenses 3.00 0.12 - - 1.80 0.11
Managing Director
Mr. Kartikey Tyagi Director* - - - - 1.80 0.11
(iii) Interest paid
Mr. Kartikey Tyagi Director* 0.66 0.03 0.36 0.02 0.18 0.01
Ms. Rekha Tyagi Executive Director 6.50 0.27 4.80 0.24 6.35 0.38
33Mr. Sanjay Tyagi Managing Director 11.14 0.46 6.27 0.31 4.06 0.24
Enterprises significantly influenced
Sanjay Tyagi HUF 1.21 0.05 1.12 0.06 0.37 0.02
by KMP & and their relatives
Daughter of Mr. Sanjay Tyagi,
Ms. Vartika Tyagi 0.67 0.03 0.49 0.02 0.22 0.01
Managing Director
(iv) Other Expenses
Daughter of Mr. Sanjay Tyagi,
Ms. Vartika Tyagi - - 1.95 0.10 - -
Managing Director
(v) Lease Rentals Paid
Ms. Rekha Tyagi Executive Director 1.40 0.06 1.45 0.07 1.32 0.08
Mr. Sanjay Tyagi Managing Director 0.61 0.03 0.66 0.03 0.60 0.04
(vi) Revenue from operations
TESPL LRS TCPL -JV Associate (Partnership Firm) 163.53 5.82 147.66 6.50 - -
VVIP Infratech Limited Total
(Formerly Known as Income
Group Company 507.85 18.07 431.48 18.98 2.16 0.12
Vibhor Vaibhav Infra
Private Limited)
(vii) Profit /(Loss) from Associates
Profit on TESPL-LRS-
Associate (Partnership Firm) Net Profit 5.19 1.84 2.82 1.48 (0.02) (0.02)
TCPL (JV)
After Tax
Profit on Krishna TCPL
Associate (Partnership Firm) 0.00 0.00 0.00 0.00 0.00 0.00
(JV)
(viii) Loan Taken
Mr. Sanjay Tyagi Managing Director 33.40 75.05 37.40
Ms. Rekha Tyagi Executive Director 9.45 17.40 14.40
Mr. Kartikey Tyagi Director* 8.20 6.16 3.80
34Enterprises significantly influenced
Sanjay Tyagi HUF 9.50 11.20 9.58
by KMP & and their relatives
Daughter of Mr. Sanjay Tyagi,
Ms. Vartika Tyagi 4.00 0.00 3.85
Managing Director
(ix) Repayment of Loan & TDS
Mr. Sanjay Tyagi Managing Director 39.85 - 16.41 - 59.70 -
Ms. Rekha Tyagi Executive Director 2.51 - 1.83 - 68.13 -
Mr. Kartikey Tyagi Director* 5.63 - 4.24 - 3.01 -
Enterprises significantly influenced
Sanjay Tyagi HUF 6.97 - 10.59 - 7.14 -
by KMP & and their relatives
Daughter of Mr. Sanjay Tyagi,
Ms. Vartika Tyagi 0.72 - 0.47 - 0.42 -
Managing Director
(x) Purchase of Fixed Assets
VVIP Infratech Limited
(Formerly Known as Enterprises significantly influenced
- - 0.85 - - -
Vibhor Vaibhav Infra by KMP & and their relatives
Private Limited)
*As on the date of this Draft Red Herring Prospectus, he is Whole Time Director & Chief Financial Officer of the Company.
As certified by Rishi Kapoor & Company, Chartered Accountants pursuant to their certificate dated August 04, 2025 vide UDIN 25455362BMGILL9146.
For further details, kindly refer “Restated Consolidated Financial Information– Annexure 44 – Related Party Transactions” beginning on page 395.
35WEIGHTED AVERAGE PRICE AT WHICH THE EQUITY SHARES WERE ACQUIRED BY OUR
PROMOTERS AND PROMOTER SELLING SHAREHOLDER IN THE LAST ONE YEAR
PRECEDING THE DATE OF THIS DRAFT RED HERRING PROSPECTUS.
Except as disclosed below, our Promoters and the Promoter Selling Shareholder have not acquired any specified
securities in the last one year.
Number of Equity Shares of face Weighted average price
Name value of ₹ 10 each acquired in the one of acquisition per Equity
year preceding the date of this DRHP Share (in ₹)(1)
Sanjay Tyagi 909,750 0.10(3)
Rekha Tyagi 296,400 Nil(4)
Kartikey Tyagi 450,000 Nil(4)
Kartikey Constructions (Partnership
18,742,500 Nil(4)
Firm) (2)
Sanjay Tyagi HUF 1,585,650 Nil(4)
(1)As certified by Rishi Kapoor & Company, Chartered Accountants pursuant to their certificate dated August 04,
2025 vide UDIN 25455362BMGIMA7351S.
(2)Also the promoter selling shareholder.
(3)Mr. Sanjay Tyagi has acquired 750 shares from transfer at ₹121.76 per share and 909,000 Equity Shares has
been acquired through bonus issue of shares.
(4)Includes Equity Shares allotted to the Shareholders pursuant to the bonus issue on May 29, 2025 in the ratio of
three Equity Shares for every 1 Equity Share.
AVERAGE COST OF ACQUISITION OF SPECIFIED SECURITIES FOR OUR PROMOTERS AND
THE PROMOTER SELLING SHAREHOLDER
The average cost of acquisition of specified securities for our Promoters and the Promoter Selling Shareholder as
of the date of this Draft Red Herring Prospectus is as set out below:
Number of Equity Shares of face Average cost of
Name value of ₹ 10 each of our Company acquisition per Equity
held Share (in ₹)
Sanjay Tyagi 1,212,000 0.93
Rekha Tyagi 395,200 2.50
Kartikey Tyagi 600,000 Nil
Kartikey Constructions (Partnership
24,990,000 2.50
Firm) (2)
Sanjay Tyagi HUF 2,114,200 2.50
(1)As certified by Rishi Kapoor & Company, Chartered Accountants pursuant to their certificate dated August 04,
2025 vide UDIN 25455362BMGIMA7351S.
(2 )also the Promoter Selling Shareholder
WEIGHTED AVERAGE COST OF ACQUISITION OF ALL EQUITY SHARES TRANSACTED BY
THE PROMOTER, PROMOTER GROUP AND PROMOTER SELLING SHAREHOLDER IN THE
LAST THREE YEARS, EIGHTEEN MONTHS AND ONE YEAR PRECEDING THE DATE OF THIS
DRAFT RED HERRING PROSPECTUS
Weighted average cost of acquisition of all Equity Shares transacted by the shareholders in the three years,
eighteen months and one year preceding the date of this Draft Red Herring Prospectus is set forth below except
issue of bonus shares & transfer through gifts:
36Weighted Average Cost Cap Price@ is ‘[●]’ times Range of acquisition
Particulars of Acquisition (WACA) the Weighted Average price Lowest Price-
(in ₹)(1) Cost of Acquisition(2) Highest Price (in ₹)(2)
Last three years 121.76 [●] Nil
Last eighteen months 121.76 [●] Nil
Last one year 121.76 [●] Nil
(1) As certified by Rishi Kapoor & Company, Chartered Accountants pursuant to their certificate dated August 04,
2025 vide UDIN 25455362BMGIMA7351S.
(2)To be updated at prospectus stage.
@Cap price cannot be determined at this stage and will be updated upon finalization of the Price.
Note: We have not taken the effect of bonus shares issued on May 29, 2025 and effect of transfer of shares through
gifts for the calculation of Weighted Average Cost of Acquisition (WACA).
DETAILS OF PRICE AT WHICH EQUITY SHARES WERE ACQUIRED IN THE LAST THREE
YEARS PRECEDING THE DATE OF THIS DRAFT RED HERRING PROSPECTUS BY THE
PROMOTERS, PROMOTER GROUP, THE PROMOTER SELLING SHAREHOLDER WITH RIGHTS
TO NOMINATE DIRECTOR(S) OR OTHER SPECIAL RIGHT
Our Company does not have any Shareholders with rights to nominate Directors or any other special rights.
Further, the price at which Equity Shares of face value of ₹ 10 each were acquired in the last three years preceding
the date of this Draft Red Herring Prospectus by the Promoters, Promoter Group and Promoter Selling Shareholder
is as below:
Issuance of Equity Shares for Consideration Other than Cash in the last One Year
Other than issuance of 22,575,900 Equity Shares on May 29, 2025, of face value ₹10 each as fully paid-up bonus
shares, in the ratio of 3:1 (three Equity Shares for every one Equity Share held), to the existing shareholders whose
names appeared in the register of members as on the record date, our Company has not issued any equity shares
of face value ₹10 each of our Company in the one year immediately preceding the date of this Draft Red Herring
Prospectus, for consideration other than cash
For further details, kindly refer “Capital Structure” beginning on page 100.
DETAILS OF OUR FINANCIAL KPIs FOR THE FINANCIAL YEARS 2025, 2024 AND 2023 ARE SET
OUT BELOW:
(₹ in million except for percentages)
For the Financial Year ended
Key Financial Indicators
March 31, 2025 March 31, 2024 March 31, 2023
Revenue from Operations(1) 2,795.64 2,261.02 1,786.91
Total Income(2) 2,810.04 2,272.98 1,805.44
EBITDA (₹)(3) 481.88 338.30 218.81
EBITDA Margin (%)(4) 17.24 14.96 12.25
PAT 282.04 190.54 108.06
PAT Margin (%)(5) 10.09 8.43 6.05
Operating Cash Flows 216.84 13.99 100.35
Net Worth(6) 1,199.83 917.78 727.34
Net Debt(7) 869.17 789.89 480.89
Debt- Equity Ratio (times)(8) 0.73 0.87 0.70
Return on Equity (%)(9) 23.51 20.76 14.86
Return on Capital Employed (%)(10) 22.35 19.08 16.85
37Current Ratio(11) 1.76 1.63 1.57
Interest Coverage Ratio(12) 5.02 4.14 2.56
(1) As certified by Rishi Kapoor & Company, Chartered Accountants pursuant to their certificate dated August
04, 2025 vide UDIN 25455362BMGILQ8952.
Notes:
(1) Revenue from operation means revenue from sales and other operating revenues.
(2) Total Income represents the total turnover of our business i.e. Revenue from Operations and Other Income,
if any.
(3) EBITDA is calculated as restated profit/(loss) before tax plus finance costs, depreciation and amortization
expense less other income.
(4) EBITDA Margin is calculated as EBITDA divided by Revenue from Operations.
(5) PAT Margin is calculated as restated profit/(loss) attributable to owners for the financial year divided by
Revenue from Operations.
(6) Net worth means the aggregate value of the paid-up share capital, equity suspense account and all reserves
created out of the profits and securities premium account and debit or credit balance of profit and loss
account after deducting the aggregate value of the accumulated losses, debit or credit balance of common
control adjustment deficit account, deferred expenditure and miscellaneous expenditure not written off, as
per the audited balance sheet, but does not include reserves created out of revaluation of assets, write-
back of depreciation and amalgamation.
(7) Net debt = non-current borrowing + current borrowing – Cash and Cash Equivalent.
(8) Debt equity ratio means ratio of total debt (long term plus short-term including current maturity of long-
term debt) and Equity Share capital plus other equity.
(9) ROE is calculated as Profit attributable to owners of the company divided by total shareholder’s equity
(excluding minority interest).
(10) ROCE is calculated as EBIT (i.e. restated profit/(loss) before tax plus finance costs minus other income)
divided by capital employed (i.e. sum of:(i) Total Equity;(ii) Long-Term Borrowings (including Lease
Liabilities, if any); (iii) Short-Term Borrowings (including Lease Liability, if any).
(11) Current Ratio is a liquidity ratio that measures our ability to pay short-term obligations (those which are
due within one year) and is calculated by dividing the current assets by current liabilities.
(12) The Interest Coverage Ratio measures our ability to make interest payments from available earnings and is
calculated by dividing EBIT less Other Income by interest expense.
For further details, kindly refer “Restated Consolidated Financial Information”, “Other Financial Information”
and “Basis for Offer Price” beginning on pages 331, 426 and 134 respectively.
SPLIT/CONSOLIDATION OF EQUITY SHARES IN THE LAST ONE YEAR
Our Company has not undertaken split or consolidation of its Equity Shares in the last one year preceding the date
of this Draft Red Herring Prospectus.
EXEMPTION FROM COMPLYING WITH ANY PROVISIONS OF SECURITIES LAWS, IF ANY,
GRANTED BY SEBI
As on the date of this Draft Red Herring Prospectus, we have not sought any exemption from SEBI from
complying with any provisions of securities laws including SEBI ICDR Regulations from SEBI, in respect of the
Offer.
38SECTION II - RISK FACTORS
An investment in Equity Shares involves a high degree of financial risk. You should carefully consider all
information in this Draft Red Herring Prospectus, including the risks described below, before making an
investment in our Equity Shares. The risk factors set forth below do not purport to be complete or comprehensive
in terms of all the risk factors that may arise in connection with our business or any decision to purchase, own or
dispose of the Equity Shares. This section addresses general risks associated with the industry in which we operate
and specific risks associated with our Company. If any of the following risks, as well as the other risks and
uncertainties discussed in this Draft Red Herring Prospectus, could have a material adverse effect on our business
and could cause the trading price of our Equity Shares to decline and you may lose all or part of your investment.
This Draft Red Herring Prospectus also contains forward-looking statements that involve risks and uncertainties.
We have described the risks and uncertainties that our management believes are material, but these risks and
uncertainties may not be the only ones we face. Additional risks and uncertainties, including those we are not
aware of or deem immaterial, may also result in decreased revenues, increased expenses or other events that could
result in a decline in the value of our Equity Shares. In making an investment decision, prospective investors must
rely on their own examination of our Company and the Offer, including the merits and risks involved. Unless
specified or quantified in the relevant risk factors below, we are not in a position to quantify the financial or other
implications of any of the risks described in this section. Investors are advised to read the risk factors carefully
before taking an investment decision in this Offer. Investors should not invest in this Offer unless they are prepared
to accept the risk of losing all or part of their investment, and they should consult their tax, financial and legal
advisors about the particular consequences to you of an investment in the Equity Shares.
To obtain a better understanding of our business, you should read this section in conjunction with other chapters
of this Draft Red Herring Prospectus, including the chapters titled “Our Business”, “Management’s Discussion
and Analysis of Financial Condition and Results of Operations”, “Industry Overview” and “Restated
Consolidated Financial Information” beginning on page 228, 444, 152 and 331 respectively, together with all
other financial information contained in this Draft Red Herring Prospectus. Our actual results could differ
materially from those anticipated in these forward-looking statements as a result of certain factors, including the
considerations described below and elsewhere in this Draft Red Herring Prospectus.
Unless otherwise stated, the financial data in this chapter is derived from our Restated Consolidated Financial
Information for the Fiscal 2025, 2024 and 2023 as included in “Restated Consolidated Financial Information”
beginning on page 331.
Unless stated otherwise, industry and market data used in this Draft Red Herring Prospectus has been obtained
or derived from publicly available information as well as industry publication and sources. Further, the
information has also been derived from the report titled “Assessment of infrastructure construction industry in
India with focus on water and wastewater management” dated August 05, 2025 prepared by Crisil Intelligence
(“CRISIL”) (“CRISIL Report”), which was appointed by our Company vide engagement letter dated April 10,
2025 and has been exclusively commissioned and paid for by our Company in connection with the Offer. Unless
otherwise indicated, all financial, operational, industry and other related information derived from the CRISIL
Report and included herein with respect to any particular year refers to such information for the relevant calendar
year.
Internal Risk Factors
1. Our business is significantly dependent on government-funded infrastructure projects, particularly in the
water, wastewater, and urban development sectors, and any reduction in budgetary allocations or change in
governmental priorities may adversely impact our revenue and operations.
Our business operations are primarily focused on the execution of turnkey EPC (Engineering, Procurement and
Construction) contracts across multiple public infrastructure segments, including wastewater treatment plants
(“WWTPs”), sewerage and drainage networks, water supply scheme projects (“WSSPs”), roads and highways,
housing and sector development, electricity transmission and distribution networks, and specialized micro
39tunneling projects. These projects are largely awarded by State Governments, Urban Local Bodies (“ULBs”), and
public sector undertakings through competitive, tender-based procurement mechanisms and are principally funded
under Central and State government initiatives, such as the Atal Mission for Rejuvenation and Urban
Transformation (“AMRUT”), Jal Jeevan Mission (“JJM”), Namami Gange, Pradhan Mantri Gram Sadak Yojana
(“PMGSY”), and various state-level schemes. For further details, kindly refer “Our Business” beginning on page
228.
Our revenue visibility is directly linked to the volume and continuity of such government-sponsored projects. Any
adverse change in the policy focus, reduction or delay in funding allocations, or reprioritization of governmental
infrastructure goals may lead to a lower number of tenders issued or deferred project execution, thereby adversely
impacting our business prospects and financial condition.
Further, our projects are often awarded following a competitive bidding process and are subject to bureaucratic
and political factors, multi-tiered approvals, and administrative delays. These factors may result in time gaps
between tender submission and project award or between the issuance of Letter of Acceptance and the declaration
of appointed date. In such cases, we may incur additional fixed costs due to underutilized project resources,
including workforce, equipment, and working capital, affecting our profitability and cash flows.
We have submitted aggregate bids for 47 projects during the Fiscal i.e. 2025, 2024 and 2023 out of which 10 have
been awarded. The table below sets forth our bidding and conversion metrics:
Solo bid by the Company:
Financial Financial Financial
Particulars Total
Year 2025 Year 2024 Year 2023
Bids submitted 11 14 12 37
Less: Cancelled/ Awaited/ Pending Result 2 8 4 14
Net bids submitted 9 6 8 23
Awarded 5 1 0 6
Successful Conversion of Bids (in %) 45.45 16.66 0 16.22
As lead partner:
Financial Financial Financial
Particulars Total
Year 2025 Year 2024 Year 2023
Bids submitted 1 3 0 4
Less: Cancelled/ Awaited/ Pending Result 0 0 0 0
Net bids submitted 1 3 0 4
Awarded 0 3 0 3
Successful Conversion of Bids (in %) 0 100.00 0 75.00
As JV partner:
Financial Financial Financial
Particulars Total
Year 2025 Year 2024 Year 2023
Bids submitted 3 2 1 6
Less: Cancelled/ Awaited/ Pending Result 1 2 0 3
Net bids submitted 2 0 1 3
Awarded 0 0 1 1
Successful Conversion of Bids (in %) 0 0 100.00 16.66
40Moreover, contracts awarded by government agencies are vulnerable to early termination or foreclosure due to
shifting policy priorities or budget reallocations. Any such development may materially and adversely affect our
order book, revenue generation, and long-term growth strategy.
2. Our ability to secure projects is dependent on successful qualification and bidding under government tendering
processes, and any failure to qualify or win tenders may adversely affect our order book and financial
performance.
We participate in public infrastructure development projects primarily through competitive bidding processes
conducted by central and state government agencies, Urban Local Bodies (“ULBs”), and public sector
undertakings. Our ability to win such projects—including those in wastewater treatment, water supply, electrical
transmission and distribution, road construction, microtunneling, and housing infrastructure is contingent upon
meeting technical and financial qualification criteria either independently or through joint venture arrangements.
While we selectively bid for projects that align with our strategic priorities and resource capacity, there can be no
assurance that we will continue to pre-qualify or emerge successful in the bidding process. In particular, for high-
value or technically complex projects such as sewage treatment plants (“STPs”) of high capacity such as 56 MLD
plus, multi-zone water transmission networks, high-voltage substation works, or multilateral-funded tenders,
further we may need to form joint ventures to meet eligibility norms for the projects of sewage treatment plants
(“STPs”) having more than 60 MLD. Inability to forge timely and competitive consortiums may limit our ability
to pursue such projects.
Further, public tender processes are often subject to change in qualification benchmarks, delays in issuance, or
cancellation of tenders altogether. The time and cost invested in bid preparation may not always result in contract
awards, which could impact our resource utilization and financial results. Delays in project awarding or
declaration of appointed dates—even where we are successful—can result in under-deployment of labour and
equipment, increasing our overheads and affecting margins.
Additionally, awarded projects may be challenged by unsuccessful bidders through legal proceedings. While we
have not experienced adverse outcomes or termination of awarded contracts due to such litigation, we cannot
assure that future legal disputes will not result in delays or cancellations. Defending such claims may also require
us to incur significant time and expenditure, and any unfavorable ruling could have a material adverse effect on
our operations, revenue, and profitability.
For further details, kindly refer “Our Business – Our Order Book” and “Management’s Discussion and Analysis
of Financial Conditions and Results of Operations” beginning on pages 232 and 444 respectively.
3. We are yet to utilise requisite amount towards Corporate Social Responsibility (“CSR”), failure to do so may
attract regulatory scrutiny and adversely affect our reputation.
In terms of Section 135 of the Companies Act, 2013 and the Companies (Corporate Social Responsibility Policy)
Rules, 2014, companies meeting specified thresholds are required to incur prescribed minimum CSR expenditure
and report the same in the Board’s report. For the last three Fiscal i.e. 2025, 2024 and 2023, our Company fell
within the applicability criteria for CSR obligations, however our Company is yet to utilise the CSR amount for
stated period towards CSR activities. For further details, kindly refer “Restated Consolidated Financial
Information” beginning on page 331.
We have incurred ₹ 0.15 million towards CSR activities for the financial year ended March 31, 2025, the details
of previous financial years are as under:
(₹ in million)
For the financial year ended
Particulars
2025 2024 2023
(a) Provision for Corporate Social Responsibility for Current Year 3.33 1.95 1.51
(b) Amount of expenditure incurred during the year 0.15 - -
41(c) Amount deposited in Corporate Social Responsibility Account * 1.52 1.52 1.46
(d) Carried Forward Provision of Corporate Social Responsibility of
6.36 4.41 2.89
Previous Years
(e) Total provision of Corporate Social Responsibility (Net) as per
9.55 6.36 4.41
Annexure 30 (a-b+d)
*Section 135(6) of the Companies Act, 2013 mandates that any unspent Corporate Social Responsibility (CSR)
funds allocated for ongoing projects must be transferred by the company within 30 days from the end of the
financial year to a special account called the "Unspent Corporate Social Responsibility Account." This account
must be opened in a scheduled bank and is designated specifically for CSR purposes. The unspent amount in this
account must be utilized for the intended CSR activities within a period of three financial years from the date of
transfer. If the company fails to utilize the funds within this period, the remaining unspent amount must be
transferred to a fund specified in Schedule VII of the Act within 30 days from the completion of the third financial
year.
Details of amount transferred to the unspent CSR account opening dates:
(₹ in million)
Unspent CSR Account Opening
Particulars Amount
Date
CSR Amount pertaining to FY 2020-21 29.03.2023 1.46
CSR Amount pertaining to FY 2021-22 29.04.2023 1.52
CSR Amount pertaining to FY 2022-23 18.08.2024 1.52
CSR Amount pertaining to FY 2023-24 26.04.2025 1.95
Total 6.45
As per the Management of the Company, due to technical reasons, the company was unable to open the CSR
account with the bank on time, and hence, the account was opened at a later date. Out of the total amount deposited
in "Unspent Corporate Social Responsibility Account" (as mentioned in the above table), the company has spent
a total of ₹ 0.15 million till 31.03.2025. Further, the company has also made total expenditure of ₹ 3.33 million
for CSR during FY 2025-2026. This expenditure aligns with the company's CSR policy and is in compliance with
the provisions outlined in Section 135 of the Companies Act, 2013. The balance amount of ₹3.21 million
(including interest earned on FDR of ₹ 0.24 million) is in "Unspent Corporate Social Responsibility Account" and
the company is currently in the process of utilizing these funds in alignment with the approved CSR policy and
the objectives of the respective ongoing projects.
Details of balance amount in Unspent CSR Account:
(₹ in million)
Particulars Amount
Amount in "Unspent Corporate Social Responsibility Account" in Scheduled Bank 6.45
Less : Amount paid in 31.03.2025 out of Unspent CSR Account (B) 0.15
Less : Amount paid after 31.03.2025 out of Unspent CSR Account (C ) 3.33
Total (D=A-B-C) 2.97
Interest on FDR credited in Unspent CSR Account (E) 0.24
Balance amount in "Unspent Corporate Social Responsibility Account" (D+E) 3.21
As per the management of the company, with respect to the CSR obligation of ₹ 3.33 million for the financial year
ended March 31, 2025, the company is permitted to either spend the amount up to March 31, 2026 or to deposit
the amount in unspent CSR Account within the time prescribed as per the provision of section 135 of the
Companies Act 2013.
Our failure to incur CSR expenditure may be viewed as non-compliance with the statutory provisions, attracting
scrutiny from regulators, and may require us to transfer the unspent amounts to the funds prescribed under the
Companies Act, 2013. Additionally, such non-compliance may affect our standing with government authorities
and public stakeholders, potentially impacting our eligibility for future government contracts or tenders.
424. There are outstanding legal proceedings involving our Company, Directors, Promoters, KMPs and SMPs which
may adversely affect our business, financial conditions, and results of operations.
There are proceedings pending at different levels of adjudication before various courts, enquiry officers and
appellate forums. Such proceedings could divert management’s time, attention and consume financial resources in
their defense. Further, an adverse judgment in some of these proceedings could have an adverse impact on our
business, financial condition, and result of operations. A summary of the outstanding proceedings involving our
Company, Directors, Promoters, KMPs and SMPs as disclosed in this Draft Red Herring Prospectus, to our extent
quantifiable, have been set out below:
Number of
Disciplinar
y actions
Number Aggrega
by the
Number of of te
Number of Number of SEBI or
Statutory or Material amount
Name Criminal Tax Stock
regulatory civil involve*
proceedings proceedings Exchanges
actions litigation (₹ in
against our
** million)
Promoters
in the last
five years
Company
By our Company 5 05 Nil Nil 3 284.30
Against our
Nil 06*** Nil Nil Nil 31.34
Company
Directors other than Promoters
By our Directors Nil Nil Nil Nil Nil N.A.
Against our
Nil Nil Nil Nil Nil N.A.
Directors
Promoters
By the Promoters Nil Nil Nil Nil Nil N.A.
Against the
3 1 Nil Nil Nil 0.06
Promoters
Key Managerial Personnel other than Promoters
By our Key
Managerial Nil Nil Nil Nil Nil N.A.
Personnel
Against our Key
Managerial Nil Nil Nil Nil Nil N.A.
Personnel
Senior Management
By our Senior
Nil Nil Nil Nil Nil N.A.
Management
Against our Senior
02 Nil Nil Nil Nil N.A.
Management
*Amount to the extent quantifiable
**In accordance with the Materiality Policy
***These are income tax demand notices against our Company
For further details, kindly refer “Outstanding Litigation and Material Developments” beginning on page 479.
435. Majority of our revenue is generated from business transactions with government entities or agencies. Any
change in the government policies in the markets in which we operate, and/or our inability to recover payments
therefrom in a timely manner or at all, would adversely affect our operations and revenues which in turn would
adversely affect our profitability.
100% of our projects are works related to tenders floated by government or semi government agencies and private
sector. Hence our business is highly dependent on working with government entities or agencies but majority of
our revenue is generated from business transactions with government entities or agencies.
The revenue bifurcation between government & private sector are as under:
(₹ in million)
Financial Year Financial Year Financial Year
Particulars
2025 2024 2023
Revenue from Government 2,274.52 1,741.50 1,784.75
% of revenue from operations 81.36 77.02 99.88
Revenue from Private Sector 521.12 519.52 2.16
% of revenue from operations 18.64 22.98 0.12
Total 2,795.64 2,261.02 1,786.91
As certified by Rishi Kapoor & Company, Chartered Accountants pursuant to their certificate dated August 04,
2025 vide UDIN 25455362BMGIMF4921.
There may be delays associated with collection of receivables from government owned or controlled agencies.
Our operations involve significant working capital requirements and delayed collection of our receivables could
materially and adversely affect our liquidity, internal cash flows, cost of funding and results of operations. In
addition, we may be subject to additional regulatory or other scrutiny associated with commercial transactions
with government owned or controlled entities and agencies.
The company is engaged in government contractor business wherein realization of payment from the clients taken
some time as due to government department, verification of bill is done & demand for the payment is made by
the accounts department & then the payment releases so normally the debtors period in this business falls above
100 days, however all the payment are totally secured, there are no bad debts as all the projects are government
funded so payment channel is very secure. Further apart from in this business, few amounts in respect of the
testing and security remains hold by the department for 2-3 years, depending on the tenure of the work allotted
because testing is done once the work gets completed, which is also completely secure, only takes more time to
release.
As our majority of revenue generated through the government tenders so the Company’s trade receivables
constitute only receivables from governments:
(₹ in million)
Financial Financial Financial
Particulars
Year 2025 Year 2024 Year 2023
Trade Receivables 581.84 1,001.83 509.04
Revenue from Operations 2,795.64 2,261.02 1,786.91
Trade Receivables as a % of revenue from Operations 20.81 44.31 28.49
In addition to the above, the contracts with Government entities may be subject to extensive internal processes,
policy changes, Government or external budgetary allocation and insufficiency of funds, which may lead to lower
contracts available for bidding or increase in the time gap invitation for bids and award of the contract. As long
as Government entities are responsible for awarding contracts to us and are a critical party to the development and
ongoing operations of our projects, our business is directly and significantly dependent on projects awarded by
them.
With reference to projects where our bids have been successful, there may be delays in award of the projects
and/or notification of appointed dates, which may result in us having to retain resources which remain unallocated,
44thereby adversely affecting our financial condition and results of operations. Any adverse change in policies by
government leading to reduction in capital investment could affect us adversely. Further, if there is any change in
the government or in governmental policies that results in a slowdown in infrastructure projects, our business,
financial condition and results of operations may be adversely affected.
6. Our Company was incorporated in the year 1998 and some of our corporate records including forms filed with
the Registrar of Companies are not traceable & we have not filed certain forms with Registrar of Companies.
Certain forms we cannot assure you that these forms filings will be available in the future or that we will not
be subject to any penalties imposed by the relevant regulatory authority in this respect which may impact our
financial condition and reputation.
Our Company is unable to trace certain corporate records and documents in relation to our Company including
forms filed with the Registrar of Companies (RoC), which are mention below, on the basis of search report dated
August 08, 2025 issued by R & D Company Secretaries, Practicing Company Secretary, vide UDIN
F007775G000965149:
1. Annual return for the financial year 2004-05.
2. Form 2 for return of allotment dated March 31, 2000 in the Financial Year 1999-2000.
3. Form 2 for return of allotment dated August 31, 2000 in the Financial Year 2000-01.
4. The shareholders list forming part of the annual returns dated September 29,1999 and September 29, 2008.
5. Form 5 pertaining to increase in Authorised Share Capital from ₹ 3.20 million to ₹ 5.00 million during the
Financial Year 1999-2000.
There have also been following instances wherein the disclosures made in statutory filings done under Companies
Act, 1956/ 2013 are incomplete or erroneous in nature, and revised filing for the same has not been done by our
Company:
1. Form 2 for return of allotment dated January 02, 2007 along with the list of allottees has been erroneously
filed.
Further, due to change in methods of record keeping with the concerned RoC, certain forms filed with RoC prior
to the year 2006, could not be traced by our Company from RoC records. Under the circumstances elaborated
above, our Company cannot assure you that the filings were made in a timely manner, or the information gathered
through other available documents of our Company are correct. Also, our Company may not be in a position to
attend to and / or respond appropriately to any legal matters pertaining to such period and relating to such
documents which have been lost and to that extent the same may adversely affect our business operations.
While no legal proceedings or regulatory action has been initiated against our Company in relation to the
unavailable filings and statutory lapses as of the date of this Draft Red Herring Prospectus, we cannot assure you
that such proceedings or regulatory actions will not be initiated against our Company in the future in relation to
the missing filings and corporate records. The actual amount of the penalty which may be imposed or loss which
may be suffered by our Company cannot be ascertained at this stage and depends on the circumstances of any
potential action which may be brought against our Company. We cannot assure you that any such proceedings
will not have a material adverse effect on our financial condition or reputation.
Following are the non-compliances related to filing of respective forms with Registrar of Companies:
1. Requisite E-Forms for the re-appointment of Sanjay Tyagi as Managing Director dated September 30, 2011,
September 30, 2016 and November 30, 2021, were not filed.
2. Sanjay Tyagi was erroneously appointed as the Chairman of the Board of directors on May 29, 2025 and
DIR 12 for the same was wrongly filed as it was not required as per section 203 of the Companies Act 2013,
however the same has been resigned from the post of chairman of Company w.e.f. June 12, 2025.
3. Kartikey Tyagi was appointed as an Additional Director of the Company w.e.f. January 19, 2022, and was
not regularized at the ensuing Annual General Meeting, however his appointment was regularized in the
45EGM held on February 06, 2023. He resigned from the post of Director w.e.f. March 17, 2023. Thereafter,
he was appointed as an Additional Director of the Company w.e.f. May 29, 2023 and was not regularized at
the ensuing Annual General Meeting, he was subsequently regularized as a Director in the EGM held on
January 06, 2024.
We hereby confirm that, in the past we have not faced any legal proceedings and no penalty has been imposed on
us by RoC or Ministry of Corporate Affairs (MCA) related to RoC compliances. No show cause notice has been
issued, in case penalty is imposed then it will have an impact on the financial position of our Company.
Additionally, there have been instances where e-forms were required to be filed with the RoC on and before the
due date, however e-forms were not filed by our Company on the due date. The table below sets forth the details
with respect to additional fee paid by our Company due to late filing of certain RoC e-forms:
Financial Normal Fees Additional Fees
Form Name Due Date Date of filing
Year (in ₹) (in ₹)
CHG-1 01.04.2025 05.04.2025 600 3600
MGT-14 14.08.2024 07.06.2025 600 7200
MGT-14 22.08.2024 08.06.2025 600 7200
MGT-14 14.08.2024 14.06.2025 600 7200
DIR-12 21.05.2025 03.06.2025 600 1200
MGT-14 21.05.2025 03.06.2025 600 1200
DIR-12 14.08.2024 07.06.2025 600 7200
MGT-14 14.08.2024 07.06.2025 600 7200
MGT-14 23.04.2025 05.05.2025 600 1200
2025-26 MGT-14 24.06.2024 29.05.2025 600 7200
MGT-14 01.11.2024 29.05.2025 600 7200
MGT-14 04.12.2024 29.05.2025 600 6000
MGT-14 23.01.2025 29.05.2025 600 6000
MGT-14 23.01.2025 29.05.2025 600 6000
MGT-14 02.10.2024 30.05.2025 600 7200
MGT-14 01.11.2024 19.06.2025 600 7200
INC-22 03.03.2025 28.04.2025 600 2400
MR-1 13.06.2025 22.07.2025 600 1200
MGT-14 13.05.2024 22.07.2025 600 3600
CHG-1 10.05.2024 20.06.2024 600 3600
CHG-1 10.05.2024 20.06.2024 600 3600
CHG-1 10.05.2024 20.06.2024 600 3600
CHG-1 05.11.2024 06.11.2024 600 3600
MGT-7 29.11.2024 22.12.2024 600 2300
AOC-4 XBRL 30.08.2024 31.12.2024 600 2300
PAS-6 29.11.2024 13.02.2025 600 3600
CRA-2 30.09.2024 18.02.2025 600 6000
2024-25 CRA-2 30.09.2023 18.02.2025 600 7200
CRA-2 30.09.2022 18.02.2025 600 7200
CRA-2 30.09.2021 18.02.2025 600 7200
CRA-2 30.12.2020 17.02.2025 600 7200
CRA-2 30.09.2019 17.02.2025 600 7200
CRA-4 02.10.2024 29.03.2025 600 6000
CRA-4 05.10.2023 28.03.2025 600 7200
CRA-4 27.10.2022 27.03.2025 600 7200
CRA-4 27.10.2021 25.03.2025 600 7200
CHG-4 21.06.2023 07.09.2023 600 6000
CHG-4 26.08.2023 12.09.2023 600 1200
2023-24
AOC-4 XBRL 30.08.2023 16.12.2023 600 4800
INC-27 12.04.2024 04.05.2024 600 2400
46AOC-4 XBRL 30.09.2021 09.04.2022 600 10100
CHG-1 24.03.2022 21.05.2022 600 3600
CHG-4 27.04.2022 15.06.2022 600 2400
CHG-4 27.04.2022 07.07.2022 600 2400
2022-23
ADT-1 15.12.2021 12.11.2022 600 7200
AOC-4 XBRL 30.09.2022 23.12.2022 600 5500
CHG-4 16.06.2022 29.12.2022 600 6000
CHG-4 14.11.2022 29.12.2022 600 1200
CHG-4 04.09.2022 03.03.2023 600 7200
The above data has been taken from search report dated August 08, 2025 issued by R & D Company Secretaries,
Practicing Company Secretary, vide UDIN F007775G000965149.
No show cause notice in respect to the above (non-filing, delayed filing and erroneous filing) has been received
by our Company till date and no penalty or fine has been imposed by any regulatory authority in respect to the
same. Our Company may be required to file/ re-file the e-forms not filed/ erroneously filed, as the case may be,
with additional fees and penalties. Our Company and its Directors and Key Managerial Personnel may face action
against above non-filing, delayed filing or erroneous filing, which may cause a material effect on our results,
operations and financial position. Our Company has appointed a Company Secretary & Compliance Officer for
statutory compliances, however, it cannot be assured, that there will not be such instances in the future, or our
Company will not commit any further delays or defaults in relation to its reporting requirements, or any penalty
or fine will not be imposed by any regulatory authority in respect to the same. We will ensure timely compliance
in the future, our Company Secretary shall oversee all legal and compliance matters and will make sure to timely
comply with all the requirements under the relevant laws and regulation.
7. Our Company has reported certain negative cash flows from its investing activities and financing activities,
details of which are given below. Sustained negative cash flow could impact our growth and business.
Our Company had reported certain negative cash flows from our investing activities and financing activities in
previous years as per the restated consolidated financial information and the same are summarised as under:
(₹ in million)
For the financial year ended March 31,
Particulars
2025 2024 2023
Cash flow from Investing Activities (126.38) 2.63 62.03
Cash flow from Financing Activities (96.55) (32.56) (140.65)
Cash flow of a company is a key indicator to show the extent of cash generated from operations to meet capital
expenditure, pay dividends, repay loans and make new investments without raising finance from external
resources. If our Company is not able to generate sufficient cash flows, it may adversely affect our business and
financial operations.
For further details, kindly refer “Restated Consolidated Financial Information” beginning on page 331.
8. We rely on our in-house engineering and construction teams for project execution, and the loss of key
personnel or inability to retain skilled manpower may adversely affect our operations.
Our ability to execute infrastructure projects across sectors such as wastewater treatment, water supply, roads,
electrical networks, and microtunneling is critically dependent on our in-house teams of engineers, designers, and
site supervisors. As of June 30, 2025, we employed 170 full-time personnel, including 76 engineers across civil,
mechanical and electrical domains. This internal capacity enables us to manage the complete EPC lifecycle
ranging from design and procurement to construction, commissioning, and quality assurance without substantial
reliance on third-party contractors.
However, we face operational risks due to attrition, especially at project sites where personnel are often unwilling
to relocate after completion. Attrition of skilled manpower or delay in onboarding replacements may cause project
47execution delays, cost overruns, or loss of institutional know-how. For details of our employee strength and
attrition statistics, kindly refer “Our Business – Human Resources” beginning on page 276.
For the Financial Year/Period
As at June
Attrition Rate Financial Financial Financial
30, 2025
Year 2025 Year 2024 Year 2023
Employees at the beginning of the Fiscal/Period 173 125 74 47
Employees at the end of the Fiscal/Period 170 173 125 74
Average number of employees 171.50 149 99.50 60.50
Net change in number of employees (3) 48 51 27
Change rate (in %) (1.73) 38.40 68.92 57.45
We set out below instances of delays in payments made by our Company towards the Provident Fund and
Employee State Insurance for the full-time employees of our Company for the financial year ended 2025, 2024
and 2023:
(₹ in million)
For the Financial Year ended March 31,
Statutory Dues
2025 2024 2023
Employee’s Provident Fund Contribution 0.05 - 0.18
Employee’s State Insurance Contribution 0.00 0.03 0.02
As certified by Rishi Kapoor & Company, Chartered Accountants pursuant to their certificate dated August 04,
2025 vide UDIN 25455362BMGILI3986.
Any disruption in workforce continuity or inability to retain experienced professionals could materially impact the
timely and cost-effective execution of our projects and adversely affect our business operations and growth.
Further, we also employ contract labour for civil construction work. The number of contract labourers employed
by us fluctuates depending on the scope and scale of the projects we undertake. Our dependence on such contract
labour introduces certain risks to our operations, particularly regarding the availability and skillset of these
labourers, as well as potential disruptions during peak periods in labour-intensive sectors like ours. There is no
guarantee that we will always have access to skilled labour at competitive rates or in the locations where we carry
out our projects. Consequently, we may need to incur additional expenses to ensure the timely completion of our
projects.
9. Failure to meet performance standards or retain skilled staff in our Operations and Maintenance (O&M)
segment may adversely impact our long-term contracts and client relationships.
We undertake long-term Operations and Maintenance (“O&M”) assignments following commissioning of public
infrastructure assets such as STPs, sewerage networks, and water supply systems. These contracts, often spanning
5–10 years, require deployment of dedicated teams for round-the-clock site management, preventive maintenance,
and compliance with service benchmarks.
O&M work is resource-intensive and spread across geographically dispersed locations. High attrition—especially
among locally recruited site-level technicians—can disrupt continuity and affect performance-linked payments.
Failure to meet contractually agreed operational standards may result in imposition of penalties, reputational
damage, or termination of ongoing contracts.
As of June 30, 2025, we are executing 5 O&M contracts with a total value of ₹ 201.60 million. For further details,
kindly refer “Our Business – Our Order Book for O&M” on page 241.
4810. Our reliance on contract labour introduces operational uncertainties and may impact project timelines and
cost efficiency.
We regularly engage contract labour for civil construction, electrical works, and site operations depending on
project scale and location. The availability, skill level, and cost of such labour vary across geographies and may
be influenced by seasonal factors or competing infrastructure demands.
There is no assurance that we will always have access to an adequate pool of skilled contract labour at competitive
rates. Labour shortages or disruptions during peak construction phases may delay execution, inflate costs, or
compromise workmanship. Additionally, variations in local labour regulations, unionisation risks, and site-
specific conditions could further affect deployment.
Our contract labour deployment is typically project-specific and fluctuates based on execution timelines and local
requirements. For further details, kindly refer “Our Business – Human Resources” beginning on page 276.
11. Our operations are working capital intensive, and any shortfall or delay in availability of funds may adversely
affect our project execution and financial performance.
Our operations across infrastructure segments, including water and wastewater projects, roads, electrical
networks, and civil construction—are inherently working capital intensive due to significant upfront expenses in
procurement, mobilization, and project execution. As per our restated consolidated financial Information, our
working capital requirements for the Financial Year 2025, 2024 and 2023 amounted to ₹ 1,400.09 million, ₹
1,280.66 million and ₹ 650.58 million, respectively.
Further, our working capital requirements for Financial Year 2026 & 2027 are estimated at ₹ 1,769.78 million and
₹ 2,468.54 million out of which an amount of ₹ 900.00 million and ₹ 480.00 million will be funded out of the Net
Proceeds from issue of fresh equity shares in respective financial years, whereas the balance, if any, would be
arranged from our internal accruals and/or borrowings. For details of our working capital requirements and
estimation, kindly refer “Objects of the Offer” beginning on page 121.
Our projects typically follow milestone-based billing structures with clients—primarily government authorities—
releasing payments subject to certification protocols. These procedures, often coupled with administrative delays,
result in extended receivable cycles and cash flow mismatches. We are also required to furnish performance
guarantees backed by cash margins, and a portion of our contract value is retained as security until defect liability
periods are over, further tightening available liquidity.
Delays in client-side invoice certification, slower-than-expected release of payments, or a build-up in trade
receivables can compel us to rely on short-term borrowings to meet operational needs. Any such dependency may
expose us to increased interest costs and strain our liquidity position.
Our ability to secure financing on favourable terms is subject to prevailing credit norms and our relationship with
lenders. Changes in bank policies, interest rate hikes, or the imposition of restrictive loan covenants may impair
our access to funding. If we are unable to manage our working capital cycle efficiently, it could lead to execution
delays, cost overruns, or project disruptions, thereby adversely impacting our financial performance and
operational continuity.
For further details, kindly refer “Restated Consolidated Financial Information” and “Objects of the Offer”
beginning on pages 331 and 121, respectively.
12. Our Order Book may not be a reliable indicator of our future revenue or profitability, and any delay,
modification, or cancellation of projects may materially affect our financial performance, liquidity, and cash
flows.
As on June 30, 2025, our Order Book includes 14 EPC projects across wastewater treatment, water supply, roads,
and electrical infrastructure segments, with an aggregate contract value of ₹ 6,656.74 million and 5 Operations
and Maintenance (O&M) projects aggregating ₹ 201.60 million. For further details, kindly refer “Our Business –
Our Order Book” on page 232.
49Our Order Book represents the unexecuted value of ongoing and newly awarded contracts, net of the work
completed as on the relevant date. It is compiled based on internal estimates and is unaudited. The methodology
used may differ from industry practices and should not be construed as a guaranteed measure of future revenue or
profitability. The realization of income from our Order Book is subject to various factors including but not limited
to project approvals, site conditions, contractual timelines, and changes in project scope or specifications by the
client.
Delays in obtaining statutory approvals or right-of-way, client-side indecision, adverse site conditions, or
contractual disputes may lead to postponement, modification, or even cancellation of projects. In some cases,
project activities may be initiated before receiving formal work orders or completion certificates, which may delay
revenue recognition or lead to payment disputes.
Additionally, in projects involving government or public sector undertakings, even timely execution may not
ensure prompt payments. Such delays can impact our billing cycle, working capital requirements, and liquidity.
Consequently, our revenue and profitability may vary significantly across reporting periods and could be
adversely affected if projects are stalled, altered, or not completed as expected.
13. We cannot assure you that the Objects of the Offer will be achieved within the expected time frame, any
variation in the utilisation of the Net Proceeds of the Fresh Issue as disclosed in this Draft Red Herring
Prospectus shall be subject to certain compliance requirements, including prior Shareholders’ approval.
Our Company proposes to utilise the Net Proceeds towards the following objects:
(₹ in million)
Particulars Amount
Working Capital Requirements 1,380.00
General Corporate Purpose (2) [●]
Net Proceeds (1)(2) [●]
(1) To be finalised on determination of the Offer Price and updated in the Prospectus prior to filing with the RoC.
(2) The amount proposed to be utilised for general corporate purpose shall not exceed 25% of the gross proceed
from Fresh Issue.
The Objects of the Offer have not been appraised by any bank or financial institution. While a monitoring agency
will be appointed to monitor the utilisation of the Net Proceeds from issue of fresh equity shares, the proposed
utilisation of the Net Proceeds is based on current business plan, current conditions and other commercial and
technical factors including interest rates and other charges, the financing and other agreements entered into by our
Company, which is subject to change in light of changes in external circumstances and other factors beyond our
control such as general economic conditions, inflation, technological changes, changing customer preferences and
competitive landscape, credit availability and interest rate levels. Our management will have broad discretion to
revise our business plans, estimates and budgets from time to time. Consequently, our funding requirements and
deployment of funds may change, which may result in rescheduling of the proposed utilisation of the Net Proceeds,
subject to compliance with applicable law. A portion of the use of the Net Proceeds involving deployment towards
general corporate purposes is at the discretion of the management of our Company. For further information kindly
refer “Objects of the Offer” beginning on page 121.
In case of increase in actual expenses or shortfall in requisite funds, additional funds for a particular activity will
be met by any means available to us, including internal accruals and additional equity and/or debt arrangements.
If actual utilisation towards the Objects of the Offer is lower than the proposed deployment, such balance will be
used for future growth opportunities, including funding other existing objects, if required. If estimated utilisation
of the Net Proceeds from issue of fresh equity shares is not completely met in a fiscal year, it shall be carried
forward. In accordance with Section 27 of the Companies Act, 2013, we cannot undertake any variation in the
utilization of the Net Proceeds from the Fresh Issue as disclosed in this Draft Red Herring Prospectus without
obtaining the shareholders’ approval through a special resolution. In the event of any such circumstances that
requires us to undertake variation in the disclosed utilisation of the Net Proceeds, we may not be able to obtain
the Shareholders’ approval in a timely manner, or at all. Any delay or inability in obtaining such Shareholders’
50approval may adversely affect our business or operations. Further, our Promoters or controlling shareholders
would be required to provide an exit opportunity to the shareholders who do not agree with our proposal to modify
the objects of the Offer as prescribed in the SEBI (ICDR) Regulations. If our shareholders exercise such exit
option, our business and financial condition could be adversely affected. Therefore, we may not be able to
undertake variation of objects of the Offer to use any unutilized proceeds of the Fresh Issue, if any, even if such
variation is in the interest of our Company, which may restrict our ability to respond to any change in our business
or financial condition, and may adversely affect our business and results of operations. Further, we cannot assure
you that the Promoters or the controlling shareholders of our Company will have adequate resources at their
disposal at all times to enable them to provide an exit opportunity at the price prescribed by SEBI.
14. Our growth is significantly dependent on leveraging government initiatives in the water and wastewater
infrastructure sector, and our inability to capitalize on these opportunities could adversely affect our business
prospects.
A substantial portion of our business is driven by public infrastructure projects funded under various Central and
State Government programs. These include sector-specific schemes such as AMRUT, JJM, NMCG, as well as
broader infrastructure initiatives like the PMGSY, the Rajiv Gandhi Grameen Vidyutikaran Yojana (“RGGVY”)
and Restructured Accelerated Power Development and Reforms Programme (“RAPDRP”) and electrification
schemes by utility agencies such as Paschimanchal Vidyut Vitaran Nigam Limited (“PVVNL”) and
Dakshinanchal Vidyut Vitaran Nigam Limited (“DVVNL”). These schemes have collectively contributed to a
significant portion of our order book across sectors such as wastewater treatment, water supply, sewerage, roads,
and power distribution. For further details of our ongoing projects, kindly refer “Our Business – Our Order Book”
on page 232.
As of June 30, 2025, we are executing 04 projects under AMRUT. Our continued participation in such
government-led initiatives is crucial to maintaining project flow and sustaining our growth.
However, the ability to secure contracts under these schemes depends on various factors, including adherence to
evolving eligibility norms, timely availability of internal and external resources, and responsiveness to tendering
requirements. Any failure to qualify, delays in bidding processes, or inability to execute awarded projects in line
with prescribed benchmarks may curtail our ability to grow in these sectors.
We intend to continue participating in tenders issued under these and similar schemes. However, our ability to
secure and successfully execute such projects depends on various factors including availability of financial and
technical resources, management bandwidth, and responsiveness to tender conditions. Any inability or delay in
capitalizing on these schemes, or failure to meet qualification or execution standards, could restrict our growth
trajectory. Moreover, the scope and funding of these schemes are contingent upon government budgetary
allocations and policy priorities. A reduction in outlay, reallocation of funds, delays in disbursement, or a shift in
implementation strategy—such as moving from EPC to Public-Private Partnership (PPP) or Hybrid Annuity
Model (HAM) models—could reduce the availability of new projects or alter risk-sharing frameworks
unfavorably. Any such development may materially affect our future business pipeline and financial performance.
15. We rely on joint venture partners for selective project bids and the execution of certain awarded projects.
Failure by such partners to perform their obligations could adversely impact our operations, increase our
financial and performance-related responsibilities, and reduce our profitability.
Our Company selectively forms joint ventures to bid on and execute projects where technical or financial
qualification criteria require such arrangements. As of June 30, 2025, Company is executing 4 projects under the
joint ventures with the value of ₹ 3,838.64 million, out of our total Order Book of ₹ 6,656.74 million. For further
details, kindly refer “Our Business – Our Order Book” on page 232.
For further details on our Projects of our Company with Joint Ventures, kindly refer “Our Business – Our Order
Book” on page 232.
51The success of projects undertaken through joint ventures is dependent on the continued performance of our joint
venture partners. We and our joint venture partners are typically jointly and severally liable under the terms of the
contract. If a joint venture partner fails to perform its obligations due to operational inefficiencies, financial
constraints, or other reasons, we may be required to step in to perform the defaulting partner’s obligations or
assume full responsibility for the project, which could lead to delays, cost overruns, or potential losses.
Additionally, disputes or misalignment with our joint venture partners may delay project execution or cause
reputational harm.
Moreover, our joint ventures are not wholly controlled and managed by us. There are specific risks associated
with the inability to control the activities of joint venture partners, which may, in turn, pose additional risks to us.
These risks include the potential failure of joint venture partners to meet their obligations under joint venture
agreements, conflicts with partners, the risk of a partner misappropriating valuable knowledge, and the possibility
that a joint venture entity may not have access to necessary funds. While we have not experienced any adverse
impact on account of our joint ventures to date, we cannot assure that such situations will not arise in the future.
Inability to secure capable joint venture partners in the future may also restrict our ability to bid for projects that
require consortium participation, thereby limiting our business development opportunities.
16. We depend on external vendors and suppliers for critical inputs, and any shortfall in their performance could
adversely affect our project delivery timelines and quality.
While the core design, engineering, and construction activities across our infrastructure segments including
WWTPs, WSSPs, roads, and electrical works are predominantly executed by our in-house teams, we rely on
vendors and suppliers for the timely provision of key inputs such as raw materials, plant and machinery, and
specialized equipment. Any delay or deficiency in the delivery of such inputs whether due to material shortages,
logistical disruptions, supply chain constraints, or quality issues may adversely impact our execution timelines,
escalate project costs, or affect the quality of deliverables.
Such disruptions can impair our operational efficiency, hinder compliance with project schedules, and negatively
affect client relationships and profitability. Given the scale and technical complexity of certain projects, the
continued reliability and coordination with our vendor base is essential to maintain construction momentum and
adhere to contractual milestones.
17. We have certain contingent liabilities, which, if materialized, may affect our financial condition and results of
operations.
The details of our contingent liabilities (as per Ind AS 37), derived from the Restated Consolidated Financial
Information are as set out below as on March 31, 2025, March 31, 2024 and March 31, 2023:
(₹ in million)
Financial Year ended March 31,
Particulars
2025 2024 2023
A) Disputed claims/levies in respect of Income tax against which Rectification application is filed except for
the Assessment year 2024-25 before jurisdictional Assessing Officer and demand will be deleted as told by the
Management of the Company.
For the Assessment year 2024-25, the rectification application is yet to be filed as the TDS from the principal
is not reflected in the 26AS of the Company, as told by the management of the company, they are pursuing with
the principal to show the TDS in the 26AS, after reflection in 26AS, the company will file the rectification
application with the Income Tax Department.
A.Y 2024-25 7.34 - -
A.Y 2018-19 0.13 0.13 0.13
A.Y 2023-24 1.16 1.16 -
B) Disputed claims/levies in respect of Goods and Services Tax)
52Appeals filed of GST (Rajasthan) Tax Assessment of FY 2018-2019 0.97 - -
Appeal filed of GST (Rajasthan) Interest Liability of FY 2023-2024 21.74 - -
GST Liability (U.P) on account of differential amount of GST @ 6%
and 18% on the supply/Services made to the department (UP Jal
Amount not
Nigam) in compliance to DGGI Meerut Proceedings, against which - -
quantifiable
writ petition is yet to be filed before the High Court for the period Jan
2022 to July 2022.
Total 31.34 1.29 0.13
As certified by Rishi Kapoor & Company, Chartered Accountants pursuant to their certificate dated August 04,
2025 vide UDIN 25455362BMGILN1743.
(₹ in million)
GUARANTEES
For the Financial Year ended March 31
Particulars
2025 2024 2023
A) Bank Guarantees 1,113.16 792.27 595.55
Total 1,113.16 792.27 595.55
As certified by Rishi Kapoor & Company, Chartered Accountants pursuant to their certificate dated August 04,
2025 vide UDIN 25455362BMGILN1743.
For further details, kindly refer “Restated Consolidated Financial Information – Annexure 46 – Contingent
Liabilities” beginning on page 398.
If a significant portion of these liabilities materialize, it could have an effect on our results of operations and
financial condition. Further, there can be no assurance that we will not incur similar or increased levels of
contingent liabilities in the future.
18. Our business is subject to seasonal fluctuations that could result in delays or disruptions to our operations
during the critical periods of our projects and cause severe damages to our premises and equipment’s.
Our business operations may be affected by seasonal factors which may restrict our ability to carry on activities
related to our construction projects, laying of water pipes and fully utilize our resources.
The following factors may restrict our ability:
➢ Heavy or sustained rainfalls
➢ Flood
➢ Cyclones or
➢ Other extreme weather conditions
The above could result in delays or disruptions to our operations during the critical periods of our projects and
cause severe damages to our premises and equipment’s.
In particular, the monsoon season may restrict our ability to carry on activities related to our projects and fully
utilize our resources and may slow our activities on construction projects, which shifts our revenue and
accordingly profit recognition to subsequent quarters. Adverse seasonal developments may also require the
evacuation of personnel, suspension or curtailment of operations, resulting in damage to construction sites or
delays in the delivery of materials. Such fluctuations may adversely affect our revenues, cash flows, results of
operations and financial conditions. We have not experienced any delay of projects or any disruptions to our
operations during the critical periods of our projects and cause severe damages to our construction Projects.
Further, no assurance can be given that we will not experience such incidents in future.
5319. Our business is largely concentrated in two states (“States”) and is affected by various factors associated with
these states.
Our project portfolio has historically been concentrated in projects in Uttar Pradesh and Rajasthan. Though we
have undertaken projects in other parts of India, including Uttarakhand and Delhi. This concentration of our
business in Uttar Pradesh & Rajasthan subjects us to various risks, including but not limited to:
▪ regional slowdown in construction activities or reduction of infrastructure projects in states;
▪ vulnerability to change of policies, laws and regulations or the political and economic environment of States;
▪ constraint on our ability to diversify across states;
▪ perception by our potential clients that we are a regional construction company, which hampers us from
competing for large and complex projects at the national level; and
▪ Limitation on our ability to cluster projects in the states where we intend to conduct business.
While we strive to diversify across states and reduce our concentration risk, there is no guarantee that the above
factors associated with the states will not continue to have a significant impact on our business. If we are not able
to mitigate this concentration risk, we may not be able to develop our business as we planned and our business,
financial condition and results of operations could be materially and adversely affected.
As on the date of this Draft Red Herring Prospectus, Company has executed 13 projects out of which 12 projects
were executed in Uttar Pradesh & currently the Company is executing 19 projects out of which 06 projects & 04
O & M projects executing in Uttar Pradesh.
For further information, kindly refer “Our Business-Our Order Book and Order Book for Completed Projects” on
page 243.
Following are the state wise bifurcation of revenue for the financial year ended March 31, 2025, March 31, 2024
and March 31, 2023:
(₹ in million)
For the Financial Year ended March 31,
2025 2024 2023
Sr. Name of % of % of % of
Revenue Revenue Revenue
No. the States Revenue Revenue Revenue
from from from
from from from
Operations Operations Operations
Operations Operations Operations
1. Uttar
756.39 27.05 1,382.72 61.15 1,717.57 96.12
Pradesh
2. Rajasthan 1,665.42 59.58 730.64 32.31 69.34 3.88
3. Delhi 163.53 5.85 147.66 6.54 - -
4. Uttarakhand 210.30 7.52 - - - -
Total 2,795.64 100.00 2,261.02 100.00 1,786.91 100.00
20. Trade Receivables and Inventories form a substantial part of our current assets and net worth. Failure to
accurately forecast and manage inventory could result in an unexpected shortfall and/ or surplus of raw
materials, equipment and manpower, which could affect our business and financial condition.
Our business requires significant working capital investment, and trade receivables and inventories together form
a substantial part of our non-cash current assets, constituting 72.93%, 74.59% and 78.76% of total non-cash
current assets as of March 31, 2025, March 31, 2024 and March 31, 2023, respectively. As of the said dates, our
total trade receivables and inventories stood at ₹ 1,471.17 million, ₹ 1,559.28 million and ₹ 981.59 million.
We procure materials and plan manpower deployment based on management estimates of project timelines,
customer demand, and past trends. Any underestimation may result in shortages of raw materials, equipment, or
labour, affecting project execution and increasing costs. Conversely, overestimation may lead to excess inventory,
additional storage cost, reduced inventory quality, and potential write-offs, all of which can impact our margins
54and liquidity.
Moreover, our ability to effectively manage trade receivables is critical to our cash flows. If we fail to evaluate
the creditworthiness of customers or secure appropriate payment terms, it may result in bad debts, delayed
recoveries, or write-offs, leading to liquidity crunches. This may, in turn, require increased working capital
borrowings, escalating finance costs and adversely impacting our profitability. Any inability to manage our
inventory or receivables effectively may result in operational disruptions, tighter vendor financing requirements,
and adverse effects on our business, financial condition, and results of operations.
21. Our Company has availed ₹ 273.16 million as unsecured loan which are repayable on demand. Any demand
from the lenders for repayment of such unsecured loan may affect our cash flow and financial condition.
As per the Restated Consolidated Financial Information as on March 31, 2025, our Company has availed a sum
of ₹ 273.16 million as unsecured loans which are repayable on demand. Sudden recall may disrupt our operations
and also may force us to opt for funding at higher interest rates, resulting in higher financial burden. Further, we
will not be able to raise funds at short notice and thus resulting in shortage of working capital fund. For further
details, please refer to the section “Financial Indebtedness” beginning on page 428. Any demand for the
repayment of such unsecured loans, may adversely affect our cash flow and financial condition.
22. Increases in the cost of raw materials, labour, and contract execution charges may impact our profitability and
cash flows.
Our operations across infrastructure segments including wastewater treatment, water supply schemes, roads,
housing, electrical works, and microtunneling require significant consumption of raw materials, construction
equipment, and skilled and unskilled labour. Inputs such as steel, cement, pipes, electrical components, and fuel
are critical to our project execution. The cost and availability of these materials are influenced by multiple external
factors including domestic and international supply-demand dynamics, local sourcing constraints, transportation
costs, and geopolitical developments.
For the financial year ended 2025, 2024 and 2023, our cost of revenue of operations adjusted to change in
inventories amounted to ₹ 2,170.50 million, ₹ 1,839.95 million and ₹ 1,513.28 million, respectively, representing
77.64%, 81.38% and 84.69% of our revenue from operations. For further details, kindly refer “Restated
Consolidated Financial Information” beginning on page 331.
Our contracts are typically awarded through competitive bidding and are structured as fixed-price or item-rate
contracts, many of which include limited price escalation clauses. These arrangements expose us to the risk of
absorbing increased costs in the event of material or labour price inflation. While some contracts include price
variation mechanisms, we cannot assure that such clauses will be adequate to fully offset cost escalations or that
they will be contractually enforceable in every circumstance.
Moreover, our execution costs may increase due to factors such as changes in applicable tax rates, unanticipated
site conditions, labour unavailability, delays in client handovers, or exigencies arising during implementation.
Any such increase in project input costs could adversely affect our margins, cash flows, and overall financial
performance.
23. Variations in project execution costs from bid-stage assumptions may result in reduced profitability or losses.
We undertake the construction and execution of infrastructure projects—including WWTPs, WSSPs, roads,
electrical systems, and urban utilities—primarily through fixed-price EPC contracts awarded by government
authorities and public bodies through competitive bidding. At the bid stage, we estimate input costs based on
available technical data, preliminary site assessments, and projected quantities of materials, labour, equipment,
and subcontracted services.
However, actual execution costs may deviate materially from bid-stage assumptions due to a variety of factors,
including unforeseen geotechnical or site-specific conditions, changes in project scope or design after award,
delays in land possession or statutory approvals, labour shortages, or weather-related disruptions. Volatility in the
55prices of key construction inputs such as cement, steel, pipes, and fuel can further widen the gap between projected
and actual costs.
Although certain contracts contain escalation clauses or permit variations in quantities, there is no assurance that
such provisions will be sufficient or enforceable to fully compensate for unanticipated increases in cost.
Additionally, projects undertaken through joint ventures may expose us to shared risks and liabilities, including
cost overruns or delays caused by the actions or defaults of our partners. Any material cost deviations that cannot
be recovered through contract variation or claims mechanisms may lead to margin erosion or project-level losses,
adversely impacting our financial performance and cash flows.
24. We require certain approvals and licenses in the ordinary course of business and are required to comply with
certain rules and regulations to operate our business, and the failure to obtain, retain and renew such approvals
and licences in timely manner or comply with such rules and regulations or at all may adversely affect our
operations.
We require certain statutory and regulatory permits, licenses and approvals to operate our business. Many of these
approvals are granted for fixed periods of time and need renewal from time to time. Non-renewal of the said
permits and licenses would adversely affect our operations, thereby having a material adverse effect on our
business, results of operations and financial condition. There can be no assurance that the relevant authorities will
issue any of such permits or approvals in the time-frame anticipated by us or at all.
Further, some of our permits, licenses and approvals are subject to several conditions and we cannot provide any
assurance that we will be able to continuously meet such conditions or be able to prove compliance with such
conditions to the statutory authorities, which may lead to the cancellation, revocation or suspension of relevant
permits, licenses or approvals. Any failure by us to apply in time, to renew, maintain or obtain the required permits,
licenses or approvals, or revoke the cancellation or suspension of any of the permits, licenses or approvals may
result in the interruption of our operations and may have a material adverse effect on the business.
Currently no approvals/licenses are pending which we have applied. For further details, kindly refer “Key Industry
Regulations and Policies” and “Government and Other Statutory Approvals” beginning on pages 287 and 486
respectively.
25. Our reliance on advanced and evolving technologies for the designing and installation of Wastewater
Treatment Plants (WWTPs) & Water Supply Scheme Projects (WSSPs) may affect our ability to secure and
implement future contracts if we fail to adapt to updated technical requirements.
The design, engineering, and implementation of WWTPs and WSSPs undertaken by our Company involve the
use of advanced and project-specific technologies. As disclosed under “Our Business – Segments of our Business
Operations” on page 249, we provide customized design-build solutions, integrating civil, electrical, mechanical,
and instrumentation works using modern water treatment and distribution technologies. Our technical solutions
are tailored to client requirements, often aligned with central and state government mandates for compliance with
environmental and sustainability norms.
We deploy technologies such as Sequential Batch Reactor (SBR) and Upflow Anaerobic Sludge Blanket (UASB)
to meet project specifications and regulatory standards. However, our continued eligibility for such projects is
dependent on our ability to stay updated with evolving technology norms prescribed by government authorities
and project owners.
Any inability to adopt required technologies, or delays in upgrading our engineering and operational capacities in
response to changes in technical standards, may result in disqualification from bidding processes or reduced
competitiveness. This may adversely affect our ability to secure and execute projects under government schemes
including AMRUT 2.0, Jal Jeevan Mission, and Namami Gange. For further details of such projects, kindly refer
“Our Business – Our Order Book” on page 232.
5626. Our government contracts usually contain terms that favour government clients. Our ability to negotiate the
standard form of Government contracts is limited and we may be required to accept unusual or onerous
provisions in such contracts, which may affect the efficient execution and profitability of our projects.
The counterparties to a number of our construction contracts are government entities and these contracts are
usually based on standard terms and conditions set out by the government entities. We thus have had only a limited
ability to negotiate the terms of these contracts, which tend to favour our government clients and we may be
required to accept unusual or onerous provisions in such contracts in order to be engaged to execute such projects.
For example, the terms laying out our obligations as well as operation and maintenance specification for our
projects are determined by the Government entities and we are not permitted to amend such terms or
specifications. Additionally, our projects provide the Government authority with a right to terminate the contract
unilaterally without assigning any reason. These onerous conditions in the Government contracts may affect the
efficient execution of these projects and may have adverse effects on our profitability.
27. Inadequate performance or failure to comply with contractual standards under Operation and Maintenance
(O&M) works may result in penalties, termination of contracts, or reputational harm, and could adversely
impact our business and financial condition.
Our Company undertakes operation and maintenance (O&M) works as part of several government-awarded
projects. These O&M works typically follow the execution and commissioning of wastewater treatment plants
and are governed by detailed performance standards prescribed in the underlying contracts with the awarding
authorities. As on June 30, 2025, our O&M Order Book comprises 5 projects, aggregating to a value of ₹ 201.60
million, with contract periods ranging from 5 to 10 years. For further details, kindly refer “Our Business – Our
Order Book for O&M” on page 241.
Under the terms of these contracts, we are required to comply with specified maintenance protocols and quality
benchmarks, including periodic assessments of treated water quality and project upkeep by independent third-
party agencies. Non-compliance with performance obligations may result in liquidated damages, withholding of
payments, or, in some cases, termination of the concession or service agreement.
Our cost structure may also be affected by unforeseen increases in O&M expenditure arising from (i) revisions in
statutory maintenance standards; (ii) rise in manpower and input costs; (iii) increased frequency of major repairs;
or (iv) higher fuel and electricity consumption. Moreover, technical disruptions in our operational systems or
failure to meet stipulated service levels may adversely impact our financial performance.
Any significant deviation from contracted performance standards, whether due to operational inefficiencies,
external cost escalations, or systemic failures, may result in the imposition of penalties, adversely affect our cash
flows, and materially impact our business, reputation, and results of operations.
28. Our business transactions are with government or government funded entities in India, which may expose us
to risk, including additional regulatory scrutiny.
Our business operations are primarily dependent on contracts awarded by government bodies and entities funded
by the Central and State Governments, in connection with water supply and wastewater treatment projects. Given
the nature of these contracts, we are subject to additional regulatory oversight and administrative procedures,
including technical audits and inspections by the awarding authorities. Any findings of non-compliance or
disputes arising from such audits may expose us to penalties, recovery claims, or adverse observations that could
impact our project execution timelines and payment schedules.
Further, delays in release of funds or milestone-based payments by government entities are common and beyond
our control, which may adversely affect our working capital cycle. While we have not faced any instances of
penalty imposition or blacklisting in the past, there can be no assurance that such circumstances will not arise in
the future, especially in the event of disputes, contractual breaches, or procedural defaults.
In the event of a contract termination or our debarment from future bidding opportunities by government bodies,
it could adversely impact our project pipeline, revenues, and reputation, thereby affecting our financial condition
57and results of operations.
29. Water treatment or reuse technology is subject to rapid change. These changes may affect the demand for our
services. If we are unable to keep informed of the technological changes and new introductions our business,
results of operations and financial condition may be adversely affected.
Water reuse technology is constantly evolving, and these changes may influence the demand for our services and
construction activities. Our future performance will largely depend on our ability to successfully implement
WWTPs and WSSPs with up-to-date, advanced, and efficient technologies that meet customer requirements and
align with market trends. If our clients require new or specific technologies that we are unable to provide, we may
be disqualified from bidding on such projects. Additionally, if clients continue to favor technologies that we do
not offer, our business, results of operations, and financial condition could be adversely impacted.
To address evolving customer preferences and market trends, we have developed and introduced several upgraded
water treatment plants for water reuse in recent years. However, there is a possibility that we may miss market
opportunities if we fail to invest timely, invest inadequately, or fail to upgrade our capabilities or form partnerships
with technology providers. Shifts in market demand could also lead to the discontinuation of existing or planned
projects, which may negatively impact our client relationships. If we are unable to adapt to these changes or meet
market demands in our construction and servicing of WWTPs or WSSPs, our business, results of operations, and
financial condition could be adversely affected.
30. Educational certificates of one of our Director & Promoter, Mrs. Rekha Tyagi, Promoter & Some of our SMPs
are unable to trace.
One of our Director and Promoter, Mrs. Rekha Tyagi holds a degree of Bachelors of Arts from Meerut University
and some of our Senior Management Personnel i.e. Mr. Rajiv Tyagi is a graduate from Delhi University in 1991
and Mr. Fateh Chand Sharma, holds a degree of Bachelor of Science from CCS University in 1996 possess the
necessary qualifications for their respective positions. Unfortunately, the original copies of their degrees are
untraceable. Due to lack of the required documentation, the qualifications of the director and Senior Management
Personnel are not shown in their profile at the particular places in this Draft Red Herring Prospectus.
31. We may be subject to liability claims or claims for damages or termination of contracts for failure to meet
project completion timelines or defective work, which may adversely impact our profitability, cash flows, results
of operations and reputation.
We undertake infrastructure projects—including WWTPs, WSSPs, roads, and electrical systems—pursuant to
contracts with government authorities and public sector undertakings. These agreements typically contain
provisions that impose liquidated damages in the event of project delays, subject to customary exclusions such as
force majeure events or delays solely attributable to the contracting authority. In such cases, the client may deduct
penalties directly from milestone payments otherwise due to us.
During both the construction phase and the post-completion defect notification period, we are contractually
obligated to rectify any construction or performance deficiencies at our own cost and risk. The defect liability
period generally ranges from 12 to 60 months, during which we remain responsible for addressing any defects or
non-conformities. In certain contracts, we may also be required to indemnify the contracting authority for losses
arising from our failure to fulfill contractual obligations.
Apart from monetary penalties, failure to meet project deadlines or perform quality-compliant work may harm
our business reputation and client relationships. Government authorities may reserve the right to terminate
contracts in case of material delays or defective performance not falling within agreed exclusions. Upon
termination, we may be entitled only to partial compensation, which may not be commensurate with the work
completed or the expected revenue from the project.
Delays in execution may also result in cost overruns, which can affect project profitability and overall viability.
Factors contributing to such delays in past projects include:
58i. delays in handover of hindrance-free sites,
ii. delays in approval of designs and drawings,
iii. delays in payment release,
iv. delays in providing sewage or effluent inlet connections,
v. delays in providing electrical connections, and
vi. seasonal disruptions due to heavy rainfall.
As of the date of this Draft Red Herring Prospectus, we have not been subjected to liquidated damages or
termination for reasons attributable to us, there can be no assurance that such claims will not arise in the future.
Any imposition of liquidated damages, liability claims, or contract terminations may materially and adversely
affect our profitability, cash flows, financial condition, and business operations.
32. We are required to furnish bank guarantees as part of our business. Our inability to arrange such guarantees
or the invocation of such guarantees may adversely affect our cash flows and financial condition.
As part of our business and as is customary, we are required to provide financial and performance bank guarantees
in favour of our project clients under the respective contracts for our projects. For our projects, we typically issue
bank guarantees to the relevant authority with whom the contractual arrangement has been entered into. We may
not be able to continue obtaining new financial and performance bank guarantees in sufficient quantities to match
our business requirements. If we are unable to provide sufficient collateral to secure the financial bank guarantees,
performance bank guarantees or letters of credit, our ability to enter into new contracts or obtain adequate supplies
could be limited and could have a material adverse effect on our business, results of operations and financial
condition.
Further, the process of obtaining contracts, financial and performance bank guarantees, tends to increase our
working capital requirements. As of March 31, 2025, March 31, 2024 and March 31, 2023, we had issued bank
guarantees amounting to ₹ 1,113.16 million, ₹ 792.27 million and ₹ 595.55 million, respectively, towards securing
our financial / performance obligations under our ongoing projects. We may be unable to fulfil any or all of our
obligations under the contracts entered into by us in relation to our ongoing projects due to unforeseen
circumstances which may result in a default under our contracts resulting in invocation of the bank guarantees
issued by us. If any or all the bank guarantees are invoked, it may result in a material adverse effect on our business
and financial condition.
33. Environmental protection policies, legislation, regulations, and judicial directives significantly influence
government spending on water reuse solutions. These frameworks are subject to change due to evolving
political, social, and economic factors. Amendments to laws and regulations related to environmental
protection, water supply, treatment, and discharge may alter the demand for our services. Such changes could
materially and adversely impact our business, financial condition, and results of operations.
Our operations involve risks inherent in providing erection, civil construction, and maintenance services,
including equipment failures, work-related accidents, fire, explosions, and other hazards that could result in
injuries, loss of life, significant damage to property and equipment, and environmental harm. Additionally, the
construction and development of these projects are subject to implementation risks, such as construction delays,
disruptions in the supply of raw materials, unanticipated cost escalations, force majeure events, and cost overruns.
Furthermore, we may encounter the following risks:
✓ unforeseen technical problems, disputes with works and labour contractor, force majeure events and
unanticipated costs due to defective plans and specifications;
✓ not being able to obtain adequate capital or other financing at affordable costs or obtain any financing at all
to complete construction and installation of any of our projects;
59✓ not being able to provide the required guarantees under project agreements or enter into financing
arrangements;
✓ experiencing shortages of, and price increases in, materials and skilled and unskilled labour, and inflation in
key supply markets;
✓ geological, construction, excavation, regulatory and equipment problems with respect to operating projects
and projects under construction;
✓ the relevant authorities may not be able to fulfil their obligation prior to construction of a project, in
accordance with the relevant contracts resulting in unanticipated delays;
✓ spread of infectious diseases at our project sites, resulting in temporary shutdown of operations at such sites
until such sites are successfully decontaminated and the relevant persons are quarantined;
✓ delays in completion and commercial operation could increase the financing costs associated with the
construction and installation and cause our forecast budget to be exceeded;
✓ risk of equipment failure that may cause injury and loss of life, and severe damage to and destruction of
property and equipment; and
✓ other unanticipated circumstances or cost increases.
WWTPs and WSSPs typically have long gestation periods and require substantial capital infusion at periodic
intervals. However, payments through running account bills are cleared subject to approval by the respective
government authorities. There is no assurance that these projects will be completed within the expected timelines.
There have been instances where delays occurred due to government authorities/bodies not providing land
promptly to commence the construction and installation of the WWTPs and WSSPs. If any of these risks
materialize, we may face significant cost overruns or even losses due to unanticipated cost increases, which could
materially and adversely affect our business, profitability, and results of operations.
34. Our operations across diverse geographical regions expose us to executional, regulatory, and logistical
challenges that may adversely affect our project performance and financial condition.
As on June 30, 2025, we have successfully executed infrastructure projects—including WWTPs, WSSPs, roads,
and other public utility works—across multiple states in northern India over the past 5 years. While this geographic
diversification enhances our market reach and order book visibility, it also introduces region-specific challenges
that may affect execution timelines and costs.
Such challenges include variations in topography, climate conditions (particularly project delays during monsoon
seasons), regional labour availability, transportation and supply chain limitations, and differing regulatory
frameworks and administrative processes across states. Our engagement with new subcontractors, limited
familiarity with local socio-political dynamics, and language or cultural barriers may also complicate site
coordination and stakeholder communication.
Operational and administrative inefficiencies in unfamiliar territories may result in cost overruns, workforce
mobilization issues, or delays in obtaining local clearances. Additionally, logistical bottlenecks or disputes with
local authorities, vendors, or communities may disrupt project progress.
Any inability to efficiently manage region-specific risks and coordinate execution across diverse locations could
adversely affect the cost efficiency, timelines, and profitability of our projects, thereby impacting our business
operations, financial condition, and results of operations.
35. Failure to increase the size of our projects or enhance our pre-qualification credentials may negatively impact
our growth prospects.
We have executed and upgraded STPs ranging from 3 MLD to 56 MLD in capacity. Projects with higher installed
capacities typically attract lower competition, enable greater economies of scale, and allow for more efficient
60deployment of resources, thereby offering the potential for improved margins. We intend to continue focusing on
the design, construction, operation, and maintenance of wastewater treatment plants, with the strategic objective
of scaling up to higher capacity projects.
An increase in the size and complexity of executed projects also contributes to our technical pre-qualification for
future bids involving large-scale public infrastructure contracts. We continue to pursue opportunities for WWTPs
and WSSPs on an EPC basis, either independently or through joint venture partnerships. For further details on our
completed projects, kindly refer “Our Business – Our Order Book for Completed Projects” on page 243.
However, our ability to qualify for and secure larger contracts depends on our financial, technical, and operational
track record, including the timely and quality execution of ongoing projects. Any failure to win or execute high-
capacity projects may limit our pre-qualification credentials and competitiveness in future tenders. Such
limitations could, in turn, constrain our order book expansion and adversely impact our growth trajectory, financial
condition, and results of operations.
36. Our Promoters and members of Promoters Group & relatives of our Promoter & Promoter group have
mortgaged their personal properties and provided personal guarantees for our borrowings to secure our loans.
Our business, financial condition, results of operations, cash flows and prospects may be adversely affected by
the revocation of all or any of the personal guarantees provided by our Promoters and members of Promoters
Group in connection with our Company’s borrowings.
Our Promoters, and our Promoters Group & relatives of our Promoter & Promoter group have mortgaged their
personal properties and provided personal guarantees for our borrowings to secure our loans as disclosed below:
Sr.
Bank Name Guarantee
No.
1 Kotak Personal Guarantee of Sanjay Tyagi, Rekha Tyagi, Kartikey Tyagi.
Mahindra Plot No. 17, Block A, Sector 49, Noida-201301, Uttar Pradesh owned by Sanjay Tyagi
Bank & Rekha Tyagi (First & Exclusive Charge).
Limited Plot No. C-83, RDC Raj Nagar, Ghaziabad-201002, Uttar Pradesh, owned by M/s Shiv
Durga Constructions Company Proprietor Anju Sharma (relative of Promoter group)
(First & Exclusive Charge).
2 Punjab Personal Guarantee of Sanjay Tyagi, Rekha Tyagi, Kartikey Tyagi, M/s Kartikey
National Constructions (Partnership Firm), Mam Chand Tyagi, Rajiv Tyagi, Sandhya Tyagi,
Bank Madhusudan Gupta, Kamlesh Gaur, Neeraj Tyagi, Saroj Bala and M/s Unimax Build
Limited Estate.
Property bearing No. B-27, Sector-49, Noida, Gautam Budh Nagar, Uttar Pradesh-
201301, India, owned by Mr. Sanjay Tyagi & Mrs. Rekha Tyagi.
Plot bearing No. NK-II 265A, Indirapuram, Ghaziabad, Uttar Pradesh, owned by Mrs.
Rekha Tyagi.
Khasra No. 85, Min at Village Morti, Pargana Jalalabad, Ghaziabad, Uttar Pradesh,
owned by Mr. Mam Chand Tyagi.
House No. 3/1223 at Sector-3, Vasundhara Yojna, Vashundhara, Ghaziabad, Uttar
Pradesh, owned by Mr. Rajiv Tyagi.
Lease hold (JDA) Plot No. 44, Gulmohar Park-I, Mahal Jagatpura, Jaipur, Rajasthan,
owned by Mr. Madhusudan Gupta.
61Lease hold (JDA) Plot No.45, Gulmohar Park-I, Mahal Jagatpura, Jaipur, Rajasthan,
owned by Mr. Madhusudan Gupta.
Lease hold (JDA) Plot No.52, Gulmohar Park-I, Mahal Jagatpura, Jaipur, Rajasthan,
owned by Mr. Madhusudan Gupta.
Lease hold (JDA) Plot No.53, Gulmohar Park-I, Mahal Jagatpura, Jaipur, Rajasthan,
owned by Mr. Madhusudan Gupta.
Lease hold (JDA) Plot No. S 59, Mahesh Nagar, Jaipur, Rajasthan, owned by Ms.
Kamlesh Gaur.
Under Construction Building on lease hold (JDA) Plot No. B 181, SEZ at Village Jhai,
Tehsil, Sangner, Jaipur, Rajasthan, owned by M/s Unimax Build Estate.
Property situated at 29, Avadhpuri, Near Mahesh Nagar, Jaipur, Rajasthan, owned by
Ms. Kamlesh Gaur.
House No. 474/11 at North Civil Lines, Muzaffarnagar, Uttar Pradesh, owned by Ms.
Saroj Bala.
3 ICICI Bank Personal Guarantee of Sanjay Tyagi, Rekha Tyagi, Kartikey Tyagi.
Limited
4 HDFC Bank Personal Guarantee of Sanjay Tyagi, Rekha Tyagi, Kartikey Tyagi and Counter bank
Limited guarantee of Technocraft Ventures Limited.
If any of these guarantees are revoked, our lenders may require alternative guarantees or collateral or cancellation
of such facilities, entailing repayment of amounts outstanding under such facilities. If we are unable to procure
alternative guarantees satisfactory to our lenders, we may need to seek alternative sources of capital, which may
not be available to us at commercially reasonable terms or at all, or to agree to more onerous terms under our
financing agreements, which may limit our operational flexibility. Accordingly, our business, financial condition,
results of operations, cash flows and prospects may be adversely affected by the revocation of all or any of the
personal guarantees provided by our Promoters and Promoters Group and relatives of our Promoter & Promoter
Group in connection with our Company’s borrowings.
37. Our contracts with government authorities/bodies typically include terms that are more favorable to them,
allowing for the possibility of premature termination under circumstances beyond our control.
We execute most of our infrastructure projects—including wastewater treatment plants, water supply schemes,
roads, and electrical works—pursuant to contracts with government authorities and public sector bodies. These
contracts are typically non-negotiable, and the terms are standardized in favour of the awarding authority. As such,
we have limited ability to modify provisions relating to our obligations, payment terms, construction rates,
liability, and dispute resolution.
These government contracts often contain onerous provisions, including:
i. Transfer of significant project execution risk to the contractor, without reciprocal obligations on the part
of the client;
ii. Liability for defects arising even after project termination or handover;
iii. Discretionary powers of the client to extend project timelines, potentially causing delays and cost overruns
without guaranteed compensation;
iv. Exposure to consequential or economic loss claims initiated by the client;
v. Delays in land acquisition, utility shifting, or regulatory clearances, which remain the client's responsibility
but may materially impact execution; and
vi. The client's right to unilaterally suspend or terminate the contract with notice, including for reasons
62unrelated to contractor performance.
While these contracts may provide for compensation in the event of termination not arising from our default, such
compensation typically covers only unrecovered investments and does not account for lost profits. Moreover, the
compensation process may be protracted, and the amount ultimately disbursed may fall short of our financial
exposure. In such circumstances, we are also required to hand back the construction site and project assets to the
authority, often without full cost recovery.
Further, in the event of any alleged breach or default on our part, government entities may suspend us from
executing project work, impose penalties, or invoke indemnification clauses. Although we have not experienced
such suspension or termination in the recent past, the asymmetrical terms of our government contracts increase
our exposure to operational disruptions, revenue uncertainty, and reputational risk. These risks may materially
affect our project delivery, financial condition, and results of operations.
38. Our business operations and future growth are dependent on the continued services of our Key Managerial
Personnel (KMP) and Senior Management Personnel (SMP). Loss of their expertise or inability to attract
qualified talent may adversely impact our operations and growth strategy.
Our success in designing, engineering, and executing complex infrastructure projects—including wastewater
treatment plants, water supply schemes, and other public utility contracts—depends significantly on the
knowledge, leadership, and execution capabilities of our KMPs and SMPs. These individuals play a critical role
in project planning, tender bidding, regulatory compliance, client engagement, and on-site implementation. For
further information on our KMPs and SMPs, kindly refer “Our Management” beginning on page 321.
The loss of any member of our senior management team could disrupt ongoing projects, hinder decision-making,
and adversely affect our ability to secure and execute new contracts. In particular, their familiarity with client
expectations, internal processes, and regulatory procedures contributes materially to our operational efficiency
and competitiveness.
As our business expands across geographies and sectors, our need for technically skilled professionals—including
engineers, site supervisors, and project managers—is expected to grow. The infrastructure sector is highly
competitive in terms of human capital, and attracting or retaining qualified talent may require us to offer enhanced
compensation packages or long-term incentive plans. Any failure to recruit new talent or manage attrition,
especially at the project execution level, may delay project delivery or affect the quality of execution.
Although we have not experienced any material attrition at the KMP or SMP level in the past, we cannot assure
that such stability will continue. Any significant loss of leadership or failure to build a robust talent pipeline could
adversely affect our business continuity, financial condition, and future growth trajectory.
39. We may not be able to successfully protect our brand name and trademark, which may adversely affect our
business, reputation, and competitive position.
We have filed an application for registration of our logo as a device mark under Class 37 vide application no.
6798628, of the Trade Marks Act, 1999. As on the date of this Draft Red Herring Prospectus, the status of our
application is “Formalities Check Pass.” For further details, kindly refer “Our Business – Intellectual Property”
on page 279.
There is no assurance that our trademark will be successfully registered or that third parties will not oppose the
registration. Until registration is granted, our ability to enforce exclusive rights over the use of the mark remains
limited. Any failure to secure or maintain trademark protection may result in loss of brand identity or dilution of
market recognition, particularly if similar marks are used by competitors or unrelated entities in the EPC or
infrastructure sector.
In addition, enforcement of intellectual property rights—whether through opposition, infringement suits, or cease-
and-desist actions—may require significant legal expenditure and managerial attention. These efforts may not
63always result in favorable outcomes and could divert resources from our core business operations. Any adverse
ruling or inability to prevent unauthorized use of our mark may impact our reputation, erode competitive
advantage, and adversely affect our business prospects and financial results.
40. Our inability to respond effectively to increasing competition may adversely impact our business, financial
condition, and results of operations.
We operate in a competitive infrastructure development environment, particularly in sectors such as WWTPs
WSSPs, and related EPC services. We face competition from a range of players, including large, well-established
domestic companies with greater financial resources, stronger brand recognition, wider operational footprints, and
the capacity to execute larger and more complex projects.
Additionally, emerging players and new entrants with greater operational flexibility or technological agility may
intensify competition. Competitive factors include not only pricing but also execution capability, technological
efficiency, compliance record, and overall value proposition to the client.
We have previously encountered significant price-based competition in government tenders. Continued or
increased price pressure may require us to submit lower-margin bids, potentially affecting our revenue generation
and profitability. Moreover, some of our competitors may be able to offer more aggressive pricing, faster project
delivery timelines, or better access to skilled resources, which could erode our competitive position and restrict
our ability to secure new contracts.
There can be no assurance that we will continue to maintain or grow our market share in the face of such
competition, or that our existing cost structures will remain sustainable in a more competitive landscape. Any
inability to adapt to evolving market dynamics may adversely affect our business operations, financial condition,
and long-term growth.
41. Industry information included in this Draft Red Herring Prospectus has been derived from an industry report
issued by CRISIL Intelligence dated August 05, 2025 ("CRISIL Report"). There can be no assurance that such
third-party statistical, financial and other industry information is complete, reliable or accurate.
This Draft Red Herring Prospectus includes information from the report titled ‘Assessment of infrastructure
construction industry in India with focus on water and wastewater management’ dated August 05, 2025 prepared
by CRISIL Intelligence (“CRISIL Report”).
For further details, kindly refer “Industry Overview” beginning on page 152. CRISIL Intelligence is an independent
agency and does not have any relationship with our Company, Promoters, Directors, or the Book Running Lead
Manager as of the date of this Draft Red Herring Prospectus. The data used in these sources may have been
reclassified by us for the purposes of presentation and may also not be comparable. Industry sources and
publications may also base their information on estimates, projections, forecasts and assumptions that may prove
to be incorrect. Accordingly, investors are advised to rely on their independent evaluation and should not place
undue reliance on or base their investment decisions solely on the information provided. This report does not
constitute business, financial, legal, taxation, or investment advice. Recipients are strongly encouraged to consult
with their own business, financial, legal, taxation, and other advisors for guidance regarding the transaction.
42. Some of our borrowings carry restrictive covenants or conditions and could affect our ability to manage our
business operations.
Our borrowings from banks have certain restrictive covenants which could affect our operational flexibilities such
as:
• Effecting any change in control/ ownership/ management/ directorship of our Company amongst others.
• Amending the constitutional documents of our Company, including the Memorandum of Association and
Articles of Association.
• Effecting any changes to the capital structure or shareholding pattern of our Company.
• Enter into any scheme of merger, amalgamation, compromise or reconstruction, or do a buyback.
64• Undertaking any new business, operations or projects or substantial expansion of any current business.
operations, or projects; and
• Pledge of its shares to any other lender/entity.
Further, we have received NoC from following Bankers to the Company;
Name of the Bank/Lender Date of NoC
Punjab National Bank Limited June 20, 2025
Kotak Mahindra Bank Limited June 09, 2025
ICICI Bank Limited June 18, 2025
HDFC Bank Limited June 27, 2025
Our inability to meet these conditions or ensure that compliance of these conditions do not hamper the operational
flexibility needed from time to time could materially adversely affect our results of operations and financial
conditions.
43. We will not receive any proceeds from the Offer for Sale. The Promoter Selling Shareholder will receive the
Net Proceeds from the Offer for Sale.
The Offer consists of an Offer for Sale by the Promoter Selling Shareholder. The Promoter Selling Shareholder
shall be entitled to the Net Proceeds from the Offer for Sale, which comprises proceeds from the Offer for Sale
net of Offer Expenses for the share of the Offer for Sale. Our Company will not receive any proceeds from the
Offer for Sale. For further information, kindly refer “Objects of the Offer” beginning on page 121.
44. Our Company has engaged in related party transactions in the past with our Directors, Promoters,
members/entities of the Promoter Group and Group Companies and may continue to do so in the future. There
can be no assurance that such transactions, individually or in aggregate, will not have an adverse effect on our
financial condition and results of operations.
In the ordinary course of business, we have engaged in transactions with certain related parties in the past and
may continue to do so in the future. These transactions involve our Directors, Promoters, members/entities of the
Promoter Group and Group Companies. Such transactions include, among others, the issuance of shares,
remuneration, loans and advances, purchases, sales, and reimbursement of expenses etc. For further details, kindly
refer “Restated Consolidated Financial Information – Annexure 44 - Related Party Transactions” on page 395.
All such transactions have been conducted on an arm’s length basis and are accounted as per Ind AS 24 are in
compliance with the provisions of the Companies Act, 2013 and other applicable laws.
Our Company has entered into such transactions due to easy proximity and quick execution. while all related-
party transactions that we may enter into in the future will be subject to the requisite approvals of our Audit
Committee, Board of Directors, or shareholders, as mandated by the Companies Act, we cannot assure you that
such transactions, whether individually or collectively, will not adversely affect our financial condition or results
of operations. Further, there can be no assurance that we could not have secured more favorable terms if these
transactions were conducted with unrelated parties.
45. If we are not successful in managing our growth, our business may be disrupted and our profitability may be
reduced.
We have experienced a steady growth in recent years and expect our businesses to continue to grow significantly.
Our future growth is subject to risks arising from a rapid increase in order volume, and inability to retain and
recruit skilled staff. Although, we plan to continue to expand our scale of operations through organic growth or
investments in other entities, we may not grow at a rate comparable to our growth rate in the past, either in terms
of income or profit or work quality. Our future growth may place significant demands on our management and
operations and require us to continuously evolve and improve our financial, operational and other internal controls
within our Company. In particular, continued expansion may pose challenges in:
65▪ maintaining high levels of project control and management, and client satisfaction;
▪ recruiting, training and retaining sufficient skilled management, technical and bidding personnel;
▪ developing and improving our internal administrative infrastructure, particularly our financial, operational,
communications, internal control and other internal systems;
▪ making accurate assessments of the resources we will require;
▪ adhering to the standards of health, safety and environment and quality and process execution to meet clients’
expectations;
▪ operating in jurisdictions and business segments where we have limited experience;
▪ preserving a uniform culture, values and work environment;
▪ strengthening internal control and ensuring compliance with legal and contractual obligations;
▪ managing relationships with clients, suppliers, contractors, investors, lenders and service providers; and
▪ Supporting infrastructure such as IT and HR management systems.
If we are not successful in managing our growth, our business may be disrupted and profitability may be reduced.
Our business, prospects, financial condition and results of operations may be adversely affected.
In respect of our growth, kindly refer “Our Business- Financial Performance of our Company on page 231, Our
Strengths on page 262, Our Strategies on page 265 and Our Order Book on page 232”.
46. The average cost of acquisition of Equity Shares by our Promoters is lower than the floor price.
Our Promoters average cost of acquisition of Equity Shares in our Company is lower than the Floor Price of the
Price Band as may be decided by the Company in consultation with the Book Running Lead Manager. For further
details regarding average cost of acquisition of Equity Shares by our Promoters in our Company and build-up of
Equity Shares by our Promoters in our Company, kindly refer “Capital Structure” beginning on page 100.
47. Any adverse revision to our credit rating by rating agencies may adversely affect our ability to raise additional
financing and the interest rates and other commercial terms at which such funding is available.
Currently, our borrowing facilities availed from the banks are rated by CARE Ratings and Brickwork Ratings,
credit rating agency. The credit ratings assigned to bank facilities availed by our Company are as follows:
Type of credit rating March 31, 2025 March 31, 2024 March 31, 2023
Date of Rating March 31, 2025 February 01, 2024 September 20, 2022
Ratings Agency Care Ratings Care Ratings Brickwork Ratings
Bank Facility ₹ 250.00 Crores ₹ 170.00 Crores ₹ 120.00 Crores
Long term rating CARE BB+; Stable CARE BB+; Stable BWR BBB /Stable
CARE BB+; Stable / CARE BB+; Stable /
Short term rating BWR A3
CARE A4+ CARE A4+
Though the ratings have not been downgraded in the past three years, any downgrade in our credit ratings by
rating agencies in future may increase our costs of accessing funds in the capital markets and adversely affect our
ability to raise additional financing and the interest rates and other commercial terms at which such funding is
available. This could have an adverse effect on our business and future financial performance, our ability to obtain
financing for capital expenditures or other purposes.
48. Our inability to effectively execute our growth strategies, including expansion into Hybrid Annuity Model
(HAM) projects and new geographies, could adversely impact our business, financial condition, and results of
operations.
As part of our future growth plans, we intend to selectively pursue Hybrid Annuity Model (HAM) projects in the
water and wastewater treatment segment and expand into new geographies across India. These initiatives are
expected to strengthen our presence in the EPC space and diversify our revenue base. For further details, kindly
refer “Our Business – Our Strategies” on page 265.
66However, our ability to successfully implement these strategies depends on various factors, including
identification of suitable projects, accurate assessment of financial and operational viability, timely availability of
capital and human resources, and obtaining requisite regulatory and environmental approvals. HAM projects, in
particular, involve long gestation cycles and require substantial upfront capital investment and working capital
commitments. There can be no assurance that we will be able to secure the funding required for such projects at
terms favourable to us or at all.
Execution of our growth strategies may also place significant demands on our management and operational
infrastructure, including internal processes, systems, and manpower. In addition, entry into new geographic
markets may expose us to operational and regulatory risks associated with unfamiliar regional dynamics, potential
delays in mobilization, or the absence of established vendor or labour relationships in those areas.
We may also face delays in project execution, cost overruns, increased competition, or the risk of not winning
bids for new projects. Any delay or inability to implement our growth strategy or failure to achieve anticipated
benefits may materially affect our business, prospects, and profitability. Additionally, if our plans are financed
through additional debt, our interest obligations and leverage may increase, which could restrict operational
flexibility.
Accordingly, any failure to efficiently implement our growth strategies or manage associated risks may adversely
impact our financial condition, business operations and overall performance.
49. We may not be able to obtain adequate financing on acceptable terms in the future, which could adversely
impact our growth plans and business operations.
Our future business plans may require additional financing beyond the Net Proceeds from issue of fresh equity
shares and our internal accruals. Such funding could be needed for working capital, expansion of operations, or
unforeseen project-related requirements. To meet these demands, we may be required to access external financing,
including new debt facilities from banks and financial institutions.
However, the availability and cost of such financing are subject to a number of factors, many of which are beyond
our control. These include our financial condition, operational performance, prevailing interest rates, our credit
profile, the terms of our existing borrowings, and broader economic and market conditions in India and globally.
Our ability to raise debt may also be constrained by our existing leverage levels, potential covenant restrictions,
or requirements to offer security in the form of pledges or guarantees.
If we are unable to secure additional funding on acceptable terms, in a timely manner, or at all, we may be forced
to delay, modify, or abandon planned business initiatives. Such developments could adversely affect our ability to
execute projects, pursue new opportunities, and achieve our targeted growth, thereby impacting our operational
performance, financial condition, and future prospects.
50. Inadequate or insufficient insurance coverage may expose us to significant losses, liabilities, or regulatory
consequences, which could adversely affect our business, financial condition, and results of operations.
Our operations involve inherent risks associated with the construction, installation, and operation of water and
wastewater treatment projects (WWTPs and WSSPs), including potential accidents, damage to plant and
machinery, employee injury or fatality, and damage during the transportation of equipment to project sites. In
addition, we face risks such as power outages, labour disputes, equipment failure, natural disasters, and other force
majeure events that could disrupt operations and lead to financial loss or liability.
Although we maintain insurance coverage for certain risks—including fire insurance for our registered office and
project sites, and insurance for our vehicles and movable assets—our policies are subject to exclusions,
deductibles, and coverage limits. For details of our insurance policies, kindly refer “Our Business – Insurance”
on page 284. As on the date of this Draft Red Herring Prospectus, certain ongoing projects are not covered by
dedicated insurance policies. However, we have not encountered any instance in the past three financial years,
where the amount of claim made exceeded the insured amount or where a material loss occurred without insurance
coverage.
67Further, our insurance coverage may not be sufficient to cover potential losses or damages to life, property, and
any consequential losses that may arise from such events, which could impact our operations and financial
condition. Moreover, even if we are fully insured or not found liable for a fatal accident or incident causing damage
or loss, it could harm our reputation, making it harder to conduct our business effectively and potentially affect
our future Order Book and results of operations.
Further, in the future, we might also face challenges in obtaining insurance coverage for new projects at favorable
rates, which could increase our costs. If we cannot secure adequate insurance or if our coverage is insufficient to
cover losses, it could negatively impact our business, financial condition, and operations. Additionally, if our
projects are underinsured or uninsured, we may face penalties from government authorities for non-compliance
with contract terms, potentially affecting our ability to bid for future projects.
51. Even though this Offer comprises both a Fresh Issue of Equity Shares and an Offer for Sale by the Promoter
Selling Shareholder, our Promoters and members of the Promoter Group will continue to exercise significant
control over our Company following the completion of the Offer, which may limit the ability of other
shareholders to influence key corporate decisions.
Upon completion of the Offer, which includes a sale of a portion of their shareholding by the Promoter Selling
Shareholder through the offer for sale, our Promoters and Promoter Group will continue to hold a majority of the
Equity Shares of our Company. Accordingly, they will be in a position to exercise significant influence over
matters requiring shareholder approval, including the election of directors, approval of financial statements,
declaration of dividends, and significant strategic transactions such as mergers, acquisitions, or changes to the
capital structure of the Company. For details of the post-offer shareholding of our Promoters and Promoter Group,
kindly refer “Capital Structure” beginning on page 100 and “Our Promoters and Promoter Group” beginning on
page 324.
This concentration of ownership may limit the ability of public shareholders to influence the outcome of
shareholder resolutions, even where their interests may diverge from those of the Promoters. There can be no
assurance that the Promoters and Promoter Group will not take decisions that may conflict with the interests of
the minority shareholders.
Further, after the expiry of the applicable lock-in periods, if our Promoters or Promoter Group members sell a
substantial portion of their remaining shareholding, or there is a perception in the market that such a sale may
occur, it could adversely affect the trading price of our Equity Shares. For further details on the lock-in
arrangements applicable to the Promoter and Promoter Group, kindly refer “Capital Structure” beginning on page
100.
Accordingly, such continued control post-offer may impact our corporate governance framework, limit minority
shareholder rights, and affect investor perception, which may in turn influence our valuation, access to capital,
and market performance.
52. Our ability to pay dividends in the future will depend upon future earnings, financial condition, cash flows,
working capital requirements and capital expenditures.
We have not paid any dividends on our Equity Shares in the past. The decision to declare future dividends, if any,
will depend on factors that our Board considers relevant, including our future earnings, financial condition, cash
flows, working capital needs, capital expenditures, applicable Indian legal restrictions, and other considerations.
Therefore, there is no assurance that our Company will be able to pay dividends in the future. For further details,
kindly refer ‘Dividend Policy’ beginning on page 330.
53. We have issued the following shares in the last one year prior to the date of this Draft Red Herring Prospectus,
which has been issued at a price lower than the Offer Price.
The following shares of the Company have been issued in the last one year:
68Date of No. of Equity Face Value Issue Price Nature of Nature of
Allotment Shares Allotted (in ₹) (in ₹) Allotment Consideration
Bonus Issue of
Other than
May 29, 2025 2,25,75,900 10.00 - Shares in the
Cash
ratio of 3:1
The price at which Equity Shares have been issued by our Company in the immediately preceding one year is not
indicative of the Offer Price at which the Equity Shares shall be offered and traded (subsequent to listing). For
further information, kindly refer “Capital Structure” beginning on page 100.
54. Our operations may be adversely affected in case of industrial accidents at our construction sites.
Usage of heavy machineries, laying of water pipes, Safety belt with rope, Air-blowers, presence of Toxic gases,
handling of sharp parts of machinery by labour during construction activities or otherwise etc. may result in
accidents, which could cause indirect injury to our labourers, employees or other persons on the site and may
prove fatal which could also damage our properties thereby affecting our operations. While our Company has
obtained Contractor's All Risks Insurance Policy, Employees Compensation Insurance Policy, Standard Fire and
Special Perils Insurance, Erection All Risk Insurance and there can be no assurance that any claim under the
insurance policies maintained by us will be honoured fully, in part or in time, or that we have taken out sufficient
insurance to cover all material losses which could adversely hamper our cash flows and profitability.
For further details, kindly refer “Our Business- Insurance” on page 228.
55. We cannot assure you that the construction of our projects will be free from any and all defects.
We cannot assure you that we will always finish the construction or development of our projects in accordance
with the requisite specifications or that the construction of our projects will be free from any and all defects. If the
work is unsatisfactory, the work has to be redone as per the instructions of site in charge without any extra cost.
In the event of discovery of defects/faults in our work, or due to damages to our construction due to factors beyond
our control, or any of the other reasons, we may incur significant contractual liabilities and losses under our
projects contracts and such losses may materially and adversely affect our financial performance and results of
operations.
Further, it may result in cancellation of projects by clients and/ or refund of any advance deposited with us by any
customer, dissatisfaction among our customers, resulting in negative publicity, consumer litigation and lack of
confidence among clients and all these factors could adversely affect our business, financial condition and results
of operations.
56. Even though this Offer comprises a Fresh Issue and an Offer for Sale, our Company will not receive any
proceeds from the Offer for Sale by the Promoter Selling Shareholder.
The Offer comprises a Fresh Issue of Equity Shares by our Company and an Offer for Sale of Equity Shares by
the Promoter Selling Shareholder. While the Fresh Issue will result in proceeds being received by the Company
to be deployed towards the objects of the offer, the entire proceeds from the Offer for Sale will be received by the
Promoter Selling Shareholder and not by our Company. As a result, our Company will not benefit from the Offer
for Sale in terms of capital inflow and such proceeds will not be available to us for funding growth or operational
requirements. For further details, kindly refer “Objects of the Offer” beginning bon page 121 and “Capital
Structure” beginning on page 100.
6957. Water treatment or reuse and zero liquid discharge technology is subject to rapid change. These changes may
affect the demand for our services. If we are unable to keep abreast of the technological changes and new
introductions our business, results of operations and financial condition may be adversely affected.
Water reuse and zero liquid discharge technology is subject to rapid change. These changes may affect the demand
for our services and construction activities. Our future performance will depend on the successful installation of
WWTPs and WSSPs with updated new, improved and enhanced technology catering to customer requirements
and changing market trends. If our clients require a new technology or a technology which we are not able or
capable to provide, we may be disqualified from bidding from such projects and if our clients continue to prefer
a technology which we are unable to provide, our business, results of operations and financial condition would be
adversely affected.
There is possibility that we may miss a market opportunity if we fail to invest, or invest too late, or would be
unable to upgrade ourselves or enter into an arrangement with a technology partner. Changes in market demand
may also cause us to discontinue existing or planned projects, which can have an adverse effect on our
relationships with clients. If we fail to service or construct WWTPs or WSSPs in line with the changing
preferences and market trends in our business, results of operations and financial condition could be adversely
affected.
58. We enter into various contract agreements with our customers for our construction projects. Such agreements
contain conditions and requirements, the non-fulfilment of which could result in delays or inability to
implement and complete our projects as contemplated.
Our mostly projects are as a direct contractor from private players and government authorities. The agreement
confers the rights on us to construct and develop the said project either for a fixed fee. Such project involves
following the drawing plans, architecture designs, timelines, material quality, end finishing of the structure, etc.
to be followed strictly as provided by our customer. Though we are generally empowered to make practical
operating decisions for development of the project, we may be required to make certain decisions in consultation
with the government agencies involved and / or regulatory authorities. These arrangements may limit our
flexibility to make certain decisions in relation to the projects. In the event of any delay in the completion of the
project within the envisaged time frame, we may be required to indemnify and compensate the employers or
contractors with whom we have entered into an agreement with. Any disputes that may arise between us and the
parties involved in the agreement may cause delay in completion, suspension or complete abandonment of the
projects we undertake. This may have a material adverse effect on our business operations, financial condition
and reputation.
59. Our employees may engage in misconduct or other improper activities, including non-compliance with
regulatory standards and requirements and the same may results into imposition of criminal proceedings, fines,
revocation of regulatory approvals and harm to our reputation, any of which could form a material adverse effect
on our business.
We are exposed to the risk of employee fraud or other misconduct which could include intentional failures to
comply with regulations, providing inaccurate information to regulatory authorities, not adhering to
manufacturing standards, or misreporting financial data. In particular, our industry is subject to laws and
regulations aimed at preventing fraud, misconduct, kickbacks, self-dealing, and other unethical practices. These
regulations can restrict various business activities such as pricing, discounting, marketing, promotions, and
customer incentive programs. Although we have not encountered such issues in the past, there is no guarantee that
we will be able to detect and prevent fraud or misconduct effectively. If such misconduct occurs, we could face
criminal penalties, fines, loss of regulatory approvals, and damage to our reputation, any of which could have a
significant negative impact on our business.
7060. If we are unable to establish and maintain an effective internal control and compliance system, our business
and reputation could be adversely affected.
We are responsible for establishing and maintaining internal measures that align with the size and complexity of
our operations. We continuously evaluate the adequacy and effectiveness of our internal systems to ensure that
our operations comply with policies, regulations, and internal guidelines. Our internal processes and systems are
periodically tested and updated, and there have been no significant instances of failure in maintaining effective
controls. However, we remain exposed to operational risks due to the potential inadequacy or failure of these
processes or systems, and our efforts may not always be sufficient to ensure effective checks and balances. We
take reasonable measures to maintain appropriate compliance procedures and robust internal controls over
financial reporting to ensure reliable financial reporting and prevent fraud. As risks evolve, our internal controls
must be continuously reviewed, and maintaining these controls requires diligent compliance, which may still be
subject to lapses or errors.
Further, our operations are subject to anti-corruption laws and regulations. These laws generally prohibit us and
our employees and intermediaries from bribing, being bribed or making other prohibited payments to government
officials or other persons to obtain or retain business or gain some other business advantage. We participate in
collaborations and relationships with third parties, there is a potential risk that their actions could expose us to
liability under these laws or other local anti-corruption regulations. While our code of conduct requires employees
to comply with applicable laws, and we continuously enhance our policies and procedures to ensure compliance
with anti-corruption laws, these measures may not entirely eliminate the risk of violations, particularly in
emerging markets like India. Non-compliance with anti-corruption laws could result in criminal and civil
penalties, disgorgement, sanctions, legal expenses, and other remedial actions, which could negatively affect our
business, results, and financial condition. Furthermore, any investigation into potential violations by authorities
could harm our reputation and operations.
61. We are exposed to the risks of malfunctions or disruptions of information technology systems, which could
adversely affect our business operations and financial condition.
Our business operations across the engineering, procurement, construction, and commissioning lifecycle rely on
various information technology (“IT”) systems and platforms for planning, execution, and control. These systems
support functions such as project design and modeling (including CAD-based engineering and structural
detailing), inventory and procurement planning, manpower deployment, performance tracking, finance and
accounts, and HR processes. We also utilize cloud-based platforms and real-time dashboards to monitor project
progress and enable communication between project sites and the corporate office.
Any malfunction, disruption, or security breach affecting these systems—due to reasons such as power outages,
system errors, cyberattacks, data corruption, or connectivity failures—may impact our ability to execute projects
in a timely and efficient manner. In particular, our reliance on digital coordination tools for inter-office
communication, tender submissions, documentation, and statutory compliance introduces additional
vulnerabilities. Prolonged IT downtimes or delays in system restoration could hinder workflow continuity, delay
invoicing and billing processes, or impair financial reporting.
While we have not encountered material IT disruptions to date, there is no assurance that such events will not
occur in the future. Any significant failure of our IT infrastructure or inability to secure and maintain the integrity
of our systems could adversely impact our business continuity, reputation, results of operations, and cash flows.
62. Our funding requirements and the proposed deployment of Net Proceeds from issue of fresh equity shares
(“Net Proceeds”) have not been appraised by any bank or financial institution or any other independent agency
and our management will have broad discretion over the use of the Net Proceeds.
We plan to use the Net Proceeds for the purposes outlined in "Objects of the Offer" beginning on page 121. As of
the date of this document, our funding requirements are based on management estimates, the current state of our
71business, prevailing market conditions, and other commercial and technical factors and have not been appraised
by any bank or financial institution. These estimates are based on current conditions and may change due to factors
such as our financial condition, business strategy, and external influences like government policies, market
conditions, competitive landscape, interest or exchange rate fluctuations, and other factors beyond our
management's control. While we will use the Net Proceeds from fresh issue of equity shares for purposes such as
part funding of working capital requirements of ₹ 1,380.00 million specified in “Objects of the Offer” beginning
on page 121.
The deployment of the Net Proceeds through fresh issue of equity shares will be monitored by a monitoring agency
as required by the SEBI ICDR Regulations. However, our internal management estimates may exceed the fair
market value, which could lead to the need to reschedule or reallocate our expenditure, potentially impacting our
business, financial condition, results of operations, and cash flows. We may need to reconsider our estimates or
business plans due to changes in factors beyond our control, such as fluctuations in interest rates, changes in input
costs, and other financial or operational factors. As such, prospective investors will need to rely on our
management's judgment regarding the use of the Net Proceeds. Any delays or inefficiencies in deploying the Net
Proceeds could negatively affect our business and results of operations.
63. Significant differences exist between Ind AS and other accounting principles, such as U.S. GAAP and IFRS,
which investors may be more familiar with and may consider material to their assessment of our financial
condition.
Our Restated Consolidated Financial Information for the Fiscal 2025, 2024 and 2023, have been prepared and
presented in conformity with Ind AS. Ind AS differs in certain significant respects from IFRS, U.S. GAAP and
other accounting principles with which prospective investors may be familiar in other countries. If our financial
statements were to be prepared in accordance with such other accounting principles, our results of operations,
cash flows and financial position may be substantially different. Prospective investors should review the
accounting policies applied in the preparation of our financial statements, and consult their own professional
advisers for an understanding of the differences between these accounting principles and those with which they
may be more familiar. Any reliance by person not familiar with Indian accounting practices on the financial
disclosures presented in this Draft Red Herring Prospectus should be limited accordingly.
64. Destruction, theft, breakdowns of our major plants or equipment or failures to repair or maintain the same
may adversely affect our business, cash flows, financial condition and results of operations.
We are engaged in the operations and maintenance (O&M) of STPs, water supply projects, and sewerage schemes
post-commissioning, across various government contracts. These services are generally resource-intensive and
depend significantly on the availability and performance of machinery, pumping stations, electrical control
systems, mechanical parts, and mobile service equipment. For further information, kindly refer “Our Business –
Our Order Book for O&M” on page 241.
We deploy critical plant and equipment—including bar screens, blowers, SCADA systems, decanters, and
pumps—which are necessary for maintaining treatment capacity and discharge standards under applicable effluent
or water quality norms. The destruction, theft, malfunction, or prolonged downtime of such machinery due to
wear and tear, accident, or vandalism can impact service continuity. In particular, delays in the repair or
replacement of imported parts or specialized components sourced from OEMs (original equipment manufacturers)
may result in penalty deductions under O&M contracts.
Although we have not experienced such incidents in the past, there can be no assurance that such risks will not
arise in the future. Any unavailability of key equipment or breakdown of machinery during ongoing O&M
assignments may render us unable to meet our contracted performance obligations, leading to breach of service-
level standards, revenue loss, or invocation of contractual penalties. Additionally, if such events are not adequately
covered under our insurance policies or if the claim settlement is delayed or disputed, it may further affect our
liquidity and financial position.
72Our ability to sustain long-term O&M contracts is critically dependent on preventive maintenance, availability of
spare parts, timely repairs, and technical intervention—all of which involve coordination between our internal
engineering teams and external vendors. As we continue to expand our portfolio of O&M projects across regions,
these risks may be magnified and could adversely impact our business, cash flows, and results of operations.
65. Our Promoters and certain members of our Board of Directors hold Equity Shares in our Company and are
therefore interested in our performance beyond remuneration and reimbursement of expenses.
Some of our Directors, including our Promoters, have an interest in the Company beyond their regular
remuneration or benefits and reimbursement of expenses, due to their shareholding in the Company. For more
information, kindly refer “Our Management” beginning on page 303. However, there is no assurance that our
Directors (including our Promoters) will always exercise their rights as shareholders in a manner that benefits or
is in the best interest of the Company. Further, our Promoters will maintain significant control over the Company,
including the ability to control the composition of our Board and make decisions requiring shareholder voting,
whether by simple or special majority. As a result, other shareholders may have limited influence on the outcome
of such decisions. Our Promoters may take or block actions with respect to our business, which may conflict with
the best interests of our Company or that of minority shareholders.
External Risk Factors
66. Political, economic or other factors that are beyond our control may have an adverse effect on our business
and results of operations.
Over the past decade, India’s economy has undergone significant changes, with external trade and capital flows
becoming increasingly important. Any slowdown or perceived slowdown in the Indian economy, or in specific
sectors of the Indian economy, could adversely affect our business, results of operations and financial condition
and the price of the Equity Shares. Conditions outside India may also contribute to a slowdown in the Indian
economy or changes in India’s economic policies and regulations, which could adversely affect the level of trading
activity in the securities market, such as the Russia-Ukraine war, power shortages in Europe, and rising inflation
rates globally. Our performance and the growth of our business depend on the overall performance of the Indian
economy as well as the economies of the regional markets in which we operate. Further, the following external
risks may have an adverse impact on our business and results of operations, should any of them materialize:
i. increase in interest rates may adversely affect our access to capital and increase our borrowing costs, which
may constrain our ability to grow our business and operate profitably;
ii. downgrade of India’s sovereign debt rating by an independent agency;
iii. political instability, resulting from a change in governmental or economic and fiscal policies, may adversely
affect economic conditions in India. In recent years, India has implemented various economic and political
reforms. Reforms in relation to land acquisition policies and trade barriers have led to increased incidents of
social unrest in India over which we have no control;
iv. civil unrest, acts of violence, terrorist attacks, regional conflicts or situations or war; and
v. India has experienced epidemics, and natural calamities such as earthquakes, tsunamis, floods, and drought
in recent years.
vi. contagious diseases such as the COVID-19 pandemic or a similar contagious disease could adversely affect
the Indian economy and economic activity in the region.
67. The occurrence of natural or man-made disasters could adversely affect our results of operations, cash flows
and financial condition. Hostilities, terrorist attacks, civil unrest and other acts of violence could adversely
affect the financial markets and our business.
The occurrence of natural disasters such as cyclones, floods, earthquakes, and man-made disasters like acts of
terrorism, military actions, or civil unrest could negatively impact our operations, cash flow, or financial condition.
Such events, including terrorist attacks or war, may disrupt the Indian securities markets. Additionally,
73deteriorating international relations, particularly between India and its neighboring countries, may raise investor
concerns about regional stability, affecting the price of our Equity Shares. Social, economic, or political
disturbances within India may also harm our business and negatively affect the market perception of investment
in Indian companies, leading to a decline in the price of our Equity Shares.
We cannot assure that there will not be any such incidents or accidents in the future thereby causing an adverse
effect on our business and operations. Any terrorist attacks or civil unrest as well as other adverse social, economic
and political events in India could have a negative effect on us. Such incidents could also create a greater
perception that investment in Indian companies involves a higher degree of risk and could have an adverse effect
on our business and the price of the Equity Shares. India, along with several other countries in Asia and across
the world, remains susceptible to outbreaks of infectious diseases, including strains of influenza such as H1N1,
H5N1, and H7N9, as well as viruses with pandemic potential. While the global impact of the COVID-19 pandemic
has receded, the long-term economic and operational consequences continue to be felt across industries, including
the infrastructure and construction sectors.
Further, the emergence of any new epidemic or pandemic, or a resurgence of COVID-19 or similar contagious
diseases, may lead to disruptions in economic activity, supply chains, labour availability, or the implementation
of government projects. Such developments could adversely affect our operations, project timelines, or financial
performance. Consequently, any future public health crisis could have a material adverse effect on our business,
results of operations, and the trading price of the Equity Shares.
68. Changing laws, rules and regulations and legal uncertainties, including adverse application of tax laws, in the
jurisdictions in which we operate may adversely affect our business and results of operations.
The regulatory and policy environment in which we operate is evolving and subject to change. Such changes,
including the instances mentioned below, could adversely affect our business, prospects and results of operations,
to the extent that we are unable to suitably respond to and comply with any such changes in applicable law and
policy. Further, any future amendments may affect our tax benefits such as exemptions for income earned by way
of dividend from investments in other domestic companies and units of mutual funds, exemptions for interest
received in respect of tax-free bonds, and long-term capital gains on equity shares. Changes in capital gains tax
or tax on capital market transactions or the sale of shares could affect investor returns. As a result, any such
changes or interpretations could have an adverse effect on our business and financial performance.
For instance, the Government of India has announced the union budget for the Financial Year 2026 (the “Budget”),
pursuant to which the Finance Act, 2025 has amended the Income-tax Act, 1961, including the capital gains tax
rates with effect from the date of announcement of the Budget. We have not fully determined the effects of these
recent and proposed laws and regulations on our business.
The Government introduced (a) the Code on Wages, 2019 (“Wages Code”); (b) the Code on Social Security, 2020
(“Social Security Code”); (c) the Occupational Safety, Health and Working Conditions Code, 2020; and (d) the
Industrial Relations Code, 2020, which consolidate, subsume and replace numerous existing central labor
legislations. Except certain portions of the Wages Code, which have come into force pursuant to notification by
Ministry of Labor and Employment, the rules for implementation under such codes are yet to be notified.
The Parliament of India has passed the Bharatiya Nyaya Sanhita, 2023, the Bharatiya Nagarik Suraksha Sanhita,
2023 and the Bharatiya Sakshya Adhiniyam, 2023, which have repealed the Indian Penal Code, 1860, the Code
of Criminal Procedure, 1973 and the Indian Evidence Act, 1872, respectively, with effect from July 01, 2024. The
effect of the provisions of these on us and the litigations involving us cannot be predicted with certainty at this
stage.
Unfavorable changes in or interpretations of existing, or the promulgation of new, laws, rules and regulations
including foreign investment and stamp duty laws governing our business and operations could result in us being
deemed to be in contravention of such laws and may require us to apply for additional approvals. Uncertainty in
74the applicability, interpretation, or implementation of any amendment to, or change in, governing law, regulation
or policy, including by reason of an absence, or a limited body, of administrative or judicial precedent may be
time consuming as well as costly for us to resolve and may affect the viability of our current businesses or restrict
our ability to grow our businesses in the future.
69. We may be affected by competition laws, the adverse application or interpretation of which could adversely
affect our business.
The Competition Act, 2002, as amended (the “Competition Act”) was enacted for the purpose of preventing
practices that have or are likely to have an adverse effect on competition (“AAEC”) in certain markets in India
and has mandated the Competition Commission of India (the “CCI”) to separate such practices. Under the
Competition Act, any arrangement, understanding or action, whether formal or informal, which causes or is likely
to cause an AAEC is deemed void and attracts substantial penalties.
Further, any agreement among competitors which directly or indirectly involves determination of purchase or sale
prices, limits or controls production, or shares the market by way of geographical area or number of customers in
the relevant market is presumed to have an appreciable adverse effect on competition in the relevant market in
India and shall be void. Further, the Competition Act prohibits abuse of dominant position by any enterprise. If it
is proved that the contravention committed by a company took place with the consent or connivance or is
attributable to any neglect on the part of, any director, manager, secretary or other officer of such company, that
person shall be guilty of the contravention and liable to be punished.
The Competition Act aims to, among others, prohibit all agreements and transactions which may have an AAEC
in India. Consequently, certain agreements entered into by us could be within the purview of the Competition Act.
Further, the CCI has extra-territorial powers and can investigate any agreements, abusive conduct or combination
occurring outside India if such agreement, conduct or combination has an AAEC in India. The effects of the
provisions of the Competition Act on the agreements entered into by us cannot be predicted with certainty at this
stage. However, since we pursue an acquisition driven growth strategy, we may be affected, directly or indirectly,
by the application or interpretation of any provision of the Competition Act, any enforcement proceedings initiated
by the CCI, any adverse publicity that may be generated due to scrutiny or prosecution by the CCI, or any
prohibition or substantial penalties levied under the Competition Act, which would adversely affect our business,
results of operations, cash flows and prospects.
The Government of India has also passed the Competition (Amendment) Act, 2023, which has proposed several
amendments to the Competition Act, such as introduction of deal value thresholds for assessing whether a merger
or acquisition qualifies as a “combination”, expedited merger review timelines, codification of the lowest standard
of “control” and enhanced penalties for providing false information or a failure to provide material information.
If we pursue acquisitions in the future, we may be affected, directly or indirectly, by the application or
interpretation of any provision of the Competition Act, any enforcement proceedings initiated by the CCI, any
adverse publicity that may be generated due to scrutiny or prosecution by the CCI, or any prohibition or substantial
penalties levied under the Competition Act, which would adversely affect our business, results of operations, cash
flows and prospects.
70. We are entirely dependent on our operations in India for revenue, and any adverse changes in India’s
economic, political or regulatory environment may negatively impact our business, results of operations,
financial condition and the price of our Equity Shares.
Our Company derives all of its revenue from projects executed within India. Accordingly, our performance is
closely linked to macroeconomic conditions and political developments in India. Any slowdown in the Indian
economy, volatility in interest or inflation rates, decline in infrastructure spending, or reduction in government
capital expenditure could materially and adversely affect the award of new projects and our ability to execute
existing projects, which could, in turn, affect our revenues and profitability.
75In recent years, the Indian economy has been subject to various macroeconomic headwinds, including rising
inflation, high fiscal and current account deficits, volatility in the value of the Indian Rupee against major foreign
currencies, elevated commodity and fuel prices, and tightening of liquidity conditions. Any further deterioration
in these conditions may impair the Government’s ability to finance infrastructure projects, including WWTPs and
WSSPs, which form the core of our business operations.
Further, the Indian financial system has experienced periodic disruptions, including credit tightness and sectoral
lending constraints. Any adverse developments in the Indian banking sector or capital markets may impact our
access to project finance, working capital facilities, or bank guarantees. Such constraints could delay or impede
project execution and strain our cash flows. For more information, kindly refer “Financial Indebtedness”
beginning on page 428.
Our operations may also be impacted by changes in central or state government policies relating to infrastructure
development, public procurement, or regulatory norms concerning environmental clearances and wastewater
treatment technologies. Additionally, unforeseen political instability, social unrest, or significant policy shifts
following general or state elections may create an uncertain business environment. Any changes in taxation policy,
labour regulations, or the enforcement of contractual obligations by government agencies could further affect our
cost structures and contractual rights.
The Government of India has historically exercised significant influence over the Indian economy and continues
to intervene in various sectors through policy, regulatory, and fiscal instruments. Any abrupt or adverse changes
in government policy, regulatory direction, or administrative actions could affect investor sentiment, delay project
approvals, or impact our order inflow and project timelines. In such circumstances, our business, financial
condition, results of operations, cash flows and the market price of our Equity Shares could be adversely affected.
71. If inflation were to rise in India, we might not be able to increase the prices of our services at a proportional
rate in order to pass costs on to our customers and our profits might decline.
Inflation rates in India have been volatile in recent years, and such volatility may continue in the future. India has
experienced high inflation in the recent past. Increased inflation can contribute to an increase in interest rates and
increased costs to our business, including increased costs of salaries, and other expenses relevant to our business.
High fluctuations in inflation rates can make it challenging for us to accurately estimate or control our costs. If
inflation in India rises, it may increase our expenses, and we may not be able to fully or partially pass these
increased costs on to our customers. This could negatively impact our business and financial condition.
Specifically, if we are unable to reduce our costs or adjust our rates to offset the increase in costs, our business,
results of operations, cash flows, and overall financial condition could be adversely affected.
Further, the GoI has previously initiated economic measures to combat high inflation rates, and it is unclear
whether these measures will remain in effect. There can be no assurance that Indian inflation levels will not worsen
in the future.
72. Any downgrading of India’s debt rating by an independent agency may harm our ability to raise financing.
Our borrowing costs and access to debt capital markets are closely tied to India’s sovereign credit ratings. As of
now, India’s sovereign rating stands at Baa3 with a “negative” outlook (Moody’s), BBB- with a “stable” outlook
(S&P), and BBB- with a “stable” outlook (Fitch). Any adverse changes to these credit ratings, especially from
international rating agencies, could negatively affect our ability to raise additional financing and could lead to
higher interest rates and less favourable commercial terms for any financing, including overseas funding. A
downgrade in India’s credit ratings could occur due to changes in government tax or fiscal policies, which are
beyond our control. Such a downgrade would likely impair our ability to raise funds on favourable terms, or at
all, which in turn could negatively impact our business, financial performance, and the market price of our Equity
Shares.
76Risks relating to the Equity Shares and the Offer
73. The Offer Price, market capitalization to total revenue multiple and price to earnings ratio based on the Offer
Price of our Company, may not be indicative of the market price of the Equity Shares on listing or thereafter.
The Offer Price of the Equity Shares will be determined through a book-building process. Following the Offer,
the market price of the Equity Shares, along with the market capitalization to total revenue multiple and price-to-
earnings ratio based on the Offer Price, may experience significant fluctuations due to various factors. These
factors include changes in our operating results, industry-specific market conditions, developments within India,
volatility in securities markets in other jurisdictions, changes in financial indicators, fluctuations in revenue or
earnings estimates by research publications, and shifts in economic, legal, and regulatory environments. As a
result, the price of our Equity Shares may be volatile, and there is a possibility that you may not be able to resell
your Equity Shares at or above the Offer Price, or even at all.
Prior to the Offer, there has been no public market for our Equity Shares, and an active trading market on the
Stock Exchanges may not develop or be sustained after the Offer. Listing and quotation do not guarantee that a
market for the Equity Shares will develop, or if developed, the liquidity of such market for the Equity Shares. As
such, any valuation conducted for the Offer may not be based on a benchmark that reflects our industry peers. The
specific financial parameters used to determine the Price Band will be disclosed in the advertisement that will be
issued for the publication of the Price Band.
Additionally, the Indian stock markets have recently experienced significant volatility, and the price of our Equity
Shares could fluctuate substantially as a result. A decrease in the market price could lead to investors losing part
or all of their investment.
74. We may be subject to surveillance measures, such as the Additional Surveillance Measures (ASM) and the
Graded Surveillance Measures (GSM) by the Stock Exchanges which may adversely affect trading price of our
Equity Shares.
SEBI and Stock Exchanges in order to enhance market integrity and safeguard interest of investors, have been
introducing various enhanced pre-emptive surveillance measures. The main objective of these measures is to alert
and advice investors to be extra cautious while dealing in these securities and advice market participants to carry
out necessary due diligence while dealing in these securities. Accordingly, SEBI and Stock Exchanges have
provided for:
(a) GSM on securities where such trading price of such securities does not commensurate with financial health
and fundamentals such as earnings, book value, fixed assets, net-worth, price per equity multiple and market
capitalization; and
(b) ASM on securities with surveillance concerns based on objective parameters such as price and volume
variation and volatility.
Upon listing, our Equity Shares may be influenced by general market conditions, which could include significant
fluctuations in price and trading volume. The price of our Equity Shares may continue to fluctuate post-Offer due
to various factors such as volatility in both Indian and global securities markets, our financial performance, the
performance of competitors, changes in performance estimates, or other political or economic events. Any of these
factors may trigger the criteria set by SEBI and the Stock Exchanges for placing securities under the GSM (Graded
Surveillance Measure) or ASM (Additional Surveillance Measure) framework, including factors like net worth,
fixed assets, price variations, client concentration, or price movements between the high and low ranges of trading.
If our Equity Shares are subjected to pre-emptive surveillance measures by any of the Stock Exchanges, trading
of our Equity Shares may be impacted by additional restrictions. These restrictions could include limitations on
trading frequency, such as permitting trades only once a week or month, or capping price movements on the upper
77side of trading. Such measures may adversely affect the market price of our Equity Shares and could disrupt the
development of an active trading market for our Equity Shares.
75. Investors bear the risk of fluctuations in the price of Equity Shares and there can be no assurance that a liquid
market for our Equity Shares will develop following the listing of our Equity Shares on the Stock Exchanges.
There has been no public market for our Equity Shares prior to the Offer. The purchase price of our Equity Shares
in the Offer will be determined by our Company in consultation with the BRLM, pursuant to the Book Building
Process. This price will be based on numerous factors, as described under in “Basis for Offer Price” beginning
on page 134. However, this price may not reflect the market price of our Equity Shares following the completion
of the Offer. Investors may not be able to resell their Equity Shares at or above the Offer Price and could incur
partial or total loss of their investment.
While our Equity Shares are proposed to be listed on the NSE and BSE post-offer, there can be no assurance that
active trading will develop or be sustained. In the absence of active trading, investors may find it challenging to
sell their Equity Shares at the quoted price.
The price at which our Equity Shares will trade at after the Offer will be determined by the marketplace and may
be influenced by many factors, including:
i. Our financial condition, results of operations and cash flows
ii. The history and prospects for our business
iii. An assessment of our management, our past and present operations and the prospects for as well as timing of
our future revenues and cost structures
iv. The valuation of publicly traded companies that are engaged in business activities similar to ours
v. quarterly variations in our results of operations
vi. results of operations that vary from the expectations of securities analysts and investors
vii. results of operations that vary from those of our competitors
viii. changes in expectations as to our future financial performance, including financial estimates by research
analysts and investors
ix. a change in research analysts’ recommendations
x. announcements by us or our competitors of significant acquisitions, strategic alliances, joint operations or
capital commitments
xi. announcements of significant claims or proceedings against us
xii. new laws and government regulations that directly or indirectly affecting our business
xiii. additions or departures of Key Managerial Personnel
xiv. changes in the interest rates
xv. fluctuations in stock market prices and volume
xvi. general economic conditions
The Indian stock markets have historically witnessed significant price and volume fluctuations, which have
impacted the market prices of securities issued by Indian companies. Consequently, investors in our Equity Shares
may face a decline in the value of their investment, irrespective of our Company’s financial performance or future
prospects.
76. Any future issuance of Equity Shares by us or sales of Equity Shares by our Promoter could negatively impact
the trading price of our Equity Shares. Additionally, the issuance of Equity Shares by our Company may lead
to dilution of the shareholding of our then-existing shareholders.
As disclosed in “Capital Structure” beginning on page 100, an aggregate of 20% of our fully diluted post-offer
capital held by our Promoter shall be considered as minimum Promoters’ Contribution and locked in for a period
of eighteen (18) months and the balance Equity Shares held by the Promoters following the Offer will be locked-
in for six (6) months from the date of Allotment. Except for the customary lock-in on our ability to issue equity or
78equity-linked securities discussed in “Capital Structure” beginning on page 112, there is no restriction on disposal
of Equity Shares by promoter. As such, there can be no assurance that our Company will refrain from issuing
additional Equity Shares after the expiration of the lock-in period or that our Promoter will not sell, pledge, or
encumber their Equity Shares post-lock-in. Future issuance of Equity Shares or convertible securities, and the
subsequent sale of the underlying Equity Shares, could dilute the shareholding of existing Shareholders and
negatively impact the trading price of our Equity Shares. Additionally, such securities may be issued at prices
lower than the prevailing trading price of our Equity Shares or the Offer Price. Any sale of Equity Shares by the
Promoter could further adversely affect the trading price of our Equity Shares.
77. You will not be able to immediately sell any of the Equity Shares you purchase in this Offer on the Stock Exchanges.
The Equity Shares will be listed on the Stock Exchange in compliance with applicable Indian laws and practices.
Listing permission will only be granted once the Equity Shares offered have been issued, allotted, and all necessary
documentation submitted to the Stock Exchanges. Additionally, certain procedural actions must be completed
before the listing and trading of Equity Shares can commence. For instance, the credit of Equity Shares to
investors' dematerialized ("demat") accounts with their depository participants in India is expected to occur within
one (1) Working Day of finalizing the Basis of Allotment with the Designated Stock Exchange. Furthermore, the
allotment process and credit of the Equity Shares to applicants' demat accounts may take up to Two (2) Working
Days from the Bid/Offer Closing Date. Upon receipt of listing and trading approval from the Stock Exchanges,
trading in the Equity Shares is anticipated to begin within three (3) Working Days from the Bid/Offer Closing
Date. Any failure or delay in obtaining the approval or otherwise commence trading in Equity Shares would restrict
your ability to dispose of your Equity Shares. We cannot assure you that the Equity Shares will be credited to
investors’ demat accounts or that trading in the Equity Shares will commence in a timely manner (as specified
herein) or at all. We could also be required to pay interest at the applicable rates if the allotment is not made, refund
orders are not dispatched or demat credits are not made to investors within the prescribed time periods.
78. You may be subject to Indian taxes arising out of capital gains on the sale of our Equity Shares.
Under the current Indian Tax Laws and Regulations, Capital Gains arising on the sale of Equity Shares of an
Indian Company are generally taxable in India. Any Capital Gain realized on the sale of listed equity shares on a
stock exchange held for more than 12 months shall be subject to capital gains tax in India at 12.50% (on the gains
in excess of ₹1.25 lakhs) if Securities Transaction Tax (STT) has been paid on both acquisition and transfer of
such shares. STT shall be levied on and collected by a domestic stock exchange on which the equity shares are
sold. Any gain realised on the sale of equity shares held for more than 12 months by an Indian resident, which are
sold other than on a recognized stock exchange provided no STT has been paid, will be subject to long term capital
gain tax in India. However, any capital gain realized on the sale of listed Equity Shares held for a period of 12
months or less shall be subject to short term capital gains tax in India and are taxed at 20%. Provided Further, any
gain realised on the sale of listed equity shares held for a period of 12 months or less which are sold on other than
on a recognised stock exchange and on which no STT has been paid, shall be subject to short term capital gains
tax at a relatively higher rate as compared to the transaction where STT has been paid in India.
Taxation of Capital Gains is subject to the provisions of the Income Tax Act, 1961, as amended from time to time,
and changes introduced through successive Finance Acts. Any amendment in the tax regime, including an increase
in capital gains tax rates, whether through the Finance Act or other legislative measures, could adversely impact
the post-tax returns of investors in our equity shares. Given the evolving fiscal and economic policies, there is a
possibility that future amendments may result in higher tax rates or reduced exemptions, thereby affecting the
overall attractiveness of equity investments. Investors should consider potential changes in tax laws while making
investment decisions.
7979. QIBs and Non-Institutional Bidders are not permitted to withdraw or lower their Bids (in terms of quantity of
Equity Shares or the Bid Amount) at any stage after submitting a Bid and Retail Individual Investors are not
permitted to withdraw their Bids after Bid/Offer Closing Date.
Under the SEBI ICDR Regulations, Qualified Institutional Buyers (QIBs) and Non-Institutional Bidders are not
permitted to withdraw or reduce their Bids (in terms of the quantity of Equity Shares or the Bid Amount) after
submitting a Bid. Retail Individual Bidders, however, are allowed to revise their Bids during the Bid/Offer Period
and withdraw their Bids until the Bid/Offer Closing Date. Although we are required to complete the Allotment,
listing, and commencement of trading of Equity Shares within three (3) Working Days from the Bid/Offer Closing
Date, unforeseen events may occur during this period. Such events, including adverse changes in international or
national monetary policy, financial, political, or economic conditions, or developments in our business, financial
condition, results of operations, or cash flows, may affect the Bidders' decision to invest. Notwithstanding these
events, we may proceed with the Allotment, listing, and commencement of trading of our Equity Shares. These
developments could restrict the Bidders' ability to sell their Equity Shares allotted pursuant to the Offer or result
in a decline in the trading price of our Equity Shares upon listing.
Retail Individual Investors are permitted to revise their Bids during the Bid/Offer Period and withdraw their Bids
until the Bid/Offer Closing Date. While our Company is obligated to complete all formalities related to the listing
and commencement of trading of the Equity Shares on the Stock Exchanges where such Equity Shares are
proposed to be listed, including the Allotment pursuant to the Offer, within three (3) Working Days from the
Bid/Offer Closing Date, certain events may arise during this period. These events, including material adverse
changes in international or national monetary policy, financial, political, or economic conditions, or changes in
our business, results of operations, or financial condition, may influence the Bidders’ decision to invest in the
Equity Shares. Our Company may complete the Allotment of the Equity Shares even if such events occur, and such
events limit the Bidders’ ability to sell the Equity Shares Allotted pursuant to the Offer or cause the trading price
of the Equity Shares to decline on listing.
80. Foreign investors are subject to foreign investment restrictions under Indian laws which limit our ability to
attract foreign investors, which may adversely affect the market price of the Equity Shares.
Under the current foreign exchange regulations in India, transfers of shares between non-residents and residents
are generally allowed (subject to certain restrictions), provided they adhere to the pricing guidelines and reporting
requirements set by the RBI. If the transfer of Equity Shares does not comply with these guidelines or falls under
any exceptions, prior approval from the RBI will be necessary. Furthermore, shareholders wishing to convert the
Rupee proceeds from the sale of Equity Shares into foreign currency and repatriate it will need to obtain a no-
objection/tax clearance certificate from the income tax authority. We cannot guarantee that the required approvals
from the RBI or any other Indian government agency will be obtained on favorable terms, or at all.
81. The Equity Shares have never been publicly traded, and, after the Offer, the Equity Shares may experience
price and volume fluctuations, and an active trading market for the Equity Shares may not develop. Further,
the price of the Equity Shares may be volatile, and you may be unable to resell the Equity Shares at or above the
Offer Price, or at all.
Prior to the Offer, there has been no public market for the Equity Shares, and there is no guarantee that an active
trading market will develop or be maintained on the Stock Exchanges after the Offer. The listing and quotation of
the Equity Shares do not ensure the creation of a market, nor do they guarantee liquidity in the market for the
shares. The Offer Price will be determined through the book-building process as per SEBI ICDR Regulations and
may not reflect the market price at the time trading begins or at any point thereafter. The market price of the
Equity Shares could experience significant fluctuations due to various factors, including changes in our operating
performance, market conditions specific to our industry, developments in India, volatility in global securities
markets, fluctuations in financial indicators, variations in earnings or revenue projections by analysts, and changes
in economic, legal, or regulatory conditions.
8082. The Offer Price of the Equity Shares may not be indicative of the market price of the Equity Shares after the
Offer.
The Offer Price of the Equity Shares will be determined by our Company in consultation with the Book Running
Lead Manager (BRLM) through the Book Building Process. This price will be influenced by various factors, as
detailed under the "Basis for Offer Price" beginning on page 134, and may not necessarily reflect the market price
of the Equity Shares post-offer. The market price of the Equity Shares may fluctuate significantly after the Offer
and could fall below the offer Price. We cannot assure you that the investor will be able to resell their Equity
Shares at or above the Offer Price.
83. There is no guarantee that our Equity Shares will be listed on the BSE and NSE in a timely manner or at all.
In accordance with Indian law, permission for listing and trading of our Equity Shares will not be granted until
after certain actions have been completed in relation to this Offer and until allotment of Equity Shares pursuant to
this Offer. In accordance with current regulations and circulars issued by SEBI, our Equity Shares are required to
be listed on the BSE and NSE within such time as mandated under UPI Circulars, subject to any change in the
prescribed timeline in this regard. However, we cannot assure you that the trading in our Equity Shares will
commence in a timely manner or at all.
84. Holders of Equity Shares could be restricted in their ability to exercise pre-emptive rights under Indian law
and could thereby suffer future dilution of their ownership position.
Under the Companies Act, 2013 a company incorporated in India must offer holders of its Equity Shares pre-
emptive rights to subscribe and pay for a proportionate number of Equity Shares to maintain their existing
ownership percentages prior to the issuance of any new Equity Shares, unless the pre-emptive rights have been
waived by the adoption of a special resolution by holders of three-fourths of the Equity Shares who have voted
on such resolution. However, if the law of the jurisdiction that investors are in does not permit the exercise of such
pre-emptive rights without us filing an offering document or registration statement with the applicable authority
in such jurisdiction, they will be unable to exercise such pre-emptive rights unless we make such a filing. We may
elect not to file a registration statement in relation to pre-emptive rights otherwise available by Indian law to
investors. To the extent that investors are unable to exercise pre-emptive rights granted in respect of the Equity
Shares, they may suffer future dilution of their ownership position and their proportional interests in us would be
reduced.
81SECTION III – INTRODUCTION
THE OFFER
The following table summarizes details of the Offer:
Up to 11,881,000 Equity Shares of face value of ₹10 each
The Offer of Equity Shares(1)(2) fully paid up of our Company for cash at a price of ₹ [●] per
Equity Shares, aggregating up to ₹ [●] million.
The Offer comprises:
Up to 9,505,000 Equity Shares of face value of ₹ 10 each,
Fresh Issue (1)
aggregating up to ₹ [●] million.
Up to 2,376,000 Equity Shares of face value of ₹10 each,
Offer for Sale (2)
aggregating up to ₹ [●] million.
The Offer consists of:
Not more than [●] Equity Shares of face value of ₹10 each
A) QIB Portion (3)(4)
aggregating up to ₹ [●] million.
of which:
(i) Anchor Investor Portion(3) [●] Equity Shares of face value of ₹10 each.
(ii) Net QIB Portion available for allocation to
QIBs other than Anchor Investors (assuming [●] Equity Shares of face value of ₹10 each.
Anchor Investor Portion is fully subscribed)
of which:
(a) Available for allocation to Mutual
Up to [●] Equity Shares of face value of ₹10 each.
Funds only (5% of the Net QIB Portion)
(b) Balance for all QIBs including Mutual
Up to [●] Equity Shares of face value of ₹10 each.
Funds
Not less than [●] Equity Shares of face value of ₹10 each
B) Non-Institutional Portion (4) (5)
aggregating up to ₹ [●] million.
of which:
(a) One-third of the Non-Institutional Portion [●] Equity Shares of face value of ₹10 each.
available for allocation to Bidders with an
application size of more than ₹ 2,00,000 to ₹
10,00,000
(b) Two-third of the Non-Institutional Portion [●] Equity Shares of face value of ₹10 each.
available for allocation to Bidders with an
application size of more than ₹10,00,000
Not less than [●] Equity Shares of face value of ₹10 each
C) Retail Portion (4)(5)
aggregating up to ₹ [●] million.
Pre and Post Offer Equity Shares
Equity Shares outstanding prior to the Offer 30,101,200 Equity Shares of face value of ₹10 each.
(as at the date of this Draft Red Herring
Prospectus)
Equity Shares outstanding after the Offer [●] Equity Shares of face value of ₹10 each.
82kindly refer “Objects of the Offer” beginning on page 121
for information on the use of the net proceeds arising from
Use of Net Proceeds of the Offer
the Fresh Issue. Our Company will not receive any portion
of the proceeds from the Offer for Sale.
(1) The Offer has been authorised by our Board pursuant to resolutions passed at their meeting held on May 29,
2025, and by our Shareholders pursuant to a special resolution dated June 02, 2025.
(2) The Promoter Selling Shareholder has confirmed that the Offered Shares have been held by the Promoter
Selling Shareholder for a period of at least one year immediately preceding the date of this Draft Red Herring
Prospectus and are accordingly eligible for being offered for sale in the Offer in compliance with the SEBI
ICDR Regulations. Further, the Promoter Selling Shareholder has confirmed that its Offered Shares are
compliant with Regulation 8 of the SEBI ICDR Regulations. For further information, kindly refer “Capital
Structure” beginning on page 101. The Promoter Selling Shareholder has consented to the inclusion of its
portion of the Offered Shares in the Offer for Sale as follows:
Aggregate proceeds from
Maximum Date of
the sale of Equity Shares
number of corporate
Promoter Selling of face value of ₹10 each Date of Consent
Equity Shares authorization/
Shareholder forming part of the Offer Letter
offered in the board
for Sale (₹ in million)
Offer for Sale resolution
(up to)
Kartikey [●] Up to 2,376,000 June 05, 2025 June 05, 2025
Constructions Equity Shares
(Partnership Firm)
(3) Our Company may, in consultation with the BRLM, allocate up to 60% of the QIB Portion to Anchor Investors
on a discretionary basis in accordance with SEBI ICDR Regulations. The QIB Portion will accordingly be
reduced for the Equity Shares allocated to Anchor Investors. One-third of the Anchor Investor Portion shall
be reserved for domestic Mutual Funds only, subject to valid Bids being received from domestic Mutual Funds
at or above the Anchor Investor Allocation Price. In the event of undersubscription in the Anchor Investor
Portion, the remaining Equity Shares shall be added to the Net QIB Portion. Further, 5% of the Net QIB
Portion shall be available for allocation on a proportionate basis to Mutual Funds only, and the remainder of
the Net QIB Portion shall be available for allocation on a proportionate basis to all QIB Bidders, including
Mutual Funds, subject to valid Bids being received at or above the Offer Price. In the event the aggregate
demand from Mutual Funds is less than as specified above, the balance Equity Shares available for Allotment
in the Mutual Fund Portion will be added to the Net QIB Portion and allocated proportionately to the QIB
Bidders in proportion to their Bids. For further details, kindly refer “Offer Procedure” beginning on page
520.
(4) Subject to valid Bids being received at or above the Offer Price, under-subscription, if any, in the Non-
Institutional Portion or the Retail Portion would be allowed to be met with spill-over from any other category
or a combination of categories at the discretion of our Company, in consultation with the BRLM and the
Designated Stock Exchange, on a proportionate basis, subject to applicable laws. In the event of under-
subscription in the Offer, subject to receiving minimum subscription for 90% of the Fresh Issue and
compliance with Rule 19(2)(b) of the Securities Contracts (Regulation) Rules, 1957, the Allotment for the valid
Bids will be made in the first instance towards subscription for 90% of the Fresh Issue. Under-subscription,
if any, in the QIB Portion would not be allowed to be met with spill-over from other categories or a
combination of categories. For further details, kindly refer “Terms of the Offer” beginning on page 506.
83(5) Further, not less than 15% of the Offer shall be available for allocation to Non-Institutional Bidders of which
(a) 1/3rd of the portion available to NIBs shall be reserved for applicants with application size of more than
₹ 200,000 and up to ₹ 1,000,000 and (b) 2/3rd of the portion available to NIBs shall be reserved for applicants
with application size of more than ₹ 1,000,000. Provided that the unsubscribed portion in either of the sub-
categories specified in clauses (a) or (b), may be allocated to applicants in the other sub-category of NIBs
.The allocation to each NIB shall not be less than the minimum NIB Application Size, subject to availability of
Equity Shares in the Non-Institutional Portion and the remaining available Equity Shares, if any, shall be
allocated on a proportionate basis in accordance with the conditions specified in this regard in Schedule XIII
of the SEBI ICDR Regulations.
Allocation to Bidders in all categories, except the Anchor Investors, shall be made on a proportionate basis subject
to valid Bids received at or above the Offer Price. The allocation to each Retail Individual Investor shall not be
less than the minimum Bid Lot, subject to availability of Equity Shares in the Retail Category and the remaining
available Equity Shares, if any, shall be allocated on a proportionate basis. The allocation to each NII shall not be
less than the minimum non-institutional investor application size, subject to availability of Equity Shares in the
Non-Institutional Category and the remaining available Equity Shares, if any, shall be allocated on a proportionate
basis in accordance with the conditions specified in this regard in Schedule XIII to the SEBI ICDR Regulations.
SEBI through its circular (SEBI/HO/CFD/DIL2/CIR/P/2022/45) dated April 05, 2022, has prescribed that all
individual investors applying in initial public offerings opening on or after May 01, 2022, where the application
amount is up to ₹ 500,000, shall use UPI. Individual investors bidding under the Non-Institutional Portion bidding
for more than ₹ 200,000 and up to ₹ 500,000, using the UPI Mechanism, shall provide their UPI ID in the Bid-
cum-Application Form for Bidding through Syndicate, sub-syndicate members, Registered Brokers, RTA or
CDPs, or online using the facility of linked online trading, demat and bank account (3 in 1 type accounts), provided
by certain brokers.
For details, including in relation to grounds for rejection of Bids, kindly refer “Offer Structure” and “Offer
Procedure” beginning on pages 514 and 520, respectively. For details of the terms of the Offer, kindly refer
“Terms of the Offer” beginning on page 506.
84SUMMARY OF RESTATED CONSOLIDATED FINANCIAL INFORMATION
The summary of restated consolidated financial information presented below are derived from our Restated
Consolidated Financial Information for the financial years ended March 31, 2025, March 31, 2024 and March 31,
2023 should be read in conjunction with the chapter titled “Restated Consolidated Financial Information” and
“Management’s Discussion and Analysis of Financial Conditions and Results of Operations” beginning on pages
331 and 444, respectively.
(The remainder of this page is intentionally left blank)
85TECHNOCRAFT VENTURES LIMITED
(Formerly known as M/s TECHNOCRAFT CONSTRUCTION PRIVATE LIMITED)
(₹ in million)
RESTATED CONSOLIDATED STATEMENT OF ASSETS AND LIABILITIES
As at
Particulars Annexure
31-Mar-25 31-Mar-24 31-Mar-23
ASSETS
Non-current Assets
Property, Plant and Equipment 7 80.99 65.10 39.99
Capital work in progress 8 8.42 - 9.63
Right of Use Asset 9 49.21 50.25 51.28
Investment Property - - - -
Other Intangible Assets - - - -
Investment in Associates 10 52.24 1.86 1.04
Financial Assets
(I) Investments 11 - - 3.35
(ii) Others 12 329.56 274.67 334.35
(iii)Loans - - -
(iv)Trade Receivables - - - -
Other Non-Current Assets 13 13.88 6.88 9.96
Deferred tax assets (Net) 14 5.41 4.08 3.67
Total non-current assets(A) 539.71 402.85 453.27
Current Assets
Inventories 15 889.33 557.45 472.55
Financial Assets
(i) Trade receivables 16 581.84 1,001.83 509.04
(ii) Cash and cash equivalent 17 5.13 11.22 27.16
(iii) Bank Balances other than Cash and Cash
18 135.30 75.88 108.10
Equivalents
(iv) Loans - - - -
(v) Others 19 495.18 427.74 180.47
Other current assets 20 50.88 103.50 83.00
Income tax Asset (Net) 21 - - 1.31
Total Current assets(B) 2,157.66 2,177.61 1,381.62
TOTAL ASSETS(A+B) 2,697.37 2,580.46 1,834.89
EQUITY AND LIABILITIES
Equity
Equity share capital 22 75.25 75.25 75.25
Other equity 23 1,124.57 842.53 652.09
Total equity 1,199.83 917.78 727.34
Equity attributable to owners of the Group
Non - Controlling Interest - - -
Total Equity (A) 1,199.83 917.78 727.34
Liabilities
Non-current liabilities
Financial liabilities
(i) Long Term Borrowings 24 268.36 272.53 225.80
86(ii) Lease Liabilities 9 - - -
(iii) Others 25 - 47.07 -
Long term provisions 26 6.11 4.65 3.71
Deferred tax liabilities (Net) - - -
Total non-current liabilities(B) 274.47 324.25 229.51
Current liabilities
Financial liabilities
(i) Short Term Borrowings 27 605.94 528.58 282.24
(ii) Lease Liabilities 9 - - -
(iii) Trade Payables 28 -
(i) Total outstanding dues of Micro enterprises &
25.28 85.40 57.34
small enterprises
(ii) Total outstanding dues of creditors other than
99.75 125.23 228.87
Micro enterprises & small enterprises
(iv) Others 29 422.40 416.84 276.58
Other current liabilities 30 43.01 149.63 32.62
Short term provisions 31 0.64 0.63 0.39
Liabilities for current tax (Net) 32 26.06 32.13 -
Total current liabilities(C) 1,223.08 1,338.43 878.04
Total liabilities(B+C) 1,497.55 1,662.68 1,107.55
TOTAL EQUITY AND LIABILITIES(A+B+C) 2,697.37 2,580.46 1,834.89
87TECHNOCRAFT VENTURES LIMITED
(Formerly known as M/s TECHNOCRAFT CONSTRUCTION PRIVATE LIMITED)
(₹ in million)
RESTATED CONSOLIDATED STATEMENT OF PROFIT AND LOSS
For the Financial Year ended
Particulars Annexure
31-Mar-25 31-Mar-24 31-Mar-23
Revenue:
Revenue from Operations (Net) 33 2,795.64 2,261.02 1,786.91
Other income 34 14.40 11.96 18.53
Total revenue (I) 2,810.04 2,272.98 1,805.44
Expenses:
Cost of Revenue from Operations 35 2,467.84 1,907.99 1,791.88
Changes in inventories of Work in Progress 36 (297.34) (68.04) (278.60)
Employee benefit expenses 37 100.35 60.32 39.03
Finance costs 38 92.39 79.29 81.22
Depreciation and Amortization 39 18.24 10.36 10.68
Other expenses 40 48.11 25.28 15.76
Total Expenses (II) 2,429.59 2,015.20 1,659.98
Restated Profit before share of profit of
380.46 257.78 145.46
associates and tax (III)=(I)-(II)
Share of Profit/(Loss) of Associates (IV) 5.19 2.82 (0.02)
Restated Profit before tax (V=III+IV) 385.65 260.60 145.44
Tax Expense (VI) 41
Current Taxes including current tax expenses
104.94 70.44 37.55
related to prior period and Firm Tax
Deferred taxes (Asset)/Liability (1.33) (0.38) (0.16)
Restated Profit for the period/ year (VII)=
282.04 190.54 108.06
(V)-(VI)
Other Comprehensive Income (OCI) (VIII) - - -
Items not to be reclassified to profit or loss
- - -
in subsequent period:
Remeasurement gain/ (loss) on defined benefit
0.01 (0.14) 0.24
plan
Income tax relating to items that will not be
0.00 0.04 (0.06)
reclassified to profit or loss
Restated Total Comprehensive Income for
282.04 190.44 108.24
the period/year, net of tax (IX) (VII+VIII)
Profit for the year attributable to
Shareholders of the Group 282.04 190.54 108.06
Non-Controlling Interest - - -
Other Comprehensive income for the year
attributable to
Shareholders of the Group 0.01 (0.11) 0.18
Non-Controlling Interest - - -
Restated Earnings per Equity Share
42
(Face Value: Rupees 10)
- Basic 9.37 6.33 3.59
- Diluted 9.37 6.33 3.59
88TECHNOCRAFT VENTURES LIMITED
(Formerly known as M/s TECHNOCRAFT CONSTRUCTION PRIVATE LIMITED)
(₹ in million)
RESTATED CONSOLIDATED STATEMENT OF CASH FLOWS
For the Financial Year ended
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
A. CASH FLOW FROM OPERATING ACTIVITIES
Profit/ (Loss) before Exceptional items and Tax 385.65 260.60 145.44
Non-cash adjustments:
Depreciation and amortisation expenses 18.24 10.36 10.68
Interest Expense 92.39 79.29 81.22
Loss/ (Gain) on Sale of Property, Plant and Equipment - - (3.11)
Interest Received (14.40) (11.66) (15.42)
Share of (Profit) /Loss from Associates (5.19) (2.82) 0.02
Provision for Expected Credit Loss 0.16 0.44 0.46
Remeasurement gain/ (loss) on defined benefit plan 0.01 (0.14) 0.24
Operating profit before working capital changes 476.84 336.07 219.54
Changes in working capital:
(Increase)/ Decrease in Inventories (331.88) (84.91) (297.15)
(Increase)/Decrease in Trade Receivables - Current 419.83 (493.23) 276.60
(Increase)/Decrease in Other Financial Assets- Non-
(69.52) 65.83 (268.86)
Current other than Bank Deposits
(Increase)/Decrease in Other Financial Assets- Current
(58.15) (231.63) 239.67
other than Bank Deposits
(Increase)/Decrease in Other Non-Current Assets (7.00) 3.08 2.10
(Increase)/Decrease in Other Current Assets 52.62 (20.50) (57.14)
Increase/(Decrease) in other financial liabilities- non-
(47.07) 47.07 (86.24)
current
Increase/(Decrease) in other financial liabilities Current 5.56 140.26 76.12
Increase/(Decrease) in Short Term Borrowings 77.36 246.33 (93.05)
Increase/(Decrease) in other current liabilities (106.62) 117.02 (1.60)
Increase/(Decrease) in Trade Payables (85.60) (75.58) 125.14
Increase/(Decrease) in Provisions 1.48 1.17 0.55
Cash generated from operations 327.85 50.99 135.66
Income tax (Refund)/ paid during the year 111.01 37.00 35.30
Net cash from operating activities (A) 216.84 13.99 100.35
B. CASH FLOW FROM INVESTING ACTIVITIES
Purchase of Property, Plant and Equipment and Capital
(41.51) (24.81) (13.23)
Work in Progress
Sale of Property, Plant and Equipment - - 3.72
(Increase)/ Decrease in Investment - 3.35 -
Investment in Associates (45.18) 2.00 (0.05)
Interest Received 14.40 11.66 15.42
Movement in bank balances other than cash and cash
(54.09) 10.43 56.16
equivalent including all Bank Deposits
Net cash from investing activities (B) (126.38) 2.63 62.03
89C. CASH FLOW FROM FINANCING ACTIVITIES
Interest paid on borrowings (92.39) (79.29) (81.22)
Proceeds/(Repayment) of Long-term Borrowings (4.17) 46.73 (59.43)
Net cash from financing activities (C) (96.55) (32.56) (140.65)
Net increase in cash and cash equivalents (A+B+C) (6.09) (15.94) 21.72
Cash and cash equivalents at the beginning of the year 11.22 27.16 5.43
Cash and cash equivalents at the end of the year 5.13 11.22 27.16
Net increase in cash and cash equivalents (6.09) (15.94) 21.72
90GENERAL INFORMATION
Our Company was originally incorporated as ‘Technocraft Construction Private Limited’ a private limited
company under the Companies Act, 1956, pursuant to a certificate of incorporation dated October 21, 1998, issued
by the Registrar of Companies, NCT of Delhi & Haryana. Thereafter, the name of our Company was changed
from ‘Technocraft Construction Private Limited’ to ‘Technocraft Ventures Private Limited’ pursuant to a board
resolution dated January 08, 2024, and a special resolution passed by our Shareholders on January 10, 2024, and
a fresh certificate of incorporation dated February 09, 2024, was issued pursuant to change of name, by the
Registrar of Companies, NCT of Delhi & Haryana. Subsequently, our Company was converted into a public
limited company pursuant to a resolution passed by our Board of Directors dated February 16, 2024, and a special
resolution passed by our Shareholders on March 13, 2024. Consequently, the name of our Company was changed
to ‘Technocraft Ventures Limited’, and a fresh certificate of incorporation was issued to our Company by the
Registrar of Companies, Central Processing Centre, on June 11, 2024. The CIN of the Company is
U70101DL1998PLC096763.
COMPANY REGISTRATION NUMBER AND CORPORATE IDENTITY NUMBER
The registration number and corporate identity number of our Company are as follow:
Corporate identity number: U70101DL1998PLC096763
Company registration number: 096763
REGISTERED OFFICE OF OUR COMPANY
TECHNOCRAFT VENTURES LIMITED
S 553/54, Ground Floor,
School Block, Shakarpur,
New Delhi-110092, India
Tel.: +91 9211252228
E-mail: compliance@technocraftventures.com
Website: www.technocraftventures.com
CORPORATE OFFICE OF OUR COMPANY
TECHNOCRAFT VENTURES LIMITED
B-137, Sector-2, Noida,
Gautam Buddha Nagar,
Uttar Pradesh-201301, India
Tel.: +91 7835008595
E-mail: compliance@technocraftventures.com
Website: www.technocraftventures.com
For details in relation to changes in the registered office address of our Company, kindly refer “Our History and
Certain Corporate Matters – Changes in the registered office of our Company” beginning on page 297.
REGISTRAR OF COMPANIES
Our Company is registered with the Registrar of Companies, NCT of Delhi & Haryana which is situated at the
following address:
4th Floor, IFCI Tower,
61, Nehru Place,
New Delhi-110019, India
91BOARD OF DIRECTORS OF OUR COMPANY
The following table sets out the details of our Board of Directors as on the date of this Draft Red Herring
Prospectus:
Name of Director Designation DIN Address
B-27, Sector-49, Noida, Uttar Pradesh-
Sanjay Tyagi Managing Director 01446861
201301, India.
Whole-Time Director B-27, Near Prayag Hospital Sector-49,
Kartikey Tyagi and Chief Financial 09471808 Noida, Uttar Pradesh-201301, India.
Officer
02556586 B-27, Sector-49, Noida, Uttar Pradesh-
Rekha Tyagi Executive Director
201301, India.
Flat no. 2714, Eternia Tower, Mahagun
Mezzaria, Sector-78, Noida, Gautam
Mukesh Kumar Garg Independent Director 08936325
Buddha Nagar, Uttar Pradesh-201301,
India.
H-186, Pratap Vihar, Sector-12,
Bhawna Saunkhiya Independent Director 10683032
Ghaziabad, Uttar Pradesh-201009, India.
B-34/4381 Durga Puri, Haibowal Kalan,
Shruti Gupta Independent Director 10310259 Near Rajendra School, Ludhiana, Punjab-
141001, India.
For further details of our Board of Directors, kindly refer “Our Management – Board of Directors” beginning on
page 303.
COMPANY SECRETARY AND COMPLIANCE OFFICER
Saket Surolia is the Company Secretary and Compliance Officer of our Company. His contact details are set forth
below:
S 553/54, Ground Floor,
School Block, Shakarpur,
New Delhi-110092, India.
Tel.: +91 7835008595
E-mail: compliance@technocraftventures.com
CHIEF FINANCIAL OFFICER AND WHOLE-TIME DIRECTOR
Kartikey Tyagi is the Chief Financial Officer and Whole-Time Director of our Company. His contact details are
set forth below:
S 553/54, Ground Floor,
School Block, Shakarpur,
New Delhi-110092, India.
Tel.: +91 9211252228
E-mail: kartikey@technocraftventures.com
INVESTOR GRIEVANCES
Bidders may contact our Company Secretary and Compliance Officer or the Registrar to the Offer in case
of any pre-offer or post-offer related grievances including non-receipt of letters of Allotment, non-credit of
allotted Equity Shares in the respective beneficiary account, non-receipt of refund orders or non-receipt of
92funds by electronic mode, etc. For all Offer related queries and for redressal of complaints, investors may
also write to the BRLM.
All Offer related grievances, other than of Anchor Investors, may be addressed to the Registrar to the Offer with
a copy to the relevant Designated Intermediary(ies) with whom the Bid cum Application Form was submitted,
giving full details such as name of the sole or First Bidder, Bid cum Application Form number, Bidder’s DP ID,
Client ID, PAN, address of Bidder, number of Equity Shares applied for, ASBA Account number in which the
amount equivalent to the Bid Amount was blocked or the UPI ID (for UPI Bidders who make the payment of Bid
Amount through the UPI Mechanism), date of Bid cum Application Form and the name and address of the relevant
Designated Intermediary(ies) where the Bid was submitted. Further, the Bidder shall enclose the Acknowledgment
Slip or the application number from the Designated Intermediaries in addition to the documents or information
mentioned hereinabove. All grievances relating to Bids submitted through Registered Brokers may be addressed
to the Stock Exchanges with a copy to the Registrar to the Offer. The Registrar to the Offer shall obtain the required
information from the SCSBs for addressing any clarifications or grievances of ASBA Bidders.
All Offer related grievances of the Anchor Investors may be addressed to the Registrar to the Offer, giving full
details such as the name of the sole or First Bidder, Anchor Investor Application Form number, Bidders’ DP ID,
Client ID, PAN, date of the Anchor Investor Application Form, address of the Bidder, number of the Equity Shares
applied for Bid Amount paid on submission of the Anchor Investor Application Form and the name and address
of the BRLM where the Anchor Investor Application Form was submitted by the Anchor Investor.
BOOK RUNNING LEAD MANAGER
KHAMBATTA SECURITIES LIMITED
806, World Trade Tower,
Tower B, Noida Sector-16,
Uttar Pradesh- 201301, India.
Tel: +91 9953989693; +91 120 4415469
E-mail: ipo@khambattasecurities.com
Website: www.khambattasecurities.com
Investor grievance email: mbcomplaints@khambattasecurities.com
Contact Person: Mr. Chandhan Mishra/ Ms. Shubhra
SEBI Registration No.: INM000011914
SYNDICATE MEMBERS
[●]
STATEMENT OF INTER-SE ALLOCATION OF RESPONSIBILITIES AMONG THE BOOK RUNNING
LEAD MANAGER
Khambatta Securities Limited is the sole Book Running Lead Manager to the Offer and all the responsibilities
relating to co-ordination and other activities in relation to the Offer shall be performed by them.
LEGAL COUNSEL TO OUR COMPANY
Desai & Diwanji
16th Floor, Tower C,
DLF Epitome, Building No. 5,
DLF Phase 3, Gurugram-122002,
Haryana, India
Tel: +91 124 485 0300
E-mail: projecttechnoventure@desaidiwanji.com
93REGISTRAR TO THE OFFER
BIGSHARE SERVICES PRIVATE LIMITED
S6-2, 6th Floor, Pinnacle Business Park,
Next to Ahura Centre,
Mahakali Caves Road,
Andheri (East), Mumbai-400073,
Maharashtra- 400073, India.
Tel: +91 22 6263 8200
Email: ipo@bigshareonline.com
Investor Grievance Email: investor@bigshareonline.com
Website: www.bigshareonline.com
Contact Person: Babu Rapheal C
SEBI Registration No.: INR000001385
BANKER(S) TO THE OFFER
ESCROW COLLECTION BANK(S)
[●]
REFUND BANK(S)
[●]
PUBLIC ISSUE BANK(S)
[●]
SPONSOR BANK(S)
[●]
DESIGNATED INTERMEDIARIES
SELF-CERTIFIED SYNDICATE BANKS
The banks registered with SEBI, which offer the facility of ASBA services in relation to ASBA, where the Bid
Amount will be blocked by authorising an SCSB, a list of which is available on the website of SEBI at
https://www.sebi.gov.in/sebiweb/other/OtherAction.do?doRecognised=yes and updated from time to time and at
such other websites as may be prescribed by SEBI from time to time.
A list of the Designated SCSB Branches with which an ASBA Bidder (other than a RIB using the UPI Mechanism),
not Bidding through Syndicate / Sub Syndicate or through a Registered Broker, RTA or CDP may submit the
ASBA Forms, is available at
https://www.sebi.gov.in/sebiweb/other/OtherAction.do?doRecognisedFpi=yes&intmId=34 and at such other
websites as may be prescribed by SEBI from time to time.
Further, the branches of the SCSBs where the Designated Intermediaries could submit the ASBA Form(s) of
Bidders (other than RIBs) is provided on the website of SEBI at
https://www.sebi.gov.in/sebiweb/other/OtherAction.do?doRecognisedFpi=yes&intmId=35 which may be
updated from time to time or at such other website as may be prescribed by SEBI from time to time. Details of
nodal officers of SCSBs, identified for Bids made through the UPI Mechanism, are available at www.sebi.gov.in.
SELF-CERTIFIED SYNDICATE BANKS ELIGIBLE AS ISSUER BANKS FOR UPI MECHANISM
In accordance with circular no. SEBI/HO/CFD/DIL2/CIR/P/2019/76 dated June 28, 2019, circular no.
SEBI/HO/CFD/DIL2/CIR/P/2019/85 dated July 26, 2019 and SEBI Circular no.
94SEBI/HO/CFD/DIL2/P/CIR/P/2022/45 dated April 05, 2022 issued by the SEBI, UPI Bidders using the UPI
Mechanism may apply through the SCSBs and mobile applications whose names appears on the website of the
SEBI at www.sebi.gov.in/sebiweb/other/OtherAction.do?doRecognisedFpi=yes&intmId=40, as updated from
time to time. A list of SCSBs and mobile applications, which are live for applying in public issues using UPI
Mechanism is provided on the website of the SEBI at
www.sebi.gov.in/sebiweb/other/OtherAction.do?doRecognisedFpi=yes&intmId=40 and
www.sebi.gov.in/sebiweb/other/OtherAction.do?doRecognisedFpi=yes&intmId=43, respectively.
SYNDICATE SCSB BRANCHES
In relation to Bids (other than Bids by Anchor Investor) submitted under ASBA process to a member of the
Syndicate, the list of branches of the SCSBs at the Specified Locations named by the respective SCSBs to receive
deposits of Bid cum Application Forms from the members of the Syndicate is available on the website of the SEBI
(https://www.sebi.gov.in/sebiweb/other/OtherAction.do?doRecognisedFpi=yes&intmId=35) as updated from
time to time. For more information on such branches collecting Bid cum Application Forms from the Syndicate
at Specified Locations, see the website of the SEBI
(https://www.sebi.gov.in/sebiweb/other/OtherAction.do?doRecognisedFpi=yes&intmId=35) or any such other
website as may be prescribed by SEBI from time to time.
REGISTERED BROKERS
The list of the Registered Brokers eligible to accept ASBA forms, including details such as postal address,
telephone number and e-mail address, is provided on the websites of the Stock Exchanges at www.bseindia.com
and www.nseindia.com, respectively, as updated from time to time.
REGISTRAR AND SHARE TRANSFER AGENTS
The list of the RTAs eligible to accept ASBA Forms at the Designated RTA Locations, including details such as
address, telephone number and e-mail address, is provided on the websites of Stock Exchanges at
http://www.bseindia.com/Static/Markets/PublicIssues/RtaDp.aspx?andhttp://www.nseindia.com/products/conten
t/equities/ipos/asba_procedures.htm, respectively, as updated from time to time.
COLLECTING DEPOSITORY PARTICIPANTS
The list of the CDPs eligible to accept ASBA Forms at the Designated CDP Locations, including details such as
name and contact details, is provided on the websites of BSE at
http://www.bseindia.com/Static/Markets/PublicIssues/RtaDp.aspx? and on the website of NSE at
http://www.nseindia.com/products/content/equities/ipos/asba_procedures.htm, as updated from time to time.
EXPERTS
Except as stated below, our Company has not obtained any expert opinions:
Our Company has received the following written consents to include the names of the following persons as
“experts” as defined under Section 2(38) read with Section 26 of the Companies Act, 2013 in this Draft Red
Herring Prospectus:
1. Our Company has received written consent dated August 04, 2025 from our Statutory Auditor, Rishi Kapoor
& Company, Chartered Accountants, holding a valid peer review certificate from ICAI to include their name
in this Draft Red Herring Prospectus in their capacity as an expert in respect of their examination report on
the Restated Consolidated Financial Information dated July 12, 2025 and the Statement of Special Tax
Benefits dated August 04, 2025, included in this Draft Red Herring Prospectus and such consent has not
been withdrawn as of the date of this Draft Red Herring Prospectus.
2. Our Company has received written consent dated July 18, 2025 from Y. P. & Associates, Independent
Chartered Engineer bearing firm registration number M-1488451 to include their name as required under
Section 26(5) of the Companies Act, 2013 read with SEBI ICDR Regulations, in this Draft Red Herring
Prospectus, and as an “expert” as defined under section 2(38) of the Companies Act, 2013 in relation to
95certifications and confirmations dated August 05, 2025 issued by them in their capacity as the Independent
Chartered Engineer.
3. Our Company has received written consent dated July 05, 2025 from R & D Company Secretaries, Practicing
Company Secretary to include their name in this Draft Red Herring Prospectus in their capacity as an
“expert” in respect of certificate issued by them in their capacity as the independent practising company
secretary to our Company submitted for the purposes of this offer and such consent has not been withdrawn
as of the date of this Draft Red Herring Prospectus.
The term “experts” and consent thereof does not represent an expert or consent within the meaning under the U.S.
Securities Act.
STATUTORY AUDITOR OF OUR COMPANY
Rishi Kapoor & Company
Chartered Accountants
10, First Floor, Advocate Chamber Raj Nagar,
Opposite Telephone Exchange,
Ghaziabad, Uttar Pradesh-201001, India.
E-mail: carishikapoor@yahoo.co.in
Tel: +91 9910385499/ +91 9213529347/ +91 120 437 1050
Firm registration number: 006615C
Peer review number: 014978
Contact Person: Mr. Rishi Kapoor/ Ms. Jyoti Arora
CHANGES IN AUDITORS
There has been no change in our statutory auditors in the three years preceding the date of this Draft Red Herring
Prospectus.
BANKERS TO OUR COMPANY
HDFC Bank Limited ICICI Bank Limited
03rd Floor, Tower B, Ace Capitol, Sector 132, Anchor 2, SG Benefit,
Noida- 201305, Uttar Pradesh, India Block-I, Govindpuram, Ghaziabad-
Tel: +91 7020939238 201013, Uttar Pradesh, India.
Contact Person: Pooja Singh Solanki Tel: +91 8006954478
Email: pooja.solanki2@hdfcbank.com Contact Person: Tushar Barthwal
Website: www.hdfcbank.com Email: tushar.barthwal@icicibank.com
Website: www.icicibank.com
Punjab National Bank Kotak Mahindra Bank Limited
Large Corporate Branch, Sector-1 02nd Floor, Epicah Mall, Near
Noida-201301, Uttar Pradesh, India. Moti Nagar Metro Station, Moti Nagar,
Tel: +91 7506200848 New Delhi-110015, India.
Contact Person: Sandeep Kumar Tel: +91 9350030503
Email: bo6420@pnb.co.in Contact Person: Faizan Ahmad
Website: www.pnbindia.in Email: faizan.ahmad@kotak.com
Website: www.kotak.com
Grading of the Offer
No credit agency registered with SEBI has been appointed in respect of obtaining grading for the Offer.
Monitoring Agency
Our Company shall, in compliance with Regulation 41 of the SEBI ICDR Regulations, appoint a monitoring
agency for monitoring the utilization of the Gross Proceeds prior to filing of the Red Herring Prospectus. For
96details in relation to the proposed utilisation of the Gross Proceeds, kindly refer “Object of the Offer- Monitoring
utilisation of funds” beginning on page 122.
Appraising Entity
None of the objects for which the Net Proceeds from the Fresh Issue will be utilised have been appraised by any
agency and no appraising entity has been appointed in relation to the Offer.
Credit Rating
As this is an Offer of Equity Shares, there is no credit rating required for the Offer.
Debenture Trustee
As this is an Offer of Equity Shares, the appointment of a debenture trustee is not required.
Green Shoe Option
No green shoe option is contemplated under the Offer.
Filing of the Draft Red Herring Prospectus
A copy of this Draft Red Herring Prospectus is being filed electronically with SEBI online portal at
https://siportal.sebi.gov.in, in accordance with SEBI master circular bearing reference no.
SEBI/HO/CFD/PoD2/P/CIR/2023/00094 dated June 21, 2023, as specified in Regulation 25(8) of the SEBI ICDR
Regulations.
It will also be filed with SEBI at the following address:
SECURITIES AND EXCHANGE BOARD OF INDIA
Corporation Finance Department Division of Issues and Listing
SEBI Bhavan, Plot No. C4 A, ‘G’ Block,
Bandra Kurla Complex, Bandra (E),
Mumbai-400051, Maharashtra, India
A copy of the Red Herring Prospectus, along with the material contracts and documents required to be filed, shall
be filed with the RoC in accordance with Section 32 of the Companies Act, 2013, and a copy of the Prospectus
required to be filed under Section 26 of the Companies Act, 2013 shall be filed with the RoC at its office, and
through the electronic portal at http://www.mca.gov.in/mcafoportal/loginvalidateuser.do.
Book Building Process
The book building, in the context of the Offer, refers to the process of collection of Bids from investors on the
basis of the Red Herring Prospectus and the Bid cum Application Forms and the Revision Forms within the Price
Band. The Price Band and the minimum Bid Lot will be decided by our Company in consultation with the Book
Running Lead Manager, and shall be advertised in all editions of [●] (a widely circulated English national daily
newspaper), all editions of [●] (a widely circulated Hindi national daily newspaper) and [●] editions of [●], a
widely circulated Hindi newspaper, Hindi being the regional language of Delhi, where our Registered Office is
located, each with wide circulation, at least two Working Days prior to the Bid/Offer Opening Date and shall be
made available to the Stock Exchanges for the purpose of uploading on their respective websites. The Offer Price
shall be determined by our Company in consultation with the BRLM after the Bid/ Offer Closing Date. For details,
kindly refer “Offer Procedure” beginning on page 520.
All Bidders, except Anchor Investors, are mandatorily required to use the ASBA process for participating
in the Offer by providing details of their respective ASBA Account in which the corresponding Bid Amount
will be blocked by SCSBs. UPI Bidders shall participate through the ASBA process, either by (i) providing
the details of their respective ASBA Account in which the corresponding Bid Amount will be blocked by the
SCSBs; or (ii) using the UPI Mechanism. Pursuant to SEBI circular no.
97SEBI/HO/CFD/DIL2/P/CIR/P/2022/45 dated April 05, 2022, all individual bidders in initial public offerings
whose application sizes are up to ₹ 0.50 million shall use the UPI Mechanism. Anchor Investors are not
permitted to participate in the Offer through the ASBA process.
In accordance with the SEBI ICDR Regulations, QIBs and Non-Institutional Bidders are not allowed to withdraw
or lower the size of their Bids (in terms of the quantity of the Equity Shares or the Bid Amount) at any stage.
Retail Individual Investors Bidding in the Retail Portion can revise their Bids during the Bid/Offer Period and
withdraw their Bids until the Bid/Offer Closing Date. Further, Anchor Investors cannot withdraw their Bids after
the Anchor Investor Bid/ Offer Period. Allocation to QIBs (other than Anchor Investors) and Non-Institutional
Bidders will be on a proportionate basis while Allocation to the Anchor Investors will be on a discretionary basis.
The allocation to each Retail Individual Investor and Non-Institutional Investor shall not be less than the minimum
Bid Lot, subject to availability of Equity Shares in the Retail Portion and the Non-Institutional Portion and the
remaining available Equity Shares, if any, shall be allocated on a proportionate basis.
For allocation to the Non-Institutional Bidders, the following shall be followed:
a) One-third of the portion available to Non-Institutional Bidders shall be reserved for Bidders with application
size of more than ₹0.20 million and up to ₹1.00 million;
b) Two-thirds of the portion available to Non-Institutional Bidders shall be reserved for Bidders with
application size of more than ₹1.00 million.
Provided that the unsubscribed portion in either of the sub-categories specified under clauses (a) or (b), may be
allocated to Bidders in the other sub-category of Non-Institutional Bidders.
The process of Book Building under the SEBI ICDR Regulations and the Bidding Process are subject to
change from time to time and the investors are advised to make their own judgment about investment
through this process prior to submitting a Bid in the Offer.
Bidders should note that the Offer is also subject to (i) filing of the Red Herring Prospectus or Prospectus by our
Company with the RoC; and (ii) our Company obtaining final listing and trading approvals from the Stock
Exchanges, which our Company shall apply for after Allotment.
For Further details on the method and procedure for Bidding kindly refer “Terms of the Offer”, “Offer Structure”
and “Offer Procedure” beginning on pages 506, 514 and 520, respectively.
Illustration of Book Building Process and Price Discovery Process
For an illustration of the Book Building Process and further details, kindly refer “Terms of the Offer” and “Offer
Procedure” beginning on pages 506 and 520 respectively.
Underwriting Agreement
After the determination of the Offer Price and allocation of Equity Shares, but prior to the filing of the Prospectus
with the RoC, our Company shall enter into an Underwriting Agreement with the Underwriters for the Equity
Shares offered in the Issue. The extent of underwriting obligations and the Bids to be underwritten in the Offer
shall be as per the Underwriting Agreement. The Underwriting Agreement will be dated [●]. Pursuant to the terms
of the Underwriting Agreement, the obligations of each of the Underwriters will be several and will be subject to
certain conditions specified therein.
The Underwriters have indicated their intention to underwrite the following number of Equity Shares:
(This portion has been intentionally left blank and will be filled in before filing of the Prospectus with the RoC)
(₹ in million)
Name, address, telephone and Indicative number of Equity Shares
Amount Underwritten
e-mail of Underwriters to be Underwritten
[●] [●] [●]
98The above-mentioned underwriting commitments are indicative and will be finalised after determination of Offer
Price and Basis of Allotment and subject to the provisions of Regulation 40(2) of the SEBI ICDR Regulations.
In the opinion of our Board (based on representations made to our Company by the Underwriters), the resources
of the aforementioned Underwriters are sufficient to enable them to discharge their respective underwriting
obligations in full. The aforementioned Underwriters are merchant banker registered with our Board or stock
brokers registered with the Stock Exchanges. Our Board at its meeting held on [●], has accepted and entered into
the Underwriting Agreement mentioned above on behalf of our Company.
Allocation among the Underwriters may not necessarily be in proportion to their underwriting commitment set
forth in the table above. Notwithstanding the above table, the Underwriters shall be severally responsible for
ensuring payment with respect to the Equity Shares allocated to investors respectively procured by them in
accordance with the Underwriting Agreement.
Notwithstanding the above table, the Underwriters shall be severally responsible for ensuring payment with
respect to the Equity Shares allocated to investors respectively procured by them in accordance with the
Underwriting Agreement. In the event of any default in payment, the respective Underwriter, in addition to other
obligations defined in the Underwriting Agreement, will also be required to procure subscribers for or subscribe
to the Equity Shares to the extent of the defaulted amount in accordance with the Underwriting Agreement. The
Underwriting Agreement has not been executed as on the date of this Draft Red Herring Prospectus and will be
executed after determination of the Offer Price and allocation of Equity Shares, but prior to the filing of the
Prospectus with the RoC. The extent of underwriting obligations and the Bids to be underwritten in the Offer shall
be as per the Underwriting Agreement.
99CAPITAL STRUCTURE
The share capital of our Company, as on the date of this Draft Red Herring Prospectus, is set forth below:
(in ₹, except share data)
Sr. Aggregate nominal Aggregate value at
Particulars
No. value Offer Price*
A. Authorized Share Capital (1)
40,000,000 Equity Shares of face value of ₹ 10 each 400,000,000 -
B. Issued, Subscribed and Paid-up Share Capital
before the Offer
30,101,200 Equity Shares of face value of ₹10 each 301,012,000 -
C. Present Offer in terms of this Draft Red Herring
Prospectus
Offer of up to 11,881,000 Equity Shares of face value 118,810,000 [●]
of ₹10 each aggregating up to ₹ [●] million
Of which
Fresh Offer of up to 9,505,000 Equity Shares of face 95,050,000 [●]
value of ₹ 10 each aggregating up to ₹ [●] million (2)
Offer for sale of up to 2,376,000 Equity Shares of face 23,760,000 [●]
value of ₹10 each aggregating up to ₹ [●] million (3)
D. Issued, Subscribed and Paid-up Share Capital after
the Offer*
[●] Equity Shares of face value of ₹ 10 each [●] [●]
E. Securities Premium Account
Before the Offer Nil
After the Offer* [●]
*To be updated upon finalization of the Offer Price, and subject to basis of allotment
(1) For details in relation to the changes in the authorized share capital of our Company in the last 10 years, kindly
refer “Our History and Certain Corporate Matters - Amendments to our Memorandum of Association”
beginning on page 298.
(2) The Offer has been authorized by our Board pursuant to its resolution dated May 29, 2025 and Shareholders
pursuant to their special resolution dated June 02, 2025.
(3) The Promoter Selling Shareholder namely, Kartikey Constructions (partnership firm) has consented to and
authorized the transfer of its portion of its Offered Shares pursuant to the Offer for Sale vide its consent letter
dated June 05, 2025. Further, our Board has taken on record consent of Kartikey Constructions (partnership
firm) by a resolution dated June 05, 2025. In addition, the Promoter Selling Shareholder has confirmed that its
portion of the Offered Shares have been held by it for a period of at least one year prior to the filing of this Draft
Red Herring Prospectus with SEBI and are accordingly eligible for being offered for sale in the Offer as required
by the SEBI ICDR Regulations. For details on the authorisation of the Promoter Selling Shareholder in relation
to the Offered Shares, kindly refer “The Offer” beginning on page 82.
100Notes to the Capital Structure
1. Equity Share Capital history of our Company
(a) History of Equity Share Capital of our Company
The following table sets forth the history of the Equity Share capital of our Company:
Cumulative
Number of Face value Offer
Cumulative paid-up
Date of Reason for/ Nature of Equity per price per Nature of
Details of Allottees number of Equity
allotment allotment Shares Equity Equity consideration
Equity Shares Share
allotted Share (₹) Share (₹)
Capital (₹)
October 21, 100 Equity Shares each Initial subscription to 200 10 10 Cash 200 2,000
1998 were allotted to Rekha the Memorandum of
Tyagi and Neeraj Tyagi Association
March 31, 1. 79,050 Equity Shares Further Issue 311,650 10 10 Cash 311,850 3,118,500
2000* were allotted to Rekha
Tyagi,
2. 20,350 Equity Shares
were allotted to Neeraj
Tyagi,
3. 27,500 Equity Shares
were allotted to Bala
Tyagi,
4. 42,600 Equity Shares
were allotted to Lalit
Tyagi,
5. 35,250 Equity Shares
were allotted to Mohan
Tyagi HUF,
1016. 37,400 Equity Shares
were allotted to Mohan
Tyagi,
7. 3,600 Equity Shares
were allotted to Neeta
Tyagi,
8. 37,900 Equity Shares
were allotted to Poonam
Devi, and
9. 28,000 Equity shares
were allotted to Praveen
Tyagi
August 31, 1. 6,150 Equity Shares Further Issue 188,150 10 10 Cash 500,000 5,000,000
2000* were allotted to Rekha
Tyagi;
2. 41,800 Equity Shares
were allotted to Ritu
Tyagi;
3. 45,200 Equity Shares
were allotted to Salintri
Tyagi;
4. 55,000 Equity Shares
were allotted to Sanjay
Tyagi HUF, and
5. 40,000 Equity Shares
were allotted to Saroj
Bala
March 30, 2004 1. 750 Equity Shares were Further Issue 633,250 10 10 Cash 1,133,250 11,332,500
allotted to Neeraj Tyagi
HUF;
2. 200,000 Equity Shares
were allotted to Jai
Mata Pipes Pvt Ltd;
1023. 100,000 Equity Shares
were allotted to Pradeep
Sons Pvt Ltd;
4. 150,000 Equity Shares
were allotted to Aakash
Packaging (India) Pvt
Ltd;
5. 100,000 Equity Shares
were allotted to
Goldline Lotto
Management Pvt Ltd,
and
6. 82,500 Equity Shares
were allotted to Shyam
Automobiles Ltd
November 29, 750,000 Equity Shares Further Issue 750,000 10 10 Cash 1,883,250 18,832,500
2006 were allotted to Aman
Promoters Pvt Ltd
January 02, 1. 750,000 Equity Further Issue 1,130,550 10 10 Cash 3,013,800 30,138,000
2007* Shares were allotted
to D.D Construction
Private Limited;
2. 365,000 Equity
Shares were allotted
to Expert Power
Control (India) Pvt
Ltd and;
3. 15,550 Equity Shares
were allotted to
Sanjay Tyagi HUF
November 19, 1. 3,500 Equity Shares Further Issue 3,764,500 10 10 Cash 6,778,300 67,783,000
2007 were allotted to Rekha
Tyagi,
1032. 8,000 Equity Shares
were allotted to
Sanjay Tyagi HUF,
3. 3,000 Equity Shares
were allotted to
Sanjay Tyagi,
4. 1,000,000 Equity
Shares were allotted
to Gannayak Fintech
Services Pvt Ltd,
5. 5,00,000 Equity
Shares were allotted
to JKD Capital &
Finlease Ltd, and
6. 2,250,000 Equity
Shares were allotted
to Pradeep Sons Pvt
Ltd.
March 27, 2010 1. 55,000 Equity Shares Further Issue 107,000 10 10 Cash 6,885,300 68,853,000
were allotted to
Neeraj Tyagi;
2. 10,000 Equity Shares
were allotted to Rekha
Tyagi, and
3. 42,000 Equity Shares
were allotted to Ritu
Tyagi.
March 31, 2013 90,000 Equity Shares were Further Issue 90,000 10 10 Cash 6,975,300 69,753,000
allotted to Technocraft
Developers Pvt Ltd
October 21, 1. 100,000 Equity Shares Further Issue 550,000 10 10 Cash 7,525,300 75,253,000
2013 were allotted to Sanjay
Tyagi and
1042. 450,000 Equity Shares
were allotted to Sanjay
Tyagi HUF
May 29, 2025 1. 296,400 Equity Shares Bonus Issue 22,575,900 10 Nil Other than 30,101,200 301,012,000
were allotted to Rekha cash
Tyagi,
2. 1,585,650 Equity
Shares were allotted to
Sanjay Tyagi HUF,
3. 909,000 Equity Shares
were allotted to Sanjay
Tyagi,
4. 270,000 Equity Shares
were allotted to
Technocraft Developers
Pvt Ltd,
5. 18,742,500 Equity
Shares were allotted to
Kartikey Constructions
(Partnership Firm),
6. 450,000 Equity Shares
were allotted to
Kartikey Tyagi, and
7. 322,350 Equity Shares
were allotted to Vartika
Tyagi.
*Form -2 for return of allotment dated March 31, 2000 and August 31, 2000 is untraceable and Form-2 for return of allotment along with list of allottees dated January 02,
2007 has been erroneously filed. For further details, kindly refer “Risk Factor No. 6 “Our Company was incorporated in the year 1998 and some of our corporate records
including forms filed with the Registrar of Companies are not traceable & we have not filed certain forms with Registrar of Companies. Certain forms we cannot assure you
that these forms filings will be available in the future or that we will not be subject to any penalties imposed by the relevant regulatory authority in this respect which may
impact our financial condition and reputation.” on page 45.
105(b) Preference Share Capital history of our Company
Our Company does not have any Preference Share Capital as on the date of filing of this Draft Red Herring
Prospectus.
(c) Shares issued for consideration other than cash or out of revaluation reserves
Except for the bonus issue undertaken by our Company on May 29, 2025, our Company has not issued any Equity
Shares at a price which is below the Offer Price during the period of one year preceding the date of this Draft Red
Herring Prospectus. For further details, kindly refer ‘Equity Share Capital history of our Company’ as mentioned
above.
Except as disclosed below, our Company has not issued equity shares for consideration other than cash since its
incorporation:
Date of Reason for Number of Equity Face value Offer Price Benefits accrued to
allotment allotment Shares allotted (₹) (₹) our Company
May 29, 2025 Bonus Issue in 22,575,900 10 Nil Capitalisation of
the ratio of 3:1 reserves
2. Issue of specified securities at a price lower than the Offer Price in the last one year from the date of this
Draft Red Herring prospectus
The Offer Price shall be determined by our Company, in consultation with the BRLM after the Bid/ Offer Closing
Date. Except for the allotment made pursuant to the bonus issue on May 29, 2025 of 22,575,900 Equity Shares in
the ratio of 3 Equity Shares for every 1 Equity Share held, our Company has not issued any Equity Shares at a
price lower than the Offer Price in preceding one year preceding from the date of this Draft Red Herring
Prospectus. For further details, kindly refer “Notes to the Capital Structure–Equity Share Capital history of our
Company” beginning on page 101.
3. Issue of Equity Shares out of revaluation reserves
Our Company has not issued any Equity Shares out of its revaluation reserves since incorporation.
4. Issue of Equity Shares pursuant to any scheme of arrangement
Our Company has not issued or allotted any Equity Shares pursuant to any scheme of arrangement approved under
sections 391 to 394 of the erstwhile Companies Act, 1956 or sections 230 to 234 of the Companies Act, 2013, as
applicable.
5. History of Build-up of Promoters’ Shareholding and Lock-in of Promoters’ Shareholding
As of the date of this Draft Red Herring Prospectus, our Promoters hold 29,311,400 Equity Shares, constituting
97.38% of the pre-offer paid-up equity share capital of our Company. All the Equity Shares held by our Promoters
are held in dematerialised form.
106(a) Build-up of the Equity Shareholding of our Promoters in our Company
Set forth below is the build-up of our Promoters Equity Shareholding since the incorporation of our Company:
Issue /
Face value Nature of Percentage of the Percentage of the
Date of allotment / Number of Transfer price Nature of
per Equity acquisition/ pre- offer equity post-offer equity
transfer Equity Shares per Equity consideration
Share (₹) allotment/ transfer share capital (%) share capital (%)
Share (₹)
Sanjay Tyagi
November 19, 2007 3,000 10 10 Further Issue Cash 0.01 [●]
October 21, 2013 1,00,000 10 10 Further Issue Cash 0.33 [●]
December 27, Share Transfer by
1,99,250 10 Nil Other than cash 0.67 [●]
2022* way of Gift
Share
Negligible
March 24, 2025 750 10 121.76 Transfer from Cash [●]
Neeraj Tyagi HUF
May 29, 2025 9,09,000 10 Nil Bonus Issue Other than cash 3.02 [●]
Total 1,212,000 4.03
Rekha Tyagi
Initial subscription
October 21, 1998 100 10 10 Cash Negligible [●]
to MoA
March 31, 2000 79,050 10 10 Further Issue Cash 0.26 [●]
August 31, 2000 6,150 10 10 Further Issue Cash 0.02 [●]
November 19, 2007 3,500 10 10 Further Issue Cash 0.01 [●]
March 27, 2010 10,000 10 10 Further Issue Cash 0.03 [●]
May 29, 2025 296,400 10 Nil Bonus Issue Other than cash 0.99 [●]
Total 395,200 1.31
107Kartikey Tyagi
December 27, Share Transfer by
150,000 10 Nil Other than cash 0.50 [●]
2022** way of Gift
May 29, 2025 450,000 10 Nil Bonus Issue Other than cash 1.49 [●]
Total 600,000 1.99
Kartikey Constructions (Partnership Firm)
May, 31, 2010*** 6,247,500 10 10 Share Transfer Cash 20.76 [●]
May 29, 2025 18,742,500 10 Nil Bonus Issue Other than cash 62.26 [●]
Total 24,990,000 83.02
Sanjay Tyagi HUF
August 31, 2000 55,000 10 10 Further Issue Cash 0.18 [●]
January 02, 2007 15,550 10 10 Further Issue Cash 0.05 [●]
November 19, 2007 8,000 10 10 Further Issue Cash 0.03 [●]
October 21, 2013 450,000 10 10 Further Issue Cash 1.50 [●]
May 29, 2025 1,585,650 10 Nil Bonus Issue Other than cash 5.26 [●]
Total 2,114,200 7.02
* Mr. Sanjay Tyagi received 75,450 equity shares from Neeraj Tyagi, 83,800 equity shares from Ritu Tyagi and 40,000 equity shares from Saroj Bala by way of gift deed executed
on December 27, 2022.
** Mr. Kartikey Tyagi received 27,500 equity shares from Saroj Bala, 37,400 equity shares from Mohan Tyagi, 35,250 equity shares from Mohan Tyagi HUF, 4,650 equity shares
from Poonam Devi and 45,200 equity shares from Salintri Tyagi by way of gift deed executed on December 27, 2022.
*** Kartikey Constructions (Partnership Firm) received 200,000 equity shares from Jai Mata Pipes Pvt Ltd, 150,000 equity share from Akash Packaging Pvt Ltd, 100,000
equity shares from Goldline Lotto Management Pvt Ltd, 82,500 equity shares from Shyam Automobiles Pvt Ltd, 2,350,000 equity shares from Pradeep Sons Pvt Ltd, 750,000
equity shares from Aman Properties Private Limited (formerly known as Aman Promoters Pvt Ltd), 750,000 equity shares from DD Constructions Pvt Ltd, 365,000 equity
shares from Expert Power Control Pvt Ltd, 1,000,000 equity shares from Gannayak Fintech Services Pvt Ltd, 500,000 equity shares from JKD Capital & Finlease Pvt Ltd.
108(b) Details of the Shareholding of our Promoters and members of the Promoter Group
None of our Promoters and members of the Promoter Group hold any Equity Shares in our Company as of the
date of filing of this Draft Red Herring Prospectus other than as disclosed below:
Pre-Offer Post-Offer
Percentage of Percentage of
Sr. Name of the Number of the pre-offer Number of the post-offer
No. shareholder Equity Shares paid-up Equity Equity Shares paid-up
Held Share Capital held Equity Share
(%) Capital (%)
Promoters (I)
1. Sanjay Tyagi 1212,000 4.03 [●] [●]
2. Rekha Tyagi 395,200 1.31 [●] [●]
3. Kartikey Tyagi 600,000 1.99 [●] [●]
Kartikey
4. Constructions 24,990,000 83.02 [●] [●]
(Partnership Firm)
5. Sanjay Tyagi HUF 2114,200 7.02 [●] [●]
Total 29,311,400 97.38 [●] [●]
Promoter Group (II)
6. Vartika Tyagi 429,800 1.42 [●] [●]
Technocraft
360,000
7. Developers 1.20 [●] [●]
Private Limited
Total 789,800 2.62 [●] [●]
Total (I+II) 30,101,200 100.00 [●] [●]
(c) Secondary Transactions since incorporation
Except as disclosed in “Notes to the Capital Structure – History of build-up of Promoters’ shareholding and lock-
in of Promoters’ shareholding – Build-up of the Equity shareholding of our Promoters in our Company” on page
107 as set out below, there has been no acquisition of Equity Shares through secondary transactions by our
Promoters, Promoter Selling Shareholder and the members of the Promoter Group, as on the date of this Draft
Red Herring Prospectus.
Face Transfer
Date of Number of value price of
transfer equity Details of Details of per equity shares Nature of
of equity shares transferor(s) transferee(s) Equity Aggregate consideration
shares transferred share Consideration
(₹) (₹)
May 31, 200,000 Jai Mata Kartikey 10 2,000,000 Cash
2010 Pipes Pvt Ltd Constructions
(Partnership
Firm)
150,000 Akash Kartikey 1,500,000 Cash
Packaging (I) Constructions
Pvt Ltd (Partnership
Firm)
100,000 Goldline Kartikey 1,000,000 Cash
Lotto Constructions
109Management (Partnership
Pvt Ltd Firm)
82,500 Shyam Kartikey 825,000 Cash
Automobiles Constructions
Pvt Ltd (Partnership
Firm)
2,350,000 Pradeep Sons Kartikey 23,500,000 Cash
Pvt Ltd Constructions
(Partnership
Firm)
750,000 Aman Kartikey 7,500,000 Cash
Properties Constructions
Private (Partnership
Limited Firm)
(formerly
known as
Aman
Promoters
Pvt Ltd)
750,000 DD Kartikey 7,500,000 Cash
Constructions Constructions
Pvt Ltd (Partnership
Firm)
365,000 Expert Power Kartikey 3,650,000 Cash
Control Pvt Constructions
Ltd (Partnership
Firm)
1,000,000 Gannayak Kartikey 10,000,000 Cash
Fintech Constructions
Services Pvt (Partnership
Ltd Firm)
500,000 JKD Capital Kartikey 5,000,000 Cash
& Finlease Constructions
Pvt Ltd (Partnership
Firm)
December 75,450 Neeraj Tyagi, Sanjay Tyagi Nil Other than cash
27, 2022 (Gift)
83,800 Ritu Tyagi Sanjay Tyagi Nil Other than cash
(Gift)
40,000 Saroj Bala Sanjay Tyagi Nil Other than cash
(Gift)
December 27,500 Bala Tyagi Kartikey Nil Other than cash
27, 2022 Tyagi (Gift)
37,400 Mohan Tyagi Kartikey Nil Other than cash
Tyagi (Gift)
35,250 Mohan Tyagi Kartikey Nil Other than cash
HUF Tyagi (Gift)
4,650 Poonam Devi Kartikey Nil Other than cash
Tyagi (Gift)
45,200 Salintri Tyagi Kartikey Nil Other than cash
Tyagi (Gift)
110December 42,600 Lalit Tyagi Vartika Tyagi Nil Other than cash
27, 2022 (Gift)
3,600 Neeta Tyagi Vartika Tyagi Nil Other than cash
(Gift)
33,250 Poonam Devi Vartika Tyagi Nil Other than cash
(Gift)
28,000 Praveen Vartika Tyagi Nil Other than cash
Tyagi (Gift)
March 24, 750 M/s Neeraj Sanjay Tyagi 91,320 Cash
2025 Tyagi HUF
200,000 Jai Mata Kartikey 2,000,000 Cash
May 31, Pipes Pvt Ltd Constructions
2010 (Partnership
Firm)
150,000 Akash Kartikey 1,500,000 Cash
Packaging (I) Constructions
Pvt Ltd (Partnership
Firm)
100,000 Goldline Kartikey 1,000,000 Cash
Lotto Constructions
Management (Partnership
Pvt Ltd Firm)
82,500 Shyam Kartikey 825,000 Cash
Automobiles Constructions
Pvt Ltd (Partnership
Firm)
2,350,000 Pradeep Sons Kartikey 23,500,000 Cash
Pvt Ltd Constructions
(Partnership
Firm)
750,000 Aman Kartikey 7,500,000 Cash
Properties Constructions
Private (Partnership
Limited Firm)
(formerly
known as
Aman
Promoters
Pvt Ltd)
750,000 DD Kartikey 7,500,000 Cash
Constructions Constructions
Pvt Ltd (Partnership
Firm)
365,000 Expert Power Kartikey 3,650,000 Cash
Control Pvt Constructions
Ltd (Partnership
Firm)
1,000,000 Gannayak Kartikey 10,000,000 Cash
Fintech Constructions
Services Pvt (Partnership
Ltd Firm)
111500,000 JKD Capital Kartikey 5,000,000 Cash
& Finlease Constructions
Pvt Ltd (Partnership
Firm)
December 75,450 Neeraj Tyagi, Sanjay Tyagi Nil Other than cash
27, 2022 (Gift)
83,800 Ritu Tyagi Sanjay Tyagi Nil Other than cash
(Gift)
40,000 Saroj Bala Sanjay Tyagi Nil Other than cash
(Gift)
December 27,500 Saroj Bala Kartikey Nil Other than cash
27, 2022 Tyagi (Gift)
37,400 Mohan Tyagi Kartikey Nil Other than cash
Tyagi (Gift)
35,250 Mohan Tyagi Kartikey Nil Other than cash
HUF Tyagi (Gift)
4,650 Poonam Devi Kartikey Nil Other than cash
Tyagi (Gift)
45,200 Salintri Tyagi Kartikey Nil Other than cash
Tyagi (Gift)
December 42,600 Lalit Tyagi Vartika Tyagi Nil Other than cash
27, 2022 (Gift)
3,600 Neeta Tyagi Vartika Tyagi Nil Other than cash
(Gift)
33,250 Poonam Devi Vartika Tyagi Nil Other than cash
(Gift)
28,000 Praveen Vartika Tyagi Nil Other than cash
Tyagi (Gift)
March 24, 750 M/s Neeraj Sanjay Tyagi 91,320 Cash
2025 Tyagi HUF
5. Lock-in requirements
(a) Details of Minimum Promoter’s contribution and lock-in
Pursuant to Regulations 14 and 16 of the SEBI ICDR Regulations, an aggregate of at least 20% of the fully diluted
post-offer Equity Share Capital of our Company held by our Promoters shall be considered as the minimum
Promoters’ contribution and locked-in for a period of 18 months from the date of Allotment (“Minimum
Promoter’s Contribution”). Our Promoters’ shareholding in excess of 20% shall be locked in for a period of 6
months from the date of Allotment.
The details of the Equity Shares held by our Promoters, which shall be locked-in for a period of 18 months, from
the date of Allotment as Minimum Promoters’ Contribution are set forth below:
112Date
up to
which Date of Face Percentag Percentag
Numbe Issue/
Equit Allotment/ Nature Value e of Pre- e of Post-
r of Acquisitio
y Acquisitio of per Offer Offer
Name of the Equity n
Share n of transac Equit Equity Equity
Promoters Shares price per
s are Equity t y Share Share
locked- Equity
subjec Shares ion Share Capital Capital
in Share (₹)
t to (₹) (%) (%)
lock-
in
Sanjay
[●] [●] [●] [●] [●] [●] [●] [●]
Tyagi
Rekha Tyagi [●] [●] [●] [●] [●] [●] [●] [●]
Kartikey
[●] [●] [●] [●] [●] [●] [●] [●]
Tyagi
Kartikey
Construction
s [●] [●] [●] [●] [●] [●] [●] [●]
(Partnership
Firm)
Sanjay
[●] [●] [●] [●] [●] [●] [●] [●]
Tyagi HUF
Note: To be updated prior to filing of the Prospectus with the RoC.
The Promoters have given their consent to include such number of Equity Shares held by them as may, in
aggregate, constitute 20% of the fully diluted post-offer Equity Share capital of our Company as the Minimum
Promoters’ Contribution and have agreed not to dispose, sell, transfer, charge, pledge or otherwise encumber in
any manner, the Minimum Promoters’ Contribution from the date of filing the Draft Red Herring Prospectus until
the expiry of the lock-in specified above, or for such other time as required under SEBI ICDR Regulations, except
as may be permitted, in accordance with the SEBI ICDR Regulations.
Our Company undertakes that the Equity Shares that are being locked-in will not be ineligible for computation of
Promoters’ Contribution in terms of Regulation 15 of the SEBI ICDR Regulations. For details of the build-up of
the share capital held by our Promoters, kindly refer “Notes to the Capital Structure – Build-up of the Equity
Shareholding of our Promoters in our Company” on page 107.
In this connection, we confirm the following:
i. The Equity Shares offered towards Minimum Promoters’ Contribution have not been acquired during the
three immediately preceding years (a) for consideration other than cash and revaluation of assets or
capitalization of intangible assets, or (b) arising from bonus issue by utilization of revaluation reserves or
unrealized profits of our Company or from a bonus issue against Equity Shares, which are otherwise
ineligible for computation of Minimum Promoters’ Contribution;
ii. the Minimum Promoters’ Contribution does not include any Equity Shares acquired during the immediately
preceding year at a price lower than the price at which the Equity Shares are being offered to the public in
the Offer;
iii. Our Company has not been formed by the conversion of a partnership firm or a limited liability partnership
firm into a company;
iv. The Equity Shares forming part of the Minimum Promoter’s Contribution are not subject to any pledge
with any creditor; and
All the Equity Shares held by the Promoters are held in dematerialised form as on the date of this Draft Red
Herring Prospectus. Pursuant to the SEBI ICDR Regulations, the price per share for determining securities
113ineligible for Promoters’ Contribution, shall be determined, after adjusting the same for corporate actions,
including but not limited to bonus issuance, split of Equity Shares that may be undertaken by our Company, as
applicable.
(b) Details of Equity Shares locked- in for six months
In terms of Regulation 17 of the SEBI ICDR Regulations, except for:
i. the Minimum Promoters’ Contribution and any Equity Shares held by our Promoters in excess of the
Minimum Promoters’ Contribution, which shall be locked in as above;
ii. any Equity Shares allotted to employees, whether currently an employee or not, pursuant to any employee
stock option schemes (if any) prior to the Offer;
iii. Equity Shares held by an employee stock option trust or transferred to the employees by an employee stock
option trust pursuant to exercise of options by the employees, whether currently employees or not, in
accordance with the employee stock option plan or employee stock purchase scheme;
iv. Equity Shares held by a VCF or Category I AIF or Category II AIF or FVCI;
v. the entire pre-offer equity share capital held by persons other than our Promoters, will be locked-in for a
period of six months from the date of Allotment.
In terms of Regulation 17(c) of the SEBI ICDR Regulations, Equity Shares held by a VCF or Category I AIF or
Category II AIF or FVCI shall not be locked-in for a period of six months from the date of Allotment, provided
that such Equity Shares shall be locked in for a period of at least six months from the date of purchase by such
shareholders.
(c) Lock-in of Equity Shares Allotted to Anchor Investors
50% of the Equity Shares allotted to Anchor Investors under the Anchor Investor Portion shall be locked-in for a
period of 90 days from the date of Allotment, and the remaining 50% of the Equity Shares allotted to Anchor
Investors under the Anchor Investor Portion shall be locked-in for a period of 30 days from the date of Allotment.
(d) Other requirements in respect of lock-in
In addition to 20% of the fully diluted post-Offer shareholding of our Company held by our Promoters and locked-
in for 18 months, in terms of Regulation 16(1)(b) and Regulation 17 of the SEBI ICDR Regulations, the entire
pre-offer Equity Share Capital of our Company shall be locked-in for a period of six months from the date of
Allotment, except for the Equity Shares transferred pursuant to the Offer for Sale.
As required under Regulation 20 of the SEBI ICDR Regulations, our Company shall ensure that the details of the
Equity Shares locked-in are recorded by the relevant Depository.
Our Promoters have agreed not to sell, transfer, charge, pledge or otherwise encumber in any manner, the
Promoter’s contribution from the date of filing of this Draft Red Herring Prospectus, until the expiry of the lock-
in specified above, or for such other time as required under SEBI ICDR Regulations, except as may be permitted,
in accordance with the SEBI ICDR Regulations.
The Equity Shares held by our Promoters, which are locked-in, may be pledged only with scheduled commercial
banks or public financial institutions or NBFC-SIs or housing finance companies, as collateral security for loans
granted by such banks or public financial institutions or Systemically Important NBFCs or housing finance
companies in terms of Regulation 21 of the SEBI ICDR Regulations. In terms of Regulation 21(a) of the SEBI
ICDR Regulations, the Equity Shares held by our Promoters which are locked-in for a period of 18 months from
the date of Allotment may be pledged only with the entities mentioned above, provided that such loans have been
granted for the purpose of financing one or more of the objects of the Offer and pledge of the Equity Shares is a
term of sanction of such loans. Further, pursuant to Regulation 21(b) of the SEBI ICDR Regulations, the Equity
Shares held by our Promoters, which are locked-in for a period of six months from the date of Allotment, may be
pledged only with the entities mentioned above, provided that such pledge of the Equity Shares is one of the terms
114of the sanction of such loans. However, the relevant lock-in period shall continue post the invocation of the pledge
referenced above, and the relevant transferee shall not be eligible to transfer the Equity Shares till the relevant
lock-in period has expired in terms of the SEBI ICDR Regulations.
In terms of Regulation 22 of the SEBI ICDR Regulations, Equity Shares held by our Promoters which are locked
in for a period of six months may be transferred amongst our Promoters or any member of the Promoter Group or
to any new promoter, subject to continuation of lock-in in the hands of the transferees for the remaining period
and in compliance with the provisions of the Takeover Regulations, as applicable and such transferee shall not be
eligible to transfer them till the lock-in period stipulated in SEBI ICDR Regulations has expired. The Equity
Shares held by persons other than our Promoters prior to the Offer and locked-in for a period of six months may
be transferred to any other person holding Equity Shares which are locked-in along with the Equity Shares
proposed to be transferred, subject to the continuation of the applicable lock-in and the transferee being ineligible
to transfer such Equity Shares until expiry of the lock-in period, and in compliance with the provisions of the
Takeover Regulations.
Any unsubscribed portion of the Offered Shares would also be locked-in as required under the SEBI ICDR
Regulations.
1156. Shareholding Pattern of our Company
The table below represents the current shareholding pattern of our Company
e d o c y r o g e t a C ) I I ( r e d lo h e r a h s f o y r o g e t a C ) I I I ( s r e d lo h e r a h s f o .s o N ) V I ( d le h s de ir aa ph ys ly lut i fu fq oe . op Nu - ) V ( d le h d is ae pr a yh lts r y at Piu fq oe . op Nu - s t p ie c e r y r o t is o p e D g n iy lr e d n u s e r a h s f o .o N) I V ( + ) V ( + ) V I ( = ) I I V .d le h s e r a h s f o .o N la t o T) I V ( s e r a h s f o .o n la t o t f o % a s a g n id lo h e r a h S ) 7 5 9 1 ,R R C S r e p s a d e t a lu c la c ( ) 2 C + B + A ( f o % a s A ) I I I V ( N Nu ) X : g e ( s s a lC om ob e r a h S y t iu q E - fe Vr c oo la tf is nV s g o o ) Y : g e ( s s a lC t (fi X n se Ig c V R u )r i Rg ith ii la t o T get ss h t(h sIe Xld ) in f o % a s a la t o T eac ) C + B + A ( h g n id n a t s t u O g n iy lr e d n U s e r a h s f o o N ) s t n a r r a W g n id u lc n I ( s e it ir u c e s e lb it r e v n o c) X ( S n a f c o c s ( p o s c ( + X (u a X Ae ho o as ffh g e ( )c s s l an n pr I +, da l au u c r )av v iar Bi s=trm e el e ee s a ui +n a( r rh t li Va t Ctis t )n %o ee a ii I% g b dl o 2s g Id n l
)
) oeei f N ) a ( .o N Lu o s (m hc Xk ab Ie r s e r a h s la t o t f o % a s A e Id e )r s i ) b ( d le h o nf e ) a ( .o N N p nol cu tes (h um dh Xe mga r Ib er Ibw s e r a h s la t o t f o % a s A e de Ier )is r s o ) b ( d le h o e erf d y t iun qi e d f ole rh e s be mr a uh Ns m r o f d e z ila ir e t a m e d
A Promoters 7 30,101,200 - - 30,101,200 100.00 30,101,200 - 30,101,200 100.00 - 100.00 - - - - 30,101,200
&
Promoter
Group
B Public - - - - - - - - - - - - - - - - -
C Non- - - - - - - - - - - - - - - - - -
Promoter-
Non-
Public
C Shares - - - - - - - - - - - - - - - - -
1 underlying
DRs
C Shares held - - - - - - - - - - - - - - - - -
2 by
Employee
Trusts
Total 7 30,101,200 - - 30,101,200 100.00 30,101,200 - 30,101,200 100.00 - 100.00 - - - - 30,101,200
*As on the date of this Draft Red Herring Prospectus 1 Equity Share holds 1 vote. There is no voting right on the preference shares issued by our Company.
**Shall be locked-in on or before filing of Prospectus with NSE, BSE, SEBI & RoC.
1167. Details of the Shareholding of the major Shareholders
(a) Set forth below is a list of Shareholders, holding 1% or more of the paid-up Equity Share Capital of our Company
as on the date of filing of this Draft Red Herring Prospectus:
Sr. Number of Equity Face Value per Pre-Offer Equity
Name of the Shareholder
No. Shares held Equity Share (₹) Share Capital (%)
1. Sanjay Tyagi 1,212,000 10 4.03
2. Rekha Tyagi 395,200 10 1.31
3. Kartikey Tyagi 600,000 10 1.99
Kartikey Constructions
4. 24,990,000 10 83.02
(Partnership Firm)
5. Sanjay Tyagi HUF 2,114,200 10 7.02
6. Vartika Tyagi 429,800 10 1.42
Technocraft Developers
7. 360,000 10 1.20
Private Limited
Total 30,101,200 100.00
(b) Set forth below is a list of Shareholders, holding 1% or more of the paid-up Equity Share Capital of our Company
as of ten days prior to filing this Draft Red Herring Prospectus:
Sr. Number of Face Value per Pre-Offer Equity
Name of the Shareholder
No. Equity Shares held Equity Share (₹) Share Capital (%)
1. Sanjay Tyagi 1,212,000 10 4.03
2. Rekha Tyagi 395,200 10 1.31
3. Kartikey Tyagi 600,000 10 1.99
Kartikey Constructions
4. 24,990,000 10 83.02
(Partnership Firm)
5. Sanjay Tyagi HUF 2,114,200 10 7.02
6. Vartika Tyagi 429,800 10 1.42
Technocraft Developers
7. 360,000 10 1.20
Private Limited
Total 30,101,200 100.00
(c) Set forth below is a list of Shareholders, holding 1% or more of the paid-up Equity Share Capital of our Company
as of one year prior to filing this Draft Red Herring Prospectus:
Sr. Number of Equity Face Value per Pre-Offer Equity
Name of the Shareholder
No. Shares held Equity Share (₹) Share Capital (%)
1. Sanjay Tyagi 302,250 10 4.02
2. Rekha Tyagi 98,800 10 1.31
3. Kartikey Tyagi 150,000 10 1.99
117Sr. Number of Equity Face Value per Pre-Offer Equity
Name of the Shareholder
No. Shares held Equity Share (₹) Share Capital (%)
4. Kartikey Constructions
6,247,500 10 83.02
(Partnership Firm)
5. Sanjay Tyagi HUF 528,550 10 7.02
6. Vartika Tyagi 107,450 10 1.43
7. Technocraft Developers
90,000 10 1.20
Private Limited
Total 7,524,550 99.99
(d) Set forth below is a list of Shareholders, holding 1% or more of the paid-up Equity Share Capital of our Company
as of two years prior to filing this Draft Red Herring Prospectus:
Sr. Number of Equity Face Value per Pre-Offer Equity
Name of the Shareholder
No. Shares held Equity Share (₹) Share Capital (%)
1. Sanjay Tyagi 302,250 10 4.02
2. Rekha Tyagi 98,800 10 1.31
3. Kartikey Tyagi 150,000 10 1.99
Kartikey Constructions
4. 6,247,500 10 83.02
(Partnership Firm)
5. Sanjay Tyagi HUF 528,550 10 7.02
6. Vartika Tyagi 107,450 10 1.43
Technocraft Developers
7. 90,000 10 1.20
Private Limited
Total 7,524,550 99.99
8. Except as stated below, none of our Directors, Key Managerial Personnel or Senior Management Personnel hold
any Equity Share of our Company:
Pre-Offer Post-Offer
paid-up paid-up
Number of
Sr. Name of the Equity Equity
Equity Shares Designation
No. Shareholder Share Share
held
Capital (%) Capital (%)
1. Sanjay Tyagi 12,12,000 Managing Director 4.03 [●]
2. Rekha Tyagi 3,95,200 Executive Director 1.31 [●]
Whole-Time Director &
3. Kartikey Tyagi 600,000 1.99 [●]
Chief Financial Officer
9. There have been no financing arrangements whereby our Promoters, members of our Promoter Group, our
Directors and their relatives have financed the purchase by any other person of securities of our Company during
the period of six months immediately preceding the date of filing of this Draft Red Herring Prospectus.
10. Our Company, our Directors and the BRLM have not entered into any buy-back arrangements for purchase of
Equity Shares to be allotted pursuant to the Offer.
11811. As of on the date of this Draft Red Herring Prospectus, the BRLM and its respective associates (as defined in the
Securities and Exchange Board of India (Merchant Bankers) Regulations, 1992 do not hold any Equity Shares of
our Company. The BRLM and its affiliates may engage in the transactions with and perform services for our
Company in the ordinary course of business or may in the future engage in commercial banking and investment
banking transactions with our Company for which they may in the future receive customary compensation.
12. All issuances of Equity Shares by our Company from the date of incorporation of our Company till the date of
filing of this Draft Red Herring Prospectus have been made in compliance with Companies Act 2013. The Equity
Shares are fully paid-up and there are no partly paid-up Equity Shares as on the date of this Draft Red Herring
Prospectus.
13. As of the date of this Draft Red Herring Prospectus, there are no outstanding warrants, options, debentures, loans
or other instruments convertible instruments into Equity Shares.
14. There will be no further issuance of Equity Shares whether by way of issue of bonus shares, preferential allotment,
rights issue or in any other manner during the period commencing from the date of filing of this Draft Red Herring
Prospectus with SEBI until the Equity Shares have been listed on the Stock Exchanges or all application monies
have been refunded, as the case may be, other than in connection with the issuance of Fresh Equity Shares pursuant
to IPO.
15. No person connected with the Offer, including our Company, the BRLM, the Member of the Syndicate, our
Promoters, member of our Promoter Group, or our Directors, shall offer any incentive, whether direct or indirect,
in any manner, whether in cash or kind or services or otherwise to any Bidder for making a Bid, except for fees
or commission for services rendered in relation to the Offer.
16. Except as disclosed under “Notes to the Capital Structure – History of Equity Share Capital of our Company” and
“Notes to the Capital Structure – History of build-up of Promoters’ shareholding and Lock-in of Promoters’
shareholding - Build-up of the Equity shareholding of our Promoters in our Company” on pages 107 and 113
respectively, our Promoters, any member of our Promoter Group, our Directors, or any of their relatives have not
purchased or sold any securities of our Company during the period of six months immediately preceding the date
of this Draft Red Herring Prospectus.
17. Our Company presently does not intend or propose and is not under negotiations or considerations to alter its
capital structure for a period of six months from the Bid/Offer Opening Date, by way of split or consolidation of
the denomination of Equity Shares or further issue of Equity Shares (including issue of securities convertible into
or exchangeable, directly or indirectly for Equity Shares) whether on a preferential basis or by way of issue of
bonus shares or on a rights basis or by way of further public issue of Equity Shares or qualified institutions
placements or otherwise.
18. Our Company shall ensure that any transactions in the Equity Shares by our Promoters and members of our
Promoter Group during the period between the date of filing of this Draft Red Herring Prospectus and the date of
closure of the Offer shall be reported to the Stock Exchanges within 24 hours of the transactions.
19. Our Company does not have any outstanding compulsorily convertible debentures as on the date of this Draft Red
Herring Prospectus.
20. As of the date of filing of this Draft Red Herring Prospectus, the total number of holders of the Equity Shares are
seven (7).
21. Any oversubscription to the extent of 1% of the Offer size can be retained for the purpose of rounding off to the
nearest multiple of the minimum allotment lot while finalising the Basis of Allotment.
11922. Our Company will ensure that there shall be only one denomination of Equity Shares, unless otherwise permitted
by law.
23. Our Company does not have any Employee Stock Option Scheme / Employee Stock Purchase Scheme for our
employees, and we do not intend to allot any shares to our employees under Employee Stock Option Scheme /
Employee Stock Purchase Scheme from the proposed issue. As and when, options are granted to our employees
under the Employee Stock Option Scheme, our Company shall comply with the SEBI (Share Based Employee
Benefits) Regulations, 2021.
24. Neither the (i) BRLM or any associate of the BRLM (other than mutual funds sponsored by entities which are
associates of the BRLM or insurance companies promoted by entities which are associates of the BRLM or AIFs
sponsored by entities which are associates of the BRLM or FPIs (other than individuals, corporate bodies and
family offices) sponsored by entities which are associates of the BRLM); nor (ii) any person related to the
Promoters or Promoter Group can apply under the Anchor Investor Portion.
25. We confirm that the Book Running Lead Manager is not associates of the Company or the Promoter selling
Shareholder as per Regulation 21A of the SEBI Merchant Bankers Regulations.
26. Our Promoters and the members of the Promoter Group shall not participate in the Offer, except to the extent of
the Promoter Selling Shareholder participating in the Offer for Sale.
120OBJECTS OF THE OFFER
The Offer comprises of a Fresh Issue of 95,05,000 Equity Shares, aggregating up to ₹ [●] million by our Company
and an Offer for Sale of up to 23,76,000 Equity Shares, aggregating up to ₹ [●] million by Kartikey Constructions,
a partnership firm (“Promoter Selling Shareholder”). For further details, kindly refer “The Offer” beginning on
page 82.
Offer for Sale
Our Company will not receive any proceeds from the Offer for Sale by the Promoter Selling Shareholder and the
proceeds received from the Offer for Sale will not form part of the Net Proceeds. The Promoter Selling
Shareholder will be entitled to the proceeds of the Offer for Sale after deducting its proportion of Offer expenses
and relevant taxes thereon.
Except for (i) listing fees and stamp duty payable on issue of Equity Shares pursuant to Fresh Offer which shall
be borne solely by the Company, (ii) the stamp duty payable on transfer of Offered Shares which shall be borne
solely by the Promoter Selling Shareholder, our Company and the Promoter Selling Shareholder shall share the
costs and expenses (including all applicable taxes in relation to such costs and expenses) directly attributable to
the Offer (including fees and expenses of the BRLM, legal counsel to the Company and other intermediaries,
advertising and marketing expenses other than corporate advertisements expenses undertaken in the ordinary
course of business by our Company), printing, underwriting commission, procurement commission (if any),
brokerage and selling commission and payment of fees and charges to various regulators in relation to the Offer
in proportion to the number of Equity Shares issued and allotted by the Company through the Fresh Issue and sold
by the Promoter Selling Shareholder through the Offer for Sale.
Fresh Issue
The net proceeds of the Fresh Issue, i.e. gross proceeds of the Fresh Issue less the offer expenses apportioned to
our Company (“Net Proceeds”) are proposed to be utilised in the following manner:
i. Funding of working capital requirements of our Company; and
ii. General corporate purposes.
(Collectively referred as the “Objects”)
The main objects and objects incidental and ancillary to the main objects set out in our Memorandum of
Association enables us to (i) undertake our existing business activities; and (ii) to undertake activities proposed to
be funded from the Net Proceeds. Further, our Company expects to receive the benefits of listing of the Equity
Shares, including to enhancement of our visibility and our brand image among our existing and potential
customers as well as vendors and creation of a public market for our Equity Shares in India.
Net Proceeds of the Fresh Issue
The details of the proceeds of the Fresh Issue are set forth in the table below:
Sr. No. Particulars Amount (₹ in million)
1 Gross Proceeds of the Fresh Issue [●]
2 Company’s share of Offer related Expenses [●]
Net Proceeds of the Fresh Issue* [●]
*To be finalised upon determination of the Offer Price and to be updated in the Prospectus prior to filing with the
RoC.
121Utilisation of Net Proceeds
We intend to utilise the Net Proceeds of the Fresh Issue (“Net Proceeds”) of ₹ [●] million for financing the objects
as set forth below:
(₹ in million)
Sr. No. Particulars Amount
1 Funding working capital requirements of our Company 1,380.00
2 General Corporate Purpose(1)) [●]
Total [●]
(1)To be determined on finalisation of the Offer Price and updated in the Prospectus. The amount utilised for
General Corporate Purposes shall not exceed 25% of the Gross Proceeds of the Fresh Issue.
Proposed schedule of implementation and deployment of Net Proceeds
We propose to deploy the Net Proceeds for the aforesaid purposes in accordance with the estimated schedule of
implementation and deployment of funds set forth in the table below:
(₹ in million)
Deployment during FY Balance deployment
Particulars Total Deployment
2025-26 during FY 2026-27**
Working capital requirements 1,380.00 900.00 480.00
General Corporate Purpose# [●] [●] [●]
Total [●] [●] [●]
#To be finalised upon determination of Offer Price and updated in the Prospectus prior to filing with the RoC.
The amount shall not exceed 25% of the Gross Proceeds of the Fresh Issue.
**To the extent our Company is unable to utilize any portion of the Net Proceeds towards the Object, as per the
estimated schedule of deployment specified above; our Company shall deploy the Net Proceeds of fresh issue in
the subsequent Financial Years towards the Object.
The above-stated fund requirements, deployment of the funds and the intended use of the Net Proceeds as
described in this Draft Red Herring Prospectus are based on (a) our current business plan and internal management
estimates based on current market conditions; and (b) certificate from chartered accountant for certifying the
working capital requirements. However, such fund requirements and deployment of funds have not been appraised
by any bank, financial institution or any other independent agency. For further details, kindly refer ‘Risk Factor
No. 62 – Our funding requirements and the proposed deployment of Net Proceeds from issue of fresh equity shares
(“Net Proceeds”) have not been appraised by any bank or financial institution or any other independent agency
and our management will have broad discretion over the use of the Net Proceeds.” on page 71. We may have to
revise our funding requirements and deployment on account of a variety of factors such as our financial and market
condition, our business and growth strategies, our ability to identify and implement inorganic growth initiatives
(including investments and acquisitions), competitive landscape, general factors affecting our results of
operations, financial condition and access to capital and other external factors such as changes in the business
environment or regulatory climate and interest or exchange rate fluctuations, which may not be within the control
of our management. This may entail rescheduling the proposed utilization of the Net Proceeds and changing the
allocation of funds from its planned allocation at the discretion of our management, subject to compliance with
applicable law.
Means of Finance
The fund requirements for the Objects detailed above are proposed to be met from the short term borrowings,
internal accruals and Net Proceeds. Accordingly, we confirm that there is no requirement to make other firm
arrangements of finance under Regulation 7(1)(e) of the SEBI ICDR Regulations through verifiable means
122towards at least 75% of the stated means of finance, excluding the amount to be raised from the Offer and existing
identifiable accruals, as prescribed under the SEBI ICDR Regulations.
In the event of the estimated utilisation of the Net Proceeds in a scheduled Fiscal being not undertaken in its
entirety, the remaining Net Proceeds shall be utilised in subsequent Fiscals, as may be decided by our Company,
in accordance with applicable laws. Further, if the Net Proceeds are not completely utilised for the objects during
the respective periods stated above due to factors such as economic and business conditions, timely completion
of the Offer, market conditions outside the control of our Company, and any other commercial considerations, the
remaining Net Proceeds shall be utilised (in part or full) in subsequent periods as may be determined by us, in
accordance with applicable laws.
In case of any surplus after utilisation of the Net Proceeds towards the aforementioned objects, we may use such
surplus towards general corporate purposes, provided that the total amount to be utilised towards general corporate
purposes does not exceed 25% of the Gross Proceeds of the Fresh Issue, in accordance with applicable law. Subject
to applicable laws, in the event of any variations in the actual utilisation of funds earmarked towards the objects
set forth above, any increased fund requirements for a particular object may be financed by surplus funds, if any,
available in respect of the other objects for which funds are being raised pursuant to the Offer. In case of a shortfall
in the Net Proceeds or any increase in the actual utilisation of funds earmarked for the Objects, our Company may
explore a range of options including utilizing our internal accruals and/or seeking additional debt from existing
and/or other lenders, subject to compliance with applicable law. Such alternate arrangements would be available
to fund any such shortfalls.
DETAILS OF THE FUND REQUIREMENTS
The details in relation to objects of the Fresh Issue are set forth herein below:
1. Funding working capital requirements of our Company
Our business is working capital intensive and we fund the majority of our working capital requirements in the
ordinary course of our business from our internal accruals, net worth, financing from various banks, if any. As on
March 31, 2025, our Company has total sanctioned limit of working capital facilities of fund- based of ₹ 290.00
million and Non-Fund-based limits of ₹ 1,695.00 million and has utilized Fund-based limits of ₹ 593.38 million
& has utilized only Non-Fund based limits of ₹ 1,138.25 million. For further details, kindly refer “Financial
Indebtedness” beginning on page 428.
The details of our Company’s consolidated working capital requirements, based on Restated Consolidated
Financial Information for the Fiscal 2025, Fiscal 2024 and Fiscal 2023 and based on projected financial for the
Fiscal 2026 and Fiscal 2027. Further the source of funding of the same are provided in the table below:
A) Existing Working Capital:
The details of the Company’s working capital as at March 31, 2025, March 31, 2024 and March 31, 2023 and the
source of funding, derived from the Restated Consolidated Financial Information of our Company, on the basis
of Certificate dated August 04, 2025 bearing UDIN: 25455362BMGILW3034 issued by our Statutory Auditor
M/s Rishi Kapoor & Company, Chartered Accountants, are provided in the table below:
123(₹ in million)
Holding Holding Holding
Fiscal Fiscal Fiscal
Period Period Period
Particulars 2025 2024 2023
No. of No. of No. of
(Audited) (Audited) (Audited)
Days Days Days
Inventories 889.33 116 557.45 90 472.55 97
Financial Assets
(i) Trade receivables 581.84 76 1,001.83 162 509.04 104
(ii) Other Financial Assets 495.18 427.74 180.47
Other current assets 50.88 103.50 83.00
Income tax Asset (Net) - - 1.31
Total Current Assets - (A) 2,017.23 2,090.52 1,246.37
Current Liabilities
Financial liabilities
(i) Trade Payables 125.03 21 210.63 42 286.21 69
(ii) Others Financial Liabilities 422.40 416.84 276.58
Other current liabilities 43.01 149.63 32.62
Short term provisions 0.64 0.63 0.39
Liabilities for current tax (Net) 26.06 32.13 -
Total Current Liabilities - (B) 617.14 809.85 595.79
Total Working Capital
1,400.09 1,280.66 650.58
Requirements (A-B)
Funding Pattern
Working Capital Funding from
520.39 377.89 266.68
Banks and Financial Institutions
Internal Accruals* (Equity
879.70 902.77 383.89
Contribution and Past Year Profits)
*Internal accruals and equity as per the restated consolidated financial information of our Company for the
financial year ended March 31, 2025, March 31, 2024 and March 31, 2023 are ₹1,199.83 million, ₹ 917.78
million and ₹ 727.34 million, respectively.
B) Estimated Working Capital Requirements
Our Company proposes to utilize ₹ 1,380.00 million of the Net Proceeds for our estimated working capital
requirements. For working capital requirement ₹ 900.00 million and ₹ 480.00 million will be utilized during the
Financial Year 2026 and Financial Year 2027. The balance portion of our Company working capital requirement,
if any, shall be met from the working capital facilities availed/ to be availed and internal accruals. The estimated
working capital requirements, as approved by the Board pursuant to a resolution dated August 04, 2025, and key
assumptions with respect to the determination of the same are mentioned below. Our Company’s estimated
working capital requirements for Financial Year 2026 and Financial Year 2027 and the proposed funding of such
working capital requirements are as set out in the table below:
(₹ in million)
Holding Holding
Financial Financial
Period Period
Particulars Year 2026 Year 2027
No. of No. of
(Estimated)* (Projected)*
Days Days
Inventories 794.79 81 1,205.67 93
Financial Assets
124(i) Trade receivables 739.73 75 976.03 75
(ii) Others Financial Assets 431.50 531.50
Other current assets 53.50 58.50
Income tax Asset (Net) 0.00 0.00
Total Current Assets - (A) 2,019.52 2,771.70
Current Liabilities
Financial liabilities
(i) Trade Payables 52.74 7 80.16 8
(ii) Others Financial Labilities 150.00 170.00
Other current liabilities 42.00 48.00
Short term provisions 0.75 0.75
Liabilities for current tax (Net) 4.25 4.25
Total Current Liabilities - (B) 249.74 303.16
Total Working Capital Requirements (A-B) 1,769.78 2,468.54
Funding Pattern
Working Capital Funding from Banks and Financial
300.00 300.00
Institutions
Proposed Working Capital to be funded from IPO 900.00 480.00
Internal Accruals (Equity Contribution and Past Year
569.78 1,688.54
Profits)
Pursuant to the certificate dated August 04, 2025 issued by the Statutory Auditor M/s Rishi Kapoor & Company,
Chartered Accountants on the working capital projections vide UDIN 25455362BMGILW3034.
Our Company is required to issue a Performance and Security Deposit Bank Guarantee equal to a fixed percentage
of the Work Order, which is around 5%-10% of the Work Order value as a Guarantee to the Authority towards
performance obligations for the said Work Order. The Performance Bank Guarantee is retained by the customer
till Defect Liability Period of the WWTPs or WSSPs, which generally varies from 1-5 years. The Non-fund based
limit is secured by our Company against margin of Fixed Deposits and collateral security. This amount of Fixed
Deposit is classified under ‘Current Assets’ and ‘Non-Current Assets’, as per the maturity of the Fixed Deposit in
the Restated Consolidated Financial Information. Management is of the opinion that these Fixed Deposit should
be classified as part of long-term working capital.
The company requires the Working Capital for the execution of the Project, in the form of Fund based limit &
Non-Fund based Limit (Bank Guarantee & LC Limit). With the increasing number of projects increased working
capital is required for smooth functioning. Majorly, the company requires the Non-fund base limit:
➢ The Company is required to furnish Bank Guarantees—such as Performance BG, Security BG, and
Mobilisation BG—upon securing the respective awarded project through the bidding process.
➢ The company requires the LCs as it has to purchase DI pipes and other materials related to respective project
from various vendors. DI pipes may also be supplied by the suppliers as against the LCs.
WC requirement has increased because of increase in the outstanding order book of the company as below:
(₹ in million)
Financial Year Financial Year Financial Year
Details
2025 2024 2023
Outstanding Order book
19 11 10
(Number of Projects, including O&M)
Outstanding Order book
7,688.10 7,528.90 3,243.30
(in amount, including O&M)
125Working Capital Requirements 1,400.09 1,280.66 650.58
The working capital requirement of our Company increased to ₹ 1,280.66 million for the Fiscal 2024 from ₹
650.58 million for Fiscal 2023 which further increased to ₹ 1,400.09 million for Fiscal 2025 primarily due increase
in the order book which stands at ₹ 7,688.10 million, ₹ 7,528.90 million and ₹ 3,443.30 million for the Fiscal
2025, Fiscal 2024 and Fiscal 2023 respectively. The Working Capital Requirement of our Company increases in
line with the expansion of its order book, as it must arrange for higher bank guarantees and lines of credit to meet
performance guarantee obligations and facilitate the procurement of DI pipes & other stock required to execute
the projects.
Key justifications for holding levels:
Sr.
Particulars Assumptions
No.
Current Assets
Our business of designing, construction, operation and maintenance of
WWTPs and WSSPs requires procuring inventories in large quantities to fulfil
project needs. Given the increase in our order books and that our projects are
mostly located in remote regions, managing multiple logistics poses a
consistent challenge. Inventories include raw materials. The historical holding
days of inventories (calculated as closing inventory on balance sheet date
divided by revenue from operations over 365 days) has been in range 90 to 120
days during the last three financial years. Our Company estimates inventories
holding days to be around 81 days in Fiscal 2026 & 93 days in Fiscal 2027
considering the scale of operations. Further in order to avoid any supply chain
1 Inventories
disruption the company expects to maintain such inventory levels. The
inventories have increased from ₹ 472.55 million for Fiscal 2023 to ₹ 557.45
million for Fiscal 2024. Similarly, the inventories have increased from ₹ 557.45
million for Fiscal 2024 to ₹ 889.33 million for Fiscal 2025 due to increase in
the Order Book of the Company from ₹ 7,528.90 million in Fiscal 2024 to ₹
7,688.10 million in Fiscal 2025 which requires higher levels of inventories for
project execution. Depending on the size and capacity of the project it usually
takes 3 to 5 years for the company to complete a project. Therefore, orders won
in Fiscal 2025 required inventories to be maintained for its execution during
Fiscal 2025, Fiscal 2026 and Fiscal 2027.
The historical holding days of trade receivables (calculated as closing trade
receivables divided by revenue from operations over 365 days) have been
improving from 104 days to 76 days during last three financial years from
Financial Year 2023 to Financial Year 2025, restively. As we currently engage
in development of WWTPs and WSSPs on Engineering, Procurement, and
Construction model (EPC) the specific terms of our work orders and tenders
provide variations in our debtor cycle. As per the current credit terms of the
2 Trade Receivables company & prevalent trend in business of the company, the holding level for
debtors is anticipated at 75 days of revenue from operations during the financial
year ended 2026 & 2027. Our customer base comprises of government
authorities where payments of running account bills are approved post
inspection of projects and satisfactory verification by the authorities. The Trade
Receivables has increased from ₹ 509.04 million for Fiscal 2023 to ₹ 581.84
million for Fiscal 2025 due to higher levels of project execution. Our payment
is dependent on allocation of funds available with government authorities.
126Other Financial Assets, Other Current Assets and Income tax Asset (Net)
majorly comprise of contract assets such as Customer Retention, Balance with
Banks Held as Deposits, Balances with Statutory/Governmental Authorities,
Advance to Suppliers, Prepaid Expenses, Earnest Money Deposits and
Advance Income Tax (Net of Provision for Tax). We expect the growth in other
financial assets to be in line with the expected growth in business. Other
Financial Assets has increased from ₹ 180.47 million for Fiscal 2023 to ₹
427.74 million for Fiscal 2024 and further increased to ₹ 495.18 million due to
increase in value of Customer Retention & Withheld money for project
Other Financial
execution. The primary reason for the increase in the other financial assets was
Assets, Other Current
3 execution for higher no. of projects. Further, the Other Current Assets have
Assets and Income tax
increased from ₹ 83.00 million for Fiscal 2023 to ₹ 103.50 million for Fiscal
Asset (Net)
2024 primarily due to increase in value of Balance with Indirect Revenues
Authorities. Additionally, Other Current Assets has decreased from ₹ 103.50
million for Fiscal 2024 to ₹ 50.88 million in Fiscal 2025 primarily due to
decrease in Balance with Indirect Revenues Authorities. Income tax Asset
(Net) for the Fiscal 2023 amounted to ₹ 1.31 million attributable to the advance
payment of tax net of provision of tax. As is evident from explanations
provided, the company’s turnover has increased between Fiscal 2023 and
Fiscal 2025 and accordingly larger amount of funds were blocked in Other
Financial & Other Current Assets.
Current Liabilities
Past trend of trade payable holding days (calculated as closing trade payables
as on balance sheet date divided by cost of material consumed over 365 days)
has been in range 30 to 60 days during the last three financial years. However,
our Company intends to reduce trade payable in the range of 5-10 days for
Fiscal 2026 & Fiscal 2027 to avail cash discount as well as competitive
purchase price to increase overall profitability of our Company. Our Company
plans to streamline its payable processes to its vendors enabling it to negotiate
for better rates and thereby the holding levels are expected to reduce to 7 days
5 Trade Payables
and 8 days in Fiscal 2026 & Fiscal 2027. Additionally, prompt payments
empower us to negotiate more favorable terms and prices, fostering stronger
supplier relations and bolstering our bottom line. Sundry Creditors has
decreased from ₹ 286.21 million for Fiscal 2023 to ₹ 210.63 million for Fiscal
2024 and further decrease to ₹ 125.03 million for Fiscal 2025. The decreasing
trend in trade payables is attributable to the Company’s efforts to negotiate
improved payment terms by making early payments, aimed at enhancing
overall operational profitability.
Other Financial and Current Liabilities primarily includes Mobilisation
Advance, Security Received from Contractors & Others, Statutory Dues
Payable, Corporate Social Responsibility Expense Payable, Other Expense
Other Financial Payable and Advances from Customers. Short Term Provisions relates to the
Liabilities, Other provisions for gratuity and Current Tax Liabilities (Net) is with respect to
Current Liabilities, Provision for Income Tax (Net of Advance Tax & TDS). We expect the growth
6 Short Term in these liabilities to be in line with the expected growth in business. All the
Provisions and above-mentioned liabilities increased from ₹ 309.59 million for Fiscal 2023 to
Current Tax ₹ 599.22 million for Fiscal 2024 primarily due to increase in mobilization
Liabilities (Net) advance, Security Received from Contractors & Others and Statutory Dues
Payable. Further, these Liabilities decrease marginally from ₹ 599.22 million
for Fiscal 2024 to ₹ 492.11 million for Fiscal 2025 primarily due to decrease
in Mobilisation Advance and Statutory Dues Payable.
127Key Justification for the projected Working Capital Requirements:
The working capital requirement of our Company is expected to increase by ₹ 369.69 million or by 26.40% from
₹ 1400.09 million for Fiscal 2025 to ₹ 1,769.78 million in Financial Year 2026 and expected to increase by ₹
698.76 million or by 39.48% from ₹ 1,769.78 million in Fiscal 2026 to ₹ 2,468.54 million in Fiscal 2027 on
account of expected increase in revenue as per the current order book of our Company as well as new order book
expected to be received during the Fiscal 2026 and Fiscal 2027.
The working capital requirements of our Company is estimated at ₹ 1,769.78 million for the Fiscal 2026 and ₹
2,468.54 million for the Fiscal 2027, based on the following assumptions:
✓ Robust Order Book: As on June 30, 2025, our outstanding order book is at ₹ 6,858.34 million, which will
be completed within next 3 to 4 years.
✓ Margin money for performance guarantees: As part of its business and as is customary, our Company is
required to provide financial and performance bank guarantees in favour of its project clients under the
respective contracts in relation to the projects. For projects, our Company typically issues bank guarantees
to the relevant authority which enter into contractual arrangement with our Company.
✓ Future Order Book: Our Company is continuously working to increase its order book and it requires
working capital to execute these projects subject to allotment of letter of intent. The availability of working
capital also provides strength to our Company for bidding for new projects.
✓ Receivables: Our Company is engaged in government contractor business wherein payment channel, is
totally secured however realization of payment from the clients may take some time due to operational
reasons of the respective government departments.”
2. General Corporate Purposes
We propose to utilise upto ₹ [●] million of the Net Proceeds towards general corporate purposes and the business
requirements of our Company as approved by the Board, from time to time, subject to such utilisation for general
corporate purposes not exceeding 25% of the gross proceeds from the Fresh Issue, in compliance with the SEBI
ICDR Regulations.
The general corporate purposes for which our Company proposes to utilise the Net Proceeds include, strategic
initiatives/ funding growth opportunities i.e. to enter any joint venture/partnership for any specific project, meeting
ongoing general corporate contingencies, capital expenditure in the ordinary course of business, business
development initiatives i.e. one time expenditure, research and development related to treatment of wastewater,
as may be approved by the Board & shareholders or a duly constituted committee thereof from time to time,
subject to compliance with applicable law, including provisions of the Companies Act. In the event our Company
is unable to utilise the Net Proceeds towards any of the objects of the Offer for any of the reasons as
aforementioned, our Company may utilise such Net Proceeds towards general corporate purposes, provided that
the aggregate amount deployed towards general corporate purposes shall not exceed 25% of the gross proceeds
from the Fresh Issue.
The quantum of utilisation of funds towards each of the above purposes will be determined by our Board, based
on the amount available under this head and the business requirements of our Company, from time to time. Our
Company’s management, in accordance with the policies of the Board, shall have flexibility in utilising surplus
amounts, if any. In the event that we are unable to utilise the entire amount that we have currently estimated for
use out of Net Proceeds in a Fiscal, we will utilise such unutilised amount(s) in the subsequent Fiscals.
128Offer Related Expenses
The total expenses of the Offer are estimated to be approximately ₹ [●] million. The expenses of this Offer include,
listing fees, fees payable to the Book Running Lead Manager, Legal Counsel to the Company, Registrar to the
Offer, Bankers to the Offer, processing fee to the SCSBs brokerage and selling commission payable to the
Syndicate, Registered Brokers, SCSBs, RTA and CDPs, printing and stationery expenses, advertising and
marketing expenses and all other incidental expenses for listing the Equity Shares on the Stock Exchanges.
Subject to applicable law, other than (a) the listing fees, audit fees of statutory auditors (to the extent not
attributable to the Offer), and expenses in relation to services or corporate advertisements, i.e., any corporate
advertisements consistent with past practices of the Company (other than the expenses relating to marketing and
advertisements undertaken in connection with the Offer), each of which will be borne solely by our Company;
and (b) the stamp duty payable on transfer of Offered Shares shall be borne solely by the Promoter Selling
Shareholder (c) all costs, fees and expenses with respect to the Offer will be shared amongst our Company and
the Promoter Selling Shareholder, on a pro-rata basis, in proportion to the number of Equity Shares, Allotted by
the Company in the Fresh Issue and sold by Promoter the Selling Shareholder in the Offer for Sale, upon the
successful completion of the Offer. Upon commencement of listing and trading of the Equity Shares on the Stock
Exchanges pursuant to the Offer, the Promoter Selling Shareholder shall, reimburse the Company for any expenses
in relation to the Offer paid by the Company on behalf of the Promoter Selling Shareholder. However, in the event
that the Offer is withdrawn or not completed for any reason whatsoever, all Offer related expenses will be borne
by our Company.
The estimated Offer Expenses are as under:
(₹ in million)
As a % of total
Estimated As a % of total
Expenses estimated Offer
Expenses* Offer Size*
Expenses*
Fees payable to BRLM (including underwriting
[●] [●] [●]
commission)
Advertising and marketing expenses [●] [●] [●]
Fees payable to the Legal Counsel to the
[●] [●] [●]
Company
Fees to the Registrar to the Offer [●] [●] [●]
Fees payable to the Regulators including stock
[●] [●] [●]
exchanges
Printing and stationary expenses [●] [●] [●]
Brokerage and selling commission payable to
[●] [●] [●]
Syndicate2
Brokerage and selling commission payable to
[●] [●] [●]
Registered Brokers(2)(3)(4)
Processing fees to SCSBs for ASBA
Applications procured by the members of the
[●] [●] [●]
Syndicate or Registered Brokers and submitted
with the SCSBs(2)(3)(4)
Processing fees to Issuer banks for UPI
Mechanism w.r.t application Forms procured by
the members of the Syndicate, Registered [●] [●] [●]
Brokers, RTA or the CDPs and submitted to
them(2)(3)(4)
Others (Bankers to the Offer, Auditor’s fees etc.) [●] [●] [●]
Total Estimated Offer Expenses [●] [●] [●]
*To be determined on finalization of the Offer Price and updated in the Prospectus prior to filing with the RoC.
129For Sub‐Syndicate Members, RTA and CDPs
1. Selling commission payable to the SCSBs on the portion, RIBs and Non-Institutional Bidders which are
directly procured and uploaded by the SCSBs, would be as follows:
Portion for RIBs: 0.25% of the Amount Allotted* (plus applicable taxes)
Portion for Non-Institutional Bidders: 0.25% of the Amount Allotted* (plus applicable taxes)
*Amount Allotted is the product of the number of Equity Shares Allotted and the Offer Price.
Selling Commission payable to the SCSBs will be determined on the basis of the bidding terminal id as
captured in the Bid Book of BSE or NSE.
No processing fees shall be payable by our Company to the SCSBs on the applications directly procured by
them.
Processing fees payable to the SCSBs on the RIB and Non-Institutional Bidders (excluding UPI Bids) which
are procured by the members of the Syndicate/sub-Syndicate/Registered Broker/RTA/ CDPs and submitted to
SCSB for blocking, would be as follows:
Portion for RIB and Non-Institutional Bidders ₹ 5/- per valid application (plus applicable taxes)
Notwithstanding anything contained above the total processing fee payable under this clause will not exceed
₹ 0.5 million (plus applicable taxes) and in case if the total processing fees exceeds ₹ 0.5 million (plus
applicable taxes) then processing fees will be paid on pro-rata basis.
2. The processing fees for applications made by Retail Individual Bidders, Eligible Employees and Non
Institutional Investors using the UPI Mechanism would be as follows:
Members of the Syndicate / RTA / CDPs (uploading ₹ 5 per valid application (plus applicable taxes)
charges)
Sponsor Bank- [●] ₹ [●] per valid application form* (plus applicable
taxes).
The Sponsor bank shall be responsible for making
payments to the third parties such as remitter
company, NPCI and such other parties as required
in connection with the performance of its duties
under applicable SEBI circulars, agreements and
other Applicable Laws
Sponsor Bank- [●] ₹ [●] per valid application form* (plus applicable
taxes).
The Sponsor bank shall be responsible for making
payments to the third parties such as remitter
company, NPCI and such other parties as required
in connection with the performance of its duties
under applicable SEBI circulars, agreements and
other Applicable Laws
*For each valid application by respective Sponsor Bank.
130All such commissions and processing fees set out above shall be paid as per the timelines in terms of the
Syndicate Agreement and Escrow and Sponsor Company Agreement.
Notwithstanding anything contained above in this clause the total Uploading charges/ Processing fees for
applications made by RIBs (up to ₹ 200,000), Non-Institutional Bidders (for an amount more than ₹ 200,000
and up to ₹ 500,000) using the UPI Mechanism and Eligible Employee(s), if any using the UPI Mechanism
would not exceed ₹ 20,00,000 (plus applicable taxes) and in case if the total uploading charges/ processing
fees exceeds ₹ 20,00,000 (plus applicable taxes) then uploading charges/ processing fees using UPI
Mechanism will be paid on pro-rata basis (plus applicable taxes).
Uploading/Processing fees payable to the SCSBs for capturing Syndicate Member/Sub syndicate(Broker)/Sub-
broker code on the ASBA Form for Non-Institutional Bidders and Qualified Institutional Bidders with bids
above ₹ [●] would be ₹ [●] plus applicable taxes, per valid application. In case the total ASBA processing
charges payable to SCSBs exceeds ₹ [●] million, the amount payable to SCSBs would be proportionately
distributed based on the number of valid applications such that the total ASBA processing charges payable
does not exceed ₹ [●] million.
3. Selling commission on the portion for RIBs, Non-Institutional Bidders, which are procured by members of the
Syndicate (including their sub-Syndicate Members), RTA and CDPs or for using 3-in-1 type accounts- linked
online trading, demat & company account provided by some of the brokers which are members of Syndicate
(including their Sub-Syndicate Members) would be as follows:
1. Portion for RIBs: 0.25% of the Amount Allotted* (plus applicable taxes)
2. Portion for Non-Institutional Bidders: 0.15% of the Amount Allotted* (plus applicable taxes)
*Amount Allotted is the product of the number of Equity Shares Allotted and the Offer Price.
4. Uploading Charge/processing Charges:
I. payable to members of the Syndicate (including their sub-Syndicate Members), on the applications made using
3-in-1 accounts, would be: ₹ 5 plus applicable taxes, per valid application bid by the Syndicate member
(including their sub-Syndicate Members).
II. Bid Uploading charges payable to the SCSBs on the portion of Non-Institutional Bidders (excluding UPI Bids)
which are procured by the members of the Syndicate/sub-Syndicate/Registered Broker/RTA/ CDPs and
submitted to SCSB for blocking and uploading would be: ₹ 10 per valid application (plus applicable taxes).
Notwithstanding anything contained above the total uploading charges payable under this clause will not
exceed ₹ 2,00,000 (plus applicable taxes) and in case if the total uploading charges exceeds ₹ 2,00,000 (plus
applicable taxes) then uploading charges will be paid on pro-rata basis.
The Selling Commission payable to the Syndicate / Sub-Syndicate Members will be determined on the basis of
the application form number / series, provided that the application is also bid by the respective Syndicate /
Sub-Syndicate Member. For clarification, if a Syndicate ASBA application on the application form number /
series of a Syndicate / Sub-Syndicate Member, is bid by an SCSB, the Selling Commission will be payable to
the SCSB and not the Syndicate / Sub-Syndicate Member.
Bidding Charges payable to members of the Syndicate (including their sub-Syndicate Members), on the portion
for RIBs, Eligible Employees and Non-Institutional Bidders which are procured by them and submitted to
SCSB for blocking, would be as follows: ₹ 5 plus applicable taxes, per valid application bid by the Syndicate
(including their sub-Syndicate Members.
131The selling commission and bidding charges payable to Registered Brokers the RTA and CDPs will be
determined on the basis of the bidding terminal id as captured in the Bid Book of BSE or NSE.
All such commissions and processing fees set out above shall be paid as per the timelines in terms of the Syndicate
Agreement and Escrow and Sponsor Bank Agreement. Further, the processing fees for applications made by UPI
Bidders using the UPI Mechanism may be released to the remitter banks (SCSBs) only after such banks provide
a written confirmation on compliance with SEBI Circular no. SEBI/HO/CFD/DIL2/P/CIR/2022/75 dated May 30,
2022 and SEBI Master Circular no. SEBI/HO/MIRSD/POD1/P/CIR/2023/70 dated May 17, 2023 (to the extent
applicable).
The Offer expenses shall be payable in accordance with the arrangements or agreements entered into by our
Company with the respective Designated Intermediary.
Interim Use of Proceeds
Pending utilization of the Net Proceeds for the Objects of the Offer described above, our Company shall deposit
the funds only in Scheduled Commercial Banks included in the Second Schedule of Reserve Bank of India Act,
1934. In accordance with Section 27 of the Companies Act, 2013, our Company confirms that, pending utilisation
of the net proceeds of the fresh Issue as described above, it shall not use the funds from the Net Proceeds for any
investment in equity and/or real estate products and/or equity linked and/or real estate linked products.
Bridge Financing Facilities
Our Company has not raised any bridge loans from any banks or financial institutions as on the date of this Draft
Red Herring Prospectus, which are proposed to be repaid from the Net Proceeds.
Monitoring Utilization of Funds
The Gross Proceeds shall be monitored by the Monitoring Agency in compliance with Regulation 41 of SEBI
ICDR Regulation. Our Company will appoint [●] as the monitoring agency in accordance with Regulation 41 of
the SEBI ICDR Regulations before filing of Red Herring Prospectus with RoC. Our Company undertakes to place
the report received under Regulation 41(2) of the ICDR Regulations of the monitoring agency on receipt before
the Audit Committee without any delay will monitor the utilization of the Gross Proceeds from fresh issue of
equity shares, and submit the report required under Regulation 41(2) of the SEBI ICDR Regulations.
Our Company will disclose the utilization of the Gross Proceeds through fresh issue of equity shares including
interim use, under a separate head in the balance sheet, specifying the details, if any, in relation to all proceeds of
the Offer that have been utilized. Our Company will also, in its balance sheet for the applicable financial year,
provide details, if any, in relation to all such Gross Proceeds that have not been utilized, if any, of such currently
unutilized Gross Proceeds. Our Company will also indicate investments, if any, of the unutilized proceeds of the
Offer in our balance sheet for the relevant Fiscals subsequent to receipt of listing and trading approvals from the
Stock Exchanges.
Pursuant to Regulation 32(3) of the SEBI Listing Regulations, our Company shall, on a quarterly basis, disclose
to the Audit Committee the uses and applications of the Net Proceeds. On an annual basis, our Company shall
prepare a statement of funds utilized for purposes other than those stated in this Draft Red Herring Prospectus and
place it before the Audit Committee and make other disclosures as may be required until such time as the Gross
Proceeds remain unutilized. Such disclosure shall be made only until such time that all the Gross Proceeds have
been utilized in full.
The statement shall be certified by the statutory auditor of our Company. Furthermore, in accordance with
Regulation 32(1) of the SEBI Listing Regulations, our Company shall furnish to the Stock Exchanges on a
quarterly basis, a statement indicating (i) deviations, if any, in the actual utilization of the gross proceeds of the
Offer from the Objects; and (ii) details of category wise variations in the actual utilization of the gross proceeds
of the offer from the objects of the offer as stated above. This information will also be published in newspapers
132simultaneously with the interim or annual financial results and explanation for such variation (if any) will be
included in our Director’s report, after placing the same before the Audit Committee.
Variation in Objects
In accordance with Section 13(8) and Section 27 of the Companies Act, 2013 and applicable rules, our Company
shall not vary the Objects of the Offer without our Company being authorized to do so by the Shareholders by
way of a special resolution through postal ballot. In addition, the notice issued to the Shareholders in relation to
the passing of such special resolution (the “Postal Ballot Notice”) shall specify the prescribed details as required
under the Companies Act and applicable rules. The Postal Ballot Notice shall simultaneously be published in the
newspapers, one in English and one in the vernacular language of the jurisdiction where the Registered Office is
situated. Our Promoters will be required to provide an exit opportunity to such Shareholders who do not agree to
the proposal to vary the Objects, subject to the provisions of the Companies Act, 2013 and in accordance with
such terms and conditions, including in respect of pricing of the Equity Shares, in accordance with our Articles of
Association, the Companies Act, 2013 and SEBI Regulations.
Appraisal by Appraising Agency
None of the objects of the Fresh Issue for which the Net Proceeds will be utilized have been appraised by any
bank/ financial institution/any other agency.
Other Confirmations
No part of the Net Proceeds will be utilized by our Company as consideration to the Promoters, members of the
Promoter Group, the Directors, or Key Managerial Personnel. Our Company has not entered into or is not planning
to enter into any arrangement / agreements with the Promoters, the Directors, the Key Managerial Personnel in
relation to the utilization of the Net Proceeds of the Issue. Further, except in the ordinary course of business, there
is no existing or anticipated interest of such individuals and entities in the objects of the Fresh Issue as set out
above.
We confirm that the audited financial statements of our Company for past three full financial years immediately
preceding the date of filing of offer document have been provided on our website in accordance with the ICDR
Regulations.
133BASIS FOR OFFER PRICE
The Price Band and Offer Price will be determined by our Company in consultation with the BRLM, and in
accordance with applicable law, on the basis of assessment of market demand for the Equity Shares offered
through the Book Building Process and quantitative and qualitative factors as described below. The face value of
the Equity Shares is ₹10 each and the Offer Price is [●] times the face value at the lower end of the Price Band
and [●] times the face value at the higher end of the Price Band. Investors should also refer to the sections “Risk
Factors”, “Our Business”, “Restated Consolidated Financial Information” and “Management’s Discussion and
Analysis of Financial Conditions and Results of Operations” beginning on pages 39, 228, 331 and 444,
respectively, to have an informed view before making an investment decision.
I. Qualitative Factors
Some of the qualitative factors which form the basis for the Offer Price are:
• Diversified EPC Capabilities across Core Infrastructure Sectors.
• Execution of High Value Government and Multilateral Funded Projects.
• In House Engineering Strength with Technological Adaption.
• Revenue Stability from Long term Operation & Management Contracts.
• Regulatory Approved Electrical EPC Capabilities with Statewide Licenses.
• Promoter - Led Business with Strong Execution Capabilities.
For further details, please refer to the chapters titled “Risk Factors” and “Our Business – Our Strengths”
beginning on pages 39 and 262, respectively.
II. Quantitative Factors
Certain information presented below relating to our Company is based on the on the Restated Consolidated
Financial Information. For details, please refer to the chapter titled “Restated Consolidated Financial
Information” beginning on page 331. Some of the quantitative factors which may form the basis for calculating
the Offer Price are as follows:
1. Basic and diluted earnings per Equity Share (“EPS”):
Derived from the Restated Consolidated Financial Information:
For the Financial Year ended Basic (in ₹) Diluted (in ₹) Weight
March 31, 2025 9.37 9.37 3
March 31, 2024 6.33 6.33 2
March 31, 2023 3.59 3.59 1
Weighted Average 7.39 7.39 -
As certified by Rishi Kapoor & Company, Chartered Accountants pursuant to their certificate dated August 04,
2025 vide UDIN 25455362BMGILB8484.
Notes:
i) Weighted average = Aggregate of financial year-wise weighted EPS divided by the aggregate of weights
i.e. (EPS x Weight) for each financial year/Total of weights
ii) Basic Earnings per Equity Share (₹) = Profit for the financial year attributable to equity shareholders /
Weighted average no. of Equity Shares outstanding during the financial year.*
iii) Diluted Earnings per Equity Share (₹) = Profit for the financial year attributable to equity shareholders /
Weighted average no. of potential Equity Shares outstanding during the financial year.*
iv) Earnings per Share calculations are in accordance with the notified Indian Accounting Standard 33 ‘Earnings
134per share’.
*Adjusted for bonus share and / or sub-division of shares from beginning of previous financial year i.e.
March 31, 2023, in accordance with Ind AS 33.
2. Price/Earning (“P/E”) ratio in relation to the Price Band of ₹ [●] to ₹ [●] per Equity Share:
P/E at the Floor Price P/E at the Cap Price
Particulars
(no. of times) * (no. of times)*
Based on basic EPS for F.Y. 2024-25 [●] [●]
Based on diluted EPS for F.Y. 2024-25 [●] [●]
*To be updated at the Prospectus stage.
3. Industry Peer Group P/E ratio
Based on the peer group information (excluding our Company), details of the highest, lowest and industry
average P/E ratio are set forth below:
Particulars Name of the company(s) P/E Ratio
Highest VA Tech Wabag Limited 32.19
Lowest Denta Water and Infra Solutions Limited 11.85
VA Tech Wabag Limited, Denta Water and Infra Solutions
Average 20.77
Limited, EMS Limited and Enviro Infra Engineers Limited
Note: The highest and lowest industry P/E shown above is based on the peer set provided below under
“Comparison of accounting ratios with listed industry peers” beginning on page 136. The industry average has
been calculated as the arithmetic average P/E of the peer set provided below.
4. Return on Net Worth (“RoNW”)
Derived from the Restated Consolidated Financial Information:
For the Financial Year RoNW (%) Weight
March 31, 2025 23.51 3
March 31, 2024 20.76 2
March 31, 2023 14.86 1
Weighted Average 21.15
As certified by Rishi Kapoor & Company, Chartered Accountants pursuant to their certificate dated August 04,
2025 vide UDIN 25455362BMGILB8484.
Notes:
(i) Weighted average = Aggregate of financial year-wise weighted RoNW divided by the aggregate of weights
i.e. (RoNW x Weight) for each financial year /Total of weights.
(ii) Return on Net Worth (%) = Profit for the financial year attributable to owners of our Company, as restated
/ Net worth at the end of the financial year.
(iii) Net worth means the aggregate value of the paid-up share capital, equity suspense account and all reserves
created out of the profits and securities premium account and debit or credit balance of profit and loss
account after deducting the aggregate value of the accumulated losses, debit or credit balance of common
control adjustment deficit account, deferred expenditure and miscellaneous expenditure not written off, as
per the audited balance sheet, but does not include reserves created out of revaluation of assets, write-
back of depreciation and amalgamation.
1355. Net Asset Value per Equity Share (“NAV”)
Derived from the Restated Consolidated Financial Information:
As at Consolidated (₹)
March 31, 2025 39.86
March 31, 2024 30.49
March 31, 2023 24.16
After the Offer [●]
- At the Floor Price [●]
- At the Cap Price [●]
At Offer Price [●]
As certified by Rishi Kapoor & Company, Chartered Accountants pursuant to their certificate dated August 04,
2025 vide UDIN 25455362BMGILB8484.
Notes:
i) NAV means Net asset value (NAV) per share is computed as the closing net worth divided by number of equity
shares outstanding at the end of financial year, as adjusted for bonus issue of Equity Shares.
ii) Net worth means the aggregate value of the paid-up share capital, equity suspense account and all reserves
created out of the profits and securities premium account and debit or credit balance of profit and loss account
after deducting the aggregate value of the accumulated losses, debit or credit balance of common control
adjustment deficit account, deferred expenditure and miscellaneous expenditure not written off, as per the
audited balance sheet, but does not include reserves created out of revaluation of assets, write-back of
depreciation and amalgamation.
6. Comparison of Accounting Ratios with listed industry peers
Set forth below is a comparison of our KPIs with our peer group companies listed in India:
Face
EPS (₹ per
Value Revenue from RoNW
Closin NAV
share)
Name of the (₹ Operations for P/E (%)
g (₹ per
Company per Fiscal 2025 Ratio Fiscal
Price share)
shar (₹ in million) 2025
Basic Diluted
e)
Technocraft
Ventures 10 [●] 2,795.64 9.37 9.37 39.86 [●] 23.51
Limited*
Peer Group
EMS Limited 10 615.00 9,658.32 33.05 33.05 175.70 18.15 18.84
VA Tech
2 1604.00 32,940.00 47.48 46.80 345.15 32.19 13.78
Wabag Limited
Enviro Infra
Engineers 10 257.98 10,660.56 11.76 11.76 56.66 20.87 17.81
Limited
Denta Water
and Infra
10 322.50 2,032.85 25.83 25.83 153.10 11.85 12.94
Solutions
Limited
*The financial information for our Company is based on the Restated Consolidated Financial Information
136**Source: All the financial information for listed industry peers mentioned above is on a Consolidated/Standalone
basis and is sourced from the annual/ quarterly results submitted to stock exchanges and posted on their websites.
(1) Basic EPS and Diluted EPS refer to the Basic EPS and Diluted EPS sourced from the financial statements of
the respective company.
(2) P/E Ratio has been computed based on closing price as at August 06, 2025 / Diluted EPS as on March 31,
2025.
(3) Net asset value (NAV) per share is computed as the closing net worth divided by number of equity shares
outstanding at the end of financial year, as adjusted for bonus issue of Equity Shares.
(4) Return on Net Worth calculated as restated profit for the financial year divided by Net Worth.
(5) “Net worth” means the aggregate value of the paid-up share capital and all reserves created out of the profits
and securities premium account and debit or credit balance of profit and loss account, after deducting the
aggregate value of the accumulated losses, deferred expenditure and miscellaneous expenditure not written
off, as per the audited balance sheet, but does not include reserves created out of revaluation of assets, write-
back of depreciation and amalgamation, capital reserve on consolidation and foreign currency translation
reserve
* Adjusted for bonus shares from beginning of previous financial year i.e., March 31, 2023, in accordance with
Ind AS 33.
7. Key Performance Indicators (“KPIs”)
The table below sets forth the details of the KPIs that our Company considers have a bearing for arriving at the
basis for Offer Price. These KPIs have been used historically by our Company to understand and analyse the
business performance, which as a result help us in analysing the growth of various verticals segments in
comparison to our peers. The Bidders can refer to the below-mentioned KPIs, being a combination of financial
and operational key financial and operational metrics, to make an assessment of our Company’s performance in
various business verticals and make an informed decision.
The KPIs disclosed below have been approved by a resolution of our Audit Committee dated July 12, 2025 and
have been certified by, Rishi Kapoor & Company, Chartered Accountants, pursuant to certificate dated August
04, 2025, which has been included as part of the “Material Contracts and Documents for Inspections” beginning
on page 562. Further, the resolution of our Audit Committee dated July 12, 2025 has confirmed that there is no
KPIs pertaining to our Company that have been disclosed to any investor at any point of time during the three
financial years prior to the date of this Draft Red Herring Prospectus.
For details of other business and operating metrics disclosed elsewhere in this Draft Red Herring Prospectus,
kindly refer “Our Business” and “Management’s Discussion and Analysis of Financial Conditions and Results
of Operations” beginning on pages 228 and 444, respectively.
Details of our Financial KPIs for the financial years ended March 31, 2025, March 31, 2024 and March 31, 2023
are set out below:
(₹ in million, unless otherwise indicated)
For the Financial Year ended
Key Financial Indicators
March 31, 2025 March 31, 2024 March 31, 2023
Revenue from Operations(1) 2,795.64 2,261.02 1,786.91
Total Income(2) 2,810.04 2,272.98 1,805.44
EBITDA (₹)(3) 481.88 338.30 218.81
EBITDA Margin (%)(4) 17.24% 14.96% 12.25%
PAT 282.04 190.54 108.06
PAT Margin (%)(5) 10.09% 8.43% 6.05%
Operating Cash Flows 216.84 13.99 100.35
Net Worth(6) 1,199.83 917.78 727.34
137Net Debt(7) 869.17 789.78 480.89
Debt- Equity Ratio (times)(8) 0.73 0.87 0.70
Return on Equity (%)(9) 23.51% 20.76% 14.86%
Return on Capital Employed (%)(10) 22.35% 19.08% 16.85%
As certified by Rishi Kapoor & Company, Chartered Accountants pursuant to their certificate dated August 04,
2025 vide UDIN 25455362BMGILQ8952.
Notes:
(1) Revenue from operation means revenue from sales and other operating revenues.
(2) Total Income represents the total turnover of our business i.e. Revenue from Operations and Other Income,
if any.
(3) EBITDA is calculated as restated profit/(loss) before tax plus finance costs, depreciation and amortization
expense less other income.
(4) EBITDA Margin is calculated as EBITDA divided by Revenue from Operations.
(5) PAT Margin is calculated as restated profit/(loss) attributable to owners for the financial year divided by
Revenue from Operations.
(6) Net worth means the aggregate value of the paid-up share capital, equity suspense account and all
reserves created out of the profits and securities premium account and debit or credit balance of profit
and loss account after deducting the aggregate value of the accumulated losses, debit or credit balance
of common control adjustment deficit account, deferred expenditure and miscellaneous expenditure not
written off, as per the audited balance sheet, but does not include reserves created out of revaluation of
assets, write-back of depreciation and amalgamation.
(7) Net debt = non-current borrowing + current borrowing – Cash and Cash Equivalent.
(8) Debt equity ratio means ratio of total debt (long term plus short-term including current maturity of long-
term debt) and Equity Share capital plus other equity.
(9) ROE is calculated as Profit attributable to owners of the company divided by total shareholder’s equity
(including minority interest).
(10) ROCE is calculated as EBIT (i.e. restated profit/(loss) before tax plus finance costs minus other income)
divided by capital employed (i.e. sum of:(i) Total shareholder’s Equity (including minority interest); (ii)
Long-Term Borrowings (including Lease Liabilities, if any); (iii) Short-Term Borrowings (including Lease
Liability, if any).
Details of our Operational KPIs
(₹ in million, unless otherwise indicated)
For the Financial Year ended*
KPI March 31, March 31, March 31,
2025 2024 2023
No. of Sewage Treatment Plant (STP) Projects Completed**1 1 Nil 1
No. of Govt. Projects Completed 2 2 7
No. of Contract Secured in last 5 years 12 11 10
Order Book (in numbers) 19 11 10
Order Book (in value) 7,688.10 7,528.90 3,243.30
Tender Participation and Success Ratio2 41.67% 44.44% 11.11%
EPC Volume under Government Schemes 7,688.10 7,528.90 3,243.30
*The Operational KPIs have been certified by Y.P.& Associates, Chartered Engineer vide certificate dated August
05, 2025, bearing certificate no. 630C/OPERATIONAL KPI/TECHNOCRAFT.
**Since our inception, we completed and commissioned Waste Water Treatment projects, including high capacity
STPs of capacity 56 MLD and 40 MLD based on SBR technology and 3 MLD STP based on UASB technology.
1 STP Projects take 2-3 years for completion ,3 projects are undergoing.
2 Successful Conversion of Bids (in %) = Bids awarded / Net Bids *100
138Our Company confirms that it shall continue to disclose all the KPIs included hereinabove in this section on a
periodic basis, at least once in a year (or for any lesser period as determined by the Board of our Company), for a
duration of one year after the date of listing of the Equity Shares on the Stock Exchanges pursuant to the Offer, or
until the utilization of Fresh Issue as disclosed in “Objects of the Offer” beginning on page 121, whichever is later,
or for such other period as may be required under the SEBI ICDR Regulations. All such KPIs have been defined
consistently and precisely in “Definitions and Abbreviations – Key Performance Indicators” on page 02 & 21.
KPI Explanations
Revenue from Operations is used by our management to track the revenue profile of the
Revenue from
business and in turn helps assess the overall financial performance of our
Operations
Company and size of our business.
Total income is used by the management to track revenue from operations and other
Total income
income.
EBITDA EBITDA provides information regarding the operational efficiency of the business.
EBITDA Margin (%) is an indicator of the operational profitability and financial
EBITDA Margin (%)
performance of our business.
PAT Profit after tax provides information regarding the overall profitability of the business.
PAT Margin (%) is an indicator of the overall profitability and financial performance of
PAT Margin (%)
our business.
Operating Cash Operating cash flows activities provides how efficiently our company generates cash
Flows through its core business activities.
Net worth is used by the management to ascertain the total value created by the entity
Net Worth
and provides a snapshot of current financial position of the entity.
Net debt helps the management to determine whether a company is over leveraged or
Net Debt
has too much debt given its liquid assets
Debt- Equity Ratio The debt-to-equity ratio compares an organization's liabilities to its shareholder’s
(times) equity and is used to gauge how much debt or leverage the organization is using.
ROE provides how efficiently our Company generates profits from shareholders’
ROE (%)
funds.
ROCE provides how efficiently our Company generates earnings from the capital
ROCE (%)
employed in the business.
Description on the historic use of the KPIs by our Company to analyze, track or monitor the operational
and/or financial performance of our Company
In evaluating our business, we consider and use certain KPIs, as presented above, as a supplemental measure to
review and assess our financial and operating performance. The presentation of these KPIs is not intended to be
considered in isolation or as a substitute for the Restated Consolidated Financial Information. We use these KPIs
to evaluate our financial and operating performance. Some of these KPIs are not defined under Ind AS and are not
presented in accordance with Ind AS. These KPIs have limitations as analytical tools. Although these KPIs are not
a measure of performance calculated in accordance with applicable accounting standards, our Company’s
management believes that it provides an additional tool for investors to use in evaluating our ongoing operating
results and trends because it provides consistency and comparability with past financial performance, when taken
collectively with financial measures prepared in accordance with Ind AS.
139Comparison of Key Performance Indicators with listed industry peers
Set forth below is a comparison of our KPIs with our peer companies listed in India:
For the Financial Year ended March 31, 2025
(₹ in million, unless otherwise indicated)
Denta Water
Technocraft VA Tech Enviro Infra
and Infra
Key Financial Indicators Ventures EMS Limited Wabag Engineers
Solutions
Limited Limited Limited
Limited
Revenue from Operations 2,795.64 9,658.32 32,940.00 10,660.56 2,032.85
Total Income 2,810.04 9,816.98 33,386.00 10,854.69 2,080.30
EBITDA (₹) 481.88 2,511.67 4,245.00 2,677.64 676.88
EBITDA Margin (%) 17.24 26.01 12.89 25.12 33.30
PAT 282.04 1,837.84 2,948.00 1,771.48 528.85
PAT Margin (%) 10.09 19.03 8.95 16.62 26.02
Operating Cash Flows 216.84 335.38 3,552.00 (465.96) (718.92)
Net Worth 1,199.83 9,756.80 21,399.00 9,945.10 4,087.66
Net Debt 869.17 (83.08) (3560.00) 717.44 (607.77)
Debt- Equity Ratio (times) 0.73 0.09 0.17 0.24 0.00
Return on Equity (%) 23.51% 18.79% 13.74% 17.83% 12.94%
Return on Capital Employed (%) 22.35% 22.70% 16.70% 21.04% 16.41%
As certified by Rishi Kapoor & Company, Chartered Accountants pursuant to their certificate dated August 04,
2025 vide UDIN 25455362BMGILQ8952.
For the Financial Year ended March 31, 2024
(₹ in million, unless otherwise indicated)
Denta
Enviro
Technocraft VA Tech Water and
EMS Infra
Key Financial Indicators Ventures Wabag Infra
Limited Engineers
Limited Limited Solutions
Limited
Limited
Revenue from Operations 2,261.02 7,933.11 28,564.00 7,289.15 2,385.98
Total Income 2,272.98 8,090.68 28,998.00 7,380.05 2,418.37
EBITDA (₹) 338.30 2,038.47 3,662.00 1,664.99 791.37
EBITDA Margin (%) 14.96 25.70 12.82 22.84 33.17
PAT 190.54 1,526.63 2,504.00 1,064.56 604.68
PAT Margin (%) 8.43 19.24 8.77 14.60 25.34
Operating Cash Flows 13.99 (1,159.16) 1,335.00 (1,021.70) 268.95
Net Worth 917.78 7,981.30 18,186.00 2,921.83 1,642.56
Net Debt 789.78 299.38 (1,510.00) 2,334.90 (117.15)
Debt- Equity Ratio (times) 0.87 0.09 0.16 0.81 0.01
Return on Equity (%) 20.76 19.07 13.73 36.63 36.80
Return on Capital Employed (%) 19.08 22.65 16.93 30.56 47.61
As certified by Rishi Kapoor & Company, Chartered Accountants pursuant to their certificate dated August 04,
2025 vide UDIN 25455362BMGILQ8952.
140For the Financial Year ended March 31, 2023
(₹ in million, unless otherwise indicated)
Denta
Enviro
Technocraft VA Tech Water and
EMS Infra
Key Financial Indicators Ventures Wabag Infra
Limited Engineers
Limited Limited Solutions
Limited
Limited
Revenue from Operations 1,786.91 5,381.62 29,604.80 3,381.02 1,743.24
Total Income 1,805.44 5,432.77 30,140.80 3,416.62 1,757.47
EBITDA (₹) 218.81 1,500.08 3,270.70 845.12 669.60
EBITDA Margin (%) 12.25 27.87 11.05 25.00 38.41
PAT 108.06 1,088.51 109.30 574.52 498.55
PAT Margin (%) 6.05 20.23 0.37 16.99 28.60
Operating Cash Flows 100.35 (122.76) 849.80 482.93 514.64
Net Worth 727.34 4,907.21 15,748.90 1,286.27 1,042.90
Net Debt 480.89 (362.79) 385.00 625.97 (347.55)
Debt- Equity Ratio (times) 0.70 0.09 0.14 0.50 0.01
Return on Equity (%) 14.86 22.09 0.69 42.47 47.77
Return on Capital Employed (%) 16.85 27.24 17.74 44.54 63.11
As certified by Rishi Kapoor & Company, Chartered Accountants pursuant to their certificate dated August 04,
2025 vide UDIN 25455362BMGILQ8952.
8. Weighted average cost of acquisition (“WACA”)
Weighted average cost of acquisition based on Primary Issuances and Secondary Transactions
a) Primary Transactions*#
Except as disclosed below, there are no primary transactions in the last three years preceding where our Promoters,
Promoter Group, Promoter Selling Shareholder, in the last three years preceding the date of this Draft Red Herring
Prospectus irrespective of the size of the transaction.
Adjusted
Nature Face
no. of
of No. of Value Issue Total
shares
Sr. Date of Specifie Specified per per Nature of Considerati
Allotted at Nature of
No Allotme d Security Share share Consideration on (₹ in
Face Value Allotment
. nt Securiti Allocated (in ₹) (in ₹) million)
of ₹ 10 each
es
1 May 29, Equity 22,575,9 10 Nil Nil Bonus Capitalisation Nil
2025 00 Issue of Reserves
As certified by Rishi Kapoor & Company, Chartered Accountants pursuant to their certificate dated August 04,
2025 vide UDIN 25455362BMGILB8484.
# The Primary Issue Transactions includes Bonus issue.
141b) Secondary Transactions*#
Except as disclosed below, there have been no secondary transactions where our Promoters, Promoter Group,
Promoter Selling Shareholder, or shareholder(s) having the right to nominate director(s) on our Board are a party
to the transaction, in the last three years preceding the date of this Draft Red Herring Prospectus:
Face Adjuste
Number of Valu d no. of Total
Nature of E quity e Shares Transfer consid
Sr. Date of Name of Name of Transactio Shares per allotted Price per eration
No. Allotment Transferee Transferor n Transferre Sha of Face share in (₹ in
d re Value (in ₹) million
(in ₹10 )
₹) each*
December Sanjay Neeraj Other than
75,450 10 Nil Nil Nil
1 27, 2022 Tyagi Tyagi cash (Gift)
December Sanjay Other than
Ritu Tyagi 83,800 10 Nil Nil Nil
2 27, 2022 Tyagi cash (Gift)
December Sanjay Saroj Bala Other than
40,000 10 Nil Nil Nil
3 27, 2022 Tyagi Tyagi cash (Gift)
December Kartikey Other than
Bala Tyagi 27,500 10 Nil Nil Nil
4 27, 2022 Tyagi cash (Gift)
December Kartikey Mohan Other than
37,400 10 Nil Nil Nil
5 27, 2022 Tyagi Tyagi cash (Gift)
December Kartikey Mohan Other than
35,250 10 Nil Nil Nil
6 27, 2022 Tyagi Tyagi HUF cash (Gift)
December Kartikey Poonam Other than
4,650 10 Nil Nil Nil
7 27, 2022 Tyagi Tyagi cash (Gift)
December Kartikey Salintri Other than
45,200 10 Nil Nil Nil
8 27, 2022 Tyagi Tyagi cash (Gift)
December Vartika Other than
Lalit Tyagi 42,600 10 Nil Nil Nil
9 27, 2022 Tyagi cash (Gift)
December Vartika Neeta Other than
3,600 10 Nil Nil Nil
10 27, 2022 Tyagi Tyagi cash (Gift)
December Vartika Poonam Other than
33,250 10 Nil Nil Nil
11 27, 2022 Tyagi Tyagi cash (Gift)
December Vartika Praveen Other than
28,000 10 Nil Nil Nil
12 27, 2022 Tyagi Tyagi cash (Gift)
March 24, Sanjay M/S Neeraj
Cash 750 10 Nil 121.76 91,320
13 2025 Tyagi Tyagi HUF
As certified by Rishi Kapoor & Company, Chartered Accountants pursuant to their certificate dated August 04,
2025 vide UDIN 25455362BMGILB8484.
# The Secondary Transfer Transactions includes the gift transfers.
1421. The Floor Price is [●] times and the Cap Price is [●] times the weighted average cost of acquisition at
which the Equity Shares were issued by our Company, are disclosed below:
Weighted
average cost of
Past transactions Floor Price (₹)* Cap Price (₹)*
acquisition per
Equity Share (₹)#
Weighted average cost of
acquisition of Primary Issuances as Nil [●] times [●] times
per paragraph 8(a) above.
Weighted average cost of
acquisition of Secondary
0.20 [●] times [●] times
Transactions as per paragraph 8(b)
above.
* To be updated at the Prospectus stage
#As certified by Rishi Kapoor & Company, Chartered Accountants pursuant to their certificate dated August 04,
2025 vide UDIN 25455362BMGILB8484.
2. The Offer Price is [●] times of the face value of the Equity Shares
The Offer Price of ₹ [●] has been determined by our Company in consultation with the BRLM, on the basis of
the demand from investors for the Equity Shares through the Book Building Process. Our Company, in
consultation with the BRLM, are justified of the Offer Price in view of the above qualitative and quantitative
parameters.
3. Detailed explanation for Offer Price/ Cap Price being [●] times of WACA of Primary Issuances /Secondary
transactions of Equity Shares (as disclosed above) along with our Company’s KPIs and financial ratios for the
Financial Year ended on March 31, 2025, March 31, 2024 and March 31, 2023
[●]*
* To be included on finalisation of Price Band.
4. Explanation for the Offer Price/Cap Price, being [●] times of WACA of primary issuances/secondary
transactions of Equity Shares (as disclosed above) in view of the external factors which may have influenced
the pricing of the Offer.
[●]*
*To be included on finalisation of Price Band.
Investors should read the above-mentioned information along with “Risk Factors”, “Our Business”,
“Management Discussion and Analysis of Financial Conditions and Results of Operations” and “Restated
Consolidated Financial Information” beginning on pages 228 and 444, respectively, to have a more informed
view.
The trading price of the Equity Shares could decline due to the factors mentioned in the section “Risk Factors”
beginning on page 39 and any other factors that may arise in the future and you may lose all or part of your
investment.
143STATEMENT OF SPECIAL TAX BENEFITS
To,
The Board of Directors
Technocraft Ventures Limited,
S 553/54, Ground Floor, School Block,
Shakarpur, New Delhi-110092 India.
AND
Khambatta Securities Limited,
806, 8th Floor, Tower-B, World Trade Tower,
Noida Sector-16, Uttar Pradesh-201301, India.
(Khambatta Securities Limited the “BRLM”)
Re: Proposed initial public offering of equity shares of face value of ₹ 10 each (the “Equity Shares” and
such offering, the “Offer”) of Technocraft Ventures Limited (the “Company”)
This report is issued in accordance with the Engagement Letter dated July 05, 2025.
We hereby report that the enclosed Annexure I prepared by the Company, initialled by us and the Company for
identification purpose, states the possible special tax benefits available to the Company and its shareholders, under
direct and indirect taxes including the Income-tax Act, 1961, the Central Goods and Services Tax Act, 2017, the
Integrated Goods and Services Tax Act, 2017, the Union Territory Goods and Services Tax Act, 2017, respective
State Goods and Services Tax Act, 2017 (collectively the “GST Act”) including the rules, regulations, circulars
and notifications issued there under (together “the Tax Laws”), as presently in force and applicable to the Financial
Year 2025-26 and relevant to the Assessment Year 2026-2027, for inclusion in the Draft Red Herring Prospectus
(“DRHP”)/Red Herring Prospectus (“RHP”)/ Prospectus for the proposed initial public offering of shares of the
Company as required under the Securities and Exchange Board of India (Issue of Capital and Disclosure
Requirements) Regulations, 2018, as amended (“ICDR Regulations”). The provisions of the Income Tax Act,
1961 are amended by the Finance Bill, 2025 which received the assent of President of India on March 29, 2025.
Certain key amendments as amended by Finance Act, 2025 are therefore considered, in this document, which are
defined in Annexure I. These possible special tax benefits are dependent on the Company and its shareholders
fulfilling the conditions prescribed under the relevant provisions of the Tax Laws. Hence, the ability of the
Company and its shareholders to derive these possible special tax benefits is dependent upon their fulfilling such
conditions, which is based on business imperatives the Company may face in the future and accordingly, the
Company and its shareholders may or may not choose to fulfil.
The benefits discussed in the enclosed Annexure II cover the possible special tax benefits available to the
Company and its shareholders but does not cover any general tax benefits available to the Company and its
shareholders. Further, the preparation of the enclosed Annexure II and its contents is the responsibility of the
management of the Company and is not exhaustive. We were informed that the Statement is only intended to
provide general information to the investors and is neither designed nor intended to be a substitute for professional
tax advice. In view of the individual nature of the tax consequences and the changing Tax Laws, each investor is
advised to consult his or her own tax consultant with respect to the specific tax implications arising out of their
participation in the proposed initial public offering of equity shares of the Company comprising a fresh Offer of
the equity shares of the Company and offer for sale of equity shares from Promoter Selling Shareholder of the
Company particularly in view of the fact that certain recently enacted legislation may not have a direct legal
precedent or may have a different interpretation on the possible special tax benefits, which an investor can avail.
Neither we are suggesting nor advising the investors to invest money based on this Statement.
144We conducted our examination in accordance with the “Guidance Note on Reports or Certificates for Special
Purposes (Revised 2016)”, as amended from time to time (the “Guidance Note”) issued by the Institute of
Chartered Accountants of India. The Guidance Note requires that we comply with ethical requirements of the
Code of Ethics issued by the Institute of Charted Accountants of India.
We have complied with the relevant applicable requirements of the Standard on Quality Control (SQC) 1, Quality
Control for Firms that Perform Audits and Reviews of Historical Financial information, and Other Assurance and
Related Services Engagements.
We do not express any opinion or provide any assurance as to whether:
i) the Company and its shareholders will continue to obtain these possible special tax benefits in future; or
ii) the conditions prescribed for availing the possible special tax benefits where applicable, have been/ would
be met with.
iii) The revenue authorities/courts will concur with the views expressed herein.
The contents of enclosed Annexures are based on the information, explanation and representations obtained from
the Company and on the basis of our understanding of the business activities and operations of the Company.
Our views expressed herein are based on the facts and assumptions indicated to us. No assurance is given that the
revenue authorities/ courts will concur with the views expressed herein. Our views are based on the existing
provisions of the Tax Laws and its interpretation, which are subject to change from time to time. We do not assume
responsibility to update the views consequent to such changes. We shall not be liable to the Company for any
claims, liabilities or expenses relating to this assignment except to the extent of fees relating to this assignment,
as finally judicially determined to have resulted primarily from bad faith or intentional misconduct. We will not
be liable to the Company and any other person in respect of this Statement, except as per applicable law.
We hereby give consent to include this Statement in the Draft Red Herring Prospectus, Red Herring Prospectus,
and the Prospectus, and in any other material used in connection with the proposed Offer. The Statement is not to
be used, referred to or distributed for any other purpose without our prior written consent.
We undertake to immediately communicate, in writing, any changes to the above information/confirmations as
and when: (i) made available to us by the management of the company; or (ii) we become aware of any such
changes, on the basis of the updated information to be received from the management of the company from time
to time to the BRLM and the legal counsel to the Company until the Equity Shares allotted/transferred in the Offer
commence trading on the Stock Exchanges. In the absence of any such communication from us, the Company, the
BRLM and the Legal Counsel to the Company can assume that there is no change to the information/confirmations
forming part of this certificate and accordingly, such information should be considered to be true and accurate.
This certificate is issued for the sole purpose of the Offer and this certificate or any extracts or annexures thereof,
can be used, in full or part, for inclusion in the Offer Documents in connection with the Offer, and for the
submission of this certificate as may be necessary, to any regulatory / statutory authority, stock exchanges, any
other authority as may be required and/or for the records to be maintained by the BRLM in connection with the
Offer and in accordance with applicable law, and for the purpose of any defense the BRLM may wish to advance
in any claim or proceeding in connection with the contents of the Offer Documents.
145This certificate may be relied on by the BRLM, their affiliates and Legal Counsel to the Company.
Yours faithfully,
For and on behalf of
Rishi Kapoor & Company
Chartered Accountants
Firm Registration Number: 006615C
Peer Review Number: 014978
Sd/-
Jyoti Arora
Partner
Membership No.: 455362
UDIN: 25455362BMGIKT5816
Place: Ghaziabad
Date: August 04, 2025
Encl: Annexure I and II
146ANNEXURE I
ANNEXURE ON THE STATEMENT OF SPECIAL DIRECT TAX BENEFITS AVAILABLE TO
TECHNOCRAFT VENTURES LIMITED AND ITS SHAREHOLDERS
The information provided below sets out the possible certain key direct tax benefits available to Technocraft
Ventures Limited (“the Company”) and the shareholders of the Company in a summary manner only and is not a
complete analysis or listing of all potential tax consequences of the subscription, ownership and disposal of equity
shares of the Company, under the Income-tax Act, 1961 (“the Act”).
Several of these benefits are dependent on the Company/ shareholders fulfilling the conditions prescribed under
the Act. Hence, the ability of the Company/ shareholders to derive the tax benefits is dependent upon fulfilling
such conditions, which, based on business / commercial imperatives, the Company/ shareholders may or may not
choose to fulfil. We do not express any opinion or provide any assurance as to whether the Company/ shareholders
will continue to obtain these benefits in present or future. The following overview is not exhaustive or
comprehensive and is not intended to be a substitute for professional advice.
In view of the individual nature of the tax consequences and the changing tax laws, investors are advised to consult
their own tax consultants with respect to the specific tax implications arising out of their participation in the issue.
We are neither suggesting nor are we advising investors to invest money or not to invest money based on this
statement.
The statement below covers only certain relevant direct tax benefits and does not cover any indirect tax benefits
or benefits under any other law.
The statement outlined below is based on the provisions of the Act presently in force in India. The provisions of
the Income Tax Act, 1961 are amended by the Finance Bill, 2025 upon receipt of assent of President of India on
March 29, 2025 and the same be effective from such date. Certain key amendments as passed by Finance Act,
2025 are therefore considered.
I. Possible Special Tax Benefits available to the Company
1. Lower corporate tax rate under section 115BAA of the Act:
As per section 115BAA of the Act as inserted vide the Taxation Laws (Amendment) Act, 2019 with effect from
FY 2019-20 relevant to AY 2020-21, a domestic company has an option to pay income tax in respect of its
total income at a concessional tax rate of 22% (plus surcharge of 10% and cess of 4%) provided the company
does not avail of specified exemptions/ incentives/ deductions or setoff of losses/ unabsorbed depreciation etc.
claims depreciation in the prescribed manner and complies with the other conditions specified in section
115BAA of the Act.
The total income of a company availing the concessional rate of 25.168% (i.e., 22% along with surcharge of
10% and health and education cess of 4%) is required to be computed without set-off of any carried forward
loss and depreciation attributable to any of the aforesaid deductions/incentives. A company can exercise the
option to apply for the concessional tax rate by filing Form No. 10-IC on or before the due date of filing return
of income under section 139(1) of the ITA. Further, provisions of Minimum Alternate Tax (‘MAT’) under
section 115JB of the ITA shall not be applicable to companies availing this reduced tax rate.
In case a company opts for section 115BAA of the Act, the provisions of Minimum Alternate Tax (“MAT”)
under section 115JB of the Act would not be applicable and MAT credit of the earlier year(s) will not be
available for set-off.
147The option needs to be exercised in the prescribed manner during a particular A.Y. on or before the due date
of filing the income-tax return for such A.Y. The option once exercised shall apply to subsequent A.Y.s and
cannot be subsequently withdrawn for the same or any other A.Y. Further, if the conditions mentioned in
section 115BAA of the Act are not satisfied in any A.Y., the option exercised shall become invalid in respect
of such A.Y. and subsequent A.Y.s, and the other provisions of the Act shall apply as if the option under section
115BAA had not been exercised. The company has opted Section 115BAA of the Act, for the purpose of
computing its income tax liability from Financial Year 2019-2020.
2. Deductions from Gross Total Income
Deduction in respect of employment of new employees – section 80JJAA of the Act:
As per section 80JJAA of the Act, while computing income under the head business and profession in case of
an assessee to whom section 44AB (i.e., tax audit) applies, a deduction of an amount equal to 30% of additional
employee cost incurred in the course of such business in the F.Y., shall be allowed for three A.Y.s including
the A.Y. relevant to the F.Y. in which such employment is provided. The Company is entitled to claim such
deduction subject to fulfilment of conditions specified under section 80JJAA of the Act even under the
concessional regime under section 115BAA of the Act.
Deduction in respect of inter-corporate dividends – section 80M of the Act:
Up to 31 March 2020, any dividend paid to a shareholder by a company was liable to payment of Dividend
Distribution Tax (“DDT”) by such company, and the dividend was exempt from tax in the hands of the recipient
shareholder. Pursuant to the amendment made by the Finance Act, 2020, DDT was abolished, and dividend
received by a shareholder on or after 1 April 2020 is liable to tax in the hands of the shareholder, other than
dividend on which tax under section 115-O has been paid.
With respect to a shareholder which is a domestic company as defined in section 2(22A) of the Act, section
80M inter alia provides that where the gross total income of a domestic company in any F.Y. includes any
income by way of dividends from any other domestic company or a foreign company or a business trust, there
shall, in accordance with and subject to the provisions of the said section, be allowed in computing the total
income of such domestic company, a deduction of an amount equal to so much of the amount of income by
way of dividends received from such other domestic company or foreign company or business trust as does
not exceed the amount of dividend distributed by it on or before the “due date”. For the purposes of the section,
“due date” means the date one month prior to the date for furnishing the income-tax return under section 139(1)
of the Act.
The Company is entitled to claim such deduction subject to fulfilment of conditions specified under section
80M of the Act even under the concessional regime under section 115BAA.
II. Possible Special Tax Benefits available to the shareholder
As per section 194 of the Act, the Company is required to deduct tax at source from the amount of dividend
paid to shareholders, except in the case of certain categories of shareholders as specified in the said section
which inter alia include individual shareholders receiving dividend not exceeding ₹ 10,000 (in aggregate
during a F.Y.) by any mode other than cash.
Further, as discussed above, subject to fulfilment of conditions, deduction shall be available under section 80M
of the Act to domestic corporate shareholders in respect of inter-corporate dividends.
148Section 2(42A) of the Act provides that securities (other than units) listed in a recognized stock exchange in
India that are held for not more than 12 months immediately preceding the date of its transfer, shall constitute
short-term capital assets.
As per Section 111A of the Act, short term capital gains arising from the transfer of an equity share shall be
taxed at 20% (plus applicable surcharge and cess) subject to fulfilment of prescribed conditions under the Act.
Further, as per section 112A of the Act, long-term capital gains exceeding ₹ 1,25,000 arising from the transfer
of equity shares in a company transacted through a recognized stock exchange on which STT has been paid
on acquisition (except in certain situations) and on transfer, shall be chargeable to tax at the rate of 12.5% (plus
applicable surcharge and cess) without applying the benefit under the first proviso to section 48 of the Act.
The condition of STT shall not apply to a transfer undertaken on a recognized stock exchange located in any
IFSC and where the consideration for such transaction is received or receivable in foreign currency.
Finance Act, 2023 has amended section 115BAC of the Act to provide that with effect from F.Y. 2023-24
relevant to A.Y. 2024-25, Individuals, HUF, Association of Persons (other than a co-operative society), Body
of Individuals and Artificial Juridical Person will be taxed on its total income at the reduced tax rates (‘Default
Tax Regime’) (to be reduced further by Finance Act, 2025 with some additional deductions with effect from
A.Y. 2026-27). The income would however have to be computed without claiming prescribed deductions or
exemptions.
Such person will however have the option to be taxed on its total income as per the tax rates under the old tax
regime. The option is required to be exercised – (i) on or before the due date specified under section 139(1) of
the Act for furnishing the income-tax return for such A.Y., in case of a person having income from business or
profession and such option once exercised shall apply to subsequent A.Y.s; or (ii) along with the income-tax
return to be furnished under section 139(1) of the Act for every A.Y. in case of a person not having income
from business or profession.
A person having income from business or profession who has exercised the option of shifting out of the Default
Tax Regime shall not be able to exercise the option of again opting out from the Default Tax Regime till he
has business income. However, a person not having income from business or profession shall be able to
exercise this option every year.
Notes:
1. This statement does not discuss any tax consequences arising in a country outside India pursuant to an
investment in the shares of the Company. The shareholders in the country outside India are advised to consult
their own professional advisors regarding the possible tax consequences that apply to them in such country
outside India.
2. In respect of non-resident shareholders, the taxation and tax rates discussed above may be further subject to
any benefit available under the applicable Double Taxation Avoidance Agreement, if any, between India and
the country in which the non-resident has fiscal domicile. Applicability of DTAA benefit shall be subject to
furnishing of relevant documents/declarations viz. tax residency certificate, Form 10F, etc. by the non-resident
shareholders.
3. No assurance is given that the revenue authorities/courts will concur with the views expressed herein. Our
views are based on the existing provisions of law and its interpretation, which is subject to change from time
to time. We do not assume responsibility to update the views consequent to such changes.
149ANNEXURE ON THE STATEMENT OF SPECIAL INDIRECT TAX BENEFITS AVAILABLE TO
TECHNOCRAFT VENTURES LIMITED AND ITS SHAREHOLDERS
The Central Goods and Services Tax Act, 2017, the Integrated Goods and Services Tax Act, 2017, the Union
Territory Goods and Services Tax Act, 2017, respective State Goods and Services Tax Act, 2017 (collectively the
“GST Act”) including the rules, regulations, circulars and notifications issued there under (together “the Tax
Laws”) and the Customs Tariff Act, 1975 (collectively referred to as “Indirect tax”).
1. Special Indirect Tax Benefits available to the Company
There are no special indirect tax benefits available to the Company.
2. Special Indirect Tax Benefits available the Shareholders of the Company
There are no special indirect tax benefits available to the shareholders of the Company.
Notes:
1. The Statement has been prepared on the basis that the shares of the Company are listed on a recognized stock
exchange in India and the Company will be issuing equity shares.
2. The above views are basis the provisions of law, their interpretation and applicability as on date, which may
be subject to change from time to time and that department may take a view contrary to that indicated above.
150ANNEXURE II
ANNEXURE COVERING SPECIAL TAX BENEFITS AVAILABLE TO THE COMPANY AND ITS
SHAREHOLDERS OTHER THAN GENERAL TAX BENEFITS
This statement of possible special tax benefits is required as per Schedule VI (Part A)(9)(L) of the SEBI ICDR
Regulations. While the term ‘Possible Special Tax Benefits’ has not been defined under the SEBI ICDR
Regulations, for the purpose of this Statement, it is assumed that with respect to possible special tax benefits
available to the Company, the same would include those benefits as enumerated in this Annexure. Any benefits
under the taxation laws other than those specified in this Annexure are considered to be general tax benefits and
therefore not covered within the ambit of this Statement. Further, any benefits available under any other laws
within or outside India, except for those mentioned in this Annexure have not been reviewed and covered by this
statement.
I. Possible Special Direct tax benefits available to the Company
There are no special direct tax benefits available to the Company.
II. Possible Special Indirect tax benefits available to the Company
There are no special Indirect tax benefits available to the Company.
III. Possible Special tax benefits available to Shareholders of the Company
There are no possible special tax benefits available to Shareholders of the Company.
Notes:
1. The above Statement of Tax benefits sets out the possible special tax benefits available to the Company and
its shareholders under the tax laws mentioned above as applicable.
2. The above Statement covers only above-mentioned tax laws benefits and does not cover any general tax
benefits under any other law as applicable.
3. This Statement is intended only to provide general information to the investors and is neither designed nor
intended to be a substitute for professional tax advice. In view of the individual nature of tax consequences,
each investor is advised to consult his/her own tax advisor with respect to specific tax consequences of
his/her investment in the shares of the Company as applicable.
4. No assurance is given that the revenue authorities/courts will concur with the views expressed herein. Our
views are based on the existing provisions of law and its interpretation, which are subject to changes from
time to time. We do not assume responsibility to update the views consequent to such changes as applicable.
5. This statement does not discuss any tax consequences under any law for the time being in force, as applicable
of any country outside India. The shareholders / investors are advised to consult their own professional
advisors regarding possible tax consequences that apply to them in any country other than India as applicable.
151SECTION IV – ABOUT THE COMPANY
INDUSTRY OVERVIEW
Unless stated otherwise, industry and market data used in this section have been extracted from the report titled
“Assessment of Infrastructure construction industry in India with focus on water and wastewater management”
dated August 05, 2025 (the “CRISIL Report”), exclusively prepared, commissioned and paid for by our Company
for the purposes of the Offer and issued by CRISIL Intelligence who was appointed by our Company pursuant to
a technical proposal dated April 10, 2025. For further information, kindly refer “Risk Factor No. 41 — Industry
information included in this Draft Red Herring Prospectus has been derived from an industry report issued by
CRISIL Intelligence dated August 05, 2025 ("CRISIL Report"). There can be no assurance that such third-party
statistical, financial and other industry information is complete, reliable or accurate.” on page 64. Also, kindly
refer “Certain Conventions, Presentation of Financial, Industry and Market Data and Currency of Presentation”
beginning on page 22. The CRISIL Report will be available on the website of our Company at
www.technocraftventures.com from the date of this Draft Red Herring Prospectus until the Bid/Offer Closing
Date. Unless otherwise indicated, financial, operational, industry and other related information derived from the
CRISIL Report and included herein with respect to any particular year refers to such information for the relevant
calendar year.
Macroeconomic assessment
Global GDP outlook
Global GDP is estimated to grow at 2.8% in CY25 and 3.0% in CY26 amid moderating inflation and steady
growth in key economies
As per the International Monetary Fund's (IMF) April 2025 update, global gross domestic product (GDP) growth
witnessed a growth of 3.3% in 2024 as signs of stabilization emerged — inflation declined from multi-decade
highs, and labor markets gradually normalized, with unemployment and vacancy rates returning to pre-pandemic
levels.
However, major policy shifts are resetting the global trade system and giving rise to uncertainty in the global
economy. Since February 2025, a series of new tariff measures by the United States which announced multiple
waves of tariffs on major trading partners and critical sectors, culminating on April 2 with a set of nearly universal
tariffs. While many of the scheduled tariff increases are on hold for now, the combination of measures and
countermeasures has hiked US and global tariff rates to centennial highs. However, the context for such increases
is very different compared to earlier, the global economy is now characterized by a high degree of economic and
financial integration, with supply chains and financial flows crisscrossing the world, whose potential unwinding
could constitute a major source of economic upheaval. For this reason, IMF April 2025 outlook expect that it will
lead to a significant slowdown in global growth in the near term.
This swift escalation of trade tensions and extremely high levels of policy uncertainty are expected to have a
significant impact on global economic activity. Under the reference forecast that incorporates information as of
April 4, global growth is projected to drop to 2.8% in CY25 and 3.0% in CY26.
152Global GDP trend and outlook (CY18-30P, $ trillion)
120.0 8.0%
6.6%
100.0 5.0%
3.4% 3.3% 3.8% 3.7% 2.9% 3.6% 3.5% 3.3% 2.8% 3.0%
80.0 2.0%
60.0 -1.0%
-2.7%
40.0 -4.0%
20.0 -7.0%
76 78 81 84 87 85 90 93 97 100 103 106
0.0 -10.0%
5 6 7 8 9 0 1 2 3 P P P
1 1 1 1 1 2 2 2 2 4 5 6
Y Y Y Y Y Y Y Y Y 2 2 2
C C C C C C C C C Y Y Y
C C C
GDP ($ trillion) GDP growth (%)
Note: E: Estimated, P: Projection
Source: IMF economic database, Crisil Intelligence
India among fastest-growing major economies
India became the fourth largest economy in the world by 2025 and has grown at a faster growth rate compared to
top key economies. Additionally, India’s expanding economy along with growing per capita income, could
positively impact the consumer purchasing power, which in turn will influence the demand for discretionary
spends like entertainment, leisure, tourism, etc.
United States: For the United States, growth is projected to decrease in 2025 to 1.8%, 1% lower than the rate for
2024 as a result of greater policy uncertainty, trade tensions, and a softer demand outlook, given slower-than-
anticipated consumption growth. Tariffs are also expected to weigh on growth in 2026, which is projected at 1.7%
amid moderate private consumption.
Euro area: Growth in the euro area is expected to decline slightly to 0.8% in 2025, before picking up modestly
to 1.2% in 2026. Rising uncertainty and tariffs are key drivers of the subdued growth in 2025. Offsetting forces
that support the modest pickup in 2026 include stronger consumption on the back of rising real wages and a
projected fiscal easing in Germany.
For advanced economies, growth under the reference forecast is projected to drop from an estimated 1.8% in
2024 to 1.4 percent in 2025 and 1.5 percent in 2026. The forecasts for 2025 include significant downward revisions
for Canada, Japan, the United Kingdom, and the United States and an upward revision for Spain.
Emerging market and developing economies: For emerging market and developing economies, growth is
projected to drop to 3.7% in 2025 and 3.9% in 2026, following an estimated 4.3% in 2024.
Real GDP growth comparison between India and advanced and emerging economies
Real GDP growth (Annual
2019 2020 2021 2022 2023 2024P 2025P 2026P
percent change)
Advanced economies 1.9 -4.0 6.0 2.9 1.7 1.8 1.4 1.5
Canada 1.9 -5.0 6.0 4.2 1.5 1.5 1.4 1.6
China 6.1 2.3 8.6 3.1 5.4 5.0 4.0 4.0
153Real GDP growth (Annual
2019 2020 2021 2022 2023 2024P 2025P 2026P
percent change)
Emerging market and developing
3.7 -1.7 7.0 4.1 4.7 4.3 3.7 3.9
economies
Euro area 1.6 -6.0 6.3 3.5 0.4 0.9 0.8 1.2
India* 3.9 -5.8 9.7 7.6 9.2 6.5 6.5** 6.3
United Kingdom 1.6 -10.3 8.6 4.8 0.4 1.1 1.1 1.4
United States 2.6 -2.2 6.1 2.5 2.9 2.8 1.8 1.7
World 2.9 -2.7 6.6 3.6 3.5 3.3 2.8 3.0
Notes: P- projected
* Numbers for India are for financial year from April to March (2020 is FY21 and so on) and according to MoSPI.
^India GDP estimate for the FY24 is 9.2% according to Second Advance Estimates from MoSPI.
**Projection is as per the Crisil forecast
Source: IMF economic database, Crisil Intelligence
Macroeconomic assessment of India
India GDP logged 6.1% CAGR between FY12 and FY25 to grow 6.5% in FY25
India’s GDP grew at 6.1% compounded annual growth rate (CAGR) between FY14 and FY25 to Rs. 188 trillion
in FY25 from Rs. 98 trillion in FY14. This growth was primarily driven by expansion of non-agricultural
economy, particularly the financial, state, and professional services sector, which recorded the highest CAGR of
7.4% during this period. In contrast, the agriculture, livestock, forestry, and fishing sector posted a comparatively
modest CAGR of 4.0% during the considered period. A key contributor to GDP growth during this period was
the rise in private final consumption expenditure (PFCE), which constitutes the largest share of GDP. This was
complemented by improvements in exports and increase in government final consumption expenditure (GFCF).
Additionally, according to Provisional Estimates (PE) of FY25, India's GDP is projected to have grown at 6.5%
in FY25, a moderation from the 9.2% growth recorded in FY24. Despite this deacceleration, growth remains close
to the pre-pandemic decadal average of 6.6 % between FY11- 20, enabling India to retain its position as the fastest
growing major economy.
Moving forward, Crisil projects GDP growth to remain steady at 6.5% in FY26, despite potential headwinds
arising from geopolitical developments and global trade uncertainties, including tariff actions by the United States.
Factors expected to support growth includes easing food inflation, tax incentives announced in the Union Budget
2025-26, and lower borrowing cost, all of which are expected to boost discretionary consumption. However,
India's Current Account Deficit (CAD) is projected to widen slightly in FY26, driven by challenges in exports
amid subdued global demand and trade tensions. Nonetheless, a strong service trade surplus and continued growth
in remittances are expected to mitigate the extent of the widening CAD. In the medium term (fiscal 2025-2031),
Crisil expects India’s GDP to grow 6.7% per year, with capital investments playing a dominant role and a bigger
push from efficiency gains.
154India real GDP growth at constant prices (new series)
(In Rs trillion)
(In %)
300 15.0%
250
9.7% 9.2% 10.0%
7.4%8.0%8.3%
7.6%
200 6.4% 6.8%6.5% 6.5%6.5% 6.7%
5.5% 5.0%
3.9%
150
0.0%
100 1
-5.0%
50 -5.8%
8 9 9 1 1 1 1 1 1 1 1 1 1 2 2
0 -10.0%
2 1 Y F 3 1 Y F 4 1 Y F 5 1 Y F 6 1 Y F 7 1 Y F 8 1 Y F 9 1 Y F 0 2 Y F 1 2 Y F 2 2 Y F 3 2 Y FE F4 2 Y FE R F E P 5 2 Y P 6 2 Y F P 1 3 Y F
F
GDP at constant prices (FY12) in Rs. trillion y-o-y GDP growth rate
Note: FE: Final Estimates, FRE: First Revised Estimates, SAE: Second Advance Estimates, P: Projected
These values are reported by the government under various stages of estimates
Only actuals and estimates of GDP are provided in the bar graph
Source: Second Advance Estimates of annual GDP for 2024-25, Ministry of Statistics and Program
Implementation (MoSPI), Crisil Intelligence
Per capita net national income of India further improved in FY25
India’s per capita income, a broad indicator of living standards, rose from Rs 68,572 in FY14 to Rs 114,705 in
FY25 as per SAE, logging 4.8% CAGR. Growth was led by better job opportunities, propped up by overall GDP
growth. Moreover, population growth remained stable at ~1% CAGR.
Per capita net national income at constant prices
CAG
R
FY23F FY24FR FY25SA
FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21 FY22 (FY14
E E E
-
FY25)
Per-
capita 68,57 72,80 77,65 83,00 87,58 92,13 94,42 86,03 94,05
100,163 108,786 114,705 4.8%
NNI 2 5 9 3 6 3 0 4 4
(Rs.)
Y-o-Y
growt 4.6% 6.2% 6.7% 6.9% 5.5% 5.2% 2.5% -8.9% 9.3% 6.5% 8.6% 5.4% -
h (%)
Note: FE: Final Estimates; FRE: First Revised Estimates; SAE: Second Advance Estimates;
Source: Second Advance Estimates of Annual GDP for 2024-25, MoSPI, Crisil Intelligence
155Private final consumption expenditure to maintain dominant share in India’s GDP
PFCE continues to be the largest component of India's GDP with the share of 56.7% in FY25. It recorded a CAGR
of 6.1% between F14 and FY25, thereby mirroring the overall GDP growth rate during the same period and is
estimated at Rs 106.6 trillion in FY25 compared to Rs 55.6 trillion in FY14.
Growth was led by healthy monsoon, wage revisions due to the implementation of the Seventh Central Pay
Commission’s (CPC) recommendations (effective from 1st July 2017), benign interest rates, growing middle age
population and low inflation. Furthermore, the tax benefits announced in the Union Budget 2025-2026 are also
expected to positively boost the PFCE. As of FY25, PFCE is estimated to have increased to Rs. 106.6 trillion,
registering a y-o-y growth of 7.6% and forming ~56.7% of India’s GDP. Overall, PFCE has consistently led
India’s GDP growth from the demand side, underscoring sustained domestic consumption.
PFCE (at constant prices)
Rs. trillion
CAGR (FY14-25):6.1%
120 59%
58.1% 58.1% 58%
100
57.1% 57%
56.7% 56.8% 56.7%
80 56.2% 56.1% 56.1% 56.1% 56.1% 56%
55.8%
55%
60
54%
40 53%
52%
20 6
6
.5
1
.9
8
.3
0
.9
3
.3
5
.8
6
.2
2
.8
3
.7
8
.3
1
.9
.6
0 51%
5 5 6 6 7 7 8 7 8 9 9 1
0 50%
4 5 6 7 8 9 0 1 2 E E E
1 1 1 1 1 1 2 2 2 F R A
Y Y Y Y Y Y Y Y Y 3 F S
F F F F F F F F F 2 Y 4 2 5 2
F Y Y
F F
PFCE (INR billion) % share in GDP
Note: FE: Final Estimates; FRE: First Revised Estimates; SAE: Second Advance Estimates;
Source: Second Advance Estimates of Annual GDP for 2024-25, MoSPI, Crisil Intelligence
Consumption expenditure will continue to drive GDP growth led by discretionary spends
In the medium to long term, positive economic outlook and growth across key employment generating sectors
(such as real estate, infrastructure, and automobiles) are expected to have a cascading effect on overall per capita
income. This, in turn, is expected to drive discretionary spending.
This rising share of discretionary spendings along with growing per capita income will positively impact industries
like tourism, hospitality, entertainment, retail, etc which depends heavily on discretionary spends.
India’s population aged 25-49 years is projected to increase to ~38% indicates strong potential for
disposable income, to contribute to discretionary consumer spending
Furthermore, the share of population aged 25-49 years as a percentage of total population stood at ~37% in
CY2023 and is projected to increase to ~38% in CY2030, indicating a strong potential for disposable income.
This increasing share of working age population, coupled with overall economic growth will provide a larger
consumer base for industries like entertainment, cruising, lifestyle products, etc. thereby driving greater consumer
spending in consumer driven businesses.
156Population split across age groups (%)
4.1% 5.3%
15.9%
17.7%
37.1%
38.3%
17.9%
16.2%
25.1% 22.4%
CY 2023 CY 2030
0-14 15-24 25-49 50-69 70+
Note: P: Projected
Population is the above chart as of 1st January
Source: UN Department of Economic and Social Affairs, World Population Prospects 2024, Crisil Intelligence
Urbanisation likely to reach 40% by CY30
India’s population is estimated to have grown to ~1.4 billion in 2023 as per World Population Prospects 2024,
compared to 1.0 billion in 2000, thereby registering a CAGR of ~1.3%. Additionally, as per World Population
Prospects 2024, the population of India is expected to remain the world’s largest throughout the century and will
likely reach its peak in the early 2060s at about 1.7 billion.
Furthermore, India’s urban population has also been increasing over the years. The trend is expected to continue
as economic growth increases. From ~31% of the total population in CY10, the country’s urban population is
projected to reach nearly 40% by CY2030, according to a UN report on urbanisation. People from rural areas
move to cities for better job opportunities, education and quality of life. Typically, migration can be of the entire
family or a few individuals (generally an earning member or students).
India’s urban population versus rural
(Billio CAGR (2023-30):0.8%
1.8 CAGR (2000-23):1.3%
1.5
1.4 1.4
1.5
1.2
1.2 1.1
60%
0.9 65% 64%
69%
72%
0.6
0.3 35% 36% 40%
28% 31%
-
2000 2010 2020 2023P 2030P
Rural Urban
Note: P: Projected
Source: World Urbanization Prospects: The 2018 Revision, UN, Crisil Intelligence
157India’s gross fixed capital formation as % of GDP to have further improved in fiscal 2024
Gross fixed capital formation (GFCF) measures the level of investment in creating physical assets and
infrastructure, which plays a crucial role in fostering economic growth and development. Gross fixed capital
formation includes land improvements (fences, ditches, drains, and so on); plant, machinery, and equipment
purchases; and the construction of roads, railways, and the like, including schools, offices, hospitals, private
residential dwellings, and commercial and industrial buildings.
GFCF % of GDP (CY2023)
This is a sharp reversal from fiscals 2020 and 2021, when the GFCF had fallen to 31.6% and 31.2% of GDP,
respectively, as investments in physical assets were impacted by disruptions in supply chains and business
operations owing to the pandemic. It, however, recovered to 33.4% of GDP in fiscal 2022 and 33.6% of GDP in
fiscal 2023, attributed to factors such as easing of pandemic-related restrictions, the government's focus on
infrastructure development, economic reforms and increase in urbanisation, which boosted demand for affordable
housing. As per the second advance estimates for fiscal 2025, GFCF as % of India’s GDP to remain at 33.4%.
GFCF as % of India’s GDP (fiscal 2012 to 2025)
35.0% 34.3% 34.2%
34.0% 33.4% 33.6% 33.5% 33.4%
33.0% 32.6% 32.5%
31.6%
32.0%
31.1% 31.1% 31.2%
30.7% 30.8%
31.0%
30.0%
29.0%
28.0%
FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25
FE FRE SAE
Note: FE: Final Estimates; FRE: First Revised Estimates; SAE: Second Advance Estimates;
Source: Second Advance Estimates of Annual GDP for 2024-25, MoSPI, Crisil Intelligence
A large part of the rise in fiscal 2023 was because of dwellings, other buildings and structures, which had a
significant ~55% weightage in the GFCF. Key factors contributing to the vertical’s dominant share were economic
growth, the government's commitment to infrastructure development, particularly in roads, railways, and energy
projects, and increase in FDI, which boosted private sector investment. A growing middle class and increasing
urbanisation contributed significantly to the rising demand for housing and commercial spaces, thereby spurring
investment in the construction sector.
Private sector is a major contributor to GFCF
The distribution of GFCF between the private and public sectors has been relatively constant in India, with the
private sector consistently the predominant contributor. In fiscal 2023, the private sector accounted for ~77% of
total GFCF.
158Share of public and private sectors in GFCF
(Rs trillion)
34.3% 34.1%
33.4% 33.3% 33.5% 33.5%
70 32.6% 32.4% 62.8 35.0%
31.1% 30.7% 30.8% 31.1% 31.6% 31.2% 59.2
60 54.4
50.1 30.0%
45.4 45.9
50 42.7
40.8
37.9
34.9 25.0%
40 31.5 31.9 32.8
30
77%
78%
30 76% 77%
76% 20.0%
77%
75%
74%
20 79% 79% 78% 77%
15.0%
10
21% 21% 22% 23% 26% 25% 23% 24% 23% 24% 22% 23%
0 10.0%
FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25
FE FRE SAE
Public Private % Share of GFCF in GDP
RE – revised estimate, PE – provisional estimate, FE: Final Estimates, FRE: First Revised Estimates, SAE:
Second Advance Estimates,
Note: Private fixed capital formation includes household sector
Source: MoSPI, Crisil Intelligence
Inflation of key construction materials has increased in FY25 but it is in line with overall WPI inflation
In FY25, WPI inflation stood at 2.31%. WPI inflation for categories such as cement, lime, plasters, paints,
varnishes, mild steel long products registered a negative WPI inflation of -5.03%, -2.92%, -1.62% and -0.64%
respectively, whereas manufacture of articles of concrete cement, and plaster, refractory products, porcelain
sanitary products, electrical insulating material saw a modest WPI inflation of 1.09%, 1.59%, 0.40%, and 1.06%
respectively.
WPI index of key construction raw materials (%)
Key
FY1 FY1 FY1 FY1 FY1 FY2 FY2 FY2 FY2 FY2
construction FY25
5 6 7 8 9 0 1 2 3 4
raw materials
Manufacture of
cement, lime 4.23 -0.90 0.64 2.89 0.44 4.55 1.17 4.55 8.54 0.07 -5.03
and plaster
Manufacture of
articles of
concrete, 3.56 -0.34 -0.69 3.12 2.19 0.08 3.04 3.11 4.02 2.46 1.09
cement and
plaster
Manufacture of
refractory 2.95 3.82 -2.84 -2.58 -1.86 -2.16 0.74 5.57 2.94 0.59 1.59
products
Manufacture of 13.4 11.2
2.01 -1.88 -1.18 0.09 3.78 1.77 0.17 -0.90 -2.92
paints 9 0
159Key
FY1 FY1 FY1 FY1 FY1 FY2 FY2 FY2 FY2 FY2
construction FY25
5 6 7 8 9 0 1 2 3 4
raw materials
Manufacture of
10.1
varnishes (all 5.00 5.62 1.15 -0.57 5.78 1.69 -2.57 7.54 -2.82 -1.62
9
types)
-
Porcelain 13.4
6.55 14.8 -8.00 -0.32 4.26 4.90 6.32 9.15 -8.43 0.40
sanitary ware 1
7
Electric
insulating 4.94 1.79 1.02 0.37 -0.09 1.10 -4.79 1.61 3.36 1.99 1.06
material
-
Mild steel- long 12.0 15.2 22.6
2.02 13.6 -1.95 -4.26 6.16 8.95 -5.61 -0.64
products 8 7 8
9
Overall WPI 12.9
1.24 -3.69 1.73 2.96 4.26 1.67 1.31 9.40 -0.72 2.31
inflation 7
Note: Inflation below zero is highlighted in green
Source: Office of Economic Advisor, Crisil Intelligence
Construction sector’s share in overall GVA estimated to have risen further in fiscal 2024
Construction GVA is a critical indicator of economic activity since it represents the value generated by the
construction sector, which includes activities related to building infrastructure, real estate and other construction
projects.
In India, construction GVA increased to Rs 15.5 trillion in fiscal 2025SAE from Rs 7.8 trillion in fiscal 2012,
which was 5.4% CAGR. Several factors contributed to the growth, including economic expansion, the
government's commitment to infrastructure development, particularly roads, railways and energy projects, and
increase in foreign direct investment, which boosted private sector investment. Furthermore, increasing demand
for affordable housing, driven by rising urbanisation and an expanding middle-class population, has also played
a significant role in elevating construction GVA. However, in fiscal 2021, the country’s GVA was under pressure
amid challenges heaped by the pandemic. In fiscal 2022, though, the share of construction GVA in the overall
GVA rebounded to 8.6%, increasing further to 8.8% in fiscal 2023. As per the provisional estimates for fiscal
2025, construction GVA was Rs 15.7 trillion, thereby contributing to 9.1% of overall GVA.
Construction GVA
Rs trillion CAGR (FY14-25) 6.3%
18.0 9.5%
9.1%
16.0
8.9%
14.0 8.8% 8.8% 9.0%
8.6% 8.6%
12.0
8.5%
10.0 8.2% 8.1% 8.1%
8.0%
8.0 7.9%
7.8% 8.0%
6.0
4.0 7.5%
2.0
8.0 8.4 8.7 9.2 9.6 10.3 10.4 10.0 11.9 13.1 14.4 15.7
0.0 7.0%
FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25
FRE PE
Construction GVA (Rs trillion) Share of construction in total GVA
FRE – Final revised estimate, PE – provisional estimates
Source: MoSPI, Crisil Intelligence
160Overview of FDI in construction segment in India
The construction sector is a vital component of the Indian economy, with a significant multiplier effect on the
country's growth. The government's efforts to promote ease of doing business have led to an increase in Foreign
Direct Investment (FDI) inflows in the sector. As a result, FDI has played a crucial role in the development of the
construction industry in India, with the sector attracting significant investments from foreign investors.
The Indian government's decision to allow 100% FDI in the construction development sector under the automatic
route in 2005 has been a key factor in attracting foreign investment. The sector has seen significant FDI inflows,
with total FDI in the construction segment reaching a peak of 61,357 INR Cr in FY21. Notably, the total FDI in
the construction segment has accounted for around 5-10% of the total FDI inflows into the country.
FDI inflow in construction sector of India
Rs billions
700.0 16.0%
13.9%
600.0 14.0%
12.0%
500.0 10.1%
10.0%
400.0
7.3%
8.0%
300.0 5.6% 5.7%
5.3% 5.1% 6.0%
4.0%
200.0
4.0%
100.0 2.0%
210.4 174.3 188.6 613.6 251.1 147.8 371.9 174.6
0.0 0.0%
FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25*
Construction FDI inflow Share of construction sector in total FDI inflow
Note: FY25 numbers are updated till Dec-24 Construction FDI inflow numbers include both construction in
infrastructure activities and construction development projects
Source: DPIIT, Crisil Intelligence
Overview of National infrastructure pipeline
In fiscal 2019, Government of India has launched the National Infrastructure Pipeline (NIP) for fiscal 2020 –
2025, with an aim to improve India’s infrastructure and attract investments across various sectors. To draw up
NIP, economic and social infrastructure projects worth more than Rs. 1,000 million per project under construction,
proposed greenfield projects, brownfield projects and those in conceptualisation stage were considered. These
pipelines of projects are implemented by all the states and union territories of India and 22 infrastructure ministries
under Government of India.
With various projects across sectors the NIP aims to create various employment opportunities while enhancing
the standard of living. It also aims to increase investments in the projects by improving investors’ confidence
through better project preparation, reducing aggressive bids/failure in project delivery and ensuring enhanced
access to sources of finance.
Initially, the NIP started with 6,835 projects. By April 2025, this number has increased to 13,108 projects across
32 different sectors. Out of these, 1,077 projects are currently under development, showing progress in India's
infrastructure development efforts. The total investment target under NIP during the period, has been revised from
Rs. 111 trillion to Rs. 147 trillion.
161Despite a slowdown in the global economy, emerging economies like India continue to prioritize infrastructure
development, with a focus on essential services such as roads, railways, power, water supply, and sanitation,
which account for approximately 70% of the NIP.
These sectors are less affected by economic fluctuations and are supported by long-term budget allocations,
providing a stable source of opportunities for EPC companies. Currently, around 62% of NIP projects are being
implemented through the EPC model, presenting significant opportunities for EPC companies operating in these
areas
Transport, power, and water projects occupy major share under planned NIP spending of planned Rs 147
trillion
Roads Rail* Power WSS Real estate Others^
27% 13% 19% 12% 11% 18%
Note: Values are rounded-off to closest whole number
*Rail also includes investments under Mass Rapid Transit System (MRTS)
^Others include Others include irrigation, rural infra, ports, airports, health, petroleum, natural gas, education,
etc
Source: India Investment Grid (IIG), Crisil Intelligence
Half of the NIP projects (value terms) are under implementation
Planning Pre-construction Under construction Completed
16% 26% 54% 4%
Note: Values are rounded-off to closest whole number
Source: India Investment Grid (IIG), Crisil Intelligence
Total EPC opportunity at ~Rs 92 trillion
EPC
EPC Private PPP Undecided
62% 7% 22% 9%
Note: Values are rounded-off to closest whole number
Source: India Investment Grid (IIG), Crisil Intelligence
162Transport sector occupies the highest share among the total EPC contracts
Roads Rail* Power WSS Others^
23% 12% 19% 7% 39%
Note: Values are rounded-off to closest whole number
*Rail also includes investments under Mass Rapid Transit System (MRTS)
^Others include Others include irrigation, rural infra, ports, airports, health, petroleum, natural gas, education,
etc
Source: India Investment Grid (IIG), Crisil Intelligence
Budgetary capex for infrastructure ministries is Rs 10.7 trillion, up 11.6% from fiscal 2025
The budgetary capex for infrastructure ministries is Rs 10.7 trillion, up 11.6% from fiscal 2025RE. This increase
aligns with the government’s emphasis on infrastructure development, as seen in the rising budget allocations
aimed at achieving the goals outlined in the National Infrastructure Pipeline (NIP).
The key announcements for infrastructure section in the Budget for fiscal 2026 are as follows:
• The budgetary capex for infrastructure ministries is Rs 10.6 trillion, up 11.6% from fiscal 2025RE
• Each infrastructure-related ministry will come up with a three-year project pipeline that can be implemented
through the public-private partnership (PPP) mode. States are also encouraged to do so
• To support states in infrastructure development, an outlay of Rs 1.5 trillion is proposed for 50-year interest-
free loans as capex and incentives for reforms
• In the second phase of the asset monetisation plan, the government aims to generate Rs 10 trillion with a
pipeline of assets to be monetised between fiscals 2025 and 2030
Budget allocation for infrastructure sector
Rs trillion FY24 FY25RE FY26BE
Gross Budgetary Support GBS) 5.5 5.7 5.8
Internal and external budgetary resources (IEBR) 1.5 1.8 2.2
Grants allocation for capital creation (GIA) 1.9 2.0 2.7
Total Budget allocation 8.5 9.5 10.7
Note: 10 infrastructure ministries included: Road transport and highways, Housing and urban affairs, civil
aviation, power, railways, shipping, rural development, water resources, New and renewable energy, Department
of atomic energy
RE- Revised estimates, BE-Budgeted estimates
Source: Budget documents, Crisil Intelligence
Assessment of Infrastructure construction segment in India
Overview of investments in construction sector
The construction sector in India can be broadly classified into Building Construction, Industrial/ Manufacturing
construction, and Infrastructure construction.
Industrial/manufacturing construction includes manufacturing plants, factories, power plants, and other highly
specialised facilities. Infrastructure construction includes warehouses, bridges, dams, roads, airports, canals, etc.
163and building construction includes constructing buildings for residential uses such as houses, residential towers,
etc. as well as non-commercial buildings like hospitals, educational institutions as well as buildings for
commercial use such as offices, retail malls, etc.
The further classification of these verticals into conventional and unconventional construction methods has been
discussed in the latter section of the report.
Construction Industry in India
Industrial/ Manufacturing construction Infrastructure construction Building construction
Source: Crisil Intelligence
Investments in construction sector
The construction industry in India is expected to grow steadily at an annual rate of 6-8% between fiscal years
2026 and 2030. This growth will be mainly driven by increased spending on infrastructure projects such as roads
and railways, supported by both central and state government investments.
In fiscal year 2025, construction capital expenditure expected to rise by 7% compared to the previous year,
reaching ₹12.7 lakh crore. This increase aligns with the government’s emphasis on infrastructure development, as
seen in the rising budget allocations aimed at achieving the goals outlined in the National Infrastructure Pipeline
(NIP). Previously, the construction sector faced challenges like policy delays in infrastructure and low industrial
investments. Residential construction also declined due to weak demand, affordability issues, and a sluggish
economy. However, recent government initiatives have revitalized construction activity, especially in
infrastructure.
The share of infrastructure projects is expected to stabilise in the ~68-70% range in the next five years as against
~63% for FY19-24, as Infrastructure investments are seen growing faster than the other two segments due to the
Government's focus on Infrastructure under the NIP, NMP and the Gati Shakti initiative. The Central government's
focus on roads, urban infrastructure and railways will boost infrastructure investments. Roads, railways, irrigation
& Power sectors will continue to drive the bulk of these investments. Building & construction and industrial
segments are expected to witness muted growth.
Break-up of the domestic construction sector
Rs trillion
100.0 90-95
90.0
6%
80.0
25%
70.0
54.7
60.0
50.0 8%
40.0 29%
30.0 68% -70%
20.0
63%
10.0
-
FY19-24A FY25-30P
Infrastructure Building construction Industrial
164Note: A - Actual, P – Projected
The numbers in the above chart represents cumulative investments for the specific period
Source: Crisil Intelligence
Overview of investments across building, Infrastructure and Industrial in overall construction segment
Share of infrastructure segment is estimated to increase further
• Infrastructure investments are seen growing faster
than the other two sectors due to the government's
focus under the National Infrastructure Pipeline
(NIP), National Monetization Pipeline (NMP) and
the Gati Shakti initiatives. Total construction
investments in this sector is expected to attract
investments of ~Rs 61-63 trillion between FY25-
30P, up from Rs 33-35 trillion between FY21-25.
• Moving forward, the share of infrastructure projects
is expected to stabilise in the ~68-70% range in the
Infrastructure
next five years (FY26-30). Private sector
involvement in infrastructure, which has been
FY 19-24: 34-36 trillion increasing, is poised to intensify with the
FY25-30P: 61-63 trillion government's renewed emphasis on the build-
Projected growth: 1.7x-1.8x operate- transfer (BOT) model in roads. The power
sector continues to attract substantial private
investment, driven by a sharper focus on non-fossil
fuel energy generation. The government's National
Monetisation Pipeline is also expected to play a key
role in boosting private sector participation by
facilitating its greater involvement in infrastructure
development.
• Crisil Intelligence estimates Building &
Construction sector to see stagnant growth with real
estate segment showing a slowdown in demand
along with rising inventory levels in key cities. The
increase in execution of deferred projects and
Building
government schemes such as PMAY is expected to
provide the required boost to the sector.
FY 19-24: 15-16 trillion
FY25-30P: 22-24 trillion • Between FY25-30P, the sector is expected to rise to
Projected growth: 1.4x-1.5x Rs 22-24 trillion from an investment of Rs 15-16
trillion between FY19-24.
165• Based on an analysis of eight key sectors, Crisil
Intelligence estimates construction investment in
the industrial sector at Rs 5.5-6 trillion between
FY25-30P, compared to Rs 4.5-5 trillion spends
seen in FY21-25. The rise in investment is projected
Industrial due to inclusion of the PLI scheme in the capex
FY 19-24: 4.5-5 trillion investments of the industrial sector.
FY25-30P: 5.5-6 trillion • Crisil have only considered 3 capex-intensive
Projected growth: 1.2x-1.3x sectors in case of PLI scheme, viz., auto and auto
components, textiles and specialty steel for
inclusion in our estimates.
Note: A - Actual, P – Projected
Infrastructure vertical includes warehouse
Building construction includes residential, commercial and non-commercial verticals
Source: Crisil Intelligence
Building and Construction estimated to record 1.5-1.6x growth in FY25-30
The building and construction sector is expected to grow by 4-6% in fiscal year 2025. Over the longer term,
investments in building construction are projected to increase at an average annual rate of 5-7% between fiscal
years 2025 and 2030.
A key factor driving this growth is the governments focus on affordable housing. In September 2024, the
government launched PMAY-U 2.0 under the Housing for All initiative. By March 2025, approvals were granted
for the construction of 3.52 lakh houses under this scheme. These homes fall under two key categories: Beneficiary
Led Construction (BLC) and Affordable Housing in Partnership (AHP).
To support this initiative, the government has committed Rs. 2.30 trillion in financial assistance, with an overall
investment of Rs. 10 trillion. This push for affordable housing is expected to boost construction activity and create
long-term growth opportunities in the sector.
Share of major segments building construction spending (%)
Rs trillion
25.00 22-24
11%
20.00
15-16
15.00
15%
10.00 89%
85%
5.00
-
FY19-24 FY25-30P
Residential Commercial and Social Sector
Note: A: Actual; P: Projected
Source: Crisil Intelligence
166Investments in Oil & Gas segment to drive the industrial construction sector
Construction spending on industrial investments in fiscal 2025 is expected to rise by 3–4%, driven by expansion
in the oil & gas and metals segments. Notably, this growth comes on a high base in FY24, when the sector saw a
surge due to deferred investments from FY21 and FY22 and increased capex under the PLI scheme. The PLI
scheme is a time bound incentive scheme by the Government of India which rewards companies in the range on
5-15% of their annual revenues based on the companies meeting pre-decided targets for incremental production
and/or exports and capex over a base year.
Based on an analysis of eight key sectors, Crisil intelligence estimates construction investment in the industrial
segment at Rs -5.5 – 6 trillion between fiscals 2025 and 2030, rising ~1.2x to 1.3x over spends seen in fiscals
2019 to 2024. The rise in investments is projected due to inclusion of PLI scheme in the capex investments of
industrial sector.
Share of major segments Industrial construction spending
Rs trillion
6.00 5.5-6
10%
5.00 4.5-5
6%
7% 13%
4.00 6%
13% 14%
3.00 16%
2.00
57%
58%
1.00
0.00
FY19-24 FY25-30P
Oil & Gas Metals Automobile Cement Others
Note: A: Actual; P: Projected
Source: Crisil Intelligence
Within infra segments, roads continue to have the highest share
Between fiscal years 2018 and 2022, construction capital expenditure (capex) grew at a steady rate of 7% per
year. During this time, investments in infrastructure followed a consistent long-term growth pattern, with moderate
but stable increases in spending.
However, in fiscal years 2023 and 2024, the central government significantly increased its spending on
infrastructure, leading to a sharp rise in construction capex, with growth reaching double digits. This surge was
driven by large-scale investments in roads, railways, and urban development projects, as the government
prioritized infrastructure expansion.
Now, as the government moderates its infrastructure spending, the rapid growth in construction capex seen in
recent years is expected to slow down and return to its earlier long-term trend. Private investments in infrastructure
are expected to play a crucial role if the growth trajectory is to be sustained over the medium to long term.
167Share of major segments in overall Infrastructure construction spending
Rs trillion
70.0 61-63
8%
60.0
10%
50.0 13%
40.0 34-36 16%
9%
30.0 13%
15%
20.0 14% 58%
10.0 50%
0.0
FY19-24 FY25-30P
Roads Urban Infra Railways Irrigation Others
Note: A: Actual; P: Projected
Source: Crisil Intelligence
SWOT analysis of Infrastructure construction industry
Growing Economy: India’s economic growth supports infrastructure development
and construction activities.
Government Initiatives: Programs like Sagar mala, Bharat mala, development of
metros, Jal Jeevan mission and significant investments in infrastructure projects boost
the construction sector
S
Abundant Labor Supply: India has a large pool of skilled laborers, including
(Strength)
masons, carpenters, and engineers, who are readily available for construction projects.
Low-cost labour: Labor costs in India are relatively low compared to other countries,
making it an attractive destination for construction projects.
Growing Domestic Market: Growth in major sectors such as automobile, residential,
commercial real estate, couple with population growth.
Environmental concerns: Construction companies in India has faced criticism for its
impact on the environment, particularly in terms of waste generation and energy
consumption.
High Capital investments: Companies in this sector requires substantial upfront
W
capital. This coupled with high borrowing costs can limit the capacity for construction.
(Weakness) Input related risk: Rise in raw material costs would impact the profitability of the
companies. However, presence of cost escalation clause in contract would aid in
protecting the contractor
Working capital management: delay in payment from government agencies and
security and retention money stretch working capital resulting in high interest costs.
Urbanization: Rapid urbanization offers significant opportunities for residential,
O commercial, and infrastructure projects.
Eco-friendly initiatives: The global transition towards environmentally responsible
(Opportunities)
initiatives, such as renewable energy sources, advanced wastewater treatment systems,
and Greenfield highways, is creating a surge in demand for companies in the
168construction sector, presenting a significant opportunity for growth and development
in the industry
Rural Development: Government focus on rural infrastructure development creates
opportunities in new geographic areas.
Economic Slowdown: Any downturn in the economy can significantly affect the
infrastructure sector.
Regulatory challenges: Changes in regulations, such as safety standards and building
codes. As companies need to comply with these standards, this can impact the project
costs and timelines.
T
Advancement in technology: Companies should be abreast with latest technologies
(Threats) in order to optimise project management and improve execution efficiency. However,
this requires capital investments towards skill development. Lack of such investments
would it make it diificult for players to obtain projects.
Competitive Pressure: Industry is highly competitive with many firms vying for
same projects. This intense competition can pressure profitability and reduce market
share.
Water treatment, wastewater treatment and supply market in India
Overview of construction spend on Water treatment, wastewater treatment and supply market
Govt's increased focus on water supply and sanitation to drive investments
Investments in urban infrastructure recorded a 33% CAGR between fiscal 2020-fiscal 2024 led by investments in
Water supply and sanitation under schemes such as Swachh Bharat Mission, Jal Jeevan mission, AMRUT and
deferred investments in Metro projects a bulk of which were under implementation and have achieved financial
closure. Urban infrastructure includes construction-intensive mass rapid transit system (MRTS), bus rapid transit
system (BRTS), water supply and sanitation (WSS) projects, smart cities, and related infrastructure development.
Crisil Intelligence projects ~Rs 7.9 – 8.3 trillion spends on water treatment, supply and wastewater treatment
between fiscals 2025 and 2030, which is ~1.75x to 1.85x higher than the amount invested in the previous five
years. Water treatment, wastewater treatment and supply projects are expected to account for more than half of
the total urban infrastructure investments over the next five years, driven primarily by state governments and
through centrally sponsored programmes such as Jal Jeevan mission, AMRUT and Swach Bharat mission.
169Construction spends on water and wastewater treatment infrastructure
In Rs Trillion
9.0 7.9 -8.3
8.0
7.0
6.0 3.9 -4.1
4.5
5.0
4.0
2.2
3.0
2.0 4.1-4.3
1.0 2.3
0.0
FY19-24 FY25-30P
Water treatment and supply Wastewater treatment
Notes: P: projected
Source: Crisil Intelligence
Indian water treatment market has grown remarkably over the past five years, fuelled by the government’s
initiatives to enhance water supply and sanitation infrastructure. The Har Ghar Jal scheme for rural areas under
the Jal Jeevan Mission and the 24x7 water supply plan for 500 cities under the AMRUT programme have been
instrumental in driving this growth, with additional support from other schemes such as the Smart City Mission.
Rapid growth in water treatment and supply market can be attributed to significant investments in water
infrastructure, including the augmentation of water treatment plant (WTP) capacity, renovation of existing WTPs
and expansion of pipeline infrastructure. The integration of cutting-edge technologies, such as SCADA and
leakage detection systems, has played a crucial role in modernising the sector. With continued urbanisation and
industrialisation, the country’s demand for clean water is on the rise, creating a pressing need for efficient water
treatment solutions.
The Jal Jeevan Mission has already led to substantial investment in rural water infrastructure, with rural household
tap water connections increasing from 16.1% in 2019 to 80% just five years later, the next phase of growth is
expected to be driven by urban development. The government’s plans to provide 24x7 water supply and reduce
non-revenue water (NRW) in urban areas are anticipated to be major growth drivers.
Overview of Wastewater treatment landscape in India
In India, the wastewater sector is facing significant challenges, with a large portion of the population lacking
access to proper sanitation and wastewater treatment facilities. The National Commission for Integrated Water
Resources Development projects the country’s water requirements to reach approximately 1,180 billion cubic
metres by 2050, with around 70% allocated for agriculture, 9% for drinking water, 7% for industrial purposes, 6%
for energy generation and the rest for other uses.
The increasing trend of urbanisation is expected to shift the priority from irrigation to drinking water. According
to the United Nations, 64% of the country’s population resides in rural areas, while 36% is connected to
metropolitan centres. By 2050, 50% of the country’s population (877 million) is estimated to be living in cities,
which are rapidly expanding as a result of economic development and reforms.
Many towns are situated on riverbanks, where freshwater is used by the population and wastewater is discharged
back into the river, thereby affecting the drinking and irrigation water supply. Research conducted by the Ministry
of Jal Shakti shows the quality of rivers has shown some improvement, with 46% of rivers examined in 2022
designated as contaminated, compared with 70% in 2015. The Central Pollution Control Board (CPCB) has
identified the release of industrial waste and untreated or partially treated municipal wastewater into water bodies,
and inadequate solid waste management as some of the primary causes of water pollution.
170A 2021 assessment by NITI Aayog indicates that India is one of the most water-stressed regions globally, with
approximately 600 million Indians facing high water stress. By 2030, the demand for the water is expected to be
twice the available supply, potentially leading to water scarcity for millions of people and impacting the country’s
GDP. Effective management of water resources, and reusing and recycling them, is essential for a sustainable
future.
Wastewater generation and treatment capacity in India
The expected sewage generated has increased steadily over the years, from 70,517 MLD in fiscal 2020 to 81,309
MLD in fiscal 2025, based on population growth and rapid urbanisation. Sewage treatment capacity has also
increased from 29,738 MLD to 42,012 MLD during this period, based on monthly reports submitted by state
pollution control boards to the National Green Tribunal (NGT). This is a positive step towards addressing the
country’s wastewater management challenges.
The actual sewage treated has also shown an increasing trend, from 19,627 MLD to 29,795 MLD, indicating a
growth of ~30% during the period. While there is still a significant gap between installed capacity and actual
treatment, it has narrowed over the years, indicating improved utilisation of existing infrastructure. This suggests
that while there is still a significant gap in treatment capacity, the country is making progress in treating a larger
proportion of sewage generated.
Another significant reason for low utilisation is the lack of proper sewage supply infrastructure in many areas. In
some cases, the sewage collection network is incomplete, or the pipes are old and leaky, leading to significant
losses of sewage during transmission. This results in a lower volume of sewage reaching the STP, which in turn
affects the utilisation rate. The structural challenges in achieving optimal STP utilisation are multifaceted,
involving not only the physical infrastructure but also the coordination and interface between various stakeholders,
including Public Health Engineering Departments (PHED) and Urban Local Bodies (ULBs). Companies operating
in this space are attempting to mitigate these challenges through phased implementation of STP projects,
prioritising areas with existing sewage infrastructure and ensuring that new capacities are created in tandem with
the development of supporting infrastructure. Furthermore, they are working closely with PHED and ULBs to
enhance interface coordination, streamline sewage collection and transmission, and ultimately increase the
utilisation rates of STPs.
STP capacity vs utilisation (In MLD, %)
90,000 74%
72%
72%
80,000 72%
70,000
70%
68%
60,000
67% 68%
50,000
65% 66%
40,000
63%
64%
30,000
62%
20,000
7 8 9 8 1 5 9 3 4 1 7 2 8 7 6 9 2 5
10,000 1 5 3 7 1 9 6 3 4 8 3 2 9 7 9 8 0 7 1 3 0 4 2 4 0 9 3 4 1 9 0 3 1 0 9 7 60%
,0 ,9 ,9 ,2 ,1 ,0 ,4 ,5 ,3 ,7 ,8 ,5 ,9 ,1 ,7 ,1 ,2 ,9
7 2 1 7 3 2 7 3 2 7 3 2 7 4 2 8 4 2
- 58%
FY20 FY21 FY22 FY23 FY24 FY25
Expected sewage generated Sewage treatment capacity
Sewage treated % Gap in treatment
171Note: For states where NGT monthly progress reports for March were not available, data from the nearest
available month was used. Additionally, data for Chandigarh and Arunachal Pradesh has not been published and
therefore was not included in the analysis
Source: NGT monthly progress reports, Niti Aayog, CPCB, Crisil Intelligence
The state-wise distribution of STPs reveals that the top six states, namely Gujarat, Haryana, Karnataka, Punjab,
Uttar Pradesh, and Maharashtra account for approximately 54% of the total STPs in fiscal 2024. Gujarat leads the
pack with 206 STPs, followed closely by Haryana with 195 STPs.
Certain states, including Gujarat, Haryana, Karnataka, and Uttar Pradesh, have not only established a large number
of Sewage Treatment Plants (STPs) but have also demonstrated remarkable growth in their numbers between 2015
and 2024, with some even achieving triple-digit growth. This surge suggests that these states are prioritizing the
development of smaller, ULB-based STPs, which has contributed to the significant increase in their overall
numbers.
Number of STPs across states
250
206
194
200 188
168
153 152154
150
140
150 131
124 126
119
114 112
107
100 70 86 73 76 63 73 63 66 667880 72 71 63 747188
51 57 5053 50
50 41 37 353837 37
12 17 24 28 18 15 22
2 3
0
ta
ra ju G
a
n a y ra H
a
k a ta n r a K
b
a jn u P
h
s e d a rP r a ttU
a
rth s a r a h a M
n
a h ts a ja R
u
d a N lim a T
h
s e d a r P a r h d n A
h
s e d a rP la h c a m
h
s e d a rP a y h d a M
d
n a h k a r a ttU
la
g n e B ts e W
a
n a g n a le T
ih
le D
d
n a h k r a h J
h
r a g s itta h h C
*
s r e h tO
iH
2014-15 2020-21 2024-25
Notes: * Others includes states with less than 20 operational STPs such as J&K, Odisha, Goa, Sikkim,
Puducherry, Bihar, Kerala, Mizoram, Daman & Diu, Tripura
Source: CPCB Status of STP report, MPR report published by each SPCBs, Crisil Intelligence
172STP capacity across states (FY25)
8000.0 100%
87%
7000.0 79% 80% 90%
70% 69% 71% 75% 73% 74% 69% 80%
6000.0 63% 59% 65% 66% 70%
5000.0 52% 50% 60%
46% 5
4000.0 9 9 6 41% 50%
.2 .7 7
1230 00 0000 00 ... 000 3 .3 1 0 9 .4 0 1 1 5 6 4 .8 3 7 3 3 .4 7 4 3 .2 0 7 4 3 2 3 3 2 .9 4 9 1 8 .7 7 4 1 7 .1 2 4 1 9 .0 3 0 1 0 .9 4 8 6 4 4 5 1 9 .0 3 4 5 .5 7 3 8 4 3 4 .7 1 3 1 1234 0000 %%% %
7 6 4 3 3 2
0.0 0%
a rth s a r a h a M ta ra ju G h s e d a rP r a ttU a k a ta n r a K ih le D u d a N lim a T b a jn u P a n a y ra H a n a g n a le T h s e d a rP a y h
d
n a h ts a ja R la g n e B ts e W h s e d a rP a r h
d
h r a g s itta h h C d n a h k a r a ttU a h s id O r a h iB s r e h tO
a n
M A
Treatment capacity (MLD)
Note: For states where NGT monthly progress reports for March were not available, data from the nearest
available month was used. Additionally, data for Chandigarh and Arunachal Pradesh has not been published and
therefore was not included in the analysis
Source: NGT monthly progress reports, Crisil Intelligence
The states with the highest treatment capacity are Maharashtra, Gujarat, Uttar Pradesh, Delhi and Karnataka,
accounting for more than 50% of the country's total treatment capacity. Maharashtra has the largest share at around
18%, followed by Gujarat with 11%, Uttar Pradesh with 8%, and Delhi and Karnataka with each around 7%.
These are among the most populous and industrialised states and their high treatment capacities reflect the
significant efforts being made to manage their wastewater.
Overall, the data indicates that the top 10 states are making significant progress in managing their wastewater.
This progress can be attributed to state-level initiatives, such as the New Liquid Waste Management Rules in
Gujarat and Maharashtra’s upgraded water policy of 2019, which added mandates on reuse and sanitation. These
initiatives highlight the importance of tailored approaches to address the unique challenges and opportunities in
each state.
Wastewater treatment technologies
The wastewater industry employs various technologies and treatment plants to remove contaminants and
pollutants from water. Here is a qualitative overview of some key technologies and types of treatment plants:
Activated sludge process (ASP): It is a biological treatment method that uses microorganisms to break down
organic matter in wastewater. It involves aerating the wastewater to promote microbial growth, followed by
settling and removal of the sludge.
Membrane bio reactor (MBR): It is a hybrid treatment process that combines biological treatment with membrane
filtration. It uses microorganisms to break down organic matter and then uses membranes to separate the treated
water from the sludge.
Moving bed bio reactor (MBBR): It is a biological treatment process that uses moving beds of biomass carriers to
support microbial growth. It is a compact and efficient treatment process that can handle high organic loads.
173Sequencing batch reactor (SBR): It is a biological treatment process that uses a single tank to perform all treatment
steps, including filling, reacting, settling and decanting. It is a flexible and efficient treatment process that can
handle variable flows and loads.
Others: Other key technologies and types of treatment plants include trickling filter, rotating biological contactor
(RBC), upflow anaerobic sludge blanket (UASB) reactor, constructed wetlands, and advanced oxidation processes
(AOPs), which use various methods such as fixed bed media, rotating disks, sludge blankets, plants, and oxidising
agents to break down organic matter and remove contaminants from water.
Different tendering models in water and wastewater treatment
The Indian water and wastewater sector has witnessed a significant trend in project implementation, with projects
across water supply, wastewater and desalination segments being implemented mainly under three models EPC,
PPP, PPP – HAM models. However, PPP-HAM is emerging as a popular alternative, with increasing interest from
private players even though the majority of the project in WSS segment is happening through EPC mode.
Overview of EPC mode
Over the years, the infrastructure business has seen various contracting methods evolve. Traditional contracting
models have been replaced by new approaches as projects have grown more complex. Gradually, the responsibility
for project management has moved from the owner or developer to the contractor.
This shift is evident in the move from owner-managed projects to Engineering, Procurement, and Construction
(EPC) contracts. In EPC contracts, the contractor assumes the risks of time and cost overruns, along with the
responsibilities for design, material procurement, and construction. These contracts also shield the
owner/developer from currency and interest rate fluctuations.
Unlike other contracts where procurement and design are separate processes, EPC contracts integrate them,
reducing the overall project duration. Contract which requires heavy financial and technically requirement
generally divided into smaller EPC projects.
A typical EPC project covers design, civil works, equipment purchase and installation, and commissioning. Most
of the EPC players provide integrated and customised solutions as per the client requirements through a
consultative approach. Favorable government initiatives, increased infrastructure development in Water and
wastewater treatment and supply sectors
Key factors influencing EPC player selection
Past experience •Size of the projects handled and that are sucessfully running
Financial networth and
•Typically "x" times the cost of the project. Higher the credit rating the better
credit rating
Workmanship and
•Demostrated performance with respect to quality of the project
completion time
Usage of modern
techniques and design •This aids in hasle free and on-time completion of projects
innovation
Bankability of EPC
•Risk sharing, insurances, warrantes, guarenties etc
contractor
174Further in India, in general, a single stage two-part system (referred to as the "Bidding Process") is used for
selection of the EPC contractor in order to award the project. It includes technical evaluation and financial
evaluation
Technical qualification: In this the eligibility and qualification criteria are evaluated based on years of experience
and expertise of the contractor in the said industry in which EPC project is being executed, domicile of the
executing contractor, availability of resources with the contractor and capabilities of such resources among others
Financial qualification: In this the average annual turnover of the EPC contractor over the past 3 financial years
is considered which needs to be above the said criteria mentioned along with this the EPC contractor should have
a minimum net worth (set forth in bid document) as per his financials. Further, in some cases a minimum amount
of working capital as per its latest financials is also considered. In addition, the contractor is also asked to furbish
financial statements for the necessary financial years.
After thorough evaluation of all bid documents, the L1 bidder with the lowest bid value is identified, but the
selection process doesn't end there - multiple iterations of checks and evaluations are conducted to ensure the most
competitive bidder is selected. For example, MoRTH follows a structured approach for selecting the final bidder,
which includes multiple stages of evaluation and iteration to determine the best-suited contractor for the project.
Step 1: Identification of L1 Bidder
• Among all responsive bidders, the lowest bidder will be termed as L1.
• If L1 is a 'Class-1 Local Supplier', the contract will be awarded to L1 directly.
Step 2: Preference to Class-1 Local Suppliers
• If L1 is not a 'Class-1 Local Supplier', the lowest bidder among the 'Class-1 Local Suppliers' will be invited
to match the L1 price.
• This is subject to the Class-1 Local Supplier's quoted price falling within the margin of purchase preference.
• The contract will be awarded to the Class-1 Local Supplier who matches the L1 price.
Step 3: Iterative Process for Class-1 Local Suppliers
• In case the lowest eligible Class-1 Local Supplier fails to match the L1 price, the next higher bidder among
the Class-1 Local Suppliers within the margin of purchase preference will be invited to match the L1 price.
• This process will continue until a Class-1 Local Supplier matches the L1 price or none of the Class-1 Local
Suppliers within the margin of purchase preference are willing to match the L1 price.
Step 4: Award of Contract
• If a Class-1 Local Supplier matches the L1 price, the contract will be awarded to that supplier.
• If none of the Class-1 Local Suppliers within the margin of purchase preference match the L1 price, the
contract will be awarded to the L1 bidder.
Margin of Purchase Preference
• The margin of purchase preference is the maximum extent to which the price quoted by a Class-1 Local
Supplier may be above the L1 for the purpose of purchase preference.
• The margin of purchase preference is set at 20%.
• This means that a Class-1 Local Supplier's quoted price can be up to 20% higher than the L1 price and still
be considered for the contract.
175Overview of entry barriers for EPC industry in India
The Engineering, Procurement, and Construction (EPC) industry in India is a vital part of the country's
infrastructure development, encompassing sectors like infrastructure, and industrial projects. However, there are
multiple challenges faced in EPC modes:
• High Capital Requirements: The EPC industry demands substantial initial investments for equipment,
technology, and skilled manpower. Smaller firms may find it challenging to secure the necessary funding to
compete with established players.
• Regulatory and Compliance Issues: The industry is heavily regulated, requiring companies to comply with
various environmental, safety, and labour regulations. Navigating these regulations can be complex and costly
affair, posing a significant barrier for new entrants.
• Technical Expertise: Some of the EPC projects often require specialized technical knowledge and expertise
of the industry. Companies must possess a skilled workforce capable of handling complex engineering tasks
and innovative construction techniques. Building such a team is a considerable challenge for newcomers.
• Project Management Skills: Managing large-scale EPC projects requires robust project management skills
to ensure timely and cost-effective completion. New entrants might lack the experience and processes needed
to manage such projects efficiently.
• Financial Risks and Creditworthiness: EPC projects often involve significant financial risks, including cost
overruns and delays. New entrants must demonstrate strong financial stability and creditworthiness to secure
contracts and financing, which can be challenging without a proven track record.
• Competitive Landscape: The EPC industry in India is highly competitive, with established players having
strong market presence and relationships with key stakeholders. Breaking into this competitive landscape
requires significant marketing efforts and the ability to differentiate from existing competitors.
Overview of PPP model
Under PPP, there are several models that have gained popularity but HAM (Hybrid annuity model) has gained the
popularity in the water and wastewater treatment industry. Below are the few different tendering models which is
taken under PPP modes
• Design-build-operate-transfer (DBOT): A model where the private sector partner designs, builds, and
operates the project for a specified period, after which it is transferred to the government
• Design-build-operate (DBO): A model where the private sector partner designs, builds, and operates the
project, but the ownership remains with the government
• Build-own-operate-transfer (BOOT): A model where the private sector partner builds, owns, and operates
the project for a specified period, after which it is transferred to the government
• Design-build-finance-operate-transfer (DBFOT): A model where the private sector partner designs, builds,
finances, and operates the project for a specified period, after which it is transferred to the government
• Build-operate-transfer (BOT): A model where the private sector partner builds and operates the project for
a specified period, after which it is transferred to the government
• Hybrid annuity model (HAM): A model where the government provides 40% of the project capital cost as
construction support, and the remaining 60% is paid as annuity payments throughout the operations phase,
plus interest.
EPC projects among the overall infra investments for water supply and sanitation to remain at 75-85%
We have assessed water supply, water sanitation, wastewater management, and water treatment plant projects, to
evaluate investments through the EPC (Engineering, Procurement, and Construction) route.
176Purely for water supply projects, more than 95% of project investments happen via the EPC route. Considering
wastewater treatment and water supply projects together, it is estimated that 80-90% of investments in the sector
happen via the EPC route, while the rest happen via public private partnership (PPP).
EPC investments in the water (irrigation + WSS) sectors
PPP projects, 15 -25%
EPC investments, 75 -85%
Source: Crisil Intelligence
Key projects across water and wastewater treatment sector in India
Key projects in Water treatment and supply sector in India
Total
Sr State / Union
Project Capacity cost (Rs Status
no territory
Mn)
1 Water Treatment Plant (Bhandup) Maharashtra 2000 MLD 41238.8 Planning
Water Treatment Plant (Bilga,
2 Punjab 580 MLD 1,5460.0 Planning
Ludhiana)
Water Treatment Plant (Aluva) and
3 Kerala 190 MLD 4950.0 Planning
associated transmission network
Madhya
4 Water Supply Scheme (Indore) 400 MLD 5797.8 Planning
Pradesh
Water Treatment Plant (Jite,
5 Maharashtra 270 MLD 4264.7 Planning
Raigarh)
Water Treatment Plant (Bidkin) and
6 Maharashtra 70 MLD 4000.0 Planning
associated transmission network
Water Treatment Plant (Vallah)
Under
7 associated transmission network Punjab 440 MLD 6653.2
execution
and over head service reservoirs
Water Treatment Plant & its
ancillary structures for Under
8 Odisha 130 MLD 3120.0
improvement of water supply to execution
Bhubaneswar city
Water Treatment Plant (Dighi Port Under
9 Maharashtra 50 MLD 1771.6
Industrial Area) execution
177Total
Sr State / Union
Project Capacity cost (Rs Status
no territory
Mn)
1,30,000 km –
covering 26
Telangana Drinking Water Supply internal grids, 62
Scheme for Adilabad, Karimnagar, intermediate
Warangal, Khammam, Nalgonda, pumping stations, Under
10 Telangana 428530.0
Mahaboobnagar, Medak, 16 intake wells, 110 execution
Nizamabad and Rangareddy water treatment
districts of Telangana plants and 37,573
Overhead Service
Reservoirs.
Pipe Water Supply Scheme Under
11 Uttar Pradesh 33115.0
(Mathura) execution
Note: The above list is not exhaustive and only an indicative list of projects
Source: Projects Today, Crisil Intelligence
Key projects in Wastewater treatment sector in India
Total
Sr State / Union
Project Capacity cost (Rs Status
no territory
Mn)
Under
1 Waste Water Treatment Plant (Worli) Maharashtra 500 MLD 58,170
execution
Waste Water Treatment Plant Under
2 Maharashtra 454 MLD 56,880
(Malad) execution
418 MLD
Waste Water Treatment Plant Under
3 Maharashtra 209 MLD 46,360
(Dharavi) execution
(TTP)
Waste Water Treatment Plant Under
4 Maharashtra 360 MLD 42,933.4
(Bandra) execution
Sewage Treatment Plant (Kukatpally, Under
5 Telangana 376.5 MLD 12,808.7
Quthbullapur & Serilingampally) execution
Sewage Treatment Plants Under
6 Telangana 480.50 MLD 11,800
(Hyderabad, South of Musi) execution
Under
7 Sewage Treatment Plants (Agra) Uttar Pradesh 176 MLD 9,400
execution
Integrated Sewerage System Under
8 Odisha 127.5 MLD 7,542.3
(Bhubaneswar) - JNNURM execution
9 Sewage Treatment Plant (Indore) Madhya Pradesh 260 MLD 9,460.9 Planning
Sewage Treatment Plant
10 (Koramangala-Chellaghatta Valley) Karnataka 400 MLD 9,000 Planning
Project
240 MLD
11 Sewage Treatment Plant (Pirana) Gujarat 160 MLD 8445.1 Planning
(TTP)
178Total
Sr State / Union
Project Capacity cost (Rs Status
no territory
Mn)
Common Effluent Treatment Plant
12 Gujarat 70 MLD 6603.6 Planning
(Vapi)
Waste Water Treatment Plant
13 Karnataka 150 MLD 5578.3 Planning
(Nayanadana Halli)
Note: The above list is not exhaustive and only an indicative list of projects
Source: Projects Today, Crisil Intelligence
Recent initiatives across wastewater management
Initiatives Details
• In December 2024, DJB started partial operations of the Okhla STP under the
Yamuna Action Plan Phase III in Delhi. Currently, the trial run is ongoing. The STP
will be commissioned in phases
Delhi Jal Board (DJB)
• The project involves development of 124 million gallon per day at Okhla to treat the
sewage generated in South Delhi, New Delhi Municipal Corporation (NDMC) areas
and some other parts of Delhi
• On October 30, 2024, GCC passed a resolution to raise municipal bonds worth Rs 2
billion for the construction of stormwater drains. The stormwater drain projects are
expected to be implemented in Thiruvottiyur, Manali and Madhavaram localities in
Greater Chennai
Northern Chennai
Corporation (GCC)
• GCC will invest about Rs 4.7 billion under the Asian Development Bank-financed
Kosasthalaiyar Basin project. Out of the 769 kilometre (km) drain network
proposed, about 100 km is yet to be constructed under the project
• In October 2024, BWSSB proposed to mandate having onsite STPs in upcoming
independent houses in Bengaluru. This mandate is already in place for apartment
Bangalore Water
complexes built after 2016
Supply and Sewerage
Board (BWSSB) • Reportedly, a new policy requiring dual piping systems and small recycling units in
upcoming residential buildings has been approved by BWSSB. It will also be
submitted to the government for approval and necessary legislative amendments
• BWSSB has revived Kengeri Lake by filling it with treated wastewater. The lake
BWSSB has revived had dried up due to absence of rainfall in Bengaluru
Kengeri Lake
• It further plans to recharge five more lakes and has issued a public disclaimer
advising against using the water for potable purposes
179Initiatives Details
• Treated wastewater discharged by fish processing plants is expected to be utilised
for water requirements of steel rolling mills at the Cuncolim Industrial Estate in Goa.
This water conservation solution has been suggested by the Goa State Pollution
Treated wastewater
Control Board (GSPCB)
from fish processing
plants proposed to be
• As per a study by GSPCB, seven fish processing plants and exporters together
reused by steel rolling
consume about 567 kld (thousand litres per day) and generate approximately 494
mills in Goa
kld of wastewater
• The steel mills need 749 kld of water every day for cooling, slag crushing, the
furnace tank, and other processes
• GMC has a significant budget for fiscal 2025, with Rs 1.94 billion earmarked
for infrastructure development, including sewer and road construction, and Rs
1.39 billion for water conservation, distribution, and strengthening of water
infrastructure
Ghaziabad Municipal
Corporation (GMC) • The corporation also expects to generate revenue through the sale of treated
water, with estimated earnings of Rs. 670.10 million from the TSTP (Tertiary
sewage treatment plant) and Rs. 5 million sewage which will supply treated
water to private, industrial and other units, promoting sustainable practices and
contributing to the corporation's revenue streams
Source: Crisil Intelligence
Digital and technological initiatives
Digital initiatives Details
Automatic drain
• The Bhubaneswar Municipal Corporation plans to use automatic drain cleaning
cleaning machines by
machines instead of excavators
Bhubaneswar
Municipal • They will be utilised owing to advantages such as automatic drain cover removal,
Corporation silt extraction and a complete shift to mechanical cleaning of drains
• The Government of Delhi has started constructing an online monitoring station
Online monitoring
along Yamuna River and different locations of drains flowing into it
stations by Delhi
Pollution Control • It is being installed by the Delhi Pollution Control Committee. It will help access
Committee real-time data on pollutants discharged in the river. The work is expected to be
completed by end-2025
• India’s first fully automated vacuum sewer network system was inaugurated in Goa
on October 15, 2024, under AMRUT. It is expected to aid sewage management for
more than 200 households in areas with a high-water table, such as Mala and St Inez
Fully automated
Creek in Panaji
vacuum sewer
network in Goa • The project is expected to overcome the geographical constraints of traditional
gravity-based sewer systems, such as a high-water table and narrow lanes. It offers
advantages such as minimal excavation requirements, fully sealed solution and
prevention of groundwater infiltration
180Digital initiatives Details
• The Hyderabad Metropolitan Water Supply and Sewerage Board has undertaken
desiltation of 300,000 manholes under its 90-day initiative in Hyderabad, with the
use of 220 airtech machines and 146 silt removal vehicles for sewage management
Desiltation
machineries and • A dedicated dashboard has been established to monitor the initiative on a daily basis.
monitoring systems It enables data uploading of details such as cleaned pipeline lengths and manhole
counts, along with photographs as evidence. Also, Google Maps using CAN
(Communication area network) numbers with GPS integration is being deployed to
record complaints relating to sewage overflow, contaminated water and road silt
Source: Crisil Intelligence
Key growth drivers and challenges of the water treatment, supply and wastewater treatment market of
India
Key growth drivers:
Growth drivers Description
• Improved risk allocation through innovative financing models, such as the hybrid
annuity model (HAM), which is attracting private sector participation
Supporting financial • Diversified funding sources, including international organisations (e.g., the World
models for Bank, the Asian Development Bank and Japan International Cooperation Agency)
industries and government grants and subsidies
• Increased private sector participation, driven by the provision of additional funding
sources and improved risk allocation
• Implementing regulatory measures to enforce or incentivise the mandatory reuse of
Unlocking revenue
treated wastewater in industries
potential through
reuse • Creating a market for compost from digested sludge, which can provide an additional
revenue stream
• Sharing resources across projects, to increase the scale of operations and reduce costs
• Implementing city-wide sanitation and wastewater treatment programmes, to achieve
Integrated water
integrated water management and improve overall efficiency
management
• Adoption of energy-efficient technologies, such as variable frequency drive (VFD)-
based pumps, which can reduce energy consumption and costs
181Growth drivers Description
• The government has intensified its focus on water security, with central and state
authorities working towards implementing effective and equitable water management
systems
• The Union government has proposed offsetting up an Integrated Water Resources
Management Authority (IWRMA) in each state as part of its vision for a developed
India by 2047. A draft model Bill has been circulated to all states for consideration.
o The IWRMA is expected to play a crucial role in developing comprehensive
water security plans for various administrative tiers, including villages, cities,
Focus on water
districts and states. Its responsibilities will also encompass groundwater and
security
floodplain management, and river conservation, all of which are critical
components of a robust water management framework
• National river interlinking plan: The concept of interlinking rivers in India,
initiated in the 1980s under the National Perspective Plan (NPP), aims to enhance
water security, a critical growth driver for India's economic development. The
National Water Development Agency (NWDA), set up in 1982, and the proposed
National Interlinking of Rivers Authority (NIRA) in 2021, will play a key role in
optimizing water resources, reducing regional disparities, and ensuring a reliable
water supply, thereby unlocking sustainable growth and development opportunities.
• The Environmental Hygiene Committee has outlined recommendations to facilitate
this change, aiming to provide 24x7 water supply to all citizens
• Currently, only a handful of cities, including Puri, Malkapur and certain parts of
24x7 water supply Bengaluru and Delhi, have achieved this milestone, while others like Coimbatore are
actively working towards it
• The government of Assam laid the foundation stone for the Jorhat 24x7 Water Supply
Scheme on December 14, 2024
Deploying • Operational efficiency of WTPs/ STPs is being improved through application of
technological energy-saving systems such as VFD-based and other energy efficient pumps
innovations and
• New technologies such as sewer cleaning machines, programmable logic controller
energy efficient
(PLC)-based SCADA systems, and sensor-based predictive maintenance are also
measures
being deployed
• There is a growing trend of private sector participation in the water management
sector, with companies increasingly bidding for government projects under various
models such as one city, one operator (under the hybrid annuity model), performance-
Growing private
based contracting and payments
sector participation
o This increased engagement of private players is expected to bring in expertise,
efficiency and investment, ultimately enhancing the country’s water
infrastructure and services
• The government is taking steps to reduce NRW levels by metering the supply lines;
AMRUT 2.0 targets to reduce NRW in cities to 20%
Reduction of NRW
• Thane Municipal Corporation and Thane Smart City Ltd have installed 105,000 smart
water meters in October 2024 across Thane under its Smart Water Meter project
182Source: Crisil Intelligence
Key market challenges:
Market challenges Details
• ULBs are primarily responsible for the provision and maintenance of wastewater and
water treatment facilities in their administrative area. However, in many cases, they
lack the capacity to plan and implement such projects
• Performance audit by CPCB in the ‘human power availability in SPCBs” report
Institutional
(CPCB, 2020) based on category states that the shortage of staff is 37.6%, 39% and
challenges
52.3% in the Group A, B and C categories, respectively in the ULBs because of which
managing the plant becomes difficult for them
• Labs are not well equipped due to a shortage of manpower and procurement delays
in instruments, equipment and consumables
• Indian cities face significant challenges in providing adequate water supply and
sewerage services, with notable deficiencies in network coverage and service quality
Water network and
coverage • Despite their size, even million-plus cities have substantial backlogs, with gaps
greater than 20% in network coverage, highlighting the need for infrastructure
expansion and upgrading to meet the growing demands of urban populations.
• Most ULBs does not have a water meter installed. As a result, they continue with a
Technical
fixed rate billing system and the meters are unread
inadequacies of
ULBs • As per the CWC, only 20-30% of current water supply is metered, which is leading
to losses
• No standards have been set for the ambient water quality for a surface waterbody
which is probably on the receiving end of treated or untreated domestic sewage and,
thus, misses the goals that need to be set (water quality criteria by CPCB are set based
Regulatory
on the uses)
challenges
• As per the CPCB notified “General Discharge Standards”, a surface waterbody is
regulated by 35 parameters, while wastewater for land application (or irrigation) is
regulated by 10 parameters, not including heavy metals
• Cost of STPs increases substantially with more advanced treatments that ensure
reduced pollution
o Hence, the direct economic benefits from the STP derived from the use of treated
water in agriculture or fisheries are considerably low
Economic
challenges • Higher capital and O&M (Operations and Maintenance) costs and cost of utilities are
rarely covered by revenue from STPs (may include dried sludge and treated water)
due to high uncertainty in demand
o Thus, smaller towns find it difficult to install STPs of adequate capacity, and the
gap increases in cities and towns with lower revenue
183Market challenges Details
• Conventional centralised wastewater treatment plants are designed only to
remove biological oxygen demand (BOD), nitrogen (N) and phosphorous. With
Technological
rapid urbanisation, the nature and type of contaminants are changing, along with
challenges
the emergence of new challenges. Hence, new technologies that are more
efficient in treating water for reuse are required
Source: Crisil Intelligence
Government policies and regulatory framework in India
Evolution of water policies and regulations over the years
The government has various policies and frameworks that supported the growth of the water management sector
in the country.
In India, water management is primarily the responsibility of state governments, with the central government
providing technical and financial support. Recognising the importance of water conservation, the government has
made it a top priority.
The National Water Mission continues to guide the policy, prioritising water conservation, rainwater harvesting
and improving efficiency to ensure long-term sustainability in water resource management. These guidelines aim
to build resilient systems that ensure safe drinking water, addressing long-standing issues of competence and
capacity in small water systems.
184Budgetary allocation across different funds related to WSS sector
Rs. Billion, %
1005.9
1000.0 943.2 3…
903.2
2… 5…
825.1 3… 3… 5…
2…
800.0 22 …… 3…780.3 8 6% % 2… 7… 10%
8% 2… 7% 8% 7%
8% 11%
4…
8%
600.0
6%
284.6
400.0
281.0
74% 78% 70%
1… 265.9 77%
2… 9… 4… 1… 32 …… 70%
200.0 21% 20% 1…
23%
22%
29% 19%
46% 35% 41%
0.0
FY19 FY20 FY21 FY22 FY23 FY24 FY25RE FY26BE
JJM SBM - R AMRUT Smart city SBM - U Namami Gange
Source: India Budget, expenditure profile, Crisil Intelligence
Launched on August 15, 2019, the Jal Jeevan Mission (JJM) is a flagship programme of the central government,
with the objective of providing functional household tap connections (FHTCs) to all rural households. It aims to
improve the lives of rural communities by providing them safe and adequate drinking water and promoting
sustainable water management practices.
Jal Jeevan Mission
JJM uses a multi-stakeholder approach, involving the central government, state governments and local
communities. It promotes community participation in water management, with a focus on sustainable and
equitable use of water resources. It also emphasises on the importance of technological innovations, such as solar-
powered water supply systems, to reduce cost and improve efficiency.
The mission has made significant progress with over 74 million FHTCs provided to rural households so far.
Community participation in water management is being promoted, with a focus on sustainable and equitable use
of water resources. A comprehensive plan has been developed to achieve the mission's objectives, build resilient
water supply systems and promote community-led initiatives. It also recognises the importance of community
education and awareness about water management to ensure long-term sustainability of water resources.
The mission is being implemented in a phased manner by developing in-village piped water supply infrastructure.
Local communities are given help in capacity building and training to ensure their active participation in water
management. Community-led total sanitation (CLTS) will help improve the overall quality of life in rural areas.
A comprehensive plan has been developed to achieve the mission's objectives. The mission will continue to work
towards achieving its objectives, with a focus on community participation, education and technological
innovations.
In short, the highlights of the mission are:
• Providing FHTCs to all rural households
• Promoting community participation in water management
185• Ensuring sustainable and equitable use of water resources
• Developing a comprehensive plan to achieve the mission's objectives
• Providing community education and creating awareness about water management
• Promoting technological innovations, such as solar-powered water supply systems, to reduce cost and
improve efficiency
Fund distribution ratio for different states/ UTs
State/UTs Central share (%) State share (%)
Himalayan and northeastern sates 90 10
Other states 50 50
UT with legislature 90 10
UT without legislature 100 0
Source: JJM toolkit, Crisil Intelligence
JJM’s fund distribution ratio varies with states and Union Territories (UT), with Himalayan and northeastern states
receiving 90% central funding, other states 50% and UTs without legislature receiving 100% central funding.
Funds drawn by states/ UTs
Rs billion
800.0
698.9
700.0
600.0
547.4
500.0
400.1
400.0
300.0
219.2
200.0
109.2
99.5
100.0
0.0
FY20 FY21 FY22 FY23 FY24 FY25*
Source: JJM dashboard, Crisil Intelligence
The mission has made significant progress in providing tap water supply to households across the country. Funds
utilized by states under JJM have shown a steady increase over the years, indicating a growing commitment to the
mission. The trend suggests that the mission is gaining momentum. The increased fund offtake boosted tap water
supply to households as there has been a notable increase in connections provided over the years.
Households provided with tap water supply
18635.0 90.0%
80.3%
73.5% 80.0%
30.0
70.0%
59.8%
25.0
60.0%
48.2%
20.0 50.0%
38.0%
15.0 40.0%
30.0%
21.3%
10.0
20.0%
5.0
10.0%
8.3 32.3 20.1 23.3 29.9 8.6
0.0 0.0%
FY20 FY21 FY22 FY23 FY24 FY25*
No.of connections (in Millions) % of total household with connections
Source: JJM dashboard, Crisil Intelligence
Budgetary allocation for JJM
Rs billion
800
700
670
700
600 547
500
400
300 227
200
100
0
FY23Actuals FY24 Actual FY24RE FY25BE
Source: Ministry of finance, Crisil Intelligence
The substantial budget allocation for JJM, though with some fluctuation over the years, also reflects the
government's commitment to providing adequate funding to support the mission's objectives. The funds allocated
to are utilised to provide tap water supply to households and to maintain and upgrade existing water supply
infrastructure. The steady increase in household connections provided under the mission suggests it is on track to
achieve its targets. Overall, the data suggests that JJM is making progress towards its objectives and the
government is committed to supporting the mission through adequate funding.
AMRUT 2.0
The AMRUT 2.0 scheme was launched on October 1, 2021, by the Ministry of Housing and Urban Affairs
(MoHUA) with the aim of making cities self-reliant and water secure. The scheme is a continuation of the previous
AMRUT scheme, which was launched in 2015. It is designed to provide basic services such as water supply,
sewerage and urban transport to households and build amenities in cities to improve the quality of life for all
citizens, especially the poor and disadvantaged.
187The main objectives of AMRUT 2.0 are:
• Universal piped water supply: Giving water tap connections to all households to ensure every household
has access to clean and safe drinking water
• Universal coverage of sewerage and septage management: To provide universal coverage of sewerage and
septage management in 500 AMRUT cities, ensuring that every household has access to proper sanitation
facilities
• Promoting circular economy of water: Recycling and reusing treated sewage, reducing the burden on
freshwater resources and minimising the environmental impact of wastewater disposal
• Rejuvenation of water bodies: To augment water availability, enhance amenity value and develop green
spaces, which will, in turn, improve the overall aesthetic and environmental quality of urban areas
• Making cities atmanirbhar and water secure: By ensuring they have necessary infrastructure and resources
to manage their water needs sustainably
The AMRUT 2.0 scheme has several key components, including:
• Water supply: The scheme aims to provide universal piped water supply with household water tap
connections, ensuring that every household has access to clean and safe drinking water
• Sewerage and septage management: It aims to provide sewerage and septage management in 500 AMRUT
cities, ensuring every household has access to proper sanitation facilities
• Rejuvenation of water bodies: It seeks to rejuvenate water bodies to augment water and enhance amenity
value and develop green spaces, improving the overall aesthetic and environmental quality of urban areas
• Technology sub-mission: It will leverage latest technologies in the field of water to improve the efficiency
and effectiveness of water supply and sewerage systems.
• Public-private partnerships (PPPs): The scheme encourages PPP projects in million-plus cities, with a
minimum of 10% of total fund allocation at the city level committed to such project
The AMRUT 2.0 scheme has a multi-level governance structure as follows:
• State high powered steering committees (SHPSCs): Headed by the state chief secretaries, SHPSCs monitor
and supervise the implementation of the scheme at the state/UT level
• State level technical committee (SLTC): Headed by the state secretary of Urban Development and Housing
Department, the SLTC provides technical support to the SHPSC in monitoring and supervising the scheme
at the State level
• Apex committee: The apex committee reviews and monitors the mission periodically
• Independent review and monitoring agencies (IRMAs): IRMAs assess and monitor the work done under
AMRUT in states/UTs. Funds are released to States/UTs basis compliance reports by these monitoring
agencies
Funds distribution ratio:
States/UTs Central share (%)
Union Territories 100%
Northeastern states and Himalayan states 90%
Cities of states with less than one lakh population 50%
Cities of states with population one lakh to 10 lakh
On-third of the project cost
(both included)
18825% of the project funds by the Centre (except for
Cities of states with population more than 10 lakh
projects taken up under PPP mode) *
Note: PPP projects amounting to at least 10% of total project allocation for all cities with population above 10
lakh in a state will be mandatorily taken up under this scheme
Source: AMRUT 2 guidelines (MoHUA), Crisil Intelligence
The total indicative outlay for AMRUT 2.0 is Rs 2,990 billion, including the total Central assistance of Rs 767.6
billion, for five years (FY22 to FY26). As on November 15, 2024, Central assistance of Rs 639.77 billion was
approved to states/UTs, of which Rs 117.56 billion has been released so far. The states/UTs have reported
utilisation of Rs 65,40 billion of central share, and cumulatively, with state's share, the total expenditure reported
by states/UTs is Rs 170.89 billion.
Tentative distribution of central fund allocation among project components of Mission planned during
launch of AMRUT 2.0
Central share (Rs.
Description
Billion)
Water supply projects 352.5
Rejuvenation of water bodies and developing green spaces & parks projects 39
Sewerage and septage management projects 276
Total tentative central allocation (CA) on projects 667.5
Source: AMRUT 2 guidelines (MoHUA), Crisil Intelligence
Budget allocation under the scheme
Mission component Allocation (Rs billion)
Projects 667.50
Incentive for reforms (8% of CA allocation) 53.40
Administrative and other expenses (A&OE) for states/
21.69
UTs (3.25% of project CA allocation)
Administrative and Other Expenses for MoHUA (1.75%
11.68
of project CA allocation)
Technology sub-mission (1% of project CA allocation) 6.67
IEC activities (1% of project CA allocation) 6.67
Source: AMRUT 2 guidelines (MoHUA), Crisil Intelligence
Achievements under AMRUT 2.0, as of April 2025
• Water supply: 3,568 water supply projects worth Rs. 1,142.21 billion approved, 18.1 million new tap
connections approved, 10,647 MLD Water Treatment Plant (WTP) capacity approved. 1,487 water supply
projects approved with SCADA technology.
• Sewerage & Septage Management: 592 sewerage/septage management projects worth Rs. 676.08 billion
approved (includes O&M cost). 6.7 million new sewer connections approved, 6,739 MLD Sewage Treatment
Plant (STP) capacity approved, 235 sewerage projects approved with SCADA technology.
• Technology Sub-Mission (component of AMRUT 2.0 to encourage start-up ideas and private
entrepreneurship): 120 start-ups shortlisted and has been mapped to 82 AMRUT cities for pilot projects.
Jal Hi Amrit scheme: In October 2024, the Jal Hi Amrit (JHA) scheme was launched as an extension of AMRUT
2.0, with the aim of transforming STPs into resource recovery facilities. The JHA programme aims to incentivise
states and UTs to ensure the optimal functioning of Used-water Treatment Plants (UWTPs). These plants must
189consistently meet environmental standards while producing recyclable treated water. As part of this initiative,
UWTPs will be awarded clean water credits through a star rating system. Incentives will be provided to urban
local bodies (ULBs)/ parastatal agencies based on a comprehensive evaluation process detailed in the following
section. Additionally, the JHA programme focuses on enhancing the skills of UWTP operators/ULB officials.
Through customised capacity-building programmes, the initiative aims to equip these personnel with the
knowledge and expertise needed to manage the facilities efficiently and consistently meet discharge standards.
The AMRUT 2.0 scheme is expected to have several benefits, including:
• Improved water supply: The scheme will ensure that every household has access to clean and safe drinking
water, improving the overall health and well-being of citizens
• Better sanitation: The scheme will ensure that every household has access to proper sanitation facilities,
reducing the risk of water-borne diseases and improving the overall environmental quality of urban areas
• Increased water security: The scheme will promote the circular economy of water, reducing the burden on
freshwater resources and minimising the environmental impact of wastewater disposal
• Higher aesthetic and environmental quality: The scheme will rejuvenate water bodies and develop green
spaces, improving the overall aesthetic and environmental quality of urban areas
• Increased economic opportunities: The scheme will create new economic opportunities in the water sector,
including the development of new technologies and industries related to water management
AMRUT 2.0 is a comprehensive scheme aimed at making cities self-reliant and water secure by providing
universal piped water supply, sewerage and septage management, and promoting the circular economy of water.
The scheme has made significant progress since its launch and it is expected to have a positive impact on the
urban life. However, the scheme faces several challenges, including financial, technical, institutional and
environmental, which need to be addressed to ensure the successful implementation of the scheme.
Namami Gange Programme
The Namami Gange Programme (NGP), also known as National Mission for Clean Ganga, is an integrated
conservation programme launched in June 2014 with the aim to achieve the twin goals of conservation and
restoration of the water quality of the Ganga, along with effective pollution abatement.
The initiative has been implemented, taking into account the significant economic, environmental and cultural
value associated with the river.
The programme was initially set to run until March 2021, but was subsequently extended to March 2026. The
100% centrally funded programme adopts a hybrid annuity-based PPP model.
The Ganga flows more than 2,500 km through the plains of north and eastern India, with the Ganga basin
comprising 26% of India's landmass, making it a key source of livelihood and water for many citizens.
The NPG covers eight states, 47 towns and 12 rivers, comprising the main river and its tributaries.
The second phase of the programme, which runs from fiscal 2021 to 2026, aims to build on the success of the first
phase.
The key features of the NGP 2 are:
• Empanelment of agencies to support the preparation of Detailed project reports (DPR)
• Standardisation of the DPRs and instituting trainings ahead of its preparation
• Mapping and monthly monitoring of the drains by the SPCBs
• Characterisation of sludge and its monetisation
• Monthly reports and review of activities to improve monitoring
190• Institutional strengthening of the SPMGs by filling up of vacancies
• Stringent monitoring of the DPRs and procurement process
• Strengthening of the DGCs (District ganga committees) through capacity building
• Fixed day, mandated monthly DGCs meetings along with minutes
• Increase participation in Namami Gange programmes – Arth Ganga, etc
To be sure, the programme has made significant progress in achieving its objectives.
The first phase of the programme, which ended in 2021, saw the completion of several key projects, including the
creation of sewerage infrastructure, control of industrial pollution and improvement with regard to rural sanitation.
For instance, all 4,465 villages along the bank of the Ganga have been declared open defecation-free and
significant reduction in pollution from industries has been achieved. Paper and pulp facilities have installed
advanced process technologies, resulting in lower freshwater consumption and wastewater discharge, and zero
black liquor discharge. In fact, the industrial sector has been a key focus area, with CETPs provided to tanneries
located along the riverbank to transition to cleaner processes and reduce water consumption.
In addition to these efforts, the government has also promoted sustainable agricultural practices, such as organic
farming, to reduce pollution and improve the overall health of the Ganga basin. The introduction of new
technologies, such as the use of GIS and remote sensing, has helped monitor the health of the river as well. Public
awareness and community participation have been crucial components, with initiatives such as Ganga Utsav,
which aims to promote awareness and education about the river among the general public, successful in engaging
the community. Ganga Amantran, a 34-day river rafting expedition, has also been instrumental in promoting
community participation and public awareness.
The programme has also seen significant investment in infrastructure development, including the creation of
sewerage, industrial pollution control and rural sanitation infrastructure, which has improved the overall quality
of life for people living in proximity to the Ganga basin.
Furthermore, initiatives such as Arth Ganga aim to promote sustainable agriculture and reduce pollution in the
basin area – this has seen significant success, with the adoption of sustainable agricultural practices by farmers in
the Ganga basin, and the reduction of pollution from industrial and agricultural sources.
As the programme moves forward, there are plans to restore the ‘wholesomeness’ of the river, defined in terms of
ensuring continuous flow, unpolluted flow, geologic and ecological integrity, and climatic and spatial
understanding.
Towards this, the programme will continue to focus on creation of sewerage, industrial pollution control and rural
sanitation infrastructure, and will introduce advanced technologies to monitor and further improve the health of
the river.
Overall, of a total of 492 under NGP, 307 projects have been completed, which represents a completion rate of
~62%, which is a notable achievement, considering the complexity and scale of the programme. The fact that 154
projects are still in progress and 31 are at the tendering stage indicates that the programme continues to have a
strong pipeline of projects.
191Projects under NGP segregated by status
Total: 492
31
154
307
Completed Progress Tendering
Source: NGP dashboard, Crisil Intelligence
Uttar Pradesh has the highest number of projects, totalling 161. The state has also made significant progress, with
101 projects completed. Uttarakhand has made significant progress as well, with 60 projects of a total of 87
completed, representing a completion rate of ~69%. In contrast, Jharkhand, Delhi and Madhya Pradesh have
relatively fewer projects and will need to accelerate the pace of project implementation to meet the overall
objectives of the NGP.
State-wise NGP project split by status
States Completed Progress Tendering Total
Uttar Pradesh 101 48 12 161
Uttarakhand 60 26 1 87
West Bengal 52 15 9 76
Bihar 41 22 6 69
Jharkhand 13 6 19
Delhi 10 6 16
Madhya Pradesh 4 3 7
Haryana 3 1 4
Himachal Pradesh 1 1 2
Rajasthan 1 1
Telangana 1 1
Other projects1 26 23 49
Notes:
1: Other projects are R&D, study, reports, etc. projects given to institutions
2: Numbers are as of January 30, 2025
Source: NGP dashboard, Crisil Intelligence
Still, despite the variations, data suggests that NGP is making progress, in terms of project completion, and with
continued efforts, it is likely to achieve the overall objective.
A look at the project status reveals that the majority of completed projects are in the categories of ghats, crematoria
and River front development (84 projects), sewage infrastructure (127 projects), and interception and diversion
192(64 projects), indicating that the programme has made substantial progress in improving the sewage infrastructure
and creating new ghats and crematoria along the river.
The completion of these projects is expected to have a positive impact on the river's water quality and the overall
environment.
Data also shows that there are still significant number of projects in progress, particularly in the categories of
interception and diversion (52 projects), R&D (37 projects) and industrial pollution abatement (11 projects). The
tendering stage also has a notable number of sewage infrastructure (22 projects), interception and diversion (20
projects), and bioremediation (two projects) projects.
Project type split as per status
Type of projects Completed Progress Tendering Total
Sewage infrastructure 127 57 22 206
Interception and diversion 64 52 20 136
Laying of new sewerage networks 25 3 28
Construction of new STPs 18 1 1 20
Repair/restoration/upgradation works 17 17
Rehabilitation of existing STPs 3 1 1 5
Ghats, crematoria and RFD (River front
84 20 5 109
development)
R&D 22 37 59
Afforestation 32 5 37
Industrial pollution abatement 9 11 1 21
Bioremediation 10 7 2 19
Biodiversity conservation 8 8 16
IEC activities and institutional development 3 6 9
Solid waste management 5 2 1 8
Composite ecological task force 6 1 7
Sanitation 1 1
Note: As of January 30, 2025
Source: NGP dashboard, Crisil Intelligence
Ongoing and upcoming projects will continue to build on the momentum of the completed projects, and their
successful implementation will be crucial in achieving the programme's objectives of restoring the river
On the funding front, data reveals that of the total sanctioned amount of ~Rs 400.5 billion, Rs 197.3 billion has
been released and Rs 194.1 billion has been expended. Majority of the sanctioned amount is allocated to sewage
infrastructure (Rs 330.0 billion), interception and diversion (Rs 216.5 billion) and laying of new sewerage
networks (Rs 55.8 billion).
The fact that these categories account for a significant portion of the total expenditure indicates that the programme
is prioritising the development of sewage infrastructure and interception and diversion systems to improve the
water quality.
Category wise project update
Sanctioned
Funds released Total expenditure
Type of project Amount (Rs
(Rs billion) (Rs billion)
billion)
Sewage infrastructure 330.0 156.8 155.9
193Sanctioned
Funds released Total expenditure
Type of project Amount (Rs
(Rs billion) (Rs billion)
billion)
Interception and diversion 216.5 73.5 73.2
Laying of new sewerage networks 55.8 44.8 44.5
Construction of new STPs 37.6 24.7 24.7
Rehabilitation of existing STPs 14.8 7.7 7.6
Repair/restoration/upgradation works 5.4 6.1 5.9
Ghats, Crematoria and RFD 18.1 13.1 13.1
Industrial pollution abatement 17.2 5.8 5.1
Sanitation 10.2 9.9 9.9
R&D 7.3 2.0 1.9
Afforestation 5.4 4.5 3.7
Bioremediation 3.9 0.4 0.4
Composite ecological task force 3.4 2.0 2.0
Biodiversity conservation 2.5 1.3 1.1
IEC (Information, Education, and
Communication) activities and institutional 1.9 1.0 0.5
development
Solid waste management 0.6 0.5 0.5
Total 400.5 197.3 194.1
Note: As of January 30, 2025
Source: NGP dashboard, Crisil Intelligence
Smart Cities Mission
The Smart Cities Mission is an initiative of the government to promote core infrastructure and quality of life for
citizens in cities by ensuring a clean and sustainable environment and the application of 'smart' solutions. The
focus is on sustainable and inclusive development, which can be replicated within as well as outside the ‘smart
city’, catalysing the creation of similar smart cities in various regions and parts of the country.
The core infrastructure elements in a smart city include adequate water supply, assured electricity supply,
sanitation, efficient urban mobility and public transport, affordable housing, robust IT connectivity and
digitalisation, good governance, sustainable environment, safety and security of citizens, and health and education.
The mission involves the strategic components of area-based development, which includes city improvement, city
renewal and city extension, as well as a pan city initiative that applies smart solutions to larger parts of the city.
Government funds and matching contribution by the states/ULBs meet only part of the project cost, with the
balance funding to be mobilised from various sources, including own resources of the states/ULBs, and via
innovative finance mechanisms and private sector participation through PPPs.
The distribution of funds under the scheme is:
• 93% project funds
• 5% administrative and office expenses (A&OE) funds for states/ULBs (towards preparation of Smart city
proposals and for Project management consultants, pilot studies connected to area-based developments, and
deployment and generation of smart solutions and capacity building)
194• 2% A&OE funds for the Mission Directorate and connected activities/structures, research, pilot studies,
capacity building, and concurrent evaluation
The Smart Cities Mission also involves convergence with other schemes, such as AMRUT, Swachh Bharat
Mission, National Heritage City Development and Augmentation Yojana, Digital India, and other programmes
connected to social infrastructure.
By integrating these schemes, comprehensive development can occur, achieving urban transformation and
improving the quality of life for citizens.
As of February 7, 2025, the mission has undertaken 8,058 projects, which cost a cumulative Rs 1,645.14 billion.
Of these, a significant 7,491 projects have been successfully completed, comprising a total investment of Rs
1,501.57 billion. Another 567 projects totalling Rs 143.57 billion are ongoing.
The Smart Cities Mission has achieved milestones across sectors, with a total of 8,058 projects initiated. Notably,
the WASH (water, sanitation, and hygiene) sector has been a major focus area, with 1,440 projects completed at
a total cost of Rs 467.30 billion. The projects include significant initiatives such as the 120 MLD WTP and ZLD
system under 590 MLD WTPs at Sarthana Water Works in Surat, as well as 2 MLD water treatment plant,
pumping station and pipeline for conveying water from Narsinghghat and Kshipra rivers to Rudrasagar. The
primary objective of these projects has been to enhance the water supply, sanitation and hygiene infrastructure in
urban areas, tackling pressing concerns such as sewage management, water treatment and sewage treatment.
With 106 ongoing WASH projects valued at Rs 30.05 billion, the mission continues to prioritise health and well-
being of citizens.
Project progress under SCM
Completed Work in Progress
Cost Cost
Sector No. of projects No. of projects
(Rs billion) (Rs billion)
WASH (water, sanitation and
1440 467.30 106 30.05
hygiene)
Smart mobility 1582 373.62 159 42.96
Smart governance 644 162.62 41 14.00
Smart energy 676 138.64 18 3.87
Social infrastructure 848 120.73 50 11.10
Integrated Command and Control
100 111.75 - -
Centre
Economic infrastructure 839 110.88 93 18.67
Vibrant public spaces 1314 103.44 95 20.05
PPP 195 91.93 3 0.26
Smart environment 147 24.33 4 2.74
Note: As of February 7, 2025
Source: SCM dashboard, Crisil Intelligence
Roads and Highways
Overview of spend on road construction
Road construction investments to grow in fiscal 2025-2030 driven by high value expressways
Investment in the road sector grew at an average annual rate of 12% between fiscal years 2021 and 2024, driven
by a high number of national highway projects being approved and built. However, in fiscal year 2024, highway
approvals dropped by 31%, bringing the total to 8,581 km. Between April and December 2024, the number of
new highway projects remained similar to the previous year, but there was a boost in January-2025, adding 4,200
195km. Despite this, overall highway approvals for fiscal year 2025 are expected to stay in the range of 7,000-9,000
km, similar to last year.
Since road construction usually happens around 18 months after approval, the slowdown in new projects will
likely affect actual highway construction in fiscal year 2026. However, the government is shifting its focus toward
building wider, high-capacity highways, so even though fewer kilometers may be constructed, spending on road
infrastructure will remain high. Additionally, the government is using asset monetization, which involves leasing
or selling completed road projects to private companies. This has already shown some success and is expected to
help manage debt while ensuring steady investment in road development.
One notable trend in the road sector is the low level of Build-Operate-Transfer (BOT) project awards, which has
been negligible in recent fiscal years. However, with the introduction of a new concession agreement and increased
government focus on revitalizing the BOT model, the share of BOT projects and private sector participation is
likely to increase.
Spend on road construction
Rs trillion
40.0
30-35
35.0
30.0
25.0
20.0
17.1
15.0
10.0
5.0
0.0
FY19-24 FY25-30P
Note: A: Actual; P: Projected
Source: Crisil Intelligence
Road construction spends across Rural, State and National highways
According to Crisil Intelligence, state road capital expenditure is expected to account for ~50% of the sector's
total in FY25. However, state spending on roads and highways remained stagnant in fiscals 2021 and 2022 due to
limited state funds. Although state capex saw a 10-13% year-on-year growth in fiscal 2023, in line with budget
allocations, the increased investment in national highways has surpassed the growth of state roads, leading to a
shift in the sector's composition, with national highways now accounting for larger share.
State roads, which include highways, major district roads and rural roads that do not come under the purview of
the Pradhan Mantri Gram Sadak Yojana, constitute over 20% of the country's road network and handle ~40% of
road traffic. These play an important role in the economic development of mid-sized towns and rural areas, and
aid industrial development by enabling the movement of raw materials and products to and from the hinterland
196% Spend split in road construction
% road construction split (FY19) % road construction split (FY25P)
8% 6%
37%
44%
50%
55%
National Highway State Road Rural Road National Highway State Road Rural Road
Source: State budget documents, Crisil Intelligence Source: State budget documents, Crisil Intelligence
Overview of NHAI awarding and construction pace
NHAI awarding to revive in fiscal 2025 with the revamped BOT model likely to account for a sizeable share
National Highways Authority of India (NHAI) awarding had witnessed a rise from merely 2,222 km in fiscal 2019
to 5,351 km in fiscal 2023. However, in fiscal 2024, awarding momentum was marred by various roadblocks.
NHAI's flagship Bharatmala Pariyojana Programme (BMP) Phase-1 witnessed significant cost overrun on account
of costlier land acquisition and high inflation. The estimated cost of the BMP phase-1 increased almost twice than
the initial estimate and the ministry sought cabinet approval for a revamped programme and additional funds in
order to undertake rapid awarding of projects in the pipeline. NHAI awarding was ~4500 kms in fiscal 2024 and
expected to remain on similar lines for FY25 as well.
National highways - Year-wise total length awarded (km) by NHAI
(Km)
8,000 7,394
6,306
6,000 5,351 4,500-5,000
4,818 4,500-5,000
4,344 4,336 4,500
4,000
3,211
2,222
2,000
0
FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25E FY26P
Note: E - Estimated; P - Projected
Source: Crisil Intelligence
197Share of BOT in NHAI awarding to be around 4-6% in fiscal 2025 on the back of amendments in the BOT
MCA
The Hybrid Annuity Model (HAM) is anticipated to regain its momentum, accounting for 12-16% of total national
highway infrastructure spending in fiscal 2025, up from its current share in fiscal 2024. Additionally, amendments
to the Build-Operate-Transfer (BOT) Model Concession Agreement (MCA) are expected to lead to an increase in
project awards under the BOT model, driven by renewed interest from developers due to favorable changes in the
model.
• HAM was favored by the road developers due to lower risk and higher profitability. However, the competition
in HAM awarding has increased substantially leading to average bid premiums tumbling from a peak of 15-
20% to around 4-6% in the last few fiscals. As a result, share of the larger developers have dropped
substantially since many large developers have refrained from bidding aggressively for HAM projects in
order to protect their margins. Given the amendment in BOT MCA and the scope of higher profitability due
to lower bidding competitiveness in the BOT space many large developers are keen on taking up BOT
projects.
• Furthermore, owing to the healthy balance sheets the developers are also in a comfortable position to
undertake BOT projects with high funding requirements.
• The increased traffic visibility vis-à-vis earlier years also augurs well for the BOT projects.
The shift towards the BOT model comes against the backdrop of NHAI facing funding challenges and moderation
in growth in the central government's budgetary outlay towards the roads & highways sector. Thus, the shift will
have a two-pronged benefit by not only alleviating funding challenges to a great extent but also increasing the
private investments in the sector.
Share of EPC, BOT & HAM in highway awarding (%)
100% 1% 1% 1-3% 0-1% 60%
9% 4-6%
6-10%
90%
18% 18-22%
54% 55% 50%
80% 12-16%
24% 27%
48%
70%
44% 40%
60%
50% 30%
40% 28%
26%
20%
30% 23%
20%
10%
10%
82% 91% 75% 72% 75-80% 88-94% 74-78%
0% 0%
FY19 FY20 FY21 FY22 FY23 FY24 FY25P
EPC HAM BOT Share of HAM in NHAI awarding
Note: E - Estimated; P - Projected
Source: Crisil Intelligence
198NHAI execution is also rising steadily with focus on swifter execution
Even though overall national highways construction at the MoRTH level had remained flattish in fiscals 2022 and
2023, NHAI execution witnessed strong momentum. NHAI execution sequentially rose from 4,175 km in fiscal
2021 to 6,644 km in fiscal 2024. Acceleration in project awards, sharper focus on resolving land acquisition issues,
and the ‘Atmanirbhar Bharat’ initiatives to ease liquidity (monthly milestone payments, release of retention
money, reduction in performance security & extension of 3-6 months in milestones & SCODs) for EPC road
players augured well for the pace of execution of NHAI projects.
Higher awarding of the previous years (FY21-23) and many of those projects receiving appointed dates in a timely
manner have further boosted NHAI execution in fiscal 2024. As a result, 6,644 km of NHAI projects were
executed during the year. In other words, the construction per day stood at around 18 km. Given the healthy
orderbooks of the developers, the momentum in the pace of execution is likely to continue in fiscal 2025 as well.
Crisil intelligence expects NHAI execution to be between 5,000-6,000 km in fiscal 2025. Over the medium term,
the pace of construction is expected to rise steadily to reach ~19 km per day by fiscal 2028.
National highways - Total length constructed/ upgraded (km) by NHAI
(Km) (Km per day)
10,000 20
18 16-19
15-18
8,000 16
13
6,644 6,000-7,000
11 12 5,500-6,500
6,000 11 12
9 4,882
8 4,175 4,325
3,979
7
4,000 3,380 8
3,071
5 2,623
1,886
2,000 4
0 0
FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25E FY28P
Note: E - Estimated; P - Projected
Source: Crisil Intelligence
Key highway projects in India
Sr State / Union Length Total cost
Project Status
no territory (km) (Rs Mn)
Versova-Virar-Palghar Sea Link
1. Maharashtra 43 8,74,272 Planning
Project
Pavnar-Patradevi Maharashtra
2. Maharashtra and Goa 805 8,63,589 Planning
Shaktipeeth Expressway
Expressway (Raxaul to Haldia Bihar, Jharkhand & Under
3. 719 600,000
Port) Project West Bengal Implementation
Expressway (Somnath-Dwarka) Under
4. Gujarat 680 571,200
Project Implementation
Hindu Hruday Samrat Under
5. Maharashtra 701 553,350
Balasaheb Thackeray Implementation
199Maharashtra Samruddhi
Mahamarg
Expressway (Pune-Bengaluru) Maharashtra & Under
6. 745 500,000
Project Karnataka Implementation
Gorakhpur-Siliguri Expressway Uttar Pradesh, Bihar,
7. 519 386,450 Planning
Project [Package-III] West Bengal
Chambal Expressway (Kota- Rajasthan, Madhya
8. Etawah) Project [Atal Pradesh & Uttar 409 236,450 Planning
Progressway] Pradesh
Note: The above list is not exhaustive and only an indicative list of projects
Source: Projects Today, Crisil Intelligence
Review of budgetary allocation for the road industry
Bharatmala Pariyojana
Launched in 2017, the Bharatmala Pariyojana envisages development of about 26,000 km length of Economic
Corridors, which along with Golden Quadrilateral (GQ) and North-South and East-West (NS-EW) Corridors are
expected to carry majority of the freight traffic on roads. It also envisages development of ring roads / bypasses
and elevated corridors to decongest the traffic passing through cities and enhance logistic efficiency. As on Feb
2025 projects covering a total length of 26,425 km have been awarded and out of this, 19,826 km have already
been constructed.
Further network of 35 Multimodal Logistics Parks is planned to be developed as part of Bharatmala Pariyojana,
with a total investment of about Rs. 46,000 crore, which once operational, shall be able to handle around 700
million metric tons of cargo.
There are six key features of the program:
• Economic Corridors: Integrating the economic corridors facilitates larger connectedness between
economically important production and consumption centers.
• Inter-corridor and Feeder routes: Inter-corridor connectivity would ensure first mile and last mile
connectivity.
• National Corridor Efficiency Improvement: Through this, the greater actionable goal is to undertake lane
expansion and decongestion of existing National Corridors.
• Border and International connectivity Roads: Better border road infrastructure would ensure greater
manoeuvrability, while also boosting trade with neighbouring countries.
• Coastal and Port connectivity roads: Port led economic development is further boosted through connectivity
to coastal areas, encouraging both, tourism and industrial development
• Green-field Expressways: Expressways with higher traffic congestion and choke points would benefit from
green field expressways.
The objective of the Bharatmala Pariyojana program is to optimize the efficiency of freight and passenger
movement across the country by bridging critical infrastructure gaps through development of Economic Corridors,
Inter Corridors and Feeder Routes, National Corridor Efficiency Improvement, Border and International
connectivity roads, Coastal and Port connectivity roads and Green-field expressways.
Identification of the project stretches under the components of the proposed program is based on detailed Origin-
Destination (O-D) study, freight flow projections and verification of the identified infrastructure gaps through
geo-mapping.
200Bharatmala Phase-I:
Construction of a total length of about 24,800 kms is being taken up under Phase-I of Bharatmala Pariyojana. In
addition, Phase-I would also include 9 Bharatmala- optimizing the efficiency of movement about 10,000 kms of
residual works of National Highway Development Project (NHDP).
The Public Investment Board (PIB) recommended the proposal during its meeting held on 16 June 2017. Cabinet
Committee on Economic Affairs (CCEA) approved the Bharatmala Phase-I in October 2017. Total aggregate
length of 26,425 km with a total capital cost of ` 8,53,656 crore has been approved and awarded till date under
Bharatmala Pariyojana (including 6,758 km length of residual NHDP). No further projects are now being taken
up under Bharatmala Pariyojana.
The status of various components of Bharatmala Pariyojana as on 31 December 2024 is as under:
Total Length Completed (in km)
Component Length (in km)
Up to 31.12.2024
Economic Corridors 8,737 5,986
Inter Corridors Roads 2,889 2,108
Feeder Roads 973 540
National Corridors 1,777 1,394
National Corridor Efficiency Improvement 824 732
Expressways 2,422 1,791
Border Roads & International Connectivity Roads 1,619 1,400
Coastal Roads 77 72
Port Connectivity Roads 348 120
Balance Road Works under NHDP 6,758 5,058
Total - Bharatmala 26,425 19,201
Source: MoRTH annual report, Crisil Intelligence
Pradhan Mantri Gram Sadak Yojana (PMGSY)
The Pradhan Mantri Gram Sadak Yojana (PMGSY) is a flagship program aimed at providing rural connectivity
by constructing all-weather roads to unconnected habitations with a population of 500 persons and above in plain
areas, as per the 2001 Census. The program has undergone several phases, with PMGSY-II and PMGSY-III
launched in 2013 and 2019, respectively, to upgrade existing rural roads based on their economic potential and
role in facilitating rural market centers and hubs. PMGSY-II focused on consolidating 50,000 km of existing rural
road networks, while PMGSY-III targeted the construction of 125,000 km of roads, with 122,555 km sanctioned,
119,031 km awarded, and 96,061 km completed as of May 2025, at a total expenditure of Rs 62,843.55 crore.
The Government has recently approved Phase IV of PMGSY, which aims to provide all-weather road connectivity
to 25,000 unconnected habitations with a population of 500+ in plain areas, 250+ in North-East and Hill
States/UTs, and special category areas, as well as 100+ in Left Wing Extremism (LWE) affected areas. This phase
proposes to construct 62,500 km of road length at a cost of Rs 70,125 crore between 2024-25 and 2028-29. As of
May 2025, a total of 8,19,390 km of road length has been sanctioned under various PMGSY interventions, with
7,80,263 km already completed and upgraded.
The progress of each phase is notable, with PMGSY-I achieving a completion rate of 99%, having sanctioned
629,050 km and completed 625,094 km. PMGSY-II has also shown significant progress, with 49,245 km
sanctioned and 49,079 km completed. PMGSY-III has completed 96,060 km out of the sanctioned 121,387 km,
achieving a completion rate of 79%. Overall, the PMGSY has made significant strides in providing rural
connectivity, with a substantial portion of the targeted road length already completed and upgraded.
201Completed Road length under PMGSY
45,000 42,004
40,000
35,000
29,749
30,000 28,009
26,100
25,000
20,573
20,000 18,088
15,000
10,000
5,000
0
FY22 FY23 FY24
Road length Sanctioned (Km) Road length completed (Km)
Source: Data published by PIB in Feb 2025, Crisil Intelligence
Funds released and expenditure incurred in PMGSY scheme
300 278
242
250
203
189
200
140 140
150
100
50
0
FY22 FY23 FY24
Release of central funds (Rs billion) Expenditure incurred including State share (Rs billion)
Source: Data published by PIB in Feb 2025, Crisil Intelligence
Special Accelerated Road Development Programme for North East (SARDP-NE)
The Special Accelerated Road Development Programme for the North Eastern region (SARDP-NE) is a
government initiative launched in 2005 to expedite road construction in the region. The program has three primary
objectives: to develop interstate connectivity, to establish access and connectivity to international borders, and to
create connectivity to district headquarters from the nearest national highways.
Furthermore, SARDP-NE aims to upgrade national highways connecting state capitals to 2/4 lanes, provide
connectivity to district headquarters in the North Eastern Region (NER) with at least 2-lane roads, and improve
road connectivity to backward and remote areas to boost socio-economic development. The program also focuses
on improving roads of strategic importance in border areas and enhancing connectivity to neighboring countries.
202Under SARDP-NE, a total of 5,468 km of road works have been sanctioned in the Arunachal Package of the North
Eastern Region (NER), with a total cost of Rs. 63,542 crores. The central government has proposed an allocation
of Rs. 19,499.09 crore in the Union Budget 2025-26 for road development in the North Eastern region under the
Special Accelerated Road Development Program. The amount of Rs. 11,000 crore is earmarked for the Special
Accelerated Road Development Program (SARDP) for North-Eastern Areas financed from the National
Investment Fund, and Rs. 8499.09 crore is proposed under SARDP for NER.
The status of works taken up under SARDP-NE as on 30th December 2024 is as under:
Total Length (in km) Length Completed (in km)
5,998 (Original: 6,418) 5,702
Source: MoRTH annual report, Crisil Intelligence
Key growth drivers and challenges for the road construction sector
Key growth drivers:
Growth
Description and reasoning
driver
The Bharatmala Initiative is a crucial part of this effort, which involves executing projects
across various categories, including Economic Corridors Development, Inter-corridor and
Feeder Routes Development, National Corridors Efficiency Improvement, Border and
International Connectivity Roads, Coastal and Port Connectivity Roads, and Expressways. A
total of 64,987 km of road length has been identified for execution under this initiative, which
Road
will be developed across these categories to enhance the country's road network
Network
Expansion Under the Bharatmala initiative, Phase 1 targets the completion of 34,800 km of roadways,
including outstanding NHDP works. As of March 2025, significant progress has been made,
with 26,425 km of roads awarded and 19,826 km constructed. Additionally, 6,669 km of high-
speed greenfield corridors have been awarded, with construction completed for 4,610 km as of
February 31, 2025, marking substantial progress under this flagship program
The Central Government has undertaken numerous road and transport infrastructure
development projects in the North Eastern Region (NER) through its concerned Ministries and
Departments. The region-wise details of National Highway (NH) projects in the Northeastern
states, including Assam, Arunachal Pradesh, Nagaland, Manipur, and Tripura, as well as the
Bodoland area, are as follows for the period of 2024-25:
• Completed NH projects: 389 km, with a total cost of Rs. 4,352 crore
Road • Ongoing NH projects: 3,582 km, with a total cost of Rs. 77,362 crore
Connectivity
expansion in • Approved NH projects yet to commence: 1,692 km, with a total cost of Rs. 43,322
North-East crore
Region
The Ministry of Development of North Eastern Region (DoNER) has also sanctioned various
projects under the Prime Minister's Development Initiative for North East Region (PM-
DevINE), North East Special Infrastructure Development Scheme (NESIDS), and North East
Road Sector Development Scheme (NERSDS). As of April 2025, a total of 515 projects have
been completed under the DoNER scheme, with a total cost of Rs 5,135.26 crore. Additionally,
there are 178 ongoing projects, with a total cost of Rs 4,208.64 crore, which are currently being
implemented.
203Growth
Description and reasoning
driver
PM Gati Shakti is essentially a digital platform to bring 16 Ministries including Railways and
Roadways together for integrated planning and coordinated implementation of infrastructure
connectivity projects. The multi-modal connectivity will provide integrated and seamless
connectivity for movement of people, goods and services from one mode of transport to
another. It will facilitate the last mile connectivity of infrastructure and also reduce travel time
PM Gati
for people. PM Gati Shakti will incorporate the infrastructure schemes of various Ministries
Shakti
and State Governments like Bharatmala, Sagarmala, inland waterways, dry/land ports, UDAN
etc. Economic Zones like textile clusters, pharmaceutical clusters, defence corridors, electronic
parks, industrial corridors, fishing clusters, Agri zones will be covered to improve connectivity
& make Indian businesses more competitive.
The Pradhan Mantri Gram Sadak Yojana (PMGSY) has significantly enhanced rural road
connectivity. Under this scheme, 819,391 km of road length was sanctioned, out of which
780,105 km (95%) has been constructed. As of May 20, 2025, the total expenditure on this
initiative stands at Rs. 3,38,982 crores.
Focus on
Rural Road Further, the launch of Phase IV of PMGSY to provide all-weather connectivity to 25,000 rural
Connectivity habitations, which have become eligible due to population increase. This next phase will
continue the momentum of rural infrastructure development, ensuring that more remote areas
gain vital road access, thereby fostering economic growth and improving the quality of life for
rural populations.
The Ministry of Road Transport and Highways allocates Central Road Infrastructure Fund
(CRIF) to State Governments and Union Territories for the development and maintenance of
Increased State Roads. Currently, 1,209 State Road projects, spanning approximately 14,369 Km and
focus on totalling Rs. 37,098 Crore, are underway, with completion expected in phases by 2027.
Road and
To ensure the structural integrity of National Highways and their bridges, the further mandates
Bridge
both visual and equipment-based periodical inspections, evaluations, and monitoring.
Maintenance
Structural health monitoring is conducted in real time for critical bridges, and the Indian Bridge
and Safety
Management System (IBMS) has been sanctioned for comprehensive oversight and
maintenance of bridges across the entire National Highway network.
NIP outlined in fiscal 2019 by the Government of India had an initial investment target of Rs
111 trillion over fiscals 2020-25. Subsequently, the target has been revised and it currently
stands at Rs 147 trillion. NIP is expected to drive infrastructure investments as nearly 50% of
National
projects are currently under construction. Engineering, procurement and construction (EPC)
Infrastructure
dominates mode of implementation of projects as ~72% of the outlined spends come under
Pipeline
this mode. Even though capital spending of Rs 147 trillion might not be completed by 2025,
(NIP)
Crisil Intelligence expects 70-75% achievement of these outlined spends, which is expected to
give a huge boost to the infrastructure of the country.
Source: NHAI, MoRTH, Rural dashboard, DoNER, Crisil Intelligence
Key market challenges:
The construction industry occupies a pivotal position in the nation's development plans. As of fiscal 2024,
construction sector occupies a share of 9.0% in the overall GVA. Below are the key risks and threats impacting
the industry
204Market Description
challenges
In construction projects, cost savings and timely performance are crucial concerns for all
stakeholders, including owners, contractors, and subcontractors. However, projects can be
Time
delayed or stalled due to various reasons, such as land unavailability, funding issues, and
contingency
incomplete clearances. The allocation of risk determines which party, the owner or the
contractor, bears the burden of increased costs in the event of project disruptions.
In the construction industry, particularly in infrastructure development, many projects
Risks involved involve government authorities as counterparties. These authorities may be central or state
in dealing with governments, or special purpose vehicles established by governments to address specific
governmental needs. As a result, companies operating in sectors, where central or state governments, or
agencies special purpose vehicles are the primary payers, often face prolonged working capital cycles
due to delayed payments.
Climate change is leading to more frequent and intense natural disasters, which can cause
Climate Change significant damage to construction projects, disrupt supply chains, and impact worker
and Extreme safety. Additionally, changing weather patterns and rising temperatures can also affect the
Weather Events durability and performance of building materials, requiring companies to adapt their designs
and materials to mitigate these risks
The construction industry is facing a severe shortage of skilled labourers, which can lead to
Labour project delays, increased costs, and compromised quality. This shortage is exacerbated by
Shortages an aging workforce, lack of vocational training, and a decline in interest in construction
careers among younger generations
The construction industry is highly fragmented as low fixed capital requirement for
construction contracts. Capital expenditure is only required for procuring necessary
Increase in
equipment, unlike a manufacturing business, which requires plants and machinery for
competition
production. This makes the industry less capital-intensive as compared with other industries,
encouraging many contractors to enter the sector.
EPC contracts which are for longer than one year usually come with cost escalation clauses
Possibility of thereby protecting the contractor from rise in raw material costs. However, interest costs
payment delays from high working capital will continue to impact profitability. The working capital
heightens requirement of construction companies is expected to remain high owing to delayed
working capital payments in sectors such as irrigation, power and urban infrastructure projects and disputes
intensity with clients. This is expected to lead to increased borrowings and thus higher interest cost
and liquidity constrains.
Land is a critical input for infrastructure projects. In the past several projects have been
delayed to inability to acquire required land and clearances. Further, construction work
involves skilled and unskilled labour. Construction players struggle with wage increases,
Labour and land which can be attributed to labour shortages and rising inflation. Local job opportunities from
acquisition government welfare schemes, growth in the overall rural economy and migration of
labourers to Gulf countries for better prospects are some reasons that have led to a shortage
of construction labourers. To solve the labour issue, construction companies are increasing
mechanisation, particularly in the highway projects.
Fluctuations in The construction industry is raw material intensive. Any change in prices of raw materials
raw material like steel, cement, bitumen, etc impact the cost of the project. However, the impact is limited
prices
205Market Description
challenges
to the extent of the proportion of fixed price contracts in a company's order book. Some
construction companies also own quarries to ensure constant raw material supply.
In the recent times, in fiscal 2024, despite drop in prices for steel , prices for cement and
bitumen have been fluctuating and had reached its all-time high. Hence, prices of all three
raw materials remain a key monitorable for the sector.
Source: Crisil Intelligence
Assessment of Power sector in India
Overview of construction spends in Indian power sector
Power investments driven by renewable capacity additions to rise 10-12% in FY25
Crisil Intelligence expects construction spending on power to rise 10-12% on year in fiscal 2025 driven by capacity
additions in the renewable energy space. Significant capacity additions are anticipated in the renewable energy
sector over the next five fiscal years, with projections indicating these additions will be more than three times
greater than those achieved in the previous five fiscal years. This substantial increase underscores a robust shift
towards renewable energy sources, driven by both technological advancements and policy support aimed at
reducing carbon emissions and promoting sustainable energy.
However, it's important to note that the construction intensity in the renewable energy sector is lower compared
to that in the conventional energy sector. Renewable energy projects, such as solar and wind farms, typically
require less intensive construction efforts and shorter project timelines compared to conventional energy projects,
such as coal-fired power plants, which involve more complex and extensive construction processes.
In contrast, the conventional energy sector, particularly in the coal segment, has seen slower capacity additions in
recent years. This trend is shifting as the government has recently focused more attention on expanding coal
capacity. These new additions are expected to be primarily government-led initiatives aimed at meeting base load
requirements, ensuring a stable and reliable energy supply as the country continues to develop. This renewed focus
on coal capacity highlights the balancing act between advancing renewable energy and maintaining sufficient
conventional energy capacity to support the nation's energy needs.
Power construction capex trend
In Rs Trillion
4.0
3 -4
3.5
3.0
2.5
2.0 1.7 -1.8
1.5
1.0
0.5
0.0
FY19-24 FY25-30P
Source: Crisil Intelligence
206Investments in Indian power sector
Share of green investments set to rise to ~60% between fiscal 2026-2030 from ~40% between fiscal 2019-
2025
Crisil Intelligence projects investments of Rs 28-31 trillion in the power sector between fiscal 2026-2030.
Investments in power generation are expected to increase ~1.7 times from Rs 11-12 trillion between fiscals 2019-
2025 to Rs 19-21 trillion between fiscals 2026-2030. Investments in renewable energy (excluding hydro, pumped
storage and BESS) generation capacity are expected to account for 70% of these investments over the same period
as India seeks to achieve its 500 GW of non-fossil energy capacity announced in COP26.
To achieve the RE generation target, strong transmission infrastructure is needed so as to integrate large scale RE
capacities into the grid. This is expected to lead to transmission investments of Rs 4.5-5.5 trillion between fiscals
2026-2030 from ~Rs 3 - 4 trillion between fiscals 2019-2025 led by upcoming ISTS projects.
Additionally, we expect Rs 3.5-4.5 trillion worth of investments in the distribution segment between fiscal 2026-
2030 driven by upgradation of distribution infrastructure along with installation of smart meters as India focuses
on reduction of its carbon emission.
Segment-wise break-up of total power investments
Rs. trillion Growth
FY(19-25) to
35.0
FY(25-30)
28-31
30.0
~1.6 times
4.5 -5.5
25.0
~0.7 times
19 -21 3.5 -4.5
20.0
3 -4
15.0
5 -6
~1.7 times
10.0 19 -21
11 -12
5.0
0.0
FY19-25 FY26-30P
Generation Distribution
Note: P: Projected, Private sector investments in the distribution are not included
Source: Crisil Intelligence
Investments in generation to be driven by renewable capacity additions between fiscal 2025-2030
Over the next five years, investments in generation will be led by renewable energy (excluding hydro and storage)
capacity additions, followed by investments in conventional generation and FGD installations, indicating a shift
in investment flow towards enhancing clean energy supply. Capacity addition from RE sources is expected to be
190-200 GW over fiscals 2026 to 2030, and 25-30 GW from coal-based plants sources over the same period.
Investments in RE capacity, will constitute ~70% of overall generation investments.
With the introduction of tariff-based competitive bidding (TBCB) in 2006 and anticipated healthy return profile,
large private conglomerates invested heavily in generation projects. Capacity additions in the private sector were
led by players such as Tata Power, Adani Power, Sterlite Energy, KSK Mahanadi and Lanco Infratech. However,
lack of adequate long-term power purchase agreements and stretched financials of private developers led to a
slowdown in capacity additions and restricted private investments in the generation space. As a result, central and
207state sectors, which typically have higher funding accessibility and strong execution record, will lead the
investments in conventional generation, accounting for over 65-70% of investments over fiscal 2026-2030.
Renewable energy evacuation, ISTS network expansion and upgradation to boost investment in
transmission
Investments in the transmission sector are expected to be driven by the need for a robust and reliable transmission
system to support continued generation additions and the strong push to the renewable energy sector as well as
rural electrification. Also, strong execution capability coupled with healthy financials of PGCIL will drive
investments.
As capacity additions in the country are not evenly distributed geographically, few regions in the country will be
in deficit and others in surplus. To cater to this, there will be need to import/export from/to regions. Several inter-
regional transmission corridors have been planned, and some of these high-capacity transmission corridors are in
various stages of implementation. Newly sanctioned projects under the North-Eastern System Strengthening
Scheme and system strengthening schemes focused in the the Ladakh region are also expected to augment
investments in the transmission segment.
Distribution investments to be aided by Revamped Distribution Sector Scheme (RDSS) spending
State distribution companies (discoms), the major players undertaking investment in the distribution space, have
been reeling under severe financial burden for the last few years on account of collection inefficiencies and
mounting receivables to power generation companies (gencos). Revenue dipped in fiscal 2021 due to fall in
demand from high-paying industrial and commercial consumers on account of reduced economic activity as a
fallout of the Covid-19 pandemic.
Although the government's relief package providing loans worth Rs 1.35 trillion by Power Finance Corporation
(PFC) Ltd / Rural Electrification (REC) Ltd for clearing power generators' dues eased discoms' liquidity problems
in the second half of the fiscal by aiding payments of dues to gencos', the impact was short-lived with dues on the
rise again post March 2021. The relief package is also expected to have worsened the debt profile of discoms,
forcing them to curb investments over the medium term.
Several foreign institutions such as Japan International Cooperation Agency (JICA) and Asian Development Bank
(ADB) are also expected to extend credit to the distribution sector. For instance, ADB approved a $48 million
loan to finance the expansion and upgrading of the power distribution system in Assam. In December 2020, the
ADB approved a loan of $190 million to Bangalore Electricity Supply Company Ltd for modernisation of the
power distribution system in Bengaluru city in Karnataka.
208Overview of power generation capacity in India
Renewable energy to account for ~50% of India's installed capacity by fiscal 2030
Total power generation capacity (in GW) in India
1,000.0
900.4
900.0 19.7
800.0
700.0
600.0
596.3
475.2
500.0
8.2
400.0
220.1
300.0
200.0
284.5
246.9
100.0
0.0
2024-25 2031-32(P)
Thermal Renewable (Hydro, Solar, etc.) Nuclear
Source: NEP, CEA, Crisil Intelligence
According to the National Energy Policy (NEP) plan, India's total power generation capacity is expected to grow
at a CAGR of 9.6%. While the coal sector is anticipated to expand, albeit at a moderate pace, coal will play a
crucial role in meeting peak demand due to its ability to rapidly ramp up generation. This is particularly important
given the expected 5-7% CAGR growth in power demand and the intermittent nature of renewable energy sources.
Furthermore, the stress on gas-based power plants, exacerbated by high gas prices and inadequate supply, has
underscored the importance of coal in ensuring a reliable energy mix. As a result, coal retirements are expected
to be negligible between fiscal 2026-2030.
With boost to rooftop solar and declining cost of renewable energy generation, the off-grid solar generation is
expected to increase, reducing power demand from grid. By fiscal 2032, installed capacity is expected to be 49-
50 GW resulting in diversion of 2-3% of the power demand being met directly at consumer site. Major
conventional gencos have been moving towards a more RE dominated fuel mix to address the uncertainty arising
out of the imminent phasing out of thermal power generation in the distant future.
Overview of power demand in India
Power demand to maintain healthy momentum slated to grow at 5-7% CAGR over fiscals 2025-2030
India's electricity demand has been rising steadily, with a CAGR of ~5% between fiscals 2019 and 2025. The
expected power demand in FY25 is estimated to be around 1,690-1,710 billion units. Power demand is likely to
increase by 5.5-6.5% in fiscal 2026 and it is projected to clock a compound annual growth rate (CAGR) of 5-7%
between fiscals 2025 and 2030, supported by economic growth recovery and improved reach and quality of power
supply. Central and state sectors are likely to drive conventional capacity additions as private capacity addition
shifts towards renewable sources, with a large share of the investments geared towards increasing clean-energy
supply.
209Power demand across years
Billion units CAGR FY25-30P : 5-
CAGR FY19-25P : 4.8%-5%
7%
2500 9.7%
10.0%
8.2%
7.4%
2000 8.0%
4.2%
5.1% 6.0%
1500
4.0%
1.3%
1000 2.0%
0
1 0
7 5
-1.2% ,1 3
2
0.0%
500 5 7 2
1
1 9 2
1
6 7 2
1
0 8 3
1
4 1 5
1
6 2 6
1
0 9 6 ,1- 0 5 1 2- -2.0%
0 -4.0%
FY19 FY20 FY21 FY22 FY23 FY24 FY25E FY2030P
Power demand (Billion units) Annual growth
Source: CEA, Crisil Intelligence
The demand for electricity in India is expected to be driven by various sectors, including industrial, commercial,
and domestic. The industrial and commercial sectors are expected to be the primary drivers of power demand,
with significant investments in manufacturing, infrastructure development, and policies like the Production-
Linked Incentive (PLI) scheme. The government's Aatmanirbhar Bharat relief package, spending on infrastructure
through the National Infrastructure Pipeline, and commissioning of dedicated freight corridors are also expected
to foster power demand. Additionally, the expansion of the services industry, rapid urbanization, and increased
farm income from agriculture-related reforms will contribute to the growth in power demand.
The domestic sector is also expected to see a rise in electricity consumption due to improving living standards,
increased air conditioning requirements, and government schemes like the Pradhan Mantri Sahaj Bijli Har Ghar
Yojana, which has achieved universal household electrification. The scheme has helped electrify 28.6 million
households, driving electricity demand and aiming to ensure 24x7 power supply to separate agriculture and non-
agriculture feeders. Further, railway electrification, rapid transition to electric vehicles, increased urbanization,
and industrialization, smart city projects, and upcoming metro projects are expected to provide impetus to power
demand.
Long term growth to come from industrial push and temperature vagaries
Industrial and commercial consumers are the largest consumers of electricity in absolute terms. Going forward,
India’s economy is expected to continue to expand beyond fiscal 2022, with industrial activity gradually picking
up over the medium term. Trickle-down effect of Aatmanirbhar Bharat relief package, government spending on
infrastructure through the National Infrastructure Pipeline, commissioning of the dedicated freight corridors,
expansion of the services industry, rapid urbanization, and increased farm income from agriculture-related reforms
are key macroeconomic factors fostering the power demand. Significant policy initiatives such as PLI schemes
and low corporate tax rates, among others have aided large scale manufacturing in India which will further boost
power demand in the country. In fact, several sectors including automobiles, mobile handsets and tablets, solar,
lithium-ion batteries, food & beverages and defence are expected to witness fresh investments including foreign
direct investments from global majors.
Further, railway electrification, rapid transition to EVs, increased urbanisation and Industrialisation, smart city
projects, upcoming metro projects primary tailwinds providing impetus to power demand. A confluence of these
factors is expected to drive energy sales to the industrial and commercial consumer segment.
210Further, domestic consumption has increased over the years due to the rising urbanisation rate, improvements in
the standard of living, increase in air conditioning requirements to mitigate soaring temperatures and offering free
units upto a certain level to some category/regions of India. Pradhan Mantri Sahaj Bijli Har Ghar Yojana
(Saubhagya), which was launched by the GoI in September 2017, has helped achieve universal household
electrification across the country. Under the scheme, 28.6 million households were electrified in the country. The
scheme is completed and, in turn, drives electricity demand. The programme also aims to ensure 24x7 power
supply to separate agriculture and non-agriculture feeders, facilitating judicious fostering of supply to agricultural
and non-agricultural consumers in rural areas and strengthening the sub-transmission and distribution
infrastructure in rural areas, including metering of distribution transformers/feeders/consumers. It is also expected
that electricity currently being supplied through back-up facilities, such as invertors and DGs, may move back to
the grid with increased quality of supply.
Key demand segments split across agriculture, domestic, commercial and industrial segments for power in
India (FY25)
Industrial and commercial Domestic Agriculture
600 – 610 BU 390 – 400 BU 265 – 275 BU
Source: CEA, Grid India, Crisil Intelligence
Industrial and commercial
Power demand from the industrial segment is estimated to rise by 7.5-8.5% on year in fiscal 2026 driven by a
steady rise in real GDP at 6.5%. Normal monsoon, softening commodity prices, cooling food inflation and tax
benefits announced during the Union Budget 2025-26, and lower borrowing cost are expected to drive
discretionary spending consequentially boosting industrial activity.
Manufacturing growth is expected to average 9.0% per year over fiscals 2025-2030, up from 6% on average in
the pre-pandemic decade. The services sector is expected to grow slower, though it will remain the primary growth
driver. As a result, the share of manufacturing in GDP will increase to ~20% from ~17% in fiscal 2025,
consequently, aiding power demand
Commercial power demand completed its recovery curve in fiscal 2023 as office spaces and educational
institutions reopened to full capacity. In fiscal 2026, Crisil Intelligence expects power demand from this segment
to increase by 4.5-5.5% on year on account of rising urbanisation, which, in turn, will lead to growth in commercial
spaces such as hospitals, educational institutions, malls, and offices
Domestic
In fiscal 2026, power demand from the domestic segment is expected estimated to be 5.5-6.5% on year as the
nation deals with extreme weather vagaries leading to rise in cooling and heating demand. additionally, rising
temperatures is also expected to support room air conditioner (RAC) penetration. By fiscal 2029, RAC penetration
is expected to rise to 16-18% from 13% in fiscal 2024.
Agriculture
Power demand from the agriculture sector is expected to witness 3.5-4.5% growth on-year in fiscal 2026 driven
by higher irrigation needs. In fiscal 2025, demand from the sector is estimated to have increased by 4.7% on year
driven by higher than normal temperatures leading to higher irrigation requirement. On the other hand, above
normal south west monsoon is estimated to have been a headwind for irrigation usage. For example, the
211agriculture-dominated states of Madhya Pradesh in western India and Rajasthan in North India led the dip in
demand with on-year declines of ~13% and ~25%, respectively in August 2024.
These states had witnessed excess rainfall in August 2024 (~14% and ~44% above average in Madhya Pradesh
and Rajasthan, respectively), which most likely drove down power demand for irrigation. Another key agriculture
state, Bihar, bucked the trend as it saw demand increase ~2% on-year in August. This could be attributed to
district-level rainfall and irrigation needs. For example, Rohtas, a key paddy growing district, experienced ~30%
deficit in rainfall on an average in August, which would have likely increased demand for irrigation.
In the medium term, reduced power cuts, segregation of agricultural and non-agricultural feeders, and solarization
of distribution feeders (installation of small-sized grid connected solar power plants in rural areas to compliment
grid power and extend supply hours to agricultural consumers) are expected to drive agricultural power demand.
However, agricultural feeder segregation and network strengthening in rural areas are expected to lower AT&C
losses, which currently plagues the agriculture segment.
Key projects in power sector in India
Sr State / Union Total cost
Project Unit Status
no territory (Rs Mn)
Under
5X800
1 Yadadri Coal Based Power Project Telangana 345,430 Implementati
MW
on
Under
5X800
2 Patratu Coal Based Power Project Jharkhand 320,000 Implementati
MW
on
Under
Hydro Electric Power (Dibang Valley) Arunachal 12X240
3 318,760 Implementati
Project Pradesh MW
on
Under
Coal Based Power (Janjgir-Champa) 6X600
4 Chattisgarh 270,800 Implementati
Project MW
on
Under
Solar-Wind Hybrid Power (Dwarka) 5000
5 Gujarat 250,000 Implementati
Project MW
on
Under
4X700
6 Nuclear Based Power (Fatehabad) Project Haryana 235,020 Implementati
MWe
on
Under
2X700
7 Rajasthan Atomic Power Project - Stage IV Rajasthan 229,240 Implementati
MWe
on
Under
3X660
8 Coal Based Power (Ghatampur) Project Uttar Pradesh 217,809 Implementati
MW
on
6X1650
9 Jaitapur Nuclear Power Project Maharashtra 330,000 Planning
MWe
Arunachal 8X231.2
10 Oju Hydro Electric Project 313,564 Planning
Pradesh 5 MW
Nabinagar Super Thermal Power Project 3X800
11 Bihar 299,479 Planning
(Stage-II) MW
212Sr State / Union Total cost
Project Unit Status
no territory (Rs Mn)
4X700
12 Mahi Banswara Nuclear Power Project Rajasthan 297,820 Planning
MW
Coal Based Power (Ramagundam) Project 3X800
13 Telangana 293,449 Planning
[Telangana STPP, Phase-II] MW
Talabira Coal Based Power Project [Phase- 3X800
14 Odisha 270,000 Planning
I] MW
Transmission System (Rajasthan REZ,
15 Rajasthan 250,000 Planning
Phase-III Part-I) Project
Note: The above list is not exhaustive and only an indicative list of projects
Source: Projects Today, Crisil Intelligence
Key budgetary allocation for the power sector
Policies and initiatives of Indian government to boost power sector in India
The Government of India implemented multiple initiatives aimed at ensuring uninterrupted power supply to every
household since 2014. Under the Deen Dayal Upadhyaya Gram Jyoti Yojana (DDUGJY), Integrated Power
Development Scheme (IPDS) introduced in 2014, and the Pradhan Mantri Sahaj Bijli Har Ghar Yojana
(SAUBHAGYA), introduced in 2017, about Rs. 1850 billion has been invested to boost distribution infrastructure
across various states. Consequently, 18,374 villages have been electrified under DDUGJY, and 29 million
households have gained access to electricity through SAUBHAGYA
Revamped Distribution Sector Scheme (RDSS)
In a bid to transform the power distribution landscape, the Central Government has unveiled a comprehensive
Revamped Distribution Sector Scheme, a reforms-based and results-linked initiative with a substantial outlay of
Rs. 3,037.58 billion over five years (FY22 to FY26) with a Gross Budgetary Support of Rs. 976.31 billion from
Government of India over a period of five years from 2021-22 to FY 2025-26, projects worth Rs. 2800 billion
have been approved to develop distribution infrastructure and implement smart metering solutions. The RDSS is
a result-linked evaluation scheme, where DISCOMs must meet the pre-qualifying criteria every year to be eligible
for funds under the scheme. Upon the launch of RDSS scheme in 2021, the ongoing projects under IPDS and
DDUGY have been subsumed under RDSS
The primary objective of this scheme is to significantly enhance the quality, reliability, and affordability of power
supply to consumers by fostering a financially sustainable and operationally efficient distribution sector.
The scheme aims to achieve two critical milestones by 2024-25:
• Reduce AT&C losses: Bring down Aggregate Technical and Commercial (AT&C) losses to a pan-India level
of 12-15%, ensuring a significant reduction in energy wastage and revenue leakage.
• Eliminate ACS-ARR gap: Achieve a zero gap between the Average Cost of Supply (ACS) and Average
Revenue Realized (ARR) by improving the operational efficiencies and financial sustainability of all state-
owned Distribution Companies (DISCOMs and Power Departments, excluding private sector DISCOMs
213Budget estimates and actuals for RDSS:
Rs. billion
140
123.45
118.32
120
101.5
100
80
60
40
25.31
20
0
FY23-A FY24-BE FY 24-RE FY 25-BE
Source: India Budget, Crisil Intelligence
Integrated Power Development Scheme (IPDS)
It aims to enhance the transmission and distribution networks throughout India. The scheme focuses on reducing
AT&C losses, implementing IT-enabled energy accounting and auditing systems, improving billed energy based
on metered consumption, and enhancing collection efficiency. The scheme primarily focuses on urban areas,
including the strengthening of sub-transmission and distribution networks, provision of solar panels on
government buildings, metering of feeders, distribution transformers, and consumers, as well as IT enablement of
the distribution sector.
Details of works executed under IPDS till November 2024:
• Total closure Cost: Rs. 288.86 billion.
• Installation of 994 nos. of new 33/11kV substations.
• Augmentation of 1609 nos. of 33/11kV substations.
• Laying of 33,884 CKm of HT and LT lines.
• Installation of 59,993 nos. of Distribution Transformers (DTRs).
• Installation of 89,67,566 nos. of Consumer meters/smart meters/prepaid meters/DT meters/Feeder
meters/Boundary meters.
Pradhan Mantri Sahaj Bijli Har Ghar Yojana – (Saubhagya)
The Saubhagya scheme, launched in October 2017, has successfully achieved its objective of providing electricity
connections to all un-electrified households in rural areas and poor households in urban areas. As of the end of
FY22, all states have reported 100% electrification of willing un-electrified households, identified prior to March
31, 2019. This remarkable achievement is a testament to the scheme's effectiveness, with a total of 29 million
households electrified since its inception, as reported by the states.
214Grants released by central government under Saubhagya scheme till FY23
Rs. billion
20.0 18.2
18.0
16.0
14.0
12.0
10.0
7.1
8.0
5.5
4.9
46 ..0 0 3.8 3.2 3.1 2.8 2.7 2.2 2.1 1.7 1.6 4.3
2.0
0.0
h s e d a rP r a ttU m a s s A h s e d a rP a y h d r a h iB h r a g s itta h h C a h s id O n a h ts a ja R d n a h k r a h J a r u p irT a rth s a r a h a M a y a la h g e M la g n e B ts e W h s e d a rP la h c a s r e h tO
a n
M u
rA
Source: Ministry of Power, Crisil Intelligence
North Eastern Region Power System Improvement Project (NERPSIP)
In December 2014, the Government of India launched the NERPSIP to strengthen the intra-state transmission and
distribution systems in six states: Assam, Manipur, Meghalaya, Mizoram, Tripura, and Nagaland. It was initiated
to address the region's power infrastructure challenges, which had hindered economic growth and development.
The project aimed to enhance the reliability, efficiency, and sustainability of the power supply in the region,
ultimately improving the quality of life for its inhabitants. With an initial estimated cost of R. 51.13 billion, the
project was designed to be funded 50% by a loan from the World Bank
As of March 2024, the NERPSIP has made significant progress, with 433 out of 446 sanctioned elements (lines
and substations) completed. During the period from January 2023 to March 2024, 26 new elements were
completed, further augmenting the region's power infrastructure. A total of Rs. 4.84 billion was spent by
POWERGRID, the implementing agency, during the same period
Budget estimates and actuals for NERPSIP:
Rs. billion
12.0
9.9
10.0
8.0
6.0 6.0
6.0
3.8
4.0
2.0
0.0
FY24-BE FY24-RE FY 24-AE FY 25-BE
Source: Ministry of Power, Crisil Intelligence
215Scheme for strengthening of Transmission & Distribution in Arunachal Pradesh and Sikkim
In October 2014, the Government of India approved a comprehensive scheme to strengthen the transmission and
distribution systems in Arunachal Pradesh and Sikkim. The initial estimated cost of the project was Rs. 47.54
billion, with a completion timeline of December 2018. However, the project's cost has been revised to Rs. 91.29.32
billion, with a revised completion timeline for the awarded scope of work (204 elements) and additional timeline
for the unawarded packages (88 elements).
Significant progress has been made, with 175 out of 292 sanctioned elements, including lines and substations,
completed. Between January 2023 and June 2024, an additional 64 elements were completed, contributing to the
project's progress
Budget estimates and actuals
Rs. billion
16
14 14.09
14 13.15
12 11.11
10
8
6
4
2
0
FY24-BE FY24-RE FY 24-AE FY 25-BE
Source: Ministry of Power, Crisil Intelligence
Green Energy Corridor:
The Green Energy Corridor (GEC) is a transmission infrastructure project aimed at evacuating and transmitting
power from large-scale solar and wind power plants in India. The project was initiated in 2012 by the Power Grid
Corporation of India Limited (PGCIL), which conducted a study to identify the need for dedicated transmission
infrastructure for renewable energy (RE) sources. The study found that the power evacuation and transmission
infrastructure in the vicinity of potential RE sites was inadequate, leading to the planning of dedicated transmission
infrastructure for large-scale solar and wind power plants. The objective of the GEC project is to ensure the smooth
integration of RE into the national grid by providing accurate forecasting, real-time monitoring, and efficient
scheduling of RE.
Key Characteristics
The GEC project comprises of both Inter-State Transmission System (ISTS) and Intra-State Transmission System
(InSTS), along with the establishment of Renewable Energy Management Centres (REMCs) and other control
supporting infrastructure such as reactive power compensation and energy storage systems. The REMCs are
installed at various locations, including the Southern Region, which includes states such as Tamil Nadu, Andhra
Pradesh, and Karnataka, the Western Region, which includes states such as Gujarat, Maharashtra, and Madhya
Pradesh, and the North Region, which includes states such as Rajasthan and Delhi. These REMCs provide accurate
forecasting, real-time monitoring, and efficient scheduling of RE to ensure the smooth integration of RE into the
national grid. The key features of the GEC project include the evacuation of approximately 24 GW of RE power,
the setting up of transmission lines and substations, and the establishment of REMCs.
Phase 1: Intra-State Transmission System Green Energy Corridor Phase-I and Inter-State Transmission
System
The first phase of the GEC project includes the Intra-State Transmission System Green Energy Corridor Phase-I,
which was approved by the Cabinet Committee on Economic Affairs (CCEA) in 2015. The project has a total
216target of 9700 ckm of intra-state transmission lines and 22600 MVA sub-stations, and is being implemented by
State Transmission Utilities (STUs) in 8 RE-rich states, including Andhra Pradesh, Gujarat, Himachal Pradesh,
Karnataka, Madhya Pradesh, Maharashtra, Rajasthan, and Tamil Nadu. The project cost is approximately Rs.
10,141.68 crore, with funding from the Ministry of New and Renewable Energy (MNRE), KfW, and the STUs.
GEC Phase-I has been completed in State of Madhya Pradesh, Rajasthan, Tamil Nadu and Karnataka. Completion
date for GEC Phase-I for States of Andhra Pradesh, Himachal Pradesh, Maharashtra is December 2024 and for
State of Gujarat is March 2025. The projects have been delayed mainly due to delay in land acquisition, Right of
Way (RoW) issues and forest clearances.
The Inter-State Transmission System (ISTS) GEC project, which was commissioned in March 2020, has a total
of 3200 ckm of inter-state transmission lines and 17000 MVA substations, and was implemented by PGCIL at a
cost of Rs. 11369 crore. Some of the key points of this phase include:
Phase 2: Intra-State Transmission System Green Energy Corridor Phase-II and Inter-State Green Energy
Corridor Phase-II
The InSTS GEC-II scheme with total target of 10,750 ckm intra-state transmission lines and 27,500 MVA sub-
stations was approved by the CCEA in January 2022.
The project cost is Rs. 12031.33 crore with central financial assistance from MNRE of Rs. 3970.34 crore (i.e.
33% of project cost). The balance 67% of the project cost is available as loan from KfW/REC/PFC. The
transmission schemes would be implemented by the State Transmission Utilities (STUs) of seven states, i.e.
Gujarat, Himachal Pradesh, Karnataka, Kerala, Rajasthan, Tamil Nadu and Uttar Pradesh for evacuation of
approx. 20 GW of RE power in the seven States. Currently, the STUs are inviting tenders for implementing the
projects. The scheduled commissioning timeline for the projects under this scheme is March 2026. Subsequently,
some states had requested for revision of projects under the GEC-II Scheme and the same has been approved by
MNRE.
Estimated project Length of transmission Capacity of substations RE addition
State
cost (Rs Crore) lines envisaged (ckm) envisaged (MVA) envisaged
Gujarat 3667.29 2470 7460 5,100
Himachal
489.49 62 761 317
Pradesh
Karnataka 1036.25 938 1225 2,639
Kerala 420.32 224 620 452
Rajasthan 907.61 659 2191 2,478
Tamil
719.76 624 2200 4,000
Nadu
Uttar
4847.86 2597 15280 4,000
Pradesh
Total 12088.58 7574 29737 18,986
Source: Ministry of Power, Crisil Intelligence
Key growth drivers and challenges in the power sector
Key growth drivers:
Growth drivers Description
Government push
• At present, India depends on coal imports along with its domestic production to meet
towards reducing
the power demand in the country. In order to reduce the dependence on imports, the
coal imports
government is planning to increase the domestic coal production aiming to increase
217Growth drivers Description
availability and reduce dependence on imported coal. This would lead to infrastructure
growth, in turn boosting the EPC segment
• To achieve its ambitious target of 500 GW of renewable energy capacity by 2030, the
Indian government has introduced the Green Energy Corridor (GEC) scheme, which
aims to integrate electricity generated from renewable sources like wind and solar into
the conventional power grid
Increase focus on
• Under GEC Phase 1, 24 GW of renewable energy has been integrated into the grid by
renewable energy
2023, with an additional 19.43 GW planned in GEC phase 2 at a cost of Rs 120.3 billion
• Cabinet Committee on Economic Affairs has approved to develop 10,750 ckm of
transmission lines and 27,500 MVA of sub-stations to support renewable energy
growth with commissioned deadline by 2026
• In December 2023, CEA has notified the draft National Electricity Plan (Volume II)
for transmission which is under finalisation. The tentative transmission line and
capacity addition as per the draft NEP is estimated to increase by ~1.2 times to 580,293
Development of
ckm by fiscal 2027 from 485,544 ckm in fiscal 2024. Similarly, transmission line
T&D infrastructure
capacity is expected to increase to 685,293 ckm by fiscal 2032 while the substation
capacity is expected to rise by ~1.3 times. This will aid the growth of projects in EPC
segment of transmission and distribution.
• Power demand is directly linked to GDP. With rising India’s GDP coupled with other
factors such as urbanisation, rise in population, rise in industrial output the power
Rising power
demand is expected to see a growth of 5-7% between fiscal 2025 and 2029. In order to
demand
meet the rising demand the power sector is expected to see a capacity addition from
442 GW in fiscal 2024 to 700-710 GW in fiscal 2029. This addition of capacities will
further aid the construction under power EPC industry.
• The National Electricity Plan (2022-2032) recommends the adoption of cutting-edge
technologies in substations, transmission lines, and communication systems, as well as
Technological the use of advanced surveying tools and robust cybersecurity measures.
advancements
• The integration of these modern technologies is expected to enhance the efficiency and
reliability of the transmission network, while also attracting new investments in the
sector, supporting both new projects and the upgrade of existing infrastructure
• India's central location in South Asia has sparked regional energy cooperation, with the
Ministry of Power introducing guidelines for cross-border electricity trade in 2018 to
facilitate imports and exports with neighboring countries.
• Multiple transmission projects are planned or underway, including lines connecting
Increase in cross
India to Nepal, Myanmar, and others, while the "One Sun One World One Grid"
border power
(OSOWOG) initiative is under discussion to create a global renewable energy grid,
transfer
potentially interconnecting with countries like Maldives, Singapore, UAE, and Saudi
Arabia.
• Once completed, these initiatives will further boost India's transmission infrastructure,
attracting new investments and driving growth in the sector.
Source: Crisil Intelligence
218Key market challenges:
Market challenges Description
• While there has been good progress in developing Inter-State Transmission Systems
(ISTS) in recent years, Intra-State Transmission Systems (InSTS) remain a concern.
InSTS infrastructure
lag in investment • The lack of adequate transmission infrastructure within states can lead to congestion,
power shortages, and reduced grid reliability, ultimately affecting the overall
efficiency of the power system
• The acquisition of land and securing RoW for transmission lines has become a
significant challenge, resulting in delayed project timelines and increased costs.
Right of Way (RoW)
Issues • According to the CEA monthly progress report for February 2025, over 50% of ISTS
projects awarded under the TBCB route have cited right-of-way issues as the primary
reason for project delays
• The process of obtaining environmental clearance for transmission lines that traverse
Additional time forest areas is also causing delays in project timelines, ultimately leading to increased
taken in costs.
environmental
• As per the CEA monthly progress report, over 30% of the projects are facing
clearances
challenges related to forest and wildlife clearance, highlighting the significance of
this issue in hindering project progress
• The synchronized commissioning of multiple projects is essential to ensure that the
transmission infrastructure is ready to evacuate power from generating stations in a
Synchronous
timely and efficient manner.
Commissioning
(SCOD) Issues • Delays in one project can trigger a ripple effect, impacting connected projects and
leading to a cascade of delays and inefficiencies, ultimately hindering the overall
progress of the transmission infrastructure development.
Source: Crisil Intelligence
Assessment of competitive landscape of water and wastewater treatment market in India
Overview of key players
In this section, Crisil has analysed some key players operating in the water and wastewater treatment industry in
India. Data has been sourced from publicly available information, including annual reports and investor
presentations of listed players, regulatory filings, rating rationales, and/or company websites. The financials in the
competitive section have been re-classified by Crisil Intelligence, based on annual reports and filings by the
players. Financial ratios used in this report may not match with the reported financial ratios by the players on
account of standardization and re-classification done by Crisil.
Note: The list of competitive landscape peers considered in this section is not exhaustive but an indicative list
Operational overview
Overview of key players in water and wastewater treatment industry in India
219Geographical
Company Name Established Overview
presence
Denta Water and Infra Solutions Ltd operates in the
EPC sector, focusing on projects related to
groundwater recharge, lift irrigation, and drinking
water supply infrastructure, including those under
the Jal Jeevan Mission. The company's services
encompass design, engineering, procurement, and
installation, as well as on-site execution and project
Denta Water and India (Majority of
management, culminating in project
Infra Solutions 2016 the projects are in
commissioning. Additionally, it offers operations
Limited Karnataka)
and maintenance services for a specified period,
typically ranging from three to five years, post-
commissioning. The company's portfolio also
includes construction projects in the railway and
highway sectors, with experience in water
management infrastructure, including groundwater
recharge projects.
EMS Limited a multi-disciplinary EPC company
with a presence across multiple business segments.
The company's expertise spans Integrated Water
and Wastewater Solutions, Electrical Transmission
India: Uttar Pradesh,
and Distribution, and Building and Road
Uttarakhand,
Construction. With a comprehensive range of
Rajasthan, Bihar,
EMS Limited 1998 services, EMS Limited offers turnkey solutions
Haryana, Madhya
that cater to the needs of various industries, from
Pradesh, and
design and engineering to construction and
Maharashtra
installation to operation and maintenance. The
company's capabilities extend to undertaking EPC
and HAM contracts, making it a complete solution
provider for the projects
Enviro Infra Engineers provides services related to
environmental infrastructure. The company's
offerings include Sewage Treatment Plants (STP)
India: Uttar Pradesh,
and Sewage Systems (SS), Common Effluent
Rajasthan, Haryana,
Treatment Plants (CETP), and Water Supply
Enviro Infra Madhya Pradesh,
2009 Scheme Projects (WSSP). Enviro Infra Engineers
Engineers Ltd Chhattisgarh, Delhi,
delivers its projects through various models,
Gujarat, Karnataka,
including Engineering, Procurement, and
Punjab, Jharkhand
Construction (EPC), Hybrid Annuity Model
(HAM), and Operation and Maintenance (O&M)
contracts.
GA Infra Private Limited (GAIPL) was founded by
Mr. Gajendra Agarwal and was initially a
India: Haryana,
proprietorship firm. It was later reconstituted as a
GA Infra Private Rajasthan, Uttar
1994 private limited company in March 2012. The
Limited Pradesh, Madhya
company takes on turnkey projects that involve
Pradesh, Delhi
setting up water distribution systems, water
purification plants, and solar pumps. GAIPL
220Geographical
Company Name Established Overview
presence
primarily operated in Rajasthan, but it has also
expanded its presence to other states.
Gaja Engineering Private Limited is a construction
India: West Bengal, company that executes various types of contracts,
Orissa, Andhra including civil, mechanical, electrical, water,
Pradesh, Uttar irrigation, railways, roads, and building projects.
Gaja Engineering
2011 Pradesh, Jharkhand, The company undertakes turnkey works and is
Private Limited
Telangana, currently involved in projects related to water,
Maharashtra, Goa, electrical, irrigation, tunnels, industrial buildings,
Karnataka, Jammu environmental engineering, and operational
maintenance, among others
Ion Exchange (India) Ltd provides water,
wastewater treatment, and environmental
solutions. The company is headquartered in
Mumbai and has multiple manufacturing and
assembly facilities in India and abroad, including
Pan India Portugal, UAE, Indonesia, Bangladesh, and Saudi
Arabia, with a presence in other key geographies as
Ion Exchange Global: APAC, well. The company provides comprehensive and
1964
(India) Ltd Africa, Europe, integrated services and solutions in water and
Middle east and wastewater treatment, including sea water
North america desalination, recycle, and zero liquid discharge
plants to diverse industries. Additionally, it offers
a comprehensive range of resins, specialty
chemicals, and customized chemical treatment
programs for water, non-water, and specialty
applications
JITF Infralogistics Limited operates its
infrastructure businesses through its subsidiaries,
Municipal Solid Waste management and Waste to
Energy business which is being carried out by JITF
India: Madhya
Urban Infrastructure Limited, Rail wagon
Pradesh, Delhi, Uttar
fabrication and manufacturing business being
Pradesh, Bihar,
carried out by Jindal Rail Infrastructure Limited,
Jharkhand,
and Water and Wastewater EPC business being
Chhattisgarh,
JITF carried out by JWIL Infra Limited. These
Rajasthan, Tamil
Infralogistics 2006 subsidiaries focus on municipal solid waste
Nadu, Assam,
Limited management, rail wagon fabrication, and water and
Uttarakhand,
wastewater EPC businesses, respectively.
Maharashtra
JWIL provides solutions for projects in the
drinking water, irrigation, and wastewater
Global: Africa,
treatment sectors. The company has expanded its
MENA and ASEAN
footprint beyond India, with a presence in the
MENA, Africa, and ASEAN regions. JWIL's
portfolio includes desalination, reuse, zero liquid
discharge, sludge, and solid waste management.
221Geographical
Company Name Established Overview
presence
Technocraft Ventures Limited (formerly known as
M/s Technocraft Construction Private Limited) is a
company that develops public infrastructure
through turnkey Engineering, Procurement and
Construction (“EPC”) contracts. The company's
work spans multiple infrastructure areas, including
India: Uttar Pradesh, Wastewater Treatment (“WWT”), Operation and
Technocraft
1998 Uttarakhand, Maintenance (“O&M”) of public utilities, Water
Ventures Limited
Rajasthan, and Delhi Supply Scheme Projects (“WSSPs”), electrical
transmission and distribution networks,
construction of substations, road and highway
works, micro tunneling, renewable energy,
housing, residential buildings, and urban
development at the sector level. Its clients are
primarily state governments and their agencies
Pan India
Global: Bangladesh, VA Tech Wabag Limited provides water treatment
Malaysia, solutions, offering a range of services including
Nepal, Philippines, desalination, wastewater treatment, recycle and
Singapore, Sri Lanka, reuse, effluent treatment, drinking water, zero
Vietnam, Bahrain, liquid discharge, sludge treatment, and energy
Oman, Qatar, Saudi recovery. The company's expertise spans various
VA Tech Wabag 1995 Arabia, UAE, aspects of water management, making it a solution
Limited Kuwait, Egypt, provider for industries and communities.
Ethiopia, Libya,
VA Tech Wabag Limited pursues partnerships
Namibia, Nigeria,
across various project models, including EPC, EP,
Tunisia, Senegal,
DBO, BOOT, HAM and O&M. The company is
Zambia, Tanzania,
deepening its focus on key regions, including the
Austria, Russia,
Middle East, GCC, CIS, and Southeast Asia.
Turkey, CIS
Countries
VPRPL is an EPC company with experience in
designing and constructing infrastructure projects.
The company's business operations are divided into
four categories: Water Supply Projects, Railway
India: Uttar Pradesh, Projects, Road Projects, and Irrigation Network
Uttarakhand, Assam, Projects. It undertakes projects on an EPC basis,
Vishnu Prakash R Haryana, Rajasthan, with or without operation and maintenance
Punglia Limited 1986 Gujarat, Maharashtra, services.
(VPRPL) Madhya Pradesh,
The company's Water Supply Projects division
Manipur, Daman and
offers services, including survey, design,
Diu
construction, and operation of water supply
projects. This includes pipeline laying, water tank
construction, and provision of household tap
connections. The company also provides design,
operation, and maintenance services, and
222Geographical
Company Name Established Overview
presence
undertakes augmentation and reorganization of
water supply projects on a turnkey basis.
Welspun Enterprise Limited operates in the
infrastructure sector, with a focus on the
development and operation of roads, highways,
water, and wastewater projects across India. The
company is involved in various PPP models in
rural and urban areas. In addition to its
India: Uttar Pradesh, infrastructure business, Welspun Enterprise
Maharashtra, Limited has investments in oil and gas exploration
Welspun
1994 Uttarakhand, Bihar, assets through a joint venture with the Adani
Enterprises Ltd
Tamil Nadu, Punjab, Group, called Adani Welspun Exploration Limited
etc. (AWEL).
The company has also expanded its water
infrastructure business through the acquisition of
Welspun Michigan Engineers Limited, a trenchless
technology-based EPC company, which enables it
to provide services in tunnelling, sewer
rehabilitation, and allied areas.
Source: Crisil Intelligence, company websites, and company annual reports
Order book trend for the selected players
Orderbook (Rs. billion)
Company Name FY22 FY23 FY24 FY25
Denta Water and Infra Solutions Limited N.A. N.A. N.A. 6.2
EMS Limited 8.6 14.9 18.0+ N.A.
Enviro Infra Engineers Ltd 1.7 14.9 23.4 19.9
GA Infra Private Limited N.A. N.A. N.A. N.A.
Gaja Engineering Private Limited N.A. N.A. N.A. N.A.
Ion Exchange (India) Ltd 26.7 34.3 35.5 27.6
JITF Infralogistics Limited N.A. 37.0* 40.0* N.A.
Technocraft Ventures Limited 4.7 3.4 7.5 7.7
VA Tech Wabag Limited 101.1 132.2 114.5 124.8
Vishnu Prakash R Punglia Limited 38.4 N.A. 47.2 53.6
Welspun Enterprises Ltd 84.0 101.0 122.0 143.0
Note: N.A. – Not Available; N.Ap. – Not Applicable, *approximate figures given by the company
Source: Company annual reports, quarterly financials and investor presentation available in the public domain,
Crisil Intelligence
223Financial parameters
Revenue from operations and growth (Rs. million)
CAGR CAGR
Company Name FY22 FY23 FY24 FY25 (FY22- (FY22
24) -25)
Denta Water and Infra Solutions Limited 1,195.7 1,743.2 2,386.0 2,032.9 41.3% 19.4%
EMS Limited 3,599.2 5,381.6 7,933.1 9,658.3 48.5% 39.0%
10,660.
Enviro Infra Engineers Ltd 2,235.3 3,381.0 7,289.2 80.6% 68.3%
6
11,994. 18,293. 110.2
GA Infra Private Limited 4,139.4 N.A. N.Ap.
4 2 %
16,148. 12,061. 16,415.
Gaja Engineering Private Limited N.A. 0.8% N.Ap.
8 3 4
15,768. 19,896. 23,478. 27,371.
Ion Exchange (India) Ltd 22.0% 20.2%
7 1 5 1
12,347. 15,902. 32,835. 22,648.
JITF Infralogistics Limited 63.1% 22.4%
9 9 6 1
Technocraft Ventures Limited 1,205.8 1,786.9 2,261.0 2.795.6 36.9% 32.4%
29,793. 29,605. 28,564. 32,940.
VA Tech Wabag Limited -2.1% 3.4%
0 0 0 0
11,684. 14,738. 12,374.
Vishnu Prakash R Punglia Limited 7,856.1 37.0% 16.4%
0 7 2
13,423. 27,581. 28,722. 35,841.
Welspun Enterprises Ltd 46.3% 38.7%
3 9 8 0
Note: N.A. – Not Available; N.Ap. – Not Applicable, FY25 numbers are taken from financial statements whereas
rest all numbers are taken from respective annual reports
Source: Company annual reports, quarterly financials and investor presentation available in the public domain,
Crisil Intelligence
YoY Growth in revenue from operations (%)
Company Name FY23 FY24 FY25
Denta Water and Infra Solutions Limited 45.8% 36.9% -14.8%
EMS Limited 49.5% 47.4% 21.7%
Enviro Infra Engineers Ltd 51.3% 115.6% 46.3%
GA Infra Private Limited 189.8% 52.5% N.A.
Gaja Engineering Private Limited -25.3% 36.1% N.A.
Ion Exchange (India) Ltd 26.2% 18.0% 16.6%
JITF Infralogistics Limited 28.8% 106.5% -31.0%
Technocraft Ventures Limited 48.2% 26.5% 23.6%
VA Tech Wabag Limited -0.6% -3.5% 15.3%
Vishnu Prakash R Punglia Limited 48.7% 26.1% 16.0%
224Company Name FY23 FY24 FY25
Welspun Enterprises Ltd 105.5% 4.1% 24.8%
Note: N.A. – Not Available; N.Ap. – Not Applicable, FY25 numbers are taken from financial statements whereas
rest all numbers are taken from respective annual reports
Source: Company annual reports, quarterly financials and investor presentation available in the public domain,
Crisil Intelligence
Operating profit before depreciation, interest and taxes – OPBDIT (Rs. million)
CAGR CAGR
Company Name FY22 FY23 FY24 FY25 (FY22- (FY22-
24) 25)
Denta Water and Infra Solutions Limited 518.1 669.6 791.4 676.8 24% 9.3%
EMS Limited 1,127.1 1,500.0 2,038.5 2,511.7 34% 30.6%
Enviro Infra Engineers Ltd 500.2 845.1 1,665.0 2,667.6 82% 74.7%
GA Infra Private Limited 451.9 1,296.0 2,339.5 N.A. 128% N.Ap.
Gaja Engineering Private Limited 3,991.9 2,751.2 2,331.6 N.A. -24% N.Ap.
Ion Exchange (India) Ltd 2,132.1 2,549.9 2,719.4 2,938.2 13% 11.3%
JITF Infralogistics Limited 1,495.6 2,594.3 4,783.2 4,045.3 79% 39.3%
Technocraft Ventures Limited 138.6 218.8 335.7 477.1 56% 51.0%
VA Tech Wabag Limited 2,369.9 3,178.0 3,757.0 4,223.0 26% 21.2%
Vishnu Prakash R Punglia Limited 868.7 1,565.8 2,098.9 1,554.6 55% 21.4%
Welspun Enterprises Ltd 1,500.5 2,476.4 4,254.4 5,216.9 68% 51.5%
Note: N.A. – Not Available; N.Ap. – Not Applicable, FY25 numbers are taken from financial statements whereas
rest all numbers are taken from respective annual reports
OPBDIT = Revenue from operations- total expenses + depreciation and amortization expenses+ finance cost
Source: Company annual reports, quarterly financials and investor presentation available in the public domain,
Crisil Intelligence
Operating profit before depreciation, interest and taxes – OPBDIT margins (%)
Company Name FY22 FY23 FY24 FY25
Denta Water and Infra Solutions Limited 43.3% 38.4% 33.2% 33.3%
EMS Limited 31.3% 27.9% 25.7% 26.0%
Enviro Infra Engineers Ltd 22.4% 25.0% 22.8% 25.1%
GA Infra Private Limited 10.9% 10.8% 12.8% N.A.
Gaja Engineering Private Limited 24.7% 22.8% 14.2% N.A.
Ion Exchange (India) Ltd 13.5% 12.8% 11.6% 10.7%
JITF Infralogistics Limited 12.1% 16.3% 14.6% 17.9%
Technocraft Ventures Limited 11.5% 12.2% 14.8% 17.1%
VA Tech Wabag Limited 8.0% 10.7% 13.2% 12.8%
Vishnu Prakash R Punglia Limited 11.1% 13.4% 14.2% 12.6%
Welspun Enterprises Ltd 11.2% 9.0% 14.8% 14.6%
225Note: N.A. – Not Available; N.Ap. – Not Applicable, FY25 numbers are taken from financial statements whereas
rest all numbers are taken from respective annual reports
Source: Company annual reports, quarterly financials and investor presentation available in the public domain,
Crisil Intelligence
Profit after tax (Rs. million)
CAGR CAGR
Company Name FY22 FY23 FY24 FY25 (FY22- (FY22-
24) 25)
Denta Water and Infra Solutions Limited 383.4 498.5 604.7 528.9 26% 11%
EMS Limited 788.5 1,088.5 1,526.6 1,837.8 39% 33%
Enviro Infra Engineers Ltd 345.5 574.5 1,064.6 1,771.5 76% 72%
GA Infra Private Limited 270.5 786.5 1,408.9 N.A. 128% N.Ap.
Gaja Engineering Private Limited 2,581.3 2,098.1 1,931.9 N.A. -13% N.Ap.
Ion Exchange (India) Ltd 1,616.9 1,949.7 1,953.5 2,082.5 10% 9%
-
JITF Infralogistics Limited -1,287.6 908.2 -244.3 N.Ap.
1,071.4 N.Ap.
Technocraft Ventures Limited 59.4 108.1 190.5 282.0 79% 68%
VA Tech Wabag Limited 1,320.6 110.0 2,504.0 2,948.0 38% 31%
Vishnu Prakash R Punglia Limited 448.5 906.4 1,221.9 586.0 65% 9%
Welspun Enterprises Ltd 797.9 6,844.2 3,488.4 3,835.7 109% 69%
Note: N.A. – Not Available; N.Ap. – Not Applicable, FY25 numbers are taken from financial statements whereas
rest all numbers are taken from respective annual reports
Source: Company annual reports, quarterly financials and investor presentation available in the public domain,
Crisil Intelligence
Financial Ratios (FY24)
Interest
PAT Gearing Current
Company Name ROE ROCE coverage
% ratio Ratio
ratio
Denta Water and Infra Solutions Limited 25.0% 36.8% 60.5% 0.01 3.2 162.5
EMS Limited 18.9% 19.2% 30.5% 0.09 6.1 34.9
Enviro Infra Engineers Ltd 14.4% 36.6% 47.2% 0.80 1.5 7.8
GA Infra Private Limited 7.7% 39.7% 34.0% 1.35 1.6 5.7
Gaja Engineering Private Limited 11.4% 16.0% 24.9% 0.00 3.1 25.3
Ion Exchange (India) Ltd 8.2% 19.7% 27.8% 0.13 1.5 26.3
JITF Infralogistics Limited 2.7% -4.5% 28.8% N.Ap 1.5 1.7
Technocraft Ventures Limited 8.4% 20.8% 22.8% 0.87 1.5 4.4
VA Tech Wabag Limited 8.6% 13.8% 21.1% 0.15 1.7 5.8
Vishnu Prakash R Punglia Limited 8.2% 16.9% 24.7% 0.55 1.7 5.1
Welspun Enterprises Ltd 11.4% 14.8% 19.1% 0.30 1.9 5.6
Note: *On a consolidated basis; N.A. – Not Available; N.Ap. – Not Applicable, FY25 numbers are taken from
financial statements whereas rest all numbers are taken from respective annual reports
OPBDIT % = OPBDIT / Revenue from operations
PAT % = PAT / Total income
226Return on Capital Employed (RoCE) = Profit before interest and tax (PBIT) / Average of capital employed
Capital employed: Total debt+ Total Deferred Tax Liability+ Total tangible equity
Return on Equity (RoE) = PAT / Average tangible net worth
Current ratio: Current assets/ Current liabilities
Gearing ratio= Total debt/ Tangible equity
Interest coverage ratio= PBDIT/ Finance cost
PBDIT= Profit before tax+ Finance cost+ Depreciation and amortisation expense
Source: Company annual reports, quarterly financials and investor presentation available in the public domain,
Crisil Intelligence
Financial Ratios (FY25)
Interest
PAT Gearing Current
Company Name ROE ROCE coverage
% ratio Ratio
ratio
Denta Water and Infra Solutions Limited 25.4% 12.9% 25.0% 0.00 20.3 201.8
EMS Limited 18.7% 18.9% 31.5% 0.09 8.2 31.7
Enviro Infra Engineers Ltd 16.3% 17.8% 31.7% 0.24 3.1 7.7
GA Infra Private Limited N.A. N.A. N.A. N.A. N.A. N.A.
Gaja Engineering Private Limited N.A. N.A. N.A. N.A. N.A. N.A.
Ion Exchange (India) Ltd 7.5% 17.7% 25.6% 0.25 1.5 25.5
JITF Infralogistics Limited -1.1% 1.1% 23.8% -7.36 1.4 1.3
Technocraft Ventures Limited 10.0% 23.5% 28.2% 0.73 1.8 5.4
VA Tech Wabag Limited 8.8% 13.8% 21.7% 0.17 1.7 6.0
Vishnu Prakash R Punglia Limited 4.7% 7.5% 16.9% 0.91 1.5 2.4
Welspun Enterprises Ltd 10.1% 14.9% 20.5% 0.55 1.8 4.6
Note: *On a consolidated basis; N.A. – Not Available; N.Ap. – Not Applicable, FY25 numbers are taken from
financial statements whereas rest all numbers are taken from respective annual reports
OPBDIT % = OPBDIT / Revenue from operations
PAT % = PAT / Total income
Return on Capital Employed (RoCE) = Profit before interest and tax (PBIT) / Average of capital employed
Capital employed: Total debt+ Total Deferred Tax Liability+ Total tangible equity
Return on Equity (RoE) = PAT / Average tangible net worth
Current ratio: Current assets/ Current liabilities
Gearing ratio= Total debt/ Tangible equity
Interest coverage ratio= PBDIT/ Finance cost
PBDIT= Profit before tax+ Finance cost+ Depreciation and amortisation expense
Source: Company annual reports, quarterly financials and investor presentation available in the public domain,
Crisil Intelligence.
227OUR BUSINESS
Some of the information in this section, including information with respect to our business plans and strategies,
contain forward-looking statements that involve risks and uncertainties. To obtain a complete understanding of
our Company and its business, prospective investors should read this section in conjunction with “Risk Factors”,
“Industry Overview”, and “Management’s Discussions and Analysis of Financial Condition and Results of
Operations” beginning on pages 39, 152 and 444, for a discussion of certain factors that may affect our business,
financial condition or results of operations. Our actual results may differ materially from those expressed in or
implied by these forward-looking statements.
Our Company’s financial year commences on April 01 and ends on March 31 of the immediately subsequent
year, and references to a particular financial year are to the 12 months ended March 31 of that particular year.
Unless otherwise indicated or the context otherwise requires, the financial information for the financial years
ended March 31, 2025, March 31, 2024 and March 31, 2023, included herein is based on or derived from our
Restated Consolidated Financial Information included in this Draft Red Herring Prospectus. For further
information, kindly refer “Restated Consolidated Financial Information” beginning on page 331. Additionally,
please refer to “Definitions and Abbreviations” beginning on page 02 for certain terms used in this section. The
Restated Consolidated Financial Information are based on our audited financial statements and is restated in
accordance with the Companies Act, 2013, and the SEBI ICDR Regulations.
Unless the context otherwise requires, in this section, references to “we”, “us”, “our” “our Company” or “the
Company” refers to Technocraft Ventures Limited.
Unless noted otherwise, the information in this section is obtained or extracted from report titled ‘Assessment of
infrastructure construction industry in India with focus on water and wastewater management’ dated August 05,
2025 prepared and released by Crisil Intelligence (“CRISIL”) and exclusively commissioned and paid by our
Company for an agreed fee for the purposes of confirming our understanding of the industry in connection with
the Offer and will be available on our Company’s website at www.technocraftventures.com from the date of
the Draft Red Herring Prospectus until the Bid/ Offer Closing Date. CRISIL was appointed on April 10, 2025,
pursuant to an engagement letter entered into with our Company. CRISIL is not related in any other manner to
our Company. The data included herein includes excerpts from the CRISIL Report and may have been reordered
by us for the purposes of the presentation. Further, the CRISIL Report was prepared on the basis of information
as of specific dates and opinions in the CRISIL Report may be based on estimates, projections, forecasts and
assumptions that may be as of such dates. CRISIL has prepared this study in an independent and objective
manner, and it has taken all reasonable care to ensure its accuracy and has further advised that it has taken due
care and caution in preparing the CRISIL Report based on the information obtained by it from sources which it
considers reliable. Unless otherwise indicated, financial, operational, industry and other related information
derived from the CRISIL Report and included herein with respect to any particular year refers to such information
for the relevant financial year. Further, the CRISIL Report is not a recommendation to invest or disinvest in any
company covered in the report. Prospective investors are advised not to unduly rely on CRISIL Report. For more
information and risks in relation to commissioned reports, kindly refer “Risk Factor No. 41 – Industry
information included in this Draft Red Herring Prospectus has been derived from an industry report issued by
CRISIL Intelligence dated August 05, 2025 ("CRISIL Report"). There can be no assurance that such third-party
statistical, financial and other industry information is complete, reliable or accurate.” beginning on page 64.
Also, kindly refer, “Certain Conventions, Presentation of Financial, Industry and Market Data – Industry and
Market Data” beginning on 22.
OVERVIEW
We are a multidisciplinary public infrastructure development company engaged in the execution of turnkey
Engineering, Procurement and Construction (“EPC”) contracts. We operate across various infrastructure
segments, including Wastewater Treatment (“WWT”), Operation and Maintenance (“O&M”) of public utilities,
228Water Supply Scheme Projects (“WSSPs”), electrical transmission and distribution networks, construction of
substations, road and national highway works, micro tunneling, and sector-level urban development. We execute
projects primarily for state governments and government agencies across northern India, including Uttar Pradesh,
Uttarakhand, Rajasthan and the National Capital Territory of Delhi.
Our project execution model is predominantly tender-based, with contracts awarded by state agencies, public
works departments, urban local bodies, and other government bodies. We maintain a strong presence across
multiple project locations and operate through dedicated site teams aligned with the nature and geography of
individual contracts.
Incorporated in 1998, our Company commenced operations in Uttar Pradesh with residential and road construction
projects, including the development of planned housing colonies, sector-level layouts, and execution of road
construction, widening and strengthening works under Public Works Departments (“PWD”) and National
Highways programs. These early projects laid the foundation for our subsequent diversification into wastewater
management, water supply, and public utility infrastructure.
We have executed projects under key central and state-sponsored schemes including the Atal Mission for
Rejuvenation and Urban Transformation (“AMRUT”), Jawaharlal Nehru National Urban Renewal Mission
(“JNNURM”), Urban Infrastructure Development Scheme in Satellite Towns (“UIDSST”), Namami Gange
Programme (“Namami Gange”), Jal Jeevan Mission (“JJM”), and Pradhan Mantri Gram Sadak Yojana
(“PMGSY”). We also have experience in implementing infrastructure projects funded by multilateral agencies
such as the Asian Development Bank (“ADB”), which require compliance with rigorous technical and
environmental standards.
Our integrated in-house capabilities span civil construction, mechanical and electrical integration, project design,
and commissioning. These enable us to offer comprehensive infrastructure solutions from concept to delivery.
Additionally, we support long-term asset sustainability through our operations and maintenance (“O&M”)
services across wastewater and road projects, reinforcing our lifecycle approach to public infrastructure.
Our growth and strategic direction have significantly benefited from the leadership of our Managing Director, Mr.
Sanjay Tyagi, who joined the Company in April 2007. His professional journey began at the Ghaziabad
Development Authority, where he served as an Engineer from January 1990 to March 2007. His expertise in civil
engineering and infrastructure development, combined with his extensive experience in government contract
procurement and execution, has been crucial to the company's success. He is responsible for strategic planning,
execution oversight, quality control, and project delivery, ensuring the company maintains its high standards of
performance. Under his guidance, we strategically diversified into specialized EPC segments, notably entering
wastewater treatment infrastructure through our strategic partnership in M/s Ultratech Engineers, a multi-party
partnership firm instituted pursuant to a deed executed in March 2009 (with effect from January 25, 2009), which
was subsequently acquired by our Company pursuant to a business transfer agreement dated June 02, 2016. This
partnership was instrumental in enhancing our technical capabilities and allowed us to qualify for larger, complex
infrastructure tenders.
Services Offered:
Segment Core Services
Water & Wastewater EPC of WSSPs, sewerage networks, sewerage treatment plants (“STPs”),
Infrastructure wastewater treatment plants (“WWTPs”), transmission mains, reservoirs
Operation &
Long-term O&M of STPs, WSSPs, Sewer networks
Maintenance (O&M)
Roads and Highways EPC of Road and Highway Projects
229Segment Core Services
Urban Infrastructure Sector-level planning and residential buildings
Power Distribution Electrification schemes, substations, transmission lines
Trenchless & Micro
Pipeline installation in high-density zones with minimal surface disruption
tunnelling Works
Key Milestones in the growth and evolution of our Company since its incorporation
Our Company has followed a structured growth trajectory since its incorporation, marked by strategic
diversification across core infrastructure sectors. In the early 2000s, we established a presence in the road
construction segment by securing projects from various government bodies such as the National Highway
Division – PWD Uttar Pradesh (“PWD UP”), Noida Authority, and Ghaziabad Development Authority.
In 2007, we achieved a key operational benchmark by crossing an annual turnover of ₹450 million.
In 2008, we entered into a partnership with M/s Krishna Contractors pursuant to a deed dated August 01, 2008,
under the trade name and style of “M/s Krishna-TCPL (J.V.)” to undertake contracting assignments; this
partnership was subsequently dissolved with effect from December 31, 2024.
In 2009, we further expanded our capabilities by entering the wastewater treatment segment through the formation
of M/s Ultratech Engineers, a strategic multi-party partnership that enabled us to participate in government
contracts in the wastewater infrastructure space.
In 2012, we diversified into the power distribution sector with contract awards from Paschimanchal Vidyut
Vitaran Nigam Limited (“PVVNL”) and Dakshinanchal Vidyut Vitaran Nigam Limited (“DVVNL”), collectively
valued at approximately ₹891.4 million. The following year i.e. financial year 2013, we achieved an annual
turnover exceeding ₹1,000 million and secured contracts for the construction of 33/11 kV substations under
PVVNL.
In 2016, we acquired the ongoing business of M/s Ultratech Engineers pursuant to a business transfer agreement
dated June 02, 2016, including all assets, liabilities, work orders, and contractual rights of the partnership firm,
which had been engaged in executing government infrastructure contracts. This acquisition strengthened our
technical capabilities in the wastewater treatment segment and enhanced our eligibility for larger-scale public
infrastructure projects.
Our geographic footprint expanded in 2017 with the award of an ADB-funded sewerage network project in
Udaipur, Rajasthan, valued at approximately ₹1,262.34 million (as per the Letter of Acceptance) and including a
10-year O&M component. This marked our entry into multilateral-funded infrastructure projects.
In 2022, we entered into a consortium-based joint venture arrangement under the trade name ‘TESPL-LRS-TCPL
JV’ pursuant to an agreement dated June 10, 2022, with Trenchless Engineering Services Private Limited and
L.R. Sharma & Co., for jointly bidding on a Delhi Jal Board project involving the replacement of transmission
mains by micro-tunnelling across the Shahdara, Greater Kailash, and Jal Vihar zones. This arrangement was
formally constituted as a partnership firm through a deed executed on May 25, 2023, to undertake and execute the
awarded project.
In 2023, we achieved an annual turnover exceeding ₹1,750 million and secured two major AMRUT 2.0 projects
in Kota and Bikaner, collectively valued at over ₹5,500 million, awarded by Rajasthan Urban Drinking Water
Sewerage & Infrastructure Corporation (“RUDSICO”). We were also awarded a wastewater infrastructure project
in Kotputli, Rajasthan, valued at approximately ₹1,839.21 million.
230In 2024, we achieved an annual turnover exceeding ₹2,250 million, reflecting our continued expansion and
execution capabilities in the infrastructure sector.
In 2025, we achieved an annual turnover exceeding ₹2,700 million, shows our sustained growth. In 2025, we were
awarded a major road widening and strengthening project under the PWD UP, valued at over ₹665 million.
Our financial performance for the Fiscals 2025, 2024 and 2023 based on the Restated Consolidated Financial
Information, are set forth in the table below:
(₹ in million except otherwise stated)
For the Financial Year ended
Key Financial Indicators
March 31, 2025 March 31, 2024 March 31, 2023
Revenue from Operations(1) 2,795.64 2,261.02 1,786.91
Total Income(2) 2,810.04 2,272.98 1,805.44
EBITDA (₹)(3) 481.88 338.30 218.81
EBITDA Margin (%)(4) 17.24% 14.96% 12.25%
PAT 282.04 190.54 108.06
PAT Margin (%)(5) 10.09% 8.43% 6.05%
Operating Cash Flows 216.84 13.99 100.35
Net Worth(6) 1,199.83 917.78 727.34
Net Debt(7) 869.17 789.89 480.89
Debt- Equity Ratio (times)(8) 0.73 0.87 0.70
Return on Equity (%)(9) 23.51% 20.76% 14.86%
Return on Capital Employed (%)(10) 22.35% 19.08% 16.85%
As certified by Rishi Kapoor & Company, Chartered Accountants pursuant to their certificate dated August 04,
2025 vide UDIN 25455362BMGILQ8952.
Notes:
(1) Revenue from operation means revenue from sales and other operating revenues.
(2) Total Income represents the total turnover of our business i.e. Revenue from Operations and Other Income, if
any.
(3) EBITDA is calculated as restated profit/(loss) before tax plus finance costs, depreciation and amortization
expense less other income.
(4) EBITDA Margin is calculated as EBITDA divided by Revenue from Operations.
(5) PAT Margin is calculated as restated profit/(loss) attributable to owners for the financial year divided by
Revenue from Operations.
(6) Net worth means the aggregate value of the paid-up share capital, equity suspense account and all reserves
created out of the profits and securities premium account and debit or credit balance of profit and loss account
after deducting the aggregate value of the accumulated losses, debit or credit balance of common control
adjustment deficit account, deferred expenditure and miscellaneous expenditure not written off, as per the
audited balance sheet, but does not include reserves created out of revaluation of assets, write-back of
depreciation and amalgamation.
(7) Net debt = non-current borrowing + current borrowing – Cash and Cash Equivalent.
(8) Debt equity ratio means ratio of total debt (long term plus short-term including current maturity of long-term
debt) and Equity Share capital plus other equity.
(9) ROE is calculated as Profit attributable to owners of the company divided by total shareholder’s equity
(including minority interest).
(10) ROCE is calculated as EBIT (i.e. restated profit/(loss) before tax plus finance costs minus other income)
divided by capital employed (i.e. sum of:(i) Total Shareholder’s equity including minority interest;(ii) Long-Term
Borrowings (including Lease Liabilities, if any); (iii) Short-Term Borrowings (including Lease Liability, if any)
231OUR ORDER BOOK
Our Order Book as on a particular date consists of project value of unexecuted projects or uncompleted portions of our Ongoing Projects, i.e., the total project value of ongoing
projects work billed till June 30, 2025. For further details kindly refer, “Risk Factor No. 12 - Our Order Book may not be a reliable indicator of our future revenue or
profitability, and any delay, modification, or cancellation of projects may materially affect our financial performance, liquidity, and cash flows.” beginning on page 49.
Our Order Book for Ongoing Projects is ₹ 6,858.34 million (including O&M to be executed after complication of respective projects) as on June 30, 2025.
Further, as on June 30, 2025, we are executing 4 projects with the unexpected value of ₹ 3,838.64 million under the joint ventures.
The following table sets forth the break-up of our Order Book for all the Ongoing Projects:
Sewerage Works:
(₹ in million except otherwise stated)
% of
Balance
Constructio Techno
Stipulated Date Contract Operation Work Work
Sr. Estimated n Work Ventures
of Value & Complete Pending
No Name of work Client Date of including Limited
Commencemen (Excludin Maintenanc d up to as on
. Completion Provisional (TVL) in
t g GST) e 30.06.2025 30.06.202
Sum, if any the
5
Project
1. Providing, Laying, Commissioner September 30, September 30, 2,486.4 2,315.8 170.6 1,112.0 1,374.44 75%
Jointing, Testing & , Nagar 2023 2025 share of
Commissioning of Nigam, Kota TVL with
Sewerage System and (North), O&M: 10 years EMS
All ancillary works (Rajasthan) operation & Limited
along with Design, maintenance JV
Construction, Supply, work after partner
installation, testing commissioning having
and Commissioning of created 25%
(Civil, Mechanical, assets. shares
Electrical, (100%
232instrumentation & work is
other necessary being
works) of Sewage executing
Pumping by TVL)
Station/MWPS (if
any), Sewage
Treatment Plant based
on SBR Process with
provision for treated
waste water reuse
including 1 year defect
liability with 10 years
O&M for towns under
package AMRUT-
2.0/RAJ/SEWERAGE
-21 a) Kota North :
Sewer System with 5
Nos. SPS & Up
gradation of existing
20 MLD ASP STP
2. Providing, Laying, Commissioner September 29, September 29, 2,248.0 2,204.6 43.4 791.5 1,456.5 75%
Jointing, Testing & , Nagar 2023 2025 share of
Commissioning of Nigam, TVL with
Sewerage System and Bikaner O&M: 5 years EMS
All ancillary works (Rajasthan) operation & Limited
along with Design, maintenance JV
Construction, Supply, work after partner
installation, testing defect liability having
and Commissioning period. 25%
(Civil, Mechanical, shares
Electrical, (100%
instrumentation & work is
233other necessary being
works) of Sewage executing
Pumping by TVL)
Station/MWPS (in
any), Sewage
Treatment Plant based
on SBR Process with
Provision for treated
waste water reuse
including 1 Year
defect liability with 5
years O&M for towns
under package
AMRUT-
2.0/RAJ/SEWERAGE
-21 a) Bikaner: Sewer
System with 1 STP
3. Providing, Laying, Commissioner August 13, 2023 August 13, 1,558.6 1,409.0 149.7 798.7 759.90 75%
Jointing, Testing & , Muncipal 2025. share of
Commissioning of Council, TVL with
Sewerage System and Kotputli, O&M: 10 years VVIP
All ancillary works (Rajathan) operation & Infratech
along with Design, maintenance Ltd
Construction, Supply, work after (Formerl
installation, testing commissioning y known
and Commissioning of created as Vibhor
(Civil, Mechanical, assets. Vaibhav
Electrical, Infra Pvt
instrumentation & Ltd JV
other necessary partner
works) of Sewage having
Pumping 25%
234Station/MWPS (in shares
any), Sewage (100%
Treatment Plant based work is
on SBR Process with being
Provision for treated executing
waste water reuse by TVL)
including 1 Year
defect liability with 10
years O&M for
Kotputli town.
Kotputli Town:- 10
MLD STP/SPS and
Sewerage Networks
4. Survey, Investigation, Executive October 04, December 31, 2,086.00 2,086.00 - 1,804.7 281.3 100%
Design, Construction, Engineer, 2019 2023 TVL
Testing & Construction share
Commissioning of Division, U.P. (final extension
sewerage works in Jal Nigam, of both works is
Jaunpur NPP under Jaunpur (Uttar yet to be
“AMRUT” Scheme. Pradesh) received; the
correspondence
s are under
process with the
department)
5. Cleaning of 600 mm Executive Bond yet to be Bond yet to be 0.8 0.8 - - 0.8 100%
225 m and 800 mm Engineer executed executed TVL
diameter 358 m main (Water), share
trunk sewer lines with Ghaziabad
super shaker machine Municipal
from Niti Khand-1 in Corporation
front of Cambridge
School to Mangal
235Chowk via Gyan
Khand-04 Kala Pathar
in Indirapuram area
under Vasundhara
Zone
6. Cleaning of 800 mm Executive Bond yet to be Bond yet to be 0.8 0.8 - - 0.8 100%
diameter 570 m main Engineer executed executed TVL
trunk sewer lines from (Water), share
Rai Diagnostic Center Ghaziabad
(Friends Avenue) to Municipal
Bharat Ram Global Corporation
School up to Niti
Khand-02 in
Indirapuram area
under Vasundhara
Zone by super shaker
machine
7. Cleaning of 800 mm Executive Bond yet to be Bond yet to be 0.7 0.7 - - 0.7 100%
diameter 455 m main Engineer executed executed TVL
trunk sewer lines from (Water), share
Rail Vihar 48 MLD to Ghaziabad
Balaji Sweets Municipal
Chauraha Niti Khand- Corporation
03 in Indirapuram area
under Vasundhara
Zone by super shaker
machine
8. Cleaning of 800 mm Executive Bond yet to be Bond yet to be 0.7 0.7 - - 0.7 100%
diameter 510 m main Engineer executed executed TVL
trunk sewer lines from (Water), share
Bank of India branch Ghaziabad
Indirapuram to in front Municipal
236of Cambridge School Corporation
in Indirapuram area
under Vasundhara
Zone by super shaker
machine
9. Providing & Laying Executive LOA & Bond LOA & Bond 313.1 313.1 - - 313.1 100%
300 mm 700 mm dia. Engineer (C) yet to be yet to be TVL
Internal and peripheral DR-VIII, executed executed share
sewer line in Sangam DJB, Yamuna
Vihar group of Vihar, Delhi.
colonies (Ph-I) under
Okhla drainage
zone/catchment area
in Delhi. (Balance
Work).
10. Providing chamber for Executive LOA & Bond LOA & Bond 248.9 248.9 - - 248.9 100%
House Sewer Engineer (C) yet to be yet to be TVL
Connection for DR.III, executed executed share
Swaroop Nagar GOC Delhi Jal
falling under Board,
Coronation Pillar Kanhiya
Catchment area in Nagar, Near
Delhi. Metro Station,
Delhi-110035.
11. Survey, Soil Municipal LOA & Bond LOA & Bond 1,229.4 1,229.4 - - 1,229.4 100%
Investigation, Design, Corporation, yet to be yet to be TVL
Supply, Laying, Indore executed executed share
Construction and
Commissioning of
STP of 40 MLD
Tigriya Badshah and
Sewer Line of 64 km
237and 1 no. IPS of 30
MLD and Pumping
Main including House
Service Connection as
per scope of work with
10 year under
AMRUT scheme.
Total 10,173.4 9,809.80 363.70 4,506.90 5,666.54
*The Operational KPIs have been certified by Y.P.& Associates, Chartered Engineer vide certificate dated August 05, 2025, bearing certificate no. 630B/ONGOING
PROJECTS/TECHNOCRAFT.
Water Supply Works:
(₹ in million except otherwise stated)
% of
Construction
Contract Techno
Stipulated Date Estimated Work Work Balance Work
Sr. Name of Value Operation & Ventures
Client of Date of including Completed up Pending as on
No. work (Excluding Maintenance Limited
Commencement Completion Provisional to 30.06.2025 30.06.2025
GST) (TVL) in
Sum, if any
the Project
1. Replacement TESPL January 16, 2023 July 16, 599.2 599.2 - 351.4 247.8 26% share
of LRS TVL 2025 of TVL with
Transmission JV, Green two other
mains Park JV partners,
(Shahdara, Extension, namely - L.
G.K. & Jal New Delhi R. Sharma
Vihar main) & Co
emanating having 48%
from share and
Bhagirathi Trenchless
WTP (Joint Engineering
Venture) Services Pvt
Share@26% Ltd having
23826% share
(26% work
is being
executing
by TVL)
Total 599.2 599.2 - 351.4 247.8
*The Operational KPIs have been certified by Y.P.& Associates, Chartered Engineer vide certificate dated August 05, 2025, bearing certificate no. 630B/ONGOING
PROJECTS/TECHNOCRAFT.
Road Works:
(₹ in million except otherwise stated)
% of
Construction Balance Techno
Contract Work
Stipulated Date Estimated Work Work Ventures
Sr. Value Operation & Completed
Name of work Client of Date of including Pending as Limited
No. (Excluding Maintenance up to
Commencement Completion Provisional on (TVL) in
GST) 30.06.2025
Sum, if any 30.06.2025 the
Project
1. Widening and Superintending March 12, 2025 June 11, 665.8 665.8 - 130.5 535.3 100%
strengthening Engineer, 2026 TVL
work in two lanes Saharanpur share
with paved Circle, PWD,
shoulders from ch. Saharanpur
29.793 to 72.793 (Uttar
(up to the border Pradesh)-
of Uttarakhand) of 247001
Daulatpur-
Nanouta-
Mangalore Road
(State Road No.
167) in
Saharanpur
239district. (Length
40.420 km)
Contract Bond
No. 248/SE-
SRE(S.Pur)/2024-
25 dated
12/03/2025
LOA: 1049/163
C-SRE/2025
dated 04/02/2025
Total 665.8 665.8 - 130.5 535.3
*The Operational KPIs have been certified by Y.P.& Associates, Chartered Engineer vide certificate dated August 05, 2025, bearing certificate no.
630B/ONGOING PROJECTS/TECHNOCRAFT.
Electrical Works:
(₹ in million except otherwise stated)
% of
Construction Techno
Contract Work Balance
Stipulated Date Estimated Work Ventures
Sr. Name of Value Operation & Completed Work
Client of Date of including Limited
No. work (Excluding Maintenance up to Pending as
Commencement Completion Provisional (TVL) in
GST) 30.06.2025 on 30.06.2025
Sum, if any the
Project
1. Development VVIP February 22, 2025 July 10, 417.4 417.4 - 210.3 207.1 100%
of Distribution Infratech 2026 TVL share
lnfrastructure- Limited,
Loss Dehradun,
Reduction Uttarakhand
Works at EDC
Roorkee
Circle of
Uttarakhand
240under
Revamped
Reforms-
Based and
Results-
Linked,
Distribution
Sector Scheme
against
Specification
no CCP-I/41
12023-2024
Package-F
RDSS - EDC
Roorkee.
Total 417.4 417.4 - 210.3 207.1
*The Operational KPIs have been certified by Y.P.& Associates, Chartered Engineer vide certificate dated August 05, 2025, bearing certificate no. 630B/ONGOING
PROJECTS/TECHNOCRAFT.
Our Order Book for Operations and Maintenance (O&M) works is ₹ 201.60 million as on June 30, 2025. The following table sets forth the break-up of our Order Book for
O&M projects (100% TVL share in the below projects):
(₹ in million except otherwise stated)
Balance
Contract
Stipulated Date Estimated Work Work
Sr. Value Operation & Work
Name of work Client of Date of Completed up Pending as
No. (Excluding Maintenance Category
Commencement Completion to 30.06.2025 on
GST)
30.06.2025
1. Operation and Maintenance Senior September 29, September 40.80 40.80 15.50 25.30 STP O&M
work for 5 years of 2/10 MLD Manager, 2023 28, 2028
STP at Sadopur Badalpur in Greater Noida
Greater Noida. Industrial
(Tender ID: Development
2412023_GNIDA_801284_27) Authority,
Greater Noida,
Gautam Budha
Nagar (Uttar
Pradesh)
2. Design and Construction of Executive January 01, 2023 December 95.20 95.20 25.10 70.10 Sewer
Intercepting Sewer on both Engineer, 31, 2032 O&M
banks of Ayad River and Rajasthan
Lateral Sewer Network in Urban
Ward No. 34, 35 & 38 along Infrastructure
with Allied Works including Development
Operation & Maintenance Project,
services of the created system Investment
for 10 years at Udaipur. Project
Implementation
Unit, Udaipur
(Rajasthan)
3. Operation and Maintenance Greater Noida February 11, February 47.60 47.60 1.40 46.20 STP O&M
of 15MLD STP (for 60 Industrial 2025 10, 2030
months) at Sector Ecotech-II Development
in Greater Noida (Tender Authority,
ID_2024_Gnida_943975_31) Uttar Pradesh.
4. Operation and Maintenance Greater Noida February 11, February 57.50 57.50 2.60 54.90 STP O&M
of 20MLD STP (for 60 Industrial 2025 10, 2030
months) at Sector Ecotech-II Development
in Greater Noida (Tender Authority,
ID_2024_Gnida_943975_22) Uttar Pradesh.
5. Construction of T07- Kasoli Superintending August 18, 2022 May 15, 07.60 07.60 2.50 05.10 Road Work
to Baheri (Length 12.400 Engineer, Rural 2027 O&M
Km) of Package No UP 5574 Engineering
and routine maintenance for Department,
five years after completion of Saharanpur
242construction. Circle,
Saharanpur
(Uttar Pradesh)
Total 248.70 248.70 47.10 201.60 -
*The Operational KPIs have been certified by Y.P.& Associates, Chartered Engineer vide certificate dated August 05, 2025, bearing certificate no. 630B/ONGOING
PROJECTS/TECHNOCRAFT.
Our Order Book for Completed Projects
Details of projects completed by our Company and Joint Ventures of our Company during the last 5 (five) years is set out below:
(₹ in million, except otherwise stated)
Total Contract Technocraft
Sr. Company’s Joint venture Date of Actual Date of Project
Particulars of the Project value Share Value
No. Share in % Share in % Commencement Completion Tenor
(Excluding GST) of Contract
1. O&M work of 56 MLD Raw 100% Nil 73.66 73.66 July 01, 2020 January 18, 2023 2 Years & 6
Sewage Pumping Station & 56 Months
MLD Sewage Treatment Plant
based on Sequential Batch
Reactor (SBR) technology at
Indirapuram, Ghaziabad
including rising main 900 mm
dia DI - Pipe K-7 pipe length
1705m on turnkey basis
including all civil, electrical
and mechanical works.
2. Supply, Laying & amp; 49% JV with Vibhor 1,424.23 697.87 January 25, 2019 October 31, 2022 3 Years & 9
Jointing of 200 MM Dia to 800 Vaibhav Infra Months
MM Dia Sewer line and Pvt Ltd (now
Appurtenant Works, known as VVIP
Construction of additional Infratech Ltd -
sump well, Screen Chamber, 51% share)
Inlet Chamber &
243Construction of sewer house
Connecting chamber &
sewer house connection work
in Zone-I (Masani) under
Amrut programme Mathura.
3. Ghazipur Sewerage Scheme 40% JV with Satish 907.20 362.88 January 22, 2019 January 21, 2021 2 Years
Phase-II, Ghazipur Nagar Kumar &
Palika Parishad Ghazipur under Company (now
AMRUT Programme. known as SKC
Technocrat Pvt
Ltd - 60%
share)
4. Laying of Sewer Line (200mm 35% JV with EMS 875.98 306.59 November 15, February 28, 2023 4 Years & 3
dia-1200mm dia), 2 Nos. Infracon Pvt Ltd 2018 Months
Intermediate Pumping Station (now known as
(17 MLD & 41 MLD), Rising EMS Ltd - 51%
Main and Sewer House share) & EMS
Connection work etc. complete. Infrastructure
(Ghaziabad Sewerage Scheme) Pvt Ltd - 14%
share)
5. Construction, Erection, 100% Nil 407.72 407.72 July 28, 2018 January 31, 2023 4 Year 6
Testing, Including Required Months
Survey & Design Work,
Commissioning, Start-up,
performance Run of Sewerage
network of Zone-4 with Defect
Liability Period of 12 Months
including handing over to
Nagar Palika Parishad at Etah
City Etah Under Etah City
Sewerage Scheme Phase-II.
2446. Construction, Erection, 60% JV with EMS 818.75 491.25 January 22, 2018 May 31, 2022 4 Years & 4
Testing, including required Infracon Pvt Months
Survey & Design work, Ltd (now
Commissioning, Start–up, known as EMS
Operation & Maintenance Ltd - 40%
including Monitoring & share)
Performance Run of 24 MLD
Sewage treatment plant, Main
Sewage Pumping station,
intermediate pumping station
Zone-3, Sewerage network of
Zone-3 and trunk main with
appurtenant works under trial
run concept, including 5 years
O&M and handing over to
Nagar Palika Parishad at Etah
City, Etah.
7. 100% Nil 47.09 47.09 March 01, 2022 March 28, 2022 1 Month
Interception and Diversion
(I&D) works of drains and
sewage treatment plant works
with 3 months trial run, testing,
commissioning & maintenance
on design build operate &
transfer (DBOT) basis &
thereafter operation &
maintenance for 15 years at
Distt. Etawah (U.P.) under
Namami Gange programme.
8. Implementation of rural piped 100% Nil 175.37 175.38 January 20, 2024 March 31, 2024 2 Months
drinking water project by State
Water and Sanitation Mission
in view of providing clean,
adequate and sustainable
245drinking water to the rural
community under the Jal
Jeevan Mission by the
Government of Uttar Pradesh
and the sense of belongingness
to the water distribution system
being done in all respects of
w orks, (Rampur).
9. Implementation of rural piped 100% Nil 152.38 152.38 February 12, March 31, 2024 2 Months
drinking water project by State 2024
Water and Sanitation Mission
in view of providing clean,
adequate and sustainable
drinking water to the rural
community under the Jal jeevan
Mission by the Government of
Uttar Pradesh and the sense of
belongingness to the water
distribution system being done
i n all respects of works.
10. Civil Structural Work at VVIP 100% Nil 248.38 248.38 August 10, 2024 March 31, 2025 8 Months
NAMAH TOWER A & C At
Group Housing at Plot No. GH-
3/4, VVIP NAMAH, NH-24,
Village-Mahrauli & Shahpur
Bamheta, Pargana-Dasna,
Tehsil & District Ghaziabad-
201001.
11. Design and Construction of 100% Nil 732.93 732.93 August 10, 2017 December 31, 2022 5 Years & 4
Intercepting Sewer on both Months
banks of Ayad River and
Lateral Sewer Network in
Ward No. 34, 35 & 38 along
with Allied Works including
246Operation & Maintenance
services of the created system
for 10 years at Udaipur.
12. Construction of T07- Kasoli to 100% Nil 58.95 58.95 May 15, 2021 August 17, 2022 1 Year & 3
Baheri (Length 12.400 Km) of Months
Package No UP 5574 and
routine maintenance for five
years after completion of
construction.
13. Construction of 40 mld average 51% JV with Vibhor 2,046.81 1,043.87 July 17, 2020 March 31, 2025 4 Years & 8
capacity S.T.P., 55 mld average Vaibhav Infra (final bill is under Months
capacity M.P.S., Rising Main Pvt Ltd (now process)
& Trunk Sewer/Branch Sewer known as VVIP
in Central Sewerage Zone Infratech Ltd -
Nagar Nigam, Shahjahanpur 49% share)
Distt.- Shahjahanpur including
all Civil, E&M works, Testing
Commissioning, trial run. (On
Turn Key Basis).
*The Operational KPIs have been certified by Y.P.& Associates, Chartered Engineer vide certificate dated August 05, 2025, bearing certificate no. 630A/COMPLETED
PROJECTS/TECHNOCRAFT.
247Details of our ongoing and completed projects as of June 30, 2025.
As of June 30, 2025, the details of our ongoing and completed projects in last five years are as follows:
Sr.
Particulars By our Company With Joint Ventures Total
No.
1. Ongoing Projects 15 04 19*
2. Completed Projects 08 05 13
*including 5 O&M projects.
Details of our contract value of our order book as on June 30, 2025 are as under:
(₹ in million, except otherwise stated)
Sr.
Project Segment No. of Projects Contract Value*
No.
1. Sewerage Work 11 10,173.4
2. Road Work 1 665.80
3. Electrical Work 1 417.40
4. Water Supply Works 1 599.20
5. Operation & Maintenance
4 241.1
Work- Sewerage Work
6. Operation & Maintenance
1 7.60
Work- Road Work
Total 19 12,104.50
*Amount excluding applicable taxes.
SUCCESS RATIO OF OUR COMPANY:
Solo bid by the Company:
During the
Particulars
Fiscal 2025 Fiscal 2024 Fiscal 2023 Total
Bids submitted 11 14 12 37
Less: Cancelled/ Awaited/
2 8 4 14
Pending Result
Net bids submitted 9 6 8 23
Awarded 5 1 0 6
Successful Conversion of Bids
45.45 16.66 0 16.22
(in %)
As lead partner:
During the
Particulars
Fiscal 2025 Fiscal 2024 Fiscal 2023 Total
Bids submitted 1 3 - 4
Less: Cancelled/ Awaited/
0 - - -
Pending Result
Net bids submitted 1 3 - 4
Awarded 0 3 - 3
Successful Conversion of Bids
0 100.00 0 75.00
(in %)
248As JV partner:
During the
Particulars
Fiscal 2025 Fiscal 2024 Fiscal 2023 Total
Bids submitted 3 2 1 6
Less: Cancelled/ Awaited/
1 2 - 3
Pending Result
Net bids submitted 2 - 1 3
Awarded - - 1 1
Successful Conversion of Bids
0 0 100.00 16.66
(in %)
Contract Secured segment wise in last 5 years:
Name of the segment Number of Projects
STP and Sewerage 5
Sewerage 11
Water Supply Projects 3
Electricity 1
Building 1
Road 2
STP O&M 4
Sewerage O&M 1
Road O&M 1
Total 29
SEGMENTS OF OUR BUSINESS OPERATIONS
1. Wastewater Treatment and Sewerage Network Projects (WWTs)
Our Company functions as a turnkey executor for sewerage network and wastewater treatment infrastructure,
offering end-to-end solutions that support sustainable urban water management. Our operations in this segment begin
with the design and implementation of comprehensive sewerage networks, where we lay pipelines of various
materials, including High-Density Polyethylene (HDPE), Reinforced Cement Concrete (RCC), Mild Steel (MS),
Asbestos Cement Mazza (AC Mazza), Double Wall Corrugated (DWC), and Unplasticized Polyvinyl Chloride
(UPVC). These pipelines, with diameters ranging from 120 mm to 1600 mm, are engineered to ensure efficient
wastewater conveyance while minimizing the risk of blockage through the achievement of self-cleaning velocities.
The process of laying sewer pipelines involves systematic excavation, precise installation of pipelines, construction
of house connection chambers, and complete restoration of affected roads. Once installed, the network connects
urban households to centralized sewer systems, supporting the effective transportation of sewage to treatment
facilities.
As part of our service offering, we also undertake the design and construction of STPs, utilizing technologies such
as Sequential Batch Reactor (SBR) and Upflow Anaerobic Sludge Blanket (UASB). These treatment systems are
built in accordance with effluent quality norms prescribed by the National Green Tribunal and the Ministry of
Environment, Forest and Climate Change. The treated effluent is suitable for non-potable applications such as
horticulture, vehicle washing, and industrial cooling.
249Following the completion of construction activities, our Company is also responsible for the long-term operation and
maintenance of the developed assets, including STPs and SPSs. These O&M responsibilities are typically mandated
for a period of up to 10-15 years and include monitoring of system performance, regular maintenance of pipelines
and machinery, and ensuring uninterrupted operation in line with performance and discharge standards. This
integrated approach enhances asset longevity and reliability of service delivery to the end-users.
2. Water Supply Scheme Projects (WSSPs)
Our expertise also extends to the development and execution of water supply infrastructure, particularly in urban
areas where reliable and continuous access to treated water is critical.
To ensure minimal surface disruption during the laying of water transmission mains, especially in densely populated
urban areas, our Company employs advanced microtunneling technology. This method allows the installation of
large-diameter pipelines below ground with limited excavation, thus avoiding disturbances to existing roadways,
buildings, and public utilities. The precision of tunnel boring machines used in microtunneling enables us to meet
alignment and depth specifications, even in complex geotechnical conditions. Our current engagement with the Delhi
Jal Board, involving the laying of water mains from the Bhagirathi WTP, showcases the application of this
technology for a high-impact urban utility.
3. Renewable Energy Integration
As part of our broader commitment to environmental sustainability and energy efficiency, we integrate renewable
energy systems into our infrastructure projects, particularly in wastewater treatment facilities. Our focus in this area
is the installation of solar photovoltaic systems to power the operations of STPs and SPSs, thereby reducing
dependence on conventional electricity sources.
The process begins with detailed site assessments to optimize solar exposure and determine the appropriate
configuration of the solar plant. Ground-mounted/ Roof-mounted solar panels are installed with support structures
designed to withstand local environmental conditions, ensuring durability and performance over the long term. These
systems are designed to generate sufficient energy to meet the operational demands of the treatment facilities.
The solar systems are seamlessly integrated with the existing plant infrastructure, supplying power directly to key
operational components including decanters, diffusers, pumps, blowers, and control systems. In addition, we are
implementing energy monitoring systems that allow for real-time tracking of power generation, consumption, and
efficiency. The integration also includes the provision of essential electrical components such as inverters,
transformers, and switchgear, as well as necessary safety systems including earthing and lightning protection. This
approach not only promotes the use of clean energy but also contributes to operational cost savings and aligns with
government objectives of promoting renewable energy in public infrastructure.
4. Specialized Technologies – Microtunneling and Trenchless Methods
Our Company has built strong technical capabilities in the use of trenchless construction technologies, particularly
microtunneling, to install underground utilities in urban environments where surface disruption must be minimized.
This method is especially useful in high-density areas or in zones with heritage structures, utilities, or roadways that
must remain undisturbed during construction. The microtunneling process is initiated with detailed geotechnical
surveys and mapping of existing utilities, followed by the use of tunnel boring machines that facilitate accurate
installation of pipelines below ground.
The use of this method allows for the placement of reinforced concrete pipelines with high precision in terms of
alignment and depth. These operations include the construction of launch and receiving shafts, slurry excavation
systems, and active guidance control for tunnel direction. In areas or applications where microtunneling is not
250feasible, we deploy Horizontal Directional Drilling (HDD) for the trenchless laying of smaller pipelines. This
alternative approach is also effective in minimizing environmental and public disruptions.
Following installation, we conduct thorough testing procedures such as pressure tests and flow assessments to ensure
the integrity and functionality of the installed networks. Additional structures such as manholes, access chambers,
and junction boxes are constructed to enable future inspections and maintenance. This segment plays a crucial role
in supporting seamless urban infrastructure development, allowing the execution of essential projects in areas where
traditional open-cut methods would be unviable.
5. Road and Highway Construction
Our Company has a well-established presence in the road and national highway construction sector, with a strong
execution record under state and national road development programs. We have successfully completed multiple
projects involving new road construction, as well as the widening and strengthening of existing roads across Uttar
Pradesh under the PWD and National Highway development authorities. These projects involve end-to-end
execution, starting with design, procurement, and civil works, through to final commissioning. A recently awarded
contract involves the widening and strengthening of the Daulatpur–Nanouta–Mangalore Road (State Road No. 167)
from kilometer 29.793 to 72.793, extending to the Uttarakhand border, with a total project length of 40.42 kilometers
in Saharanpur district.
The scope of work in these road projects typically begins with the preparation and compaction of the subgrade,
followed by the laying of the Granular Sub Base (GSB) to provide a stable foundation. This is succeeded by the
construction of the Wet Mix Macadam (WMM) layer, which serves as a granular base for the bituminous layers.
Bituminous works involve the application of a prime coat over WMM and a tack coat between subsequent
bituminous layers to ensure proper bonding. The Dense Bituminous Macadam (DBM) is laid as the primary structural
layer, possibly followed by an intermediate layer of Bituminous Macadam (BM), depending on design requirements,
and finally topped with a Semi-Dense Bituminous Concrete (SDBC) or Bituminous Concrete (BC) layer as the
wearing course. The projects also include the installation of road furniture such as signage, pavement markings, and
safety barriers, along with the development of roadside amenities like bus bays and rest shelters, in accordance with
government specifications and safety standards.
6. Electricity Transmission, Distribution Networks, and Substations
Our operations in the electrical infrastructure domain include the development of power transmission and distribution
networks, along with the construction of electrical substations. We have implemented several projects under schemes
such as the RGGVY) and the RAPDRP for Uttar Pradesh state utilities like PVVNL and DVVNL. Our scope of
work spans the complete lifecycle of these electrical infrastructure projects, from survey and design to
commissioning.
Transmission infrastructure developed under these projects includes the construction of 33 kV and 11 kV lines using
both overhead and underground systems. These installations involve the use of ACSR conductors, XLPE cables, and
integration of railway crossing works where applicable. The distribution component covers new installations and the
upgradation of legacy systems, including the implementation of Aerial Bunched Cables (ABC) and armored LT
cables for single-phase and three-phase distribution. We also construct and commission substations of various
capacities, including 33/11 kV substations, power transformers ranging from 25 kVA to 10 MVA, and mobile trolley-
mounted substations. In addition to core power infrastructure, we deliver power quality and automation solutions
such as capacitor banks with Automatic Power Factor Control (APFC) panels, metering systems for distribution
transformers, consumer service connections, and street lighting automation systems. All work is executed in
alignment with the standards set by the respective state electricity boards and central power sector policies.
251TYPICAL TERMS OF OUR CONTRACTS
Our contracts, primarily awarded by government agencies and public sector undertakings, generally follow
standardized terms and conditions aligned with prevailing public procurement guidelines. The key provisions
typically incorporated in such contracts include the following:
1. Payment Milestones
Contracts generally provide for monthly billing cycles, wherein the contractor is required to submit monthly
progress bills based on actual work executed. These bills are verified and certified by the client or its appointed
engineer. Upon certification, payments are released as per the agreed schedule, subject to applicable deductions
and withholdings such as retention money and statutory taxes.
2. Liquidated Damages for Delay
All contracts contain provisions for liquidated damages (LD) in case of delay in achieving contractual milestones
or completion. However, if delays are attributable to circumstances beyond the contractor’s control—such as
force majeure events, delays in drawings approval, site handover, or approvals—the contractor is entitled to an
Extension of Time (EOT) and is not held liable for LD or compensation.
3. Variation and Extra Items
Contracts allow for variation in quantities and the inclusion of new items essential for the completion of the
project scope. Any such variations or execution of extra items must be undertaken only after obtaining written
approval from the competent authority. The terms of compensation and rates for such items are governed either
by the Schedule of Rates (SOR), mutually agreed rates, or by rate analysis as per contractual guidelines.
4. Dispute Resolution Mechanism
Most contracts include a tiered dispute resolution framework. In the event of any dispute or disagreement arising
out of the contract, the matter is first referred to a Dispute Resolution Board (DRB) or Dispute Adjudication Board
(DAB), if constituted. If unresolved, the dispute is subject to binding arbitration in accordance with the Arbitration
and Conciliation Act, 1996 (as amended), with the seat and venue typically being in the jurisdiction of the project
location or the capital city of the awarding authority.
5. Other Commercial Clauses
Contracts may also include provisions relating to performance guarantees, retention money, mobilization and
material advances (subject to applicable securities), defect liability periods, price escalation (where applicable),
and termination rights. These terms are generally defined in accordance with the guidelines of the respective
funding agency or government authority.
252Some photos of our projects:
253254255Segment-wise Bifurcation of Revenue: The Company's core operations span several critical infrastructure
sectors such as Wastewater Treatment/Supply Schemes, Operation and Maintenance, Water Supply Scheme
Projects (WSSPs) Electricity Transmission Distribution Networks and Electrical Substations, Road and Highway
Construction and Housing, Residential Buildings, and Sector Development. Based on similarity of activities, risk
and reward structure, organisation structure and internal reporting system, the company has structured its
operations into single operating segment and hence there is no reportable segment as per Ind AS 108 “Operating
Segments”. Accordingly, there is no other separate reportable segment as defined by IND AS 108 "Operating
Segments"
256Segment wise Revenue Bifurcation:
The business segment wise bifurcation of revenue for the financial year ended March 31, 2025, March 31, 2024 and March 31, 2023 are as below:
(₹ in million)
Financial Year ended
% of revenue % of revenue % of revenue
Particulars
31-Mar-25 from 31-Mar-24 from 31-Mar-23 from
operations operations operations
Sale of Services
Sewerage Construction contracts 2,079.08 74.37 1,580.07 69.89 1,770.17 99.07
Operation and maintenance & Sewerage works 23.41 0.84 13.10 0.58 13.11 0.73
Road & Highway Construction & Maintenance 21.47 0.77 0.69 0.03 - -
Building Construction Work 248.38 8.88 - - - -
Water Supply Work 163.53 5.85 475.42 21.02 - -
Electricals Work 210.30 7.52 - - - -
Other Operating Revenues
Sale of Material 49.47 1.77 191.75 8.48 3.63 0.20
Total 2,795.64 100.00 2,261.02 100.00 1,786.91 100.00
257MACHINERY AND EQUIPMENT
The following is the list of machinery owned by our Company as on June 30, 2025:
Sr. Total
Name of Machine Make Model Location
No. Quantity
1 Gujrat Apollo
1. Hot Mix Plant 2 Saharanpur
1 Everest Equipments
2. LDO Tank - 2 Saharanpur
3. LDO Tank Small - 2 Saharanpur
4. Com pressor - 2 Saharanpur
5. Bitum en Tank - 4 Saharanpur
6. Dies el Tank Large - 2 Saharanpur
1 Gujrat Apollo
7. WM M Plant 1 Slah Industries 3 Saharanpur
1 Omkar Enterprises
8. Emu lsion Tank - 2 Saharanpur
9. Cem ent Unit - 2 Saharanpur
10. Wate r Tank - 3 Saharanpur
11. Tend om Roller IR DD-90 2 Saharanpur
Unipave Sensor Saharanpur
12. Pave r Apollo Sensor 3
Apollo Mechanical Wm-6
13. PTR IR 1 Saharanpur
14. Soil Compactor IR SD-110 1 Saharanpur
15. Mini Roller DYNAPACK 1 Saharanpur
16. Hand ling Roller (Small) - 1 Saharanpur
17. Tarb oiler - 4 Saharanpur
18. Broo mer - 1 Saharanpur
19. Weig hing Bridge - 1 Saharanpur
20. Bole ro Camper - 1 Saharanpur
21. Core Cutter - 3 Saharanpur
22. Pin V ibrator - 1 Saharanpur
23. Mini Excavator SANY 27 1 Saharanpur
24. JCB Backhoe Loader JCB 3DX 1 Saharanpur
25. JCB Backhoe Loader JCB 3DX 1 Saharanpur
TATA Hitachi Backhoe
26. TATA 1 Saharanpur
Loader
27. Mini Roller DYNAPACK 1 Saharanpur
28. Gene rator Jakson 45 KVA 1 Noida
29. Gene rator Jakson 25 KVA 1 Noida
30. Gene rator Jakson Limited 62.5 KVA 1 Noida
Generator Jakson &
31. 57 KVA 1 Noida
Company
32. Mini Roller Dynapack 1 Saharanpur
Note: All the Machines and equipments mentioned herein above are newly purchased.
258The following are the list of Machinery rented for the Projects:
Total
Sr. No. Name of Machine Location of the Project Agreement
Quantity
1. Tafe Tractor with Water Tanker 1 Kotputli Executed
2. JCB 3DX with Breaker 1 Kotputli Executed
3. Generator 125KVA 1 DNMR Under Process
4. Generator 15KVA 1 DNMR Under Process
5. Hydra 1 Kota Executed
6. Tractor with Water Tanker 1 Kota Executed
7. Tractor with Water Tanker 1 Kota Executed
8. Tractor with Trolley 1 Kota Executed
OUR BUSINESS PROCESS
We set out below the flow chart explaining various steps involved in the process of our business operation:
1. Pre-Bidding Stage
Our business operations commence with a structured pre-bidding process focused on identifying and
evaluating potential project opportunities. We primarily secure contracts through competitive bidding
conducted by government bodies and public sector undertakings. A dedicated tendering department actively
monitors e-procurement portals, departmental websites, and leading national dailies to identify relevant
tenders across our core infrastructure sectors.
Upon identification of a potential project, the tendering team conducts an initial feasibility review based on
criteria such as geographic location, scope complexity, internal resource availability, pre-qualification
thresholds, and projected profitability. Based on this preliminary assessment, internal approvals are sought
from senior management to proceed with bid preparation.
259In cases where standalone eligibility criteria are not met, we may form project-specific joint ventures with
technically or financially qualified partners. This collaborative approach enhances bid strength while
allowing access to larger and more complex tenders.
Following internal approval, the tendering and design teams initiate a comprehensive pre-bid diligence
exercise, which includes detailed study of tender documents, site visits to assess ground conditions,
preparation of preliminary designs and layouts, cost estimation, and obtaining vendor quotations. These
inputs inform both the technical and financial components of the bid submission.
Where applicable, the Company participates in pre-bid meetings to seek clarifications and understand client
expectations. Technical eligibility and bid responsiveness are evaluated during the pre-qualification stage,
which determines eligibility for participation in the financial bidding round. Final bid submission is made
after ensuring alignment with both internal commercial expectations and client requirements.
Price competitiveness remains a critical determinant in award of contracts, and our approach emphasizes
accurate cost benchmarking and risk-adjusted pricing to enhance bid success rates while maintaining financial
discipline.
2. Post-Award Stage
Following the award of a contract, we initiate the mobilisation of manpower and key resources to the project
site. Site infrastructure is established, including site offices, storage facilities, and deployment of equipment
required to support execution activities.
Our engineering and design teams prepare and submit working drawings and structural calculations for client
approval. Upon approval, construction is undertaken in phases in accordance with the approved work plans.
At the site level, technical teams prepare detailed material estimates which are communicated to our central
procurement division to ensure timely procurement and delivery. Execution progress is closely monitored,
and billing is carried out through periodic joint measurements and certifications.
Interim and final invoices are raised in line with contractual milestones and payment terms. Senior
management maintains active oversight throughout the project lifecycle to ensure timely completion and
compliance with quality and safety standards.
3. Completion
The completion stage involves conducting equipment trials, stabilisation of systems, and performance
guarantee testing. In wastewater treatment projects, this includes the development of bacterial cultures
necessary to initiate biological treatment processes.
Upon successful completion of the prescribed performance criteria, the project is considered commissioned
and a Commercial Operation Date (COD) is issued. Thereafter, where applicable, Operations and
Maintenance (O&M) responsibilities commence and may extend for a period of up to five/ten/fifteen years,
depending on the terms of the relevant contract.
The final share of retention money or release of performance security is effected upon the expiry of the Defect
Liability Period, subject to satisfactory performance and fulfillment of all contractual obligations.
260PROCUREMENT
We have instituted a centralized and structured procurement framework designed to ensure timely availability of
raw materials and equipment while optimizing costs and maintaining operational efficiency across all project sites.
Our procurement operations are coordinated from our Corporate Office in Noida and are led by a dedicated
Procurement Manager, supported by Senior Account Officers, Unit Accountants, and Storekeepers deployed
across our project locations.
Procurement planning is undertaken on a weekly, bi-weekly, and monthly basis, in coordination with project units
and engineering teams. Material requirements are consolidated and reviewed through a structured approval
hierarchy, with rate finalizations and procurement schedules deliberated in meetings chaired by senior
management. Vendor selection is carried out through a competitive quotation process, and price comparison charts
are prepared to ensure transparency and cost optimization.
We maintain a balanced mix of owned and rented machinery based on project-specific requirements. While certain
critical equipment is owned for long-term deployment, a significant portion of project-based machinery is hired
or leased to maintain operational flexibility and cost-effectiveness.
Inventory levels are monitored daily at project sites, and consumption is tracked and reconciled to prevent material
wastage and ensure accountability. Financial planning is closely aligned with procurement activities, with funding
requirements assessed periodically in line with project schedules and cash flow projections.
Supplier relationships are managed through regular coordination and performance monitoring to ensure
compliance with delivery timelines and quality benchmarks. Our procurement cycle is further supported by quality
assurance protocols, including timely approval of Quality Assurance Plans and third-party inspections, to
safeguard the quality of sourced materials.
This integrated procurement model enables us to ensure uninterrupted supply of materials and equipment across
multiple projects, while upholding governance standards, financial discipline, and execution reliability.
UTILITIES & INFRASTRUCTURE FACILITIES
Water
Water required for construction and related activities is procured locally at each project site through water tankers
on a need basis. As our projects—particularly those involving the laying of sewer lines, establishment of STPs,
and related infrastructure—are executed in open urban environments rather than in enclosed campuses, there are
no centralized or permanent water arrangements at these sites. Temporary residential and operational
infrastructure is established as per project needs, and rental arrangements are made for site offices and
accommodation in proximity to the project area.
Power
Given the widespread and mobile nature of our project execution, electricity requirements at project sites are
primarily met through diesel generator (DG) sets, which may either be hired or owned depending on the site-
specific requirement. For semi-permanent installations such as Pumping Stations or STPs, we apply for temporary
electricity connections from local utilities in accordance with applicable regulatory guidelines. Electricity
expenses for offices, stores, and guesthouses are borne directly by the Company and settled through utility bill
payments. The flexibility of our site power strategy enables us to maintain continuity of operations across diverse
and geographically dispersed project locations.
261OUR STRENGTHS
1. Diversified EPC Capabilities across Core Infrastructure Sectors.
We are engaged in the execution of turnkey Engineering, Procurement and Construction (EPC) contracts across
critical multiple infrastructure verticals including wastewater treatment plants (WWTPs), water supply schemes
(WSSPs), sewerage and drainage networks, power transmission and distribution systems, and roads and national
highways. Our capabilities encompass end-to-end project delivery—from engineering design and civil works to
mechanical-electrical integration and commissioning.
As of 30 June, 2025, we have laid over 1,000 KMs of sewer pipelines across cities such as Ghaziabad, Agra,
Udaipur, Etah, Pilakhuwa, Jaunpur and Shahjahanpur out of which approximately 563 KMs have been
commissioned as on date. Additionally, we have undertaken integrated water infrastructure projects, including
underground reservoirs and water pipelines in Noida, and are currently constructing elevated overhead reservoirs
in our projects across Rajasthan, and laying of large-diameter transmission mains through microtunnelling
techniques from the Bhagirathi Water Treatment Plant in Delhi.
Number of Sewage Treatment Plant (STP) Projects Completed as on date of this Draft Red Herring Prospectus:
1. Ghaziabad: 56 MLD
2. Pilkhuwa: 3 MLD
3. Shahjahanpur: 40 MLD
Number of O&M of STP Completed as on date of this Draft Red Herring Prospectus:
1. Ghaziabad: O&M of 56 MLD STP (For 9 years and 10 months)
2. Pilkhuwa: O&M of 3 MLD STP (For 2 years and 11 months)
These projects have been delivered under flagship infrastructure schemes such as the UIDSSMT, JNNURM,
AMRUT, Namami Gange and Jal Jeevan Mission. Our clientele includes key government authorities and agencies
such as Delhi Jal Board, RUDSICO, Rajasthan Urban Infrastructure Development Project (“RUIDP”), Uttar
Pradesh Jal Nigam, PVVNL, DVVNL and PWD.
2. Execution Capabilities Demonstrated through High-Value Government and Multilateral Projects, with Strong
Financial Growth.
We have demonstrated the technical and financial capacity to execute complex, large-scale public infrastructure
projects awarded by central government agencies and multilateral institutions. Notably, our sewerage network
project in Udaipur, Rajasthan, funded by the Asian Development Bank (ADB) and valued at ₹ 850.23 million (as
per experience certificate with final payment due, the amount is excluding unexecuted O&M), involved the design,
supply, construction, and commissioning under stringent technical specifications, along with a 10 years O&M
obligation. Such mandates require adherence to stringent international procurement norms and performance
benchmarks, which we have successfully met.
This performance highlights our operational capabilities and efficiency in delivering infrastructure projects at
scale across varied funding models. Our proven ability to execute under such frameworks positions us as a
competitive participant in upcoming multilateral and centrally-sponsored infrastructure programs.
As on the date of this Draft Red Herring Prospectus, our Company is currently executing 13 government projects
& 5 government O&M projects, for further information, kindly refer to “Our Order Book” beginning on page 232.
262Our consistent execution track record has translated into robust financial growth. Over the last three fiscals, our
revenue from operations increased from ₹ 1,786.91 million in Fiscal 2023 to ₹ 2,795.64 million in Fiscal 2025,
reflecting a CAGR of approximately 16.09%. Our EBITDA improved from ₹218.81 million in Fiscal 2023 to
₹481.88 million in Fiscal 2025, while our Profit After Tax (PAT) increased from ₹ 108.06 million to ₹ 282.04
million during the same period.
3. In-House Engineering Strength with Technological Adaptation
Our execution model is supported by a dedicated in-house engineering team comprising 76 professionals across
civil, mechanical, electrical, instrumentation, and environmental disciplines led by Mr. Vinay Kumar Shukla,
Vice President (Engineering) of our Company. This team enables us to respond to varied project demands and
integrate advanced technologies into design and execution workflows.
We have successfully deployed micro-tunnelling and trenchless pipeline installation technologies in high-density
urban areas to reduce surface disruption while enabling the installation of large-diameter underground pipelines.
These technologies have been utilized in various projects across locations including projects in Delhi (Bhagirathi
WTP), Shahjahanpur, Jaunpur, Kotputli, Kota, Bikaner, Agra, Ghaziabad, Etah, Pilakhuwa and Udaipur.
In addition, we leverage digital tools and engineering software such as Auto CAD for monitoring site execution
levels, managing project records, and optimizing resource allocation across construction sites. These capabilities
enhance execution precision, improve efficiency, and support timely delivery of technically complex projects.
4. Consistent Revenue Growth and Strengthening Profitability
Our Company has demonstrated a consistent upward growth in both revenue and profitability over the past three
financial years, reflecting strong execution capabilities and financial discipline. Revenue from operations grew
from ₹ 1,786.91 million in FY 2023 to ₹ 2,795.64 million in FY 2025, representing a compound annual growth
rate (CAGR) of approximately 16.09%. This growth was primarily driven by timely project execution and an
expanding portfolio under government-led infrastructure schemes.
Profitability has also improved significantly, with Profit After Tax (PAT) increasing from ₹ 108.06 million in FY
2023 to ₹ 282.04 million in FY 2025. Correspondingly, PAT margins improved from 6.05% in FY 2023 to 10.09%
in FY 2025, underscoring the Company's ability to scale operations efficiently while maintaining healthy bottom-
line performance.
This strong financial foundation positions us well for future growth and reinforces our credibility as a reliable
EPC and O&M contractor in the infrastructure sector.
A brief bifurcation of our Revenue from Operations and Profitability for the preceding 3 financial years are as
follows:
(₹ in million)
For financial year ended on
Particulars
March 31, 2025 March 31, 2024 March 31, 2023
Revenue from Operations 2,795.64 2,261.02 1,786.91
Increase in Revenue from Operations (in %) 23.65 26.53 -
Profit after Tax (PAT) 282.04 190.54 108.06
PAT Margins (in %) 10.09% 8.43% 6.05%
For further details on our financials, kindly refer to the chapter titled as “Restated Consolidated Financial
Information” beginning on page 331.
2635. Regulatory-Approved Electrical works Capabilities with Statewide Licenses
We hold ‘Class A’ Electrical Contractor’s Licenses from the Electrical Inspectorate Department, Government of
Rajasthan, and the Department of Electrical Safety, Government of Uttarakhand—among the highest categories
required to execute high-tension (HT) and extra high-tension (EHT) transmission and distribution projects. These
certifications authorize us to independently undertake critical electrical infrastructure works, including substation
erection, transformer installation, and HT/LT cable laying. These certifications authorize us to undertake high-
tension (HT) and extra high-tension (EHT) electrical infrastructure projects independently.
Our track record includes execution of electrification projects under the RAPDRP, RGGVY and various
electrification schemes implemented by state utilities such as PVVNL and DVVNL in Uttar Pradesh. Our work
has involved construction of 33/11 kV substations, HT/LT line installation, transformer erection, and village
electrification with metering. Our capability to coordinate with multiple stakeholders, including transmission
authorities and distribution licensees, positions us well for upcoming programs like the Revamped Distribution
Sector Scheme (“RDSS”) and Deen Dayal Upadhyaya Gram Jyoti Yojana (“DDUGJY”).
This vertical not only diversifies our revenue streams but also ensures a steady project pipeline, balancing seasonal
and sector-specific fluctuations. With India’s growing focus on integrated utilities and smart city infrastructure,
our experience in reliable power delivery solutions offers significant growth potential. As of June 30, 2025, our
pipeline of electrical contracts under execution stood at ₹ 207.10 million, and we plan to enhance our
competitiveness through further investment in testing tools, safety systems, and project monitoring technologies.
6. Promoter-Led Business with strong execution capabilities
Our business is led by our Managing Director, Mr. Sanjay Tyagi, who has over 35 years of experience in the
infrastructure sector, including extensive tenure in government contracting and public works execution. Prior to
joining our Company in April 2007, he served with the Ghaziabad Development Authority for over 15 years,
where he was involved in the planning and execution of large-scale public infrastructure projects.
His understanding of government procurement processes, EPC project execution, and regulatory environments
has been instrumental in expanding our operational footprint, enhancing our technical qualifications, and securing
mandates under major government schemes. Under his leadership, we have consistently grown our presence
across geographies and project scales, while maintaining a strong focus on execution quality and timely delivery.
As of the date of this Draft Red Herring Prospectus, our Promoters including promoter group collectively hold
100.00% of the pre-offer issued, subscribed and paid-up Equity Share capital of our Company. We believe that
their industry knowledge, government interface experience, and track record in evaluating infrastructure
opportunities position us well to pursue both organic growth and strategic partnerships, including potential
acquisitions that align with our core capabilities and future objectives. For further details on our Promoters and
their backgrounds, kindly refer the sections titled “Our Promoters and Promoter Group” and “Our Management”
beginning on pages 324 and 303, respectively.
7. Robust Order Book
As on June 30, 2025, we have been awarded with 14 projects aggregating to ₹ 6,656.44 million & 5 O&M projects
aggregating to ₹ 201.60 million. We believe that consistent growth in our Order Book has materialized due to our
continued focus on Projects and our ability to successfully bid and win new Projects. We believe that our
experience in designing, engineering, construction, operations and maintenance of Projects, technical capabilities,
timely performance, reputation for quality and timely delivery, financial strength as well as the price
competitiveness has enabled us to successfully bid and win projects. For further information, kindly refer “Our
Order Book” on page 232.
264OUR STRATEGIES
1. Strategic Expansion of Project Scale and Capacity to Enhance Market Position
We have built a strong and credible brand in the infrastructure sector over the past 20 years, anchored in our
consistent execution of technically complex, public sector infrastructure projects. Our reputation as a reliable EPC
contractor, particularly in the northern region of India, is reinforced by our ability to deliver high-quality outcomes
under stringent public procurement norms. This has enabled us to scale operations across geographies and expand
our presence through a pan-India pipeline of opportunities.
In line with our growth vision, we intend to expand the scale of our infrastructure projects, with a strategic focus
on high-capacity water and wastewater treatment plants. We have demonstrated execution capability across
capacities ranging from 3 MLD to 56 MLD for STPs, showcasing our expertise in managing both small and large-
scale infrastructure works.
Furthermore, we are focusing on scaling our operations into higher-capacity projects. This includes entering the
Common Effluent Treatment Plant (“CETP”) sector with a target of reaching 50 MLD for CETPs and 200 MLD
for STPs in the coming years. Expanding into larger projects offers substantial benefits, such as reduced
competition, higher profit margins, and the economies of scale that come with managing larger systems. These
larger projects allow us to streamline operations, integrate advanced technologies, and optimize cost management.
Targeting high-capacity projects also directly contributes to enhancing our pre-qualification status, which is
crucial for bidding on more complex and high-value projects. It positions us strategically to secure larger
contracts, further solidifying our standing as a leading infrastructure player.
This strategy aligns seamlessly with the Government of India’s increasing investment in infrastructure
development, particularly through initiatives such as the Jal Jeevan Mission, which has been allocated
approximately ₹700,000 million in the Union Budget for Fiscal 2024-25 (Source: Pg. 227, available at
https://www.indiabudget.gov.in/budget2024-25/doc/eb/allsbe.pdf). This initiative presents significant
opportunities in water infrastructure development, where we are well-equipped to contribute at scale.
Furthermore, the AMRUT 2.0 program, with its allocation of ₹2,990,000 million for water security and sewerage
management, opens extensive opportunities in the water and wastewater sectors, directly aligning with our growth
objectives (Source: available at https://www.pib.gov.in/PressReleasePage.aspx?PRID=2078409).
Additionally, expanding our project size enhances our ability to bid for EPC and Hybrid Annuity Model (“HAM”)
projects, which are increasingly being favored by the government. As a result, our company is poised to not only
capitalize on the growing demand for large-scale infrastructure projects but also to reinforce its leadership position
in the highly competitive infrastructure sector.
By scaling project size, we seek to enhance margins, reduce competitive intensity, and build a differentiated
position in core water and wastewater infrastructure segments. This approach is expected to improve project
standardization, resource utilization, and client servicing across our national footprint.
2. Expanding Our Presence in Other States and Leveraging the Infrastructure Demand
We intend to expand our geographic footprint beyond our established presence in Uttar Pradesh, Rajasthan,
Uttarakhand, and NCT of Delhi, where we have delivered large-scale projects for clients including Delhi Jal
Board, Uttar Pradesh Jal Nigam, RUIDP, RUDSICO, and UP PWD. Our next phase of growth targets high-
potential states such as Madhya Pradesh, Chhattisgarh, Bihar, Jharkhand, and Odisha, driven by increasing
urbanization and infrastructure demand under schemes like AMRUT 2.0, Jal Jeevan Mission, and Namami Gange.
265These states present scalable opportunities in water supply, STPs, WWTPs, and sewerage systems. For instance,
the Jal Jeevan Mission and AMRUT 2.0 together allocate over ₹ 36,90,000 million towards water and wastewater
infrastructure, enabling a robust project pipeline across underserved areas. We also aim to align with national
initiatives such as the PM GatiShakti National Master Plan, the National River Interlinking Project, and the
Revamped Distribution Sector Scheme, which complement our core strengths in water, wastewater, and electrical
EPC.
Furthermore, India’s urbanization is accelerating due to economic reforms and population growth, with the
population currently standing at 1.38 billion, of which 65% live in rural areas and 35% in urban centers. As the
urban population continues to grow, particularly in metropolitan cities, the demand for advanced wastewater
treatment and sewage infrastructure is becoming increasingly urgent. According to the Central Pollution Control
Board, 72,368 MLD of wastewater was generated in urban areas in 2020-21, which is double the wastewater
generated in rural areas (39,604 MLD) (Source: Page 31, available at
https://www.niti.gov.in/sites/default/files/2022-09/Waste-Water-A4_20092022.pdf). This demographic shift
places immense pressure on water resources and increases the need for infrastructure solutions that can manage
both wastewater and water supply systems efficiently.
We aim to play a critical role in addressing these challenges by contributing to national efforts to enhance water
conservation, efficient wastewater management, and sustainable urban planning. Our expertise in STPs and
Sewerage Pumping Stations (“SPS”) projects, as demonstrated in the execution of large-scale projects such as the
56 MLD STP in Ghaziabad and the 40 MLD STP in Shahjahanpur, positions us well to tackle these emerging
needs and contribute to the success of these programs.
Additionally, we are aligning our strategy with initiatives like the PM GatiShakti National Master Plan (“PMGS-
NMP”), which aims to enhance multimodal connectivity and improve infrastructure across sectors. The National
River Interlinking Project, which focuses on the development of water infrastructure through the interlinking of
major rivers, offers further prospects for water infrastructure development. These programs complement our
existing capabilities and enable us to expand our portfolio of water infrastructure projects.
The evolving regulatory landscape, with enhanced environmental and technical requirements, also plays to our
advantage. As an established player with extensive experience in meeting these stringent requirements, we are
well-equipped to participate in these government-backed initiatives. Our expertise in electricity distribution
networks, for instance, allows us to participate in programs like the Revamped Distribution Sector Scheme and
Deen Dayal Upadhyaya Gram Jyoti Yojana for rural electrification, further diversifying our portfolio.
Through our geographic expansion and alignment with key government initiatives, we aim to mitigate regional
risks, strengthen our revenue base, and build a more resilient business model. This geographic diversification
strategy will enable us to capture opportunities in rapidly urbanizing regions, ensuring that we stay ahead of
market demand and solidify our leadership position in the infrastructure development sector.
266State-wise bifurcation of Revenue
The state wise bifurcation of revenue for the financial year ended March 31, 2025, March 31, 2024 and March 31, 2023 are as below:
(₹ in million)
For the Financial Year ended
Sr. Name of the March 31, 2025 March 31, 2024 March 31, 2023
No. States Revenue from % of Revenue from Revenue from % of Revenue from Revenue from % of Revenue from
Operations Operations Operations Operations Operations Operations
1. Uttar Pradesh 756.39 27.05 1,382.72 61.15 1,717.57 96.12
2. Rajasthan 1,665.42 59.58 730.64 32.31 69.34 3.88
3. Delhi 163.53 5.85 147.66 6.54 - -
4. Uttarakhand 210.30 7.52 - - - -
Total 2,795.64 100.00 2,261.02 100.00 1,786.91 100.00
2673. On-site Renewable Energy Generation to Support Project Execution and Reduce Costs
As part of our long-term strategy to enhance environmental sustainability and operational efficiency, we are
undertaking the integration of renewable energy solutions, particularly solar power systems, within our
infrastructure projects. This initiative is focused on generating power on-site to support construction activities,
reduce dependence on external power grids, and achieve cost savings over the project lifestyle.
We are in the process of implementing solar panel installations at several of our STPs located in Kota, Bikaner,
and Kotputli under the AMRUT 2.0 scheme. These solar installations will supply power to our sewage treatment
plants (STPs), enabling us to reduce our carbon footprint and realise cost savings over the project lifecycle.
In addition to cost optimization, these installations contribute to our sustainability goals by ensuring that our
infrastructure assets align with India’s clean energy mandates. This initiative supports the objectives of the
National Action Plan on Climate Change (“NAPCC”) and India’s commitment to scaling renewable energy
capacity across sectors.
As part of our future growth plans, we aim to expand the deployment of solar power solutions across our entire
wastewater treatment portfolio. This includes installing additional solar plants at future STP projects across India,
tapping into government incentives that support renewable energy in the infrastructure sector.
Additionally, we aim to leverage the PM-KUSUM Yojana, which promotes solar energy adoption in the
agricultural sector through the installation of grid-connected solar power plants and solarized irrigation systems.
By aligning with this scheme, we plan to expand our capabilities in solar power generation and further enhance
our position in the renewable energy sector.
These initiatives position us as a responsible infrastructure developer committed to delivering environmentally
sustainable and energy-efficient solutions, aligned with India’s broader green energy and climate mitigation goals.
4. Capitalize on Government policy initiatives.
India is the world’s second most populous country with 1.38 billion people. Out of this, 65% of the population
lives in rural area and 35% are connected to the urban centers according to United Nation (2019) (Source: Page
31, available at https://www.niti.gov.in/sites/default/files/2022-09/Waste-Water-A4_20092022.pdf). The
metropolitan cities of the country are seeing major expansion as a result of economic expansions and reforms.
This expansion in urban population is unsustainable without efficient planning of cities and provision of utility
services especially sewerage, clean and affordable water. Water allocation in cities are usually done from common
pool with multiple sectoral demand. It is expected that by 2050, about 1,180 billion cubic metres of water will be
required out of which approx. 70% will be used in agriculture, ~9% for drinking water, ~7% in industries, ~6%
for energy generation. (Source: CRISIL Report) However, because of growing urbanization, the need for drinking
water will take precedence from the rural water requirements. Many of the cities are situated by the bank of rivers
from where the fresh water is consumed by the population and the waste water is disposed back into the river,
thus contamination of the water source and irrigation water. This has raised serious challenges for urban
wastewater management, planning and treatment. According to the by Central Pollution Control Board (CPCB).
Government Initiatives:
• Jawaharlal Nehru National Urban Renewal Mission
• Namami Gange programme
• Atal Mission for Rejuvenation and Urban Transformation (AMRUT)
• Swachh Bharat Mission (Urban)
• Jal Jeevan Mission (JJM)
268Currently our Company is executing 4 projects under Atal Mission for Rejuvenation and Urban Transformation
(AMRUT). The details regarding the above projects have disclosed under the heading titled “Our Order Book”
on page 232.
5. Strategic diversification into High-Growth Sectors aligned with National Infrastructure Goals
We intend to leverage the national infrastructure priorities of the government by expanding our portfolio into other
infrastructure segments that complement our core EPC capabilities. This includes diversification into renewable
energy integration, solid waste management, satellite city development, and water resource optimization.
We are actively exploring opportunities in solar energy deployment and waste-to-energy systems to contribute to
India’s 500 GW renewable energy goal by 2030. (Source:
https://www.pib.gov.in/PressReleasePage.aspx?PRID=1913789). This initiative is part of our broader
strategy to contribute to India’s energy transition goals and reduce dependency on non-renewable power sources.
Our ongoing solar installations at sewage treatment plants in Kota, Bikaner, and Kotputli under AMRUT 2.0
reflect this commitment. These solar power plants not only help reduce energy consumption costs but also
contribute to reducing the carbon footprint of our infrastructure projects, enhancing our green energy portfolio
and positioning us as a leader in the adoption of renewable energy solutions within the infrastructure sector. As
government incentives continue to promote the use of renewable energy, we plan to further expand solar
installations across our future projects, leveraging the PM-KUSUM Yojana and government schemes focusing on
solar energy to generate green power in agricultural and water management sectors.
In response to urban expansion and the need for decentralized growth, we aim to participate in the development
of satellite cities through integrated infrastructure delivery—covering roads, power, water supply, and sanitation.
These satellite cities are critical for alleviating congestion in major cities while supporting sustainable living
standards. Our strategic focus on satellite city development will allow us to venture into new infrastructure
opportunities, making us well-positioned for future growth in this space.
Furthermore, recognizing the importance of solid waste management, we plan to enter this growing sector, which
is essential for urban sustainability. As cities face challenges in managing municipal solid waste, our expertise in
infrastructure projects makes us a suitable player to lead the way in waste collection, processing, and waste-to-
energy solutions. The Smart Cities Mission and AMRUT 2.0 programs, which focus on urban renewal and
improving city infrastructures, provide significant opportunities in this area. By addressing the issue of waste in
a sustainable manner, we aim to contribute to cleaner cities and environmental sustainability.
Another critical area for growth is India’s River Interlinking Project, an ambitious national initiative aimed at
optimizing water resources across the country. This project involves interlinking India’s major rivers to address
water scarcity and improve irrigation and drinking water supply. Our past experience in water transmission
infrastructure positions us to contribute to this ambitious program. The river interlinking initiative, will
significantly enhance India’s water management systems, and we are strategically positioning ourselves to be a
key player in this initiative.
Our expansion into these high-growth sectors is aligned with major government infrastructure initiatives that
provide a steady pipeline of opportunities. will stimulate growth across multiple infrastructure segments, including
water, sewage treatment, and electrical infrastructure. Similarly, the Revamped Distribution Sector Scheme, with
an outlay of ₹3,030,000 million, will improve the efficiency of electrical distribution networks, presenting
opportunities in the electrical infrastructure sector, an area in which we already have strong expertise. The PMGS-
NMP, aimed at enhancing multimodal connectivity, along with the River Interlinking Project, will further drive
demand for infrastructure development, providing us with ample opportunities to expand our reach and execute
high-value projects in these critical areas. (Source: CRISIL Report)
269By diversifying into high-growth infrastructure segments such as renewable energy, satellite city development,
municipal solid waste management, and water resource optimization, we aim to strengthen our sectoral presence
and reduce geographic and project-specific risk. We intend to leverage our established execution capabilities and
institutional experience with government-led infrastructure programs to expand our service offerings and pursue
integrated project opportunities. This targeted diversification is expected to enhance our long-term growth
potential and align our business with the evolving infrastructure needs of a rapidly urbanizing India.
6. Continue to enhance our core strengths by attracting, retaining and training qualified personnel.
We believe that our ability to effectively execute and manage projects is crucial to our continued success. We
understand that maintaining quality, minimizing costs and ensuring timely completion of our projects depends
largely on the skill and workmanship of our employees. As competition for qualified personnel increases among
engineering and construction companies in India, we seek to improve competitiveness by increasing our focus on
training our staff. We offer our engineering and technical personnel a wide range of work experience and learning
opportunities by providing them with continuous training in latest systems, techniques and knowledge
upgradation.
CAPACITY UTILIZATION
As we are engaged in the infrastructure development business, our operations are project-based and not driven by
fixed manufacturing capacities. Accordingly, traditional capacity utilization metrics are not applicable to our
business model. Our operational output is directly linked to the scale and timelines of ongoing project execution
activities.
TOP 10 SUPPLIERS
The tables below set forth the list of our Company’s suppliers for the last three financial year ended on March 31,
2025, March 31, 2024 and March 31, 2023.
As on March 31, 2025:
Amount % of Cost of Revenue
Name of Suppliers
(₹ in million) from Operations
Suppliers-1 657.43 26.64
Suppliers -2 204.27 8.28
Suppliers -3 141.46 5.73
Suppliers -4 102.83 4.17
Suppliers -5 51.29 2.08
Suppliers -6 50.28 2.04
Suppliers -7 35.36 1.43
Suppliers -8 29.92 1.21
Suppliers -9 29.23 1.18
Suppliers -10 28.80 1.17
Total 1330.87 53.93
As certified by Rishi Kapoor & Company, Chartered Accountants pursuant to their certificate dated August 04,
2025 vide UDIN 25455362BMGILJ7429.
As on March 31, 2024:
Amount % of Cost of Revenue
Name of Suppliers
(₹ in million) from Operations
Suppliers-1 606.03 31.76
270Suppliers -2 98.79 5.18
Suppliers -3 63.89 3.35
Suppliers -4 53.54 2.81
Suppliers -5 39.10 2.05
Suppliers -6 38.50 2.02
Suppliers -7 37.30 1.95
Suppliers -8 34.98 1.83
Suppliers -9 34.51 1.81
Suppliers -10 31.71 1.66
Total 1,038.36 54.42
As certified by Rishi Kapoor & Company, Chartered Accountants pursuant to their certificate dated August 04,
2025 vide UDIN 25455362BMGILJ7429.
As on March 31, 2023:
Amount % of Cost of Revenue
Name of Suppliers
(₹ in million) from Operations
Suppliers-1 621.81 34.70
Suppliers -2 97.71 5.45
Suppliers -3 83.57 4.66
Suppliers -4 56.64 3.16
Suppliers -5 55.13 3.08
Suppliers -6 51.28 2.86
Suppliers -7 35.47 1.98
Suppliers -8 33.00 1.84
Suppliers -9 27.00 1.51
Suppliers -10 28.66 1.60
Total 1,090.28 60.85
As certified by Rishi Kapoor & Company, Chartered Accountants pursuant to their certificate dated August 04,
2025 vide UDIN 25455362BMGILJ7429.
PROJECT MONITORING
Project execution is monitored through a structured reporting and oversight mechanism designed to ensure timely
delivery, adherence to quality benchmarks, and alignment with contractual milestones. Each project is assigned a
dedicated Project Manager who is responsible for day-to-day supervision, progress tracking, and coordination
with site-level teams. Project Managers submit regular progress updates to the senior management, facilitating
proactive decision-making and timely resolution of execution challenges.
Project-specific requirements, including material needs and scheduling adjustments, are communicated by site
teams to the central office to ensure alignment across all locations. A central procurement team supports execution
by coordinating the supply of critical raw materials and engineering equipment based on real-time project inputs.
Our project teams possess long-standing experience, with several members having been associated with the
Company for many years. This institutional knowledge contributes to operational continuity, familiarity with
internal systems, and effective execution of complex infrastructure mandates.
In addition to regular site-level monitoring, our promoters actively oversee project performance through periodic
site visits and structured review meetings. These meetings facilitate direct engagement with Project Managers
and help ensure that execution remains on schedule and in line with technical specifications and contractual
obligations.
271CUSTOMERS
During the preceding 3 financial years, Company has generated majority of revenue through government tenders
only.
The revenue bifurcation between government & private sector are as under:
(₹ in million)
Particulars Fiscal 2025 Fiscal 2024 Fiscal 2023
Revenue from Government 2,274.52 1,741.50 1,784.75
% of Revenue from Operations 81.36 77.02 99.88
Revenue from Private Sector 521.12 519.52 2.16
% of Revenue from Operations 18.64 22.98 0.12
Total 2,795.64 2,261.02 1,786.91
As certified by Rishi Kapoor & Company, Chartered Accountants pursuant to their certificate dated August 04,
2025 vide UDIN 25455362BMGIMF4921.
QUALITY MANAGEMENT
We have established a structured quality management framework to ensure that all infrastructure projects adhere
to prescribed technical and regulatory standards. A dedicated team of engineers and quality control personnel
oversees project execution from material procurement through to commissioning, with regular monitoring and
testing of construction materials to maintain consistency and compliance. This quality oversight is embedded in
our day-to-day operations and aligned with the specific requirements of each project. The material supplied at
each project site is also subject to third party inspections by reputed agencies such as SGS and RITES. The quality
of executed works at project sites is also subject to third party inspection by WAPCOS in Uttar Pradesh.
Our quality systems are certified under ISO 9001:2015 for Quality Management Systems, which reflects our
ability to consistently deliver services that meet both customer expectations and statutory requirements. We have
also obtained ISO 14001:2015 certification for Environmental Management Systems, underscoring our
commitment to minimizing the environmental impact of our activities through sustainable practices. These
certifications guide our operational processes and support accountability at each stage of project delivery. In
addition, we are certified under ISO 45001:2018 for Occupational Health and Safety Management Systems, which
supports the implementation of safe working conditions at all project locations. These international standards not
only ensure operational discipline but also reinforce our focus on safety, efficiency, and environmental
stewardship.
HEALTH, SAFETY AND ENVIRONMENT
We are committed to maintaining a safe, healthy, and environmentally responsible work environment across all
our project sites. Our health and safety protocols are aligned with applicable central and state regulations, client
requirements, and industry standards, including those prescribed in the Central Public Health and Environmental
Engineering Organisation (CPHEEO) Manual. A Safety Coordinator based at our Noida office oversees project-
specific safety functions, supported by Safety Engineers at each active site. Daily inspections, toolbox talks, and
safety audits form part of our routine practices to ensure compliance and reduce operational risk.
All project personnel, including subcontractors, undergo structured safety training, covering induction, emergency
preparedness, and job-specific protocols. High-risk operations, such as confined space work in sewerage
networks, are conducted under strict supervision with required PPE, atmospheric monitoring, and ventilation
protocols. Our site safety measures also include public protection steps, such as barricading, visible signage, and
end-of-day clean-up to maintain secure and orderly work zones. Fire hazards are proactively managed, and open
272trenches and pipelines are securely covered after each shift.
We also focus on promoting worker wellbeing and environmental sustainability. Our commitment to
environmental protection is reflected in afforestation drives at select project sites such as Shahjahanpur, Kota,
Bikaner and Kotputli. These efforts are part of a broader strategy to align infrastructure development with long-
term sustainability and compliance. A robust Health, Safety and Environment (HSE) framework remains central
to our project execution, helping us ensure worker safety, safeguard public spaces, and protect natural resources.
273SWOT ANALYSIS
Strengths
1. Diversified Infrastructure Capabilities
We are a multidisciplinary infrastructure development company with a robust portfolio across sectors including
wastewater treatment, water supply schemes, road and highway construction, power transmission and distribution,
microtunneling, and renewable energy integration. This diversification reduces sector-specific risk and enables
cross-sector expertise.
2. Strong Execution Track Record
We have demonstrated a consistent ability to successfully execute complex EPC projects under various national
flagship missions such as AMRUT, Namami Gange, Jal Jeevan Mission, and projects funded by multilateral
agencies like the ADB. This positions us as trusted execution partner.
3. Integrated In-house Capabilities
Our Company possesses integrated design, engineering, procurement, construction, and commissioning
capabilities across civil, mechanical, and electrical disciplines, enabling us to deliver end-to-end infrastructure
solutions without significant reliance on third parties.
4. Government-focused Order Book with Long-term O&M Contracts
Our focus on government-funded projects ensures stable cash flow visibility. In addition, several projects include
5-10 years O&M contracts, creating recurring revenue streams and enhancing margins.
5. Sustainability Initiatives
We are early adopters of clean and smart infrastructure, integrating solar power at STPs, deploying SCADA/
Programmable Logic Controller (PLC) systems, and implementing smart manhole and sewer cleaning robots.
These innovations enhance environmental compliance, safety, digital readiness, and government mandates.
Weaknesses
1. Geographical Concentration Risk
Our operations are currently concentrated in select states in northern India, exposing us to regional political,
environmental, and administrative risks that could affect project execution.
2. High Dependence on Government Contracts
A significant proportion of our revenue is dependent on government and public sector undertakings, exposing us
to risks related to delays in project awards, payment cycles, and changes in government policies.
3. Working Capital Intensity
Execution of large-scale EPC projects and long project cycles require significant working capital investments,
which could strain liquidity, particularly in the event of delays in certification or payments from contracting
authorities.
2744. Exposure to Raw Material and Subcontractor Risks
Our operations are exposed to fluctuations in raw material costs, especially steel, cement, and mechanical-
electrical components, and potential delays by subcontractors, which could impact margins and timely project
execution.
5. Limited Brand Recognition Outside Government Sector
While we have strong recognition among government entities, our brand recall among private sector clients is
relatively limited, which may constrain future diversification efforts.
Opportunities
1. Increased Government Spending on Urban and Rural Infrastructure
Government initiatives such as AMRUT 2.0, Namami Gange, Jal Jeevan Mission, and Smart Cities are driving
significant investment in urban infrastructure, creating strong demand for integrated solutions in water, sanitation,
and renewable energy.
2. Growing Demand for Digitally Enabled Infrastructure
There is increasing policy emphasis on the use of SCADA, GIS mapping, and automation in utility services. Our
early adoption of smart manhole monitoring, robotic sewer cleaning, and remote energy monitoring systems
positions us to capitalize on this shift.
3. Expansion into New Geographies and Sectors
We have the opportunity to expand our footprint across more Indian states and potentially into international
markets, as well as explore new verticals such as industrial water management and private sector EPC.
4. Public-Private Partnership (PPP) Models
The growing acceptance of PPP models in infrastructure presents opportunities for long-term contracts with
assured returns, enabling us to diversify funding sources and revenue streams.
5. Renewable Energy Integration and Circular Economy
Policies supporting solar infrastructure under PM-KUSUM and circular economy solutions in wastewater (such
as treated water reuse and biogas recovery) align with our technical competencies and sustainability focus.
Threats
1. Policy and Regulatory Uncertainty
Changes in government regulations, contract frameworks, or environmental norms could delay or alter project
scopes, affecting revenue projections and execution timelines.
2. Intensifying Competition
The infrastructure sector is witnessing increased competition from both large conglomerates and niche technology
players, which could result in pricing pressure and reduced margins.
2753. Climate-related and Environmental Risks
Unpredictable weather events, water scarcity, or stricter environmental regulations could impact project
execution, particularly for outdoor civil works and water-related infrastructure.
4. Execution and Manpower Challenges
Shortages of skilled labor, delays in material supply chains, and safety-related incidents in high-risk construction
zones can cause project slowdowns or cost overruns.
5. Technological Obsolescence Risk
As infrastructure becomes more digitized, the rapid pace of technology change poses a risk of obsolescence if
continuous investment in innovation and upskilling is not maintained.
HUMAN RESOURCES
The Human Resources (HR) division at our Company plays a pivotal role in managing the personnel ecosystem
across project sites and administrative offices. It is responsible for workforce planning, recruitment, training,
performance evaluation, employee welfare, and ensuring compliance with labour laws and project-specific
regulations. The HR division directly supports our company’s multidisciplinary execution across verticals such
as wastewater treatment, water supply, electrical infrastructure, road construction, and renewable energy.
As of June 30, 2025, we had a total of 170 full-time employees, including 76 engineers, deployed across functional
domains such as engineering, procurement, finance, safety, business development, and administration. These
employees are based at our corporate office in Noida as well as at various project sites across states like Uttar
Pradesh, Rajasthan, Uttarakhand, and Delhi.
The Company has implemented internal policies that govern employee engagement, industrial relations, safety
compliance, and ethical conduct. This framework includes structured induction programmes, continuous technical
upskilling, and periodic workshops on health, safety, and environmental protocols. A dedicated training schedule
ensures that engineers, technicians, and administrative staff remain aligned with emerging industry standards and
project requirements.
The following table provides information about our full-time employees (including our Executive Directors), as
on June 30, 2025:
Department As on June 30, 2025
Engineering and Design 76
Site Supervisors 41
Accounts 19
Procurement 02
Management 08
Administration 16
Human Resource 01
Safety 07
Total 170
INFORMATION TECHNOLOGY
Our Company integrates advanced information technology across various stages of project execution to enhance
precision, efficiency, and operational safety. The use of digital software such as AutoCAD and Microsoft 365
276Suite is particularly important in projects involving sewerage networks, trenchless pipeline construction, and
renewable energy installations.
In microtunneling, we utilize laser-guided navigation systems to maintain line and grade control. These systems
help ensure accuracy in the placement of underground pipelines, particularly in urban environments where
minimal surface disruption is required. The use of such precision tools supports structural integrity and alignment
with engineering standards, while also reducing the environmental and social impact during construction.
At our STPs, we implement Programmable Logic Controller (PLC) and SCADA systems to automate and monitor
various treatment processes. These automation tools enhance operational transparency, reliability, and
environmental accountability. As per the requirement of the project, our scope of work includes instrumentation
and automation for sewer manholes with pumping arrangements (MWPs), integrated with SCADA to enable real-
time monitoring of operational parameters and remote management.
In our efforts to mechanize hazardous operations and eliminate manual scavenging, we have deployed robotic
systems for manhole cleaning. The sewer cleaning robots designed for use in sewer manholes are equipped with
an IP68-rated underwater camera, robotic arms with multiple degrees of freedom for shovelling and picking, and
a real-time monitoring interface. The system includes a gas detection unit for harmful gases such as methane,
carbon monoxide, and hydrogen sulphide, with alerts displayed on a touchscreen user interface. This technology
significantly enhances worker safety, operational visibility, and cleaning efficiency, while aligning with national
goals for dignity of labour and sanitation modernization.
We are also implementing Smart Manhole Monitoring Systems in our upcoming projects in urban sewer networks.
These involve the installation of battery-powered devices equipped with Light Dependent Resistors (LDRs) and
cable float switch-based water level sensors. Capable of transmitting data over GSM/GPRS networks, these
devices provide continuous monitoring of sewer water levels, enabling timely alerts and proactive intervention
through centralized management systems.
To further advance operational intelligence, we are going to deploy Artificial Intelligence-based online monitoring
systems at STP in Kota. These systems include analysers at both inlet and outlet points, dissolved oxygen (DO)
analysers, hydrostatic level sensors, data logging transmitters (DLTs), and associated instrumentation such as flow
meters and pressure gauges. The system enables end-to-end automation and intelligent plant management as per
project specifications and the direction of the Engineer-in-Charge.
As part of our commitment to digital urban infrastructure, we also undertake Geographic Information System
(GIS)-based consumer mapping services. This includes mapping of individual water and sewer connections,
database development, and asset plotting on GIS maps, using satellite imagery provided by the relevant
government department. These initiatives support data-driven decision-making and improve transparency in
utility management.
We also employ automated safety monitoring equipment in confined work environments. This includes oxygen
level detectors and alarm systems linked to gas masks, enhancing worker safety during underground and enclosed-
space operations. These safety systems form part of our broader commitment to adopting digital tools that support
compliance with health, safety, and environmental norms.
As we continue to expand our operations, particularly in projects that involve digitally managed sewerage systems
and solar-powered infrastructure and, we intend to strengthen our information technology infrastructure.
INVENTORY AND ASSET MANAGEMENT SYSTEMS
The Company manages its inventory and project assets through site-level tracking systems developed using
internally standardized formats in Microsoft Excel, supplemented by Tally for financial and stock register
277maintenance. Inventory management is executed by a dedicated team comprising unit accountants, storekeepers,
and a senior accounts officer appointed for each project site. This decentralized yet structured approach enables
effective tracking of construction equipment, pipeline materials, consumables, and other project-critical assets
across multi-phase project timelines. Stock levels, inward/outward movement, and asset utilization are recorded
and reviewed periodically to ensure transparency, accountability, and operational continuity.
MARKETING
As on the date of this Draft Red Herring Prospectus, our Company does not engage in any formal marketing activities,
as our operations are primarily project-based and contracts are awarded through competitive bidding and tendering
processes in the public infrastructure sector.
COMPETITION
Our Company operates in a competitive infrastructure development sector, particularly in the execution of
wastewater treatment plants, water supply schemes, and other public infrastructure projects. The sector is largely
influenced by government spending, policy mandates, and tender-based procurement mechanisms. According to
the CRISIL Report, the Indian water and wastewater infrastructure sector is witnessing steady growth, driven by
rapid urbanisation, policy initiatives such as Namami Gange, Jal Jeevan Mission, and AMRUT 2.0, and the
government’s increasing focus on sanitation and sustainability.
Our business model is primarily reliant on securing contracts through competitive bidding, which introduces
inherent uncertainty in terms of order book visibility and pricing power. Success in these tenders depends on
several critical factors, including pricing strategy, pre-qualification credentials, past project experience, financial
strength, and execution capacity. We regularly compete with reputed players such as Denta Water, VA Tech
Wabag Limited, EMS Limited, and Enviro Infra Engineers Limited, all of whom target similar segments under
national programs. These entities often possess long-standing government relationships, regional presence, or
access to capital, which intensifies the bidding environment.
While price remains a key determinant in the award of government infrastructure tenders, we differentiate
ourselves through our demonstrated track record of executing technically complex projects, in-house engineering
capabilities, and long-term O&M experience, which together enhance our pre-qualification eligibility. Our ability
to comply with stringent environmental standards and deliver on time further strengthens our competitive position.
However, the market dynamics also pose specific risks. Competitive pricing pressures can compress margins,
particularly in fixed-price contracts, and frequent regulatory or policy shifts may alter eligibility or scope mid-
execution. Additionally, revenue volatility can arise due to seasonal variations in project awards, delays in
government approvals, or budgetary reallocations.
To address these risks, we have adopted a multi-pronged strategy: diversifying across infrastructure verticals
(such as water, wastewater, electrical, and roads); expanding geographically to reduce dependence on specific
states or programs; and investing in equipment, technology, and talent to build scalable and cost-efficient
execution platforms. According to the CRISIL Report, Tier 2 and Tier 3 cities are expected to be key drivers of
demand in urban infrastructure, supported by national schemes and growing pressure on civic services due to
urbanisation. Furthermore, our ability to utilize cutting-edge technologies such as microtunneling and trenchless
methods, combined with our track record of successful project delivery under national programs like UIDSST,
JNNURM, AMRUT, Namami Gange, RGGVY, RAPDRP, and PMGSY gives us a unique competitive advantage
in the infrastructure space.
CORPORATE SOCIAL RESPONSIBILITY
Our Company has constituted a Corporate Social Responsibility (“CSR”) Committee in compliance with the
278provisions of Section 135 of the Companies Act, 2013 read with the Companies (Corporate Social Responsibility
Policy) Rules, 2014 and any amendments thereto. In line with these statutory requirements, we have formulated
a CSR Policy that governs the planning, implementation, and monitoring of our CSR initiatives.
The CSR initiatives of our Company are directed towards contributing to inclusive and sustainable development.
These initiatives are aligned with the activities prescribed in Schedule VII of the Companies Act, 2013. Our CSR
initiatives have been undertaken in areas surrounding our key project sites and operational regions. These are
intended to benefit communities through various targeted interventions.
In terms of Section 135 of the Companies Act, 2013 and the Companies (Corporate Social Responsibility Policy)
Rules, 2014, companies meeting specified thresholds are required to incur prescribed minimum CSR expenditure
and report the same in the Board’s report. For the last three Fiscal i.e. 2025, 2024 and 2023, our Company fell
within the applicability criteria for CSR obligations, however our Company is yet to utilise the CSR amount for
stated period towards CSR activities
For further details, kindly refer “Risk Factor no. 03: We are yet to utilise requisite amount towards Corporate
Social Responsibility (“CSR”), failure to do so may attract regulatory scrutiny and adversely affect our
reputation.” beginning on page no. 41.
Further, as per the management of the company, with respect to the CSR obligation of ₹ 3.33 million for the
financial year ended March 31, 2025, the company is permitted to spend the amount up to March 31, 2026 or
deposit the amount in Unspent Corporate Social Responsibility Account within the time prescribed as per the
provision of Section 135 of the Companies Act, 2013.
INTELLECTUAL PROPERTY
As on the date of this Draft Red Herring Prospectus, our Company has applied for the trademark registration of
its logo, details of which are set out below:
Trademark
Sr. Date of
Trademark registration application Class Status
No. registration/application
number
Formalities
1. 6798628 37 January 10, 2025
Check Pass
For further details, kindly refer “Risk Factor No. 39 – We may not be able to successfully protect our brand name
and trademark, which may adversely affect our business, reputation, and competitive position.” beginning on
page 63.
IMMOVABLE PROPERTY
Our Registered Office is located at S-553/54, Office No.214, First Floor School Block Shakarpur, New Delhi-
110092, India and our Corporate Office is located at Techno Tower, B-137, Block-B, Sector-2, Noida, Gautam
Buddha Nagar, India. In addition, our guest offices for employees, project offices, and material storage yards
across various states are primarily operated from leased or rented premises. These operational spaces are
strategically located to support project execution across multiple geographies and enable efficient mobilization of
manpower, machinery, and materials.
Our offices and project-related facilities are located across 4 states in India, enabling us to maintain proximity to
key government departments, clients, and project sites. Our lease agreements typically include standard
commercial terms and are renewed periodically based on operational requirements.
279The following table sets forth the details of our immovable properties:
Nature Date of the Term of Details of
Sr. Name of the entity Lease Purpose of
State Location / District of lease/ license/ the lease/ encumbrances,
No. holding the property Rent (₹) property
holding sale deed license if any
Technocraft Ventures
B-137, Block-B, Sector- Owned As a Security
Limited (Formerly
2, Noida, Gautam with 90 Corporate against Credit
1. Uttar Pradesh known as Technocraft March 30, 2016 90 Years -
Buddha Nagar-201301, years Office facilities from
Construction Private
Uttar Pradesh, India. lease HDFC Bank
Limited)
February 10,
S-553/54, Ground Floor Registered
2025 (effective 5,500/-
2 Delhi School Block Shakarpur Rented Ravi Datta Tyagi 11 Months Office of the NA
from February per month
Delhi-110092, India. company
01, 2025)
265 A Nitikhand-II February 11, Site office
Indirapuram Ghaziabad- 2025 (effective 72,600/- for
3 Uttar Pradesh Rented Rekha Tyagi 11 Months NA
201014, Uttar Pardesh, from March 01, per month Ghaziabad,
India. 2025) UP
22/2, Civil Lines, Near September 01,
Site office
Prem Mandir, Roorkee, 2024 (effective 4,000/-
4 Uttarakhand Rented Rajbala Tyagi 11 Months for NA
Haridwar-247667, from September per month
Uttarakhand
Uttarakhand, India. 01, 2024)
H.No.58-A, Ram
February 08,
Sarovar Colony, Guest House
2025 (effective 19,000/-
5 Rajasthan Chandrasal Road Rented Farzana Begum 11 Months for NA
from February per month
Kalatalab, Kota-324002, Employees
15, 2025)
Rajasthan, India.
Plot No.15 to 21, Khasra
No.30 & 48, Gurunanak February 08,
Store for
Nagar, Village-Naya 2025 (effective 25,000/-
6 Rajasthan Rented Sukhvinder Singh Brar 11 Months Material NA
Nohra, Tehsil-Ladpura, from January 15, per month
Storage
Kota-324001, Rajasthan, 2025)
India.
280House No. A 20,
May 07, 2025 Guest House
Neelkanth, Kota- 16,000/-
7 Rajasthan Rented Rajesh Kumar Bilotia (effective from 11 Months for NA
324002, Rajasthan, per month
May 01, 2025) Employees
India.
G 202, Neelkanth
June 06, 2025 Guest House
Apartment, Borkhandi, 7,000/-
8 Rajasthan Rented Neetu Rajora (effective from 11 Months for NA
Ladpura Kota-324001, per month
June 01, 2025) Employees
Rajasthan India.
Plot No.38, Officers
May 07, 2025
Colony, Nayanohra, 21,000/-
9 Rajasthan Rented Dileep Kumar Yadav (effective from 11 Months Site Office NA
Ladpura Kota-324002, per month
March 15, 2025)
Rajasthan, India.
Plot No.C-94, Flat No.
January 07, 2025
F-201, F-202, K.K. Site Office
Hari Kishan Fulwaria (effective from 42,500/-
10 Rajasthan Colony, Bikaner- Rented 11 Months with Guest NA
HUF January 05, per month
334001, Rajasthan, House
2025)
India.
Plot No. 288, 289, 290
& 291, Dheeraj Enclave Store for
East Phase-II, Krishi May 02, 2025 Cement &
20,000/-
11 Rajasthan Colony, Village- Rented Vikas Suthar (effective from 11 Months Other NA
per month
Karmisar, Bikaner- May 01, 2025) Material
334001, Rajasthan, Storage
India.
Sagar Road, Radio
Guest House
Tower Ke Samne, Tilak December 06, 30,800/-
12 Rajasthan Rented Koshalya 11 Months for NA
Nagar, Bikaner-334001, 2024 per month
Employees
Rajasthan, India.
Ward No.23, Khasra February 08,
Store for
No.108/49, Karmisar, 2025 (effective 28,350/-
13 Rajasthan Rented Ravindra Pittie 11 Months Material NA
Bikaner-334001, from March 01, per month
Storage
Rajasthan, India. 2025)
281Ward No. 6, Lakshmi
September 20,
Nagar, near Baberwal Guest House
2024 (effective 42,000/-
14 Rajasthan Marriage Home, Rented Jagdish Prasad 11 Months for NA
from September per month
Kotputli-303108, Employees
16, 2024)
Rajasthan
Khasra No.- 1182, 1183,
Village - Badabaas, Store for
43,000/-
15 Rajasthan Ganesh Vihar Colony, Rented Krishan Kumar Saini April 10, 2025 11 Months Material NA
per month
Kotputli, Distt.- Kotputli Storage
Behrod, Rajasthan, India
Bansur Road, Gokul
May 07, 2025
Sarovar-II, Badabas, 10,000/-
16 Rajasthan Rented Suman Jhirwal (effective from 11 Months Site Office NA
Kotputli, Jaipur, per month
April 05, 2025)
Rajasthan, India
Plot No.-8, Ganga Patti
March 10, 2025 Guest House
Kala, Bharti Bagar, 32,000/-
17 Uttar Pradesh Rented Ashok Kumar Gupta (effective from 11 Months for NA
Zafrabad Road, Distt. – per month
March 01, 2025) Employees
Jaunpur, India
Site Office
Bharti Nagar, Ganga April 07, 2025
45,000/- and Store for
18 Uttar Pradesh Patti, Zafrabad Road, Rented Indra Bhuwan Singh (effective from 4 Months NA
per month Material
Jaunpur, India April 01, 2025)
Storage
Village- Jhabiran,
Kasba-Nanauta, Tehsil-
March 12, 2025 20,000/- Store for
Rampur Maniharan,
19 Uttar Pradesh Rented Ghanshyam Singh (effective from 12 Months per acre Material NA
Khasra No. 70/3 and
March 15, 2025) annually Storage
Khasra No. 76, District-
Saharanpur, India
Mohalla-Saravgyan,
Kasba-Nanauta, Teshil- March 18, 2025 Guest House
11,000/-
20 Uttar Pradesh Rampur Maniharan, Rented Pramila Devi (effective from 11 Months for NA
per month
District- Saharanpur, March 11, 2025) Employees
India
282Village- Jhabiran,
March 12, 2025 20,000/- Store for
Tehsil- Rampur,
21 Uttar Pradesh Rented Vikas Kumar (effective from 12 Months per acre Material NA
Maniharan, Khasra No.
March 15, 2025) annually Storage
70/4
Khasra No. 70/3 and
20,000/-
70/4, Village- Jhabiran, May 01, 2025 Store for
per
22 Uttar Pradesh Tehsil- Rampur, Rented Pawan & Rakesh (effective from 12 Months Material NA
Beegha
Maniharan, District- May 01, 2025) Storage
annually
Saharanpur
Flat No. P-604, 1-BHK,
February 08, Guest House
Neelkanth Appartment,
Rajasthan Rented Om Prakash Bisht 2025 (effective 6,000/- for
23. Baran Road, Borkhandi, 11 Months NA
from February Per Month Employees
Ladpura, Kota-324001,
01, 2025)
Rajasthan, India.
Plot No.06, Saraswati
February 08,
Enclave, Village- Guest House
2025 (effective
Rajasthan Rangtalab urf Kalatalab, Shanti Devi 14,000/- for
24. Rented from January 06, 11 Months NA
Asthna Nagar Ke Pass, Per month Employees
2025)
Tehsil-Ladpura, Kota-
324001, Rajasthan India
283INSURANCE
Our Company maintains insurance coverage in line with industry norms to safeguard against potential risks arising
during the execution of infrastructure projects. These risks include construction-related contingencies, third-party
liabilities, accidental damages, and employee safety hazards at project sites. We typically obtain Contractor’s All
Risk (CAR) insurance and Workmen’s Compensation policies for major infrastructure projects, including water
and wastewater treatment plants, sewerage networks, and pumping stations. Our insurance portfolio is periodically
reviewed and updated to ensure compliance with client requirements, regulatory guidelines, and contractual
obligations. The table below provides details of our insurance coverage as of the dates indicated:
Name of the Policy Sum insured/
Sr. Total
insurance Description of the insurance policy Expiration Coverage under
No. Premium
company Date the policy
Go Digit Vehicle: Mahindra XUV 700
General (UP-14-FX-1122) Is insured with January 04, ₹0.02
1. ₹1.80 million
Insurance policy no.- 2026 million
Limited D180937189/02012025
IFFCO-Tokio Vehicle: JCB 3DX (ICV Class D
General Excavators) ₹0.01
2. March 11, 2026 ₹1.32 million
Insurance Co. (RJ-27-EA-4819) Is insured with policy million
Ltd. no.- N2729987
Contractors Plant and Machinery
Reliance
Insurance for Sany Sy27u Hydraulic ₹0.007
3. General March 29, 2026 ₹2.30 million
Excavator Is insured with policy no.- million
Insurance
130562522150012713
Reliance Employees Compensation Insurance
₹0.002
4. General Policy with policy no.- March 29, 2026 ₹0.192 million
million
Insurance 130522527110002859
Liberty Vehicle: Toyota Innova Crysta
General (UP-16 -DE-3355) Is insured with ₹0.05
5. April 23, 2026 ₹1.53 million
Insurance policy no.- million
Limited 201120020125700216400000
ICICI
Vehicle: Jeep Compass
Lombard
(RJ-45-CL-2187) Is insured with policy ₹0.03
6. General April 26, 2026 ₹1.11 million
no.- million
Insurance Co.
3001/389486458/00/000
Ltd
United India Vehicle: Toyota Innova VX 7STR
Insurance (RJ-14-UJ-1667) (Only Third-Party ₹0.009
7. May 27, 2026
Company Is insured with policy no.- Insurance) million
Limited 34020131250160115188
Inventory: Suction Cum Jetting
The Oriental
Machine
Insurance ₹0.02
8. (RJ-27-GD-9052) Is insured with May 29, 2026 ₹1.75 million
Company million
policy no.-
Limited
262101/31/2026/838
Inventory: Suction Cum Jetting
The Oriental
Machine
Insurance ₹0.02
9. (RJ-27-GD-9033) Is insured with May 29, 2026 ₹1.75 million
Company million
policy no.-
Limited
262101/31/2026/839
284Tata AIG
General Vehicle: Tata Tigor XZA Plus ICNG
July 04, 2026 ₹0.01
10. Insurance Sedan Is insured with policy no.- ₹0.83 million
(OD Cover) million
Company 62049494760000
Limited
Liberty Vehicle: Mahindra & Mahindra Scorpio
General (UP-16-CY-3083) Is insured with ₹0.03
11. July 21, 2026 ₹1.09 million
Insurance policy no.- million
Limited 2011-200104-25-1000558-02-000
ICICI
Vehicle: Volvo New XC 60 D5
Lombard
Inscription (UP-16-CY-2921) Is insured ₹0.10
12. General July 22, 2026 ₹3.70 million
with policy no.- million
Insurance Co.
3001/400575940/00/000
Ltd.
October 03,
Vehicle: Mahindra Scorpio Classic 2025 (OD
SBI General
(UP-14-GF-3436) Is insured with Cover) ₹0.06
13. Insurance Co. ₹1.65 million
policy no.- (October 03, million
Ltd.
MIB/1279713 2027 (TP
Cover)
HDFC Ergo Vehicle: Kia Seltos
General (UP-16-DB-2046) November 14, ₹0.03
14. ₹1.25 million
Insurance is insured with policy no.- 2025 million
Company Ltd 2302 1014 5800 1800 000
HDFC Ergo Vehicle: Toyota Kirloskar Fortuner
General (RJ-14-UH-9904) December 15, ₹0.06
15. ₹3.30 million
Insurance Is insured with policy no.- 2025 million
Company Ltd 2302 2059 4424 2801 000
Reliance
General Stock (Burglary)
January 30, ₹0.001
16. Insurance Is insured with policy no.- ₹600.00 million
2026 million
Company 130522529110000599
Limited
Reliance
General Stock
January 30, ₹1.36
17. Insurance Is insured with policy no.- ₹600.00 million
2026 million
Company 13056254421110004472
Limited
Go Digit
Municipal Council Kotputli Sewerage
General October 25, ₹1.49
18. Work Is insured with policy no.- ₹50.00 million
Insurance 2025 million
D134736398
Limited
Go Digit
Nagar Nigam Kota Sewerage Work Is
General October 25, ₹2.43
19. insured with policy no.- ₹50.00 million
Insurance 2025 million
D134734709
Limited
Go Digit
Nagar Nigam Bikaner Sewerage Work
General October 25, ₹2.29
20. Is insured with policy no.- ₹50.00 million
Insurance 2025 million
D134733334
Limited
285HDFC Ergo
Corporate Office Property: B -137,
General
Sector -2, Noida Is insured with policy ₹0.01
21. Insurance May 28, 2026 ₹8.14 million
no.- million
Company
2111201712598308000
Limited
Canara HSBC
Keyman Insurance Policy
Insurance September 30, ₹0.03
22. is insured with policy no.- ₹3.34 million
Company 2025 million
0098180218
Limited
Go Digit
Vehicle: JCB 3DX Plus 2wd Machine is ₹0.02
23. General March 26, 2026 ₹3.23 million
insured with policy no.- D195348085 million
Insurance Ltd
The New India Inventory: Dynapak Machine is insured
₹0.002
24. Assurance Co. with policy no.- June 18, 2026 ₹1.42 million
million
Ltd. 35350044256500000105
Tata AIG
General Inventory: Tata Hitachi machine is ₹0.010
25. May 16, 2026 ₹2.78 million
Insurance Co. insured with policy no:- 6720040592 million
Ltd.
The New India Inventory: Dynapak Machine is insured
₹0.002
26. Assurance Co. with policy no.- May 16, 2026 ₹1.42 million
million
Ltd. 42010044256500000016
Note: All the above-mentioned policies are in the name of the Company.
For further details, kindly refer “Risk Factor No. 50 – Inadequate or insufficient insurance coverage may expose
us to significant losses, liabilities, or regulatory consequences, which could adversely affect our business,
financial condition, and results of operations.” beginning on page 67.
286KEY INDUSTRY REGULATIONS AND POLICIES
The following is a summary of certain relevant laws and regulations in India, which are applicable to our
Company and our business. The information detailed in this section is based on the provisions of the applicable
Indian laws, regulations, rules, notifications, circulars, and guidelines, as interpreted by relevant statutory or
regulatory authorities, including judicial and administrative interpretations, as of the date of this Draft Red
Herring Prospectus. This section does not purport to be exhaustive, is only intended to provide general
information to investors, and is neither designed nor intended to be a substitute for professional legal advice. For
details of government approvals our Company has obtained, kindly refer “Government and Other Statutory
Approvals” beginning on page 486.
The information detailed in this chapter, is based on the current provisions of key statutes, bills, regulations,
notifications, memorandums, circulars and policies which are subject to amendments, changes and/or
modifications. Consequently, we are subject to various rules and regulations relating to, among others,
information technology, telecommunications (to the extent applicable), data protection, intellectual property,
environmental compliance, corporate laws, securities regulations (due to this Offer), labour laws, and taxation.
Any change in these laws or regulations, or in their interpretation, may adversely affect our business, prospects,
financial condition, and results of operations. The description of the applicable regulations as given below has
been provided in a manner to provide general information to the investors and may not be exhaustive and is
neither designed nor intended to be a substitute for professional legal advice. The indicative summary is based
on the current provisions of applicable law, which are subject to change or modification or amended by subsequent
legislative, regulatory, administrative, or judicial decisions.
BUSINESS SPECIFIC LAWS
1. National Building Code, 2016 (“NBC 2016”)
The NBC 2016 serves as a comprehensive guideline for regulating building construction activities throughout the
country. The NBC 2016 functions as a model code for adoption by agencies engaged in building construction,
including Public Works Departments, government construction departments, local authorities, and private
construction agencies. The NBC 2016 provides directives pertaining to administrative regulations, development
control rules, general building requirements, fire safety measures, structural design, construction standards,
material specifications, and provisions concerning building and plumbing services.
The NBC 2016 seeks to enhance the safety, sustainability, and efficiency of the built environment by establishing
uniform construction standards applicable across various jurisdictions. The NBC 2016 aims to create an enabling
framework for achieving high-quality building infrastructure while ensuring compliance with regulatory
provisions and technical requirements. The NBC 2016 further emphasizes the integration of advanced
construction technologies and sustainable practices in building design and execution, thereby fostering a robust
and resilient construction ecosystem.
Further is a list of regulations and rules applicable to building and multifunctional complexes includes:
• The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement
Act, 2013
• The Energy Conservation Building Code
• The Model Building Bye-Laws, 2016
In addition to the aforementioned laws and regulations, compliance with state-specific legislative frameworks is
mandated, including but not limited to Land Revenue Codes, Rent Control Acts, Tenancy and Agricultural Acts,
Land Reforms, Land Acquisition Acts, Town and Country Planning Acts, Land Ceiling Acts, and Municipalities
Acts.
2872. The National Highways Act, 1956 (the “NH Act”)
The NH Act entrusts the central government with the development and maintenance of National Highways and
roadways across India. The Central Government may delegate any function related to the development of National
Highways to the State Government within whose jurisdiction the National Highway falls, or to any officer or
authority subordinate to the Central or concerned State Government.
Under the NH Act, the Central Government is also empowered to enter into agreements with individuals,
partnership firms, companies, joint ventures, consortia, or any other legal entity, whether Indian or foreign,
capable of financing National Highway projects from its own resources or through funds raised from financial
institutions, banks, or open markets. Such agreements may involve the design, construction, operation, and
maintenance of the entire or a portion of a National Highway.
These agreements may include provisions allowing the private entity to collect fees from users during a specified
period, referred to as the ‘concession period’, which includes the construction period. Upon the expiry of the
concession period, the entity's right to collect fees and its obligation to operate and maintain the project ceases,
and the facility is transferred to the Central Government.
Further, the NH Act vests the Central Government with the power to declare any highway as a National Highway
and to acquire land for this purpose. The Central Government may, by notification, declare its intention to acquire
land when it is satisfied that such acquisition is required for public purposes, including the building, maintenance,
management, or operation of a National Highway or a part thereof.
The NH Act prescribes the procedure for land acquisition, which includes:
• Inspection of land,
• Hearing of objections,
• Declaration of acquisition, and
• Mode of taking possession.
3. The National Highways Authority of India Act, 1988 (the "NHAI Act")
The NHAI Act provides for the constitution of an authority for the development, maintenance and management
of National Highways. Pursuant to the same, the National Highways Authority of India ("NHAI"), was constituted
as an autonomous body in 1989 and operationalised in 1995. Under the NHAI Act, Central Government carries
out development and maintenance of the national highways system, through NHAI.
The NHAI has the power to enter into and perform any contract necessary for the discharge of its functions under
the NHAI Act. The NHAI Act prescribes a limit in relation to the value of the contracts that may be entered into
by NHAI. However, the NHAI may enter into contracts exceeding the value so specified, on obtaining prior
approval of the Central Government. NHAI Act provides that the contracts for acquisition, sale or lease of
immovable property on behalf of the NHAI cannot exceed a term of 30 years unless previously approved by the
Central Government.
4. The Building and Other Construction Workers (Regulation of Employment and Conditions of Service)
Act, 1996 (“Building and Other Construction Workers Act”)
The Building and Other Construction Workers Act was enacted to regulate the employment and conditions of
service of building and other construction workers, ensuring their safety, health, and welfare. The Act provides a
legal framework for improving working conditions in the construction sector and prescribes measures for
the welfare and protection of workers engaged in building and construction activities.
288Under the Building and Other Construction Workers Act, every employer of an establishment to which the Act
applies is required to register the establishment within sixty days of the commencement of the Act or within sixty
days from the date on which it becomes applicable to such an establishment. The registration application must be
submitted in the prescribed form along with the prescribed fee. An employer is prohibited from
employing construction workers if the establishment is required to be registered but has not been registered, or if
its registration has been revoked and no appeal has been preferred, or if an appeal has been dismissed.
Further, every building worker who is between eighteen and sixty years of age and has been engaged in building
or construction work for at least ninety days during the last twelve months is eligible for registration as a
beneficiary under the Building and Other Construction Workers’ Welfare Fund. The application for
registration must be made in the prescribed form, accompanied by prescribed documents and a registration fee not
exceeding fifty rupees.
5. The Transfer of Property Act, 1882 (“TP Act”)
The TP Act establishes the general principles governing the transfer of property in India. The TP Act regulates the
various modes by which immovable property, including any interest therein, may be transferred from one party to
another. The TP Act lays down the foundational principles concerning the transfer of property, including, inter
alia, the classification of property capable of being transferred, the competency of persons executing such
transfers, the validity of conditions and restrictions imposed on transfers, and the creation of contingent and vested
interests in property.
The TP Act further delineates the rights and liabilities of the vendor and purchaser, as well as those of the lessor
and lessee in transactions concerning the sale or lease of land. The TP Act also contains provisions governing the
mortgage of property, ensuring a structured legal framework for securing property-based financial transactions.
ENVIRONMENTAL LAWS
6. The Water (Prevention and Control of Pollution) Act, 1974 (“Water Act”) and The Water (Prevention
and Control of Pollution) Rules, 1975 (“Water Rules”)
The Water Act, as amended, aims to prevent and control water pollution caused by factories and manufacturing
units and to maintain and restore the quality of water. The Water Act is vested with regulatory and enforcement
functions, including (a) preventing and controlling the discharge of pollutants into water bodies; (b) ensuring
compliance with prescribed water quality standards; (c) monitoring and regulating industrial effluents and sewage
discharge; (d) establishing pollution control measures for industries and municipal bodies; (e) promoting water
conservation and sustainable management practices; (f) imposing penalties for violations of water pollution
norms; (g) providing legal remedies and enforcement mechanisms to ensure adherence to environmental
regulations. Under the Water Act, any person establishing any industry, operation, or process, any treatment or
disposal system, or using any new or altered outlet for the discharge of sewage or new discharge of sewage must
obtain the consent of the relevant SPCB. The SPCB is empowered to establish standards and conditions that
industries and establishments are required to comply with to ensure environmental sustainability and water quality
preservation.
The Water Act was enacted to prevent and control water pollution and to ensure the maintenance and restoration
of water quality across the country. The Water Act provides for the establishment of Pollution Control Boards
(“PCBs”) at the Central and SPCB’s to formulate and enforce standards for the discharge of pollutants into water
bodies.
The Water Rules prescribe, inter alia, the terms and conditions of service for the members of the Central PCB and
its various committees, as well as the functions of the central water laboratory. The Central PCB is empowered
to collect and analyze water samples from any sewage or trade effluent discharged into any stream or well within
any Union Territory. Further, the Water Act mandates the Central PCB to submit an annual report detailing its
289activities for the preceding financial year to the Central Government, in the format prescribed under the Water
Rules.
7. Environment Protection Act, 1986 (“EPA”)
The EPA serves as the umbrella legislation governing various environmental protection laws in India. Under
the EPA, the Government of India is empowered to undertake such measures as it deems necessary or
expedient for the protection and improvement of environmental quality and the prevention and control of
environmental pollution. The EPA provides for, inter alia, the formulation of environmental quality
standards, the regulation of emissions and discharges of environmental pollutants from various sources, as
prescribed under the Environment (Protection) Rules, 1986, and the inspection of premises, plants,
equipment, and machinery to examine manufacturing processes and materials likely to cause pollution.
Contravention of any provision of the EPA or the Rules framed thereunder is punishable with imprisonment,
fine, or both, depending on the nature and severity of the violation.
8. The Environmental Impact Assessment Notification, 2006 (“EIA Notification”)
The EIA Notification is a significant regulation issued by the Ministry of Environment and Forests, India,
mandating the requirement of prior environmental clearance for the construction of new projects or the expansion
or modernization of existing projects, based on their potential environmental impact. The EIA Notification applies
to various sectors, including mining, thermal power plants, infrastructure, and industries, ensuring that projects
comply with the objectives of the National Environment Policy and adhere to sustainable environmental practices.
The EIA Notification has undergone multiple revisions since its initial introduction in 1994, reflecting the need
to address evolving environmental concerns and strengthen regulatory oversight for environmentally sensitive
activities.
9. E-waste Management Rules, 2016 (Amended on March 08, 2024, as E-waste Management Rules, 2022)
These rules shall apply to every manufacturer, producer refurbisher, dismantler and recycler involved in
manufacture, sale, transfer, purchase, refurbishing, dismantling, recycling and processing of e-waste or electrical
and electronic equipment listed in Schedule I including their components, consumables, parts and spares which
make the product operational but the said rules will not apply to waste batteries, packaging plastics, radio-active
wastes as they are covered under their respective rules separately. It is mandatory for all the entities to get
registration under the category of Manufacturer, producer, refurbisher or recycler. All the refurbishers shall have
the responsibility to collect e-waste generated during the process of refurbishing and hand over the waste to
registered recyclers and upload information on the portal and they are required to file annual and quarterly returns
in the laid down form on the portal. All the refurbishers shall ensure that the refurbished equipment shall be as per
compulsory registration scheme of the Ministry of Electronics and Information Technology and Standards of
Bureau of Indian Standards framed for this purpose. Any person, who provides incorrect information required
under these rules for obtaining extended producer responsibility certificates, uses or causes to be used false or
forged extended producer responsibility certificates in any manner, wilfully violates the directions given under
these rules or fails to cooperate in the verification and audit proceedings, may be prosecuted under section 15 of
the Act, 1986 and this prosecution shall be in addition to the environmental compensation levied under rule 22.
10. The Air (Prevention and Control of Pollution) Act, 1981 (“Air Act”) and The Air (Prevention and
Control of Pollution) Rules, 1982 (“Air Rules”)
The Air Act provides for the prevention, control, and abatement of air pollution to safeguard public health and the
environment. The Air Act is vested with regulatory and enforcement functions, including (a) preventing and
controlling the discharge of air pollutants from industrial and commercial activities; (b) ensuring compliance with
prescribed air quality standards; (c) monitoring and regulating emissions from industrial plants and vehicles; (d)
establishing air pollution control measures for industries and urban areas; (e) promoting the adoption of pollution
290control technologies and best practices; (f) imposing penalties for violations of air pollution norms; (g) providing
legal remedies and enforcement mechanisms to ensure adherence to environmental regulations.
The Air Act stipulates that no person shall establish or operate any industrial plant that emits air pollutants in
a notified air pollution control area without obtaining prior written consent from the relevant SPCB. Further, such
an industrial plant shall not be permitted to emit air pollutants beyond the prescribed standards set by the SPCB.
The Air Rules provide for the procedure for transaction of business of the Central PCB and its
various committees. The Air Act further mandates that the Central PCB shall submit an annual report detailing its
activities in the previous financial year to the Central Government, in the format prescribed under the Air Rules.
11. Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016 (the
“Hazardous Wastes Rules”)
The Hazardous Waste Rules define the term “hazardous waste” and any person who has control over the affairs
of a factory or premises or any person in possession of the hazardous or other waste is classified as an “occupier”.
In terms of the Hazardous Waste Rules, occupiers have been, inter alia, made responsible for safe and
environmentally sound handling of hazardous wastes generated in their establishments and are required to obtain
license/ authorisation from the respective State PCB for generation, processing, treatment, package, storage,
transportation, use, collection, destruction, conversion, offering for sale, transfer or similar activities in relation to
hazardous waste. The Hazardous Waste Rules also prescribe the hierarchy in the sequence of priority of
prevention, minimization, reuse, recycling, recovery and co-processing. Further, State PCBs are mandated to
prepare an inventory of the waste generated, waste recycled, recovered and utilized including co-processed, re-
exported and disposed, based on annual returns received from occupiers and operators, and submit it to the Central
Pollution Control Board on an annual basis.
LAWS RELATED TO LABOUR AND EMPLOYMENT
12. Factories Act, 1948 (the “Factories Act”)
Factories Act defines a 'factory to cover any premises which employs ten or more workers on any day of the
preceding twelve months and in which manufacturing process is carried on with the aid of power or any premises
where at least twenty workers are employed in a manufacturing process. Each state government has enacted rules
in respect of the prior submission of plans and their approval for the establishment of factories and registration
and licensing of factories. The Factories Act provides that an occupier of a factory i.e. the person who has ultimate
control over the affairs of the factory and in the case of a company, any one of the directors, must ensure the
health, safety and welfare of all workers. There is a prohibition on employing children below the age of fourteen
years in a factory. The Factories Act also provides for imposition of fines and imprisonment of the manager and
occupier of the factory in case of any contravention of the provisions of the Factories Act. In addition to the
Factories Act, the employment of workers, depending on the nature of activity, is regulated by a wide variety of
generally applicable labour laws.
13. Shops and establishments legislations in various states
Under the provisions of local shops and establishments legislations applicable in the states in India where our
establishments are set up, such establishments are required to be registered. Such legislations regulate the working
and employment conditions of the workers employed in shops and establishments, including commercial
establishments, and provide for fixation of working hours, rest intervals, overtime, holidays, leave, termination of
service, maintenance of records, maintenance of shops and establishments and other rights and obligations of the
employers and employees. These shops and establishments acts, and the relevant rules framed thereunder, also
prescribe penalties in the form of monetary fine or imprisonment for violation of provisions, as well as procedures
for appeal in relation to such contravention of the provisions.
29114. Contract Labour (Regulation and Abolition) Act, 1970 (the “CLRA”)
The CLRA has been enacted to regulate the employment of contract labour in certain establishments, the
regulation of their conditions and terms of service and to provide for its abolition in certain circumstances. The
CLRA applies to every establishment in which 20 or more workmen are employed or to any contractor who
employed 20 or more workmen were on any day of the preceding 12 months as contract labour. Every contractor
to whom the CLRA applies is required to obtain a license and not to undertake or execute any work through
contract labour except under and in accordance with the license issued.
To ensure the welfare and health of the contract labour, the CLRA imposes certain obligations on the contractor
in relation to establishment of canteens, rest rooms, drinking water, washing facilities, first aid, other facilities and
payment of wages.
15. Employees Provident Fund and Miscellaneous Provisions Act, 1952 (the “EPFMP Act”)
Under the EPFMP Act, compulsory provident fund, family pension fund and deposit linked insurance are payable
to employees in factories and other establishments. The legislation provides that an establishment employing more
than 20 (twenty) persons, either directly or indirectly, in any capacity whatsoever, is either required to constitute
its own provident fund or subscribe to the statutory employee’s provident fund. The employer of such
establishment is required to make a monthly contribution to the provident fund equivalent to the amount of the
employee’s contribution to the provident fund. There is also a requirement to maintain prescribed records and
registers and filing of forms with the concerned authorities. The EPFMP Act also prescribes penalties for avoiding
payments required to be made under the abovementioned schemes.
16. Employees State Insurance Act, 1948, as amended (the “ESI Act”)
The ESI Act, provides for certain benefits to employees in case of sickness, maternity and employment injury. All
employees in establishments covered by the ESI Act are required to be insured, with an obligation imposed on the
employer to make certain contributions in relation thereto. In addition, the employer is also required to register
itself under the ESI Act and maintain prescribed records and registers.
17. The Sexual Harassment of Women at Workplace (Prevention, Prohibition and Redressal) Act, 2013
(the “Act”)
The Act was enacted to address the growing concerns of sexual harassment of women in workplaces by providing
for prevention, prohibition, and redressal of complaints, along with matters connected therewith or incidental
thereto. The Act defines the terms ‘sexual harassment’ and ‘workplace’ to ensure comprehensive coverage. Every
employer is mandated to constitute an Internal Complaints Committee ("ICC"), with each officer and member of
the Committee holding office for a period not exceeding three years from the date of nomination. Any aggrieved
woman may file a written complaint with the ICC regarding incidents of sexual harassment at the workplace.
Further, the employer is obligated to ensure a safe working environment, which includes protection from
individuals interacting with employees at the workplace, conducting awareness programs and workshops,
prominently displaying rules regarding sexual harassment, and providing necessary facilities to the ICC or the
Local Committee for handling complaints, along with other procedural requirements for assessing grievances.
18. The Child Labour (Prohibition and Regulation) Act, 1986 (the “CLPR Act”)
The CLPR Act aims to prohibit the employment of children in certain occupations while regulating their working
conditions in others. Part B of the Schedule to the CLPR Act expressly prohibits the employment of children in
various hazardous processes, including cloth printing, dyeing, weaving, cotton ginning, processing, and the
production of hosiery goods.
The following in an indicative list of labour laws which may be applicable in addition to the above laws to our
Company due to the nature of our business activities:
292• The Employees’ Compensation Act, 1923
• The Industrial Disputes Act, 1947 and Industrial Disputes (Central) Rules, 1957
• The Industrial Employment (Standing orders) Act, 1946
• Inter-State Migrant Workmen (Regulation of Employment and Conditions of Service) Act, 1979
• The Payment of Bonus Act, 1965
• The Minimum Wages Act, 1948
• The Payment of Wages Act, 1936
• The Equal Remuneration Act, 1976
• Maternity Benefit Act, 1961
• The Apprentices Act, 1961
• The Payment of Gratuity Act, 1972
LABOUR CODES
19. The Code on Wages, 2019
The Code on Wages, 2019, consolidates and governs matters relating to wages and bonuses, subsuming four
legislations: the Payment of Wages Act, 1936, the Minimum Wages Act, 1948, the Payment of Bonus Act, 1965,
the Professional Tax Act, 1975, and the Equal Remuneration Act, 1976. It prescribes, inter alia, the minimum
wages payable to employees, the manner of payment, the calculation of wages, and the payment of bonuses. The
Code was published in the Gazette of India on August 8, 2019. By way of a notification dated December 18, 2020,
provisions relating to the constitution of a Central Advisory Board have been brought into effect, while the
remaining provisions are yet to be enforced.
20. The Code on Social Security, 2020
The Code on Social Security, 2020 received the assent of the President of India on September 28, 2020 and it
proposes to subsume certain existing legislations including the Employee's Compensation Act, 1923, the
Employees’ State Insurance Act, 1948, the Employees’ Provident Funds and Miscellaneous Provisions Act, 1952,
the Maternity Benefit Act, 1961, the Payment of Gratuity Act, 1972, the Building and Other Construction Workers’
Welfare Cess Act, 1996 and the Unorganized Workers’ Social Security Act, 2008. The provisions of this code will
be brought into force on a date to be notified by the Central Government. The Central Government has issued the
draft rules under the Code on Social Security, 2020. The draft rules provide for operationalization of provisions
in the Code on Social Security, 2020 relating to employees’ provident fund, employees’ state insurance
corporation, gratuity, maternity benefit, social security and cess in respect of building and other construction
workers, social security for unorganized workers, gig workers and platform workers.
In addition to above, we are subject to wide variety of generally applicable labour laws concerning condition of
working, benefit and welfare of our labourers and employees such as the Sexual Harassment of Women at
Workplace (Prevention, Prohibition and Redressal) Act, 2013 and the Employees (Provident Fund and
Miscellaneous Provision) Act, 1952.
21. The Occupational Safety, Health, and Working Conditions Code, 2020
The Code consolidates and amends the laws regulating the occupational safety and health and working conditions
of the persons employed in an establishment. It replaces 13 old central labour laws including the Contract Labour
(Regulation and Abolition) Act, 1970 and received the presidential assent on September 28, 2020. It proposes to
subsume several separate legislations, including the Factories Act, 1948, the Contract Labour (Regulation and
Abolition) Act, 1970, the Inter-State Migrant Workmen (Regulation of Employment and Conditions of Service)
Act, 1979 and the Building and Other Construction Workers (Regulation of Employment and Conditions of
Service) Act, 1996.
293LAWS RELATED TO INTELLECTUAL PROPERTY
22. The Trade Marks Act, 1999 (“Trademarks Act”)
The Trademarks Act provides for the application and registration of trademarks in India for granting exclusive
rights to marks such as a brand, label and heading and obtaining relief in case of infringement. The Trademarks
Act also prohibits any registration of deceptively similar trademarks or chemical compounds among others. It also
provides for infringement, falsifying and falsely applying for trademarks.
An application for trade mark registration may be made by any person claiming to be the proprietor of a trade
mark used or proposed to be used by him, who is desirous of registering it. Applications for a trade mark
registration may be made for in one or more classes. Once granted, trade mark registration is valid for ten years
unless cancelled. Under its provisions, an application for trademark registration may be filed with the Controller
General of Patents, Designs, and Trademarks by any person or entity claiming proprietorship, either individually
or jointly, based on actual use or intent to use the trademark in the future. Once registered, a trademark is valid
for 10 years unless cancelled and may be renewed upon expiry. Failure to renew results in the lapse of the mark,
necessitating restoration to secure protection under the Act. The Trademarks Act restricts the registration of
deceptively similar marks and prescribes penalties for infringement, falsification, or false applications.
The Trade Mark (Amendment) Act, 2010 has been enacted by the Government of India to amend the Trademark
Act to enable Indian nationals as well as foreign nationals to secure simultaneous protection of trade mark in other
countries as well as streamlines the transfer of trademark ownership through assignment or transmission, and
aligns domestic trademark law with international practices.
23. Copyright Act, 1957 along with the Copyright Rules, 2013 (the “Copyright Laws”)
Copyright Laws serve to create property rights for certain kinds of intellectual property, generally called works of
authorship. The Copyright Laws protect the legal rights of the creator of an ‘original work’ by preventing others
from reproducing the work in any other way. The intellectual property protected under the Copyright Laws
includes literary works, dramatic works, musical works, artistic works, cinematography, and sound recordings.
The Copyright Laws prescribe fine, imprisonment or both for violations, with enhanced penalty on second or
subsequent convictions. While copyright registration is not a prerequisite for acquiring or enforcing a copyright
in an otherwise copyrightable work, registration constitutes prima facie evidence of the particulars entered therein
and may expedite infringement proceedings and reduce delay caused due to evidentiary considerations. Upon
registration, the copyright protection for a work exists for a period of 60 years following the demise of the author.
LAWS RELATED TO TAXATION
24. Income Tax Act, 1961
Income Tax Act, 1961 is applicable to every Domestic / Foreign Company whose income is taxable under the
provisions of this Act or Rules made under it depending upon its “Residential Status” and “Type of Income”
involved. Under section 139(1) every Company is required to file its Income tax return for every Previous Year
by 31st October of the Assessment Year. Other compliances like those relating to Tax Deduction at Source,
Advance Tax, Minimum Alternative Tax and like are also required to be complied by every Company.
25. Goods and Service Tax Act, 2017 (the “CGST Act”)
The Goods and Services Tax (“GST”) is levied on supply of goods or services or both jointly by the Central
Government and State Governments. GST provides for imposition of tax on the supply of goods or services and
will be levied by the Central Government and by the state government including union territories on intra-state
supply of goods or services. Further, Central Government levies GST on the inter-state supply of goods or services.
The GST law is enforced by various acts viz. CGST Act, relevant state's Goods and Services Act, 2017 (“SGST
Act”), Union Territory Goods and Services Act, 2017 (“UTGST Act”), Integrated Goods and Services Act, 2017
(“IGST Act”), Goods and Services (Compensation to States) Act, 2017 and various rules made thereunder.
29426. Foreign Trade Development and Regulation Act 1992 (the “FTDR Act”)
The primary objective of the FTDR Act, is to establish a framework for the development and regulation of foreign
trade by facilitating imports into the country and implementing measures to promote exports from India, along
with addressing related matters. The FTDR Act empowers the Central Government to enact provisions necessary
to achieve these objectives. Pursuant to the powers conferred under the FTDR Act, the government formulates the
Export and Import Policy to further the objectives of the Act.
OTHER APPLICABLE LAWS
27. The Companies Act, 2013
The consolidation and amendment in the law relating to the Companies Act, 1956 made way to the enactment of
the Companies Act, 2013 and rules made thereunder. The Companies Act primarily regulates the formation,
financing, functioning, and restructuring of Companies as separate legal entities. The Act provides regulatory and
compliance mechanism regarding all relevant aspects including organizational, financial, and managerial aspects
of companies. The provisions of the Act state the eligibility, procedure, and execution for various functions of the
company, the relation and action of the management and that of the shareholders. The law laid down transparency,
corporate governance, and protection of shareholders & creditors. The Companies Act plays the balancing role
between these two competing factors, namely, management autonomy and investor protection.
28. SEBI Regulations
Securities and Exchange Board of India is the regulatory body for securities market transactions including
regulation of listing and delisting of securities. It forms various rules and regulations for the regulation of listed
entities, transactions of securities, exchange platforms, securities market, and intermediaries thereto. Apart from
other rules and regulations, listed entities are mainly regulated by the SEBI Act, 1992, Securities Contract
Regulation Act, 1956, Securities Contracts (Regulation) Rules, 1957, SEBI (Issue of Capital and Disclosure
Requirements) Regulations, 2018 and SEBI (Listing Obligations and Disclosure Requirement) Regulations, 2015,
SEBI (Substantial Acquisition of Shares and Takeover) Regulations, 2011 and SEBI (Prohibition of Insider
Trading) Regulations, 2015.
29. Competition Act, 2002 (the “Competition Act”)
The Competition Act is an act to prevent practices having adverse effect on competition, to promote and sustain
competition in markets, to protect the interests of consumers and to ensure freedom of trade in India. The Act
deals with prohibition of (i) certain agreements such as anti-competitive agreements and (ii) abuse of dominant
position and regulation of combinations. No enterprise or group shall abuse its dominant position in various
circumstances as mentioned under the Competition Act. The prima facie duty of the Competition Commission of
India (“CCI”) is to eliminate practices having adverse effect on competition, promote and sustain competition,
protect interests of consumers and ensure freedom of trade. The CCI shall issue notice to show cause to the parties
to combination calling upon them to respond within 15 days in case it is of the opinion that there has been an
appreciable adverse effect on competition in India. In case a person fails to comply with the directions of the CCI
and Director General (as appointed under section 16(1) of the Competition Act), he shall be punishable with a fine
which may exceed to ₹ 100,000 for each day during such failure subject to maximum of ₹ 10,000,000, as the CCI
may determine.
30. Public Procurement (Preference to Make in India) Order, 2017
The Public Procurement (Preference to Make in India) Order, 2017, issued by the Department for Promotion of
Industry and Internal Trade (DPIIT), is designed to promote domestic manufacturing and enhance the participation
of local suppliers in public procurement in alignment with the "Make in India" and ‘Aatmanirbhar Bharat’
initiatives. This policy grants preference to local suppliers in government contracts, defined as those with a
minimum of 50% local content. Local suppliers are classified into Class-I (50% or more local content) and Class-
295II (20-50% local content). For procurements under a prescribed threshold (typically ₹50 lakh), the government
restricts participation to local suppliers only. The policy incorporates a price preference mechanism, allowing
Class-I local suppliers to match the lowest bid (within a 20% price margin) if a non-local supplier submits the
lowest offer. Suppliers are required to self-certify local content, and any false declarations can lead to penalties,
blacklisting, or termination of contracts.
296OUR HISTORY AND CERTAIN CORPORATE MATTERS
Brief history of our Company
Our Company was originally incorporated as ‘Technocraft Construction Private Limited’ a private limited
company under the Companies Act, 1956, pursuant to a certificate of incorporation dated October 21, 1998, issued
by the Registrar of Companies, NCT of Delhi & Haryana. Thereafter the name of our Company was changed from
‘Technocraft Construction Private Limited’ to ‘Technocraft Ventures Private Limited’ pursuant to a board
resolution dated January 08, 2024, and a special resolution passed by our Shareholders on January 10, 2024 and
a fresh certificate of incorporation dated February 09, 2024 was issued pursuant to change of name, by the
Registrar of Companies, NCT of Delhi & Haryana. Subsequently, our Company was converted into a public
limited company pursuant to a resolution passed by our Board of Directors on February 16, 2024, and a special
resolution passed by our Shareholders on March 13, 2024. Consequently, the name of our Company was changed
to ‘Technocraft Ventures Limited’, and a fresh certificate of incorporation was issued to our Company by the
Registrar of Companies, Central Processing Centre, on June 11, 2024. The CIN of the Company is
U70101DL1998PLC096763.
Change in the Registered Office of our Company
At the time of incorporation, the registered office of our Company was situated at 383, Bhera Enclave, Paschim
Vihar, New Delhi-110055. Except as disclosed below, there has been no change in the registered office of our
Company since its incorporation.
Date of Change Details of change in the registered office Reasons for change
2005 – 2006 The registered office of our Company was shifted from For operational and
383, Bhera Enclave, Paschim Vihar, New Delhi – administrative convenience
110055 to 803 Manjusha 54 Nehru Place, New Delhi-
110019.
October 22, The registered office of our Company was shifted from For operational and
2008 803 Manjusha 54 Nehru Place, New Delhi-110019. to administrative convenience
383, Bhera Enclave, Paschim Vihar, New Delhi –
110055.
December 26, The registered office of our Company was shifted For operational and
2009 from, Bhera Enclave, Paschim Vihar, New Delhi – administrative convenience
110055 to GH 8/21, Sahyog Apartment, Paschim
Vihar, New Delhi – 110087.
April 11, 2017 The registered office of our Company was shifted from For operational and
GH 8/21, Sahyog Apartment, Paschim Vihar, New administrative convenience
Delhi - 110087 to Flat no. 941 G/F Kondli Gharoli,
Mayur Vihar Phase-III, New Delhi-110006.
March 19, 2019 The registered office of our Company was shifted from For operational and
Flat no. 941G/F Kondli Gharoli, Mayur Vihar Phase- administrative convenience
III, New Delhi - 110006 to Flat no.151, Leiah
Apartments, Plot no. B-15, Vasundhara Enclave, New
Delhi -110096.
April 07, 2021 The registered office of our Company was shifted from For operational and
Flat no.151, Leiah Apartments, Plot no. B-15, administrative convenience
Vasundhara Enclave, New Delhi -110096 to S 550/51,
Office No. 214, First Floor, School Block, Shakarpur,
New Delhi -110092.
February 01, The registered office of our Company was shifted from For operational and
2025 S 550/51, Office No. 214, First Floor, School Block, administrative convenience
Shakarpur, New Delhi -110092 to S 553/54, Ground
Floor, School Block, Shakarpur, New Delhi -110092.
297Main Objects of our Company
The main objects contained in our Memorandum of Association are set forth below:
1. To purchase, sale, hold, take on mortgage, give on mortgage, hire or otherwise acquire and deal in any
movable or immovable property including real estates, agricultural lands, lands, buildings, houses, nursing
homes and any rights, interests and privileges therein and to develop and turn them to account.
2. To erect, construct house, buildings or civil works of every description on any land of the Company or upon
any other land or property and to pull down, rebuild enlarge, alter and improve existing house, building or
works thereon, to convert and appropriate any such land into and for roads, streets, squares gardens any other
property and to deal in sanitary, electrical, engineering goods and building materials of all kinds.
3. To carry on the business of promoters, builders, colonisers, architects, contractors, subcontractors,
constructional engineers, planners, designers, decorators, interior decorators and real estate agents supply
of civil labour in India or any part of the world.
4. To act as consultants for any person or governmental authorities for the construction of buildings of all
description, roads, bridges, earth works, sewer tanks, drains, culvert, channels, sewage sanitation and
electrification work, air conditioning and air cooling and allied civil works.
The main object clauses and matters which are necessary for the furtherance of the main objects contained in the
Memorandum of Association enable our Company to undertake its existing business.
Amendments to our Memorandum of Association in the last 10 years
Set out below are the amendments that have been made to our Memorandum of Association, in the last Ten Years
immediately preceding the date of this Draft Red Herring Prospectus:
Date of change/
shareholders’ Nature of amendment
resolution
January 10, 2024 Clause I of the Memorandum of Association was amended to reflect the change of
name of our Company from “Technocraft Construction Private Limited” to
“Technocraft Ventures Private Limited”.
January 10, 2024 The Company adopted a new set of Memorandum of Association in compliance with
the provisions of the Companies Act 2013.
March 13, 2024 Clause I of the Memorandum of Association was amended to reflect the change of
name of our Company from “Technocraft Ventures Private Limited” to “Technocraft
Ventures Limited” pursuant to conversion of our Company from a private limited
company to a public limited company.
September 06, 2024 Clause V of the Memorandum of Association was amended to reflect the increase in
the authorized share capital of our Company from ₹10,25,00,000/- divided into
1,02,50,000 Equity Shares of face value of ₹10/- each to ₹40,00,00,000/- divided into
4,00,00,000 Equity Shares of face value of ₹10/- each.
Major Events and Milestones
The table below sets forth some of the major events and milestones in the history of our Company:
Year Major Events/Milestones/Achievements
2003 Secured 12 road construction contracts from government authorities including the National
Highway Division – PWD UP, Noida Authority, Nagar Nigam (Ghaziabad), and Ghaziabad
Development Authority, marking a significant scale-up in our operations within the road
construction segment.
298Year Major Events/Milestones/Achievements
2004 Strengthened presence in the road construction segment by securing 9 additional contracts from
government bodies including PWD UP, National Highways Division – PWD UP, and Ghaziabad
Development Authority.
2007 Achieved a turnover of ₹45.27 crore in FY 2006–07, marking an increase of over 80% from the
previous year and the highest annual turnover since incorporation.
2008 Formed a partnership firm under the name M/s Krishna-TCPL JV (also known as Krishna
Contractors) on August 01, 2008, with M/s Krishna Contractors under a 60:40 profit-sharing
ratio to undertake contractor business. The partnership was dissolved with effect from
December 31, 2024.
2009 Formed a partnership firm under the name M/s Ultratech Engineers through a partnership deed
(agreement) executed on March 03, 2009, with M/s Nitesh Electricals & Engineers, and Avadh
Developers Private Limited. As per the terms of the partnership deed, the partnership was
deemed to have commenced from January 25, 2009. This partnership marked the Company’s
foray into the wastewater and sewerage infrastructure sector by executing projects for various
government bodies.
2012 Entered the power distribution sector by securing two major contracts valued at approximately
₹89.14 crore from Paschimanchal Vidyut Vitran Nigam Limited (PVVNL) and Dakshinanchal
Vidyut Vitran Nigam Limited (DVVNL).
2013 Achieved an annual financial turnover exceeding ₹100 crore for the first time since inception
and secured three contracts for constructing 33/11 KV substations under PVVNL, UP.
2016 Acquired the ongoing business of M/s Ultratech Engineers pursuant to an agreement dated June
02, 2016, to strengthen our capabilities in the wastewater treatment segment. The acquisition
included all assets, liabilities, work orders, and contractual rights of the partnership firm, which
had been engaged in executing government infrastructure contracts.
2017 Secured an Asian Development Bank-funded project for laying a sewerage network in Udaipur,
Rajasthan, including a 10-year operation and maintenance component, with a contract value of
approximately ₹85.02 crore, marking the Company’s entry into the state of Rajasthan.
2022 Entered into a joint venture arrangement under the trade name ‘TESPL-LRS-TCPL JV’,
pursuant to a consortium-based Joint Venture Agreement dated June 10, 2022, with Trenchless
Engineering Services Private Limited and L.R. Sharma & Co., for jointly bidding for a Delhi
Jal Board project involving replacement of transmission mains in Shahdara, Greater Kailash,
and Jal Vihar zones.
2023 Formally constituted a partnership firm under the name ‘TESPL-LRS-TCPL JV’ on May 25,
2023, pursuant to a partnership deed (agreement) executed with Trenchless Engineering
Services Private Limited and L.R. Sharma & Co., to undertake and execute the Delhi Jal Board
project awarded under the joint venture arrangement.
Achieved an annual turnover exceeding ₹150 crores for the first time since inception.
Secured two key projects for sewerage network laying and SPS/STP construction in Kota (20
MLD STP, 5 pumping stations) and Bikaner (2 MLD STP, 30 MLD SPS, 5.5 MLD SPS) under
Rajasthan Urban Drinking Water Sewerage & Infrastructure Corporation, valued at ₹293.39
crores and ₹265.26 crores.
2024 Achieved an annual turnover exceeding ₹200 crores for the first time since inception.
Key awards, accreditations or recognitions
Our Company has not received any key awards, accreditations and recognitions.
299Significant financial or strategic partnerships
1. Partnership and Acquisition of M/s Ultratech Engineers:
The Partnership Agreement between M/s Nitesh Electricals & Engineers, Our Company, and M/S Avadh
Developers Private Limited (“Partnership Agreement”) was executed on March 03, 2009. The Partnership
Agreement was entered into between the aforementioned parties to constitute the partnership in the name of
Ultratech Engineers (“Partnership”). In furtherance to the registration of the Partnership with the Registrar, an
application for registration of the Partnership was made on July 16, 2009. The Partnership was a multi-party firm
engaged in bidding and executing government contracts in the wastewater treatment sector. This strategic
association marked the Company’s initial foray into the wastewater segment and enabled it to participate in several
public sector projects. It was mutually agreed between the parties under the Partnership Agreement that the
effective date of the Partnership Agreement shall be January 25, 2009. Subsequently, by way of an agreement
dated June 02, 2016, our Company acquired the ongoing business of M/s Ultratech Engineers through an
agreement to take over, thereby integrating its contracts, technical credentials, and sectoral experience into the
Company’s operations.
2. Partnership - TESPL-LRS-TCPL JV:
The Company entered into a joint venture agreement dated June 10, 2022, with M/s Trenchless Engineering
Services Private Limited and M/s L.R. Sharma & Co. for forming a consortium under the name TESPL-LRS-
TCPL JV. This joint venture was constituted to jointly execute a project awarded by the Delhi Jal Board for the
replacement of transmission mains emanating from the Bhagirathi Water Treatment Plant. The parties
subsequently formalized the JV through a partnership deed (agreement) dated May 25, 2023. Our Company holds
a 26% share in the profits and losses of the firm as mentioned below:
Sr. Share in Profit/Loss
Name of the Partners
No. (%)
1. Technocraft Ventures Limited (earlier known as Technocraft 26
Construction Pvt Ltd)
2. Trenchless Engineering Services Private Limited 26
3. M/s L.R. Sharma & Co. 48
Total 100
Time and cost overruns
There has been no time or cost overruns due to reasons attributable to our Company in the setting up of projects.
For further details, kindly refer “Risk Factor No. 31 – We may be subject to liability claims or claims for damages
or termination of contracts for failure to meet project completion timelines or defective work, which may adversely
impact our profitability, cash flows, results of operations and reputation.” beginning on page 58.
Launch of key products or services entry in new geographies or exit from existing markets
For details of key services launched by our Company, entry into new geographies or exit from existing markets,
kindly refer “Our Business” beginning on page 228.
Defaults or rescheduling/restructuring of borrowings with financial institutions/banks
As on the date of this Draft Red Herring Prospectus, there are no defaults or rescheduling of borrowings with
financial institutions and banks.
Details regarding material acquisition or divestments of business/ undertakings, mergers, amalgamation,
any revaluation of assets, etc. in the last 10 years.
Pursuant to a takeover agreement dated June 02, 2016, the Company acquired the ongoing business of the
partnership firm M/s Ultratech Engineers, including all its assets, liabilities, contracts, and business operations.
300This acquisition enabled the Company to consolidate the technical capabilities and experience developed through
M/s Ultratech Engineers, particularly in the wastewater treatment segment, into its own operations. The
transaction was structured as a business transfer on a going concern basis and did not involve any merger or
amalgamation.
Details of Shareholders’ agreements
As on the date of this Draft Red Herring Prospectus, our Company, Promoters and shareholders do not have any
inter-se agreements/ arrangements and clauses / covenants which are material in nature and that there are no other
clauses / covenants which are adverse / pre-judicial to the interest of the minority/public shareholders. Also, there
are no other agreements, deed of assignments, acquisition agreements, shareholders’ agreement, inter-se
agreements, agreements of like nature.
Details of Special Rights
There are no special rights available to any shareholder of our Company or any other person as per the Articles of
Association of our Company.
Other agreements
Except as disclosed in this Draft Red Herring Prospectus, our Company has not entered into any other subsisting
material agreements including with strategic partners, joint venture partners or financial partners, which is not in
the ordinary course of business carried on by our Company, or which needs to be disclosed or non-disclosure of
which may have bearing on any investment decision in the Offer.
We confirm that there are no other inter-se agreements between our Company, Shareholders, Promoters,
shareholders’ agreements or other agreements of a like nature, in relation to the securities of our Company,
comprising material clauses / covenants that are required to be disclosed in this Draft Red Herring Prospectus or
containing clauses / covenants that are adverse / prejudicial to the interest of public shareholders.
Other than as disclosed in “Capital Structure – Build-up of Promoters’ equity shareholding in our Company”
beginning on page 107 and “Capital Structure – Details of secondary transactions of Equity Shares,” beginning
on page 109, we have not entered into any agreements in relation to the primary and secondary transactions of
securities.
There are no agreements entered into by the Shareholders, Promoters, Promoter Group entities, related parties (as
defined under Section 2(76) of the Companies Act), Directors, Key Managerial Personnel, Senior Management
Personnel, employees of our Company, among themselves or with our Company or with a third party, solely or
jointly, which, either directly, indirectly, potentially or whose purpose and effect is to, impact the management or
control of our Company or impose any restriction or create any liability upon our Company, including disclosure
of any rescission, amendment or alteration of such agreements thereto, whether or not our Company is a party to
such agreement.
Agreements with our Key Managerial Personnel, Senior Management Personnel, Director, Promoters or
any other employee
Except service agreements as disclosed in “Our Management” beginning on page 303, there are no agreements
entered into by our Promoters, Key Managerial Personnel, Senior Management Personnel or Directors or any
other employee of our Company, either by themselves or on behalf of any other person, with any shareholder or
any other third party with regard to compensation or profit sharing in connection with dealings in the securities of
our Company.
We confirm there are no other inter-se agreements, arrangements and clauses or covenants which our Company is
a party to, in relation to securities of our Company, which are material, adverse or pre-judicial to the interest of
the minority/ public shareholders or which may have a bearing on the investment decision.
301Guarantee given by the Promoter participating in the Offer for Sale
Our Promoter Selling Shareholder has issued the following guarantee in relation to loans availed by our Company
from Punjab National Bank. Set out below are the details of the said guarantee:
Period Sanctioned
till and
Name of
Name of the which Type of Considerati Guaranteed
the Reason
Promoter the Facility on Amount as on
Lender
guarante June 30, 2025
e is valid (₹ in million)
Kartikey Punjab Being major Yearly Working Nil 750.00
Construction National shareholder Renewal capital facility
s Bank, Large (Cash Credit
(Partnership Corporate & Bank
Firm) Branch, Guarantee)
Noida
Holding Company
As on the date of this Draft Red Herring Prospectus, our Company does not have any holding company.
Subsidiaries of our Company
As on the date of this Draft Red Herring Prospectus, our Company does not have any subsidiary.
Joint Ventures of our Company
As on the date of this Draft Red Herring Prospectus, our Company does not have any joint ventures.
Other confirmations
There is no conflict of interest between the suppliers of raw materials and third-party service providers (which are
crucial for operations of our Company) and our Company.
There is no conflict of interest between the lessors of the immovable properties (crucial for operations of the
company) and our Company.
302OUR MANAGEMENT
The terms of the Companies Act, 2013 (“Companies Act”) and the Articles of Association require that our Board
shall comprise of not less than three (3) Directors and not more than fifteen (15) Directors, provided that our
Shareholders may appoint more than fifteen (15) Directors after passing a special resolution in a general meeting.
As on the date of this Draft Red Herring Prospectus, we have six (6) Directors on our Board, including one (1)
Managing Director, one (1) Whole-Time Director, one (1) Executive Director, and three (3) Independent Directors.
Our Company is in compliance with the corporate governance laws prescribed under the SEBI Listing Regulations
and the Companies Act in relation to the composition of our Board and constitution of committees thereof.
Board of Directors
The following table sets forth the details of our Board as on the date of filing of this Draft Red Herring Prospectus:
Name, designation, current term, period of
directorship, address, occupation, date of birth Directorships in other companies Age
and DIN
Sanjay Tyagi 1. Technocraft Developers Private 60 years
Limited
Designation: Managing Director (“MD”) 2. Technoultra Engineers Private Limited
Address: B-27, Sector-49, Noida, Gautam Budh
Nagar, Uttar Pradesh-201301, India
Occupation: Business
Current term: For a period of five years with effect
from May 10, 2025*
Period of Directorship: Director since April 02,
2007
DIN: 01446861
Date of birth: January 02, 1965
Rekha Tyagi 1. Technocraft Developers Private 57 years
Limited
Designation: Executive Director 2. Technoultra Engineers Private Limited
Address: B-27, Sector-49, Noida, Gautam Budh
Nagar, Uttar Pradesh-201301, India
Occupation: Business
Current term: Liable to retire by rotation**
Period of Directorship: Director since October 21,
1998
DIN: 02556586
303Date of birth: June 21, 1968
Kartikey Tyagi Nil 27 years
Designation: Whole-Time Director & Chief
Financial Officer
Address: B-27, Near Prayag Hospital, Sector-49,
Noida, Gautam Budh Nagar, Uttar Pradesh-201301,
India
Occupation: Business
Current term: For a period of five years with effect
from April 21, 2025***
Period of Directorship: Director since May 29, 2023
DIN: 09471808
Date of birth: January 01, 1998
Mukesh Kumar Garg 1. EMS Limited 66 years
2. Salasar Techno Engineering Limited
Designation: Independent Director 3. Hi-Tech Pipes Limited
Address: Flat No. 2714, Eternia Tower, Mahagun
Mezzaria, Sector-78, Noida, Gautam Buddha Nagar,
Uttar Pradesh-201301, India
Occupation: Professional
Current term: For a period of five years with effect
from June 10, 2025
Period of Directorship: Director since June 10, 2025
DIN: 08936325
Date of birth: June 28, 1959
Bhawna Saunkhiya 1. Checkpoint Trends Limited 35 years
2. Wonder Electricals Limited
Designation: Independent Director
Address: H-186, Pratap Vihar, Sector-12,
Ghaziabad, Uttar Pradesh-201009, India
Occupation: Professional
Current term: For a period of five years with effect
from July 15, 2024
304Period of Directorship: Director since July 15, 2024
DIN: 10683032
Date of birth: October 09, 1989
Shruti Gupta 1. Checkpoint Trends Limited 34 years
2. Garg Furnace Limited
Designation: Independent Director 3. Mercury Trade Links Limited
4. Super Fine Knitters Limited
Address: B-34/4381 Durga Puri, Hailbowal Kalan,
Near Rajendra School, Bharat Bagar Chowk,
Ludhiana, Punjab-141001, India
Occupation: Professional
Current term: For a period of five years with effect
from July 15, 2024
Period of Directorship: Director since July 15, 2024
DIN: 10310259
Date of birth: February 26, 1991
**Sanjay Tyagi was appointed as an Additional Director of the Company w.e.f. April 02, 2007. Thereafter,
pursuant to the approval of members at the EGM held on May 10, 2007, his directorship was regularized, and he
was also appointed as the Managing Director of the Company w.e.f. May 10, 2007, for a period of five (5) years.
Subsequently, pursuant to a resolution passed at the AGM held on September 30, 2011, he was re-appointed as
the CMD of the Company, w.e.f. May 10, 2012, for a period of five (5) years. Thereafter, pursuant to a resolution
passed at the AGM held on September 30, 2016, he was re-appointed as the CMD of the Company, w.e.f. May 10,
2017, for a period of five (5) years. He was further re-appointed as CMD of the Company w.e.f. May 10, 2022,
for a period of three (3) years, pursuant to a resolution passed at the AGM held on November 30, 2021.
Subsequently, pursuant to a resolution passed at the Board Meeting held on April 14, 2025, he was re-appointed
as the Managing Director of the Company, for a period of five (5) years with effect from May 10, 2025. Thereafter,
pursuant to a Board Resolution, he was re-designated as the Chairman and Managing Director (CMD) of the
Company, w.e.f. May 29, 2025. He was further re-designated as Managing Director of the Company w.e.f. June
12, 2025 and resigned from post the post of Chairman.
Further, requisite E-Forms for the re-appointment of Sanjay Tyagi as Managing Director, dated September 30,
2011, September 30, 2016 and May 10, 2022, were not filed. For more details, kindly refer “Risk Factor No. 06-
Our Company was incorporated in the year 1998 and some of our corporate records including forms filed with
the Registrar of Companies are not traceable & we have not filed certain forms with Registrar of Companies.
Certain forms we cannot assure you that these forms filings will be available in the future or that we will not be
subject to any penalties imposed by the relevant regulatory authority in this respect which may impact our
financial condition and reputation.” on page 45.
**Rekha Tyagi was appointed as one of the first Directors of the Company at the time of its incorporation i.e.,
October 21, 1998, and has been serving as an Executive Director since then.
***Kartikey Tyagi was appointed as a Non-Executive Additional Director of the Company w.e.f. January 19,
2022, and was regularised as an Executive Director pursuant to the approval of the members in the EGM held on
February 06, 2023. He resigned from the post of Director w.e.f. March 17, 2023. Thereafter, he was appointed as
an Additional Executive Director of the Company w.e.f. May 29, 2023 and was subsequently regularized as an
305Executive Director pursuant to the approval of the members in the EGM held on January 06, 2024. He was
appointed as the Chief Financial Officer of the Company pursuant to a board resolution passed on April 21, 2025,
and was also appointed as the Whole-Time Director of the Company for a period of five (5) years w.e.f. April 21,
2025, pursuant to a special resolution passed by the shareholders at the EGM held on the same date.
For further details, kindly refer “Risk Factor No. 06 - Our Company was incorporated in the year 1998 and some
of our corporate records including forms filed with the Registrar of Companies are not traceable & we have not
filed certain forms with Registrar of Companies. Certain forms we cannot assure you that these forms filings will
be available in the future or that we will not be subject to any penalties imposed by the relevant regulatory
authority in this respect which may impact our financial condition and reputation.” beginning on page 45.
Brief profiles of our Directors
Sanjay Tyagi is the Managing Director of our Company. He holds a Bachelor of Science degree from Meerut
University and a diploma in civil engineering from Aligarh Muslim University. He has over 35 years of experience
in the infrastructure sector and is responsible for overseeing the Company’s operations, including procurement,
financial management and project execution. He previously served as an Engineer at Ghaziabad Development
Authority from 1990 to 2007 and was designated as the Uttar Pradesh State Chairman of the Builders Association
of India from 2022 to 2024 and 2025 to 2026. He has been associated with our Company since 2007.
Rekha Tyagi is an Executive Director of our Company. She has over 26 years of experience in administration,
human resources, and marketing functions. She has been associated with the Company since its incorporation.
She oversees human resources and marketing functions, playing a key role in talent acquisition, employee
engagement, and maintaining a positive work environment.
Kartikey Tyagi is the Whole-Time Director and Chief Financial Officer of our Company. He holds a Bachelor of
Arts degree in mathematical economics with a minor in computer science from the University of Pennsylvania.
With an experience of over 4 years, he has been associated with the Company since January 2021, previously
serving as Head of Finance. He has been serving as a Director of the Company since 2023as a second-generation,
he is actively involved in all the financial matters of the Company and tender participation, project execution, and
operations. His academic background, combined with expertise in data-driven decision-making and analytical
methodologies, contributes to business development, project evaluation, and strategic planning.
Mukesh Kumar Garg is an Independent Director of our Company. He holds a Bachelor of Technology (Civil
Engineering) degree from Govind Ballabh Pant Krishi Evam Praudyogik Vishwavidyalaya, Pantnagar, a Master
of Technology (Structural Engineering) degree from the Indian Institute of Technology, Delhi, and Post Graduate
Diplomas in Management and Financial Management from Indira Gandhi National Open University. He retired
as Chief Administrative Officer (Construction), North Central Railway, in June 2019, having served in the Indian
Railways for over 34 years. He has experience in project planning, tender evaluation, contract and construction
management, budgeting, and financial control. He has working experience as a team leader for railway department
in the Intercontinental Consultants and Technocrats Pvt Ltd (ICT) from March 2022 to 2024.
Bhawna Saunkhiya is an Independent Director of our Company. She is an associate member of the Institute of
Company Secretaries of India and has also passed the Intermediate examination conducted by the Institute of
Chartered Accountants of India. She has been associated with our Company since 2024. She previously served as
Company Secretary at Samwon Precision Mould MFG. (India) Private Limited.
Shruti Gupta is an Independent Director of our Company. She holds a Bachelor of Business Administration
degree from Punjab University, Chandigarh, and is an associate of the Institute of Company Secretaries of India.
She has been associated with our Company since 2024. She previously worked with the Ministry of Corporate
Affairs on a contractual basis and has held company secretary roles at Marshall Machines Limited and Super Fine
Knitters Limited.
306Relationship between our Directors and Key Managerial Personnel and Senior Management Personnel
Except as mentioned below, none of our other Directors are related to each other or to any of our Key Managerial
Personnel or Senior Management Personnel:
Name Designation Relationship
Husband of Rekha Tyagi, Father of Kartikey Tyagi and
Sanjay Tyagi Managing Director
Cousin Brother of Rajiv Tyagi
Wife of Sanjay Tyagi and Mother of Kartikey Tyagi and
Rekha Tyagi Executive Director
Sister-in-Law of Rajiv Tyagi
Whole - Time Director and Son of Sanjay Tyagi and Rekha Tyagi, and Nephew of
Kartikey Tyagi
Chief Financial Officer Rajiv Tyagi
Senior Management Cousin Brother of Sanjay Tyagi, Brother-in-Law of
Rajiv Tyagi
Personnel Rekha Tyagi and Uncle of Kartikey Tyagi
Arrangement or understanding with major shareholders, customers, suppliers or others.
None of our Directors have been nominated, appointed or selected pursuant to any arrangement or understanding
with our major Shareholders, customers, suppliers or others.
For further details, kindly refer “Our History and Certain Corporate Matters” beginning on page 297.
Payment or benefit to Directors of our Company
In Fiscal 2025, our Company has not paid any compensation or granted any benefit on an individual basis to any
of our Directors other than remuneration paid to them for such period.
Terms of appointment of our Executive Directors
Sanjay Tyagi, Managing Director
Pursuant to a Board Resolution dated April 11, 2024 & the certificate issued by Rishi Kapoor & Company,
Chartered Accountants pursuant to their certificate dated August 04, 2025 vide UDIN 25455362BMGILP1616,
he was paid remuneration and perquisites, of ₹ 12.00 million for FY 2024-25.
Pursuant to service Agreement dated April 14, 2025, the remuneration that Sanjay Tyagi is entitled to receive in
the FY 2025-26, and the other terms of his employment are enumerated below:
Sr. No. Particulars Remuneration per annum (₹ million)
1. Salary ₹12.00 million
Total ₹12.00 million
Rekha Tyagi, Executive Director
Rekha Tyagi was appointed as one of the first Directors of the Company during its incorporation. Further, pursuant
to a board resolution dated April 11, 2024, she was paid remuneration and perquisites, of ₹ 3.00 million for FY
2024-25.
Pursuant to service Agreement dated June 01, 2025& the certificate issued by Rishi Kapoor & Company,
Chartered Accountants pursuant to their certificate dated August 04, 2025 vide UDIN 25455362BMGILP1616,
the remuneration that Rekha Tyagi is entitled to receive in the FY 2025-26, and the other terms of her employment
are enumerated below:
Sr. No. Particulars Remuneration per annum (₹ million)
1. Salary ₹3.00 million
Total ₹3.00 million
307Kartikey Tyagi, Whole-Time Director and Chief Financial Officer
Pursuant to a Board Resolution dated April 11, 2024 & the certificate issued by Rishi Kapoor & Company,
Chartered Accountants pursuant to their certificate dated August 04, 2025 vide UDIN 25455362BMGILP1616,
he was paid remuneration and perquisites, of ₹ 6.00 million for FY 2024-25.
Pursuant to service Agreement dated June 01, 2025, the remuneration that Kartikey Tyagi is entitled to receive in
the FY 2025-26, and the other terms of his employment are enumerated below:
Sr. No. Particulars Remuneration per annum (₹ million)
1. Salary ₹6.00 million
Total ₹6.00 million
Compensation paid to our Non-Executive Directors
As on the date of this Draft Red Herring Prospectus, our Company does not have any Non-Executive Directors
other than Independent Directors. Our Independent Directors are not entitled to any commission or remuneration
from our Company except sitting fees for attending meetings of the Board and its committees.
Independent Directors
Our Independent Directors will be entitled to receive sitting fees for attending meetings of the Board and
committee meetings pursuant to a board resolution dated June 12, 2025, at ₹25,000 per Board meeting and ₹12,500
per Committee meeting.
Remuneration paid or payable to our Directors from our Subsidiary
As on date of this Draft Red Herring Prospectus, our Company does not have a subsidiary.
Contingent and deferred compensation payable to the Directors
As on the date of this Draft Red Herring Prospectus, there is no contingent or deferred compensation payable to
any of our Directors for FY 2025.
Bonus or profit-sharing plan for our Directors
Our Company does not have any bonus or profit-sharing plan for our Directors.
Shareholding of our Directors in our Company
The Articles of Association of our Company do not require our Directors to hold qualification shares.
Except as mentioned below, none of our Directors hold Equity Shares in our Company, as on date of this Draft
Red Herring Prospectus:
Percentage of the pre- Percentage of the post-
Number of Equity
Name of the Director offer paid up share offer paid up
Shares held
capital (%) share capital (%)
Sanjay Tyagi 1,212,000 4.03 [●]
Rekha Tyagi 395,200 1.31 [●]
Kartikey Tyagi 600,000 1.99 [●]
Interest of Directors
All our Directors may be deemed to be interested to the extent of remuneration paid to them, if any, sitting fees
and reimbursement of expenses payable, if any, payable to them for attending meetings of the Board of Directors
or committees thereof.
Our Directors may also be interested to the extent of the Equity Shares held by them or by entities in which they
308are associated as promoters, directors, partners, proprietors, or trustees, or held by their relatives, and to the extent
of any dividend or other distribution payable in respect of such Equity Shares. They may further be deemed to be
interested in the Equity Shares that may be subscribed by or allotted to companies, firms, ventures, or trusts in
which they are interested as promoters, directors, partners, proprietors, members, or trustees, pursuant to the Offer.
For further details regarding the shareholding of our Directors, kindly refer “Capital Structure – Shareholding of
our Directors, Key Managerial Personnel and Senior Management Personnel in our Company” beginning on
page 118.
Further, our Directors may also be directors on the board, or shareholders, karta, trustees, proprietors, members
or partners, of entities with which our Company has transactions and may be deemed to be interested to the extent
of the payments made by our Company, or services provided by our Company, if any, to these entities.
Interest in land and property
None of our Directors have any interest in any property acquired in the preceding three years or proposed to be
acquired from our Company or by our Company.
Interest in promotion of our Company
Except Sanjay Tyagi, Rekha Tyagi and Kartikey Tyagi, who are the Individual Promoters and Directors of our
Company, none of our Directors have any interest in the promotion of our Company, as on the date of this Draft
Red Herring Prospectus.
Loans to Directors
Except as disclosed in “Restated Consolidated Financial Information – Annexure 44- Related Party Transactions”
beginning on page 395, as on the date of this Draft Red Herring Prospectus, no loans have been availed by our
Directors from our Company.
Confirmations
None of our Directors is or has been a director on the board of any listed company whose shares have been/were
suspended from being traded on any of the stock exchanges, during his/her tenure, in the five years preceding the
date of this Draft Red Herring Prospectus.
None of our Directors have been or are directors on the board of any listed companies which is or has been delisted
from any stock exchange(s) during his/her tenure.
None of our Directors have been declared as Wilful Defaulters or Fraudulent Borrowers by any bank or financial
institution or consortium thereof, in accordance with the guidelines on Wilful Defaulters or Fraudulent Borrowers
issued by Reserve Bank of India.
None of our Directors has been declared a fugitive economic offender in accordance with the Fugitive Economic
Offenders Act, 2018.
No consideration in cash or shares or otherwise has been paid, or agreed to be paid to any of our Directors, or to
the firms or companies in which they are interested as a member by any person either to induce such director to
become, or to help such director to qualify as a Director, or otherwise for services rendered by him/her or by the
firm or company in which he/she is interested, in connection with the promotion of our Company.
Changes to our Board in the last three years
Following changes have been made to our Board during the three years immediately preceding the date of this
Draft Red Herring Prospectus:
309Name of the Director Date of Event Nature of Event Reason for the changes
Kartikey Tyagi February 06, 2023 Regularization Regularization as an
Executive Director of the
Company.
Kartikey Tyagi March 17, 2023 Resignation Cessation due to resignation
owing to preoccupation
Kartikey Tyagi May 29, 2023 Appointment Appointment as an
Additional Executive
Director of the Company.
Kartikey Tyagi January 06, 2024 Regularization Regularization as an
Executive Director of the
Company.
Monam Kapoor July 15, 2024 Appointment Appointed as an Independent
Director
Shruti Gupta July 15, 2024 Appointment Appointed as an Independent
Director
Bhawna Saunkhiya July 15, 2024 Appointment Appointed as an Independent
Director
Sanjay Tyagi April 14, 2025 Re-appointment Re-appointed as Managing
Director for Five Years.
Kartikey Tyagi April 21, 2025 Change in Designation Appointment as Whole-time
Director and Chief Financial
Officer of the Company
Sanjay Tyagi May 29, 2025 Re-designated Re-designated as Chairman
and Managing Director
(CMD)
Mukesh Kumar Garg June 10, 2025 Appointment Appointment as an
Independent Director
Monam Kapoor June 12, 2025 Resignation Cessation due to resignation
owing to preoccupation
Sanjay Tyagi June 12, 2025 Re- Re-designated as Managing
designation/Resignation Director and resignation from
post of Chairman
Borrowing Powers
In accordance with our Articles of Association and subject to the provisions of the Companies Act, pursuant to a
resolution passed by our Shareholders in its extraordinary general meeting dated July 15, 2024, in accordance
with Section 180 of the Companies Act, our Board is authorised to borrow such sums of money from time to time,
with or without security, on such terms and conditions as it may consider fit notwithstanding that the amount to
be borrowed together with the amount already borrowed by our Company (apart from temporary loans obtained
from our Company’s bankers in the ordinary course of business) exceeds the aggregate of the paid up capital and
free reserves of our Company provided that the total amount borrowed by our Board and outstanding at any point
of time shall not exceed ₹6,000.00 million.
Corporate Governance
The provisions of the Companies Act along with the SEBI Listing Regulations, with respect to corporate
governance, will be applicable to our Company immediately upon the listing of the Equity Shares on the Stock
Exchanges. Our Company is in compliance with the requirements of the applicable regulations for corporate
governance in accordance with the SEBI Listing Regulations, and the Companies Act including those pertaining
to the constitution of the Board and committees thereof.
310Our Board has been constituted in compliance with the Companies Act, 2013 and the SEBI Listing Regulations
and in accordance with corporate governance practices. The Board of Directors function either as a full board, or
through various committees constituted to oversee specific operational areas.
As on the date of filing this Draft Red Herring Prospectus, our Company currently has six (6) Directors, including
one (1) Managing Director, one (1) Whole-Time Director and Chief Financial Officer, one (1) Executive Director,
and three (3) Independent Directors.
Committees of our Board
In terms of the SEBI Listing Regulations and the provisions of the Companies Act, our Company has constituted
the following below mentioned Board committees. In addition to these, our Board may from time to time,
constitute committees for various functions.
(a) Audit Committee;
(b) Nomination and Remuneration Committee;
(c) Stakeholders’ Relationship Committee;
(d) Corporate Social Responsibility Committee;
(e) Risk Management Committee; and
(f) IPO Committee.
Audit Committee
The Audit Committee was reconstituted by a resolution passed by our Board dated June 12, 2025. The Audit
Committee is in compliance with Section 177 of the Companies Act and Regulation 18 of the SEBI Listing
Regulations. The current constitution of the Audit committee is as follows:
Name of Director Designation Committee Designation
Bhawna Saunkhiya Independent Director Chairperson
Shruti Gupta Independent Director Member
Sanjay Tyagi Managing Director Member
The Company Secretary of our Company shall serve as the secretary of the Audit Committee.
The scope and function of the Audit Committee, adopted pursuant to a resolution of our Board dated June 12,
2025, is in accordance with Section 177 of the Companies Act and Regulation 18 of the SEBI Listing
Regulations. Its terms of reference are as follows:
Scope of the Audit Committee
The role of the audit committee shall include the following –
a. the recommendation for appointment, remuneration and terms of appointment of auditors of the
company;
b. review and monitor the auditor's independence and performance, and effectiveness of audit process;
c. examination of the financial statement and the auditors' report thereon;
d. approval or any subsequent modification of transactions of the company with related parties;
The Audit Committee may make omnibus approval for related party transactions proposed to be entered into by
the company.
In case any transaction involving any amount not exceeding one crore rupees is entered into by a director or officer
of the company without obtaining the approval of the Audit Committee and it is not ratified by the Audit
Committee within three months from the date of the transaction, such transaction shall be voidable at the option
of the Audit Committee and if the transaction is with the related party to any director or is authorized by any other
director, the director concerned shall indemnify the company against any loss incurred by it.
311a. scrutiny of inter-corporate loans and investments;
b. valuation of undertaking or assets of the company, where it is necessary;
c. evaluation of internal financial controls and risk management systems;
d. monitoring the end use of funds raised through public offers and related matters.
The Audit Committee may call for the comments of the auditors about internal control systems, the scope of audit,
including the observations of the auditors and review of financial statement before their submission to the Board
and may also discuss any related issues with the internal and statutory auditors and the management of the
company.
The Audit Committee shall have authority to investigate into any matter mentioned above or referred to it by the
Board and for this purpose shall have power to obtain professional advice from external sources and have full
access to information contained in the records of the company.
The auditors of a company and the key managerial personnel shall have a right to be heard in the meetings of the
Audit Committee when it considers the auditor's report but shall not have the right to vote.
The Board's report under sub-section (3) of section 134 shall disclose the composition of the Audit Committee
and where the Board had not accepted any recommendation of the Audit Committee, the same shall be disclosed
in such report along with the reasons therefore.
The chairperson of the Audit Committee in appropriate or exceptional cases shall have direct access for adequate
safeguards against victimization of persons who use such the Vigil Mechanism.
Terms of reference, role & responsibilities and power of the Committee shall be as follows:
a. Recommendation for appointment, remuneration and terms of appointment of auditors of the company;
b. Review and monitor the auditor's independence and performance, and effectiveness of audit process;
c. Examination of the financial statement and the auditors' report thereon;
d. Approval or any subsequent modification of transactions of the company with related parties;
e. Overseeing of the Company's financial reporting process and the disclosure of its financial information to
ensure that the financial statement is correct, sufficient and credible;
f. Approval of payment to statutory auditors for any other services rendered by the statutory auditors;
g. Formulation of a policy on related party transactions, which shall include materiality of related party
transactions and making of omnibus approval of related party transactions;
h. Reviewing, with the management the annual financial statements and auditors report thereon before
submission to the board for approval, with particular reference to;
a. Matters required to be included in the Director's Responsibility Statement to be included in the
Board's report in terms of clause (c) of sub-section 3 of Section 134 of the Companies Act, 2013;
b. Changes, if any, in accounting policies and practices and reasons for the same;
c. Major accounting entries involving estimates based on the exercise of judgment by management;
d. Significant adjustments made in the financial statements arising out of audit findings;
e. Compliance with listing and other legal requirements relating to financial statements;
f. Disclosure of any related party transactions;
g. Modified opinion(s) in the draft audit report;
i. Reviewing, with the management, the quarterly, half yearly and Annual financial statements before
submission to the Board for approval;
j. Reviewing, with the management, the statement of uses / application of funds raised through an issue (public
issue, rights issue, preferential issue, etc.), the statement of funds utilized for purposes other than those stated
in the offer document / prospectus / notice and the report submitted by the monitoring agency monitoring
the utilization of proceeds of a public or rights issue, and making appropriate recommendations to the Board
to take up steps in this matter;
k. Review and monitor the auditor's independence and performance, and effectiveness of audit process;
l. Approval or any subsequent modification of transactions of the listed entity with related parties includes
omnibus approval for related party transactions subject to conditions as specified under rules;
m. Scrutiny of inter-corporate loans and investments;
312n. Valuation of undertakings or assets of the Company, wherever it is necessary;
o. Evaluation of internal financial controls and risk management systems;
p. Reviewing, with the management, performance of statutory and internal auditors, adequacy of the internal
control systems;
q. Reviewing the adequacy of internal audit function, if any, including the structure of the internal audit
department, staffing and seniority of the official heading the department, reporting structure coverage and
frequency of internal audit;
r. Discussion with internal auditors of any significant findings and follow up there on;
s. Reviewing the findings of any internal investigations by the internal auditors into matters where there is
suspected fraud or irregularity or a failure of internal control systems of a material nature and reporting the
matter to the Board;
t. Discussion with statutory auditors before the audit commences, about the nature and scope of audit as well
as post-audit discussion to ascertain any area of concern;
u. To look into the reasons for substantial defaults in the payment to the depositors, debenture holders,
shareholders (in case of non-payment of declared dividends) and creditors;
v. To oversee and review the functioning of the vigil mechanism pursuant the provisions of Rule 7 of the
Companies (Meetings of Board and its Powers) Rules, 2014 read with sub-section 9 and 10 of Section 177
of the Companies Act, 2013, which shall provide for adequate safeguards against victimization of employees
and directors who avail of the vigil mechanism and also provide for direct access to the Chairperson of the
Audit Committee in appropriate and exceptional cases
w. Approval of appointment of chief financial officer after assessing the qualifications, experience and
background, etc. of the candidate;
x. To investigate any other matters referred to by the Board of Directors;
y. Carrying out any other function as is mentioned in the terms of reference of the audit Committee.
z. Reviewing the utilization of loans and/ or advances from/investment by the holding company in the
subsidiary exceeding ₹100 crore or 10% of the asset size of the subsidiary, whichever is lower including
existing loans/ advances / investments existing as on the date of coming into force of this provision.
aa. Consider and comment on rationale, cost-benefits and impact of schemes involving merger, demerger,
amalgamation etc., on the listed entity and its shareholders.
Powers of the Audit Committee are as follows:
a. To investigate any activity within its terms of reference.
b. To seek information from any employee.
c. To obtain outside legal or other professional advice.
d. To secure attendance of outsiders with relevant expertise if it considers necessary.
The audit committee shall also mandatorily review the following information:
a. Management discussion and analysis of financial conditions and results of operations;
b. Statement of significant related party transactions (as defined by the audit committee), submitted by
management;
c. Management letters / Letter of internal control weaknesses issued by the statutory auditors;
d. internal audit reports relating to internal control weaknesses; and
e. The appointment, removal and terms of remuneration of the internal auditor shall be subject to review
by the Audit Committee;
f. Statement of deviations: (a) half yearly statement of deviation(s) submitted to stock exchange(s) in terms
of Regulation 32(1) of the SEBI ICDR Regulations. (b) annual statement of funds utilized for purposes
other than those stated in the offer document/prospectus/notice in terms of Regulation 32(l) of the SEBI
ICDR Regulations.
The chairperson of the Audit Committee in appropriate or exceptional cases shall have direct access for adequate
safeguards against victimization of persons who use such the Vigil Mechanism.
313Nomination and Remuneration Committee
The Nomination and Remuneration committee was reconstituted by a resolution passed by our Board dated June
12, 2025. The Nomination and Remuneration Committee is in compliance with Section 178 of the Companies Act
and Regulation 19 of the SEBI Listing Regulations. The current constitution of the Nomination and Remuneration
committee is as follows:
Name of Director Designation Committee Designation
Shruti Gupta Independent Director Chairperson
Bhawna Saunkhiya Independent Director Member
Mukesh Kumar Garg Independent Director Member
The scope and functions of the Nomination and Remuneration Committee, adopted pursuant to a resolution of our
Board dated June 12, 2025, is in accordance with Section 178 of the Companies Act, read with Regulation 19
of the SEBI Listing Regulations.
The Nomination and Remuneration Committee will identify persons who are qualified to become Directors and
who may be appointed in senior management in accordance with the criteria laid down, recommend to the Board
their appointment and removal and will specify the manner for effective evaluation of performance of Board, its
committees and individual Directors to be carried out either by the Board, by the Nomination and Remuneration
Committee or by an independent external agency and review its implementation and compliance.
The Chairman of the committee or, in his absence, any other member of the committee authorized by him, in this
behalf shall attend the general meetings of the company.
Shruti Gupta, Non-Executive Independent Director, be and is hereby nominated as the Chairperson of the NRC
Committee and Company Secretary, be and is hereby appointed as the Secretary of the Committee.
Terms of reference, role & responsibilities and power of the Committee shall be as follows:
1. Formulation of the criteria for determining qualifications, positive attributes and independence of a
director and recommend to the Board a policy, relating to the remuneration of the directors, key
managerial personnel and other employees;
2. For every appointment of an independent director, the Nomination and Remuneration Committee shall
evaluate the balance of skills, knowledge and experience on the Board and on the basis of such
evaluation, prepare a description of the role and capabilities required of an independent director. The
person recommended to the Board for appointment as an independent director shall have the capabilities
identified in such description. For the purpose of identifying suitable candidates, the Committee may:
a. Use the services of an external agencies, if required;
b. Consider candidates from a wide range of backgrounds, having due regard to diversity; and
c. Consider the time commitments of the candidates.
3. Formulation of criteria for evaluation of Independent Directors and the Board;
4. Devising a policy on Board diversity;
5. Identifying persons who are qualified to become directors and who may be appointed in senior
management in accordance with the criteria laid down, and recommend to the Board their appointment
and removal;
6. Whether to extend or continue the term of appointment of the independent director, on the basis of the
report of performance evaluation of independent directors;
7. To ensure that the relationship of remuneration to performance is clear and meets appropriate
performance benchmarks
8. Perform such other activities as may be delegated by the Board or specified/ provided under the
Companies Act, 2013 to the extent notified and effective, as amended or by the Securities and Exchange
Board of India (Listing Obligations and Disclosure Requirements) Regulations, 2015, as amended or by
any other applicable law or regulatory authority.
314Stakeholders’ Relationship Committee
The Stakeholders’ Relationship Committee was constituted by a resolution of our Board dated May 29, 2025.
The current constitution of the Stakeholders’ Relationship Committee is as follows:
Name of Director Designation Committee Designation
Bhawna Saunkhiya Independent Director Chairperson
Sanjay Tyagi Managing Director Member
Kartikey Tyagi Whole-Time Director and Chief Member
Financial Officer
Terms of reference, role & responsibilities and power of the Committee shall be as follows:
i. Resolving the grievances of the security holders of the Company, including complaints related to
transfer/transmission of shares, non-receipt of annual report, non-receipt of declared dividends, issue of
new/duplicate certificates, general meetings, etc.
ii. Review of measures taken for effective exercise of voting rights by shareholders;
iii. Review of adherence to the service standards adopted by the Company in respect of various services
rendered by the registrar and share transfer agent and to recommend measures for overall improvement in
the quality of investor service;
iv. Review of the various measures and initiatives taken by the Company for reducing the quantum of
unclaimed dividends and ensuring timely receipt of dividend warrants/annual reports/statutory notices by
the shareholders of the Company; and
v. Formulate procedures in line with the statutory guidelines to ensure speedy disposal of various requests
received from shareholders from time to time;
vi. Approve, register, refuse to register transfer or transmission of shares and other securities;
vii. Sub-divide, consolidate and or replace any share or other securities certificate(s) of the Company;
viii. Allotment and listing of shares;
ix. Authorise affixation of common seal of the Company;
x. Issue duplicate share or other security(ies) certificate(s) in lieu of the original share/security(ies)
certificate(s) of the Company;
xi. Approve the transmission of shares or other securities arising as a result of death of the sole/any joint
shareholder;
xii. Dematerialize or rematerialize the issued shares;
xiii. Ensure proper and timely attendance and redressal of investor queries and grievances;
xiv. Investigating complaints relating to allotment of shares, approval of transfer or transmission of shares,
debentures or any other securities;
xv. Advising for giving effect to all transfer/transmission of shares and debentures, dematerialisation of shares
and re-materialisation of shares, split and issue of duplicate/consolidated share certificates, compliance
with all the requirements related to shares, debentures and other securities from time to time;
xvi. Carry out any other functions contained in the Companies Act, 2013 (including Section 178) and/or equity
listing agreements (if applicable), as and when amended from time to time;
xvii. Further delegate all or any of the power to any other employee(s), officer(s), representative(s),
consultant(s), professional(s), or agent(s); and
xviii. Carrying out such other functions as may be specified by the Board from time to time or specified/provided
under the Companies Act or SEBI Listing Regulations, or by any other regulatory authority.
The chairperson of the committee or, in her absence, any other member of the committee authorized by her, in
this behalf shall attend the general meetings of the company.
The Stakeholders’ Relationship Committee will consider and resolve the grievances of security holders of the
company.
315Corporate Social Responsibility Committee
The Corporate Social Responsibility Committee was reconstituted by a resolution of our Board dated June 12,
2025. The current constitution of the Corporate Social Responsibility committee is as follows:
Name of Director Designation Committee Designation
Bhawna Saunkhiya Independent Director Chairperson
Sanjay Tyagi Managing Director Member
Kartikey Tyagi Whole-Time Director and Chief Member
Financial Officer
The scope and function of the Corporate Social Responsibility Committee, adopted pursuant to a resolution of our
Board dated June 12, 2025, is in accordance with Section 135 of the Companies Act.
The committee be and is hereby vested with the following roles and responsibilities:
a. formulate and recommend to the Board, a Corporate Social Responsibility Policy which shall indicate
the activities to be undertaken by the company in areas or subject, specified in Schedule VII of the Act;
b. formulate and recommend to the Board, an annual action plan in pursuance of its CSR policy, which shall
include the following, namely;
c. the list of CSR projects or programmes that are approved to be undertaken in areas or subjects specified
in Schedule VII of the Act;
d. the manner of execution of such projects or programmes as specified in sub-rule (1) of rule 4;
e. the modalities of utilization of funds and implementation schedules for the projects or programmes;
f. monitoring and reporting mechanism for the projects or programmes; and details of need and impact
assessment, if any, for the projects undertaken by the company;
g. recommend the amount of expenditure to be incurred on the CSR activities; and
h. monitor the Corporate Social Responsibility Policy of the company from time to time.
Risk Management Committee
The Risk Management Committee was constituted by a resolution of our Board dated May 29, 2025. The current
constitution of the Risk Management Committee is as follows:
Name of Director Designation Committee Designation
Sanjay Tyagi Managing Director Chairman
Kartikey Tyagi Whole-Time Director and Chief Member
Financial Officer
Shruti Gupta Independent Director Member
Pursuant to Section 134 of the Companies Act, 2013 read with the rules made thereunder, the Board’s Report must
include a statement indicating development and implementation of a risk management policy for the company
including identification of elements of risk, if any, which in the opinion of the board may threaten the existence
of the company.
Terms of reference, role & responsibilities and power of the Committee shall be as follows:
1) To formulate a detailed risk management policy which shall include:
a. A framework for identification of internal and external risks specifically faced by the Company, in
particular including financial, operational, sectoral, sustainability (particularly, environmental social
and governance related risks), information, cyber security risks or any other risk as may be determined
by the Committee.
b. Measures for risk mitigation including systems and processes for internal control of identified risks.
c. Business continuity plan.
3162) To ensure that appropriate methodology, processes and systems are in place to monitor and evaluate risks
associated with the business of the Company;
3) To co-ordinate its activities with other committees, in instances where there is any overlap with activities of
such committees, as per framework laid down by the board of directors;
4) To monitor and oversee implementation of the risk management policy, including evaluating the adequacy
of risk management systems;
5) To periodically review the risk management policy, at least once in two years, including by considering the
changing industry dynamics and evolving complexity;
6) To keep the board of directors informed about the nature and content of its discussions, recommendations
and actions to be taken;
7) To approve major decisions affecting the risk profile or exposure and give appropriate directions;
8) To consider the effectiveness of decision-making process in crisis and emergency situations;
9) To balance risks and opportunities;
10) To generally, assist the Board in the execution of its responsibility for the governance of risk;
11) To seek information from any employee, obtain outside legal or other professional advice and secure
attendance of outsiders with relevant expertise, if it considers necessary;
12) The appointment, removal and terms of remuneration of the Chief Risk Officer (if any) shall be subject to
review by the Risk Management Committee; and
13) Any other similar or other functions as may be laid down by Board from time to time and/or as may be
required under applicable law, as and when amended from time to time, including the SEBI Listing
regulations
IPO Committee
The IPO Committee was constituted by a resolution of our Board dated May 29, 2025. The current constitution
of the IPO committee is as follows:
Name of Director Designation Committee Designation
Sanjay Tyagi Managing Director Chairman
Kartikey Tyagi Whole-Time Director and Chief Member
Financial Officer
Rekha Tyagi Executive Director Member
The terms of reference, the role & responsibilities and power of the IPO Committee shall be as follows:
i. to decide, negotiate and finalize the pricing, the terms of the offer of the Equity Shares and all other related
matters regarding the Pre-IPO Placement, if any, including the execution of the relevant documents with the
investors, in consultation with the book running lead manager (“BRLM”) appointed in relation to the Issue;
ii. to decide in consultation with the BRLM the actual size of the offer and taking on record the number of
equity shares (the “Equity Shares”), and/or reservation on a competitive basis, and/or any rounding off in
the event of any oversubscription and/or any discount to be offered to retail individual bidders or eligible
employees participating in the offer and all the terms and conditions of the Issue, including without limitation
timing, opening and closing dates of the Issue, price band, allocation/allotment to eligible persons pursuant
to the Issue, including any anchor investors, and to accept any amendments, modifications, variations or
alterations thereto;
iii. to appoint, instruct and enter into agreements with the BRLM, and in consultation with BRLM appoint and
enter into agreements with intermediaries, co-managers, underwriters, syndicate members, brokers, escrow
collection bankers, auditors, independent chartered accountants, refund bankers, registrar, grading agency,
industry expert, legal counsels, depositories, printers, monitoring agency advertising agency(ies), and any
other agencies or persons (including any successors or replacements thereof) whose appointment is required
in relation to the offer and to negotiate and finalize the terms of their appointment, including but not limited
to execution of the mandate letters and offer agreement with the BRLM, and the underwriting agreement
with the underwriter, and to terminate agreements or arrangements with such intermediaries;
317iv. to make any alteration, addition or variation in relation to the offer, in consultation with the BRLM or SEBI
or such other authorities as may be required, and without prejudice to the generality of the aforesaid, deciding
the exact Issue structure and the exact component of issue of Equity Shares;
v. to finalize, settle, approve, adopt and arrange for submission of the Draft Red Herring Prospectus (“DRHP”),
the Red Herring Prospectus (“RHP”), the Prospectus, the preliminary and final international wrap and any
amendments, supplements, notices, clarifications, reply to observations, addenda or corrigenda thereto, to
appropriate government and regulatory authorities, respective stock exchanges where the Equity Shares are
proposed to be listed (“Stock Exchanges”), the Registrar of Companies, NCT of Delhi & Haryana
(“Registrar of Companies”), institutions or bodies;
vi. to invite the existing shareholders of the Company to participate in the IPO and offer for sale of the Equity
Shares held by them at the same price as in the Issue;
vii. to take all actions as may be necessary and authorized in connection with the offer for sale and to approve
and take on record the approval of the promoter selling shareholder for offering their Equity Shares in the
offer for sale and the transfer of Equity Shares in the offer for sale;
viii. to issue advertisements in such newspapers and other media as it may deem fit and proper, in consultation
with the relevant intermediaries appointed for the Issue in accordance with the Securities and Exchange
Board of India (Issue of Capital and Disclosure Requirements) Regulations, 2018, as amended (“SEBI ICDR
Regulations”), Companies Act, 2013, as amended and other applicable laws;
ix. to decide the total number of Equity Shares to be reserved for allocation to eligible categories of investors,
if any, and on permitting existing shareholders to sell any Equity Shares held by them;
x. to open separate escrow accounts as the escrow account to receive application monies from anchor investors/
underwriters in respect of the bid amounts and a bank account as the refund account for handling refunds in
relation to the Issue and in respect of which a refund, if any will be made;
xi. to open account with the bankers to the Issue to receive application monies in relation to the Issue in terms
of Section 40(3) of the Companies Act, 2013, as amended;
xii. to negotiate, finalise, sign, execute and deliver or arrange the delivery of the offer agreement, syndicate
agreement, share escrow agreement, escrow and sponsor bank agreement, underwriting agreement,
agreements with the registrar to the Issue, monitoring agency and the advertising agency(ies) and all other
agreements, documents, deeds, memorandum of understanding and other instruments whatsoever with the
registrar to the Issue, legal advisors, auditors, Stock Exchanges, BRLM and other agencies/ intermediaries
in connection with Issue with the power to authorize one or more officers of the Company to execute all or
any of the aforesaid documents;
xiii. to make any applications, seek clarifications, obtain approvals and seek exemptions, if necessary, from the
Stock Exchange, the Securities and Exchange Board of India (“SEBI”), the Reserve Bank of India (“RBI”),
Registrar of Companies, and such other statutory and governmental authorities in connection with the Issue,
as required by applicable law, and to accept, on behalf of the Board, such conditions and modifications as
may be prescribed or imposed by any of them while granting such approvals, exemptions, permissions and
sanctions as may be required, and wherever necessary, incorporate such modifications / amendments as may
be required in the DRHP, RHP and the Prospectus;
xiv. to make in-principle and final applications for listing and trading of the Equity Shares on one or more stock
exchanges, to execute and to deliver or arrange the delivery of the equity listing agreement(s) or equivalent
documentation to the Stock Exchanges and to take all such other actions as may be necessary in connection
with obtaining such listing;
xv. to determine and finalize, in consultation with the BRLM, the price band for the Issue and minimum bid lot
for the purpose of bidding, any revision to the price band and the final Offer price after bid closure, and to
finalize the basis of allocation and to allot the Equity Shares to the successful allottees and credit Equity
Shares to the demat accounts of the successful allottees in accordance with applicable laws and undertake
other matters in connection with or incidental to the Issue, including determining the anchor investor portion,
in accordance with the SEBI ICDR Regulations;
xvi. to issue receipts/allotment advice/confirmation of allocation notes either in physical or electronic mode
representing the underlying Equity Shares in the capital of the Company with such features and attributes as
may be required and to provide for the tradability and free transferability thereof as per market practices and
318regulations, including listing on one or more stock exchange(s), with power to authorize one or more officers
of the Company to sign all or any of the aforementioned documents;
xvii. to approve the code of conduct, suitable insider trading policy, whistle blower/vigil mechanism policy, risk
management policy and other corporate governance requirements considered necessary by the Board or the
IPO Committee or as required under applicable law;
xviii. to seek, if required, the consent and waivers of the parties with whom the Company has entered into various
commercial and other agreements such as Company’s lenders, joint venture partners, all concerned
governmental and regulatory authorities in India or outside India, and any other consents that may be
required in connection with the Issue in accordance with the applicable laws;
xix. to determine the price at which the Equity Shares are offered, allocated, transferred and/or allotted to
investors in the Issue in accordance with applicable regulations in consultation with the BRLM and/or any
other advisors, and determine the discount, if any, proposed to be offered to eligible categories of investors;
xx. to settle all questions, difficulties or doubts that may arise in relation to the Issue, as it may in its absolute
discretion deem fit;
xxi. to do all acts and deeds, and execute all documents, agreements, forms, certificates, undertakings, letters and
instruments as may be necessary for the purpose of or in connection with the Issue;
xxii. to authorize and approve the incurring of expenditure and payment of fees, commissions, brokerage and
remuneration in connection with the Issue;
xxiii. to withdraw the DRHP or RHP or to decide not to proceed with the Issue at any stage, in consultation with
the BRLM and in accordance with the SEBI ICDR Regulations and applicable laws;
xxiv. to submit undertaking/certificates or provide clarifications to the SEBI, Registrar of Companies and the
relevant stock exchange(s) where the Equity Shares are to be listed; and
xxv. to authorize and empower officers of the Company (each, an “Authorized Officer(s)”), for and on behalf of
the Company, to execute and deliver, on a several basis, any agreements and arrangements as well as
amendments or supplements thereto that the Authorized Officer(s) consider necessary, appropriate or
advisable, in connection with the Issue, including, without limitation, engagement letter(s), memoranda of
understanding, the listing agreement(s) with the stock exchange(s), the registrar agreement and
memorandum of understanding, the depositories’ agreements, the offer agreement with the BRLM (and other
entities as appropriate), the underwriting agreement, the syndicate agreement with the BRLM and syndicate
members, the stabilization agreement, the share escrow agreement, the cash escrow and sponsor bank
agreement, confirmation of allocation notes, allotment advice, placement agents, registrar to the Issue,
bankers to the Company, manager, underwriters, escrow agents, accountants, auditors, legal counsel,
depositories, advertising agency(ies), syndicate members, brokers, escrow collection bankers, auditors,
grading agency, monitoring agency and all such persons or agencies as may be involved in or concerned
with the Issue, if any, and to make payments to or remunerate by way of fees, commission, brokerage or the
like or reimburse expenses incurred in connection with the Issue by the BRLM and to do or cause to be done
any and all such acts or things that the Authorized Officer(s) may deem necessary, appropriate or desirable
in order to carry out the purpose and intent of the foregoing resolutions for the Issue; and any such
agreements or documents so executed and delivered and acts and things done by any such Authorized
Officer(s) shall be conclusive evidence of the authority of the Authorized Officer and the Company in so
doing.
319Management Organisation Chart
Board of
Directors
Managing Director
(Mr. Sanjay Tyagi)
(KMP)
Executive
Director Whole Time Director
Independent
(Ms. Rekha and CFO (Kartikey Directors
Tyagi) Tyagi) (KMP)
Company Secretary &
Accounts and Compliance Officer
Finance
SMP (Mr. Saket Surolia)
(KMP)
(1. Rajiv Tyagi-Senior
Vice President
(Operations),
2. Fateh Chand Sharma-
Senior Vice President
(Business Development),
3. Vinay Kumar Shukla -
Vice President
(Engineering) and
4. Umesh Kumar Sharma-
Deputy Chief Financial
Officer)
Buisness Procurement Project
Development Management Manager
320Key Management Personnel
In addition to Sanjay Tyagi, our Managing Director, and Kartikey Tyagi, who serves as both our Whole-Time
Director and Chief Financial Officer, and whose brief profiles are set out in “Our Management – Brief Profiles of
our Directors” beginning on page 306, the details of our other Key Managerial Personnel as on the date of this
Draft Red Herring Prospectus are as follows:
1. Sanjay Tyagi, Managing Director
2. Kartikey Tyagi, Whole-Time Director and Chief Financial Officer
3. Saket Surolia, Company Secretary and Compliance Officer
Brief Profiles of our Key Managerial Personnel
Sanjay Tyagi
Sanjay Tyagi is the Managing Director of our Company, responsible for the overall strategic direction, operations,
and execution of projects across the Company. For his profile, kindly refer “Our Management – Brief Profiles of
our Directors” on page 306. For FY 2024–25, he was paid an aggregate compensation of ₹12.00 million.
Kartikey Tyagi
Kartikey Tyagi is a Whole-Time Director and also serves as the Chief Financial Officer of our Company,
overseeing financial strategy, reporting, operations, fundraising, and tax matters. For his profile kindly refer “Our
Management – Brief Profiles of our Directors” on page 306. For Financial Year 2024-25, he was paid an aggregate
compensation of ₹ 6.00 million.
Saket Surolia
Saket Surolia is the Company Secretary and Compliance Officer of our Company and is responsible for ensuring
managerial, secretarial and regulatory compliances of our Company. He is an associate member of Institute of
Company Secretaries of India. He holds a Master of Commerce (Accountancy & Business Statistics), and a
Bachelor of Commerce from Maharaja Ganga Singh University, Bikaner. Prior to joining our Company, he was
associated with Finlinkers Solutions Private Limited. Since His association with our Company started on April
21, 2025, he was not paid any remuneration for Financial Year 2024-25, his current compensation is ₹ 0.78 million
for Financial Year 2025–26.
Senior Management Personnel
The details of our Senior Management Personnel are as follows:
Rajiv Tyagi is the Senior Vice President - Operations at our Company. He has been associated with our Company
since February 15, 2002, and has over two decades of experience in managing and optimising business processes
across engineering, procurement, and operations. He is responsible for overseeing end-to-end operational
workflows to ensure quality. The remuneration payable to him for Financial Year 2025-26 is ₹ 1.44 million per
annum.
Fateh Chand Sharma is the Senior Vice President – Business Development at our Company. He has been
associated with our Company since April 20, 2004, and has over 20 years of experience in business development
and strategic planning, particularly in the infrastructure sector. He is responsible for developing and executing
growth strategies, managing stakeholder relations, and identifying project opportunities aligned with industry
trends and regulatory frameworks. The remuneration payable to him for Financial Year 2025-26 is ₹ 0.96 million
per annum.
Vinay Kumar Shukla is the Vice President - Engineering of our Company. He has over 20 years of experience
in infrastructure and project management, with expertise in the water and wastewater sector. He has been
associated with our Company since July 25, 2023, and is responsible for leading engineering functions and
321executing large-scale public utility projects. Prior to joining our Company, he was associated with Larsen &
Toubro Limited as Senior Construction Manager (Civil) and a Post Graduate Certificate in Business and Project
Management from SDA Bocconi School of Management. The remuneration payable to him for Financial Year
2025-26 is ₹ 5.74 million per annum.
Umesh Kumar Sharma is the Deputy Chief Financial Officer our Company. He has over 30 years of experience
in accounting, auditing, taxation, and financial management across various industries and professional services
firms. He has been associated with our Company since May 20, 2008, and is responsible for overseeing financial
operations, regulatory compliance, and strategic planning. Prior to joining our Company, he has previously worked
with Anand & Company in audit and taxation roles. He holds a Bachelor of Commerce degree from Meerut
University. The remuneration payable to him for Financial Year 2025-26 is ₹ 1.63 million per annum.
Arrangements and understanding with major shareholders, customers and suppliers
None of our Key Managerial Personnel and Senior Management Personnel have been selected pursuant to any
arrangement or understanding with any major Shareholders, customers or suppliers of our Company, or others.
Status of Key Managerial Personnel and Senior Management Personnel
All our Key Managerial Personnel and Senior Management Personnel are permanent employees of our Company.
Relationship among Key Management Personnel Senior Management Personnel and Directors
Except as disclosed in “Relationship between our Directors and Key Managerial Personnel and Senior
Management Personnel” beginning on page 307, none of our other Key Management Personnel, Senior
Management Personnel and Directors are related to each other.
Bonus or profit-sharing plan of the Key Managerial Personnel and Senior Management Personnel
Our Company has no bonus or profit-sharing plan in which the Key Managerial Personnel and Senior Management
Personnel participate.
Shareholding of the Key Management Personnel and Senior Management Personnel
Other than the shareholding of Sanjay Tyagi, Managing Director and Kartikey Tyagi, who serves as both our
Whole-Time Director and Chief Financial Officer, as specified in “Shareholding of our Directors in our
Company” beginning on page 308 and as disclosed in section “Capital Structure” beginning on page 100, none
of our other Key Managerial Personnel and Senior Management Personnel hold any Equity Shares in our
Company.
Service contracts with Key Managerial Personnel and Senior Management Personnel
Except for Sanjay Tyagi, Managing Director and Kartikey Tyagi, Whole-Time Director and Chief Financial
Officer of our Company and Rekha Tyagi, Executive Director, who has entered into a service contract with our
Company, no other officer of our Company, including our other Directors, Key Managerial Personnel, and Senior
Management Personnel, has entered into any service contract with our Company pursuant to which they are
entitled to any benefits upon termination of employment or retirement.
Contingent and deferred compensation payable to Key Managerial Personnel and Senior Management
Personnel
As on the date of this Draft Red Herring Prospectus, there is no contingent or deferred compensation payable to
our Key Managerial Personnel and Senior Management, which does not form part of their remuneration.
Interest of our Key Management Personnel and Senior Management Personnel
Other than as disclosed in “Interest of Directors” and “Payment or benefits to Key Managerial Personnel and
Senior Management Personnel of our Company”, the Key Managerial Personnel and Senior Management
Personnel of our Company do not have any interest in our Company other than to the extent of the remuneration
322or benefits to which they are entitled to as per their terms of appointment and reimbursement of expenses incurred
by them during the ordinary course of business.
Changes in the Key Management Personnel and Senior Management Personnel in last three years
Except as disclosed below there has been no change in the Key Managerial Personnel and Senior Management
Personnel during the three years immediately preceding the date of this Draft Red Herring Prospectus.
Name of the Director Date of Event Nature of Event Reason for the changes
Sanjay Tyagi April 14, 2025 Re-appointment Re-appointed as Managing
Director for Five Years.
Kartikey Tyagi April 21, 2025 Change in Designation Appointment as Whole-time
Director and Chief Financial
Officer of the Company
Saket Surolia April 21, 2025 Appointment Appointment as Company
Secretary and Compliance
Officer
Sanjay Tyagi May 29, 2025 Re-designated Re-designated as Chairman
and Managing Director
(CMD)
Rajiv Tyagi June 12, 2025 Re-designated Re-designated as Senior Vice
President (Operations)
Fateh Chand Sharma June 12, 2025 Re-designated Re-designated as Senior vice
President (Business
Development)
Vinay Kumar Shukla June 12, 2025 Re-designated Re-designated as Vice
President (Engineering)
Umesh Kumar Sharma June 12, 2025 Re-designated Re-designated as Deputy
Chief Financial Officer
Sanjay Tyagi June 12, 2025 Re- Re-designated as Managing
designated/Resignation Director and resignation from
post of Chairman
Employee Stock Option Plan
Except as disclosed in “Capital Structure” beginning on page 100, our Company does not have any employee
stock option scheme.
Payment or benefits to the Key Management Personnel and Senior Management Personnel (non-salary
related)
No non-salary related amount or benefit has been paid or given to any of our Company’s officers including our
Directors, Key Managerial Personnel and Senior Management Personnel within the two preceding years of this
Draft Red Herring Prospectus or is intended to be paid or given, other than in the ordinary course of their
employment.
323OUR PROMOTERS AND PROMOTER GROUP
Our Promoters
The Promoters of our Company are:
1. Sanjay Tyagi;
2. Rekha Tyagi;
3. Kartikey Tyagi;
4. Kartikey Constructions (Partnership Firm); and
5. Sanjay Tyagi HUF.
As on the date of this Draft Red Herring Prospectus, our Promoters, in aggregate, hold 29,311,400 Equity Shares
in our Company, representing 97.38% of the pre-offer issued, subscribed and paid-up Equity Share Capital of our
Company.
For further details, kindly refer “Capital Structure – Details of Shareholding of our Promoters and members of
the Promoter Group in the Company – Build-up of the Promoters’ shareholding in our Company” beginning on
page 107.
I. Details of our Individual Promoters
Sanjay Tyagi
Sanjay Tyagi, aged 60 years, is one of our Promoters and is also the
Managing Director of our Company. For the complete profile of Sanjay
Tyagi along with details of his date of birth, residential address, educational
qualifications, professional experience, business, and other activities
positions / posts held in the past and other directorships, kindly refer “Our
Management-Board of Directors” beginning on page 306.
His permanent account number is ABAPT2070L.
As on the date of this Draft Red Herring Prospectus, Mr. Sanjay Tyagi holds
1,212,000 Equity Shares in his individual capacity, representing 4.03% of
the pre-offer issued, subscribed and paid-up Equity Share Capital of our
Company.
Rekha Tyagi
Rekha Tyagi, aged 57 years, is one of our Promoters and is also an
Executive Director of our Company. For the complete profile of Rekha
Tyagi along with details of her date of birth, residential address, educational
qualifications, professional experience, business, and other activities
positions / posts held in the past and other directorships, kindly refer “Our
Management-Board of Directors” beginning on page 306.
Her permanent account number is AATPT5519J.
As on date of this Draft Red Herring Prospectus, Rekha Tyagi individually
holds 395,200 Equity Shares, representing 1.31% of the pre-offer issued,
subscribed and paid-up Equity Share Capital of our Company.
324Kartikey Tyagi
Kartikey Tyagi, aged 27 years, is one of our Promoters and is the Whole-
Time Director and Chief Financial Officer of our Company. For the
complete profile of Kartikey Tyagi along with details of his date of birth,
residential address, educational qualifications, professional experience,
business, and other activities positions / posts held in the past and other
directorships, kindly refer “Our Management-Board of Directors”
beginning on page 306.
His permanent account number is AYZPT8439R.
As on the date of this Draft Red Herring Prospectus, Kartikey Tyagi
individually holds 600,000 Equity Shares, representing 1.99% of the pre-
offer issued, subscribed and paid-up Equity Share Capital of our Company.
Our Company confirms that respective permanent account numbers, bank account numbers, passport numbers,
Aadhaar card numbers and driving license numbers of our Individual Promoters shall be submitted to Stock
Exchanges at the time of filing of this Draft Red Herring Prospectus.
II. Details of our Promoter Entities
Kartikey Constructions (Partnership Firm)
Information and History: Kartikey Constructions is a partnership firm constituted under the Indian
Partnership Act, 1932, pursuant to a deed of partnership dated May 26, 2010, executed at Noida, Uttar Pradesh.
The firm was originally constituted between the partners, namely, Sanjay Tyagi & Son (HUF), through its Karta
Mr. Sanjay Tyagi and Mrs. Rekha Tyagi, and was reconstituted with effect from April 01, 2013, upon the
retirement of Sanjay Tyagi & Son (HUF) and the subsequent admission of Mr. Sanjay Tyagi (individual) as a
partner. The principal place of business of the firm is located at B-27, Sector-49, Noida, Gautam Buddha Nagar,
Uttar Pradesh-201301, India.
As on the date of this Draft Red Herring Prospectus, Kartikey Constructions holds 24,990,000 Equity Shares,
representing 83.02% of the pre-offer issued, subscribed and paid-up Equity Share Capital of our Company.
PAN: AAKFK5738K
Address: B-27, Sector-49, Noida, Gautam Buddha Nagar, Uttar Pradesh-201301, India.
Partners of Kartikey Constructions:
The current partners of Kartikey Constructions and their respective profit-sharing ratios are as follows:
Profit Sharing
Name PAN Address
Ratio
Sanjay Tyagi ABAPT2070L B-27, Sector-49, Noida, Gautam Buddha Nagar, 30%
Uttar Pradesh-201301, India.
Rekha Tyagi AATPT5519J B-27, Sector-49, Noida, Gautam Buddha Nagar, 70%
Uttar Pradesh-201301, India.
325Business Activities:
Kartikey Constructions is engaged in the business of carrying on activities as share and stock brokers, investors,
and dealing in all kinds of shares, stocks, securities, bonds, debentures, units, and other financial instruments
of all types. The firm is also engaged in the construction of roads, highways, laying of sewer lines, construction
of residential houses, commercial buildings, flats, factory sheds, and in the business of real estate development,
including activities as builders, contractors, colonizers, and construction engineers. Provided, further that the
partners by common agreement may start business in other lines or may commence any other trade, commerce
or industry under such trade name and names as may be mutually agreed upon.
Sanjay Tyagi HUF
HUF Information and History: Sanjay Tyagi HUF was constituted pursuant to a HUF deed dated December
20, 2017, at Ghaziabad, Uttar Pradesh. As on the date of this Draft Red Herring Prospectus, Sanjay Tyagi HUF
holds 2,114,200 Equity Shares representing 7.02% of the pre-offer issued, subscribed and paid-up Equity Share
Capital of our Company.
PAN: AAOHS8697B
Address: B-27, Sector-49, Noida, Gautam Buddha Nagar, Uttar Pradesh-201301, India.
Members of the HUF:
The members of Sanjay Tyagi HUF include:
Name Age Relation of Karta Address
Sanjay Tyagi 60 Self / Karta B-27, Sector-49, Noida, Gautam Buddha
Nagar, Uttar Pradesh-201301, India.
Rekha Tyagi 57 Wife B-27, Sector-49, Noida, Gautam Buddha
Nagar, Uttar Pradesh-201301, India.
Vartika Tyagi 31 Daughter B-27, Sector-49, Noida, Gautam Buddha
Nagar, Uttar Pradesh-201301, India.
Kartikey Tyagi 27 Son B-27, Sector-49, Noida, Gautam Buddha
Nagar, Uttar Pradesh-201301, India.
Business Activity:
Sanjay Tyagi HUF does not carry on any independent business activities other than holding investments in our
Company.
Change in control of our Company
There has not been any change in the control of our Company in the five (5) years immediately preceding the date
of this Draft Red Herring Prospectus.
Interest of Promoters
Our Promoters are interested in our Company to the extent that they have promoted our Company, and they along
with their relatives and the entities which form part of the Promoter Group, hold Equity Shares in our Company
and to the extent of any dividends and distributions declared thereon. For details of the shareholding of our
Promoters and members of the Promoter Group in our Company, kindly refer to the chapter titled “Capital
Structure – Details of Shareholding of our Promoters and members of the Promoter Group” beginning on page
107.
326Further, our Promoters are also directors on the board or are shareholders, karta, trustee, proprietor, member or
partners of entities with which our Company has had related party transactions and may be deemed to be interested
to the extent of the payments made by our Company, if any, to these entities. For further details of interest of our
Promoters in our Company, kindly refer “Restated Consolidated Financial Information – Related Party
Transaction” beginning on page 395.
Sanjay Tyagi, Rekha Tyagi and Kartikey Tyagi may also be deemed to be interested to the extent of remuneration,
benefits, reimbursement of expenses, sitting fees and commission payable to them as Directors on our Board. For
further details, kindly refer “Our Management – Interest of Directors” and “Our Management – Interest of Key
Management Personnel and Senior Management Personnel" beginning on pages 308 and 322 respectively.
Our Promoters do not have any interest, whether direct or indirect, in any property acquired or proposed to be
acquired by our Company within the preceding three (3) years from the date of this Draft Red Herring Prospectus
or in any transaction by our Company for acquisition of land, construction of building or supply of machinery, or
other such transaction.
No sum has been paid or agreed to be paid to our Promoters or to any firm or company in which our Promoters
are interested as a member, in cash or shares or otherwise by any person either to induce them to become or qualify
them as a director or Promoters or otherwise for services rendered by our Promoters or by such firm or company
in connection with the promotion or formation of our Company.
None of our Promoters have any interest in any ventures that are involved in any activities similar to those
conducted by our Company.
Our Promoters are not interested in, and there is no conflict of interest with any suppliers of raw materials and
third-party service providers (which are crucial for operations of the Company).
Our Promoters are not interested in, and there is no conflict of interest with any lessor of any immovable properties
(which are crucial for operations of the Company).
Payment or benefits to our Promoters or our Promoter Group
Except in the ordinary course of business and as disclosed herein and as stated in “Restated Consolidated
Financial Information-Related Party Transaction” beginning on page 395, there has been no payment or benefits
by our Company to our Promoters or any of the members of the Promoter Group during the two (2) years preceding
the date of this Draft Red Herring Prospectus nor is there any intention to pay or give any benefit to our Promoters
or Promoter Group as on the date of this Draft Red Herring Prospectus.
The remuneration to the Individual Promoters is being paid in accordance with their respective terms of
appointment. For further details, kindly refer “Our Management” beginning on page 303.
Companies or firms with which our Promoters have disassociated in the last three years
Our Promoters have not dissociated themselves from any companies or firms in the last three years preceding
the date of this Draft Red Herring Prospectus.
Experience of our Individual Promoters in the business of our Company
Our Promoters have adequate experience in the business activities currently undertaken by our Company.
Other Ventures of our Promoters
Except to the extent of their Directorship and shareholding in our Group Companies, none of our Promoters are
involved in any other ventures. For further details, kindly refer “Our Management” and “Our Promoters and
Promoter Group- The Entities forming part of our Promoters Group” beginning on page 303 and 328.
327Material Guarantees given by our Promoters
Except as stated in the chapter titled “Our History and Certain Corporate Matters” beginning on page 297, our
Promoters have not given any material guarantee to any third party with respect to the Equity Shares as on the
date of this Draft Red Herring Prospectus.
Confirmations
Our Promoters and members of our Promoter Group have not been declared wilful defaulters or fraudulent
borrowers by any bank or financial institution or consortium thereof, in accordance with the guidelines on wilful
defaulters or fraudulent borrowers issued by Reserve Bank of India.
Our Promoters and members of our Promoter Group have not been prohibited or debarred from accessing or
operating in capital markets or restrained from buying, selling or dealing in securities under any order or direction
passed by SEBI or any other regulatory or governmental authority, court or tribunal inside and outside India.
Our Promoters are not and have never been promoter, director or person in control of any other company which
is prohibited or debarred from accessing or operating in capital markets under any order or direction passed by
SEBI or any other regulatory or governmental authority.
Our Promoters and members of our Promoter Group have not been declared Fugitive Economic Offenders in
accordance with Section 12 of the Fugitive Economic Offenders Act, 2018.
In the last five years, none of our Individual Promoter or the members of the Promoter Group are or have been on
the board of directors of any company that was or has been directed by any Registrar of Companies to be struck
off from the rolls of such Registrar of Companies under Section 248 of the Companies Act 2013.
For details in relation to legal proceedings involving our Promoters, kindly refer “Outstanding Litigations and
Material Developments – Litigation Involving our Promoters” beginning on page 482.
Our Promoter Group
In addition to the Promoters named above, the following individuals and entities that form part of the Promoter
Group of our Company in terms of Regulation 2(1)(pp) of the SEBI ICDR Regulations are set out below:
Natural Person who are part of our Promoter Group
The natural person who are part of our Promoter Group, other than our Promoters, are as follows:
Name of the Promoter Name of the Relative Relationship with the Promoter
Rekha Tyagi Spouse
Kalyan Singh Father
Saroj Bala Mother
Neeraj Tyagi Brother
Shilpa Tyagi
Sister
Sangeeta Tyagi
Sanjay Tyagi
Kartikey Tyagi Son
Vartika Tyagi Daughter
Maya Prakash Father of Spouse
Urmila Devi Mother of Spouse
Praveen Tyagi Brother of Spouse
Seema Tyagi Sister of Spouse
Sanjay Tyagi Spouse
Maya Prakash Father
Rekha Tyagi
Urmila Devi Mother
Praveen Tyagi Brother
328Name of the Promoter Name of the Relative Relationship with the Promoter
Seema Tyagi Sister
Kartikey Tyagi Son
Vartika Tyagi Daughter
Kalyan Singh Father of Spouse
Saroj Bala Mother of Spouse
Neeraj Tyagi Brother of Spouse
Shilpa Tyagi Sister of Spouse
Sangeeta Tyagi
Sanjay Tyagi Father
Kartikey Tyagi* Rekha Tyagi Mother
Vartika Tyagi Sister
*unmarried
The entities forming a part of our Promoter Group
The entities forming a part of our Promoter Group are as follows:
1. Technocraft Developers Private Limited
2. Technoultra Engineers Private Limited
3. VVIP Infratech Limited
4. Tyag Landscape Private Limited
5. Tyag Readymix Private Limited
6. VVIP Entertainment Private Limited
7. Polysiatech Private Limited
8. Arohatech IT Services Private Limited
9. Vedant Agro Private Limited
10. Flowbridge Solutions LLP
11. GZB Cricket Association
12. Neeraj Tyagi HUF
13. TESPL LRS TCPL JV
For further details in relation to the Group Companies forming part of the promoter group, kindly refer “Group
Companies” beginning on page 489.
329DIVIDEND POLICY
The declaration and payment of dividends, if any, will be recommended by the Board of Directors and approved
by our shareholders in the Annual General Meeting, at their discretion, subject to the provisions of the Articles of
Association, the Companies Act and Rules made thereunder, SEBI Listing Regulations and other relevant
regulations, as amended from time to time. Further, the Board shall also have the absolute power to declare an
interim dividend in compliance with the Companies Act including the Rules made thereunder and other relevant
regulations, if any. The declaration and payment of dividend, if any, shall depend on a number of external, internal,
and financial factors, which, inter alia, include: (i) magnitude and stability of earnings, (ii) liquidity positions; (iii)
future requirements; (iv) working capital/ capital expenditure requirements; (v) leverage profile and liabilities of
our Company; (vi) legal/ statutory provisions and regulatory concerns; (vii) state of economy; (viii) taxation
policies; and (ix) any other factor deemed fit by the Board of directors of our Company.
Our Company has not declared dividends in the last three (3) Financial Year (i.e. Financial Years 2025, 2024 and
2023). The Company has not declared any dividends in the period between April 01, 2025, and the date of filing
this Draft Red Herring Prospectus. Further, for details of risks in relation to our capability to pay dividends, kindly
refer “Risk Factor No. 52 – Our ability to pay dividends in the future will depend upon future earnings, financial
condition, cash flows, working capital requirements and capital expenditures.” beginning on page 68.
330SECTION V – FINANCIAL INFORMATION
RESTATED CONSOLIDATED FINANCIAL INFORMATION
INDEPENDENT AUDITOR’S EXAMINATION REPORT ON RESTATED CONSOLIDATED
FINANCIAL INFORMATION
Examination Report of Independent Auditors on the Restated Consolidated Statement of Assets and
Liabilities as at March 31, 2025, March 31, 2024 and March 31, 2023 and Restated Consolidated Statement
of Profit and Loss (including Other Comprehensive Income), Restated Consolidated Statement of Changes
in Equity and Restated Consolidated Statement of Cash Flows for the for the financial years ended March
31, 2025, March 31, 2024 and March 31, 2023.;
TO
THE MEMBERS OF
TECHNOCRAFT VENTURES LIMITED
(Formerly known as TECHNOCRAFT CONSTRUCTION PRIVATE LIMITED)
S 553/54, Ground Floor, School Block, Shakarpur, New Delhi,
Delhi, India, 110092
1. We have examined the attached Restated Consolidated Financial Statements of TECHNOCRAFT VENTURES
LIMITED (formerly known as “TECHNOCRAFT CONSTRUCTION PRIVATE LIMITED ”)(hereinafter
referred as the “Company” or “Issuer”) , and its associate (the Company, its associate together referred to as the “
Group”) comprising of Restated Consolidated Statement of Assets and Liabilities as at March 31, 2025, March
31, 2024 and March 31, 2023 , the Restated Consolidated Statement of Profit and Loss (including other
comprehensive income), the Restated Consolidated Statement of Changes in Equity, the Restated Consolidated
Cash Flow Statement for the financial years ended March 31,2025, March 31,2024 and March 31, 2023, the
Summary Statement of Significant Accounting Policies to the Restated Consolidated Financial Statements
(collectively, the “Restated Consolidated Financial Statements”), as approved by the Board of Directors of the
Company at their meeting held on July 12, 2025 for the purpose of inclusion in the Draft Red Herring
Prospectus (“DRHP”)/ Red Herring Prospectus (“RHP”) / Prospectus prepared by the Company in
connection with its proposed Initial Public Offer (“IPO”) of equity shares prepared in terms of the
requirements of:
a) Section 26 of Part I of Chapter III of the Companies Act, 2013 as amended from time to time ("the Act")
b) The Securities and Exchange Board of India (Issue of Capital and Disclosure Requirements)
Regulations,2018 as amended from time to time ("the SEBI ICDR Regulations"); and
c) The Guidance Note on Reports in Company Prospectuses (Revised 2019) issued by the Institute of
Chartered Accountants of India (“ICAI”) as amended from time to time (“the Guidance Note”).
Management’s Responsibility for the Restated Consolidated Financial Information
2. The Company’s Board of Directors is responsible for the preparation of the Restated Consolidated Financial
Statements for the purpose of inclusion in the DRHP/ RHP/ Prospectus to be filed with Securities and
Exchange Board of India, National Stock Exchange of India Limited, BSE Limited, and Registrar of Companies,
NCT of Delhi and Haryana in connection with the proposed IPO. The Restated Consolidated Financial
Information have been prepared by the Management of the company. The responsibility of the Board of Director/
Management of the company/entity included in the Group includes designing, implementing and maintaining
adequate internal control relevant to the preparation and presentation of the Restated Consolidated Financial
Statements. The respective Board of Director/ Management are also responsible for identifying and ensuring
that the Group complies with the Act, ICDR Regulations and the Guidance Note read with the SEBI
Communication, as applicable.
331Auditors’ Responsibilities
3. We have examined such Restated Consolidated Financial Information taking into consideration:
a) The terms of reference and terms of our engagement agreed upon with you in accordance with our
engagement letter in connection with the proposed IPO of equity shares of the Issuer;
b) The Guidance Note also requires that we comply with the ethical requirements of the Code of Ethics
issued by the ICAI;
c) Concepts of test checks and materiality to obtain reasonable assurance based on verification of
evidence supporting the Restated Consolidated Financial Information; and
d) The requirements of Section 26 of the Act and the ICDR Regulations.
Our work was performed solely to assist you in meeting your responsibilities in relation to your
compliance with the Act, the ICDR Regulations and the Guidance Note in connection with the IPO.
Restated Consolidated Financial Information
4. These Restated Consolidated Financial Information have been prepared and compiled by the management from:
a) The Audited Consolidated Financial Statements of the company for the financial year ended March
31, 2025 and Audited Financial Statement of the company for the financial years ended March
31,2024 and March 31, 2023 which are prepared in accordance with accounting principles generally
accepted in India including the Accounting Standards specified under Section 133 of the Act, (“
Indian GAAP”) read with the Companies (Accounting Standards) Rules, 2015,as amended from
time to time, which have been approved by the Board of Directors at their meetings held on July 02,
2025 , September 02, 2024 and September 05, 2023, respectively.
b) The Consolidated Financial Statements of the company for the financial year ended March 31, 2025
and Financial Statement for the financial years ended March 31, 2024 and March 31, 2023 were
audited by us.
5. For the purpose of our examination, we have relied:
a) on auditors’ report issued by us, dated July 02, 2025, on the Audited Consolidated Financial
Statements of the Company as at and for the financial year ended March 31, 2025.
b) on auditors’ report issued by us, dated September 02, 2024, on the Audited Financial Statements of
the Company as at and for the financial year ended March 31, 2024.
c) on auditors’ report issued by us, dated September 05, 2023, on the Audited Financial Statements of
the Company as at and for the financial year ended March 31, 2023.
Based on our examination and according to the information and explanations given to us, we report
that the Restated Consolidated Financial Information:
a. have been prepared after incorporating adjustments for the changes in accounting policies,
material errors and regrouping/reclassifications retrospectively in the financial years ended
March 31, 2024 and March 31, 2023 to reflect the same accounting treatment as per the
accounting policies and grouping/classifications followed as at and for the year ended March
31, 2025; However there is no change in accounting policy except adoption of IND AS for the
purpose of preparation of Restated Consolidated Financial Statement
332b. do not require any adjustment for modification as there is no modification in the underlying
audit reports referred to in paragraph 5 above. There are items relating to emphasis of matters
(refer paragraphs 5(c) above, which do not require any adjustment to the Restated Consolidated
Financial Statements; and
c. have been prepared in accordance with the Act, ICDR Regulations and the Guidance Note read
with the SEBI Communication.
6. As indicated in our audit report referred above:
a) We did not audit the financial statement of TESPL LRS TCPL JV (Partnership Firm) which is an
associate of the company as it holds 26% share, whose share of profit is considered in the Restated
Consolidated Financial Statement. It reflects total assets of ₹ 852.86 million as on 31st March 2025,
total revenue of ₹ 854.13 Million and net profit after tax of ₹12.99 million for the year ended 31st
March, 2025.
Our opinion on the consolidated financial statements is not modified in respect of this matter.
b) We also did not audit the financial statement of TESPL LRS TCPL JV (Partnership Ship Firm),
which is an associate of the company, as it holds 26% share whose share of profit is considered in
the Restated Consolidated Financial Statement for the financial year ended 31st March 2024 and
31st March 2023.
(₹ in million)
For the financial year ended For the financial year ended
Particulars
March 31, 2024 March 31, 2023
Total Assets 175.61 13.06
Total Revenue 432.85 -
Net Profit after Tax 7.04 -0.08
Opinion
7. In accordance with the requirements of Section 26 of Part I of Chapter III of the Act read with the Rules, the
ICDR Regulations and the Guidance Note, we have examined the Restated Consolidated Financial
Information of the company which have been arrived after making adjustments and regrouping
/reclassifications, which in our opinion were appropriate, and have been fully described in Annexure 6: Notes
on Restatement Adjustments to audited consolidated financial statements and based on our examination, we
report that :
i. The Restated Consolidated Statement of Assets and Liabilities of the Company, as at March 31, 2025,
March 31, 2024 and March 31, 2023 examined by us, as set out in Annexure 1 to this report, have been
arrived at after making adjustments and regrouping/ reclassifications as in our opinion were appropriate.
ii. The Restated Consolidated Statement of Profit and Loss of the Company, for the financial years ended
March 31, 2025, March 31, 2024 and March 31, 2023 examined by us, as set out in Annexure 2 to this
report, have been arrived at after making adjustments and regrouping/reclassifications as in our opinion
were appropriate and more fully described in Annexure 6.
iii. The Restated Consolidated Statement of Cash Flows of the Company, for the financial years ended March
31, 2025, March 31, 2024 and March 31, 2023 examined by us, as set out in Annexures 3 to this report,
have been arrived at after making adjustments and regrouping /reclassifications as in our opinion were
appropriate and more fully described in Annexure 6.
333iv. The Restated Consolidated Statement of Changes in Equity of the Company for the financial years ended
March 31, 2025, March 31, 2024 and March 31, 2023, examined by us, as set out in Annexure 4 to this
report, have been arrived at after making adjustments and regrouping/ reclassifications as in our opinion
were appropriate.
8. Based on the above and according to the information and explanations given to us, we further report that the
Restated Consolidated Financial Information of the Company, as attached to this report and as mentioned in
paragraph 8 above, read with Notes on Adjustments for Restatement of Consolidated Profit and Loss
(Annexure 6), Significant Accounting Policies and Notes forming part of the Financial Information (Annexure
5) have been prepared in accordance with the Act, the Rules, and the ICDR Regulations, as amended from
time to time and ;
a. Have been made after incorporating adjustments for the changes in accounting policies of the Company
in respective financial years to reflect the same accounting treatment as per the changed accounting policy
for all the reporting years, however there is no change in accounting policies of the company except
adoption of IND AS.
b. Have been made after incorporating adjustments for the material amounts in the respective financial years
to which they relate;
c. There are no qualifications in the Auditor’s Report on the Audited Consolidated Financial Statements of
the Company as at March 31, 2025 and in the Auditor’s Report on the Audited Financial Statement of the
Company as at March 31, 2024 and March 31,2023, which requires adjustments; and
d. There are no extra-ordinary items that need to be disclosed separately.
9. We have also examined the following Restated financial information of the company set out in the Annexures
prepared by the Management and approved by the Board of Directors for the financial years ended March 31,
2025, March 31, 2024 and March 31, 2023.
1. Restated Summary Statement of Notes to Restated Summary Statements Annexure 5
Restated Summary Statement of Reconciliation of Restated Profit/ (Loss) to
2.
Profit/ (Loss) as per Audited Financial Statements Annexure 6
3. Restated Statement of Property, Plant & Equipment Annexure 7
4. Restated Summary Statement of Capital Work in Progress (CWIP) Annexure 8
5. Restated Summary Statement of Right of Use Assets and Lease Liabilities Annexure 9
6. Restated Summary Statement of Investments in Associates Annexure 10
7. Restated Summary Statement of Investments (Non-Current) Annexure 11
8. Restated Summary Statement of Other Financial Assets (Non-Current) Annexure 12
9. Restated Summary Statement of Other Non-Current Assets Annexure 13
10. Restated Summary Statement of Deferred Tax Assets (Net) Annexure 14
11. Restated Summary Statement of Inventories Annexure 15
12. Restated Summary Statement of Trade Receivables Annexure 16
13. Restated Summary Statement of Cash and Cash Equivalents Annexure 17
Restated Summary Statement of Bank Balances Other than Cash and Cash
14.
Equivalents Annexure 18
15. Restated Summary Statement of Other Financial Assets (Current) Annexure 19
16. Restated Summary Statement of Other Current Assets Annexure 20
17. Restated Summary Statement of Income Tax Assets (Net) Annexure 21
18. Restated Summary Statement of Equity Share Capital Annexure 22
19. Restated Summary Statement of Other Equity Annexure 23
33420. Restated Summary Statement of Borrowings (Non-current) Annexure 24
21. Restated Summary Statement of Other Financial Liabilities (Non- Current) Annexure 25
22. Restated Summary Statement of Long-Term Provisions Annexure 26
23. Restated Summary Statement of Short-Term Borrowings Annexure 27
24. Restated Summary Statement of Trade Payables Annexure 28
25. Restated Summary Statement of Other Financial Liabilities (Current) Annexure 29
26. Restated Summary Statement of Other Current Liabilities Annexure 30
27. Restated Summary Statement of Short-Term Provisions Annexure 31
28. Restated Summary Statement of Current Tax Liability (Net) Annexure 32
29. Restated Summary Statement of Revenue from Operations Annexure 33
30. Restated Summary Statement of Other Income Annexure 34
31. Restated Summary Statement of Cost of Revenue from Operations Annexure 35
32. Restated Summary Statement of Changes in Inventories of Work-In-Progress Annexure 36
33. Restated Summary Statement of Employee Benefit Expense Annexure 37
34. Restated Summary Statement of Finance Costs Annexure 38
35. Restated Summary Statement of Depreciation and Amortisation Expenses Annexure 39
36. Restated Summary Statement of Other Expenses Annexure 40
37. Restated Summary Statement of Tax Expense Annexure 41
38. Restated Summary Statement of Earnings Per Share Annexure 42
Restated Summary Statement of Payable to Micro, Small and Medium
39.
Enterprises Annexure 43
40. Restated Summary Statement of Related Party Transactions Annexure 44
41. Restated Summary Statement of Segment Information Annexure 45
42. Restated Summary Statement of Contingent Liabilities and Commitments Annexure 46
43. Restated Summary Statement of Employee Benefit Obligations Annexure 47
44. Restated Summary Statement of Transition to IND AS 116 ‘Leases’ Annexure 48
45. Restated Summary Statement of Fair Value Measurements Annexure 49
46. Restated Summary Statement of First Time Adoption of IND AS Annexure 50
Restated Summary Statement of Financial Risk Management and Capital
47.
Management Annexure 51
Restated Summary Statement of Reconciliation of Liabilities Arising from
48.
Financing Activities Annexure 52
49. Restated Summary of Capitalisation Statement Annexure 53
50. Restated Statement of Financial Indebtedness Annexure 54
51. Restated Statement of Dividend Annexure 55
52. Restated Summary Statement of Tax Shelters Annexure 56
53. Restated Statement of Corporate Social Responsibility (CSR) Annexure 57
54. Disclosure of Interest in Associates Annexure 58
Restated Statement of Net Assets, Profit and Loss and Other Comprehensive
55. Annexure 59
Income Attributable to Owners and Non-Controlling Interest.
56. Restated Summary Statement of Additional Regulatory Information Annexure 60
Restated Summary Statement of Subsequent Event Occurring after Reporting
57. Annexure 61
Period
58. Restated Summary Statement of Ratios Analysis Annexure 62
10. We have complied with the relevant applicable requirements of the Standard on Quality Control (SQC) 1, Quality
Control for Firms that Perform Audits and Reviews of Historical Financial Information, and Other Assurance and
Related Services Engagements.
33511. This report should not in any way be construed as a reissuance or re-dating of any of the previous audit reports
issued by us, nor should this report be construed as a new opinion on any of the financial statements referred to
herein.
12. We have no responsibility to update our report for events and circumstances occurring after the date of the report.
13. Our report is intended solely for use of the management for inclusion in the Offer Document to be filed with
Securities and Exchange Board of India, National Stock Exchange of India Limited, BSE Limited, and Registrar
of Companies, NCT of Delhi and Haryana in connection with the proposed IPO of equity shares of the Company.
Our report should not be used, referred to or distributed for any other purpose except with our prior consent in
writing. Accordingly, we do not accept or assume any liability or any duty of care for any other purpose or to any
other person to whom this report is shown or into whose hands it may come without our prior consent in writing.
For M/s Rishi Kapoor & Company
Chartered Accountants
Firm Registration Number: 006615C
Peer Review Number: 014978
Sd/-
Jyoti Arora
Partner
M. No: 455362
UDIN: 25455362BMGILS7183
Place: Noida
Date: July 12, 2025
336TECHNOCRAFT VENTURES LIMITED
(Formerly known as M/s TECHNOCRAFT CONSTRUCTION PRIVATE LIMITED)
(All amounts in millions, unless otherwise stated)
Annexure 1: RESTATED CONSOLIDATED STATEMENT OF ASSETS AND LIABILITIES
As at
Particulars Annexure
31-Mar-25 31-Mar-24 31-Mar-23
ASSETS
Non-current Assets
Property, Plant and Equipment 7 80.99 65.10 39.99
Capital work in progress 8 8.42 - 9.63
Right of Use Asset 9 49.21 50.25 51.28
Investment Property - - - -
Other Intangible Assets - - - -
Investment in Associates 10 52.24 1.86 1.04
Financial Assets
(i) Investments 11 - - 3.35
(ii) Others 12 329.56 274.67 334.35
(iii)Loans - - -
(iv)Trade Receivables - - - -
Other Non-Current Assets 13 13.88 6.88 9.96
Deferred tax assets (Net) 14 5.41 4.08 3.67
Total non-current assets(A) 539.71 402.85 453.27
Current Assets
Inventories 15 889.33 557.45 472.55
Financial Assets
(i) Trade receivables 16 581.84 1,001.83 509.04
(ii) Cash and cash equivalent 17 5.13 11.22 27.16
(iii) Bank Balances other than Cash and
18 135.30 75.88 108.10
Cash Equivalents
(iv) Loans - - - -
(v) Others 19 495.18 427.74 180.47
Other current assets 20 50.88 103.50 83.00
Income tax Asset (Net) 21 - - 1.31
Total Current assets(B) 2,157.66 2,177.61 1,381.62
TOTAL ASSETS(A+B) 2,697.37 2,580.46 1,834.89
EQUITY AND LIABILITIES
Equity
Equity share capital 22 75.25 75.25 75.25
Other equity 23 1,124.57 842.53 652.09
Total equity 1,199.83 917.78 727.34
Equity attributable to owners of the Group
Non - Controlling Interest - - -
Total Equity (A) 1,199.83 917.78 727.34
Liabilities
Non-current liabilities
Financial liabilities
(i) Long Term Borrowings 24 268.36 272.53 225.80
337(ii) Lease Liabilities 9 - - -
(iii) Others 25 - 47.07 -
Long term provisions 26 6.11 4.65 3.71
Deferred tax liabilities (Net) - - -
Total non-current liabilities(B) 274.47 324.25 229.51
Current liabilities
Financial liabilities
(i) Short Term Borrowings 27 605.94 528.58 282.24
(ii) Lease Liabilities 9 - - -
(iii) Trade Payables 28 - - -
(i) Total outstanding dues of Micro
25.28 85.40 57.34
enterprises & small enterprises
(ii) Total outstanding dues of creditors other
99.75 125.23 228.87
than Micro enterprises & small enterprises
(iv) Others 29 422.40 416.84 276.58
Other current liabilities 30 43.01 149.63 32.62
Short term provisions 31 0.64 0.63 0.39
Liabilities for current tax (Net) 32 26.06 32.13 -
Total current liabilities(C) 1,223.08 1,338.43 878.04
Total liabilities(B+C) 1,497.55 1,662.68 1,107.55
TOTAL EQUITY AND
2,697.37 2,580.46 1,834.89
LIABILITIES(A+B+C)
The above statement should be read with the Annexure 5: Company Overview & Significant Accounting
policies and explanatory notes to the Restated Consolidated Financial Statement, Annexure 6: Statement of
Restated Adjustments to audited financial statements and Annexures 7-62: Notes to Restated Consolidated
Financial Statement.
As per our report of even date
For and on behalf of the Board of Technocraft Ventures
Limited (Formerly Known as Technocraft Construction
FOR RISHI KAPOOR & COMPANY Private Limited)
CHARTERED ACCOUNTANTS
Firm Registration Number: 006615C
Peer Review No.: 014978
Sd- Sd/- Sd/-
Jyoti Arora Sanjay Tyagi Rekha Tyagi
Partner Managing Director Executive Director
Membership Number: 455362 DIN: 01446861 DIN: 02556586
Sd/- Sd/-
Kartikey Tyagi Saket Surolia
Whole Time Director and Chief Company Secretary and
Place: Noida Financial Officer Compliance Officer
Date: July 12, 2025 DIN: 09471808 M. No 73681
UDIN: 25455362BMGILS7183
338TECHNOCRAFT VENTURES LIMITED
(Formerly known as M/s TECHNOCRAFT CONSTRUCTION PRIVATE LIMITED)
(All amounts in millions, unless otherwise stated)
ANNEXURE 2: RESTATED CONSOLIDATED STATEMENT OF PROFIT AND LOSS
For the Financial Year ended
Particulars Annexure
31-Mar-25 31-Mar-24 31-Mar-23
Revenue:
Revenue from Operations (Net) 33 2,795.64 2,261.02 1,786.91
Other income 34 14.40 11.96 18.53
Total revenue (I) 2,810.04 2,272.98 1,805.44
Expenses:
Cost of Revenue from Operations 35 2,467.84 1,907.99 1,791.88
Changes in inventories of Work in Progress 36 (297.34) (68.04) (278.60)
Employee benefit expenses 37 100.35 60.32 39.03
Finance costs 38 92.39 79.29 81.22
Depreciation and Amortization 39 18.24 10.36 10.68
Other expenses 40 48.11 25.28 15.76
Total Expenses (II) 2,429.59 2,015.20 1,659.98
Restated Profit before share of profit of
380.46 257.78 145.46
associates and tax (III)=(I)-(II)
Share of Profit/(Loss) of Associates (IV) 5.19 2.82 (0.02)
Restated Profit before tax (V=III+IV) 385.65 260.60 145.44
Tax Expense (VI) 41
Current Taxes including current tax expenses
104.94 70.44 37.55
related to prior period and Firm Tax
Deferred taxes (Asset)/Liability (1.33) (0.38) (0.16)
Restated Profit for the period/ year (VII)=
282.04 190.54 108.06
(V)-(VI)
- - -
Other Comprehensive Income (OCI) (VIII) - - -
Items not to be reclassified to profit or loss
- - -
in subsequent period:
Remeasurement gain/ (loss) on defined benefit
0.01 (0.14) 0.24
plan
Income tax relating to items that will not be
(0.00) 0.04 (0.06)
reclassified to profit or loss
Restated Total Comprehensive Income for
282.04 190.44 108.24
the year, net of tax (IX) (VII+VIII)
Profit for the year attributable to
Shareholders of the Group 282.04 190.54 108.06
Non-Controlling Interest - - -
Other Comprehensive income for the year
attributable to
Shareholders of the Group 0.01 (0.11) 0.18
Non-Controlling Interest - - -
339Restated Earnings per Equity Share
42
(Face Value: Rupees 10)
- Basic 9.37 6.33 3.59
- Diluted 9.37 6.33 3.59
The above statement should be read with the Annexure 5: Company Overview & Significant Accounting
policies and explanatory notes to the Restated Consolidated Financial Statement, Annexure 6: Statement of
Restated Adjustments to audited financial statements and Annexures 7-62: Notes to Restated Consolidated
Financial Statement
As per our report of even date
For and on behalf of the Board of Technocraft Ventures
Limited (Formerly Known as Technocraft Construction
FOR RISHI KAPOOR & COMPANY Private Limited)
CHARTERED ACCOUNTANTS
Firm Registration Number: 006615C
Peer Review No.: 014978
Sd- Sd/- Sd/-
Jyoti Arora Sanjay Tyagi Rekha Tyagi
Partner Managing Director Executive Director
Membership Number: 455362 DIN: 01446861 DIN: 02556586
Sd/- Sd/-
Kartikey Tyagi Saket Surolia
Whole Time Director and Chief Company Secretary and
Place: Noida Financial Officer Compliance Officer
Date: July 12, 2025 DIN: 09471808 M. No 73681
UDIN: 25455362BMGILS7183
340TECHNOCRAFT VENTURES LIMITED
(Formerly known as M/s TECHNOCRAFT CONSTRUCTION PRIVATE LIMITED)
(All amounts in millions, unless otherwise stated)
Annexure 3: RESTATED CONSOLIDATED STATEMENT OF CASH FLOWS
For the Financial Year ended
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
A. CASH FLOW FROM OPERATING ACTIVITIES
Profit/ (Loss) before Exceptional items and Tax 385.65 260.60 145.44
Non-cash adjustments:
Depreciation and amortisation expenses 18.24 10.36 10.68
Interest Expense 92.39 79.29 81.22
Loss/ (Gain) on Sale of Property, Plant and Equipment - - (3.11)
Interest Received (14.40) (11.66) (15.42)
Share of (Profit) /Loss from Associates (5.19) (2.82) 0.02
Provision for Expected Credit Loss 0.16 0.44 0.46
Remeasurement gain/ (loss) on defined benefit plan 0.01 (0.14) 0.24
Operating profit before working capital changes 476.84 336.07 219.54
Changes in working capital:
(Increase)/ Decrease in Inventories (331.88) (84.91) (297.15)
(Increase)/Decrease in Trade Receivables - Current 419.83 (493.23) 276.60
(Increase)/Decrease in Other Financial Assets- Non-
(69.52) 65.83 (268.86)
Current other than Bank Deposits
(Increase)/Decrease in Other Financial Assets- Current
(58.15) (231.63) 239.67
other than Bank Deposits
(Increase)/Decrease in Other Non-Current Assets (7.00) 3.08 2.10
(Increase)/Decrease in Other Current Assets 52.62 (20.50) (57.14)
Increase/(Decrease) in other financial liabilities- non-
(47.07) 47.07 (86.24)
current
Increase/(Decrease) in other financial liabilities Current 5.56 140.26 76.12
Increase/(Decrease) in Short Term Borrowings 77.36 246.33 (93.05)
Increase/(Decrease) in other current liabilities (106.62) 117.02 (1.60)
Increase/(Decrease) in Trade Payables (85.60) (75.58) 125.14
Increase/(Decrease) in Provisions 1.48 1.17 0.55
Cash generated from operations 327.85 50.99 135.66
Income tax (Refund)/ paid during the year 111.01 37.00 35.30
Net cash from operating activities (A) 216.84 13.99 100.35
B. CASH FLOW FROM INVESTING ACTIVITIES
Purchase of Property, Plant and Equipment and Capital
(41.51) (24.81) (13.23)
Work in Progress
Sale of Property, Plant and Equipment - - 3.72
(Increase)/ Decrease in Investment - 3.35 -
Investment in Associates (45.18) 2.00 (0.05)
Interest Received 14.40 11.66 15.42
Movement in bank balances other than cash and cash
(54.09) 10.43 56.16
equivalent including all Bank Deposits
Net cash from investing activities (B) (126.38) 2.63 62.03
341C. CASH FLOW FROM FINANCING ACTIVITIES
Interest paid on borrowings (92.39) (79.29) (81.22)
Proceeds/(Repayment) of Long-term Borrowings (4.17) 46.73 (59.43)
Net cash from financing activities (C) (96.55) (32.56) (140.65)
Net increase in cash and cash equivalents (A+B+C) (6.09) (15.94) 21.72
Cash and cash equivalents at the beginning of the year 11.22 27.16 5.43
Cash and cash equivalents at the end of the year 5.13 11.22 27.16
Net increase in cash and cash equivalents (6.09) (15.94) 21.72
The above statement should be read with the Annexure 5: Company Overview & Significant Accounting
policies and explanatory notes to the Restated Consolidated Financial Statement, Annexure 6: Statement of
Restated Adjustments to audited financial statements and Annexures 7-62: Notes to Restated Consolidated
Financial Statement.
(₹ in millions)
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Cash in hand 5.11 4.63 9.65
Balance with Banks
Current Accounts 0.02 6.59 0.01
Deposit with original maturity less than 3 months
17.50
(Unlien) - -
Net increase in cash and cash equivalents 5.13 11.22 27.16
As per our report of even date
For and on behalf of the Board of Technocraft Ventures
Limited (Formerly Known as Technocraft Construction
FOR RISHI KAPOOR & COMPANY Private Limited)
CHARTERED ACCOUNTANTS
Firm Registration Number: 006615C
Peer Review No.: 014978
Sd- Sd/- Sd/-
Jyoti Arora Sanjay Tyagi Rekha Tyagi
Partner Managing Director Executive Director
Membership Number: 455362 DIN: 01446861 DIN: 02556586
Sd/- Sd/-
Kartikey Tyagi Saket Surolia
Whole Time Director and Chief Company Secretary and
Place: Noida Financial Officer Compliance Officer
Date: July 12, 2025 DIN: 09471808 M. No 73681
UDIN: 25455362BMGILS7183
342(₹ in millions)
Annexure 4
RESTATED STATEMENT OF CHANGES IN EQUITY
A. Equity Share Capital
Particulars Amount
Balance as at March 31,2022 75.25
Changes in equity share capital during the year -
Balance as at March 31,2023 75.25
Changes in equity share capital during the year -
Balance as at March 31,2024 75.25
Changes in equity share capital during the year -
Balance as at March 31,2025 75.25
(₹ in millions)
B. Other Equity
Item of Other
Reserves
Comprehensive
and Surplus
Income
Particulars Total
Remeasurement of
Retained
Defined Benefit
Earnings
Plan
Balance as at April 1,2022 543.54 0.32 543.85
Profit for the year 108.06 - 108.06
Other Comprehensive Income/(Loss) for the year - 0.24 0.24
Income Tax on above item - (0.06) (0.06)
Total Comprehensive Income for the year 108.06 0.18 108.24
Balance as at March 31,2023 651.59 0.50 652.09
Balance as at April 1,2023 651.59 0.50 652.09
Profit for the year 190.54 - 190.54
Other Comprehensive Income/(Loss) for the year - (0.14) (0.14)
Income Tax on above item - 0.04 0.04
Total Comprehensive Income for the year 190.54 (0.11) 190.44
Balance as at March 31,2024 842.14 0.39 842.53
Balance as at April 1,2024 842.14 0.39 842.53
Profit for the year 282.04 - 282.04
Other Comprehensive Income/(Loss) for the year - 0.01 0.01
Income Tax on above item - (0.00) (0.00)
Total Comprehensive Income for the year 282.04 0.01 282.04
Balance as at March 31,2025 1,124.17 0.40 1,124.57
Notes:
(a) Retained Earnings
Retained earnings represents unallocated/un-distributed profits of the Company. The amount that can be
distributed as dividend by the Company as dividends to its equity shareholders is determined based on the
separate financial statements of the Company and also considering the requirements of the Companies Act,
2013
(b) Other Comprehensive Income
Remeasurement of defined benefit plan include re-measurement loss/(gain) on defined benefit plans, net of
taxes that will not be classified to profit and loss.
343The above statement should be read with the Annexure 5: Company Overview & Significant Accounting
policies and explanatory notes to the Restated Consolidated Financial Statement, Annexure 6: Statement of
Restated Adjustments to audited financial statements and Annexures 7-62: Notes to Restated Consolidated
Financial Statement
As per our report of even date
For and on behalf of the Board of Technocraft Ventures
Limited (Formerly Known as Technocraft Construction
FOR RISHI KAPOOR & COMPANY Private Limited)
CHARTERED ACCOUNTANTS
Firm Registration Number: 006615C
Peer Review No.: 014978
Sd- Sd/- Sd/-
Jyoti Arora Sanjay Tyagi Rekha Tyagi
Partner Managing Director Executive Director
Membership Number: 455362 DIN: 01446861 DIN: 02556586
Sd/- Sd/-
Kartikey Tyagi Saket Surolia
Whole Time Director and Chief Company Secretary and
Place: Noida Financial Officer Compliance Officer
Date: July 12, 2025 DIN: 09471808 M. No 73681
UDIN: 25455362BMGILS7183
344ANNEXURE 5: Notes to Restated Summary Statements
1. CORPORATE INFORMATION
Technocraft Construction Private Limited was incorporated on October 21,1998 with Registrar of Companies
(ROC), Delhi under the provisions of Companies Act 1956. Thereafter, the name of our Company was changed
from ‘Technocraft Construction Private Limited’ to ‘Technocraft Ventures Private Limited’ on February 09,
2024 and thereafter conversion of our Company from private to public company, pursuant to a special
resolution passed by the shareholders of our Company on March 13, 2024 and a fresh certificate of
incorporation consequent to change of name from Technocraft Ventures Private Limited to Technocraft
Ventures Limited (" The Company") was issued by the ROC of June 11, 2024. The Company’s Corporate
Identity Number is U70101DL1998PLC096763.
The Registered office of company is situated at S 553/54, Ground Floor, School Block, Shakarpur, New Delhi,
New Delhi, Delhi, India, 110092 and Corporate Office of the company is B-137, Sector 2, Noida, Gautam
Buddha Nagar, Uttar Pradesh-201301, India. It has no holding, Subsidiaries or associate companies but has
investment in Partnership Firm in which the company holds 26% share.
The company is engaged in the business of executing turnkey projects in the domains of Engineering,
Procurement and Construction (EPC) of Roads, Building Construction, Highways, Sewage Networks, Sewage
Treatment Plants and Power.
2. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES
2.1 BASIS OF PREPARATION
(a) STATEMENT OF COMPLIANCE
The Restated Consolidated Financial Information comprise the Restated Consolidated Statement of Asset and
Liabilities as at 31st March 2025, 31st March 2024 and 31st March 2023, the Restated Consolidated Statement
of Profit and Loss (including other comprehensive income), for the financial year ended 31st March 2025, 31st
March 2024 and 31st March 2023 the Restated Consolidated Statement of Cash Flows for the financial years
ended 31st March 2025, 31st March 2024 and 31st March 2023, the Material Accounting Policies and Other
Explanatory Notes to the Restated Consolidated Financial Information, Statement of Restated Adjustments to
the Audited Financial Information and Notes to the Restated Consolidated Financial Information (collectively,
the “Restated Financial Information”). The Restated Consolidated Financial Information of the Company have
been prepared to comply in all material respects with the Indian Accounting Standards (“Ind AS”) as prescribed
under Section 133 of the Act read with the Companies (Indian Accounting Standards) Rules, 2015 (as amended
from time to time), presentation requirements of Division II of Schedule III to the Companies Act, 2013, as
applicable to the Restated Consolidated Financial Information and other relevant provisions of the Act. These
Restated Consolidated Financial Information have been prepared by the management as required under the
Securities and Exchange Board of India (Issue of Capital and Disclosure Requirements Regulations, 2018, as
amended (“ICDR Regulations”) issued by the Securities and Exchange Board of India ('SEBI'), in pursuance
of the Securities and Exchange Board of India Act, 1992, for the purpose of inclusion in the Draft Red Herring
Prospectus (“DRHP”)/ Red Herring Prospectus/ Prospectus in connection with the proposed initial public
offering ,prepared by the Company in terms of the requirements of
a) Section 26 of Part I of Chapter III of the Companies Act, 2013 ("the Act")
b) The Securities and Exchange Board of India (Issue of Capital and Disclosure Requirements)
Regulations, 2018 as amended; and
c) The Guidance Note on Reports in Company Prospectuses (Revised 2019) issued by the Institute of
Chartered Accountants of India (ICAI) (the “Guidance Note”).
These Restated Consolidated Financial Information have been compiled from the audited financial statements
as at and for the financial years ended March 31, 2025, March 31, 2024 and March 31, 2023 which have been
approved by the Board of Directors in their meeting held on July 02,2025, September 02, 2024, and September
05, 2023, respectively.
The Company has decided to voluntarily adopt Indian Accounting Standards notified under Section 133 of the
Companies Act 2013, read with Companies (Indian Accounting Standards) Rules, 2015 as amended from time
345to time and other accounting principles generally accepted in India. For the purpose of the preparation of
Restated Consolidated Financial Statement for the financial years ended March 31, 2025, March 31, 2024 and
March 31, 2023 of the Company, the transition date is considered as April 01, 2022.
(b) BASIS OF MEASUREMENT
The Restated Consolidated Financial Information have been prepared on a historical cost basis except certain
items that are measured at fair value as explained in accounting policies.
Fair value is the price that would be received to sell an asset or paid to transfer a liability in an orderly
transaction between market participants at the measurement date, regardless of whether that price is directly
observable or estimated using another valuation technique. In estimating the fair value of an asset or a liability,
the Company takes into account the characteristics of the asset or liability, if market participants would take
those characteristics into account when pricing the asset or liability at the measurement date. Fair value for
measurement and/or disclosure purposes in these financial statements is determined on such a basis, except for
leasing transactions that are within the scope of Ind AS 116 – Leases, and measurements.
2.2 BASIS OF CONSOLIDATION
The Restated Consolidated Financial Information presented for the reporting years include the financial
statements of the Company and its share in associate accounted in accordance with the relevant Indian
Accounting Standards (Ind AS) specified under Section 133 of the Companies Act, 2013.
Associates are entities over which the Company exercise significant influence but does not control. Significant
influence is assessed annually with reference to the voting power (usually arising from equity shareholdings
and potential voting rights) and other rights (usually contractual) enjoyed by the Company in its capacity as an
investor that provides it the power and consequential ability to direct the investee’s activities and significantly
affect the Company’s returns from its investment. Such assessment requires the exercise of judgement and is
disclosed by way of a note to the Restated Consolidated Financial Information. Investment in Associates is
accounted as per Equity Method as per IND AS in the Restated Consolidated Financial Statement.
2.3 USE OF ESTIMATES
The preparation of the Consolidated financial statements is in conformity with Ind AS requires management to
make estimates, judgments and assumptions. These estimates, judgments and assumptions affect the
application of accounting policies and the reported amounts of assets and liabilities, the disclosures of
contingent assets and liabilities at the date of the financial statements and reported amounts of revenues and
expenses during the period. Accounting estimates could change from period to period. Actual results could
differ from those estimates. Appropriate changes in estimates are made as management becomes aware of
changes in circumstances surrounding the estimates.
The estimates and underlying assumptions are reviewed on going concern basis.
Revisions to accounting estimates are recognized in the period in which the estimate is revised, if the revision
affects only that period. If the revision affects both current and future period, the same is recognised
accordingly.
Key source of estimation of uncertainty at the date of financial statements, which may cause material
adjustment to the carrying amounts of assets and liabilities within the next financial year, is in respect of
impairment, useful lives of property, plant and equipment and intangible assets, valuation of deferred tax assets,
provisions and contingent liabilities, fair value measurements of financial instruments and retirement benefit
obligations as disclosed below:
Impairment
The Company estimates the value in use of the cash generating unit (CGU) based on future cash flows after
considering current economic conditions and trends, estimated future operating results and growth rates and
anticipated future economic and regulatory conditions. The estimated cash flows are developed using internal
forecasts. The cash flows are discounted using a suitable discount rate in order to calculate the present value.
Useful lives of property, plant and equipment and intangible assets
The Company reviews the useful life of property, plant and equipment and intangible assets at the end of each
reporting period. This reassessment may result in change in depreciation and amortisation expense in future
periods.
346Valuation of deferred tax assets
The Company reviews the carrying amount of deferred tax assets at the end of each reporting period.
Allowances for expected credit loss
The Company makes provision for expected credit losses through appropriate estimations of irrecoverable
amount. The identification of expected credit loss requires use of judgment and estimates. The Company
evaluates trade receivables ageing and makes a provision for those debts as per the provisioning policy.
Where the expectation is different from the original estimate, such difference will impact the carrying value of
the trade and other receivables and doubtful debts expenses in the period in which such estimate has been
changed.
Retirement benefit obligations
The Company’s retirement benefit obligations are subject to number of assumptions including discount rates,
inflation and salary growth. Significant assumptions are required when setting these criteria and a change in
these assumptions would have a significant impact on the amount recorded in the Company’s balance sheet
and the statement of profit and loss. The Company sets these assumptions based on previous experience and
third-party actuarial advice.
Classification of Leases
The Company enters into leasing arrangements for Leasehold Land. The classification of the leasing
arrangement as a finance lease or operating lease is based on an assessment of several factors, including, but
not limited to, transfer of ownership of leased asset at end of lease term, lessee’s option to purchase and
estimated certainty of exercise of such option, proportion of lease term to the asset’s economic life, proportion
of present value of minimum lease payments to fair value of leased asset and extent of specialized nature of
the leased asset.
2.4 SIGINIFICANT ACCOUNTING POLICIES
The material accounting policies applied by the Company in the preparation of the Restated Consolidated
Financial information are listed below. Such accounting policies have been applied consistently to all the
periods presented in this Restated Consolidated Financial information, unless otherwise indicated.
i) CURRENT V/S NON-CURRENT CLASSIFICATION
The Company presents assets and liabilities in the balance sheet based on current/ non-current classification.
An asset is classified as current when it is:
• Expected to be realised or intended to sold or consumed in normal operating cycle
• Held primarily for the purpose of trading.
• Expected to be realised within twelve months after the reporting period, or
• Cash or cash equivalent unless restricted from being exchanged or used to settle a liability for at least twelve
months after the reporting period.
All other assets are classified as non-current.
A liability is current when:
• It is expected to be settled in normal operating cycle.
• It is held primarily for the purpose of trading.
• It is due to be settled within twelve months after the reporting period, or
• There is no unconditional right to defer the settlement of the liability for at least twelve months after the
reporting period.
The Company classifies all other liabilities as non-current. Deferred tax assets and liabilities are classified as
non-current assets and liabilities
The operating cycle is the time between the acquisition of assets for processing and their realisation in cash
and cash equivalents. Based on the nature of service and the time between rendering of services and their
realization in cash and cash equivalents, 12 months has been considered by the company for the purpose of
current / non-current classification of assets and liabilities.
347ii) FUNCTIONAL AND PRESENTATION CURRENCY
Amounts in the financial statements are presented in millions rounded off to two decimal places except number
of shares.
iii) PROPERTY, PLANT AND EQUIPMENT (PPE):
PPE is recognised when it is probable that future economic benefits associated with the item will flow to the
Company and the cost of the item can be measured reliably. PPE is stated at original cost net of tax/duty credits
availed, if any less accumulated depreciation and cumulative impairment, if any. All directly attributable costs
related to the acquisition of PPE and, borrowing costs case of qualifying assets are capitalised in accordance
with the Company's accounting policy.
Subsequent costs are included in the asset's carrying amount or recognised as a separate asset, as appropriate,
only when it is probable that future economic benefits associated with the item will flow to the company and
the cost of the item can be measured reliably.
PPE not ready for the intended use on the date of the Balance Sheet are disclosed as "capital work-in-progress"
DEPRECIATION METHODS, ESTIMATED USEFUL LIFE
Depreciation is recognised using written down value method so as to write off the cost of the assets (other than
freehold land and capital work-in-progress) less their residual values over their useful lives specified in
Schedule II to the Companies Act, 2013, or in the case of assets where the useful life was determined by
technical evaluation, over the useful life so determined.
Depreciation on additions to deductions from, owned assets is calculated on pro rata basis according to the
period of use.
PPE is de recognised upon disposal or when no future economic benefits are expected from its use or disposal.
Any gain or loss arising on de recognition is recognised in the Statement of Profit and Loss in the same period.
The estimated useful lives, residual values and depreciation method are reviewed at each financial year end
and the effect of any change is accounted for on prospective basis.
The carrying amount of the all property, plant and equipment are derecognized on its disposal or when no future
economic benefits are expected from its use or disposal and the gain or loss on de-recognition is recognized in
the statement of profit & loss. Other Fixed Assets include Dumper, BPD, Tandom Roller, Paver, Sensor Paver,
Tar Boiler and Bitumin Tank.
The useful life of assets are as follows:
Tangible Assets Useful Life
Building 30 years
Plant & Machinery 15 years
Vehicles 8 years
Furniture & Fixtures 10 years
Office Equipment 5 years
Computer 3 years
Others 9-15 years
iv) IMPAIRMENT OF NON-FINANCIAL ASSETS
The Company assesses, at each reporting date, whether there is an indication that an asset may be impaired. If
any indication exists, or when annual impairment testing for an asset is required, the Company estimates the
asset’s recoverable amount. An asset’s recoverable amount is the higher of an assets or cash-generating unit’s
(CGU) fair value less costs of disposal and its value in use. Recoverable amount is determined for an individual
asset, unless the asset does not generate cash inflows that are largely independent of those from other assets or
groups of assets. When the carrying amount of an asset or CGU exceeds its recoverable amount, the asset is
considered impaired and is written down to its recoverable amount.
In assessing value in use, the estimated future cash flows are discounted to their present value using a pre tax
discount rate that reflects current market assessments of the time value of money and the risks specific to the
asset. In determining fair value less costs of disposal, recent market transactions are taken into account. If no
such transactions can be identified, an appropriate valuation model is used. These calculations are corroborated
348by valuation multiples, quoted share prices for publicly traded companies or other available fair value
indicators. Impairment losses of continuing operations, including impairment on inventories, are recognised in
the statement of profit and loss.
For assets an assessment is made at each reporting date to determine whether there is an indication that
previously recognised impairment losses no longer exist or have decreased. If such indication exists, the
Company estimates the asset’s or CGU’s recoverable amount. A previously recognised impairment loss is
reversed only if there has been a change in the assumptions used to determine the asset’s recoverable amount
since the last impairment loss was recognised. The reversal is limited so that the carrying amount of the asset
does not exceed its recoverable amount, nor exceed the carrying amount that would have been determined, net
of depreciation, had no impairment loss been recognised for the asset in prior years. Such reversal is recognised
in the statement of profit or loss unless the asset is carried at a revalued amount, in which case, the reversal is
treated as a revaluation increase.
(v) Borrowing and Borrowing costs
Borrowings are initially recognised at fair value, net of transaction costs incurred. Borrowings are subsequently
measured at amortised cost. Any difference between the proceeds (net of transaction costs) and the redemption
amount is recognised in Statement of profit and loss over the period of the borrowings using the effective
interest method. Borrowings are derecognised from the balance sheet when the obligation specified in the
contract is discharged, cancelled or expired. The difference between the carrying amount of a borrowings that
has been extinguished or transferred to another party and the consideration paid, including any non-cash assets
transferred or liabilities assumed, is recognised in Statement of profit and loss as other gains/(losses).
Borrowings are classified as current liabilities unless the Company has an unconditional right to defer
settlement of the liability for at least 12 months after the reporting period.
Borrowing costs directly attributable to the acquisition, construction or production of an asset that necessarily
takes a substantial period of time to get ready for its intended use are capitalised as part of the cost of the asset.
All other borrowing costs are expensed in the period in which they occur. Borrowing costs consist of interest
and other costs that an entity incurs in connection with the borrowing of funds. Borrowing cost also includes
exchange differences to the extent regarded as an adjustment to the borrowing costs.
Borrowing costs directly attributable to the acquisition or construction of qualifying assets are capitalised as
part of the cost of the assets up to the date the asset is ready for its intended use. All other borrowing costs are
recognised as an expense in the Restated Consolidated Statement of Profit and Loss account in the year in
which they are incurred.
vi) FINANCIAL INSTRUMENTS-INITIAL RECOGNITION, SUBSEQUENT MEASUREMENT AND
IMPAIRMENT
A financial instrument is any contract that gives rise to a financial asset of one entity and a financial liability
or equity instrument of another entity.
Financial Assets
(a) Initial recognition and measurement:
All financial assets are recognised initially at fair value and, in the case of financial assets not recorded at fair
value through profit or loss, transaction costs that are attributable to the acquisition of the financial asset.
(b) Subsequent measurement
For purposes of subsequent measurement financial assets are classified in two broad categories:
: Financial assets at fair value
: Financial assets at amortised cost
(c) Classification:
The Company classifies financial assets as subsequently measured at amortised cost, fair value through other
comprehensive income or fair value through profit or loss on the basis of its business model for managing the
financial assets and the contractual cash flows characteristics of the financial asset.
349(d) Financial assets measured at amortised cost:
Financial assets are measured at amortised cost when asset is held within a business model, whose objective is
to hold assets for collecting contractual cash flows and contractual terms of the asset give rise on specified
dates to cash flows that are solely for payments of principal and interest. Such financial assets are subsequently
measured at amortised cost using the effective interest rate (EIR) method. The losses arising from impairment
are recognised in the Statement of profit and loss. This category generally applies to trade and other receivables.
(e) Financial assets measured at fair value through other comprehensive income (FVTOCI):
Financial assets under this category are measured initially as well as at each reporting date at fair value. Fair
value movements are recognized in the other comprehensive income.
(f) Financial assets measured at fair value through profit or loss (FVTPL):
Financial assets under this category are measured initially as well as at each reporting date at fair value with
all changes recognised in profit or loss.
(g) Investment in Equity Instruments:
Equity instruments which are held for trading are classified as at FVTPL. All other equity instruments are
classified as FVTOCI. Fair value changes on the instrument, excluding dividends, are recognized in the other
comprehensive income. There is no recycling of the amounts from other comprehensive income to profit or
loss. There are no investments in Equity Shares by the Company.
(h) Derecognition of Financial assets:
A financial asset is primarily derecognised when the rights to receive cash flows from the asset have expired
or the Company has transferred its rights to receive cash flows from the asset, if an entity transfers a financial
asset in a transfer that qualifies for derecognition in its entirety and retains the right to service the financial
asset for a fee, it shall recognise either a servicing asset or a servicing liability for that servicing contract. If the
fee to be received is not expected to compensate the entity adequately for performing the servicing, a servicing
liability for the servicing obligation shall be recognised at its fair value. If the fee to be received is expected to
be more than adequate compensation for the servicing, a servicing asset shall be recognised for the servicing
right at an amount determined on the basis of an allocation of the carrying amount of the larger financial asset.
(i) Impairment of Financial assets:
In accordance with Ind AS 109, the company applies expected credit loss (ECL) model for measurement and
recognition of impairment loss on the financial assets that are debt instruments and trade receivables. For
recognition of impairment loss on other financial assets and risk exposure, the company determines that
whether there has been a significant increase in the credit risk since initial recognition.
Financial Liabilities
(a) Initial recognition and measurement:
All financial liabilities are recognised initially at fair value and, in the case of loans, borrowings and payables,
net of directly attributable transaction costs. Financial liabilities include trade and other payables, loans and
borrowings including bank overdrafts.
(b) Classification & Subsequent measurement:
If a financial instrument that was previously recognised as a financial asset is measured at fair value through
profit or loss and its fair value decreases below zero, it is a financial liability measured in accordance with IND
AS. Financial liabilities are classified as held for trading, if they are incurred for the purpose of repurchasing
in the near term.
The Company classifies all financial liabilities as subsequently measured at amortised cost, except for financial
liabilities at fair value through profit or loss. Such liabilities, including derivatives that are liabilities, shall be
subsequently measured at fair value. However, there is no derivative transactions in the company.
(c) Derecognition of Financial Liabilities:
A financial liability is derecognised when the obligation under the liability is discharged or cancelled or expires.
When an existing financial liability is replaced by another from the same lender on substantially different terms,
or the terms of an existing liability are substantially modified, such an exchange or modification is treated as
the derecognition of the original liability and the recognition of a new liability. The difference in the respective
carrying amounts is recognised in the Statement of Profit and Loss.
350Offsetting financial instruments:
Financial assets and liabilities are offset and the net amount reported in the balance sheet when there is a legally
enforceable right to offset the recognised amounts and there is an intention to settle on a net basis to realise the
asset and settle the liability simultaneously.
Subsequent recoveries of amounts previously written off are credited to Other Income.
vii) CASH AND CASH EQUIVALENTS
Cash and cash equivalent in the balance sheet comprise cash at banks and on hand and short-term deposits with
an original maturity of three months or less, that are readily convertible to a known amount of cash and subject
to an insignificant risk of changes in value. Bank balances other than cash & cash equivalents includes fixed
deposits of original maturity of 3 Months to 12 Months. It also includes fixed deposits of original maturity of
less than 3 Months which are lien with Bank against Bank Guarantee & Others as it is not liquid in nature and
restricted for use.
viii) PROVISIONS, CONTINGENT LIABILITIES AND CONTINGENT ASSETS
(a) General
Provisions are recognised when the Company has a present obligation (legal or constructive) as a result of a
past event, it is probable that an outflow of resources embodying economic benefits will be required to settle
the obligation and a reliable estimate can be made of the amount of the obligation. If the effect of the time value
of money is material, the amount of a provision shall be the present value of expense expected to be required
to settle the obligation. Provisions are therefore discounted, when effect is material, The discount rate shall be
pre-tax rate that reflects current market assessment of time value of money and risk specific to the liability.
Unwinding of the discount is recognised in the Statement of Profit and Loss as a finance cost. Provisions are
reviewed at each balance sheet date and are adjusted to reflect the current best estimate.
(b) Contingencies
Contingent liabilities are disclosed when there is a possible obligation arising from past events, the existence
of which will be confirmed only by the occurrence or non-occurrence of one or more uncertain future events
not wholly within the control of the company or a present obligation that arises from past events where it is
either not probable that an outflow of resources will be required to settle or a reliable estimate of the amount
cannot be made. Information on contingent liability is disclosed in the Annexures to the Financial Statements.
A contingent asset is a possible asset that arises from past events and whose existence will be confirmed only
by the occurrence or non-occurrence of one or more uncertain future events not wholly within the control of
the entity, Contingent assets are not recognised, but are disclosed in the notes. However, when the realisation
of income is virtually certain, then the related asset is no longer a contingent asset, but it is recognised as an
asset.
ix) SHARE CAPITAL AND SECURITIES PREMIUM
Ordinary shares are classified as Equity. Incremental costs directly attributable to the issue of new shares are
shown in equity as a deduction, net of tax, from the proceeds.
Par value of the equity share is recorded as share capital and the amount received in excess of the par value is
classified as securities premium.
x) REVENUES
(a) Sale of services
Revenue is recognised on the basis of approved contracts regarding the transfer of goods or services to a
customer for an amount that reflects the consideration to which the entity expects to be entitled in exchange for
those goods and services.
Revenue towards satisfaction of a performance obligation is measured at the amount of transaction price (net
of variable consideration) allocated to that performance obligation. The transaction price of goods sold and
services rendered is net of variable consideration. Any amounts receivable from the customer are recognised
as revenue after the control over the goods sold and services rendered are transferred to the customer.
351Variable consideration includes incentives, rebates, discounts etc. which is estimated at contract inception
considering the terms of various schemes with customers and constrained until it is highly probable that a
significant revenue reversal in the amount of cumulative revenue recognised will not occur when the associated
uncertainty with the variable consideration is subsequently resolved. It is reassessed at the end of each reporting
period.
(b) Other Income
- Interest income
Interest income is recognised on a time proportion basis using the effective interest rate method.
xi) TAXATION
(a) Current tax
Current tax is expected tax payable on the taxable income for the year, using the tax rate enacted at the reporting
date, and any adjustment to the tax payable in respect of the earlier periods.
Current tax assets and liabilities are offset where the company has legally enforceable right to offset and intends
either to settle on net basis, or to realize the assets and settle the liability simultaneously.
(b) Deferred tax
Deferred tax is recognized for all taxable temporary differences and is calculated based on the carrying amounts
of assets and liabilities for financial reporting purposes and the amounts used for taxation purposes.
Deferred tax is measured at the tax rates that are expected to be applied when the asset is realized or the liability
is settled, based on the laws that have been enacted or substantively enacted at the reporting date.
Deferred tax assets are recognized only to the extent that it is probable that future taxable profits will be
available against which the assets can be utilized. Deferred tax assets are reviewed at each reporting date and
are reduced to the extent that it is no longer probable that the related tax benefit will be realized.
Deferred tax assets and liabilities are offset when there is a legally enforceable right to offset and when the
deferred tax balances relate to taxes levied by the same tax authority on the same taxable entity, or on different
tax entities, but the company intends to settle current tax liabilities and assets on a net basis or their tax assets
and liabilities will be realized simultaneously.
(c) Current and Deferred Tax for the Year
Current and deferred tax are recognized in the statement of profit & loss, except when they relates to items that
are recognized in other comprehensive income or directly in equity, in which case, the current tax and deferred
tax is recognized directly in other comprehensive income or equity respectively.
xii) EARNING PER SHARE
Basic Earnings Per Share is computed by dividing the net profit attributable to the equity shareholders of the
company to the weighted average number of Shares outstanding during the period. Diluted earnings per share
is computed by dividing the net profit attributable to the equity shareholders of the company after adjusting the
effect of all dilutive potential equity shares that were outstanding during the period. The weighted average
number of equity shares outstanding during the period is adjusted for events such as bonus issue that have
changed the number of equity shares outstanding, without a corresponding change in resources.
xiii) LEASES
As a Lessee
The Company’s lease asset classes primarily consist of leases for Land. The Company assesses whether a
contract contains a lease, at inception of a contract. A contract is, or contains, a lease if the contract conveys
the right to control the use of an identified asset for a period of time in exchange for consideration. To assess
whether a contract conveys the right to control the use of an identified asset, the company assesses whether: (i)
the contract involves the use of an identified asset (ii) the company has substantially all of the economic benefits
from use of the asset through the period of the lease and (iii) the company has the right to direct the use of the
asset.
At the date of commencement of the lease, the Company recognizes a right-of-use asset ("ROU") and a
corresponding lease liability for all lease arrangements in which it is a lessee, except for leases with a term of
twelve months or less (short-term leases) and low value leases. For these short-term and low value leases, the
352Company recognizes the lease payments as an operating expense on a straight-line basis over the term of the
lease.
Certain lease arrangements include the options to extend or terminate the lease before the end of the lease term.
ROU assets and lease liabilities includes these options when it is reasonably certain that they will be exercised.
The right-of-use assets are initially recognized at cost, which comprises the initial amount of the lease liability
adjusted for any lease payments made at or prior to the commencement date of the lease plus any initial direct
costs less any lease incentives. They are subsequently measured at cost less accumulated depreciation and
impairment losses.
Right-of-use assets are depreciated from the commencement date on a straight-line basis over the shorter of the
lease term and useful life of the underlying asset. Right of use assets are evaluated for recoverability whenever
events or changes in circumstances indicate that their carrying amounts may not be recoverable. For the purpose
of impairment testing, the recoverable amount (i.e. the higher of the fair value less cost to sell and the value-
in-use) is determined on an individual asset basis unless the asset does not generate cash flows that are largely
independent of those from other assets.
The lease liability is initially measured at amortized cost at the present value of the future lease payments. The
lease payments are discounted using the interest rate implicit in the lease or, if not readily determinable, using
the incremental borrowing rates in the country of domicile of these leases.
Lease liabilities are remeasured with a corresponding adjustment to the related right of use asset if the Company
changes its assessment if whether it will exercise an extension or a termination option. Lease liability and ROU
asset have been separately presented in the Balance Sheet and lease payments have been classified as financing
cash flows.
As informed by the management, the entire lease rent pertaining to the leased asset was paid in full by the
previous owner of the asset, prior to the transfer of ownership to the company. Accordingly, there is no future
lease rent liability payable by the company. Consequently, there is no recognition of lease liability (current or
non-current) in the financial statements. Since there are no future lease payments, the requirements of Ind AS
116 with respect to recognition of lease liability and corresponding right-of-use asset and subsequent finance
cost adjustments are not applicable in this case. No adjustments related to interest (finance cost) under Ind AS
116 have been made in the financial statements. This treatment is based on the management's representation a
due to the absence of enforceable future lease payments.
xiv) EMPLOYEE BENEFITS
The company provides for the various benefits plans to the employees. These are categorized into Defined
Benefits Plans and Defined Contributions Plans. Defined contribution plans includes the amount paid by the
company towards the liability for Provident fund to the employees provident fund organization and Employee
State Insurance fund in respect of ESI and defined benefits plans includes the retirement benefits, such as
gratuity.
a. In respect Defined Contribution Plans, contribution made to the specified fund based on the services rendered
by the employees are charged to Statement of Profit & Loss in the year in which services are rendered by the
employee.
b. Liability in respect of Defined Long Term benefit plan is determined at the present value of the amounts
payable determined using actuarial valuation techniques performed by an independent actuarial at each balance
sheet date using the projected unit credit methods. Re-measurement, comprising actuarial gain and losses, the
effects of assets ceiling (if applicable) and the return on plan assets (excluding interest), is reflected immediately
in the statement of Financial Position with a charge or credit recognized in other comprehensive income in the
period in which they occur. Past Service cost is recognized in the statement of profit & loss in the period of
plan amendment.
c. Liabilities for short term employee benefits are measured at undiscounted amount of the benefits expected
to be paid and charged to Statement of Profit & Loss in the year in which the related service is rendered.
xv) INVENTORIES
Work in Progress & Material at Site
At Cost Price only (As taken, valued and verified by the management of the Company).
353(₹ in millions)
ANNEXURE 6: STATEMENT OF RESTATED ADJUSTMENTS
Reconciliation of Profit and Other Comprehensive Income
For the Financial Year ended
S
Particulars Note
No. 31-Mar-25 31-Mar-24 31-Mar-23
I) Net Profit attributable to equity
shareholders 283.17 193.67 110.81
( as per audited financial statements) (A)
Add/Less: Adjustments
i) Provision for Gratuity Expense 1 1.57 1.03 0.79
ii) Actuarial (Gain)/ Loss on Defined Benefit 1
(0.01) 0.14 (0.24)
Plan
iii) Amortization of RoU Asset as per Ind AS 2
1.03 1.03 1.03
116 'Leases'
iv) Deferred Tax Adjustment 3 (0.41) (0.41) 0.53
v) Provision for Expected Credit Loss for Trade 4
0.16 0.44 0.46
Receivables
vi) Provision for Tax impact of Associate- 5
(0.99) 0.99 -
TESPL -LRS -TCPL-JV
vii) Benefit paid during the year adjusted in 1
(0.08) - -
provision for Gratuity
viii) Interest on delayed payment on MSME 6 (0.14) - -
Total (B) 1.13 3.23 2.57
II) Restated Total Comprehensive Income
attributable to equity holders of the
282.04 190.44 108.24
company as per Restated Consolidated
Statement of Profit and Loss (A-B)
(₹ in millions)
Reconciliation of Equity
S As at
Particulars Note
No. 31-Mar-25 31-Mar-24 31-Mar-23
I) Total Equity (as per audited Financial
1,211.76 928.58 734.91
Statements)
II) Adjustments:
i) Provision for Gratuity Expense 1 6.75 5.27 4.10
ii) Adoption of IND AS 116 ' Leases' 2 4.13 3.10 2.07
iii) Deferred Tax Effect on above adjustments 3 (1.50) (1.09) (0.68)
iv)Provision for Expected Credit Loss for
4 2.68 2.53 2.08
Trade Receivables
v) Provision for Tax impact of Associate-
5 - 0.99 -
TESPL -LRS -TCPL-JV
vi) Interest on delayed payment on MSME 6 (0.14) - -
11.93 10.80 7.57
III) Total Equity as per Restated Consolidated
1,199.83 917.78 727.34
Statement of Assets and Liabilities
354Notes
1. Provision for Gratuity Expense & Actuarial Gain/Loss on Defined benefit Plan
Provision for Gratuity Expense for the years ended March 31, 2025, March 31,2024 and March 31,2023 was
not created. Same as been reinstated as per Actuarial valuation report obtained for the years ended March
31,2025, March 31,2024 and March 31,2023. Consequent impact on Actuarial Gain/Loss on Defined benefit
plan has been reinstated in the Ind AS Restated Consolidated Financial Statement. Under IND AS, all actuarial
gains and losses are recognised in Other Comprehensive Income. Benefit paid during the year is adjusted in
the provision for Gratuity as per Actuarial Valuation Report and hence appropriate adjustments are made in the
Restated Consolidated Financial Statement.
2. Impact of IND AS 116 'Leases;
For the purpose of preparation of Restated Consolidated Financial Statements, the Company has adopted Ind
AS 116: Leases from the date of transition i.e. 1st April 2022 and management has evaluated the impact of
change in accounting policies required due to adoption of Ind AS 116 for the years ended March 31, 2025,
March 31,2024 and March 31, 2023 and made the necessary adjustments. As informed by the management, the
entire lease rent pertaining to the leased asset was paid in full by the previous owner of the asset, prior to the
transfer of ownership to the company. Accordingly:
There is no future lease rent liability payable by the company. Consequently, there is no recognition of lease
liability (current or non-current) in the financial statements. Since there are no future lease payments, the
requirements of Ind AS 116 with respect to recognition of lease liability and corresponding right-of-use asset
and subsequent finance cost adjustments are not applicable in this case. No adjustments related to interest
(finance cost) under Ind AS 116 have been made in the financial statements. This treatment is based on the
management's representation a due to the absence of enforceable future lease payments.
3.Deferred Tax
Under Previous GAAP, Deferred Tax is calculated using the income statement approach which focuses on
differences between taxable profits and accounting profits for the period. Under Ind AS 12, deferred tax is
calculated using balance sheet approach which focuses on difference between taxable profits and accounting
profits for the period. The application of Ind AS 12 approach has resulted in recognition of deferred tax on new
temporary differences which was not required under IGAAP. In addition, the various transitional adjustments
have led to temporary differences. According to the accounting policies, the company has to account for such
differences. According to the accounting policies, the company has to account for such differences. Deferred
Tax adjustments are recognised in correlation to the transactions either in retained earnings pr profit and loss
respectively.
4. Expected Credit Loss
Under Ind AS, the company has to provide loss allowance on Trade Receivables based on the Expected Credit
Loss (ECL) model which is measured following the "simplified approach". The Company uses a provision
matrix to measure the expected credit losses of trade receivables. The provision matrix is based on its historical
observed default rates, adjusted for forward looking estimates. The Company has impaired its Trade
Receivables by ₹ 0.16 million as on March 31,2025, ₹ 0.44 million as on March 31,2024 and ₹ 0.46 million as
on March 31, 2023 and its corresponding effect in statement of profit and loss in the respective financial years
and ₹1.62 million in the Retained Earnings (opening balance) as on 1st April 2023.
5. Provision for Tax impact on Associate
An Accounting Adjustment has been made where the provision for tax impact is shown in the Audited Financial
Statement for the year ended 31st March 2025, although it pertains to 31st March 2024. Thus, the appropriate
adjustment has been made in the Restated Consolidated Financial Statement for the years ended March 31,
2025 and March 31, 2024 respectively.
3556. Interest on delayed payment on MSME
An Accounting Adjustment has been made where the Interest on Delayed Payment of MSME has been wrongly
shown in the Audited Financial Statement for the financial year ended 31st March 2025 by Rs. 0.14 millions.
Thus, the appropriate adjustment has been made in the Restated Consolidated financial Statement for the
Financial year ended March 31, 2025.
Part B: Material Regrouping
Appropriate regroupings have been made in the Restated Ind AS Summary Statement of Assets and Liabilities,
Restated Ind AS Summary Statement of Profit and Loss and Restated Ind AS Summary Statement of Cash
Flows, wherever required, by reclassification of the corresponding items of income, expenses, assets, liabilities
and cash flows, in order to bring them in line with the accounting policies and classification as per Ind
AS financial information of the Company for the years ended March 31,2025, March 31,2024 and March
31, 2023 prepared in accordance with Schedule III of Companies Act, 2013, requirements of Ind AS 1 and
other applicable Ind AS principles and the requirements of the Securities and Exchange Board of India (Issue
of Capital & Disclosure Requirements) Regulations 2018, as amended.
Part C: Non-Adjusting items:
There are no audit qualifications for the respective years, which do not require any adjustments in the Restated
Consolidated Financial Statement.
356(₹ in millions)
ANNEXURE 7: PROPERTY, PLANT & EQUIPMENT
Other
Plant & Furniture & Office
Particulars Building Vehicles Computer Fixed Total
Machinery Fixture Equipment
Assets
Gross Block
Balance as at April 1, 2022 20.96 28.31 24.85 1.21 4.21 2.03 29.64 111.21
Additions for the period - 1.27 8.69 1.83 0.41 0.16 0.61 12.97
Disposals - - 3.11 - - - 1.99 5.10
Balance as at March 31, 2023 20.96 29.59 30.43 3.04 4.61 2.20 28.25 119.08
Accumulated Deprecation
Balance as at April 1, 2022 9.45 16.23 15.10 0.93 3.20 1.63 27.39 73.94
Deductions/adjustments - - 2.65 - - - 1.84 4.49
Depreciation for the year 1.09 2.72 4.64 0.09 0.47 0.16 0.47 9.64
Balance as at March 31, 2023 10.54 18.95 17.09 1.02 3.67 1.79 26.02 79.09
Net Block
Balance as at April 1, 2022 11.51 12.08 9.75 0.28 1.00 0.41 2.25 37.28
Balance as at March 31, 2023 10.42 10.64 13.34 2.02 0.94 0.41 2.23 39.99
(₹ in millions)
ANNEXURE 7: PROPERTY, PLANT & EQUIPMENT
Plant & Furniture & Office Other Fixed
Particulars Building Vehicles Computer Total
Machinery Fixture Equipment Assets
Gross Block
Balance as at April 1, 2023 20.96 29.59 30.43 3.04 4.61 2.20 28.25 119.08
Additions for the year 24.57 0.85 2.38 2.29 2.75 1.32 0.28 34.44
Disposals - - - - - - -
Balance as at March 31, 2024 45.53 30.43 32.82 5.33 7.36 3.51 28.53 153.52
Accumulated depreciation
357Balance as at April 1, 2023 10.54 18.95 17.09 1.02 3.67 1.79 26.02 79.09
Deductions/adjustments - - - - - - - -
Depreciation for the year 1.00 1.47 3.87 0.92 1.05 0.63 0.38 9.33
Balance as at March 31, 2024 11.54 20.42 20.96 1.94 4.73 2.42 26.40 88.42
Net Block
Balance as at April 1, 2023 10.42 10.64 13.34 2.02 0.94 0.41 2.23 39.99
Balance as at March 31, 2024 33.99 10.02 11.85 3.39 2.63 1.09 2.13 65.10
(₹ in millions)
ANNEXURE 7: PROPERTY, PLANT & EQUIPMENT
Plant & Furniture & Office Other Fixed
Particulars Building Vehicles Computer Total
Machinery Fixture Equipment Assets
Gross Block
Balance as at April 1, 2024 45.53 30.43 32.82 5.33 7.36 3.51 28.53 153.52
Additions for the period - 3.86 18.16 1.30 3.44 0.66 5.67 33.09
Disposals - - - - - - - -
Balance as at March 31,2025 45.53 34.29 50.97 6.64 10.80 4.17 34.20 186.61
Accumulated deprecation
Balance as at April 1, 2024 11.54 20.42 20.96 1.94 4.73 2.42 26.40 88.42
Deductions/adjustments - - - - - - - -
Depreciation for the period 3.23 1.80 7.73 1.03 1.80 0.84 0.79 17.21
Balance as at March 31,2025 14.77 22.22 28.69 2.97 6.53 3.26 27.19 105.62
Net Block
Balance as at April 1, 2024 33.99 10.02 11.85 3.39 2.63 1.09 2.13 65.10
Balance as at March 31,2025 30.76 12.07 22.28 3.67 4.27 0.91 7.01 80.99
358(₹ in millions)
ANNEXURE 8: CAPITAL WORK IN PROGRESS (CWIP)
Particulars Amount
As at April 01, 2022 9.37
Additions 0.26
Transfer to Property, Plant & Equipment -
As at March 31, 2023 9.63
Additions -
Transfer to Property, Plant & Equipment 9.63
As at March 31, 2024 -
Additions 8.42
Transfer to Property, Plant & Equipment -
As at March 31 ,2025 8.42
(₹ in millions)
As at March 31, 2025
Amount in CWIP for a period of
Particulars
Less than 1 year 1-2 years 2-3 years More than 3 years Total
Work in progress
Building 8.42 - - - 8.42
Total 8.42 - - - 8.42
(₹ in millions)
As at March 31, 2024
Amount in CWIP for a period of
Particulars
Less than 1 year 1-2 years 2-3 years More than 3 years Total
Work in progress
Building - - - - -
Total - - - - -
(₹ in millions)
As at March 31, 2023
Amount in CWIP for a period of
Particulars
Less than 1 year 1-2 years 2-3 years More than 3 years Total
Work in progress
Building 0.26 1.60 7.39 0.38 9.63
Total 0.26 1.60 7.39 0.38 9.63
(₹ in millions)
ANNEXURE 9: RIGHT OF USE ASSETS AND LEASE LIABILITIES
Particulars Land Total
Cost/Deemed Cost
As at March 31,2023
Opening Balance 52.31 52.31
Additions - -
Deductions - -
Depreciation/Amortisation 1.03 1.03
Total 51.28 51.28
As at March 31,2024
359Opening Balance 51.28 51.28
Additions - -
Deductions - -
Depreciation/Amortisation 1.03 1.03
Total 50.25 50.25
As at March 31,2025
Opening Balance 50.25 50.25
Additions - -
Deductions - -
Depreciation/Amortisation 1.03 1.03
Total 49.21 49.21
i) ROU assets are amortised from the commencement date on a straight-line basis over the lease term. The
lease term is 90 years for land. The aggregate depreciation expense on ROU assets is included under
depreciation and amortisation expense in the statement of Profit and Loss
(ii) The following is the break-up of current and non-current lease liabilities
As at As at As at
Particulars
March 31,2025 March 31,2024 March 31,2023
Current lease liability - - -
Non-current lease liability - - -
Total - - -
(iii) Following is the movement in lease liabilities
As at As at As at
Particulars
March 31,2025 March 31,2024 March 31,2023
Balance as at the beginning - - -
Additions - - -
Finance Cost accrued during the year - - -
Payment of lease liabilities - - -
Balance as at the end - - -
Note: As informed by the management, the entire lease rent pertaining to the leased asset was paid in full by
the previous owner of the asset, prior to the transfer of ownership to the company. Accordingly,there is no
future lease rent liability payable by the company.Consequently, there is no recognition of lease liability
(current or non-current) in the financial statements. Since there is no future lease payments, the requirements
of Ind AS 116 with respect to recognition of lease liability and corresponding right-of-use asset and subsequent
finance cost adjustments are not applicable in this case. No adjustments related to interest (finance cost) under
Ind AS 116 have been made in the financial statements. This treatment is based on the management's
representation a due to the absence of enforceable future lease payments.
(₹ in millions)
ANNEXURE 10: INVESTMENT IN ASSOCIATES
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Investment in Associates (accounted using the equity
method)
Investment in Partnership Firms
Investment in Partnership firm-Krishna TCPL(JV)-
- 0.00 1.01
Partner 40(%) >>
Investment in Partnership firm-TESPL-LRS-
52.24 1.86 0.03
TCPL(JV)-Partner 26(%)
Total 52.24 1.86 1.04
360Aggregate amount of unquoted investments 52.24 1.86 1.04
>>Since Krishna TCPL JV has been dissolved on December 31, 2024, it ceases to exist and the investor no
longer exert significant influence. Thus, as at March 31, 2025 the carrying amount of investment is removed
from the balance sheet as on 31st March 2025 and the gain or loss on associates is reported under " share of
profit/Loss from Associates".
(₹ in millions)
ANNEXURE 11: INVESTMENTS
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Investment in Life Insurance Policies - - 3.35
Total - - 3.35
Aggregate amount of unquoted investments - - 3.35
(₹ in millions)
ANNEXURE 12: OTHER FINANCIAL ASSETS (Non-Current)
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
(Unsecured considered good, unless otherwise stated)
Customer Retention 289.97 240.86 308.43
Earnest Money Deposit 27.86 7.51 5.42
Balance with banks held as deposits with original maturity of
more than 12 months and remaining at reporting date is also
more than 12 months.
(Lien against Collateral Security) - 17.51 -
(Lien against Bank Guarantee, Letter of Credit & Others) 8.26 5.47 16.14
(Unlien) 2.68 2.59 3.28
Security Deposits 0.80 0.74 1.08
Total 329.56 274.67 334.35
Note: The classification of Customer Retention and Fixed Deposits into Current and Non-Current (including
lien & Un-lien) is based on the information and representation provided by the management at the reporting
date.
(₹ in millions)
ANNEXURE 13: OTHER NON-CURRENT ASSETS (Non-Current)
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
(Unsecured considered good, unless otherwise stated)
Vat Recoverable 3.56 3.56 4.88
Income Tax Refundable 3.32 3.32 5.08
GST Deposited under Protest 7.00 - -
Total 13.88 6.88 9.96
(₹ in millions)
ANNEXURE 14: DEFERRED TAX ASSETS (NET)
(a) Component of deferred tax assets and liabilities are: -
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Deferred Tax Liabilities on account of:
Actuarial Gain on defined benefit plan 0.13 0.13 0.17
Total deferred tax liabilities (A) 0.13 0.13 0.17
361Deferred Tax Assets on account of:
Property, Plant and Equipment’s 3.04 2.12 2.11
Provision for Employee benefits 1.83 1.46 1.20
Provision for Expected Credit Loss 0.68 0.64 0.52
Total deferred tax assets (B) 5.55 4.22 3.83
Disclosed as Deferred Tax Assets (Net - B-A) 5.41 4.08 3.67
(₹ in millions)
Recognised in
As at Recognise
other As at March
Movement in deferred tax liabilities / asset April 01, d in profit
comprehensiv 31,2025
2024 & loss
e income
Deferred Tax Liabilities (A)
Actuarial Gain on defined benefit plan 0.13 - 0.00 0.13
Total 0.13 - 0.00 0.13
Deferred Tax Assets (B)
Property, Plant and Equipment’s 2.12 0.92 - 3.04
Provision for Employee benefits 1.46 0.37 - 1.83
Provision for Expected Credit Loss 0.64 0.04 - 0.68
4.22 1.33 - 5.55
Disclosed as Deferred Tax Assets (Net - B-
4.08 1.33 0.00 5.41
A)
(₹ in millions)
Recognised
As at Recognised As at
in other
Movement in deferred tax liabilities / asset April 01, in profit & March 31,
comprehensi
2023 loss 2024
ve income
Deferred Tax Liabilities (A)
Actuarial Gain/(Loss) on defined benefit plan 0.17 - (0.04) 0.13
Total 0.17 - (0.04) 0.13
Deferred Tax Assets (B)
Property, Plant and Equipment’s 2.11 0.01 - 2.12
Provision for Employee benefits 1.20 0.26 - 1.46
Provision for Expected Credit Loss 0.52 0.11 - 0.64
3.83 0.38 - 4.22
Disclosed as Deferred Tax Assets (Net - B-A) 3.67 0.38 0.04 4.08
(₹ in millions)
Recognised in
As at Recognised As at
other
Movement in deferred tax liabilities / asset April 01, in profit & March 31,
comprehensive
2022 loss 2023
income
Deferred Tax Liabilities (A)
Actuarial Gain on defined benefit plan 0.11 - 0.06 0.17
Total 0.11 - 0.06 0.17
Deferred Tax Assets (B)
362Property, Plant and Equipment’s 2.26 (0.15) - 2.11
Provision for Employee benefits 1.00 0.20 - 1.20
Provision for Expected Credit Loss 0.41 0.12 - 0.52
3.67 0.16 - 3.83
Disclosed as Deferred Tax Assets (Net - B-A) 3.56 0.16 (0.06) 3.67
(₹ in millions)
ANNEXURE 15: INVENTORIES
(As Valued, Verified and Certified by the management of the Company)
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
(Valued at Cost Price only)
Work in Progress 784.21 486.87 418.83
Material at Site 105.12 70.59 53.72
Total 889.33 557.45 472.55
(₹ in millions)
ANNEXURE 16: TRADE RECEIVABLES
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Unsecured Considered good
-Related parties 69.51 47.00 -
-Other than related parties 515.01 957.35 511.13
Less: Expected Credit Loss 2.68 2.53 2.08
Total 581.84 1,001.83 509.04
(₹ in millions)
Movement in allowances for expected credit losses
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Balance at the beginning of the year 2.53 2.08 1.62
Additions during the year 0.16 0.44 0.46
Utilised during the year - - -
Balance at the end of the year 2.68 2.53 2.08
363(₹ in millions)
Trade Receivables ageing schedule
Outstanding for following Periods from due date of Payment
More
Particulars Less than 6
6 Months -1 year 1 Year - 2 year 2 Year - 3 year than 3 Total
Months
years
Unsecured considered good
As at March 31, 2025
(i) Undisputed Trade Receivables - considered good 443.43 129.53 - - 11.56 584.53
(ii) Undisputed Trade Receivables - which has significant - - - - - -
increase in credit risk. - - - - -
(iii) Undisputed Trade Receivables- credit impaired - - - - - -
(iv) Disputed Trade Receivables - considered good - - - - - -
(v) Disputed Trade Receivables - which has significant - - - - - -
increase in credit risk.
(vi) Disputed Trade Receivables - credit impaired - - - - - -
Total 443.43 129.53 - - 11.56 584.53
Less: - Allowance for expected credit loss 2.68
Total 443.43 129.53 - - 11.56 581.84
Unsecured considered good
As at March 31, 2024
(i) Undisputed Trade Receivables - considered good 974.57 17.79 0.37 - 11.56 1,004.29
(ii) Undisputed Trade Receivables - which has significant
- - 0.07 - - 0.07
increase in credit risk.
(iii) Undisputed Trade Receivables- credit impaired - - - - - -
(iv) Disputed Trade Receivables - considered good - - - - - -
(v) Disputed Trade Receivables - which has significant increase
- - - - - -
in credit risk.
(vi) Disputed Trade Receivables - credit impaired - - - - - -
Total 974.57 17.79 0.44 - 11.56 1,004.35
Less: - Allowance for expected credit loss - - - - - 2.53
Total 974.57 17.79 0.44 - 11.56 1,001.83
Unsecured considered good
364As at March 31, 2023
(i) Undisputed Trade Receivables - considered good 470.46 - 7.51 0.70 32.46 511.13
(ii) Undisputed Trade Receivables - which has significant
- - - - - -
increase in credit risk.
(iii) Undisputed Trade Receivables- credit impaired - - - - - -
(iv) Disputed Trade Receivables - considered good - - - - - -
(v) Disputed Trade Receivables - which has significant increase
- - - - - -
in credit risk.
(vi) Disputed Trade Receivables - credit impaired - - - - - -
Total 470.46 - 7.51 0.70 32.46 511.13
Less: - Allowance for expected credit loss - - - - - 2.08
Total 470.46 - 7.51 0.70 32.46 509.04
365(₹ in millions)
ANNEXURE 17: CASH AND CASH EQUIVALENTS
Particulars As at
31-Mar-25 31-Mar-24 31-Mar-23
Balances with Banks
- In Current Account 0.02 6.59 0.01
- In Deposits with original maturity of less than 3
- - 17.50
months
Cash in Hand 5.11 4.63 9.65
Total 5.13 11.22 27.16
(₹ in millions)
ANNEXURE 18: BANK BALANCES OTHER THAN CASH AND CASH EQUIVALENTS
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Balances in fixed deposit accounts with original
maturity more than 3 months but less than 12 months
(Lien against Collateral Security) 19.26 18.24 17.48
(Lien against Bank Guarantee, Letter of Credit
99.42 44.08 81.51
& Others)
(Against CSR) 3.07 2.94 -
(Un-lien) 5.44 3.60 3.23
Balances in fixed deposit accounts with original
maturity less than 3 months
(Lien against Bank Guarantee, Letter of
7.32 6.91 4.41
Credit & Others)
Earmarked balances with banks against CSR 0.78 0.11 1.46
Total 135.30 75.88 108.10
Note: The classification of Fixed Deposits into Current and Non-Current (including lien & Un-lien) is based
on the information and representation provided by the management at the reporting date
(₹ in millions)
ANNEXURE 19: OTHER FINANCIAL ASSETS (Current)
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Interest accrued on Term Deposits 1.07 1.24 1.05
Balance with banks held as deposits with original maturity of
more than 12 months and remaining at reporting date is less
than 12 months.
(Lien against Collateral Security) 18.67 - -
(Lien against Bank Guarantee, Letter of Credit & Others) 104.23 112.85 100.00
(Un-lien) 2.04 2.79 -
Customer Retention 369.08 310.73 79.30
Security Deposits 0.10 0.13 0.13
Total 495.18 427.74 180.47
Note: The classification of Customer Retention, Security Deposits and Fixed Deposits into Current and Non-
Current (including lien & Unlien) is based on the information and representation provided by the management
at the reporting date.
366(₹ in millions)
ANNEXURE 20: OTHER CURRENT ASSETS
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Unsecured, considered good:
Advance to Suppliers 14.87 14.54 13.03
Advance to Employees 0.06 - 0.33
Advance to Others 1.00 - 40.24
Balance with Indirect revenues authorities 23.29 85.63 28.99
Prepaid Expenses 9.66 2.33 0.41
Pre IPO Expenses* 2.00 1.00 -
Total 50.88 103.50 83.00
* The Company has incurred pre initial public offer expenses amounting to INR 2.00 million (Previous Year
INR 1.00 million) which is shown under the head 'other current assets'. These expenses will be netted off against
the securities premium on successful completion of public offer and listing process with stock exchanges.
(₹ in millions)
ANNEXURE 21: INCOME TAX ASSETS (NET)
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Advance Income Tax (Net of Provision for Tax) - - 1.31
Total - - 1.31
ANNEXURE 22: EQUITY SHARE CAPITAL
(₹ in millions)
As at
31-Mar-25 31-Mar-24 31-Mar-23
Particulars
Number of Amount Number of Amount Number of Amount
Shares Shares Shares
Authorised Capital
4,00,00,000 Equity Shares of
4,00,00,000 400.00 1,02,50,000 102.50 1,02,50,000 102.50
Rupees 10/- each
4,00,00,000 400.00 1,02,50,000 102.50 1,02,50,000 102.50
Issued Capital
75,25,300 Equity Shares of
75,25,300 75.25 75,25,300 75.25 75,25,300 75.25
Rupees 10/- each
75,25,300 75.25 75,25,300 75.25 75,25,300 75.25
Subscribed and Fully Paid-up
Capital
75,25,300 Equity Shares of
75,25,300 75.25 75,25,300 75.25 75,25,300 75.25
Rupees 10/- each
75,25,300 75.25 75,25,300 75.25 75,25,300 75.25
367(₹ in millions)
(b): Reconciliation of the number of shares and amount outstanding as at March 31, 2025, March 31, 2024 and March 31,2023
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Number of Shares Amount Number of Shares Amount Number of Shares Amount
Equity Share Capital
Outstanding at the beginning of the year 75,25,300 75.25 75,25,300 75.25 75,25,300 75.25
Add: Bonus Shares issued during the year - - - - - -
Less: Deletion during the year - - - - - -
Balance as at the end of the year 75,25,300 75.25 75,25,300 75.25 75,25,300 75.25
(₹ in millions)
(c) Detail of shareholder holding more than 5% shares of the Company:
As at
Particulars 31-Mar-25 31-Mar-24 31-Mar-23
Number of Shares % of Holding Number of Shares % of Holding Number of Shares % of Holding
Kartikey Constructions 62,47,500 83.02% 62,47,500 83.02% 62,47,500 83.02%
Sanjay Tyagi HUF 5,28,550 7.02% 5,28,550 7.02% 5,28,550 7.02%
(d) Shares held by promoters at the end of the financial year
(₹ in millions)
As at
31-Mar-25 31-Mar-24 31-Mar-23
% change % change %
Particulars
Number of during the Number of during the Number of change
% of Holding % of Holding % of Holding
Shares year Shares year Shares during
the year
Sanjay Tyagi 3,03,000 4.03% 0.01% 3,02,250 4.02% - 3,02,250 4.02% 2.65%
Smt Rekha Tyagi 98,800 1.31% - 98,800 1.31% - 98,800 1.31% -
Kartikey Tyagi 1,50,000 2.00% - 1,50,000 2.00% - 1,50,000 2.00% 2.00%
Kartikey Constructions 62,47,500 83.02% - 62,47,500 83.02% - 62,47,500 83.02% -
Sanjay Tyagi HUF 5,28,550 7.02% - 5,28,550 7.02% - 5,28,550 7.02% -
368(e) Right, preference and restrictions attached to shares Equity Shares
The Company has only one class of equity shares having a par value of ₹10.00 per share. Each Shareholder is eligible for one vote per share. In the event of liquidation, the
equity shareholders are eligible to receive the remaining assets of the Company, after distribution of all preferential amount, in proportion of their shareholding.
(f) Equity Shares movement during the 5 years preceding March 31, 2025
The Board of Directors at their meeting held on 06th September 2024, has approved a proposal to increase authorised share capital to ₹ 40,00,00,000/-(Rupees Forty Crore)
divided into 4,00,00,000 (Four Crore) Equity Shares of ₹ 10/-each from the existing ₹ 10,25,00,000 (Rupees Ten Crore Twenty-five lakhs) divided into 1,02,50,000 (One
Crore Two Lakh Fifty thousand shares) Equity Shares of ₹ 10/-.
369(₹ in millions)
ANNEXURE 23: OTHER EQUITY
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Retained Earnings 1,124.17 842.14 651.59
Other Comprehensive Income (Net of Tax) 0.40 0.39 0.50
Total 1,124.57 842.53 652.09
(₹ in millions)
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Retained Earnings
Balance at the beginning of the year 842.14 651.59 543.54
Add: Profit during the year 282.04 190.54 108.06
Less: Transferred to General Reserve - - -
Balance at the end of the year 1,124.17 842.14 651.59
Other Comprehensive Income (Net of Tax)
Balance at the beginning of the year 0.39 0.50 0.32
Add: Remeasurement gain/ (loss) on defined benefit
0.01 (0.14) 0.24
plan
Less: Income Tax Expense on above (0.00) 0.04 (0.06)
Balance at the end of the year 0.40 0.39 0.50
Balance at the end of the year 1,124.57 842.53 652.09
(₹ in millions)
ANNEXURE 24: BORROWINGS (NON-CURRENT)
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Secured (Note-1)
From Banks 20.30 60.94 97.90
Unsecured (Note-1)
Loan from Related Party (Refer ANNEXURE 44) 188.88 159.83 70.52
Intercorporate Loans 59.19 51.76 57.38
Total 268.36 272.53 225.80
Notes:
(i) The details disclosed in Note 1 above is provided by the management of
the company.
(ii) The above includes long-term borrowings disclosed under Annexure and the current maturities of long-
term borrowings included in Short Term Borrowings.
(iii) The above loans to related party have no specific repayment schedule but taken as provided by the
management of the company.
370(₹ in millions)
Note 1
Long-Term Borrowing as on March 31, 2023
Term of Number of Balance as on
Rate of Nature of Security
Bank/ Financial Institution Name Repayment Instalment Start Date End Date March 31,
Interest Pledge
(Tenure) Outstanding 2023
Floating Hypothecation of 1.20
Union Bank of India- Car Loan II 60 40 22.08.2021 22.07.2026
Interest Rate Motor Car
Floating Hypothecation of 4.10
Union Bank of India- Car Loan III 60 40 19.08.2021 19.07.2026
Interest Rate Motor Car
Floating Hypothecation of 1.37
Union Bank of India- Car Loan IV 60 44 17.12.2021 17.11.2026
Interest Rate Motor Car
ICICI Bank Limited- Construction Hypothecation of 1.65
48 7.35 37 01.05.2022 01.04.2026
Equipment Loan -II Plant & Machinery
HDFC Bank Limited-WCTL-I by way of 49 (Including Extension of Second 0.87
Guaranteed Emergency Credit Line (GECL) Moratorium Ranking Charge over
8.25 21 07.12.2020 07.12.2024
under ECLGS Scheme of National Credit Period of 12 existing primary and
Guarantee Trustee Company Limited Months) collateral
HDFC Bank Limited-WCTL-II by way of 49 (Including Extension of Second 2.77
Guaranteed Emergenacy Credit Line Moratorium Ranking Charge over
8.25 26 07.05.2021 07.05.2025
(GECL) under ECLGS Scheme of National Period of 12 existing primary and
Credit Guarantee Trustee Company Limited Months) collateral
HDFC Bank Limited -WCTL-III by way of 61 (Including Extension of Second 13.10
Guaranteed Emergency Credit Line (GECL) Moratorium Ranking Charge over
9.10 37 07.03.2024 07.03.2027
under ECLGS Scheme of National Credit Period of 24 existing primary and
Guarantee Trustee Company Limited Months) collateral
Kotak Mahindra Bank Limited -WCTL-I by 48 (Including Second charge on all 1.05
way of Guaranteed Emergency Credit Line Moratorium existing and future
8 18 05.10.2020 05.09.2024
(GECL) under ECLGS Scheme of National Period of 12 current assets of the
Credit Guarantee Trustee Company Limited Months) company.
Kotak Mahindra Bank Limited -WCTL-II by 48 (Including Extension of Second 14.30
8 18 15.10.2020 15.09.2024
way of Guaranteed Emergency Credit Line Moratorium Ranking Charge over
371(GECL) under ECLGS Scheme of National Period of 12 existing primary and
Credit Guarantee Trustee Company Limited Months) collateral
Hypothecation of 2.17
Union Bank of India - Car Loan -V 60 7.4 49 22.05.2022 22.04.2027
Motor Car
Hypothecation of 4.17
HDFC Bank Limited- Car Loan-VI 60 8.5 58 05.02.2023 05.01.2028
Motor Car
Hypothecation of the 66.71
company's entire
stocks of Raw
Materials, WIP, Semi
HDFC Bank Limited- Project Loan 12 9 - 01.01.2023 31.12.2023
finished and finished
goods, consumable
stores, spares including
book debts.
Unsecured Loans
Loans from Related Parties
Directors
Mr. Sanjay Tyagi On Demand 10.00 - - - - 16.63
Ms. Rekha Tyagi On Demand 10.00 - - - - 28.10
Relatives
Ms. Ritu Tyagi On Demand - - - - - 2.22
Ms. Vartika Tyagi On Demand 10.00 - - - - 4.16
Mr. Neeraj Tyagi On Demand - - - - - 5.06
Neeraj Tyagi HUF On Demand - - - - - 6.89
Sanjay Tyagi HUF On Demand 10.00 - - - - 5.81
Mr. Kartikey Tyagi On Demand 10.00 - - - - 1.66
Incorporate Deposits
Avadh Developers Private Limited On Demand 10.00 - - - - 27.30
Nandani Lands & Farms Private Limited On Demand 10.00 - - - - 25.98
Shrishti Infra Engineering Private Limited On Demand 10.00 - - - - 4.10
Total 241.36
372(₹ in millions)
Long-Term Borrowing as on March 31, 2024
Term of Number of Balance as
Rate of Nature of Security
Bank/Financial Institution Name Repayment Instalment Start Date End Date on March
Interest Pledge
(Tenure) Outstanding 31, 2024
Floating Hypothecation of
Union Bank of India- Car Loan II 60 28 22.08.2021 22.07.2026 0.87
Interest Rate Motor Car
Floating Hypothecation of
Union Bank of India- Car Loan III 60 28 19.08.2021 19.07.2026 2.97
Interest Rate Motor Car
Floating Hypothecation of
Union Bank of India- Car Loan IV 60 32 17.12.2021 17.11.2026 1.03
Interest Rate Motor Car
ICICI Bank Limited- Construction Hypothecation of Plant
48 7.35 25 01.05.2022 01.04.2026 1.15
Equipment Loan -II & Machinery
HDFC Bank Limited-WCTL-I by way of 49 (Including Extension of Second
Guaranteed Emergency Credit Line (GECL) Moratorium Ranking Charge over
8.25 9 07.12.2020 07.12.2024 0.37
under ECLGS Scheme of National Credit Period of 12 existing primary and
Guarantee Trustee Company Limited Months) collateral
HDFC Bank Limited-WCTL-II by way of 49 (Including Extension of Second
Guaranteed Emergency Credit Line (GECL) Moratorium Ranking Charge over
8.25 14 07.05.2021 07.05.2025 1.53
under ECLGS Scheme of National Credit Period of 12 existing primary and
Guarantee Trustee Company Limited Months) collateral
HDFC Bank Limited -WCTL-III by way of 61 (Including Extension of Second
Guaranteed Emergency Credit Line (GECL) Moratorium Ranking Charge over
9.10 36 07.03.2024 07.03.2027 12.79
under ECLGS Scheme of National Credit Period of 24 existing primary and
Guarantee Trustee Company Limited Months) collateral
Kotak Mahindra Bank Limited -WCTL-I by 48 (Including Second charge on all
way of Guaranteed Emergency Credit Line Moratorium existing and future
8 6 05.10.2020 05.09.2024 0.36
(GECL) under ECLGS Scheme of National Period of 12 current assets of the
Credit Guarantee Trustee Company Limited Months) company.
Kotak Mahindra Bank Limited -WCTL-II by 48 (Including Extension of Second
way of Guaranteed Emergency Credit Line Moratorium Ranking Charge over
8 6 15.10.2020 15.09.2024 4.96
(GECL) under ECLGS Scheme of National Period of 12 existing primary and
Credit Guarantee Trustee Company Limited Months) collateral
373Hypothecation of the
company's entire stocks
of Raw Materials, WIP,
Kotak Mahindra Bank Limited -Project Semi finished and
24 10.5 19 25.11.2023 25.10.2025 48.41
Loan finished goods,
consumable stores,
spares including book
debts.
Union Bank of India - Car Loan -V 60 7.4 37 22.05.2022 22.04.2027 1.70
Hypothecation of
HDFC Bank Limited- Car Loan-VI 60 8.5 46 05.02.2023 05.01.2028 3.44
Motor Car
HDFC Bank Limited- Car Loan-VII 18 9.35 16 07.02.2024 07.07.2025 1.87
Hypothecation of the
company's entire stocks
of Raw Materials, WIP,
Semi finished and
HDFC Bank Limited- Project Loan-I 21 9.56 - 30.12.2023 30.09.2025 23.48
finished goods,
consumable stores,
spares including book
debts.
Hypothecation of the
company's entire stocks
of Raw Materials, WIP,
Semi finished and
HDFC Bank Limited- Project Loan-II 21 9.56 - 08.01.2024 30.09.2025 38.00
finished goods,
consumable stores,
spares including book
debts.
Hypothecation of the
company's entire stocks
of Raw Materials, WIP,
HDFC Bank Limited- Project Loan-III 21 9.56 - 27.02.2024 30.09.2025 51.00
Semi finished and
finished goods,
consumable stores,
374spares including book
debts.
Unsecured Loans
Loans from Related Parties
Directors
Mr. Sanjay Tyagi On Demand 12.00 - - - - 81.53
Ms. Rekha Tyagi On Demand 12.00 - - - - 48.47
Mr. Kartikey Tyagi On Demand 12.00 - - - - 3.94
Relatives
Ms. Ritu Tyagi On Demand - - - - - 2.22
Ms. Vartika Tyagi On Demand 12.00 - - - - 4.17
Mr. Neeraj Tyagi On Demand - - - - - 5.06
Neeraj Tyagi HUF On Demand - - - - - 6.89
Sanjay Tyagi HUF On Demand 12.00 - - - - 7.54
Incorporate Deposits
Avadh Developers Private Limited On Demand 12.00 - - - - 34.49
Nandani Lands & Farms Private Limited On Demand 12.00 - - - - 17.27
Total 405.55
(₹ in millions)
Long-Term Borrowing as on March 31,2025
Balance
Term of Number of Nature of
Rate of as on
Bank/Financial Institution Name Repayment Instalment Start Date End Date Security
Interest March
(In Months) Outstanding Pledge
31, 2025
Union Bank of India- Car Loan II 60 16 23.08.2021 23.07.2026 0.59
Floating Interest Hypothecation
Union Bank of India- Car Loan III 60 16 31.07.2021 23.07.2026 2.00
Rate of Motor Car
Union Bank of India- Car Loan IV 60 20 30.11.2021 18.11.2026 0.75
Hypothecation
ICICI Bank Limited- Construction Equipment Loan -II 48 7.35 13 01.05.2022 01.04.2026 of Plant & 0.62
Machinery
HDFC Bank Limited-WCTL-II by way of Guaranteed Extension of
49 (Including
Emergency Credit Line (GECL) under ECLGS Scheme 8.25 2 07.05.2021 07.05.2025 Second Ranking 0.18
Moratorium
of National Credit Guarantee Trustee Company Limited Charge over
375Period of 12 existing primary
Months) and collateral
Extension of
61 (Including
HDFC Bank Limited -WCTL-III by way of Guaranteed Second Ranking
Moratorium
Emergency Credit Line (GECL) under ECLGS Scheme - 24 07.03.2022 07.03.2027 Charge over 8.86
Period of 24
of National Credit Guarantee Trustee Company Limited existing primary
Months)
and collateral
Floating Interest
Union Bank of India - Car Loan -V 60 25 25.05.2022 25.04.2027 1.33
Rate Hypothecation
HDFC Bank Limited- Car Loan-VI 60 8.5 34 05.02.2023 05.01.2028 of Motor Car 2.65
HDFC Bank Limited- Car Loan-VII 18 Floating Interest 4 07.02.2024 07.07.2025 0.49
Hypothecation
of the
company's
entire stocks of
Raw Materials,
WIP, Semi
Kotak Mahindra Bank Limited -Project Loan 24 10.5 7 25.11.2023 25.10.2025 18.70
finished and
finished goods,
consumable
stores, spares
including book
debts.
Hypothecation
of the
company's
entire stocks of
Raw Materials,
HDFC Bank Limited- Project Loan-III 21 9.14 - 27.02.2024 30.09.2025 29.20
WIP, Semi
finished and
finished goods,
consumable
stores, spares
376including book
debts.
HDFC Bank Limited- Car Loan-VIII 39 Floating Interest 34 07.11.2024 07.01.2028 1.48
Hypothecation
Bank of Baroda- Car Loan -IX 60 9.25 51 10.07.2024 10.06.2029 10.12
of Motor Car
HDFC Bank Limited-Car Loan -X 39 9.40 32 05.09.2024 05.11.2027 0.71
Hypothecation
HDFC Bank Limited- Construction Equipment Loan -III 37 9.06 37 30.03.2025 20.05.2028 of Plant & 3.06
Machinery
Unsecured Loans
Loans from Related Parties
Directors
Mr. Sanjay Tyagi On Demand 12.00 - - - - 86.23
Ms. Rekha Tyagi On Demand 12.00 - - - - 61.92
Mr. Kartikey Tyagi On Demand 12.00 - - - - 7.17
Relatives
Ms. Ritu Tyagi On Demand - - - - - 2.22
Ms. Vartika Tyagi On Demand 12.00 - - - - 8.11
Mr. Neeraj Tyagi On Demand - - - - - 5.06
Neeraj Tyagi HUF On Demand - - - - - 6.89
Sanjay Tyagi HUF On Demand 12.00 - - - - 11.28
Incorporate Deposits
Avadh Developers Private Limited On Demand 12.00 - - - - 59.19
Total 328.81
377(₹ in millions)
ANNEXURE 25: OTHER FINANCIAL LIABILITIES (NON-CURRENT)
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Mobilisation Advance from Department - 47.07 -
Others - - -
Total - 47.07 -
(₹ in millions)
ANNEXURE 26: LONG TERM PROVISIONS
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Provision for Gratuity 6.11 4.65 3.71
Grand Total 6.11 4.65 3.71
(₹ in millions)
ANNEXURE 27: SHORT-TERM BORROWINGS
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Secured
Loans repayable on Demand from Banks (Note 2) 520.39 377.89 266.68
Current Liabilities of Long-Term Debts (Note 1) 60.45 133.01 15.56
Unsecured
From Others (Note 2) 25.09 17.67 -
Total 605.94 528.58 282.24
Notes:
(i) The details disclosed in Note 2 above is provided by the management of the company.
(ii) The above excludes the current maturities of long-term borrowings included in Long Term
Borrowings Note No 1.
378Note-2 : NATURE OF SECURITY & TERMS OF REPAYMENT FOR SHORT TERM BORROWINGS
Outstan
Rate
Term of ding as
Sr. Nature of of
Particulars Repaym at Nature of Security Pledge
No. Facility Inter
ent March
est
31, 2023
Primary Security for Cash Credit (Hyp) Limit: Hypothecation on 1st Pari-passu basis
on stocks of raw materials, stock in process, finished goods, stores & spares, receivables
and other current assets (existing and future) lying at work sites of various projects and
office godowns with other lenders under multiple banking arrangements.
Hypothecation of entire unencumbered fixed assets of the Company on Pari-passu basis.
Hypothecation/Mortgage of Block Assets Immovable Properties
1- Property bearing No. B-27, Sector-49, Noida, Gautam Budh Nagar, Uttar Pradesh
2- Plot bearing No. NK-II 265A, Indirapuram, Ghaziabad, Uttar Pradesh
3- Registered Mortgage at Khasra No. 85, Min at Village Morti, Pargana Jalalabad,
Ghaziabad, Uttar Pradesh
4- House No. 3/1223 at Sector-3, Vasundhara Yojna, Vashundhara, Ghaziabad, Uttar
Pradesh
Punjab National Cash Credit 11.25 5- Lease hold (JDA) Plot No. 44, Gulmohar Park-I, Mahal Jagatpura, Jaipur, Rajasthan
1 1 Year 146.68
Bank Limit % 6- Lease hold (JDA) Plot No.45, Gulmohar Park-I, Mahal Jagatpura, Jaipur, Rajasthan
7- Lease hold (JDA) Plot No.52, Gulmohar Park-I, Mahal Jagatpura, Jaipur, Rajasthan
8- Lease hold (JDA) Plot No.53, Gulmohar Park-I, Mahal Jagatpura, Jaipur, Rajasthan
9- Lease hold (JDA) Plot No. S 59, Mahesh Nagar, Jaipur, Rajasthan
10- Under Construction Building on lease hold (JDA) Plot No. B 181, SEZ at Village Jhai,
Tehsil, Sangner, Jaipur, Rajsthan
11- Property situated at 29, Avadhpuri, Near Mahesh Nagar, Jaipur, Rajasthan
12-Registered Mortgage House No. 474/11 at North Civil Lines, Muzaffarnagar, Uttar
Pradesh
l Personal Guarantee of the following Guarantor
1- Sanjay Tyagi
2- Rekha Tyagi
3- Kartikey Tyagi
3794- Mam Chand Tyagi
5- Rajiv Tyagi
6- Sandhya Tyagi
7- Madhusudan Gupta
8- Kamlesh Gaur
9- Neeraj Tyagi
10- Saroj Bala
11- M/s Kartikey Constructions
12- M/s Unimax Build Estate
l FDR kept in the Account of ₹1.71 Crore
1- Pari Passu charge in favor of the Bank by way of the Bank by way of Hypothecation of
the company's entire stocks of Raw Materials, WIP, Semi finished and finished goods,
consumable stores, spares including book debts, bill whether documentary or clean,
outstanding monies, receivables, both present & future, in a form and manner satisfactory
Overdraft 9.65
2 HDFC Bank Limited 1 Year 30.85 to the Bank.
Limit %
.2- Equitable Mortgage of property bearing B-137, Sector-2, Noida, Uttar Pradesh.
3-
Unconditional and irrevocable personal guarantees of all directors and property holders
1- Pari Passu charge in favour of the Bank by way of the Bank by way of Hypothecation
of the company's entire stocks of Raw Materials, WIP, Semi finished and finished goods,
consumable stores, spares including book debts, bill whether documentary or clean,
Letter of outstanding monies, receivables, both present & future, in a form and manner satisfactory
3 HDFC Bank Limited 1 Year - 30.40
Credit to the Bank.
2- Equitable Mortgage of property bearing B-137, Sector-2, Noida, Uttar Pradesh.
3- Unconditional and irrevocable personal guarantees of all directors and property holders
1- Pari Passu charge in favour of the Bank by way of the Bank by way of Hypothecation
of the company's entire stocks of Raw Materials, WIP, Semi finished and finished goods,
4 HDFC Bank Limited Drul LC 1 Year - 10.78 consumable stores, spares including book debts, bill whether documentary or clean,
outstanding monies, receivables, both present & future, in a form and manner satisfactory
to the Bank.
380.2- Equitable Mortgage of property bearing B-137, Sector-2, Noida, Uttar Pradesh.
3-
Unconditional and irrevocable personal guarantees of all directors and property holders
1- Primary Security -Continuation of First Pari Passu charge with Punjab National Bank,
HDFC Bank and ICICI Bank on all existing and future current assets of the Borrower.
Kotak Mahindra Cash Credit 10.10
5 1 Year 38.10 2-Collateral Security -Lien over Fixed Deposit equivalent of 45% of limit.
Bank, Noida Limit %
3-Guarantee- Personal Guarantee of Sanjay Tyagi and Rekha Tyagi. Guarantee of Security
provider M/s Shiv Durga Constructions Company Proprietor Anju Sharma
1- Primary Security -Continuation of First Pari Passu charge with Punjab National Bank,
HDFC Bank and ICICI Bank on all existing and future current assets of the Borrower.
Kotak Mahindra 10.90
6 WCDL 1 Year 9.87 2-Collateral Security -Lien over Fixed Deposit equivalent of 50% of limit.
Bank, Noida %
3-Guarantee- Personal Guarantee of Sanjay Tyagi and Rekha Tyagi. Guarantee of Security
provider M/s Shiv Durga Constructions Company Proprietor Anju Sharma
Total 266.68
Note-2: Nature Of Security & Terms of Repayment for Short-Term Borrowings
Outstanding as
Sr. Nature of Term of Rate of
Particulars at March Nature of Security Pledge
No. Facility Repayment Interest
31,2024
From Banks
Primary Security for Cash Credit (Hyp) Limit: Hypothecation on 1st Pari-
passu basis on stocks of raw materials, stock in process, finished goods, stores
& spares, receivables and other current assets (existing and future) lying at
Cash
Punjab National work sites of various projects and office godowns with other lenders under
1 Credit 1 Year 11.25% 175.40
Bank multiple banking arrangements.
Limit
Hypothecation of entire unencumbered fixed assets of the Company on Pari-
passu basis.
Hypothecation/Mortgage of Block Assets Immovable Properties
3811- Property bearing No. B-27, Sector-49, Noida, Gautam Budh Nagar, Uttar
Pradesh
2- Plot bearing No. NK-II 265A, Indirapuram, Ghaziabad, Uttar Pradesh
3- Registered Mortgage at Khasra No. 85, Min at Village Morti, Pargana
Jalalabad, Ghaziabad, Uttar Pradesh
4- House No. 3/1223 at Sector-3, Vasundhara Yojna, Vashundhara, Ghaziabad,
Uttar Pradesh
5- Lease hold (JDA) Plot No. 44, Gulmohar Park-I, Mahal Jagatpura, Jaipur,
Rajasthan
6- Lease hold (JDA) Plot No.45, Gulmohar Park-I, Mahal Jagatpura, Jaipur,
Rajasthan
7- Lease hold (JDA) Plot No.52, Gulmohar Park-I, Mahal Jagatpura, Jaipur,
Rajasthan
8- Lease hold (JDA) Plot No.53, Gulmohar Park-I, Mahal Jagatpura, Jaipur,
Rajasthan
9- Lease hold (JDA) Plot No. S 59, Mahesh Nagar, Jaipur, Rajasthan
10- Under Construction Building on lease hold (JDA) Plot No. B 181, SEZ at
Village Jhai, Tehsil, Sangner, Jaipur, Rajsthan
11- Property situated at 29, Avadhpuri, Near Mahesh Nagar, Jaipur, Rajasthan
12-Registered Mortgage House No. 474/11 at North Civil Lines,
Muzaffarnagar, Uttar Pradesh
l Personal Guarantee of the following Guarantor
1- Sanjay Tyagi
2- Rekha Tyagi
3- Kartikey Tyagi
4- Mam Chand Tyagi
5- Rajiv Tyagi
6- Sandhya Tyagi
7- Madhusudan Gupta
8- Kamlesh Gaur
9- Neeraj Tyagi,
10- Saroj Bala
38211- M/s Kartikey Constructions
12- M/s Unimax Build Estate
l FDR kept in the Account of ₹1.71 Crore
1- Pari Passu charge in favor of the Bank by way of the Bank by way of
Hypothecation of the company's entire stocks of Raw Materials, WIP, Semi
finished and finished goods, consumable stores, spares including book debts,
bill whether documentary or clean, outstanding monies, receivables, both
present & future, in a form and manner satisfactory to the Bank.
HDFC Bank Overdraft
2 1 Year 9.65% 78.22
Limited Limit
2- Equitable Mortgage of property bearing B-137, Sector-2, Noida, Uttar
Pradesh.
3- Unconditional and irrevocable personal guarantees of all directors and
property holders
1- Pari Passu charge in favor of the Bank by way of the Bank by way of
Hypothecation of the company's entire stocks of Raw Materials, WIP, Semi
finished and finished goods, consumable stores, spares including book debts,
bill whether documentary or clean, outstanding monies, receivables, both
present & future, in a form and manner satisfactory to the Bank.
HDFC Bank
3 Drul - LC 1 Year - 14.70
Limited
2- Equitable Mortgage of property bearing B-137, Sector-2, Noida, Uttar
Pradesh.
3- Unconditional and irrevocable personal guarantees of all directors and
property holders
1- Pari Passu charge in favor of the Bank by way of the Bank by way of
Hypothecation of the company's entire stocks of Raw Materials, WIP, Semi
finished and finished goods, consumable stores, spares including book debts,
HDFC Bank Letter of bill whether documentary or clean, outstanding monies, receivables, both
4 1 Year - 17.69
Limited Credit present & future, in a form and manner satisfactory to the Bank.
2- Equitable Mortgage of property bearing B-137, Sector-2, Noida, Uttar
Pradesh
3833- Unconditional and irrevocable personal guarantees of all directors and
property holders
1-Primary Security- Continuation of First Pari Passu charge on all existing
and future current assets of the Borrower.
2. Collateral Security- Creation of Equitable Mortgage over Immovable
Properties-
1- Plot No. 17, Block A, Sector 49, Noida, Uttar Pradesh - Pin Code 201301
Cash owned by Sanjay Tyagi & Rekha Tyagi (First & Exclusive Charge)
Kotak Mahindra
5 Credit 1 Year 10.10% 45.05
Bank
Limit 2-Plot No. C-83, RDC Raj Nagar, Ghaziabad, Uttar Pradesh, Pin Code 201002
owned by M/s Shiv Durga Constructions Company Proprietor Anju Sharma
(First & Exclusive Charge)
3-Guarantee- Personal Guarantee of Sanjay Tyagi, Rekha Tyagi and Kartikey
Tyagi, Guarantee of Security provider M/s Shiv Durga Constructions
Company Proprietor Anju Sharma
1-Primary Security- Continuation of First Pari Passu charge on all existing
and future current assets of the Borrower.
2. Collateral Security- Creation of Equitable Mortgage over Immovable
Properties
1- Plot No. 17, Block A, Sector 49, Noida, Uttar Pradesh - Pin Code 201301
Kotak Mahindra
6 WCDL 1 Year 11.30% 26.81 owned by Sanjay Tyagi & Rekha Tyagi (First & Exclusive Charge)
Bank
2-Plot No. C-83, RDC Raj Nagar, Ghaziabad, Uttar Pradesh, Pin Code 201002
owned by M/s Shiv Durga Constructions Company Propritor Anju Sharma
(First & Exclusive Charge)
3-Guarantee- Personal Guarantee of Sanjay Tyagi, Rekha Tyagi and Kartikey
Tyagi, Guarantee of Security provider M/s Shiv Durga Constructions
Company Proprietor Anju Sharma
1-Exclusive Charges of Movable Fixed Assets
ICICI Bank Overdraft
7 1 Year 9.75% 20.02 2- Exclusive Charges of Immovable Fixed Assets of Khasra No.742, Ward
Limited Limit
No.18, Mohalla Lower Bazar, Modinagar, Ghaziabad, Uttar Pradesh-201204
3843- Exclusive Charges of Fixed Deposit
4- First Pari-passu Charges of Current Assets
5- Personal Guarantee of Sanjay Tyagi, Rekha Tyagi and Kartikey Tyagi,
Guarantee of Security provider Meena Sharma and Manav Sharma
From Others
Oxyzo Financial
Purchase
8 Services Private 1 Year 14.50% 17.67 No Security - Unsecured Loan
Financing
Limited
Total 395.56
Note-2: Nature of Security & Terms of Repayment for Short Term Borrowings
Sr. Outstanding as
Nature of Term of Rate of
No. Particulars on 31st March Nature of Security Pledge
Facility Repayment Interest
2025
Primary Security for Cash Credit (Hyp.) Limit: Hypothecation on 1st Pari-
passu basis on stocks of raw materials, stock in process, finished goods, stores
& spares, receivables and other current assets (existing and future) lying at
work sites of various projects and office godowns with other lenders under
multiple banking arrangements.
• Hypothecation of entire unencumbered fixed assets of the Company on
Pari-passu basis.
• Hypothecation/Mortgage of Block Assets of various Immovable
Cash 1 Year (Date
Punjab National Properties
1 Credit of Sanction- 11.80% 131.90
Bank 1.Property bearing No. B-27, Sector-49, Noida, Gautam Budh Nagar, Uttar
Limit 26.11.2024)
Pradesh
2. Plot bearing No. NK-II 265A, Indirapuram, Ghaziabad, Uttar Pradesh
3.Registered Mortgage at Khasra No. 85, Min at Village Morti, Pargana
Jalalabad, Ghaziabad, Uttar Pradesh
4.House No. 3/1223 at Sector-3, Vasundhara Yojna, Vashundhara, Ghaziabad,
Uttar Pradesh
5. Lease hold (JDA) Plot No. 44, Gulmohar Park-I, Mahal Jagatpura, Jaipur,
Rajasthan
3856.Lease hold (JDA) Plot No.45, Gulmohar Park-I, Mahal Jagatpura, Jaipur,
Rajasthan
7.Lease hold (JDA) Plot No.52, Gulmohar Park-I, Mahal Jagatpura, Jaipur,
Rajasthan
8.Lease hold (JDA) Plot No.53, Gulmohar Park-I, Mahal Jagatpura, Jaipur,
Rajasthan
9.Lease hold (JDA) Plot No. S 59, Mahesh Nagar, Jaipur, Rajasthan
10.Under Construction Building on lease hold (JDA) Plot No. B 181, SEZ at
Village Jhai, Tehsil, Sangner, Jaipur, Rajsthan
11.Property situated at 29, Avadhpuri, Near Mahesh Nagar, Jaipur, Rajasthan
12 Registered Mortgage House No. 474/11 at North Civil Lines,
Muzaffarnagar, Uttar Pradesh
• Personal Guarantees & Corporate Guarantees of Mr. Sanjay Tyagi
(Director), Mr. Kartikey Tyagi (Director), Rekha Tyagi (Director),
Mam Chand Tyagi (Friend of Director), Rajiv Tyagi (Brother of
Sanjay Tyagi), Sandhya Tyagi (Wife of Mr Rajiv Tyagi),
Madhusudhan Gupta (Friend of Director), Kamlesh Gaur (Friend),
Neeraj Tyagi (Brother of Sanjay Tyagi), Saroj Bala Devi (Mother of
Director), M/S Kartikey Constructions(Partnership Firm), M/S
Unimax Buildestate (Property owner).
• FDR kept in the Account of ₹1.71 Crore
1- Pari Passu charge in favor of the Bank by way of the Bank by way of
Hypothecation of the company's entire stocks of Raw Materials, WIP, Semi
finished and finished goods, consumable stores, spares including book debts,
bill whether documentary or clean, outstanding monies, receivables, both
Cash 1 Year (Date present & future, in a form and manner satisfactory to the Bank.
HDFC Bank
2 Credit of Sanction- 9.78% 74.51
Limited
Limit 24.12.2024) 2- Equitable Mortgage of Immovable Property- B-137, Sector 2, Noida UP-
201301.
3- Unconditional & Irrevocable Personal Guarantee of all Directors and
property holder.
3861- Pari Passu charge in favor of the Bank by way of the Bank by way of
Hypothecation of the company's entire stocks of Raw Materials, WIP, Semi
finished and finished goods, consumable stores, spares including book debts,
bill whether documentary or clean, outstanding monies, receivables, both
1 Year (Date present & future, in a form and manner satisfactory to the Bank.
HDFC Bank
3 Drul - LC of Sanction- 9.78% 20.41
Limited
24.12.2024) 2- Equitable Mortgage of Immovable Property- B-137, Sector 2, Noida UP-
201301.
3- Unconditional & Irrevocable Personal Guarantee of all Directors and
property holder.
1- Pari Passu charge in favor of the Bank by way of the Bank by way of
Hypothecation of the company's entire stocks of Raw Materials, WIP, Semi
finished and finished goods, consumable stores, spares including book debts,
bill whether documentary or clean, outstanding monies, receivables, both
1 Year (Date present & future, in a form and manner satisfactory to the Bank.
HDFC Bank (Against Floating
4 of Sanction- 26.17
Limited LC) Interest
24.12.2024) 2- Equitable Mortgage of Immovable Property- B-137, Sector 2, Noida UP-
201301.
3- Unconditional & Irrevocable Personal Guarantee of all Directors and
property holder.
1-Primary Security- Continuation of First Pari Passu charge on all existing
and future current assets of the Borrower.
2.Collateral Security- Creation of Equitable Mortgage over Immovable
1 Year (Date
Kotak Mahindra Overdraft Properties- Plot No 17, Block A, Sector 49, Noida, Uttar Pradesh-201301 &
5 of Sanction- 10.10% 94.79
Bank Limit Plot No C-83, RDC, Raj Nagar, Ghaziabad-201002.
04.09.2024)
3.Personal Guarantee of Sanjay Tyagi, Rekha Tyagi and Kartikey Tyagi.
Guarantee of Security provider M/s Shiv Durga Constructions Company (Prop
Anuj Sharma)
3871-Primary Security- Continuation of First Pari Passu charge on all existing
and future current assets of the Borrower.
2.Collateral Security- Creation of Equitable Mortgage over Immovable
1 Year (Date
Kotak Mahindra Floating Properties- Plot No 17, Block A, Sector 49, Noida, Uttar Pradesh-201301 &
6 WCDL of Sanction- 28.77
Bank Interest Plot No C-83, RDC, Raj Nagar, Ghaziabad-201002.
04.09.2024)
3.Personal Guarantee of Sanjay Tyagi, Rekha Tyagi and Kartikey Tyagi.
Guarantee of Security provider M/s Shiv Durga Constructions Company (Prop
Anuj Sharma)
1-Exclusive Charges of Movable Fixed Assets
2- Exclusive Charges of Immovable Fixed Assets of Khasra No.742, Ward
1 Year (Date No.18, Mohalla Lower Bazar, Modinagar, Ghaziabad, Uttar Pradesh-201204
ICICI Bank Overdraft
7 of Sanction- 9.75% 43.84 3- Exclusive Charges of Fixed Deposit
Limited Limit
23.12.2024) 4- First Pari-passu Charges of Current Assets
5- Personal Guarantee of Sanjay Tyagi, Rekha Tyagi, Kartikey Tyagi, Meena
Sharma and Manav Sharma
1- Pari Passu charge in favor of the Bank by way of the Bank by way of
Hypothecation of the company's entire stocks of Raw Materials, WIP, Semi
10%
finished and finished goods, consumable stores, spares including book debts,
repayment
bill whether documentary or clean, outstanding monies, receivables, both
from every
HDFC Bank Project present & future, in a form and manner satisfactory to the Bank.
8 payment 9.5 50.00
Limited Loan
received
2- Equitable Mortgage of Immovable Property- B-137, Sector 2, Noida UP-
from
201301.
Department
3- Unconditional & Irrevocable Personal Guarantee of all Directors and
property holder.
10% 1- Pari Passu charge in favor of the Bank by way of the Bank by way of
repayment Hypothecation of the company's entire stocks of Raw Materials, WIP, Semi
HDFC Bank Project
9 from every 9.5 50.00 finished and finished goods, consumable stores, spares including book debts,
Limited Loan
payment bill whether documentary or clean, outstanding monies, receivables, both
received present & future, in a form and manner satisfactory to the Bank.
388from
Department 2- Equitable Mortgage of Immovable Property- B-137, Sector 2, Noida UP-
201301.
3- Unconditional & Irrevocable Personal Guarantee of all Directors and
property holder.
From Others
1 Year (Date
Oxyzo Financial Purchase Floating @
8 of Sanction- 25.09 No Security - Unsecured Loan
Services Limited Financing 14.95%
30.11.2024)
Total 545.49
389(₹ in millions)
ANNEXURE 28: TRADE PAYABLES
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Total outstanding dues to micro enterprises and small
25.28 85.40 57.34
enterprises
Total outstanding dues to other than micro enterprises
99.75 125.23 228.87
and small enterprises
TOTAL 125.03 210.63 286.21
(₹ in millions)
As at March 31, 2025
Outstanding for following periods from due date
of Payment
Particulars Total
Less than 1 1 - 2 2 - 3 More than 3
Year Years Years Years
Total outstanding dues to micro
25.28 - - - 25.28
enterprises and small enterprises
Total outstanding dues to other than
micro enterprises and small 99.75 - - - 99.75
enterprises
Disputed dues-MSME - - - - -
Disputed dues of creditors other than
- - - - -
MSME
TOTAL 125.03 - - - 125.03
As at March 31,2024
Outstanding for following periods from due date
of Payment
Particulars Total
Less than 1 1 - 2 2 - 3 More than 3
Year Years Years Years
Total outstanding dues to micro
85.40 - - - 85.40
enterprises and small enterprises
Total outstanding dues to other than
micro enterprises and small 125.23 - - - 125.23
enterprises
Disputed dues-MSME - - - - -
Disputed dues of creditors other than
- - - - -
MSME
TOTAL 210.63 - - - 210.63
As at March 31,2023
Outstanding for following periods from due date
of Payment
Particulars Total
Less than 1 1 - 2 2 - 3 More than 3
Year Years Years Years
Total outstanding dues to micro
55.86 1.48 - - 57.34
enterprises and small enterprises
Total outstanding dues to other than
micro enterprises and small 227.92 0.91 - 0.05 228.87
enterprises
Disputed dues-MSME - - - - -
390Disputed dues of creditors other than
- - - -
MSME -
TOTAL 283.78 2.38 - 0.05 286.21
(₹ in millions)
ANNEXURE 29: OTHER FINANCIAL LIABILITIES (CURRENT)
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Mobilisation Advance 216.59 275.29 161.68
Deposit Received in Joint Venture Agreement 8.90 4.90 5.80
Security Received from Contractors & Others 196.90 136.64 109.10
TOTAL 422.40 416.84 276.58
(₹ in millions)
ANNEXURE 30: OTHER CURRENT LIABILITIES
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Statutory Dues Payable 16.90 125.49 7.50
Employee related payables 7.60 5.95 3.58
Corporate Social Responsibility Expense Payable 9.55 6.36 4.41
Other Expense payable 3.54 2.08 1.67
Advances from customers 5.43 9.76 15.46
Total 43.01 149.63 32.62
(₹ in millions)
ANNEXURE 31: SHORT-TERM PROVISIONS
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Provision for Gratuity 0.64 0.63 0.39
Total 0.64 0.63 0.39
(₹ in millions)
ANNEXURE 32: CURRENT TAX LIABILITY (NET)
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Provision for Income Tax (Net of Advance Tax & TDS) 26.06 32.13 -
Total 26.06 32.13 -
(₹ in millions)
ANNEXURE 33: REVENUE FROM OPERATIONS
For the Financial Year ended
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Sale of Services
Sewerage Construction Contracts 2,079.08 1,580.07 1,770.17
Operation and maintenance of Sewerage works 23.41 13.10 13.11
Road & Highway Construction & Maintenance 21.47 0.69 -
Building Construction Work 248.38 - -
Water Supply Work 163.53 475.42 -
Electrical Work 210.30 - -
Other Operating Revenues
Sale of Material 49.47 191.75 3.63
Total 2,795.64 2,261.02 1,786.91
391(₹ in millions)
ANNEXURE 34: OTHER INCOME
For the Financial Year ended
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Interest (Received) on FDR 14.40 11.48 15.33
Interest (Received) - - -
Interest (Received) on Income Tax Refund - 0.18 0.09
Miscellaneous Income - 0.29 -
Profit on sale of Fixed Assets - - 3.11
Total 14.40 11.96 18.53
(₹ in millions)
ANNEXURE 35: COST FROM REVENUE OPERATIONS
For the Financial Year ended
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Material at Site at the beginning of the year 70.59 53.72 35.17
Purchase of Material 1,081.33 866.98 516.68
Material at Site at the end of the year 105.12 70.59 53.72
Cost of Material Consumed 1,046.79 850.11 498.14
Other Direct Costs
Stores & Consumables 4.97 2.41 2.79
Freight Charges 7.76 6.19 4.77
Labour Cess 30.93 12.02 19.34
Labour Processing, Testing and Car & Machinery Hire
32.19 10.72 5.44
Charges
Job Work Charges 1,304.18 972.90 1,239.78
Rent (Paid) 4.60 2.36 1.65
Legal & Professional expenses 5.65 13.88 2.67
Repair & Maintenance expenses 0.58 0.71 0.51
Interest on Mobilization advances 15.24 24.25 14.71
Others 14.95 12.45 2.09
Total 2,467.84 1,907.99 1,791.88
(₹ in millions)
ANNEXURE 36: CHANGES IN INVENTORIES OF WORK IN PROGRESS
For the Financial Year ended
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
As at the end of the reporting period/year
Work in Progress 784.21 486.87 418.83
(A) 784.21 486.87 418.83
As at the beginning of the reporting period/year
Work in Progress 486.87 418.83 140.23
(B) 486.87 418.83 140.23
Total (B-A) (297.34) (68.04) (278.60)
392(₹ in millions)
ANNEXURE 37: EMPLOYEE BENEFIT EXPENSE
For the Financial Year ended
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Salaries & Wages 74.68 42.68 29.25
Directors' Remuneration 21.00 13.80 8.10
Contribution to provident and other funds 0.78 0.53 0.53
Staff welfare Expenses 1.78 0.69 0.35
Gratuity Expenses 1.57 1.03 0.79
Workmen Compensation Expenses 0.55 1.59 -
Total 100.35 60.32 39.03
(₹ in millions)
ANNEXURE 38: FINANCE COSTS
For the Financial Year ended
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Bank Charges, Commission & Processing Charges 13.41 18.73 20.84
Interest on Secured Loans 49.02 36.60 35.78
Interest on Unsecured Loan & Others 27.76 22.91 23.67
Finance Charges 2.20 1.04 0.93
Total 92.39 79.29 81.22
(₹ in millions)
ANNEXURE 39: DEPRECIATION AND AMORTISATION EXPENSES
For the Financial Year ended
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Property, Plant and Equipment 17.21 9.33 9.64
Right of Use Assets 1.03 1.03 1.03
Total 18.24 10.36 10.68
(₹ in millions)
ANNEXURE 40: OTHER EXPENSES
For the Financial Year ended
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Electricity & Generator charges 1.27 1.05 0.98
Repairs & Maintenance 2.11 1.01 1.20
Legal and Professional charges 6.27 7.97 2.35
Auditors' Remuneration ** 2.11 1.00 0.75
Rent, Rates & Taxes 2.40 2.17 1.98
Printing and Stationery 1.11 0.54 0.32
Telephone, Internet & Postage Expenses 0.20 0.27 0.38
Travelling & Conveyance 9.89 4.30 3.31
Advertisement & Business Promotion 0.50 0.06 0.01
Insurance 1.63 1.09 0.42
Watch & Ward 1.20 1.08 -
Fee & Subscription 3.55 0.17 0.41
Vehicle Running and Maintenance 0.67 0.78 0.67
Tender Fee 0.26 0.25 0.15
Sales Tax/ Service Tax & GST (Paid) 0.04 0.31 -
Allowance for Expected Credit Loss 0.16 0.44 0.46
393Interest on late payment of MSME 10.16 - -
Interest on Govt Dues 0.57 0.25 -
Corporate Social Responsibility expenses 3.33 1.95 1.51
Fine & Penalty 0.35 0.05 0.34
Charity & Donation 0.04 0.03 0.02
Miscellaneous Expenses 0.31 0.49 0.52
Total 48.11 25.28 15.76
** Payment to Auditor
For the Financial Year ended
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Statutory Audit (included in Auditor Remuneration Expense
1.71 0.75 0.50
above)
Tax Audit (included in Auditor Remuneration Expense above) 0.40 0.25 0.25
Payment for Audit Services (included in Legal & Professional
0.42 0.07 0.81
Charges above)
Payment for Other Services (included in Legal & Professional
2.62 1.73 -
Charges above)
Total 5.14 2.79 1.56
(₹ in millions)
ANNEXURE 41: TAX EXPENSES
For the Financial Year ended
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Income Tax relating to current period/year 102.00 69.00 37.50
Firm Tax 1.81 0.99 -
Current Tax Expenses Relating to Prior Years 1.13 0.45 0.05
Total 104.94 70.44 37.55
(₹ in millions)
ANNEXURE 42: EARNINGS PER SHARE
For the Financial Year Ended
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Restated profit after tax attributable to the equity holders
282.04 190.54 108.06
(INR in million) (A)
Restated Weighted average number of shares considered
3,01,01,200 3,01,01,200 3,01,01,200
for calculating basic EPS (B) (after Bonus Issue)
Numerator to calculate diluted EPS (C) 282.04 190.54 108.06
Restated Weighted average number of shares considered
3,01,01,200 3,01,01,200 3,01,01,200
for calculating diluted EPS (D)
Nominal value of shares (Rupees) 10.00 10.00 10.00
Basic earnings per share (Rupees) (E) = (A)/(B) 9.37 6.33 3.59
Diluted earnings per share (Rupees) (F) = (C)/(D) 9.37 6.33 3.59
(₹ in millions)
Calculation of Restated Weighted Average Number of Shares
For the Financial Year Ended
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Original No. of Shares 75,25,300 75,25,300 75,25,300
394Add: - Bonus Shares Issue (Retrospective Impact as
2,25,75,900 2,25,75,900 2,25,75,900
per IND AS 33)
3,01,01,200 3,01,01,200 3,01,01,200
Note
Pursuant to resolutions passed by the Shareholders of our Company in their meeting held on May 28, 2025, new
bonus equity shares were issued, in the ratio of 3:1. Thus 2,25,75,900 Equity shares of ₹ 10/- each were issued
as bonus shares out of the reserves of the company. Accordingly, the disclosure of basic and diluted EPS for all
the years presented has been arrived at after giving retrospective effect of bonus shares in current year and prior
periods as per IND AS 33.
(₹ in millions)
ANNEXURE 43: PAYABLE TO MICRO, SMALL AND MEDIUM ENTERPRISES
Details dues to micro and small enterprises as defined under the Micro, Small and Medium Enterprise
Development Act, 2006 (MSMED Act, 2006)
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
i) The principal amount and the interest due thereon
remaining unpaid to any supplier as at the end of each
accounting period/ year
-- Principal amount due to micro and small enterprises 15.13 85.40 57.34
-- Interest due on above 10.16 - -
ii)The amount of interest paid by the buyer in terms of
section 16, of the MSMED Act,2006 along with the
- - -
amounts of the payment made to the supplier beyond the
appointed day during each accounting period/ year
iii) The amount of interest due and payable for the period
of delay in making payment (which have been paid but
beyond the appointed day during the year) but without - - -
adding the interest
specified under MSMED Act, 2006
iv) The amount of interest accrued and remaining unpaid
- - -
at the end of each accounting year
v) The amount of further interest remaining due and
payable even in the succeeding years, until such date when
the interest dues as above are actually paid to the small - - -
enterprise for the purpose of disallowance as a deductible
expenditure under section 23 of the MSMED Act, 2006
(₹ in millions)
ANNEXURE :44 RELATED PARTY TRANSACTIONS
A. List of the related parties and nature of relationship with whom transactions have taken place
during the respective year
Description of Relationship Name of The Party
Mr. Sanjay Tyagi (Managing Director)""
Key Managerial Ms. Rekha Tyagi (Director)
(a) Personnel (KMP) & Mr. Kartikey Tyagi (Whole Time Director & Chief Financial Officer)>>
Directors Mr Saket Surolia (Company Secretary & Compliance Officer of the
Company) **
Ms. Vartika Tyagi (Daughter of Mr. Sanjay Tyagi)
Relative of KMP &
(b) Mr. Neeraj Tyagi (Brother of Mr. Sanjay Tyagi)
Directors
Ms. Ritu Tyagi (Relative of Mr. Sanjay Tyagi)
395Enterprises significantly Sanjay Tyagi HUF (Managing Director is Karta)
influenced by KMP & Neeraj Tyagi HUF (Managing Director's Brother is Karta)
(c)
Directors and their VVIP Infratech Limited (Formerly Known as Vibhor Vaibhav Infra
relatives Private Limited)
TESPL LRS TCPL -JV
(d) Associates
Krishna TCPL -JV <<
All the related party transactions entered during the years were in ordinary course of business and are at arm
length price.
"" The Board of Directors in their meeting held on May 29, 2025 has appointed Mr Sanjay Tyagi as the
Chairman of the Company w.e.f. May 29, 2025. However, the Board of Directors in their meeting held on June
12, 2025 has approved the resignation of Mr Sanjay Tyagi from the position of Chairman of the company w.e.f.
June 12, 2025.
>> Appointed as Director on May 29, 2023. The Board of Directors in their meeting held on April 21, 2025 has
appointed Mr. Kartikey Tyagi as the Whole Time Director & Chief Financial Officer of the Company w.e.f.
April 21, 2025.
<< Krishna TCPL -JV, an associate is dissolved on December 31, 2024 vide dissolution deed dated December
31, 2024 and hence it is not a related party transaction as on March 31, 2025.
**The Board of Directors in their meeting held on April 21, 2025 has appointed Mr. Saket Surolia as the
Company Secretary and Compliance Officer of the Company w.e.f. April 21,2025.
B. Related Party Transactions and Balances
Sr. For the Financial Year ended
Particulars
No. 31-Mar-25 31-Mar-24 31-Mar-23
A. Transactions during the year
(i) Purchase & Job Work
Sanjay Tyagi HUF - - 1.59
VVIP Infratech Limited (Formerly Known as Vibhor
657.43 606.03 621.81
Vaibhav Infra Private Limited)
(ii) Revenue from operations
TESPL LRS TCPL -JV 163.53 147.66 -
VVIP Infratech Limited (Formerly Known as Vibhor
507.85 431.48 2.16
Vaibhav Infra Private Limited)
(iii) Profit/(Loss) from Associates
Profit on TESPL-LRS-TCPL (JV) 5.19 2.82 (0.02)
Profit on Krishna TCPL (JV) 0.00 0.00 0.00
(iv) Loan Taken
Mr. Sanjay Tyagi 33.40 75.05 37.40
Ms. Rekha Tyagi 9.45 17.40 14.40
Mr. Kartikey Tyagi 8.20 6.16 3.80
Sanjay Tyagi HUF 9.50 11.20 9.58
Ms. Vartika Tyagi 4.00 - 3.85
(v) Repayment of Loan & TDS
Mr. Sanjay Tyagi 39.85 16.41 59.70
Ms. Rekha Tyagi 2.51 1.83 68.13
Mr. Kartikey Tyagi 5.63 4.24 3.01
Sanjay Tyagi HUF 6.97 10.59 7.14
Ms. Vartika Tyagi 0.72 0.47 0.42
396(vi) Salary paid
Key Managerial Personnel & Directors
Mr. Kartikey Tyagi 6.00 2.40 -
Ms. Rekha Tyagi 3.00 2.40 1.50
Mr. Sanjay Tyagi 12.00 9.00 6.60
Relative of Key Managerial Personnel & Directors
Ms. Vartika Tyagi 3.00 - 1.80
Mr. Kartikey Tyagi - - 1.80
(vii) Interest paid
Mr. Kartikey Tyagi 0.66 0.36 0.18
Ms. Rekha Tyagi 6.50 4.80 6.35
Mr. Sanjay Tyagi 11.14 6.27 4.06
Sanjay Tyagi HUF 1.21 1.12 0.37
Ms. Vartika Tyagi 0.67 0.49 0.22
(viii) Other Expenses
Ms. Vartika Tyagi - 1.95 -
(ix) Purchase of Fixed Assets
VVIP Infratech Limited (Formerly Known as Vibhor
- 0.85 -
Vaibhav Infra Private Limited)
Sr. For the Financial Year ended
Particulars
No. 31-Mar-25 31-Mar-24 31-Mar-23
(x) Lease Rentals Paid
Ms. Rekha Tyagi 1.40 1.45 1.32
Mr. Sanjay Tyagi 0.61 0.66 0.60
Sr. As at
Particulars
No. 31-Mar-25 31-Mar-24 31-Mar-23
B. Outstanding Payables
(i) Loan from Related parties
Mr. Sanjay Tyagi 86.23 81.53 16.63
Ms. Rekha Tyagi 61.92 48.47 28.10
Mr. Kartikey Tyagi 7.17 3.94 1.66
Sanjay Tyagi HUF 11.28 7.54 5.81
Ms. Vartika Tyagi 8.11 4.17 4.16
Mr. Neeraj Tyagi 5.06 5.06 5.06
Ms. Ritu Tyagi 2.22 2.22 2.22
Neeraj Tyagi HUF 6.89 6.89 6.89
(ii) Salary payable
Key Managerial Personnel & Directors
Mr. Kartikey Tyagi 0.15 0.02 -
Ms. Rekha Tyagi 0.15 - 0.03
Mr. Sanjay Tyagi 0.49 0.52 0.08
Relative of Key Managerial Personnel & Directors
397Ms. Vartika Tyagi 0.17 - 0.12
Mr. Kartikey Tyagi - - 0.12
(iii) Trade Payables
Sanjay Tyagi HUF - - 0.09
VVIP Infratech Limited (Formerly Known as Vibhor
87.88 85.99 165.01
Vaibhav Infra Private Limited)
Ms. Vartika Tyagi - 1.76 -
(iv) Other Payables
Ms. Rekha Tyagi 0.05 - -
Mr. Sanjay Tyagi - - -
VVIP Infratech Limited (Formerly Known as Vibhor
Vaibhav Infra Private Limited) (Security, Retention, 123.29 109.93 94.58
Testing & Commissioning Withheld)
C. Outstanding Receivables
(i) Trade Receivables
TESPL LRS TCPL -JV 69.51 47.00 -
(ii) Other Receivables
TESPL LRS TCPL -JV (Security, Retention, Testing &
50.76 26.28 -
Commissioning Withheld)
(iii) Investments
TESPL LRS TCPL -JV 52.24 1.86 0.03
Krishna TCPL JV - 0.00 1.01
ANNEXURE 45: SEGMENT INFORMATION
M/s Technocraft Ventures Limited (formerly known as Technocraft Construction Private Limited) is a
multidisciplinary public infrastructure development company specializing in turnkey EPC government projects
primarily focusing on the Wastewater Treatment and Water Supply field. The Company's core operations span
several critical infrastructure sectors such as Wastewater Treatment/Supply Schemes, Operation and
Maintenance, Water Supply Scheme Projects (WSSPs) Electricity Transmission Distribution Networks and
Electrical Substations, Road and Highway Construction and Housing, Residential Buildings, and Sector
Development. Information is reported to and evaluated regularly by the Chief Operating Decision Maker
(CODM) i.e. Managing Director for the purpose of resource allocation and assessing performance focuses on
the business as whole. Based on similarity of activities, risk and reward structure, organisation structure and
internal reporting system, the company has structured its operations into single operating segment and hence
there is no reportable segment as per Ind AS 108 “Operating Segments”. Accordingly, there is no other separate
reportable segment as defined by IND AS 108 "Operating Segments"
(₹ in millions)
ANNEXURE 46:
(A) CONTINGENT LIABILITIES AND COMMITMENTS
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
A) Disputed claims/levies in respect of Income tax
against which Rectification application is filed except
for the Assessment year 2024-25 before jurisdictional
398Assessing Officer and demand will be deleted as told by
the Management of the Company.
For the Assessment year 2024-25, the rectification
application is yet to be filed as the TDS from the
principal is not reflected in the 26AS of the Company,
as told by the management of the company, they are
pursuing with the principal to show the TDS in the
26AS, after reflection in 26AS, the company will file the
rectification application with the Income Tax
Department.
A.Y 2024-25 7.34 - -
A.Y 2018-19 0.13 0.13 0.13
A.Y 2023-24 1.16 1.16 -
B) Disputed claims/levies in respect of Goods and
Services Tax)
Appeals filed of GST (Rajasthan) Tax Assessment of
0.97 - -
FY 2018-2019
Appeal filed of GST (Rajasthan) Interest Liability of
21.74 - -
FY 2023-2024
Gist Liability (U.P) on account of differential amount
of GST @ 6% and 18% on the supply/Services made to
the department (UP Jal Nigam) in compliance to DGGI Amount not
- -
Meerut Proceedings, against which writ petition is yet quantifiable
to be filed before the High Court for the period Jan
2022 to July 2022.
Total 31.35 1.29 0.13
(B) GUARANTEES
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
A) Bank Guarantees 1,113.16 792.27 595.55
Total 1,113.16 792.27 595.55
(₹ in millions)
ANNEXURE 47: EMPLOYMENT BENEFIT OBLIGATIONS
31-Mar-25
Particulars
Current Non-Current Total
Gratuity
Present value of defined benefit obligation 0.64 6.11 6.75
Total employee benefit obligations 0.64 6.11 6.75
31-Mar-24
Particulars
Current Non-Current Total
Gratuity
Present value of defined benefit obligation 0.63 4.65 5.27
Total employee benefit obligations 0.63 4.65 5.27
31-Mar-23
Particulars
Current Non-Current Total
Gratuity
Present value of defined benefit obligation 0.39 3.71 4.10
Total employee benefit obligations 0.39 3.71 4.10
a) Defined Benefit Plans
Gratuity
399The Company operates a defined benefit gratuity plan for its employees. The gratuity scheme provides for lump
sum payment to vested employees at retirement/death while in employment or on termination of employment
of an amount equivalent to 15 days salary payable for each completed year of service or part thereof in excess
of 6 months subject to a limit of ₹ 2.00 million (March 31, 2024: ₹ 2.00 million and March 31, 2023: ₹ 2.00
million)
(₹ in millions)
i) Movement of defined benefit obligation:
The amounts recognised in the balance sheet and the movements in the net defined benefit obligation over the
year are as follows:
For the Financial Year ended
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Opening defined benefit obligation (A) 5.27 4.10 3.55
Current service cost 1.20 0.73 0.53
Past service cost - - -
Interest cost 0.37 0.30 0.26
Expected return on plan assets - - -
Total amount recognised in profit or loss (B) 1.57 1.03 0.79
Remeasurements
Effect of change in financial assumptions 0.20 0.09 0.02
Effect of change in demographic assumptions
- - -
Effect of experience adjustments (0.21) 0.05 (0.26)
Total amount recognised in other comprehensive income (C) (0.01) 0.14 (0.24)
Benefits (Paid) (0.08) - -
Closing defined benefit obligation (A+B+C) 6.75 5.27 4.10
(₹ in millions)
ii) Net benefit asset/ (liability) recognised in the balance sheet
For the Financial Year ended
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Present value of defined benefit
6.75 5.27 4.10
obligation at the end of the period
Less: Fair value of plan assets at the
- - -
end of the period
Net benefit liability/(asset) 6.75 5.27 4.10
(₹ in millions)
iii) Principal assumptions used in determining gratuity obligations for the Company’s plan are shown
below:
For the Financial Year ended
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Discount Rate 6.73% 7.09% 7.32%
Salary Growth Rate 5.00% 5.00% 5.00%
Expected Rate of Return on Plan
N.A N.A N.A
Assets
Normal Age of Retirement 60 Years 60 Years 60 Years
Withdrawal Rate 5.00% 5.00% 5.00%
Mortality Table IALM (2012-14) Ult IALM (2012-14) Ult IALM (2012-14) Ult
Notes:
400(1) The discount rate is based on the prevailing market yield of Indian Government Securities as at Balance
Sheet date for the estimated term of obligation.
(2) The estimate of future salary increases considered in actuarial valuation takes into account inflation,
seniority, promotion and other relevant factors such as supply and demand in the employment market.
(₹ in millions)
(iv) Sensitivity Analysis
The sensitivity of the defined benefit obligation to changes in the weighted principal assumptions is:
For the Financial Year ended
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
(a) Impact of Discount rate on defined benefit
obligation
Increased by 1.00% (0.52) (0.39) (0.30)
Decreased by 1.00% 0.61 0.45 0.34
(b) Impact of Salary Escalation rate on defined
benefit obligation
Increased by 1.00% 0.55 0.40 0.31
Decreased by 1.00% (0.51) (0.39) (0.28)
The above sensitivity analyses are based on a change in an assumption while holding all other assumptions
constant. In practice, this is unlikely to occur, and changes in some of the assumptions may be correlated. When
calculating the sensitivity of the defined benefit obligation to significant actuarial assumptions the same method
i.e. projected unit credit method has been applied as that used for calculating the defined benefit liability
recognised in the balance sheet.
v) Risk Exposure
The defined benefit obligations have the undermentioned risk exposures:
Interest rate risk: The defined benefit obligation calculated uses a discount rate based on government bonds.
If bond yields fall, the defined benefit obligation will tend to increase.
Salary Inflation risk: Higher than expected increases in salary will increase the defined benefit obligation.
Demographic risk: This is the risk of variability of results due to unsystematic nature of decrements that include
mortality, withdrawal, disability and retirement. The effect of these decrements on the defined benefit obligation
is not straight forward and depends upon the combination of salary increase, discount rate and vesting criteri
Investment risk: The present value of the defined benefit plan liability is calculated using a discount rate
determined by reference to high quality corporate bond yields; if the return on plan asset is below this rate, it
will create a plan deficit.
vi) Defined benefit liability and employer contributions
The weighted average duration of the defined benefit obligation is years (March 31, 2025: 12.13 years, March
31, 2024: 11.55 years and March 31, 2023: 11.52 years).
The expected maturity analysis of undiscounted gratuity is as follows:
(₹ in millions)
For the Financial Year ended
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Less than a year 0.66 0.65 0.40
Between 1 - 2 years 0.34 0.30 0.38
Between 2 - 3 years 0.66 0.30 0.26
Between 3 - 4 years 0.36 0.65 0.26
Between 4 - 5 years 1.05 0.31 0.60
401Beyond 5 years 2.70 2.46 1.94
B) Defined Contribution Plan
The Company has a defined contribution plan in respect of provident fund. Contributions are made to provident
fund and employees state insurance in India for employees at the rate as prescribed in the regulations. The
obligation of the group is limited to the amount contributed and it has no further contractual nor any
constructive obligation.
The Company has recognized the following amounts towards defined contribution plan in the Statement of
Profit and Loss –
(₹ in millions)
For the Financial Year ended
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Employer's Contribution to Provident Fund and other
0.78 0.53 0.53
funds
Included in ‘Contribution to provident and other funds’ under Employee Benefits Expense (Refer ANNEXURE
37)
(₹ in millions)
ANNEXURE 48: TRANSITION TO IND AS 116 "LEASES"
Particulars Land Total
Cost/Deemed Cost
As at March 31,2023
Opening Balance 52.31 52.31
Additions - -
Deductions - -
Depreciation/Amortisation 1.03 1.03
Total 51.28 51.28
As at March 31,2024
Opening Balance 51.28 51.28
Additions - -
Deductions - -
Depreciation/Amortisation 1.03 1.03
Total 50.25 50.25
As at March 31,2025
Opening Balance 50.25 50.25
Additions - -
Deductions - -
Depreciation/Amortisation 1.03 1.03
Total 49.21 49.21
i) ROU assets are amortised from the commencement date on a straight-line basis over the lease term. The lease
term is 90 years for land. The aggregate depreciation expense on ROU assets is included under depreciation
and amortisation expense in the statement of Profit and Loss.
402(₹ in millions)
(ii) The following is the break-up of current and non-current lease liabilities
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Current lease liability - - -
Non-current lease liability - - -
Total - - -
(₹ in millions)
(iii) Following is the movement in lease liabilities
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Balance as at the beginning - - -
Additions - - -
Finance Cost accrued during the period/year - - -
Payment of lease liabilities - - -
Balance as at the end - - -
Note:
As informed by the management, the entire lease rent pertaining to the leased asset was paid in full by the
previous owner of the asset, prior to the transfer of ownership to the company. Accordingly, there is no future
lease rent liability payable by the company. Consequently, there is no recognition of lease liability (current or
non-current) in the financial statements. Since there are no future lease payments, the requirements of Ind AS
116 with respect to recognition of lease liability and corresponding right-of-use asset and subsequent finance
cost adjustments are not applicable in this case. No adjustments related to interest (finance cost) under Ind AS
116 have been made in the financial statements. This treatment is based on the management's representation a
due to the absence of enforceable future lease payments.
(₹ in millions)
ANNEXURE 49: FAIR VALUE MEASUREMENTS
i) Category of financial instruments and valuation techniques
Breakup of financial assets carried at amortised cost
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Trade receivables 581.84 1,001.83 509.04
Cash and cash equivalent 5.13 11.22 27.16
Bank Balances other than Cash and Cash Equivalents 135.30 75.88 108.10
Investments - - 3.35
Other Financial Assets-Non-Current 329.56 274.67 334.35
Other financial Assets-Current 495.18 427.74 180.47
Note: The management has assessed that the carrying amounts of the above financial instruments
approximate their fair values.
(₹ in millions)
Breakup of financial assets carried at fair value through Other Comprehensive Income
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
- - -
Breakup of financial assets carried at fair value through Profit & Loss
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
- - -
403(₹ in millions)
Breakup of financial liabilities carried at amortised cost
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Borrowings-non-current 268.36 272.53 225.80
Other financial liabilities-non-current - 47.07 -
Borrowings- Current 605.94 528.58 282.24
Trade payables 125.03 210.63 286.21
Other financial liabilities-Current 422.40 416.84 276.58
Note: The management has assessed that the carrying amounts of the above financial instruments
approximate their fair values.
ii) Fair value hierarchy
This section explains the judgements and estimates made in determining the fair values of the financial
instruments that are (a) recognised and measured at fair value and (b) measured at amortised cost and for which
fair values are disclosed in the financial statements. to provide an indication about the reliability of the inputs
used in determining fair value, the company has classified its financial instruments into the three levels
prescribed under the accounting standard.
Quantitative disclosures of fair value measurement hierarchy are as follows:
Fair value measurement using
Quoted prices Significant Significant
Particulars
in active observable unobservable Total
markets inputs inputs
Level 1 Level 2 Level 3
Financial assets measures at fair value
There has been no transfer among Level 1, Level 2 and Level 3 during the financial year.
Level 1 hierarchy includes financial instruments measured using quoted prices. This
includes listed equity instruments that have quoted price. The fair value of all equity
Level 1:
instruments which are traded in stock exchanges is valued using the closing price as
at the reporting period.
The fair value of financial instruments that are not traded in an active market is
determined using valuation techniques which maximise the use of observable market
Level 2: data and rely as little as possible on equity specific estimates. If all significant inputs
required to fair value instruments are observable, the instrument is included in Level
2.
If one or more of the significant inputs is not based on observable market data, the
Level 3: instrument is included in Level 3. This is the case for unlisted equity securities,
security deposits included in Level 3.
ANNEXURE 50: FIRST TIME ADOPTION OF IND AS
The Restated Consolidated Financial Information have been compiled from the Audited Financial Statements
for the financial years ended March 31, 2025, March 31, 2024 and March 31, 2023. In preparing these financial
statements, the Company’s opening balance sheet was prepared as at April 01, 2022, the Company’s date of
transition to Ind AS. This note explains the principal adjustments made by the Company in restating its IGAAP
financial statements, including the balance sheet as at April 01, 2022 and the financial statements as at and for
the financial year ended March 31, 2023 and how the transition from IGAAP to Ind AS has affected the
Company’s financial position, financial performance and cash flows.
404A) IND AS ADJUSTMENTS
Optional exemptions availed on first time adoption of IND AS under "IND AS 101".
I. Deemed Cost
The Company has availed the deemed cost exemption as per IND AS 101 in relation to property, plant and
equipment and Intangible assets as on the date of transition i.e. April 01, 2022 and hence the net block carrying
amount (as per Previous GAAP) has been considered as the gross block carrying amount (as per Ind AS) on
that date i.e. April 01, 2022
II. Remeasurement gain/loss of net defined plan
Under Ind AS, all actuarial gains and losses are recognised in the other comprehensive income.
III. Leases
Ind AS 116 'Leases' requires an entity to assess whether a contract or arrangement contains a lease. In
accordance with Ind AS 116, this assessment should be carried out at the inception of the contract or
arrangement. Ind AS 101 provides an option to make this assessment on the basis of facts and circumstances
existing at the date of transition to Ind AS, except where the effect is expected to be not material.
IV. Deferred Tax
Under Previous GAAP, Deferred tax is calculated using the income statement approach which focuses on
differences between taxable profits and accounting profits for the period. Under Ind AS 12 deferred tax is
calculated using balance sheet approach which focuses on differences between taxable profits and accounting
profits for the period. The application of Ind AS 12 approach has resulted in recognition of deferred tax on new
temporary differences which was not required under IGAAP. In addition, the various transitional adjustments
lead to temporary differences. According to the accounting policies, the Company has to account for such
differences. Deferred tax adjustments are recognised in correlation to the underlying transaction either in
retained earnings or profit and loss respectively.
V. Expected Credit losses
Under Previous GAAP, The Company had recognised provision on trade receivables based on the expectation
of the Company. Under Ind AS, the Company has to provide loss allowance on receivables based on the
Expected Credit Loss (ECL) model which is measured following the "simplified approach". The Company uses
a provision matrix to measure the expected credit losses of trade receivables. The provision matrix is based on
its historical observed default rates, adjusted for forward looking estimates.
VI. Borrowings
Under Previous GAAP, processing fee on borrowings are recognised as expense when incurred. Under Ind AS
109, these costs are recognised under EIR method. Although it has negligible impact on borrowings under IND
AS.
VII. Business Combination
In accordance with Ind AS transitional provision, the company opted not to restate business combination which
occurred prior to transition date.
B) Reconciliations from previous GAAP
The following reconciliations provide a quantification of the effect of differences arising from the transition
from previous GAAP to Ind AS in accordance with Ind AS 101 whereas the notes explain the significant
differences thereto.
(i) Balance sheet reconciliations as of April 01 ,2022
(ii) Balance sheet reconciliations as of March 31,2023
(iii) Reconciliations of total equity as at March 31, 2023 and April 1, 2022
(iv) Reconciliations of statement of profit and loss for the financial year ended March 31,2022 & March
31,2023
(v) Reconciliations of total comprehensive income for the financial year ended March 31, 2022 & March 31
2023
(vi) Explanation of material adjustments to statement of cash flows
405(i) Balance sheet reconciliation as on April 1,2022
Notes to IND AS
Regrouped
Particulars Reconciliatio Adjustment IND AS
IGAAP
n s
ASSETS
Non-current assets
Property, Plant and Equipment 37.28 - 37.28
Capital Work in Progress 9.37 - 9.37
Right of Use Assets 1 53.35 1.03 52.31
Investment Property - - -
Goodwill - - -
Other Intangible Assets - - -
Investment in Associates 1.01 - 1.01
Financial Assets
-Investments 3.35 - 3.35
-Other financial assets 53.92 - 53.92
Deferred tax Assets (Net) 2 2.35 (1.21) 3.56
Other Non-Current assets 12.06 - 12.06
Total Non-Current assets 172.69 (0.18) 172.87
Current Assets
Inventories 175.40 - 175.40
Financial Assets
-Trade receivables 3 787.72 1.62 786.10
-Cash and Cash Equivalents 5.43 - 5.43
Bank Balances other than Cash and 148.86 - 148.86
Cash Equivalents
-Other Financial Assets 447.11 - 447.11
Other current assets 25.86 - 25.86
Income Tax (Assets) 3.55 - 3.55
Total current assets 1,593.93 1.62 1,592.31
Total 1,766.63 1.45 1,765.18
Equity and Liabilities
Equity
Equity share Capital 75.25 - 75.25
Other Equity 548.85 5.00 543.85
Total equity 624.10 5.00 619.11
Liabilities
Non-current liabilities
Financial Liabilities
-Borrowings 285.23 - 285.23
Lease Liabilities - - -
Deferred Tax Liabilities (Net) - - -
Other Financial Liabilities 86.24 - 86.24
Long Term Provisions 4 - (3.22) 3.22
Total non-current liabilities 371.47 (3.22) 374.69
406Current Liabilities
Financial Liabilities
-Borrowings 375.30 - 375.30
Lease Liabilities - - -
-Trade payables 161.07 - 161.07
Others 200.46 - 200.46
Other Current Liabilities 34.22 - 34.22
Short term Provisions 4 - (0.33) 0.33
Total current liabilities 771.05 (0.33) 771.38
Total equity and liabilities 1,766.63 1.45 1,765.18
(₹ in millions)
(ii) Balance sheet reconciliation as on March 31,2023
Notes to Regrouped IND AS
Particulars IND AS
Reconciliation IGAAP Adjustments
ASSETS
Non-current assets
Property, Plant and Equipment 39.99 - 39.99
Capital Work in Progress 9.63 - 9.63
ROU Assets 1 53.35 2.07 51.28
Investment Property - -
Other Intangible Assets -
Investment in Associates 1.04 - 1.04
Financial Assets -
-Investments 3.35 - 3.35
-Other financial assets 334.35 - 334.35
Deferred tax Assets (net) 2 2.98 -0.68 3.67
Other non-current assets 9.96 - 9.96
Total non-current assets 454.66 1.39 453.27
-
Current Assets -
Inventories 472.55 - 472.55
Financial Assets
-Trade receivables 3 511.13 2.08 509.04
-Cash and Cash Equivalents 27.16 - 27.16
Bank Balances other than Cash and
108.10 - 108.10
Cash Equivalents
-Loans - - -
-Other Financial Assets 180.47 - 180.47
Other Current Assets 83.00 - 83.00
Income tax Asset (Net)
1.31 - 1.31
Total current assets 1,383.71 2.08 1,381.62
Total 1,838.36 3.47 1,834.89
Equity and Liabilities
Equity
Equity share Capital 75.25 - 75.25
Other Equity 659.66 7.57 652.09
407Non-Controlling Interest - -
Total equity 734.91 7.57 727.34
Liabilities
Non-current liabilities
Financial Liabilities
-Borrowings 225.80 - 225.80
Lease Liabilities - - -
Deferred Tax Liabilities (Net) - - -
Other Financial Liabilities - - -
Long Term Provisions 4 - (3.71) 3.71
Total non-current liabilities 225.80 (3.71) 229.51
Current Liabilities -
Financial Liabilities -
-Borrowings 282.24 - 282.24
Lease Liabilities - -
-Trade payables 286.21 - 286.21
Other Financial Liabilities 276.58 - 276.58
Other Current Liabilities 32.62 - 32.62
Short Term Provisions 4 - (0.39) 0.39
Liabilities for Current Tax (Net) - - -
Total current liabilities 877.65 (0.39) 878.04
Total equity and liabilities 1,838.36 3.47 1,834.89
(₹ in millions)
Notes to As at As at
Particulars Reconciliatio
31-Mar-23 01-Apr-22
n
Equity share Capital 75.25 75.25
Reserves and surplus 659.66 548.85
Total equity (shareholder's Fund) under Previous
734.91 624.10
GAAP
Adjustments:
i) Adoption of IND AS 116 ' Leases' 1 2.07 1.03
ii) Deferred Tax Effect on above adjustments 2 (0.68) (1.21)
iii)Provision for Expected Credit Loss for Trade
3 2.08 1.62
Receivables
iv) Provision for Gratuity Expense as per IND AS 4 4.10 3.55
Total equity as per Ind AS 727.34 619.11
408(iii) Reconciliations of statement of profit and loss for the financial year ended March 31,2022
Financial IND AS
Notes to
Year Ended
Particulars Reconciliatio IND AS
Adjustment
n 31-Mar-22
s
Income
Revenue from operations 1,205.78 - 1,205.78
Other income 29.42 - 29.42
Total Income 1,235.21 - 1,235.21
Expenses:
Cost of Revenue Operations 1,047.99 - 1,047.99
Changes in inventories of Work in Progress (24.48) - (24.48)
Employee benefit expenses 4 29.10 (0.76) 29.86
Finance costs 77.33 - 77.33
Depreciation and Amortization 1 8.08 (1.03) 9.11
Other expenses 3 12.92 (0.87) 13.79
Total expenses 1,150.94 (2.66) 1,153.60
Profit before share of profit of associates and
84.27 2.66 81.60
tax & exceptional items
Exceptional items - - -
Profit before share of profit of associates and
84.27 2.66 81.60
tax
Share of Profit of Associate (0.01) - (0.01)
Profit before tax 84.26 2.66 81.59
Tax expense:
Income Tax 22.05 - 22.05
Deferred tax 2 (0.36) 0.41 (0.77)
Current Tax Expenses Relating to Prior
0.93 - 0.93
Years
Total Tax Expense 22.62 0.41 22.21
Profit/(Loss) for the period 61.63 2.25 59.38
Other Comprehensive Income (OCI)(net of
- - -
tax)
Items not to be reclassified to profit or
loss
Remeasurement of defined benefit plan 4 - (0.42) 0.42
Deferred tax relating to these items 2 - 0.11 (0.11)
Total Comprehensive Income for the year 61.63 1.94 59.70
(₹ in millions)
(iv) Reconciliation of total comprehensive income for the financial year ended March 31, 2022
Financial Year Financial Year
Notes to
Particulars Ended Ended
Reconciliation
31-Mar-23 01-Apr-22
Profit after tax as per previous GAAP 110.81 61.63
Adjustments
409i) Amortization of RoU Asset as per Ind AS
1 1.03 1.03
116 'Leases'
ii) Deferred Tax Adjustment 2 0.53 (0.30)
iii) Provision for Expected Credit Loss for
3 0.46 0.87
Trade Receivables
iv) Provision for Gratuity Expense 4 0.79 0.76
v) Actuarial Gain/ (Loss) on Defined Benefit
4 (0.24) (0.42)
Plan
Total Comprehensive income (Net of Tax) 108.24 59.70
(₹ in millions)
(v) Reconciliations of statement of profit and loss for the financial year ended March 31,2023
Financial Year
Notes to IND AS
Particulars Ended IND AS
Reconciliation Adjustments
31-Mar-23
Income
Revenue from operations 1,786.91 - 1,786.91
Other income 18.53 - 18.53
Total Income 1,805.44 - 1,805.44
Expenses:
Cost of Revenue Operations 1,791.88 - 1,791.88
Changes in inventories of Work in
(278.60) - (278.60)
Progress
Employee benefit expenses 4 38.24 (0.79) 39.03
Finance costs 81.22 - 81.22
Depreciation and Amortization 1 9.64 (1.03) 10.68
Other expenses 3 15.30 (0.46) 15.76
Total expenses 1,657.69 (2.29) 1,659.98
Profit before share of profit of
147.75 2.29 145.46
associates, tax & exceptional items
Exceptional items - -
Profit before share of profit of
147.75 2.29 145.46
associates and tax
Share of Profit of Associate (0.02) - (0.02)
Profit before tax 147.73 2.29 145.44
Tax expense:
Income Tax 37.50 - 37.50
Deferred tax 2 (0.63) (0.47) (0.16)
Current Tax Expenses Relating to Prior
0.05 - 0.05
Years
Total Tax Expense 36.92 (0.47) 37.39
Profit/(Loss) for the period 110.81 2.75 108.06
Other Comprehensive Income (OCI)
- -
(net of tax)
Items not to be reclassified to profit
or loss
Remeasurement of defined benefit plan 4 - (0.24) 0.24
Deferred tax relating to these items 2 - 0.06 (0.06)
Total Comprehensive Income for the
110.81 2.57 108.24
year
410Notes
1. For the purpose of preparation of Restated Consolidated Financial Statements, the Company has adopted Ind
AS 116: Leases from the date of transition i.e. 1st April 2022 and management has evaluated the impact of
change in accounting policies required due to adoption of Ind AS 116 and made the necessary adjustments. As
informed by the management, the entire lease rent pertaining to the leased asset was paid in full by the previous
owner of the asset, prior to the transfer of ownership to the company. Accordingly, there is no future lease rent
liability payable by the company. Consequently, there is no recognition of lease liability (current or non-current)
in the financial statements. Since there are no future lease payments, the requirements of Ind AS 116 with respect
to recognition of lease liability and corresponding right-of-use asset and subsequent finance cost adjustments are
not applicable in this case. No adjustments related to interest (finance cost) under Ind AS 116 have been made
in the financial statements. This treatment is based on the management's representation a due to the absence of
enforceable future lease payments.
2. 'Under Previous GAAP, Deferred Tax is calculated using the income statement approach which focuses on
differences between taxable profits and accounting profits for the period. Under Ind AS 12, deferred tax is
calculated using balance sheet approach which focuses on difference between taxable profits and accounting
profits for the period. The application of Ind AS 12 approach has resulted in recognition of deferred tax on new
temporary differences which was not required under IGAAP. In addition, the various transitional adjustments
have led to temporary differences. According to the accounting policies, the company has to account for such
differences. According to the accounting policies, the company has to account for such differences. Deferred Tax
adjustments are recognised in correlation to the transactions either in retained earnings or profit and loss
respectively.
3. 'Under Ind AS, the company has to provide loss allowance on Trade Receivables based on the Expected Credit
Loss (ECL) model which is measured following the "simplified approach". The Company uses a provision
matrix to measure the expected credit losses of trade receivables. The provision matrix is based on its historical
observed default rates, adjusted for forward looking estimates.
4.Provision for Gratuity Expense for the years ended March 31, 2025, March 31,2024, March 31,2023, March
31,2022 was not created as per Indian GAAP. Thus, Provision from Gratuity has been created as per IND AS by
obtaining Actuarial valuations from the certified Actuarial Valuer. Consequent impact on Actuarial Gain/Loss on
Defined benefit plan has been reinstated in the Ind AS Restated Consolidated Financial Statement. Under IND
AS, all actuarial gains and losses are recognised in Other Comprehensive Income.
There were no material differences between the statements of cash flows presented under Ind AS and the previous
GAAP.
ANNEXURE 51
A) FINANCIAL RISK MANAGEMENT
The Company’s principal financial liabilities comprise loans, borrowings and trade and other payables. The
main purpose of these financial liabilities is to finance the Company’s operations. The Company’s principal
financial assets include loans, trade and other receivables, and cash and cash equivalents that derive directly
from its operations. The Company also holds investments in Partnership Firms.
The Company is exposed to market risk, credit risk and liquidity risk. The Company’s senior management
oversees the management of these risks. The Company’s senior management ensures that the Company’s
financial risk activities are governed by appropriate policies and procedures and that financial risks are
identified, measured and managed in accordance with the Company’s policies and risk objective. The Board
of Directors reviews and agrees policies for managing each of these risks, which are summarised below.
(a) Market risk
Market risk is the risk that the fair value of future cash flows of a financial instrument will fluctuate because
of changes in market prices. Market risk comprises three types of risk: interest rate risk, currency risk and
other price risk, such as equity price risk. Financial instruments affected by market risk include loans and
borrowings.
The Company has no direct exposure to foreign currency risk.
-Interest rate risk
411Interest rate risk is the risk that the fair value or future cash flows of a financial instrument will fluctuate because
of changes in market interest rates. The Company's exposure to the risk of changes in market interest rates
relates primarily to the Company’s long-term debt obligations with floating interest rates. The Company
manages its interest rate risk by having a balanced portfolio of fixed and variable rate loans and borrowings.
The Company’s policy is to borrow funds at fixed and floating rate of interest.
Interest rate sensitivity
The following table illustrates the sensitivity of profit and equity to a reasonably possible change in interest
rates of +/- 1%. These changes are considered to be reasonably possible based on observation of current market
conditions. Sensitivity calculations are based on an annualised interest cost on the borrowings at floating rate
as of the reporting dates March 31, 2025, March 31, 2024 and March 31, 2023. All other variables are held
constant.
(₹ in millions)
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Interest rates- increase by 1% (6.01) (5.72) (3.80)
Interest rates- decrease by 1% 6.01 5.72 3.80
(b) Credit risk
Credit risk is the risk that counterparty will not meet its obligations under a financial instrument or customer
contract, leading to a financial loss. The Company is exposed to credit risk from its operating activities
(primarily trade receivables) and from its financing activities, including investments, deposits with banks and
financial institutions and other financial instruments.
(i) Trade receivables
Customer credit risk is managed by the Company’s established policies, procedures and controls relating to
customer credit risk management. Credit quality of a customer is assessed based on an individual credit limits
and are defined in accordance with management's assessment of the customer. Outstanding customer
receivables are regularly monitored. The concentration of credit risk is limited due to the fact that the customer
base is large. An impairment analysis is performed at each reporting date using a provision matrix to measure
expected credit losses. The Company uses ageing buckets and provision matrix for the purpose of computation
of expected credit loss. The provision rates are based on past trend of recoverability. The calculation reflects
the probability-weighted outcome, the time value of money and reasonable and supportable information that is
available at the reporting date about past events, current conditions and forecasts of future economic conditions.
The Company makes provision of expected credit losses on trade receivables using a provision matrix. The
provision matrix is based on its historical observed default rates, adjusted for forward looking estimates. At
every reporting date, the historical observed default rates are updated and Company makes appropriate
provision wherever outstanding is for longer period and involves higher risk
(₹ in millions)
The movement in provision for expected credit loss for trade receivables are as follows:
Particulars Amount
Balance as at March 31,2022 1.62
Add: Additions during the year 0.46
Less: Utilised during the year -
Balance as at March 31,2023 2.08
Add: Additions during the year 0.44
Less: Utilised during the year -
Balance as at March 31,2024 2.53
Add: Additions during the year 0.16
Less: Utilised during the year -
412Balance as at March 31,2025 2.68
Credit risk from balances with banks is managed by the management in accordance with the Company’s policy.
Investments of surplus funds are made only with approved counterparties based on limits defined by the
management. The limits are set to minimise the concentration of risks and therefore mitigate financial loss
through counterparty’s potential failure to make payments.
(c) Liquidity risk
Liquidity risk is the risk that the Company may encounter difficulty in meeting its present and future obligations
associated with financial liabilities that are required to be settled by delivering cash or another financial asset.
The Company’s objective is to maintain a balance between continuity of funding and flexibility through the
use of bank overdrafts, bank loans and finance leases. The Company closely monitors its liquidity position and
deploys a robust cash management system. It aims to minimise these risks by generating sufficient cash flows
from its current operations, which in addition to the available cash and cash equivalents and sufficient
committed fund facilities, will provide liquidity. The liquidity risk is managed on the basis of expected maturity
dates of the financial liabilities. The carrying amounts are assumed to be reasonable approximation of fair
value.
(₹ in millions)
The table below summarises the maturity profile of the Company’s financial liabilities based on
contractual undiscounted payments.
Next 12
Particulars 1 to 5 years > 5 years Total
months
March 31,2025
Borrowings 605.94 268.36 - 874.30
Lease liabilities - - - -
Trade payables 125.03 - - 125.03
Other financial liabilities 422.40 - - 422.40
March 31,2024
Borrowings 528.58 272.53 - 801.11
Lease liabilities - - - -
Trade payables 210.63 - - 210.63
Other financial liabilities 416.84 47.07 - 463.91
March 31,2023
Borrowings 282.24 225.80 - 508.04
Lease liabilities - - - -
Trade payables 286.21 - - 286.21
Other financial liabilities 276.58 - - 276.58
B) Capital management
For the purpose of the Company’s capital management, capital includes issued equity capital, securities
premium and all other equity reserves attributable to the equity holders. The primary objective of the
Company’s capital management is to maximise the shareholder value. The Company manages its capital
structure and makes adjustments in light of changes in economic conditions and the requirements of the
financial covenants. The Company monitors capital using a gearing ratio, which is net debt divided by total
capital plus net debt. The Company’s policy is to keep the gearing ratio between 0% and 25%. The Company
includes within net debt, interest bearing loans and borrowings, less cash and cash equivalents.
413(₹ in millions)
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Borrowings [including current borrowings (refer
874.30 801.11 508.04
Annexure 24 and 27)]
Less: Cash and cash equivalents (refer Annexure 17) 5.13 11.22 27.16
Net debt (A) 869.17 789.89 480.89
Equity (refer Annexure 22 and 23) 1,199.83 917.78 727.34
Total capital (B) 1,199.83 917.78 727.34
Capital and net debt (C = A+B) 2,069.00 1,707.67 1,208.23
Gearing ratio (D = A/C) 0.42 0.46 0.40
The Company's objectives when maintaining capital are:
(a) to safeguard the entity's ability to continue as a going concern, so that it can continue to provide returns
for shareholders and benefits for other stakeholders, and
(b) to provide an adequate return to shareholders by pricing products and services commensurately with the
level of risk
(₹ in millions)
ANNEXURE 52: RECONCILIATION OF LIABILITIES ARISING FROM FINANCING
ACTIVITIES
Opening Balance Closing Balance
Particulars Net Cash Flow
as at April 01, 2022 as at March 31, 2023
Non- Current Borrowings 285.23 (59.43) 225.80
Total liabilities from financing
285.23 (59.43) 225.80
activities
Opening Balance Closing Balance
Particulars Net Cash Flow
as at April 01, 2023 as at March 31, 2024
Non- Current Borrowings 225.80 46.73 272.53
Total liabilities from financing
225.80 46.73 272.53
activities
Opening Balance Closing Balance
Particulars Net Cash Flow
as at April 01, 2024 as at March 31, 2025
Non- Current Borrowings 272.53 (4.17) 268.36
Total liabilities from financing
272.53 (4.17) 268.36
activities
No Financing activity arises from Current Borrowings because Current Borrowings are Working Capital
Limits which are part of operating activity.
(₹ in millions)
ANNEXURE 53: RESTATED SUMMMARY OF CAPITALISATION STATEMENT
The following table sets forth our Company’s capitalization as at March 31,2025 derived from our Restated
Consolidated Financial Statements, and as adjusted for the Offer. This table should be read in conjunction with
the sections titled “Management’s Discussion and Analysis of Financial Condition and Results of Operations”,
“Restated Consolidated Financial Statements” and “Risk Factors”.
Pre-Issue (as at
Particulars Post - Issue
March 31,2025)
Total Borrowings:
Non-Current Borrowings (A) 268.36 [●]
Current borrowings of long-term debts (B) 60.45 [●]
Current borrowings (C) excluding (B) above 545.49 [●]
414Total borrowings (D=A+B+C) 874.30 [●]
Shareholder's fund (Net worth)
Share capital 75.25 [●]
Other Equity 1,124.57 [●]
Total shareholder's fund (Net worth) (E) 1,199.83 [●]
[●]
Total Capitalisation (D+E) 2,074.12 [●]
[●]
Ratio: Non-current Borrowings (including current
[●]
maturities of borrowings) (A+B)/Total Equity (E) 0.27
Ratio: Total Borrowings (D)/Total Equity (E) 0.73 [●]
These amounts (as adjusted for issue) are not determinable at this stage pending the completion of the issue
and hence the same have not been provided in the above statement.
Notes:
Short-term borrowings are debts which are due for repayment within 12 months from reporting year
1
ended March 31, 2025.
Long-term borrowings are considered as borrowing other than short-term borrowing (including
2
Current Maturities of Long-Term Debt).
3 The amounts disclosed above are based on the Restated Consolidated Financial Statement.
(₹ in millions)
ANNEXURE 54: RESTATED STATEMENT OF FINANCIAL INDEBTEDNESS
Outstandin
Whether
S Lender Name g as on
Secured Repayment Schedule
No. March 31,
/ Unsecured
2025
1 Union Bank of India- Car Loan Secured As per Repayment Schedule 0.59
2 Union Bank of India- Car Loan Secured As per Repayment Schedule 2.00
3 Union Bank of India- Car Loan Secured As per Repayment Schedule 0.75
4 Union Bank of India - Car Loan Secured As per Repayment Schedule 1.33
ICICI Bank Limited- Construction
5 Secured As per Repayment Schedule 0.62
Equipment Loan
HDFC Bank Limited-Wetly way of
Guaranteed Emergency Credit Line
6 (GECL) under ECLGS Scheme of Secured As per Repayment Schedule 0.18
National Credit Guarantee Trustee
Company Limited
HDFC Bank Limited -WCTL by way
of Guaranteed Emergency Credit Line
7 (GECL) under ECLGS Scheme of Secured As per Repayment Schedule 8.86
National Credit Guarantee Trustee
Company Limited
8 HDFC Bank Limited- Car Loan Secured As per Repayment Schedule 2.65
9 HDFC Bank Limited- Car Loan Secured As per Repayment Schedule 0.49
Kotak Mahindra Bank Limited -
10 Secured As per Repayment Schedule 18.70
Project Loan
11 HDFC Bank Limited- Project Loan Secured As per Repayment Schedule 29.20
12 HDFC Bank Limited- Project Loan Secured As per Repayment Schedule 1.48
13 HDFC Bank Limited- Car Loan Secured As per Repayment Schedule 0.71
14 Bank of Baroda- Car Loan Secured As per Repayment Schedule 10.12
41515 HDFC Bank Limited-Car Loan Secured As per Repayment Schedule 3.06
Punjab National Bank - Cash Credit
16 Secured Yearly Renewal 131.90
Limit
17 Kotak Mahindra Bank - Overdraft Secured Yearly Renewal 94.79
HDFC Bank Limited - Cash Credit
18 Secured Yearly Renewal 74.51
Limit
19 HDFC Bank Limited - Drul LC Secured Yearly Renewal 20.41
20 HDFC Bank Limited - Against LC Secured Yearly Renewal 26.17
21 HDFC Bank Limited - Project Loan Secured As per Repayment Schedule 50.00
22 HDFC Bank Limited - Project Loan Secured As per Repayment Schedule 50.00
23 Kotak Mahindra Bank - WCDL Limit Secured Yearly Renewal 28.77
24 ICICI Bank Limited -Overdraft Secured Yearly Renewal 43.84
Oxyzo Financial Services Private
25 Unsecured Repayable on Demand 25.09
Limited
26 Sanjay Tyagi Unsecured Repayable on Demand 86.23
27 Rekha Tyagi Unsecured Repayable on Demand 61.92
28 Kartikey Tyagi Unsecured Repayable on Demand 7.17
29 Smt. Ritu Tyagi Unsecured Repayable on Demand 2.22
30 Vartika Tyagi Unsecured Repayable on Demand 8.11
31 Neeraj Tyagi Unsecured Repayable on Demand 5.06
32 Neeraj Tyagi HUF Unsecured Repayable on Demand 6.89
33 Sanjay Tyagi HUF Unsecured Repayable on Demand 11.28
34 Avadh Developers (P) Limited Unsecured Repayable on Demand 59.19
Total 874.30
(₹ in millions)
ANNEXURE 55: RESTATED STATEMENT OF DIVIDEND
For the Financial Year ended
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Share capital
Equity Share Capital 75.25 75.25 75.25
Dividend on equity shares - - -
Dividend in %
Interim Dividend NIL
Final Dividend
(₹ in millions)
ANNEXURE 56: RESTATED SUMMARY STATEMENT OF TAX SHELTERS
For the Financial Year ended
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Profit / (loss) before tax, as Restated (A) 385.65 260.60 145.44
Tax Rate - Statutory rate (B) 25.17% 25.17% 25.17%
Tax as per actual rate on profits (C= A*B) 97.06 65.59 36.61
Total Income Tax 97.06 65.59 36.61
Timing Differences
Difference between book depreciation and tax
4.68 1.08 3.54
depreciation
Others 13.68 0.73 0.04
Total Timing Differences (D) 18.36 1.81 3.58
416Total Adjustments (D) 18.36 1.81 3.58
Tax on Adjustments (E=D*B) 4.62 0.46 0.90
Taxable Restated Profit (F=A+D) 404.01 262.41 149.03
Calculated tax liability on taxable profits (G=F*B) 101.68 66.04 37.51
Interest/Others 0.32 2.96 (0.01)
Current tax expenses related to prior period
2.94 1.44 0.05
including Firm Tax
Total Tax Expenses 104.94 70.44 37.55
Notes:
1. The timing differences have been computed based on the items considered in final / provisional return of
income filed/to be filed for the tax year ending immediately after the respective accounting year as the
accounting year followed is different from the tax year.
2. Statutory tax rate includes applicable surcharge, education cess and higher education cess for the financial
year concerned.
The above statement should be read with the Annexure 5: Company Overview & Significant Accounting
policies and explanatory notes to the Restated Consolidated Financial Statement, Annexure 6: Statement of
Restated Adjustments to audited financial statements and Annexures 7-62: Notes to Restated Consolidated
Financial Statement.
(₹ in millions)
ANNEXURE 57: CORPORATE SOCIAL RESPONSIBILITY (CSR)
Information in respect of CSR Expenditure required to be spent by the company
As at
Particulars 31-Mar- 31-Mar-
31-Mar-25
24 23
(a) Provision of Corporate Social Responsibility for Current Year 3.33 1.95 1.51
(b) Amount of expenditure incurred during the year 0.15 - -
(c) Amount deposited in Corporate Social Responsibility Account * 1.52 1.52 1.46
(d) Carried Forward Provision of Corporate Social Responsibility of
6.36 4.41 2.89
Previous Years
(e) Total provision of Corporate Social Responsibility (Net) as per
9.55 6.36 4.41
Annexure 30 (a-b+d)
Plantation
& Water
Cooler
Nature of CSR Activities - -
under
Public
Sanitation
***
Section 135(6) of the Companies Act, 2013 mandates that any unspent Corporate Social Responsibility (CSR)
funds allocated for ongoing projects must be transferred by the company within 30 days from the end of the
financial year to a special account called the "Unspent Corporate Social Responsibility Account." This account
must be opened in a scheduled bank and is designated specifically for CSR purposes. The unspent amount in
this account must be utilized for the intended CSR activities within a period of three financial years from the
date of transfer. If the company fails to utilize the funds within this period, the remaining unspent amount must
be transferred to a fund specified in Schedule VII of the Act within 30 days from the completion of the third
financial year.
417(₹ in millions)
The Company has deposited unspent CSR Amount in designated " Unspent CSR Account" in the manner
provided below:
CSR Account
Particulars Amount
Opening Date
CSR Amount pertaining to FY 2020-21 29.03.2023 1.46
CSR Amount pertaining to FY 2021-22 29.04.2023 1.52
CSR Amount pertaining to FY 2022-23 18.08.2024 1.52
CSR Amount pertaining to FY 2023-24 26.04.2025 1.95
Total 6.45
Note for the CSR Expenditure till March 31, 2024
As per the Management of the Company, due to technical reasons, the company was unable to open the CSR
account with the bank on time, and hence, the account was opened at a later date. Out of the total amount
deposited in "Unspent Corporate Social Responsibility Account" (as mentioned in the above table), the
company has spent a total of ₹ 0.15 million till 31.03.2025. Further, the company has also made total
expenditure of Rs 3.33 Million for CSR during FY 2025-2026. This expenditure aligns with the company's
CSR policy and is in compliance with the provisions outlined in Section 135 of the Companies Act, 2013. The
balance amount of ₹3.21 million (including interest earned on FDR of Rs 0.24M) is in "Unspent Corporate
Social Responsibility Account" and the company is currently in the process of utilizing these funds in alignment
with the approved CSR policy and the objectives of the respective ongoing projects.
(₹ in million)
Particulars Amount
Amount in "Unspent Corporate Social Responsibility Account" in Scheduled Bank 6.45
Less : Amount paid in 31.03.2025 out of Unspent CSR Account (B) 0.15
Less : Amount paid after 31.03.2025 out of Unspent CSR Account (C ) 3.33
Total (D=A-B-C) 2.97
Interest on FDR credited in Unspent CSR Account (E) 0.24
Balance amount in "Unspent Corporate Social Responsibility Account" (D+E) 3.21
Note for the CSR Expenditure for the financial year ended March 31, 2025
As told by the management of the company, with respect to the CSR obligation of ₹ 3.33 million for the financial
year ended March 31, 2025, the company is permitted to spend the amount up to March 2026. or to deposit the
amount in Unspent CSR Account within the time prescribed as per the provision of Section 135 of Companies
Act, 2013.
(₹ in millions)
ANNEXURE 58: DISCLOSURE OF INTEREST IN ASSOCIATES
Associates
The Group has following Associates (Partnership Firms) by the Parent Company i.e. Technocraft
Ventures Limited which operate in India
% Ownership Interest
Country
Proportion of Ownership Interest and
S. Principal of
Name of Associates voting power held by the Group
No Activities Incorpor
As at
ation
31-Mar-25 31-Mar-24 31-Mar-23
1 TESPL LRS TCPL JV
Contractor INDIA 26% 26% 26%
(Partnership Firm)
2 Krishna TCPL JV
Contractor INDIA - 40% 40%
(Partnership Firm)
There are no Subsidiaries in the Company.
418(₹ in millions)
ANNEXURE 59: STATEMENT OF NET ASSETS, PROFIT AND LOSS AND OTHER COMPREHENSIVE INCOME ATTRIBUTABLE TO OWNERS AND
NON-CONTROLLING INTEREST
Statement of net assets, profit and loss and other comprehensive income attributable to owners and non-controlling interest for the financial year ended 31st March
2025
Share in Other
Net Assets i.e. Total Assets Share in Profit & Share in Total
Comprehensive Income
minus total liabilities Loss Comprehensive Income
(OCI)
Country of
As % of
Name of Entity Incorporati As % of As % of
As % of Consolidate
on Consolidat Consolida
Amount Amount Consolidate Amount d Total Amount
ed Net ted Profit
d OCI comprehen
Assets t and Loss
sive income
A) Parent Company
Technocraft Ventures Limited INDIA 100.00 1,199.83 98.16% 276.84 100.00% 0.01 98.16% 276.85
B) Associates
TESPL LRS TCPL JV (Partnership
INDIA - - 1.84% 5.19 - - 1.84% 5.19
Firm) (26%)
Gain on disposal of Krishna TCPL JV - - - 0.00 - - - 0.00
TOTAL
Total 100.00% 1,199.83 100.00% 282.04 100.00% 0.01 100.00% 282.04
419(₹ in millions)
Statement of net assets, profit and loss and other comprehensive income attributable to owners and non-controlling interest for the financial year ended 31st March
2024
Net Assets i.e. Total Share in Other
Share in Total
Assets Share in Profit & Loss Comprehensive
Comprehensive Income
minus total liabilities Income (OCI)
Country of
As % of
Name of Entity Incorporati As % of
As % of As % of Consolidate
on Consolida
Consolidate Amount Amount Consolida Amount d Total Amount
ted Profit
d Net Assets ted OCI comprehen
and Loss
sive income
A) Parent Company
Technocraft Ventures Limited INDIA 100.00 917.78 98.52% 187.72 100.00% (0.11) 98.52% 187.62
B) Associates
TESPL LRS TCPL JV (Partnership Firm)
INDIA - - 1.48% 2.82 - - 1.48% 2.82
(26%)
Krishna TCPL JV (Partnership Firm) (40%) INDIA - - - 0.00 - - - 0.00
Total 100.00% 917.78 100.00% 190.54 100.00% (0.11) 100.00% 190.44
420(₹ in millions)
Statement of net assets, profit and loss and other comprehensive income attributable to owners and non-controlling interest for the financial year ended 31st
March 2023
Net Assets i.e. Total Share in Other
Share in Total
Assets Share in Profit & Loss Comprehensive
Comprehensive Income
minus total liabilities Income (OCI)
Country of
As % of
Name of Entity Incorporati As % of As % of
As % of Consolidate
on Consolida Consolida
Amount Amount Consolida Amount d Total Amount
ted Net ted Profit
ted OCI comprehen
Assets and Loss
sive income
A) Parent Company
Technocraft Ventures Limited INDIA 100.00 727.34 100.02% 108.08 100.00% 0.18 100.02% 108.26
B) Associates
TESPL LRS TCPL JV (Partnership Firm)
INDIA - - - 0.00 - - - 0.00
(26%)
Krishna TCPL JV (Partnership Firm) (40%) INDIA - - (0.02%) (0.02) - - (0.02%) (0.02)
Total 100.00 727.34 100.00% 108.06 100.00% 0.18 100.00% 108.24
421ANNEXURE 60: ADDITIONAL REGULATORY INFORMATION
(a) The Company has not been declared a wilful defaulter by any bank or financial institution or consortium
thereof in accordance with the guidelines on wilful defaulters issued by the RBI.
(b) There are no proceedings initiated or pending against the Company for holding any benami property under the
Benami Transactions (Prohibition) Act, 1988 (45 of 1988) and rules made thereunder.
(c) The Company has neither advanced, loaned or invested funds except joint ventures nor received any fund
to/from any person or entity for lending or investing or providing guarantee to/on behalf of the ultimate beneficiary
during the reporting years.
(d) There is no charge or satisfaction of charge which is yet to be registered with ROC beyond the statutory
period.
(e) The Company do not have any transaction not recorded in the books of accounts that has been surrendered or
not disclosed as income during the year in the tax assessments under the Income Tax Act, 1961.
(f) The company has working capital limits in excess of ₹ 5 crores and is required to submit statements with banks
and other financial institutions and as told by the management that all the statements submitted to the bank is in
agreement to the books of account.
(g) The company did not enter transactions in Cryptocurrency or Virtual currency during the years ended March
31, 2025, March 31 2024 and March 31, 2023.
(h) The company does not have any relationship with companies struck off (as defined by Companies Act, 2013)
and did not enter into transactions with any such company for the years ended March 31,2025, March 31,2024
and March 31, 2023.
As per our report of even date
For and on behalf of the Board of Technocraft Ventures
Limited (Formerly Known as Technocraft Construction
FOR RISHI KAPOOR & COMPANY Private Limited)
CHARTERED ACCOUNTANTS
Firm Registration Number: 006615C
Peer Review No.: 014978
Sd- Sd/- Sd/-
Jyoti Arora Sanjay Tyagi Rekha Tyagi
Partner Managing Director Executive Director
Membership Number: 455362 DIN: 01446861 DIN: 02556586
Sd/- Sd/-
Kartikey Tyagi Saket Surolia
Whole Time Director and Chief Company Secretary and
Place: Noida Financial Officer Compliance Officer
Date: July 12, 2025 DIN: 09471808 M. No 73681
UDIN: 25455362BMGILS7183
422ANNEXURE 61: Subsequent Event occurring after Reporting Period
a) Bonus Share Issue
Pursuant to resolutions passed by the Shareholders of our Company in their meeting held on May 28, 2025
bonus equity shares were issued, in the ratio of 3:1. Thus 2,25,75,900 Equity shares of ₹ 10/- each were
issued as bonus shares out of the free reserves of the company .This issue occurred after the reporting date
of 31 March 2025 and does not relate to conditions existing at that date; hence, it is a non-adjusting event
under Ind AS 10.
However, in accordance with Ind AS 33 – Earnings Per Share, the earnings per share figures for the financial
years ended March 31, 2025, March 31, 2024 and March 31, 2023 have been restated to reflect the bonus
issue as if it had occurred at the beginning of the earliest period presented.
b) Appointment of Mr. Sanjay Tyagi as the Chairman of the company.
The Board of Directors in their meeting held on May 29, 2025 has appointed Mr Sanjay Tyagi as the
Chairman of the Company w.e.f. May 29, 2025. As this does not relate to conditions existing at the reporting
date, no adjustments have been made to the financial statements.
c) Resignation from the position of Chairman, Mr. Sanjay Tyagi
The Board of Directors in their meeting held on June 12, 2025 has approved the resignation of Mr Sanjay
Tyagi from the position of Chairman of the company w.e.f. June 12,2025. As this does not relate to conditions
existing at the reporting date, no adjustments have been made to the financial statements.
d) Appointment of Company Secretary and Compliance Officer, Mr. Saket Surolia
The Board of Directors in their meeting held on April 21 ,2025 has appointed Mr Saket Surolia as the
Company Secretary and Compliance Officer of the Company w.e.f. April 21, 2025. As this does not relate
to conditions existing at the reporting date, no adjustments have been made to the financial statements.
e) Appointment of Whole Time Director and Chief Financial Officer, Mr. Kartikey Tyagi
The Board of Directors in their meeting held on April 21 ,2025 has appointed Mr. Kartikey Tyagi as Whole
Time Director & Chief Financial Officer of the Company w.e.f April 21 ,2025. As this does not relate to
conditions existing at the reporting date, no adjustments have been made to the financial statements
f) Resignation of Independent Director, Ms. Monam Kapoor
The Board of Directors in their meeting held on June 12, 2025 has approved the resignation of Ms. Monam
Kapoor from the position of Independent Director w.e.f June 12, 2025. As this does not relate to conditions
existing at the reporting date, no adjustments have been made to the financial statements
g) Appointment of Independent Director, Mr. Mukesh Garg
The Board of Directors in their Extraordinary General meeting held on June 10, 2025 has approved the
appointment of Mr. Mukesh Garg from the position of Independent Director w.e.f. June 10, 2025. As this
does not relate to conditions existing at the reporting date, no adjustments have been made to the financial
statements.
423ANNEXURE 62: RATIOS ANALYSIS
Explanation, if the Explanation, if the
For the Financial Years ended Variance in ratio is Variance in ratio is
more than 25% more than 25%
Variance (%) Variance (%)
Ratio Methodology between the between the
31-Mar 2025 31-Mar 2024
financial years financial years
31-Mar- 31-Mar- 31-Mar-
ending 31-Mar-25 ending 31-Mar-24
25 24 22
and 31- Mar-24 and 31- Mar-23
Total Current Assets
Current Ratio over Total Current 1.76 1.63 1.57 8.43% 3.40% - -
Liabilities
Debt over Total
Debt-Equity Ratio 0.73 0.87 0.70 (16.52%) 24.97% - -
Shareholder Equity
EBITDA Less Other
Income over Debt
Debt- Service
Service (Interest & 2.16 1.77 0.80 21.84% 121.09% - Increase in EBITDA
Coverage Ratio
Lease Payments +
Principal Repayments)
Return on Equity
PAT over Total Equity 0.24 0.21 0.15 13.22% 39.75% - Increase in PAT
Ratio
Cost of goods sold
Inventory Turnover
over Average 3.00 3.57 4.67 (16.02%) (23.51%) - -
Ratio
Inventory
Revenue from
Trade Receivables Operations over
3.53 2.99 2.76 17.96% 8.47% - -
Turnover Ratio Average Trade
Receivables
Cost of revenue of
Trade Payables operations over Decrease in Average
14.70 7.68 8.01 91.45% (4.14%) -
Turnover Ratio Average Trade Trade Payables
Payables
Net Capital Revenue from
3.15 3.37 2.70 (6.40%) 24.81% - -
Turnover Ratio operations over
424Average Working
Capital (i.e. Total
Current assets less
Total current
liabilities)
Net Profit over
Net Profit Ratio Revenue from 0.10 0.08 0.06 19.71% 39.36% - Increase in PAT
operations
Profit before tax &
Interest (PBIT) Less
Return on Capital Other Income over
employed Ratio/ Capital employed (i.e.
0.22 0.19 0.17 17.17% 13.24% - -
Return on Total Equity +Short
Investment Term Borrowings
+Long Term
Borrowings)
Net Asset Value per
Share is calculated as
Net Worth as of the end
of relevant year/ period
Net Asset Value 39.86 30.49 24.16 30.73% 26.18% Increase in Net Worth Increase in Net Worth
divided by the number
of equity shares
outstanding at the end
of the year/ period
425OTHER FINANCIAL INFORMATION
The Audited Financial Statements of our Company, as at and for the Financial Year ended March 31, 2025, March
31, 2024 and March 31, 2023 (“Financial Statements”) are available at www.technocraftventures.com.
Our Company is providing these links to its website solely to comply with the requirements specified in the SEBI
ICDR Regulations. The Statements do not constitute, (i) a part of this Draft Red Herring Prospectus/ Red Herring
Prospectus; or (ii) a Prospectus, a Statement in Lieu of a Prospectus, an Offering Circular, an Offering
Memorandum, an Advertisement, an Offer or a Solicitation of any Offer or an Offer Document to purchase or sell
any securities under the Companies Act, the SEBI ICDR Regulations, or any other applicable law in India or
elsewhere. The Financial Statements should not be considered as part of information that any investor should
consider subscribing for or purchase any securities of our Company and should not be relied upon or used as a
basis for any investment decision. Neither Company or its advisors, nor the BRLM or the Promoters, nor any of
employees, directors, affiliates, agents or representatives accept any liability whatsoever for any loss, direct or
indirect, arising from any information presented or contained in the Company’s Financial Statements or the
opinions expressed therein.
The accounting ratios required under Clause 11 of Part A of Schedule VI of the SEBI ICDR Regulations are given
below:
As at March 31, As at March 31, As at March 31,
Particulars
2025 2024 2023
Basic Earnings/ (loss) per Equity Share
9.37 6.33 3.59
from continuing operations (₹)
Diluted Earnings/ (loss) per Equity Share
9.37 6.33 3.59
from continuing operations (₹)
Net Worth (₹ in million) 1,199.83 917.78 727.34
Return on Net Worth (%) 23.51 20.76 14.86
Net Asset Value Per Equity Share (₹) 39.86 30.49 24.16
Earnings before interest expense, taxes,
depreciation and amortisation before 481.88 338.30 218.81
exceptional items (EBITDA) (₹ in million)
The ratios have been computed as under:
1. Basic earnings per share (₹) is calculated by dividing Profit/ (loss) attributable to equity shareholders of the
Company for basic/ diluted EPS for continuing operations by the weighted average number of equity shares
outstanding during the year. The weighted average number of equity shares outstanding during financial year
after adjusting the impact of bonus shares issued subsequent to financial year.
2. Diluted earnings per share (₹) is calculated by dividing Profit/ (loss) attributable to equity shareholders of the
Company for basic/ diluted EPS for continuing operations by the weighted average number of equity shares
after adjusting the impact of bonus shares issued subsequent to financial year and after adjusting for the effect
of dilution. The weighted average number of equity shares is adjusted to include the potential dilutive effect of
instruments such as employee stock options, convertible securities, and/or bonus shares, as applicable during
the relevant financial year.
3. “net worth” means the aggregate value of the paid-up share capital and all reserves created out of the profits
and securities premium account and debit or credit balance of profit and loss account, after deducting the
aggregate value of the accumulated losses, deferred expenditure and miscellaneous expenditure not written
off, as per the Restated Consolidated Financial Information, but does not include reserves created out of
revaluation of assets, write-back of depreciation, amalgamation and capital reserve.
4. Return on Net Worth (%) is Restated profit/ (loss) for the financial year divided by the of Net Worth of the
relevant financial year.
4265. Net asset value per equity share is Net worth as of the end of the period /financial year divided by the weighted
average outstanding equity shares considered for diluted EPS after adjusting the impact of bonus shares issued
subsequent to financial year as the end of the financial year.
6. EBITDA refers to Earnings before interest expense, taxes, depreciation and amortisation and Exceptional
Items less Other Income as disclosed in our Restated Consolidated Financial Information.
Reconciliation of Non-GAAP measures
For details in relation to reconciliation of non-GAAP measures, kindly refer “Management’s Discussion and
Analysis of Financial Conditions and Results of Operations –Non-GAAP Financial Measures -Reconciliation of
Non-GAAP Measures” on page 447.
427FINANCIAL INDEBTEDNESS
Our Company avails loans and enters other financing arrangements in the ordinary course of business for purposes
such as, inter alia, to meet our working capital requirements. For details of the borrowing powers of our Board,
kindly refer “Our Management – Borrowing Powers” beginning on page 310.
Our Company has obtained the necessary consents required under the relevant financing documentation for
undertaking activities in relation to the Offer, including dilution of the current shareholding of our Promoters and
members of the Promoter Group, expansion of the business of our Company, effecting changes in our capital
structure and shareholding pattern.
The aggregate outstanding borrowings of our Company as on June 30, 2025 as certified by our Statutory Auditors
M/s Rishi Kapoor & Company, Chartered Accountants vide certificate dated August 04, 2025 bearing UDIN
25455362BMGILO6873, are as follows:
(₹ in million)
Sanctioned Amount as on Amount outstanding as on
Category of Borrowing
June 30, 2025 June 30, 2025
Borrowings of Company
Secured
Working capital facilities
Fund based >> 360.00 315.55
Non-fund based * 1472.52 1061.48
Term loans ** 150.72 143.62
Vehicle Loan 32.24 18.27
Interest accrued but not due - -
Unsecured
From Directors/Shareholders/Relative 185.85 185.85
From Others 60.78 60.78
From Others
Working capital facilities
Fund based<< 25.00 25.08
Non-fund based - -
Term loans - -
Interest accrued but not due - -
Sub-total (A) 2,287.10 1,810.63
Total 2,287.10 1,810.63
>> The outstanding balance includes balances of Letter of Credit - Creditors which is a Non-Fund Facility.
*Letter of Credit of ₹ 50.00 million also includes Letter of Credit facility of ₹ 25.00 million as sub-limit of Bank
Guarantees, sanctioned from HDFC Bank. Bank Guarantee (sub limit Mob Advance Sanction ₹ 150 million O/S
₹ 116.71 million & Letter of Credit ₹ 25 million).
** Term Loan includes Guaranteed Emergency Credit Line (GECL) loans, Equipment loans and Mobilization
advances taken from the bank as sub-limit of the Bank Guarantee but does not include Working Capital Demand
Loans (taken as sublimit of Bank Guarantee limit) and vehicle loans as Working Capital Demand Loans and
Vehicle Loans are shown separately).
<<The outstanding balance includes the accrued interest for the month of June, 2025.
Principal terms of the subsisting borrowings availed by our Company are disclosed below:
The details provided below are indicative and there may be additional terms, conditions and requirements under
the various financial documentation executed by us in relation to our indebtedness.
4281. Interest rate: The interest rates of the borrowings availed by Company range between 7.35 % to 14.95 % per
annum.
2. Repayment and Tenor: The repayment period for the loans availed by the Company range between 1 to 5
years and the Company is required to repay the borrowings availed in accordance with the repayment schedule
stipulated in the relevant loan documentation.
3. Details of security in relation to the credit facilities of the Company: Security of each loan & credit facilities
is enclosed in Annexure B.
4. Penal Interest: In terms of certain borrowings availed by the Company, the penal interest charged by the
lenders may range between 1 % to 18 % over and above the interest rate for all over dues and delays of any
monies payable (both principal and interest).
5. Restrictive Covenants: As per the terms of our loan agreements, certain corporate actions for which our
Company requires to intimate the lender and includes.
(a) Effecting any change in control/ ownership/ management/ directorship of our Company amongst others;
(b) Amending the constitutional documents of our Company, including the Memorandum of Association and
Articles of Association;
(c) Effecting any changes to the capital structure or shareholding pattern of our Company;
(d) Enter into any scheme of merger, amalgamation, compromise or reconstruction, or do a buyback;
(e) Undertaking any new business, operations or projects or substantial expansion of any current business,
operations, or projects;
This is an indicative list and there may be additional terms that may amount to an event of default under the
various borrowing arrangements entered into by the Company.
6. Events of Default: Our borrowing arrangements prescribe the following events of default, including, among
others:
(a) Failure and inability to pay amounts on the due date;
(b) Non-payment or delay in repayment of Facility or payment of interest to the Lender;
(c) Utilisation of the loan for any other purpose other than the purpose for which the loan is sanctioned;
(d) Making any representation or warranty that is incorrect or misleading;
(e) Cross default under other financing arrangements entered into with the lenders;
(f) Bankruptcy, insolvency or any such event;
(g) Breach of any of the terms of the transaction documents by the Borrower; and
This is an indicative list and there may be additional terms that may amount to an event of default under the
various borrowing arrangements entered into by the Company.
7. Details of Category of Borrowing:
Sanctioned / Outstanding amount
Category of borrowing Loaned amount (₹ in million) as on
(₹ in million) June 30, 2025
Working Capital Facility (From Banks) >> 360.00 315.55
Working Capital Facility (From Others) >> 25.00 25.08
Term Loans** 150.72 143.62
Vehicle Loan 32.24 18.27
429Sanctioned / Outstanding amount
Category of borrowing Loaned amount (₹ in million) as on
(₹ in million) June 30, 2025
Loan equivalent risk facility - -
Unsecured loans from related party and body corporate 246.63 246.63
Bank Guarantee & Letter of Credit* 1,472.52 1,061.48
Total 2,287.10 1,810.63
>> The outstanding balance includes balances of Letter of Credit - Creditors which is a Non-Fund Facility.
*Letter of Credit of ₹ 50.00 million also includes Letter of Credit facility of ₹ 25.00 million as sub-limit of
Bank Guarantees, sanctioned from HDFC Bank. Bank Guarantee (sub limit Mob Advance Sanction ₹ 150
million O/S ₹ 116.71 million & Letter of Credit ₹ 25 million).
**Term Loan includes Guaranteed Emergency Credit Line (GECL) loans, Equipment loans and
Mobilization advances taken from the bank as sub-limit of the Bank Guarantee but does not include Working
Capital Demand Loans (taken as sublimit of Bank Guarantee limit) and vehicle loans as Working Capital
Demand Loans and Vehicle Loans are shown separately).
Consequences of occurrence of events of default: In terms of the facility agreements and sanction letters,
the following, among others, are the consequences of occurrence of events of default, the lenders may:
a) demand that all or any part of the amount due together with accrued interest and all other amounts accrued
in relation to the facility be paid immediately;
b) enforce the security;
c) impose of penal interest over and above the contracted rate on the amount in default;
d) cancel the undrawn commitments under the Facility;
e) exercise any other rights under the Transaction Documents/ applicable law.
8. There is no Guarantees Provided to Financial Institutions against credit facilities extended to third parties by
the Company as of June 30, 2025.
9. Except as stated below, Promoter Selling Shareholder has not provided any guarantees for the loans availed
by the Company:
(₹ in million)
Name of the Type of
Name of the Sanctioned Purpose of
Promoter Selling Borrowing
Lender Amount Facility
Shareholder (Reason)
Working Capital
Kartikey For Working
Punjab National Facilities (Cash
Constructions 750.00 Capital
Bank Credit & Bank
(Partnership Firm) requirements
Guarantees)
430Annexure A
(₹ in million)
Amount
Purpose of Rate of outstandi
Sr. Nature of Amount
Borrowin Tenure Interest Nature of Security Pledge ng as on
No. Borrowings Sanctioned
gs (p.a.) June 30,
2025
Working Capital Facilities
Primary Security for Cash Credit (Hyp.) Limit: Hypothecation on 1st
Pari-passu basis on stocks of raw materials, stock in process, finished
goods, stores & spares, receivables and other current assets (existing and
future) lying at work sites of various projects and office godowns with
other lenders under multiple banking arrangements.
• Hypothecation of entire unencumbered fixed assets of the Company
on Pari-passu basis.
• Hypothecation/Mortgage of Block Assets of various Immovable
Properties
1- Property bearing No. B-27, Sector-49, Noida, Gautam Budh Nagar,
Punjab National Uttar Pradesh
Business
1 Bank - Cash 1 Year 11.80% 2- Plot bearing No. NK-II 265A, Indirapuram, Ghaziabad, Uttar Pradesh 150.00 149.09
Purpose
Credit Limit 3- Lease hold (JDA) Plot No. 44, Gulmohar Park-I, Mahal Jagatpura,
Jaipur, Rajasthan
4- Lease hold (JDA) Plot No.45, Gulmohar Park-I, Mahal Jagatpura,
Jaipur, Rajasthan
5- Lease hold (JDA) Plot No.52, Gulmohar Park-I, Mahal Jagatpura,
Jaipur, Rajasthan
6- Lease hold (JDA) Plot No.53, Gulmohar Park-I, Mahal Jagatpura,
Jaipur, Rajasthan
7- Lease hold (JDA) Plot No. S 59, Mahesh Nagar, Jaipur, Rajasthan
8- Property situated at 29, Avadhpuri, Near Mahesh Nagar, Jaipur,
Rajasthan
431As per Sanction Letter dated 05.06.2025, the personal guarantee of Shri
Mamchand Tyagi, Smt. Saroj Bala Tyagi, Shri Rajiv Tyagi, Smt. Sandhya
Tyagi & M/s Unimax Build Estate is released and obtention of personal
guarantee of Smt. Anju Sharma along with release of following
Immovable Properties:- 1.Registered Mortgage at Khasra No. 85, Min at
Village Morti, Pargana Jalalabad, Ghaziabad, Uttar Pradesh.
2-Registered Mortgage House No. 474/11 at North Civil Lines,
Muzaffarnagar, Uttar Pradesh.
3-House
No. 3/1223 at Sector-3, Vasundhara Yojna, Vashundhara, Ghaziabad,
Uttar Pradesh.
4- Under Construction Building on lease hold (JDA) Plot No. B 181, SEZ
at Village Jhai, Tehsil, Sangner, Jaipur, Rajasthan and Substitution of
Immovable Property -Khasra No. 333 M Sikri Kalan Delhi, Meerut Road
Modi Nagar, Ghaziabad, U.P.
• Personal Guarantees & Corporate Guarantees of Mr Sanjay Tyagi
(Director), Mr Kartikey Tyagi (Director), Rekha Tyagi (Director),
Madhusudhan Gupta (Friend of Director), Kamlesh Gaur (Friend),
Neeraj Tyagi$ (Brother of Sanjay Tyagi), Sooraj Bala Devi (Mother
of Director), M/s Kartikey Constructions (Partnership Firm).
$Personal Guarantee of Shri Neeraj Tyagi (Brother of Shri Neeraj Tyagi
has now been released vide Punjab National Bank letter dated August 04,
2025.
• FDR kept in the Account of ₹.17.1 million
1- Pari Passu charge in favor of the Bank by way of the Bank by way of
Hypothecation of the company's entire stocks of Raw Materials, WIP,
HDFC Bank
Business Semi finished and finished goods, consumable stores, spares including
2 Limited- Cash 1 Year 9.78% 60.00 57.49
Purpose book debts, bill whether documentary or clean, outstanding monies,
Credit Limit
receivables, both present & future, in a form and manner satisfactory to
the Bank.
4322- Equitable Mortgage of Immovable Property- B-137, Sector 2, Noida
UP-201301.
3- Unconditional & Irrevocable Personal Guarantee of all Directors and
property holder.
1- Pari Passu charge in favor of the Bank by way of the Bank by way of
Hypothecation of the company's entire stocks of Raw Materials, WIP,
Semi finished and finished goods, consumable stores, spares including
book debts, bill whether documentary or clean, outstanding monies,
receivables, both present & fut
HDFC Bank
Business ure, in a form and manner satisfactory to the Bank.
3 Limited- Drul 1 Year 9.78% 40.00 17.83
Purpose
LC
2- Equitable Mortgage of Immovable Property- B-137, Sector 2, Noida
UP-201301.
3- Unconditional & Irrevocable Personal Guarantee of all Directors and
property holder.
1-Primary Security- Continuation of First Pari Passu charge on all
existing and future current assets of the Borrower.
2.Collateral Security- Creation of Equitable Mortgage over Immovable
Kotak
Properties- Plot No 17, Block A, Sector 49, Noida, Uttar Pradesh-201301
Mahindra Bank Business
4 1 Year 10.10% & Plot No C-83, RDC, Raj Nagar, Ghaziabad-201002. 40.00 38.49
(Overdraft Purpose
Limit)
3.Personal Guarantee of Sanjay Tyagi, Rekha Tyagi and Kartikey Tyagi.
Guarantee of Security provider M/s Shiv Durga Constructions Company
(Prop Anuj Sharma)
1-Primary Security- Continuation of First Pari Passu charge on all
existing and future current assets of the Borrower.
Kotak
Business Floating
5 Mahindra Bank 1 Year 30.00 29.20
Purpose Interest 2.Collateral Security- Creation of Equitable Mortgage over Immovable
- WCDL
Properties- Plot No 17, Block A, Sector 49, Noida, Uttar Pradesh-201301
& Plot No C-83, RDC, Raj Nagar, Ghaziabad-201002.
4333.Personal Guarantee of Sanjay Tyagi, Rekha Tyagi and Kartikey Tyagi.
Guarantee of Security provider M/s Shiv Durga Constructions Company
(Prop Anuj Sharma)
1-Exclusive Charges of Movable Fixed Assets
2- Exclusive Charges of Immovable Fixed Assets of Khasra No.742, Ward
No.18, Mohalla Lower Bazar, Modinagar, Ghaziabad, Uttar Pradesh-
ICICI Bank Business 40.00 19.46
1 Year 9.75% 201204
6 Limited- Loan
3- Exclusive Charges of Fixed Deposit
Overdraft Limit
4- First Pari-passu Charges of Current Assets
5- Personal Guarantee of Sanjay Tyagi, Rekha Tyagi and Kartikey Tyagi,
Guarantee of Security provider Meena Sharma and Manav Sharma
1- Pari Passu charge in favor of the Bank by way of the Bank by way of
Hypothecation of the company's entire stocks of Raw Materials, WIP,
Semi finished and finished goods, consumable stores, spares including
HDFC Bank
book debts, bill whether documentary or clean, outstanding monies,
Limited
receivables, both present & future, in a form and manner satisfactory to
(Against LC)
Business the Bank.
7 (including 1 Year - - 3.99
Purpose
25000000
2- Equitable Mortgage of Immovable Property- B-137, Sector 2, Noida
sublimit of BG)
UP-201301.
>>
3- Unconditional & Irrevocable Personal Guarantee of all Directors and
property holder.
TOTAL (A) 360.00 315.55
Non-Fund Based
Primary Security for Cash Credit (Hyp) Limit: Hypothecation on 1st
Punjab National Pari-passu basis on stocks of raw materials, stock in process, finished
Bank - goods, stores & spares, receivables and other current assets (existing and
Business
8 Performance/ 1 Year - future) lying at work sites of various projects and office godowns with 600.00 474.17
Purpose
Financial Bank other lenders under multiple banking arrangements.
Guarantee • Hypothecation of entire unencumbered fixed assets of the Company
on Pari-passu basis.
434• Hypothecation/Mortgage of Block Assets of various Immovable
Properties
1- Property bearing No. B-27, Sector-49, Noida, Gautam Budh Nagar,
Uttar Pradesh
2- Plot bearing No. NK-II 265A, Indirapuram, Ghaziabad, Uttar Pradesh
3- Lease hold (JDA) Plot No. 44, Gulmohar Park-I, Mahal Jagatpura,
Jaipur, Rajasthan
4- Lease hold (JDA) Plot No.45, Gulmohar Park-I, Mahal Jagatpura,
Jaipur, Rajasthan
5- Lease hold (JDA) Plot No.52, Gulmohar Park-I, Mahal Jagatpura,
Jaipur, Rajasthan
6- Lease hold (JDA) Plot No.53, Gulmohar Park-I, Mahal Jagatpura,
Jaipur, Rajasthan
7- Lease hold (JDA) Plot No. S 59, Mahesh Nagar, Jaipur, Rajasthan
8- Property situated at 29, Avadhpuri, Near Mahesh Nagar, Jaipur,
Rajasthan
As per Sanction Letter dated 05.06.2025, the personal guarantee of Shri
Mamchand Tyagi, Smt. Saroj Bala Tyagi, Shri. Rajiv Tyagi, Smt. Sandhya
Tyagi & M/s Unimax Build Estate is released and obtention of personal
guarantee of Smt. Anju Sharma along with release of following
Immovable Properties:-
1.Registered Mortgage at Khasra No. 85, Min at Village Morti, Pargana
Jalalabad, Ghaziabad, Uttar Pradesh.
2-Registered Mortgage House No. 474/11 at North Civil Lines,
Muzaffarnagar, Uttar Pradesh
3-House No. 3/1223 at Sector-3, Vasundhara Yojna, Vashundhara,
Ghaziabad, Uttar Pradesh.
4- Under Construction Building on lease hold (JDA) Plot No. B 181, SEZ
at Village Jhai, Tehsil, Sangner, Jaipur, Rajsthan and Substitution of
435Immovable Property -Khasra No 333 M Sikri Kalan Delhi, Meerut Road
Modi Nagar, Ghaziabad, U.P.
• Personal Guarantees & Corporate Guarantees of Mr. Sanjay Tyagi
(Director), Mr. Kartikey Tyagi (Director), Rekha Tyagi (Director),
Madhusudhan Gupta (Friend of Director), Kamlesh Gaur (Friend),
Neeraj Tyagi$ (Brother of Sanjay Tyagi), Sooraj Bala Devi (Mother of
Director), M/S Kartikey Constructions (Partnership Firm).
$Personal Guarantee of Shri Neeraj Tyagi (Brother of Shri Neeraj Tyagi
has now been released vide Punjab National Bank letter dated August 04,
2025.
• FDR kept in the Account of Rs.17.10 million
1- Pari Passu charge in favor of the Bank by way of the Bank by way of
Hypothecation of the company's entire stocks of Raw Materials, WIP,
Semi finished and finished goods, consumable stores, spares including
book debts, bill whether documentary or clean, outstanding monies,
HDFC Bank - receivables, both present & future, in a form and manner satisfactory to
Performance/ Business the Bank.
9 1 Year - 243.29 215.05
Financial Bank Purpose
Guarantee 2- Equitable Mortgage of Immovable Property- B-137, Sector 2, Noida
UP-201301.
3- Unconditional & Irrevocable Personal Guarantee of all Directors and
property holder.
Kotak Bank 1-Primary Security- Continuation of First Pari Passu charge on all
Limited- existing and future current assets of the Borrower.
Performance/
Business
10 Financial Bank 1 Year - 2.Collateral Security- Creation of Equitable Mortgage over Immovable 219.23 175.60
Purpose
Guarantee. P r o p e r t i e s - P l o t N o 1 7 , B l o c k A , S e c t o r 4 9 , N o i d a , U t t a r P r a d e s h - 2 0 1 3 0 1
Bank Guarantee & Plot No C-83, RDC, Raj Nagar, Ghaziabad-201002.
(sub limit Mob
436Advance
Sanction ₹150 3.Personal Guarantee of Sanjay Tyagi, Rekha Tyagi and Kartikey Tyagi.
million O/S. ₹ Guarantee of Security provider M/s Shiv Durga Constructions Company
116.71 million (Prop Anuj Sharma)
& LC ₹ 25
million)
1-Exclusive Charges of Movable Fixed Assets
2- Exclusive Charges of Immovable Fixed Assets of Khasra No.742, Ward
ICICI Bank - No.18, Mohalla Lower Bazar, Modinagar, Ghaziabad, Uttar Pradesh-
Performance/ Business 201204
11 1 Year - 360.00 168.42
Financial Bank Purpose 3- Exclusive Charges of Fixed Deposit
Guarantee 4- First Pari-passu Charges of Current Assets
5- Personal Guarantee of Sanjay Tyagi, Rekha Tyagi and Kartikey Tyagi,
Guarantee of Security provider Meena Sharma and Manav Sharma
1- Pari Passu charge in favor of the Bank by way of the Bank by way of
Hypothecation of the company's entire stocks of Raw Materials, WIP,
Semi finished and finished goods, consumable stores, spares including
HDFC Bank
book debts, bill whether documentary or clean, outstanding monies,
Limited
receivables, both present & future, in a form and manner satisfactory to
(Against LC)
Business the Bank.
12 (including 1 Year - 50.00 28.24
Purpose
25000000
2- Equitable Mortgage of Immovable Property- B-137, Sector 2, Noida
sublimit of BG)
UP-201301.
*
3- Unconditional & Irrevocable Personal Guarantee of all Directors and
property holder.
TOTAL (B) 1,472.52 1,061.48
Vehicle Loans
Floating
Union Bank of Business
13 60 Interest Hypothecation of Motor Car 1.70 0.50
India- Car Loan Purpose
Rate
437Floating
Union Bank of Business
14 60 Interest Hypothecation of Motor Car 5.80 1.70
India- Car Loan Purpose
Rate
Floating
Union Bank of Business
15 60 Interest Hypothecation of Motor Car 1.78 0.66
India- Car Loan Purpose
Rate
Union Bank of Floating
Business
16 India - Car 60 Interest Hypothecation of Motor Car 2.58 1.20
Purpose
Loan Rate
HDFC Bank
Business
17 Limited- Car 60 8.5 Hypothecation of Motor Car 4.29 2.44
Purpose
Loan
HDFC Bank
Business Floating
18 Limited- Car 18 Hypothecation of Motor Car 2.09 0.12
Purpose Interest
Loan
HDFC Bank
Business Floating
19 Limited- Car 39 Hypothecation of Motor Car 1.67 1.36
Purpose Interest
Loan
Bank of
Business
20 Baroda- Car 60 9.25 Hypothecation of Motor Car 11.50 9.64
Purpose
Loan
HDFC Bank
Business
21 Limited-Car 39 9.40 Hypothecation of Motor Car 0.84 0.65
Purpose
Loan
TOTAL (C) 32.24 18.27
Term Loans * *
10%
1- Pari Passu charge in favor of the Bank by way of the Bank by way of
repayment
Hypothecation of the company's entire stocks of Raw Materials, WIP,
HDFC Bank from every
Business Semi finished and finished goods, consumable stores, spares including
22 Limited- payment 9.5 116.71 116.71
Purpose book debts, bill whether documentary or clean, outstanding monies,
Project Loan received
receivables, both present & future, in a form and manner satisfactory to
from
the Bank.
Department
4382- Equitable Mortgage of Immovable Property-B-137, Sector 2, Noida
UP-201301.
3- Unconditional & Irrevocable Personal Guarantee of all Directors and
property holder.
ICICI Bank
Limited-
Business
23 Construction 48 7.35 Hypothecation of Plant & Machinery 2.07 0.48
Purpose
Equipment
Loan
HDFC Bank
Limited -
WCTL-III by
way of
Guaranteed
Emergency 61
Credit Line (Including
Business
24 (GECL) under Moratorium - Extension of Second Ranking Charge over existing primary and collateral 13.10 7.82
Purpose
ECLGS Scheme Period of 24
of National Months)
Credit
Guarantee
Trustee
Company
Limited
Kotak
Hypothecation of the company's entire stocks of Raw Materials, WIP,
Mahindra Bank Business
25 24 10.5 Semi finished and finished goods, consumable stores, spares including 10.77 10.77
Limited - Purpose
book debts.
Project Loan
HDFC Bank
Business
26 Limited- 37 9.06 Hypothecation of Construction Equipment 3.06 2.91
Purpose
Construction
439Equipment
Loan
HDFC Bank
Limited-
Business
27 Construction 37 9.10 Hypothecation of Construction Equipment 1.27 1.24
Purpose
Equipment
Loan
HDFC Bank
Limited-
Business
28 Construction 37 9.06 Hypothecation of Construction Equipment 2.48 2.42
Purpose
Equipment
Loan
HDFC Bank
Limited-
Business
29 Construction 37 9.10 Hypothecation of Construction Equipment 1.27 1.27
Purpose
Equipment
Loan
Total (D) 150.72 143.62
Unsecured Loans
Loans from Related Parties
Directors
Business
30 Sanjay Tyagi On Demand 12.00 78.62 78.62
Purpose -
Business
31 Rekha Tyagi On Demand 12.00 63.58 63.58
Purpose -
Business
32 Kartikey Tyagi On Demand 12.00 9.05 9.05
Purpose -
Relatives
Business
33 Ritu Tyagi On Demand 2.22 2.22
Purpose - -
Business
34 Vartika Tyagi On Demand 12.00 8.33 8.33
Purpose -
440Business
35 Neeraj Tyagi On Demand 5.06 5.06
Purpose - -
Neeraj Tyagi Business
36 On Demand 6.89 6.89
HUF Purpose - -
Sanjay Tyagi Business
36 On Demand 12.00 12.09 12.09
HUF Purpose -
Others
-
Avadh
Business
37 Developers On Demand 12.00 60.78 60.78
Purpose -
Private Limited
Oxyzo
Financial
Floating
Services Business
38 1 Year @ No Security - Unsecured Loan 25.00 25.08
Limited - Purpose
14.95%
Purchase
Financing <<
Total (E) 271.62 271.71
Grand Total (A+B+C+D+E) 2,287.10 1,810.63
Term Loan includes Guaranteed Emergency Credit Line (GECL) loans, Equipment loans and Mobilization advances taken from the bank as sublimit limit of the
Bank Guarantee but does not include Working capital demand loans (taken as sublimit of Bank Guarantee limit) and vehicle loans as Working capital demand loans
** and vehicle loans are shown separately)
>> The outstanding balance includes balances of Letter of Credit - Creditors which is a Non-Fund Facility.
Letter of Credit of ₹ 50.00 million also includes Letter of Credit facility of ₹ 25.00 million as submit of Bank Guarantees, sanctioned from HDFC Bank. Bank
* Guarantee (sub limit Mob Advance Sanction ₹150 million O/S ₹ 116.71 million & Letter of Credit ₹ 25 million)
<< The outstanding balance includes interest accrued for the month of June.
441CAPITALISATION STATEMENT
The following table sets forth our Company’s capitalization as at March 31, 2025 derived from our Restated
Consolidated Financial Information, and as adjusted for the Offer. This table should be read in conjunction with
the chapters titled “Management’s Discussion and Analysis of Financial Conditions and Results of Operations”,
“Restated Consolidated Financial Information” and “Risk Factors” beginning on pages 444, 331 and 39
respectively.
(₹ in million)
Pre-Offer Adjusted for the
Particulars
(as at March 31, 2025) Proposed Offer
Total Borrowings:
Non-Current Borrowings (A) 268.36 [●]
Current borrowings of long-term debts (B) 60.45 [●]
Current borrowings (C) excluding (B) above 545.49 [●]
Total borrowings (D=A+B+C) 874.30 [●]
Shareholder's fund (Net worth)
Share capital 75.25 [●]
Other Equity 1,124.57 [●]
Total shareholder's fund (Net worth) (E) 1,199.83 [●]
Total Capitalisation (D+E) 2,074.12 [●]
Ratio: Non-Current Borrowings (including current [●]
0.27
maturities of borrowings) (A+B)/Total Equity (E)
Ratio: Total Borrowings (D)/Total Equity (E) 0.73 [●]
These amounts (as adjusted for issue) are not determinable at this stage pending the completion of the issue
and hence the same have not been provided in the above statement.
Notes:
Short-term borrowings are debts which are due for repayment within 12 months from reporting period
1.
ended March 31, 2025.
Long-term borrowings are considered as borrowing other than short-term borrowing (including Current
2.
Maturities of Long-Term Debt).
3. The amounts disclosed above are based on the Restated Consolidated Financial Information.
As certified by Rishi Kapoor & Company, Chartered Accountants pursuant to their certificate dated August 04,
2025 vide UDIN 25455362BMGILK4445.
442RELATED PARTY TRANSACTIONS
For details of related party transactions as per the requirements under applicable accounting standards, i.e. Ind AS
24 –Related Party Disclosures, read with the SEBI ICDR Regulations, for the financial years ended March 31,
2025, March 31, 2024 and March 31, 2023, kindly refer “Restated Consolidated Financial Information - Related
Party Transactions” beginning on page 395.
443MANAGEMENTS’ DISCUSSION AND ANALYSIS OF FINANCIAL CONDITIONS AND RESULTS OF
OPERATIONS
The following discussion of our financial condition and results of operations is based on, and should be read in
conjunction with, our Restated Consolidated Financial Information (including the schedules, annexures, notes
and significant accounting policies thereto), included in the section titled “Restated Consolidated Financial
Information” beginning on page 331.
Our Restated Consolidated Financial Information have been derived from our audited financial statements and
restated in accordance with the SEBI ICDR Regulations and the ICAI Guidance Note. Our financial statements
are prepared in accordance with Ind AS, notified under the Companies (Indian Accounting Standards) Rules,
2015, and read with Section 133 of the Companies Act, 2013 to the extent applicable. Ind AS differs in certain
material respects from IFRS and U.S. GAAP and other accounting principles with which prospective investors
may be familiar. Accordingly, the degree to which the financial statements prepared in accordance with Ind AS
included in this Draft Red Herring Prospectus will provide meaningful information is entirely dependent on the
reader’s level of familiarity with Ind AS accounting policies. We have not attempted to quantify the impact of IFRS
or U.S. GAAP on the financial information included in this Draft Red Herring Prospectus, nor do we provide a
reconciliation of our financial information to IFRS or U.S. GAAP. Any reliance by persons not familiar with Ind
AS accounting policies on the financial disclosures presented in this Draft Red Herring Prospectus should
accordingly be limited.
Unless otherwise indicated or the context requires otherwise, the financial information for the Fiscal 2025, 2024
and 2023 included herein have been derived from our restated consolidated balance sheets as of March 31, 2025,
March 31, 2024 and March 31, 2023 and restated consolidated statements of profit and loss, cash flows and
changes in equity for the for the financial years ended March 31, 2025, March 31, 2024 and March 31, 2023 of
the Company, together with the statement of significant accounting policies, and other explanatory information
thereon.
Unless stated otherwise, industry and market data used in this Draft Red Herring Prospectus has been obtained
or derived from the report titled “Assessment of infrastructure construction industry in India with focus on water
and wastewater management” dated August 05, 2025 prepared by Crisil Intelligence (“CRISIL”) and publicly
available information as well as other industry publications and sources. The Report has been exclusively
commissioned at the request of our Company and paid for by our Company for the purposes of this Offer and is
available on the website of the Company at www.technocraftventures.com.
Our financial year ends on March 31 of each year, and references to a particular fiscal period are to the 12 months
ended March 31 of that year. All references to a year are to that Financial Year, unless otherwise noted.
Some of the information contained in this section, including information with respect to our strategies, contain
forward-looking statements that involve risks and uncertainties. You should read the section titled “Forward
Looking Statements” beginning on page 26 for a discussion of the risks and uncertainties related to those
statements and also the section titled “Risk Factors” and “Our Business” beginning on pages 39 and 228,
respectively, for a discussion of certain factors that may affect our business, results of operations and financial
condition. The actual results of the Company may differ materially from those expressed in or implied by these
forward-looking statements.
Unless otherwise stated, references to “the Company”, “our Company”, “we”, “us”, and “our” are to
Technocraft Ventures Limited.
Business Overview
We are a multidisciplinary public infrastructure development company engaged in the execution of turnkey
Engineering, Procurement and Construction (“EPC”) contracts. We operate across various infrastructure
segments, including Wastewater Treatment (“WWT”), Operation and Maintenance (“O&M”) of public utilities,
Water Supply Scheme Projects (“WSSPs”), electrical transmission and distribution networks, construction of
substations, road and highway works, micro tunnelling, and sector-level urban development. We execute projects
444primarily for state governments and government agencies across northern India, including Uttar Pradesh,
Uttarakhand, Rajasthan, and the National Capital Territory of Delhi.
Our project execution model is predominantly tender-based, with contracts awarded by state agencies, public
works departments, urban local bodies, and other government bodies. We maintain a strong presence across
multiple project locations and operate through dedicated site teams aligned with the nature and geography of
individual contracts.
Incorporated in 1998, our Company commenced operations in Uttar Pradesh with residential and road construction
projects, including the development of planned housing colonies, sector-level layouts, and execution of road
construction, widening and strengthening works under Public Works Departments (“PWD”) and National
Highways programs. These early projects laid the foundation for our subsequent diversification into water supply,
wastewater management, and public utility infrastructure.
We have executed projects under key central and state-sponsored schemes including the Atal Mission for
Rejuvenation and Urban Transformation (“AMRUT”), Jawaharlal Nehru National Urban Renewal Mission
(“JNNURM”), Urban Infrastructure Development Scheme for Small and Medium Towns (“UIDSSMT”),
Namami Gange Programme (“Namami Gange”), Jal Jeevan Mission (“JJM”), and Pradhan Mantri Gram Sadak
Yojana (“PMGSY”). We also have experience in implementing infrastructure projects funded by multilateral
agencies such as the Asian Development Bank (“ADB”) and the World Bank, which require compliance with
rigorous technical and environmental standards.
Our integrated in-house capabilities span civil construction, mechanical and electrical integration, project design,
and commissioning. These enable us to offer comprehensive infrastructure solutions from concept to delivery.
Additionally, we support long-term asset sustainability through our operations and maintenance (“O&M”)
services across wastewater and water projects, reinforcing our lifecycle approach to public infrastructure.
Our growth and strategic direction have significantly benefited from the leadership of our Chairman and Managing
Director, Sanjay Tyagi, who joined the Company in April 2007. His professional journey began at the Ghaziabad
Development Authority, where he served as an Engineer from January 1990 to March 2007. His expertise in civil
engineering and infrastructure development, combined with his extensive experience in government contract
procurement and execution, has been crucial to the company's success. He is responsible for strategic planning,
execution oversight, quality control, and project delivery, ensuring the company maintains its high standards of
performance. Under his guidance, we strategically diversified into specialized EPC segments, notably entering
wastewater treatment infrastructure through our strategic partnership in M/s Ultratech Engineers, a partnership
firm constituted in 2010. This partnership was instrumental in enhancing our technical capabilities and allowed
us to qualify for larger, complex infrastructure tenders.
Services Offered:
Segment Core Services
Water & Wastewater EPC of WSSPs, sewerage networks, sewerage treatment plants (“STPs”),
Infrastructure wastewater treatment plants (“WWTPs”), transmission mains, reservoirs
Operation &
Long-term O&M of STPs, WSSPs, sewer networks
Maintenance (O&M)
Urban Infrastructure Sector-level planning, roadworks
Power Distribution Electrification schemes, substations, transmission lines
Trenchless &
Pipeline installation in high-density zones with minimal surface disruption
Microtunnelling Works
445Financial Key Performance Indicator (KPIs) of our Company:
In evaluating our business, we consider and use certain key performance indicators that are presented below as
supplemental measures to review and assess our operating performance. The presentation of these key
performance indicators is not intended to be considered in isolation or as a substitute for the Restated Consolidated
Financial Information included in this Draft Red Herring Prospectus. We present these key performance indicators
because they are used by our management to evaluate our operating performance. Further, these key performance
indicators may differ from the similar information used by other companies, including peer companies, and hence
their comparability may be limited. Therefore, these matrices should not be considered in isolation or construed
as an alternative to AS measures of performance or as an indicator of our operating performance, liquidity,
profitability or results of operation. A list of our KPIs for the Fiscals 2025, 2024 and 2023 is set out below:
For the Financial Year ended
Key Financial Indicators
March 31, 2025 March 31, 2024 March 31, 2023
Revenue from Operations(1) 2,795.64 2,261.02 1,786.91
Total Income(2) 2,810.04 2,272.98 1,805.44
EBITDA (₹)(3) 481.88 338.30 218.81
EBITDA Margin (%)(4) 17.24% 14.96% 12.25%
PAT 282.04 190.54 108.06
PAT Margin (%)(5) 10.09% 8.43% 6.05%
Operating Cash Flows 216.84 13.99 100.35
Net Worth(6) 1,199.83 917.78 727.34
Net Debt(7) 869.17 789.89 480.89
Debt- Equity Ratio (times)(8) 0.73 0.87 0.70
Return on Equity (%)(9) 23.51% 20.76% 14.86%
Return on Capital Employed (%)(10) 22.35% 19.08% 16.85%
Notes:
(1) Revenue from operation means revenue from sales and other operating revenues.
(2) Total Income represents the total turnover of our business i.e. Revenue from Operations and Other Income,
if any.
(3) EBITDA is calculated as restated profit/(loss) before tax plus finance costs, depreciation and amortization
expense less other income.
(4) EBITDA Margin is calculated as EBITDA divided by Revenue from Operations.
(5) PAT Margin is calculated as restated profit/(loss) attributable to owners for the financial year divided by
Revenue from Operations.
(6) Net worth means the aggregate value of the paid-up share capital, equity suspense account and all
reserves created out of the profits and securities premium account and debit or credit balance of profit
and loss account after deducting the aggregate value of the accumulated losses, debit or credit balance
of common control adjustment deficit account, deferred expenditure and miscellaneous expenditure not
written off, as per the audited balance sheet, but does not include reserves created out of revaluation of
assets, write-back of depreciation and amalgamation.
(7) Net debt = non-current borrowing + current borrowing – Cash and Cash Equivalent.
(8) Debt equity ratio means ratio of total debt (long term plus short-term including current maturity of long-
term debt) and Equity Share capital plus other equity.
(9) ROE is calculated as Profit attributable to owners of the company divided by total shareholder’s equity
(excluding minority interest).
(10) ROCE is calculated as EBIT (i.e. restated profit/(loss) before tax plus finance costs minus other income)
divided by capital employed (i.e. sum of:(i) Total Equity;(ii) Long-Term Borrowings (including Lease
Liabilities, if any); (iii) Short-Term Borrowings (including Lease Liability, if any).
446SIGNIFICANT DEVELOPMENTS SUBSEQUENT TO THE LAST FINANCIAL PERIOD
In the opinion of the Board of Directors of our Company, since the date of the last financial statements disclosed
in this Draft Red Herring Prospectus, there have not arisen any circumstance that materially or adversely affect or
are likely to affect the business activities or profitability of our Company or the value of its assets or its ability to
pay its material liabilities.
SIGNIFICANT ACCOUNTING POLICIES
1. Company Overview
Technocraft Construction Private Limited was incorporated on October 21,1998 with Registrar of Companies
(ROC), Delhi under the provisions of Companies Act 1956. Thereafter, the name of our Company was changed
from ‘Technocraft Construction Private Limited’ to ‘Technocraft Ventures Private Limited’ on February 09, 2024
and thereafter conversion of our Company from private to public company, pursuant to a special resolution passed
by the shareholders of our Company on March 13, 2024 and a fresh certificate of incorporation consequent to
change of name from Technocraft Ventures Private Limited to Technocraft Ventures Limited (" The Company")
was issued by the ROC of June 11, 2024. The Company’s Corporate Identity Number is
U70101DL1998PLC096763Z0.The Registered office of company is situated at S 553/54, Ground Floor, School
Block, Shakarpur, New Delhi, New Delhi, Delhi-110092, India, and Corporate Office of the company is B-137,
Sector 2, Noida, Gautam Buddha Nagar, Uttar Pradesh-201301, India. It has no holding, Subsidiaries or associate
companies but has investment in Partnership Firm in which the company holds 26% share. The company is
engaged in the business of executing turnkey projects in the domains of Engineering, Procurement and
Construction (EPC) of Roads, Building Construction, Highways, Sewage Networks, Sewage Treatment Plants
and Power.
2. Summary of Significant Accounting Policies
2.1 Basis of Preparation
(a) The Restated Consolidated Financial Information comprise the Restated Consolidated Statement of Asset and
Liabilities as at March 31, 2025, March 31, 2024 and March 31, 2023, the Restated Consolidated Statement of
Profit and Loss (including other comprehensive income), for the financial year ended March 31, 2025, March 31,
2024 and March 31, 2023, the Restated Consolidated Statement of Cash Flows for the financial years ended March
31, 2025, March 31, 2024 and March 31, 2023, the Material Accounting Policies and Other Explanatory Notes
to the Restated Consolidated Financial Information, Statement of Restated Adjustments to the Audited Financial
Information and Notes to the Restated Consolidated Financial Information (collectively, the “Restated
Consolidated Financial Information”). The Restated Consolidated Financial Information of the Company have
been prepared to comply in all material respects with the Indian Accounting Standards (“Ind AS”) as prescribed
under Section 133 of the Act read with the Companies (Indian Accounting Standards) Rules, 2015 (as amended
from time to time), presentation requirements of Division II of Schedule III to the Companies Act, 2013, as
applicable to the Restated Consolidated Financial Information and other relevant provisions of the Act. These
Restated Consolidated Financial Information have been prepared by the management as required under the
Securities and Exchange Board of India (Issue of Capital and Disclosure Requirements Regulations, 2018, as
amended (“ICDR Regulations”) issued by the Securities and Exchange Board of India ('SEBI'), in pursuance of
the Securities and Exchange Board of India Act, 1992, for the purpose of inclusion in this Draft Red Herring
Prospectus (“DRHP”) in connection with the proposed initial public offering, prepared by the Company in terms
of the requirements of :
a) Section 26 of Part I of Chapter III of the Companies Act, 2013 ("the Act")
b) The Securities and Exchange Board of India (Issue of Capital and Disclosure Requirements) Regulations,
2018 as amended; and
c) The Guidance Note on Reports in Company Prospectuses (Revised 2019) issued by the Institute of Chartered
Accountants of India (ICAI) (the “Guidance Note”).
447These Restated Consolidated Financial Information have been compiled from the audited financial statements as
at and for the financial years ended March 31, 2025, March 31, 2024 and March 31, 2023 which have been
approved by the Board of Directors in their meeting held on July 02, 2025, September 02, 2024 and September
05, 2023, respectively.
The Company has decided to voluntarily adopt Indian Accounting Standards notified under Section 133 of the
Companies Act 2013, read with Companies (Indian Accounting Standards) Rules, 2015 as amended from time to
time and other accounting principles generally accepted in India. For the purpose of the preparation of Restated
Consolidated Financial Statement for the financial years ended March 31, 2025, March 31, 2024 and March 31,
2023 of the Company, the transition date is considered as April 01, 2022. Accordingly, the Company has applied
the same accounting policy and accounting policy choices (both mandatory exceptions and optional exemptions
availed as per Ind AS 101, as applicable) as on April 01, 2022.
(b) Basis of Measurement
The Restated Consolidated Financial Information have been prepared on a historical cost basis except certain
items that are measured at fair value as explained in accounting policies.
Fair value is the price that would be received to sell an asset or paid to transfer a liability in an orderly transaction
between market participants at the measurement date, regardless of whether that price is directly observable or
estimated using another valuation technique. In estimating the fair value of an asset or a liability, the Company
takes into account the characteristics of the asset or liability, if market participants would take those characteristics
into account when pricing the asset or liability at the measurement date. Fair value for measurement and/or
disclosure purposes in these financial statements is determined on such a basis, except for leasing transactions that
are within the scope of Ind AS 116 – Leases, and measurements.
2.2 Principles of Consolidation
The Restated Consolidated financial information presented for the reporting financial years include the financial
statements of the Company and its share in associate accounted in accordance with the relevant Indian Accounting
Standards (Ind AS) specified under Section 133 of the Companies Act, 2013.
Associates are entities over which the Company exercise significant influence but does not control. Significant
influence is assessed annually with reference to the voting power (usually arising from equity shareholdings and
potential voting rights) and other rights (usually contractual) enjoyed by the Company in its capacity as an investor
that provides it the power and consequential ability to direct the investee’s activities and significantly affect the
Company’s returns from its investment. Such assessment requires the exercise of judgement and is disclosed by
way of a note to the restated consolidated financial information. Investment in Associates is accounted as per
Equity Method as per IND AS in the Restated Consolidated Financial Information.
2.3 Uses of Estimates
The preparation of the Restated Consolidated Financial Statements is in conformity with Ind AS requires
management to make estimates, judgments and assumptions. These estimates, judgments and assumptions affect
the application of accounting policies and the reported amounts of assets and liabilities, the disclosures of
contingent assets and liabilities at the date of the financial statements and reported amounts of revenues and
expenses during the period. Accounting estimates could change from period to period. Actual results could differ
from those estimates. Appropriate changes in estimates are made as management becomes aware of changes in
circumstances surrounding the estimates.
The estimates and underlying assumptions are reviewed on going concern basis.
Revisions to accounting estimates are recognized in the period in which the estimate is revised, if the revision
affects only that period. If the revision affects both current and future period, the same is recognised accordingly.
448Key source of estimation of uncertainty at the date of financial statements, which may cause material adjustment
to the carrying amounts of assets and liabilities within the next financial year, is in respect of impairment, useful
lives of property, plant and equipment and intangible assets, valuation of deferred tax assets, provisions and
contingent liabilities, fair value measurements of financial instruments and retirement benefit obligations as
disclosed below:
Impairment
The Company estimates the value in use of the cash generating unit (CGU) based on future cash flows after
considering current economic conditions and trends, estimated future operating results and growth rates and
anticipated future economic and regulatory conditions. The estimated cash flows are developed using internal
forecasts. The cash flows are discounted using a suitable discount rate in order to calculate the present value.
Useful lives of property, plant and equipment and intangible assets
The Company reviews the useful life of property, plant and equipment and intangible assets at the end of each
reporting period. This reassessment may result in change in depreciation and amortisation expense in future
periods.
Valuation of deferred tax assets
The Company reviews the carrying amount of deferred tax assets at the end of each reporting period.
Allowances for expected credit loss
The Company makes provision for expected credit losses through appropriate estimations of irrecoverable
amount. The identification of expected credit loss requires use of judgment and estimates. The Company evaluates
trade receivables ageing and makes a provision for those debts as per the provisioning policy. Where the
expectation is different from the original estimate, such difference will impact the carrying value of the trade and
other receivables and doubtful debts expenses in the period in which such estimate has been changed.
Retirement benefit obligations
The Company’s retirement benefit obligations are subject to number of assumptions including discount rates,
inflation and salary growth. Significant assumptions are required when setting these criteria and a change in these
assumptions would have a significant impact on the amount recorded in the Company’s balance sheet and the
statement of profit and loss. The Company sets these assumptions based on previous experience and third-party
actuarial advice.
Classification of Leases
The Company enters into leasing arrangements for Leasehold Land. The classification of the leasing arrangement
as a finance lease or operating lease is based on an assessment of several factors, including, but not limited to,
transfer of ownership of leased asset at end of lease term, lessee’s option to purchase and estimated certainty of
exercise of such option, proportion of lease term to the asset’s economic life, proportion of present value of
minimum lease payments to fair value of leased asset and extent of specialized nature of the leased asset.
2.4 Significant Accounting Policies
The material accounting policies applied by the Company in the preparation of the Restated Consolidated
Financial information are listed below. Such accounting policies have been applied consistently to all the periods
presented in this Restated Consolidated Financial information, unless otherwise indicated.
449i. Current v/s Non-Current Classification
The Company presents assets and liabilities in the balance sheet based on current/ non-current classification. An
asset is classified as current when it is:
• Expected to be realised or intended to sold or consumed in normal operating cycle
• Held primarily for the purpose of trading
• Expected to be realised within twelve months after the reporting period, or
• Cash or cash equivalent unless restricted from being exchanged or used to settle a liability for at least twelve
months after the reporting period.
All other assets are classified as non-current.
A liability is current when:
• It is expected to be settled in normal operating cycle
• It is held primarily for the purpose of trading
• It is due to be settled within twelve months after the reporting period, or
• There is no unconditional right to defer the settlement of the liability for at least twelve months after the reporting
period.
The Group classifies all other liabilities as non-current. Deferred tax assets and liabilities are classified as non-
current assets and liabilities.
The operating cycle is the time between the acquisition of assets for processing and their realisation in cash and
cash equivalents. Based on the nature of service and the time between rendering of services and their realization
in cash and cash equivalents, 12 months has been considered by the Group for the purpose of current / non-current
classification of assets and liabilities.
ii. Functional and Presentation Currency
Amounts in the financial statements are presented in millions rounded off to two decimal places as permitted by
Schedule III to the Act.
iii. Property, Plant and Equipment (PPE):
PPE is recognised when it is probable that future economic benefits associated with the item will flow to the
Company and the cost of the item can be measured reliably PPE is stated at original cost net of tax/duty credits
availed, if any less accumulated depreciation and cumulative impairment, if any All directly attributable costs
related to the acquisition of PPE and, borrowing costs case of qualifying assets are capitalised in accordance with
the Company's accounting policy.
Subsequent costs are included in the asset's carrying amount or recognised as a separate asset, as appropriate, only
when it is probable that future economic benefits associated with the item will flow to the company and the cost
of the item can be measured reliably.
PPE not ready for the intended use on the date of the Balance Sheet are disclosed as "capital work-in-progress"
Depreciation Methods, Estimated Useful Life
Depreciation is recognised using written down value method so as to write off the cost of the assets (other than
freehold land and capital work-in-progress) less their residual values over their useful lives specified in Schedule
450III to the Companies Act, 2013, or in the case of assets where the useful life was determined by technical
evaluation, over the useful life so determined.
Depreciation on additions to deductions from, owned assets is calculated on pro rata basis according to the period
of use. PPE is de recognised upon disposal or when no future economic benefits are expected from its use or
disposal. Any gain or loss arising on de recognition is recognised in the Statement of Profit and Loss in the same
period.
The estimated useful lives, residual values and depreciation method are reviewed at each financial year end and
the effect of any change is accounted for on prospective basis.
The carrying amount of the all property, plant and equipment are derecognized on its disposal or when no future
economic benefits are expected from its use or disposal and the gain or loss on de-recognition is recognized in the
statement of profit & loss. Other Fixed Assets include Dumper, BPD, Tandom Roller, Paver, Sensor Paver, Tar
Boiler, Bitumin Tank.
The useful life of assets are as follows:
Tangible Assets Useful Life
Building 30 years
Plant & Machinery 15 years
Vehicles 8 years
Furniture & Fixtures 10 years
Office Equipment 5 years
Computer 3 years
Others 9-15 years
iv. Impairment of Non-Financial Assets:
The Company assesses, at each reporting date, whether there is an indication that an asset may be impaired. If any
indication exists, or when annual impairment testing for an asset is required, the Company estimates the asset’s
recoverable amount. An asset’s recoverable amount is the higher of an assets or cash-generating unit’s (CGU) fair
value less costs of disposal and its value in use. Recoverable amount is determined for an individual asset, unless
the asset does not generate cash inflows that are largely independent of those from other assets or groups of assets.
When the carrying amount of an asset or CGU exceeds its recoverable amount, the asset is considered impaired
and is written down to its recoverable amount.
In assessing value in use, the estimated future cash flows are discounted to their present value using a pre-tax
discount rate that reflects current market assessments of the time value of money and the risks specific to the asset.
In determining fair value less costs of disposal, recent market transactions are taken into account. If no such
transactions can be identified, an appropriate valuation model is used. These calculations are corroborated by
valuation multiples, quoted share prices for publicly traded companies or other available fair value indicators.
Impairment losses of continuing operations, including impairment on inventories, are recognised in the statement
of profit and loss.
For assets an assessment is made at each reporting date to determine whether there is an indication that previously
recognised impairment losses no longer exist or have decreased. If such indication exists, the Company estimates
the assets or CGU’s recoverable amount. A previously recognised impairment loss is reversed only if there has
been a change in the assumptions used to determine the asset’s recoverable amount since the last impairment loss
was recognised. The reversal is limited so that the carrying amount of the asset does not exceed its recoverable
amount, nor exceed the carrying amount that would have been determined, net of depreciation, had no impairment
loss been recognised for the asset in prior years. Such reversal is recognised in the statement of profit or loss
unless the asset is carried at a revalued amount, in which case, the reversal is treated as a revaluation increase.
451v. Borrowing and Borrowing costs
Borrowings are initially recognised at fair value, net of transaction costs incurred. Borrowings are subsequently
measured at amortised cost. Any difference between the proceeds (net of transaction costs) and the redemption
amount is recognised in Statement of profit and loss over the period of the borrowings using the effective interest
method. Borrowings are derecognised from the balance sheet when the obligation specified in the contract is
discharged, cancelled or expired. The difference between the carrying amount of a borrowings that has been
extinguished or transferred to another party and the consideration paid, including any non-cash assets transferred
or liabilities assumed, is recognised in Statement of profit and loss as other gains/(losses). Borrowings are
classified as current liabilities unless the Company has an unconditional right to defer settlement of the liability
for at least 12 months after the reporting period.
Borrowing costs directly attributable to the acquisition, construction or production of an asset that necessarily
takes a substantial period of time to get ready for its intended use are capitalised as part of the cost of the asset.
All other borrowing costs are expensed in the period in which they occur. Borrowing costs consist of interest and
other costs that an entity incurs in connection with the borrowing of funds. Borrowing cost also includes exchange
differences to the extent regarded as an adjustment to the borrowing costs.
Borrowing costs directly attributable to the acquisition or construction of qualifying assets are capitalised as part
of the cost of the assets up to the date the asset is ready for its intended use. All other borrowing costs are
recognised as an expense in the Restated Statement of Profit and Loss account in the year in which they are
incurred.
vi. Financial Instruments-Initial Recognition, Subsequent Measurement and Impairment:
A financial instrument is any contract that gives rise to a financial asset of one entity and a financial liability or
equity instrument of another entity.
Financial Assets
(a) Initial recognition and measurement: All financial assets are recognised initially at fair value and, in the case
of financial assets not recorded at fair value through profit or loss, transaction costs that are attributable to
the acquisition of the financial asset.
(b) Subsequent measurement: For purposes of subsequent measurement financial assets are classified in two
broad categories:
-Financial assets at fair value
-Financial assets at amortised cost
(c) Classification: The Company classifies financial assets as subsequently measured at amortised cost, fair
value through other comprehensive income or fair value through profit or loss on the basis of its business
model for managing the financial assets and the contractual cash flows characteristics of the financial asset.
(d) Financial assets measured at amortised cost: Financial assets are measured at amortised cost when asset is
held within a business model, whose objective is to hold assets for collecting contractual cash flows and
contractual terms of the asset give rise on specified dates to cash flows that are solely for payments of
principal and interest. Such financial assets are subsequently measured at amortised cost using the effective
interest rate (EIR) method. The losses arising from impairment are recognised in the Statement of profit and
loss. This category generally applies to trade and other receivables.
(e) Financial assets measured at fair value through other comprehensive income (FVTOCI): Financial assets
under this category are measured initially as well as at each reporting date at fair value. Fair value movements
are recognized in the other comprehensive income.
(f) Financial assets measured at fair value through profit or loss (FVTPL): Financial assets under this category
are measured initially as well as at each reporting date at fair value with all changes recognised in profit or
loss.
452(g) Investment in Equity Instruments: Equity instruments which are held for trading are classified as at FVTPL.
All other equity instruments are classified as FVTOCI. Fair value changes on the instrument, excluding
dividends, are recognized in the other comprehensive income. There is no recycling of the amounts from
other comprehensive income to profit or loss.
(h) Derecognition of Financial assets: A financial asset is primarily derecognised when the rights to receive cash
flows from the asset have expired or the Group has transferred its rights to receive cash flows from the asset,
if an entity transfers a financial asset in a transfer that qualifies for derecognition in its entirety and retains
the right to service the financial asset for a fee, it shall recognise either a servicing asset or a servicing liability
for that servicing contract. If the fee to be received is not expected to compensate the entity adequately for
performing the servicing, a servicing liability for the servicing obligation shall be recognised at its fair value.
If the fee to be received is expected to be more than adequate compensation for the servicing, a servicing
asset shall be recognised for the servicing right at an amount determined on the basis of an allocation of the
carrying amount of the larger financial asset.
(i) Impairment of Financial assets: In accordance with Ind AS 109, the Group applies expected credit loss (ECL)
model for measurement and recognition of impairment loss on the financial assets that are debt instruments
and trade receivables. For recognition of impairment loss on other financial assets and risk exposure, the
Group determines that whether there has been a significant increase in the credit risk since initial recognition.
Financial Liabilities:
a) Initial recognition and measurement: All financial liabilities are recognised initially at fair value and, in the
case of loans, borrowings and payables, net of directly attributable transaction costs. Financial liabilities
include trade and other payables, loans and borrowings including bank overdrafts.
b) Classification & Subsequent measurement: If a financial instrument that was previously recognised as a
financial asset is measured at fair value through profit or loss and its fair value decreases below zero, it is a
financial liability measured in accordance with IND AS. Financial liabilities are classified as held for trading,
if they are incurred for the purpose of repurchasing in the near term.
The Company classifies all financial liabilities as subsequently measured at amortised cost, except for financial
liabilities at fair value through profit or loss. Such liabilities, including derivatives that are liabilities, shall be
subsequently measured at fair value. However, there is no derivative transactions in the company.
c) Derecognition of Financial Liabilities: A financial liability is derecognised when the obligation under the
liability is discharged or cancelled or expires. When an existing financial liability is replaced by another from
the same lender on substantially different terms, or the terms of an existing liability are substantially modified,
such an exchange or modification is treated as the derecognition of the original liability and the recognition of
a new liability. The difference in the respective carrying amounts is recognised in the Statement of Profit and
Loss.
d) Offsetting financial instruments: Financial assets and liabilities are offset and the net amount reported in the
balance sheet when there is a legally enforceable right to offset the recognised amounts and there is an intention
to settle on a net basis to realise the asset and settle the liability simultaneously.
Subsequent recoveries of amounts previously written off are credited to Other Income.
vii. Cash and Cash Equivalents:
Cash and cash equivalent in the balance sheet comprise cash at banks and on hand and short-term deposits with
an original maturity of three months or less, that are readily convertible to a known amount of cash and subject to
453an insignificant risk of changes in value. Bank balances other than cash & cash equivalents includes fixed deposits
of original maturity of 3 Months to 12 Months. It also includes fixed deposits of original maturity of less than 3
Months which are lien with Bank against Bank Guarantee & Others as it is not liquid in nature and restricted for
use.
viii. Provisions, Contingent Liabilities and Contingent Assets:
a) General: Provisions are recognised when the Group has a present obligation (legal or constructive) as a result of
a past event, it is probable that an outflow of resources embodying economic benefits will be required to settle the
obligation and a reliable estimate can be made of the amount of the obligation. If the effect of the time value of
money is material, the amount of a provision shall be the present value of expense expected to be required to settle
the obligation Provisions are therefore discounted, when effect is material, the discount rate shall be pre-tax rate
that reflects current market assessment of time value of money and risk specific to the liability. Unwinding of the
discount is recognised in the Statement of Profit and Loss as a finance cost. Provisions are reviewed at each
balance sheet date and are adjusted to reflect the current best estimate.
b) Contingencies: Contingent liabilities are disclosed when there is a possible obligation arising from past events,
the existence of which will be confirmed only by the occurrence or non-occurrence of one or more uncertain future
events not wholly within the control of the Group or a present obligation that arises from past events where it is
either not probable that an outflow of resources will be required to settle or a reliable estimate of the amount
cannot be made. Information on contingent liability is disclosed in the Annexures to the Financial Statements.
A contingent asset is a possible asset that arises from past events and whose existence will be confirmed only by
the occurrence or non-occurrence of one or more uncertain future events not wholly within the control of the
entity, Contingent assets are not recognised, but are disclosed in the notes. However, when the realisation of
income is virtually certain, then the related asset is no longer a contingent asset, but it is recognised as an asset.
ix. Share Capital and Securities Premium:
Ordinary shares are classified as Equity. Incremental costs directly attributable to the issue of new shares are
shown in equity as a deduction, net of tax, from the proceeds.
Par value of the equity share is recorded as share capital and the amount received in excess of the par value is
classified as securities premium.
x. Revenues:
a) Sale of services: Revenue is recognised on the basis of approved contracts regarding the transfer of goods or
services to a customer for an amount that reflects the consideration to which the entity expects to be entitled in
exchange for those goods and services.
Revenue towards satisfaction of a performance obligation is measured at the amount of transaction price (net of
variable consideration) allocated to that performance obligation. The transaction price of goods sold and services
rendered is net of variable consideration. Any amounts receivable from the customer are recognised as revenue
after the control over the goods sold and services rendered are transferred to the customer.
Variable consideration includes incentives, rebates, discounts etc. which is estimated at contract inception
considering the terms of various schemes with customers and constrained until it is highly probable that a
significant revenue reversal in the amount of cumulative revenue recognised will not occur when the associated
uncertainty with the variable consideration is subsequently resolved. It is reassessed at the end of each reporting
period. Revenue is recognised on the basis of approved contracts regarding the transfer of goods or services to a
customer for an amount that reflects the consideration to which the entity expects to be entitled in exchange for
those goods and services.
454b) Other Income:
Interest Income: Interest income is recognised on a time proportion basis using the effective interest rate method.
xi. Taxation:
a) Current Tax: Current tax is expected tax payable on the taxable income for the year, using the tax rate enacted at
the reporting date, and any adjustment to the tax payable in respect of the earlier periods.
Current tax assets and liabilities are offset where the company has legally enforceable right to offset and intends
either to settle on net basis, or to realize the assets and settle the liability simultaneously.
b) Deferred Tax: Deferred tax is recognized for all taxable temporary differences and is calculated based on the
carrying amounts of assets and liabilities for financial reporting purposes and the amounts used for taxation
purposes.
Deferred tax is measured at the tax rates that are expected to be applied when the asset is realized or the liability
is settled, based on the laws that have been enacted or substantively enacted at the reporting date.
Deferred tax assets are recognized only to the extent that it is probable that future taxable profits will be available
against which the assets can be utilized. Deferred tax assets are reviewed at each reporting date and are reduced
to the extent that it is no longer probable that the related tax benefit will be realized.
Deferred tax assets and liabilities are offset when there is a legally enforceable right to offset and when the deferred
tax balances relate to taxes levied by the same tax authority on the same taxable entity, or on different tax entities,
but the company intends to settle current tax liabilities and assets on a net basis or their tax assets and liabilities
will be realized simultaneously.
c) Current and Deferred Tax for the Year: Current and deferred tax are recognized in the statement of profit &
loss, except when they relate to items that are recognized in other comprehensive income or directly in equity, in
which case, the current tax and deferred tax is recognized directly in other comprehensive income or equity
respectively.
xii. Earning Per Share:
Basic Earnings Per Share is computed by dividing the net profit attributable to the equity shareholders of the
company to the weighted average number of Shares outstanding during the period & Diluted earnings per share
is computed by dividing the net profit attributable to the equity shareholders of the company after adjusting the
effect of all dilutive potential equity shares that were outstanding during the period. The weighted average number
of shares outstanding during the period includes the weighted average number of equity shares that could have
issued upon conversion of all dilutive potential.
xiii. Lease:
As a lessee: The Group’s lease asset classes primarily consist of leases for Land, Vehicles and Plant & Machinery.
The Group assesses whether a contract contains a lease, at inception of a contract. A contract is, or contains, a
lease if the contract conveys the right to control the use of an identified asset for a period of time in exchange for
consideration. To assess whether a contract conveys the right to control the use of an identified asset, the Group
assesses whether: (i) the contract involves the use of an identified asset (ii) the Group has substantially all of the
economic benefits from use of the asset through the period of the lease and (iii) the Group has the right to direct
the use of the asset.
455At the date of commencement of the lease, the Group recognizes a right-of-use asset ("ROU") and a corresponding
lease liability for all lease arrangements in which it is a lessee, except for leases with a term of twelve months or
less (short-term leases) and low value leases. For these short-term and low value leases, the Group recognizes the
lease payments as an operating expense on a straight-line basis over the term of the lease.
Certain lease arrangements include the options to extend or terminate the lease before the end of the lease term.
ROU assets and lease liabilities includes these options when it is reasonably certain that they will be exercised.
The right-of-use assets are initially recognized at cost, which comprises the initial amount of the lease liability
adjusted for any lease payments made at or prior to the commencement date of the lease plus any initial direct
costs less any lease incentives. They are subsequently measured at cost less accumulated depreciation and
impairment losses.
Right-of-use assets are depreciated from the commencement date on a straight-line basis over the shorter of the
lease term and useful life of the underlying asset. Right of use assets are evaluated for recoverability whenever
events or changes in circumstances indicate that their carrying amounts may not be recoverable. For the purpose
of impairment testing, the recoverable amount (i.e. the higher of the fair value less cost to sell and the value-in-
use) is determined on an individual asset basis unless the asset does not generate cash flows that are largely
independent of those from other assets.
The lease liability is initially measured at amortized cost at the present value of the future lease payments. The
lease payments are discounted using the interest rate implicit in the lease or, if not readily determinable, using the
incremental borrowing rates in the country of domicile of these leases. Lease liabilities are remeasured with a
corresponding adjustment to the related right of use asset if the Group changes its assessment if whether it will
exercise an extension or a termination option. Lease liability and ROU asset have been separately presented in the
Balance Sheet and lease payments have been classified as financing cash flows.
As informed by the management, the entire lease rent pertaining to the leased asset was paid in full by the previous
owner of the asset, prior to the transfer of ownership to the company. Accordingly, there is no future lease rent
liability payable by the company. Consequently, there is no recognition of lease liability (current or non-current)
in the financial statements. Since there are no future lease payments, the requirements of Ind AS 116 with respect
to recognition of lease liability and corresponding right-of-use asset and subsequent finance cost adjustments are
not applicable in this case. No adjustments related to interest (finance cost) under Ind AS 116 have been made in
the financial statements. This treatment is based on the management's representation a due to the absence of
enforceable future lease payments.
xiv. Employee Benefits:
The company provides for the various benefits plans to the employees. These are categorized into Defined Benefits
Plans and Defined Contributions Plans. Defined contribution plans include the amount paid by the company
towards the liability for Provident fund to the employee’s provident fund organization and Employee State
Insurance fund in respect of ESI and defined benefits plans includes the retirement benefits, such as gratuity.
a) In respect Defined Contribution Plans, contribution made to the specified fund based on the services rendered
by the employees are charged to Statement of Profit & Loss in the year in which services are rendered by
the employee.
b) Liability in respect of Defined Long-Term benefit plan is determined at the present value of the amounts
payable determined using actuarial valuation techniques performed by an independent actuarial at each
balance sheet date using the projected unit credit methods. Re-measurement, comprising actuarial gain and
losses, the effects of assets ceiling (if applicable) and the return on plan assets (excluding interest), is
reflected immediately in the statement of Financial Position with a charge or credit recognized in other
comprehensive income in the period in which they occur. Past Service cost is recognized in the statement of
profit & loss in the period of plan amendment.
456c) Liabilities for short term employee benefits are measured at undiscounted amount of the benefits expected
to be paid and charged to Statement of Profit & Loss in the year in which the related service is rendered.
xv. Inventories:
Work in Progress & Material at Site
At Cost Price only. (As taken, valued and verified by the management of the Company).
PRINCIPAL COMPONENTS OF STATEMENT OF PROFIT AND LOSS
Set forth below are the principal components of statement of profit and loss from our continuing operations:
Income
Our total income comprises revenue from operations & other income as mentioned below:
Revenue from Operations
Our revenue from operations primarily includes income from contracts related to sewerage, road, highway,
building construction, Operation & Maintenance, E/M Contracts and water supply work.
Other Income
Other income includes (i) interest income on FDR’s and other deposits; (ii) Profit on sale of Property, plant and
equipment, (iii) Miscellaneous Income etc.
Expenses
Our total expenses include the below mentioned expenses:
Cost of Revenue of Operations
Cost of revenue of operations is the aggregate of our cost of raw materials consumed which includes additional
purchases and change in inventory of raw materials.
Changes in Inventories of Work-in-Process
Changes in inventories of work-in-progress denote increase/ decrease in inventories of work in progress between
opening and closing dates of a reporting period.
Employee benefit expenses
Employee benefit expenses primarily include (i) salaries and wages, (ii) director remuneration, (iii) bonus &
incentive, (iv) contributions to ESI, PFI and other funds, (v) gratuity, (vi) staff welfare expenses and (vii) leave
encashment.
Finance Cost
Our finance costs primarily include interest, other borrowing cost and bank charges.
Depreciation and Amortization Expense
Depreciation expenses primarily include (i) depreciation expenses on our property, plant and equipment including
buildings, plant & machinery, electrical installations, office equipments, computers, furniture’s & fixtures and
vehicles; and (ii) amortization expenses include amortization of leasehold land.
Other Expenses
Other expenses include Power & Fuel, Erection & Commissioning Charges, Testing Charges, Loading &
Unloading, Job Work Charges, Site Expenses, Security Charges, Design and Drawing Expenses, Repair &
Maintenance (Machinery), Labour Charges, Hiring of Equipment & Machinery, Freight & Transportation, Rent,
457Travelling & Conveyance, Hiring of Vehicles, Fee Rates & Taxes, Insurance, Auditors' Remuneration, Legal &
Professional and CSR Expenses etc.
Tax Expense
Our tax expenses primarily include current tax, deferred tax and adjustment for tax of earlier years.
CHANGES IN ACCOUNTING POLICIES
There have been no changes in our accounting policies during the Fiscal 2025, 2024 and 2023.
NON-GAAP MEASURES
EBITDA and EBITDA Margin, (together, “Non-GAAP Measures”), presented in this Draft Red Herring
Prospectus is a supplemental measure of our performance and liquidity that is not required by, or presented in
accordance with, Ind AS, IFRS or US GAAP. Further, these Non-GAAP Measures are not a measurement of our
financial performance or liquidity under Ind AS, IFRS or US GAAP and should not be considered in isolation or
construed as an alternative to cash flows, profit/ (loss) for the years/ period or any other measure of financial
performance or as an indicator of our operating performance, liquidity, profitability or cash flows generated by
operating, investing or financing activities derived in accordance with Ind AS, IFRS or US GAAP.
In addition, these Non-GAAP Measures are not standardised terms, hence a direct comparison of these Non-
GAAP Measures between companies may not be possible. Other companies may calculate these Non-GAAP
Measures differently from us, limiting its usefulness as a comparative measure. Although such Non-GAAP
Measures are not a measure of performance calculated in accordance with applicable accounting standards, our
Company’s management believes that they are useful to an investor in evaluating us as they are widely used
measures to evaluate a company’s operating performance.
Reconciliation of Profit and Other Comprehensive Income
(₹ in million)
Sr. Financial Financial Financial
Particulars
No. Year 2025 Year 2024 Year 2023
I) Net Profit attributable to equity shareholders
283.17 193.67 110.81
( as per audited financial statements) (A)
Add/Less: Adjustments
i) Provision for Gratuity Expense 1.57 1.03 0.79
ii) Actuarial (Gain)/ Loss on Defined Benefit Plan (0.01) 0.14 (0.24)
iii) Amortization of RoU Asset as per Ind AS 116 'Leases' 1.03 1.03 1.03
iv) Deferred Tax Adjustment (0.41) (0.41) 0.53
v) Provision for Expected Credit Loss for Trade Receivables 0.16 0.44 0.46
vi) Provision for Tax impact of Associate- TESPL -LRS -
(0.99) 0.99
TCPL-JV -
vii) Benefit paid during the year adjusted in provision for
(0.08) - -
Gratuity
viii) Interest on delayed payment of MSME (0.14) - -
Total (B) 1.13 3.23 2.57
II) Restated Total Comprehensive Income attributable to
equity holders of the company as per Restated 282.04 190.44 108.24
Consolidated Statement of Profit and Loss (A-B)
458(₹ in million)
Reconciliation of Equity
Sr. Financial Financial Financial
Particulars
No. Year 2025 Year 2024 Year 2024
I) Total Equity (as per audited Financial Statements) 1,211.76 928.58 734.91
II) Adjustments:
i) Provision for Gratuity Expense 6.75 5.27 4.10
ii) Adoption of IND AS 116 ' Leases' 4.13 3.10 2.07
iii) Deferred Tax Effect on above adjustments (1.50) (1.09) (0.68)
iv)Provision for Expected Credit Loss for Trade Receivables 2.68 2.53 2.08
v) Provision for Tax impact of Associate- TESPL -LRS -
- 0.99 -
TCPL-JV
Vi) Interest on delayed payment of MSME (0.14) - -
11.93 10.80 7.57
III) Total Equity as per Restated Consolidated Statement of
1,199.83 917.78 727.34
Assets and Liabilities
1. Provision for Gratuity Expense & Actuarial Gain/Loss on Defined benefit Plan
Provision for Gratuity Expense for the years ended March 31, 2025, March 31,2024 and March 31,2023 was not
created. Same as been reinstated as per Actuarial valuation report obtained for the years ended March 31,2025,
March 31,2024 and March 31,2023. Consequent impact on Actuarial Gain/Loss on Defined benefit plan has been
reinstated in the Ind AS Restated Consolidated Financial Statement. Under IND AS, all actuarial gains and losses
are recognised in Other Comprehensive Income. Benefit paid during the year is adjusted in the provision for
Gratuity as per Actuarial Valuation Report and hence appropriate adjustments are made in the Restated
Consolidated Financial Statement.
2. Impact of IND AS 116 'Leases;
For the purpose of preparation of Restated Consolidated Financial Information, the Company has adopted Ind
AS 116: Leases from the date of transition i.e. April 01, 2022 and management has evaluated the impact of
change in accounting policies required due to adoption of Ind AS 116 for the financial years ended March 31,
2025, March 31, 2024 and March 31, 2023 and made the necessary adjustments. As informed by the management,
the entire lease rent pertaining to the leased asset was paid in full by the previous owner of the asset, prior to the
transfer of ownership to the company. Accordingly:
(a) There is no future lease rent liability payable by the company. Consequently, there is no recognition of lease
liability (current or non-current) in the financial statements. Since there are no future lease payments, the
requirements of Ind AS 116 with respect to recognition of lease liability and corresponding right-of-use asset
and subsequent finance cost adjustments are not applicable in this case. No adjustments related to interest
(finance cost) under Ind AS 116 have been made in the financial statements. This treatment is based on the
management's representation a due to the absence of enforceable future lease payments.
2. Deferred Tax
Under Previous GAAP, Deferred Tax is calculated using the income statement approach which focuses on
differences between taxable profits and accounting profits for the period. Under Ind AS 12, deferred tax is
calculated using balance sheet approach which focuses on difference between taxable profits and accounting
profits for the period. The application of Ind AS 12 approach has resulted in recognition of deferred tax on new
temporary differences which was not required under IGAAP. In addition, the various transitional adjustments
459have led to temporary differences. According to the accounting policies, the company has to account for such
differences. According to the accounting policies, the company has to account for such differences. Deferred Tax
adjustments are recognised in correlation to the transactions either in retained earnings pr profit and loss
respectively.
4. Expected Credit Loss
Under Ind AS, the company has to provide loss allowance on Trade Receivables based on the Expected
Credit Loss (ECL) model which is measured following the "sampled approach". The Company uses a
provision matrix to measure the expected credit losses of trade receivables. The provision matrix is based
on its historical observed default rates, adjusted for forward looking estimates. The Company has impaired
its Trade Receivables by ₹ 0.16 million as on March 31, 2025, ₹ 0.44 million as on March 31, 2024 and ₹
0.46 million as on March 31, 2023 and its corresponding effect in statement of profit and loss in the
respective financial years and ₹ 1.62 million in the Retained Earnings (opening balance) as on April 01,
2023.
5. Provision for Tax impact on Associate
An Accounting Adjustment has been made where the provision for tax impact is shown in the Audited
Financial Statement for the financial year ended March 31, 2025, although it pertains to March 31, 2024.
Thus, the appropriate adjustment has been made in the Restated Consolidated Financial Information for the
financial years ended March 31, 2025 and March 31, 2024 respectively.
6. Interest on delayed payment on MSME
An Accounting Adjustment has been made where the Interest on Delayed Payment of MSME has been
wrongly shown in the Audited Financial Statement for the financial year ended 31st March 2025 by Rs. 0.14
million. Thus, the appropriate adjustment has been made in the Restated Consolidated financial Statement
for the Financial year ended March 31, 2025.
Part B: Material Regrouping
Appropriate regroupings have been made in the Restated Ind AS Summary Statement of Assets and
Liabilities, Restated Ind AS Summary Statement of Profit and Loss and Restated Ind AS Summary Statement
of Cash Flows, wherever required, by reclassification of the corresponding items of income, expenses,
assets, liabilities and cash flows, in order to bring them in line with the accounting policies and
classification as per Ind AS financial information of the Company for the financial years ended March
31, 2025, March 31, 2024 and March 31, 2023 prepared in accordance with Schedule III of Companies Act,
2013, requirements of Ind AS 1 and other applicable Ind AS principles and the requirements of the Securities
and Exchange Board of India (Issue of Capital & Disclosure Requirements) Regulations 2018, as amended.
Part C: Non-Adjusting items:
There are no audit qualifications for the respective years/period, which require any adjustments in the
Restated Consolidated Financial Information.
460Results of Operations based on Restated Consolidated Financial Information
The following table sets forth select financial data from our restated consolidated statement of profit and loss & the components of which are also expressed as a percentage of
total income.
(₹ in million)
% of % of % of
Particulars Financial Year 2025 Total Financial Year 2024 Total Financial Year 2023 Total
Revenue Revenue Revenue
Revenue:
Revenue from Operations (Net) 2,795.64 99.49 2,261.02 99.47 1,786.91 98.97
Other Income 14.40 0.51 11.96 0.53 18.53 1.03
Total Revenue (I) 2,810.04 100.00 2,272.98 100.00 1,805.44 100.00
Expenses:
Cost of Revenue from Operations 2,467.84 87.82 1,907.99 83.94 1,791.88 99.25
Changes in inventories of Work in Progress (297.34) (10.58) (68.04) (2.99) (278.60) (15.43)
Employee benefit expenses 100.35 3.57 60.32 2.65 39.03 2.16
Finance costs 92.39 3.29 79.29 3.49 81.22 4.50
Depreciation and Amortization 18.24 0.65 10.36 0.46 10.68 0.59
Other expenses 48.11 1.71 25.28 1.11 15.76 0.87
Total Expenses (II) 2,429.59 86.46 2,015.20 88.66 1,659.98 91.94
Restated Profit before share of profit of associates and tax
380.46 13.54 257.78 11.34 145.46 8.06
(III)=(I)-(II)
Share of Profit/(Loss) of associates (IV) 5.19 0.18 2.82 0.12 (0.02) Negligible
Restated Profit before tax (V=III+IV) 385.65 13.72 260.60 11.47 145.44 8.06
Tax Expense (VI)
Current Taxes including current tax expenses related to prior
104.94 3.73 70.44 3.10 37.55 2.08
period & firm tax.
Deferred taxes (Asset)/Liability (1.33) (0.05) (0.38) (0.02) (0.16) (0.01)
Restated Profit for the period/ year (VII)= (V)-(VI) 282.04 10.04 190.54 8.38 108.06 5.99
461FISCAL 2025 COMPARED TO FISCAL 2024
Income
The table below sets forth details in relation to our revenue for Fiscal 2025 and Fiscal 2024:
Fiscal 2025 Fiscal 2024 %
Particulars
(₹ in million) (₹ in million) Increase/(decrease)
Revenue from Operations 2,795.64 2,261.02 23.65
Other Income 14.40 11.96 20.40
Total Revenue 2,810.04 2,272.98 23.63
Our revenue from operations increased by ₹ 534.62 million or 23.65% to ₹ 2,795.64 million for Fiscal 2025 as
compared to ₹ 2,261.02 million for Fiscal 2024. This increase in revenue from operations was primarily due to
increased income from following activities:
(₹ in million)
% increase/
Particulars Fiscal 2025 Fiscal 2024 Changes
(decrease)
Sale of Services
Sewerage Construction contracts 2,079.08 1,580.07 499.01 31.58
Operation and maintenance of Sewerage works 23.41 13.10 10.31 78.70
Road & Highway Construction & Maintenance 21.47 0.69 20.78 3,011.59
Building Construction Work 248.38 - 248.38 100.00
Water Supply Work 163.53 475.42 133.89 (65.60)
Electrical Work 210.30 - 210.30 100.00
Other Operating Revenues
Sale of Material 49.47 191.75 (142.28) (74.20)
Total 2,795.64 2,261.02 534.62 23.65
The revenue from operations has increased by 23.65% or ₹ 534.62 million mainly due to:
i. Company has started the work of building construction work in Fiscal 2025 & Company has earned ₹ 248.38
million from the said segment in the same fiscal and
ii. Company has also started work of electrical work in Fiscal 2025 & Company has earned ₹ 210.30 million
from the said work in the same fiscal.
Apart from the above reasons, the revenue from Sewerage construction contracts and revenue from Operation and
Maintenance of Sewerage works has also increased by 31.58% & 78.70%, respectively.
Other operating revenue decreased by ₹ 142.28 million or 74.20% to ₹ 49.47 million for Fiscal 2025 compared to
₹ 191.75 million for Fiscal 2024.
The increase in other income was primarily due to increase in interest income earned on deposits/FDRs, the
interest income increased by ₹ 2.92 million by 25.44% to ₹ 14.40 million for Fiscal 2025 compared to ₹ 11.48
million for Fiscal 2024.
Expenses
The table below sets forth details in relation to our total expenses for Fiscal 2025 compared to our total expenses
for Fiscal 2024:
(₹ in million)
%
Particulars Fiscal 2025 Fiscal 2024 Changes Increase/
(decrease)
Cost of Revenue from Operations 2,467.84 1,907.99 559.85 29.34
Changes in Inventories of Work-in-process (297.34) (68.04) (229.30) 337.01
462Employee Benefits Expense 100.35 60.32 40.03 66.36
Finance Cost 92.39 79.29 13.10 16.52
Depreciation and amortization expense 18.24 10.36 7.88 76.06
Other Expenses 48.11 25.28 22.83 90.31
Total Expenses 2,429.59 2,015.20 414.39 20.56
Our total expenses increased by ₹ 414.39 million or 20.56% to ₹ 2,429.59 million for Fiscal 2025 compared to ₹
2,015.20 million for Fiscal 2024.
This was primarily attributable to:
Cost of Revenue from Operations
The table below sets forth details in relation to our cost of Revenue from operations for the financial years
indicated below:
(₹ in million)
%
Particulars Fiscal 2025 Fiscal 2024 Changes Increase/
(decrease)
Material at Site at the beginning of the year 70.59 53.72 16.87 31.40
Purchase of Material 1,081.33 866.98 214.35 24.72
Material at Site at the end of the year 105.12 70.59 34.53 48.92
Cost of Material Consumed 1,046.79 850.11 196.68 23.14
Other Direct Costs
Stores & Consumables 4.97 2.41 2.57 106.22
Freight Charges 7.76 6.19 1.57 25.36
Labour Cess 30.93 12.02 18.91 157.32
Labour Processing, Testing and Car &
32.19 10.72 21.47 200.28
Machinery Hire Charges
Job Work Charges 1,304.18 972.90 331.28 34.05
Rent (Paid) 4.60 2.36 2.24 94.92
Legal & Professional expenses 5.65 13.88 (8.23) (59.29)
Repair & Maintenance expenses 0.58 0.71 (0.13) (18.31)
Interest on Mobilization advances 15.24 24.25 (9.01) (37.15)
Others 14.95 12.45 2.50 20.08
Cost of Revenue from operations 2,467.84 1,907.99 559.85 29.34
Our cost of revenue for operations increased by ₹ 559.85 million or 29.34% to ₹ 2,467.84 million for Fiscal 2025
compared to ₹ 1,907.99 million for Fiscal 2024. This increase was primarily due to increase in purchases of
material for construction, freight charges, Labour Processing, Testing and Car & Machinery Hire Charges, Rent,
job work charges and other expenses due to increase in sales of services.
The cost of material purchases has increased by 24.72% or ₹ 214.35 million and at the same time Company has
paid job work charges of ₹ 1,304.18 million, which has increased by 34.05% as compared to Fiscal 2024.
The cost of revenue from operations has increased by 29.34% while revenue has increased by 23.65% at the same
time.
Change in inventories of work-in-progress
The table below sets forth details in relation to changes in inventories for the periods indicated below:
463(₹ in million)
% Increase/
Particulars Fiscal 2025 Fiscal 2024 Changes
(decrease)
As at the end of the reporting financial year
Work in Progress 784.21 486.87 297.34 61.07
(A) 784.21 486.87 297.34 61.07
As at the beginning of the reporting financial year
Work in Progress 486.87 418.83 68.04 16.25
(B) 486.87 418.83 68.04 16.25
Total (B-A) (297.34) (68.04) (229.30) 337.01
Employee benefits expense
Our employee benefits expense increased by ₹ 40.03 million or 66.36% to ₹ 100.35 million for Fiscal 2025 from
₹ 60.32 million for Fiscal 2024. The increase primary due to increase in:
(₹ in million)
%
Particulars Fiscal 2025 Fiscal 2024 Changes Increase/
(decrease)
Salaries & Wages 74.68 42.68 32.00 74.98
Directors' Salary 21.00 13.80 7.20 52.17
Contribution to provident and other funds 0.78 0.53 0.25 47.17
Staff welfare Expenses 1.78 0.69 1.09 157.97
Gratuity Expenses 1.57 1.03 0.54 52.43
Workmen Compensation Expenses 0.55 1.59 (1.04) (65.41)
Total 100.35 60.32 40.03 66.36
The salary and wages have increased by ₹ 32.00 million or 74.98% due to increase in number of employees.
Further the director’s salary has also increased by 52.17%. The Company expenses towards the staff welfare
expenses & gratuity has also increased by 157.97% & 52.43%, respectively.
Further, as a percentage of our total income, the cost of employee benefit expenses has increased to 3.57% in
Fiscal 2025 from 2.65% in Fiscal 2024.
Finance costs
The table below sets forth details in relation our finance cost for the financial years indicated below:
(₹ in million)
% Increase/
Particulars Fiscal 2025 Fiscal 2024 Changes
(decrease)
Bank Charges, Commission & Processing
13.41 18.73 (5.32) (28.40)
Charges
Interest on Secured Loans 49.02 36.60 12.42 33.93
Interest on Unsecured Loan & Others 27.76 22.91 4.85 21.17
Finance Charges 2.20 1.04 1.16 111.54
Finance cost 92.39 79.29 13.10 16.52
Our finance costs increased by ₹ 13.10 million or 16.52% to ₹ 92.39 million for Fiscal 2025 compared to ₹ 79.29
million for Fiscal 2024. This increase was primarily due to increase in interest cost on secured & unsecured loans
& financial charges paid by the Company.
464Depreciation and Amortisation Expense
Our depreciation and amortisation expense increased by ₹ 7.88 million or 76.06% to ₹ 18.24 million for Fiscal
2025 compared to ₹ 10.36 million for Fiscal 2024. This increase was due to increase in the value of plant &
machinery, office equipment’s. and other assets. Company added depreciable assets of ₹ 34.44 million in Fiscal
2024 and ₹ 33.09 million in Fiscal 2025.
Other expenses
Our other expenses increased by ₹ 22.83 million or 90.31% to ₹ 48.11 million for Fiscal 2025 as compared to ₹
25.28 million for Fiscal 2024. This increase was primarily due to interest paid to MSME of ₹ 10.16 million on
late payment, increase in Fee & Subscription charges by ₹ 3.38 million, increase in Travelling & Conveyance
charges by ₹ 5.59 million. Further, the other charges such as printing & stationery, advertisement & business
promotion expenses, insurance charges, Tender fee, charity & donation, Electricity & Generator charges, Repairs
& Maintenance, Rent, rates & taxes, Watch & Ward, Interest on Government Dues, CSR Expenses which was
increased due to increase in operations during the year. Further, as a percentage of our total income, the other
expenses also increased to 1.71% in Fiscal 2025 from 1.11% in Fiscal 2024.
EBITDA
For the reasons described above, our EBITDA increased by ₹ 143.58 million, or 42.44%, to ₹ 481.88 million for
Fiscal 2025 from ₹ 338.30 million for Fiscal 2024.
Restated Profit before Tax
As a result of the foregoing factors, our profit before tax increased by ₹ 125.05 million or 47.99% to ₹ 385.65
million for Fiscal 2025 as compared to ₹ 260.60 million for Fiscal 2024. This increase was on account of increased
order flow, higher operations and better realizations.
Tax Expenses
Our tax expenses increased by ₹ 33.55 million or 47.89% to ₹ 103.61 million for Fiscal 2025 compared to ₹ 70.06
million for Fiscal 2024. The increase in tax expenses during Fiscal 2025 is mainly on account of increase in current
tax by ₹ 34.50 million, or 48.98%, to ₹ 104.94 million for Fiscal 2025 from ₹ 70.44 million for Fiscal 2024. The
increase in current tax was primarily on account of increase in taxable income for Fiscal 2025.
Restated Profit for the Year
As a result of the foregoing factors, our profit for the year increased by ₹ 91.50 million or 48.02% to ₹ 282.04
million for Fiscal 2025 compared to ₹ 190.54 million for Fiscal 2024.
FISCAL 2024 COMPARED TO FISCAL 2023
Income
The table below sets forth details in relation to our revenue for Fiscal 2024 and Fiscal 2023:
Fiscal 2024 Fiscal 2023 %
Particulars
(₹ in million) (₹ in million) Increase/(decrease)
Revenue from Operations 2,261.02 1,786.91 26.53
Other Income 11.96 18.53 (35.46)
Total Revenue 2,272.98 1,805.44 25.90
Our revenue from operations increased by ₹ 474.11 million or 26.53% to ₹ 2,261.02 million for Fiscal 2024 as
compared to ₹ 1,786.91 million for Fiscal 2023. This increase in revenue from operations was primarily due to
increased income from following activities:
465(₹ in million)
% Increase/
Particulars Fiscal 2024 Fiscal 2023 Changes
(decrease)
Sale of Services
Sewerage Construction contracts 1,580.07 1,770.17 (190.10) (10.74)
Operation and maintenance & Sewerage works 13.10 13.11 (0.01) (0.08)
Road & Highway Construction & Maintenance 0.69 - 0.69 100.00
Water Supply Work 475.42 - 475.42 100.00
Other Operating Revenues
Sale of Material 191.75 3.63 188.12 5,182.37
Total 2,261.02 1,786.91 474.11 26.53
The revenue from Water supply works has increased by 100% during Fiscal year 2024. Our order book was also
increased from ₹ 3,243.30 million as of March 31, 2023 to ₹ 7,528.90 million as of March 31, 2024.
Other income decreased by ₹ 6.57 million or 35.46% to ₹11.96 million for Fiscal 2024 compared to ₹ 18.53
million for Fiscal 2023.
The decrease in other income was primarily due to decrease in interest income earned on deposits/FDRs, the
interest income decreased by ₹ 3.85 million by 25.11% to ₹ 11.48 million for Fiscal 2024 compared to ₹ 15.33
million for Fiscal 2023.
Expenses
The table below sets forth details in relation to our total expenses for Fiscal 2024 compared to our total expenses
for Fiscal 2023:
(₹ in million)
% Increase/
Particulars Fiscal 2024 Fiscal 2023 Changes
(decrease)
Cost of Revenue from Operations 1,907.99 1,791.88 116.11 6.48
Changes in Inventories of Work-in-progress (68.04) (278.60) 210.56 (75.58)
Employee Benefits Expense 60.32 39.03 21.29 54.55
Finance Cost 79.29 81.22 (1.93) (2.38)
Depreciation and amortization expense 10.36 10.68 (0.32) (3.00)
Other Expenses 25.28 15.76 9.52 60.41
Total Expenses 2,015.20 1,659.98 355.22 21.40
Our total expenses increased by ₹ 355.22 million or 21.40% to ₹ 2,015.20 million for Fiscal 2024 compared to ₹
1,659.98 million for Fiscal 2023.
This was primarily attributable to:
Cost of Revenue from Operations
The table below sets forth details in relation to our cost of Revenue from Operations for the financial years
indicated below:
(₹ in million)
%
Particulars Fiscal 2024 Fiscal 2023 Changes Increase/
(decrease)
Material at Site at the beginning of the year 53.72 35.17 18.55 52.74
Purchase of Material 866.98 516.68 350.3 67.80
Material at Site at the end of the year 70.59 53.72 16.87 31.40
Cost of Material Consumed 850.11 498.14 351.97 70.66
466Other Direct Costs
Stores & Consumables 2.41 2.79 (0.38) (13.62)
Freight Charges 6.19 4.77 1.42 29.77
Labour Cess 12.02 19.34 (7.32) (37.85)
Labour Processing, Testing and Car &
10.72 5.44 5.28 97.06
Machinery Hire Charges
Job Work Charges 972.90 1,239.78 (266.88) (21.53)
Rent (Paid) 2.36 1.65 0.71 43.03
Legal & Professional expenses 13.88 2.67 11.21 419.85
Repair & Maintenance expenses 0.71 0.51 0.20 39.22
Interest on Mobilization advances 24.25 14.71 9.54 64.85
Others 12.45 2.09 10.36 495.69
Cost of Revenue from operations 1,907.99 1,791.88 116.11 6.48
Our cost of revenue for operations increased by ₹ 116.11 million or 6.48% to ₹ 1,907.99 million for Fiscal 2024
compared to ₹ 1,791.88 million for Fiscal 2023. This increase was primarily due to increase in purchase of material
for construction, freight charges, Labour Processing, Testing and Car & Machinery Hire Charges, Rent, Legal &
Professional expenses, Repair & Maintenance expenses, Interest on Mobilization advances and other expenses
due to increase in sales of services.
The cost of revenue from operations has increased by 6.48% while revenue has increased by 26.53% at the same
time.
Change in inventories of work-in-progress
The table below sets forth details in relation to changes in inventories for the financial years indicated below:
(₹ in million)
% Increase/
Particulars Fiscal 2024 Fiscal 2023 Changes
(decrease)
As at the end of the reporting financial year
Work in Progress 486.87 418.83 68.04 16.25
(A) 486.87 418.83 68.04 16.25
As at the beginning of the reporting financial year
Work in Progress 418.83 140.23 278.60 198.67
(B) 418.83 140.23 278.60 198.67
Total (B-A) (68.04) (278.60) 210.56 (75.58)
Employee benefits expense
Our employee benefits expense (except Workmen Compensation Expense) increased by ₹ 19.70 million or 50.47%
to ₹ 58.73 million for Fiscal 2024 from ₹ 39.03 million for Fiscal 2023. The increase primary due to increase in:
(₹ in million)
%
Particulars Fiscal 2024 Fiscal 2023 Changes Increase/
(decrease)
Salaries & Wages 42.68 29.25 13.43 45.91
Directors' Salary 13.80 8.10 5.70 70.37
Contribution to provident and other funds 0.53 0.53 - -
Staff welfare Expenses 0.69 0.35 0.34 97.14
Gratuity Expenses 1.03 0.79 0.24 30.38
Workmen Compensation Expenses 1.59 - 1.59 100.00
Total 60.32 39.03 21.29 54.55
467The salaries and wages have increased by 45.91% due to increase in number of employees. Further the director’s
remuneration has also increased by 70.37%. The Company expenses towards the staff welfare expenses & gratuity
has also increased by 97.14% & 30.38%, respectively.
Further, as a percentage of our total income, the cost of employee benefit expenses has increased to 2.65% in
Fiscal 2024 from 2.16% in Fiscal 2023.
Finance Costs
The table below sets forth details in relation our finance cost for the financial years indicated below:
(₹ in million)
% Increase/
Particulars Fiscal 2024 Fiscal 2023 Changes
(decrease)
Bank Charges, Commission & Processing
18.73 20.84 (2.11) (10.12)
Charges
Interest on Secured Loans 36.60 35.78 0.82 2.29
Interest on Unsecured Loan & Others 22.91 23.67 (0.76) (3.21)
Finance Charges 1.04 0.93 0.11 11.83
Finance cost 79.29 81.22 (1.93) (2.38)
Our finance costs decreased by ₹ 1.93 million or 2.38% to ₹ 79.29 million for Fiscal 2024 compared to ₹ 81.22
million for Fiscal 2023. This decrease was primarily due to decrease in Bank Charges, Commission & Processing
Charges incurred by the Company and increase in Finance cost during Fiscal year 2024.
Depreciation and Amortisation Expense
Our depreciation and amortisation expense decreased by ₹ 0.32 million or 3.00% to ₹ 10.36 million for Fiscal
2024 compared to ₹ 10.68 million for Fiscal 2023. This decrease was because depreciation is calculated on written
down value method and addition of Building in Fiscal year 2024 for insignificant period of time.
Other expenses
Our other expenses increased by ₹ 9.52 million or 60.41% to ₹ 25.28 million for Fiscal 2024 as compared to ₹
15.76 million for Fiscal 2023. This increase was primarily due to increase in legal charges, printing & stationery,
advertisement & business promotion expenses, insurance charges, Tender fee, charity & donation, Electricity &
Generator charges, Watch & Ward, Vehicle Running & Maintenance charges, CSR Expenses which was increased
due to increase in operations during the year. Further, as a percentage of our total income, the other expenses also
increased to 1.11% in Fiscal 2024 from 0.87% in Fiscal 2023.
EBITDA
For the reasons described above, our EBITDA increased by ₹ 119.49 million, or 54.61%, to ₹ 338.30 million for
Fiscal 2024 from ₹ 218.81 million for Fiscal 2023.
Restated Profit before Tax
As a result of the foregoing factors, our profit before tax increased by ₹ 115.16 million or 79.18% to ₹ 260.60
million for Fiscal 2024 as compared to ₹ 145.44 million for Fiscal 2023. This increase was on account of increased
order flow, higher operations and better realizations.
Tax Expenses
Our tax expenses increased by ₹ 32.67 million or 87.38% to ₹ 70.06 million for Fiscal 2024 compared to ₹ 37.39
million for Fiscal 2023. The increase in tax expenses during Fiscal 2024 is mainly on account of increase in current
tax by ₹ 32.89 million, or 87.59%, to ₹ 70.44 million for Fiscal 2024 from ₹ 37.55 million for Fiscal 2023. The
increase in current tax was primarily on account of increase in taxable income for Fiscal 2024.
468Restated Profit for the Year
As a result of the foregoing factors, our profit for the year increased by ₹ 82.48 million or 76.33% to ₹ 190.54
million for Fiscal 2024 compared to ₹ 108.06 million for Fiscal 2023.
CASH FLOW BASED ON RESTATED CONSOLIDATED FINANCIAL INFORMATION
(₹ in million)
Fiscal
Particulars
2025 2024 2023
Net cash generated from operating activities (A) 216.84 13.99 100.35
Net cash (used in)/generated from investing activities (B) (126.38) 2.63 62.03
Net cash (used in)/generated from financing activities (C) (96.55) (32.56) (140.65)
Net increase in cash and cash equivalents (A+B+C) (6.09) (15.94) 21.72
Cash and cash equivalents at the beginning of the year 11.22 27.16 5.43
Cash and cash equivalents at the end of the year 5.13 11.22 27.16
Net increase in cash and cash equivalents (6.09) (15.94) 21.72
For further details, kindly refer “Restated Consolidated Financial Information” beginning on page no. 331.
Net Cash Flow from Operating activities
Net cash flow from operating activities comprises cash consumed / generated from operations, increase / decrease
in working capital and increase / decrease in non-current / current liabilities.
Fiscal 2025
During the Fiscal 2025, net cash inflow from operating activities was ₹ 216.84 million. Profit before tax stood at
₹ 385.65 million. Primary adjustments were on account of interest expense of ₹ 92.39 million, depreciation and
amortisation expenses on property, plant and equipment of ₹ 18.24 million, interest received of ₹ 14.40 million,
Gain from associates of ₹ 5.19 million, provision for expected credit loss of ₹ 0.16 million and Remeasurement
gain on defined benefit plan of ₹ 0.01 million.
Operating profit before working capital changes was at ₹ 476.84 million during Fiscal 2025. Primary adjustments
included increase in inventories of ₹ 331.88 million, an decrease in trade payables of ₹ 85.60 million, an increase
in short term borrowings of ₹ 77.36 million, an decrease in other current assets of ₹ 52.62 million, an increase in
other financial assets (Non Current other than bank deposits) of ₹ 69.52 million, an increase in other financial
assets (Current other than bank deposits) of ₹ 58.15 million, an decrease in other financial liabilities (Non Current)
of ₹ 47.07 million, an increase in other financial liabilities (Current) of ₹ 5.56 million, a decrease in other current
liabilities of ₹ 106.62 million, an increase in provisions of ₹ 1.48 million, a decrease in trade receivables of ₹
419.83 million, an increase in other non current assets of ₹ 7.00 million and an income tax paid of ₹ 111.01 million.
Cash inflow from operations during Fiscal 2025 was ₹ 216.84 million.
Fiscal 2024
During the Fiscal 2024, net cash inflow from operating activities was ₹ 13.99 million. Profit before tax stood at ₹
260.60 million. Primary adjustments were on account of interest expense of ₹ 79.29 million, depreciation and
amortisation expenses on property, plant and equipment of ₹ 10.36 million, interest received of ₹ 11.66 million,
Gain from associates of ₹ 2.82 million, provision for expected credit loss of ₹ 0.44 and Remeasurement loss on
defined benefit plan of ₹ 0.14 million.
Operating profit before working capital changes was at ₹336.07 million during the Fiscal 2024. Primary
adjustments included increase in inventories of ₹ 84.91 million, an decrease in trade payables of ₹ 75.58 million,
an increase in short term borrowings of ₹ 246.33 million, an increase in other current assets of ₹ 20.50 million, an
decrease in other financial assets (Non Current other than bank deposits) of ₹ 65.83 million, an increase in other
financial assets (Current other than bank deposits) of ₹ 231.63 million, an increase in other financial liabilities
(Non Current) of ₹ 47.07 million, an increase in other financial liabilities (Current) of ₹ 140.26 million, an increase
in other current liabilities of ₹ 117.02 million, a increase in provisions of ₹ 1.17 million, an increase in trade
469receivables of ₹ 493.23 million, a decrease in other non current assets of ₹ 3.08 million and an income tax paid of
₹ 37.00 million. Cash inflow from operations during the Fiscal 2024 was ₹ 13.99 million.
Fiscal 2023
During the Fiscal 2023, net cash inflow from operating activities was ₹ 100.35 million. Profit before tax stood at
₹ 145.44 million. Primary adjustments were on account of interest expense of ₹ 81.22 million, depreciation and
amortisation expenses on property, plant and equipment of ₹ 10.68 million, interest received of ₹ 15.42 million,
loss from associates of ₹ 0.02 million, Gain on sale of property of ₹ 3.11 million, provision for expected credit
loss of ₹ 0.46 and Remeasurement gain on defined benefit plan of ₹ 0.24 million.
Operating profit before working capital changes was at ₹ 219.54 million during the Fiscal 2023. Primary
adjustments included increase in inventories of ₹ 297.15 million, an increase in trade payables of ₹ 125.14 million,
an decrease in short term borrowings of ₹ 93.05 million, an increase in other current assets of ₹ 57.14 million, an
increase in other financial assets (Non Current other than bank deposits) of ₹ 268.86 million, an decrease in other
financial assets (Current other than bank deposits) of ₹ 239.67 million, an decrease in other financial liabilities
(Non Current) of ₹ 86.24 million, an increase in other financial liabilities (Current) of ₹ 76.12 million, a decrease
in other current liabilities of ₹ 1.60 million, a increase in provisions of ₹ 0.55 million, a decrease in trade
receivables of ₹ 276.60 million, a decrease in other non current assets of ₹ 2.10 million and an income tax paid of
₹ 35.30 million. Cash inflow from operations during the Fiscal 2023 was ₹ 100.35 million.
Investing Activities
Net cash flow from investing activities comprises proceeds from purchase and sale of fixed assets including capital
work-in-progress, sale/adjustment of property, plant and equipment, increase in intangible assets and increase in
Investment Property.
Fiscal 2025
Net cash used in investing activities stood of ₹ 126.38 million as at the end of Fiscal 2025, primarily on account
of net investment made in property, plant and equipment including capital work in progress is ₹ 41.51 million and
increase in investment in associates of ₹ 45.18 million, interest received of ₹ 14.40 million and negative movement
in bank balances other than cash and cash equivalent including fixed deposits of ₹ 54.09 million.
Fiscal 2024
Net cash received through investing activities stood of ₹ 2.63 million as at the end of Fiscal 2024, primarily on
account of net investment made in property, plant and equipment including capital work in progress is ₹ 24.81
million, decrease in investments of ₹ 3.35 million, disinvestment from associates of ₹ 2.00 million, interest
received of ₹ 11.66 million and positive movement in bank balances other than cash and cash equivalent including
fixed deposits of ₹ 10.43 million.
Fiscal 2023
Net cash received through investing activities stood of ₹ 62.03 million as at the end of Fiscal 2023, primarily on
account of net investment made in property, plant and equipment including capital work in progress is ₹ 13.23
million, increase in investment in associates of ₹ 0.05 million, interest received of ₹ 15.42 million, sale of property
of ₹ 3.72 million and positive movement in bank balances other than cash and cash equivalent including fixed
deposits of ₹ 56.16 million.
Financing activities
Net cash flow from financing activities comprises impact due to business combination, proceeds / repayment of
borrowing, interest and financial charges.
Fiscal 2025
Net cash used in financing activities stood of ₹ 96.55 million as at the end of Fiscal 2025, primarily on account of
interest paid of ₹ 92.39 million and repayment of from long-term borrowings of ₹ 4.17 million.
470Fiscal 2024
Net cash used in financing activities stood of ₹ 32.56 million as at the end of Fiscal 2024, primarily on account of
interest paid of ₹ 79.29 million and proceeds from long-term borrowings of ₹ 46.73 million.
Fiscal 2023
Net cash used in financing activities stood of ₹ 140.65 million as at the end of Fiscal 2023, primarily on account
of interest paid of ₹ 81.22 million and repayment of long-term borrowings of ₹ 59.43 million.
INDEBTEDNESS
The following table sets forth certain information relating to our outstanding indebtedness as of June 30, 2025.
For further information on our indebtedness as on March 31, 2025, kindly refer “Restated Consolidated Financial
Information” beginning on page 331.
(₹ in million)
Whether Outstanding
Sr.
Lender Name Secured R epayment Schedule as on
No.
/ Unsecured June 30, 2025*
FUND BASE
As per Repayment
1 Union Bank of India- Car Loan Secured 1.20
Schedule
As per Repayment
2 Union Bank of India- Car Loan Secured 0.66
Schedule
As per Repayment
3 Union Bank of India- Car Loan Secured 0.50
Schedule
As per Repayment
4 Union Bank of India - Car Loan Secured 1.70
Schedule
As per Repayment
5 Bank of Baroda- Car Loan Secured 9.64
Schedule
ICICI Bank Limited- Construction As per Repayment
6 Secured 0.48
Equipment Loan Schedule
7 HDFC Bank Limited-Cash Credit Limit Secured As per Bank Statement 57.49
HDFC Bank Limited -WCTL by way of As per Repayment
Guaranteed Emergency Credit Line Schedule
8 (GECL) under ECLGS Scheme of Secured 7.82
National Credit Guarantee Trustee
Company Limited
As per Repayment
9 HDFC Bank Limited- Car Loan Secured 2.44
Schedule
As per Repayment
10 HDFC Bank Limited- Car Loan Secured 1.36
Schedule
As per Repayment
11 HDFC Bank Limited- Car Loan Secured 0.12
Schedule
As per Repayment
12 HDFC Bank Limited- Car Loan Secured 0.65
Schedule
As per Repayment
13 HDFC Bank Limited-Equipment Loan Secured 2.91
Schedule
As per Repayment
14 HDFC Bank Limited-Equipment Loan Secured 1.24
Schedule
As per Repayment
15 HDFC Bank Limited-Equipment Loan Secured 2.42
Schedule
As per Repayment
16 HDFC Bank Limited-Equipment Loan Secured 1.27
Schedule
471Punjab National Bank - Cash Credit As per Bank Statement
17 Secured 149.09
Limit
18 Kotak Mahindra Bank - Overdraft Secured As per Bank Statement 38.49
As per Repayment
19 Kotak Mahindra Bank – Term Loan Secured 10.77
Schedule
20 HDFC Bank Limited - Drul LC Secured As per Bank Statement 17.83
21 HDFC Bank Limited – Term Loan Secured As per Bank Statement 50.00
22 HDFC Bank Limited – Term Loan Secured As per Bank Statement 50.00
As per Repayment
23 HDFC Bank Limited – Term Loan Secured 16.71
Schedule
24 HDFC Bank Limited – Letter of Credit Secured As per Bank Statement 3.99
25 Kotak Mahindra Bank - WCDL Limit Secured As per Bank Statement 29.20
26 ICICI Bank Limited -Overdraft Secured As per Bank Statement 19.46
Oxyzo Financial Services Private
27 Unsecured Repayable on Demand 25.09
Limited
28 Sanjay Tyagi Unsecured Repayable on Demand 78.62
29 Rekha Tyagi Unsecured Repayable on Demand 63.58
30 Kartikey Tyagi Unsecured Repayable on Demand 9.05
31 Smt. Ritu Tyagi Unsecured Repayable on Demand 2.22
32 Vartika Tyagi Unsecured Repayable on Demand 8.33
33 Neeraj Tyagi Unsecured Repayable on Demand 5.06
34 Neeraj Tyagi HUF Unsecured Repayable on Demand 6.89
35 Sanjay Tyagi HUF Unsecured Repayable on Demand 12.09
36 Avadh Developers (P) Limited Unsecured Repayable on Demand 60.78
Total (A) 749.15
NON – FUND BASE
1 Punjab National Bank Secured As per Bank Statement 474.17
2 HDFC Bank Limited Secured As per Bank Statement 243.29
3 Kotak Mahindra Bank Secured As per Bank Statement 175.60
4 ICICI Bank Limited Secured As per Bank Statement 168.42
Total (B) 1061.48
Grand Total (A+B) 1810.63
*Unaudited provisional numbers.
CAPITAL EXPENDITURES
Our capital expenditure towards additions to fixed assets (property, plant and equipment’s and intangible assets)
and capital work-in-progress for the financial years ended March 31, 2025, March 31, 2024 and March 31, 2023
were ₹ 41.51 million, ₹ 34.44 million and ₹ 13.23 million, respectively.
The following table sets forth our Net block of fixed assets for the financial years indicated:
(₹ in million)
Financial Year Financial Year Financial Year
Particulars ended March 31, ended March 31, ended March 31,
2025 2024 2023
Plant, Property and Equipment and Capital
89.41 65.10 49.62
Work in Progress
472CONTINGENT LIABILITIES AND COMMITMENTS
(₹ in million)
(A) CONTINGENT LIABILITIES AND COMMITMENTS
As at
Particulars
Fiscal 2025 Fiscal 2024 Fiscal 2023
A) Disputed claims/levies in respect of Income tax against which Rectification application is filed except for
the Assessment year 2024-25 before jurisdictional Assessing Officer and demand will be deleted as told by the
Management of the Company.
'For the Assessment year 2024-25, the rectification application is yet to be filed as the TDS from the principal
is not reflected in the 26AS of the Company, as told by the management of the company, they are pursuing with
the principal to show the TDS in the 26AS, after reflection in 26AS, the company will file the rectification
application with the Income Tax Department.
A.Y 2024-25 7.34 - -
A.Y 2018-19 0.13 0.13 0.13
A.Y 2023-24 1.16 1.16 -
B) Disputed claims/levies in respect of Goods and Services Tax)
Appeals filed of GST (Rajasthan) Tax Assessment of FY
0.97 - -
2018-2019
Appeal filed of GST (Rajasthan) Interest Liability of FY
21.74 - -
2023-2024
GST Liability (U.P) on account of differential amount of GST
@ 6% and 18% on the supply/Services made to the
Amount not
department (UP Jal Nigam) in compliance to DGGI Meerut - -
quantifiable
Proceedings, against which writ petition is yet to be filed
before the High Court for the period Jan 2022 to July 2022.
Total 31.35 1.29 0.13
As certified by Rishi Kapoor & Company, Chartered Accountants pursuant to their certificate dated August 04,
2025 vide UDIN 25455362BMGILN1743.
(₹ in million)
GUARANTEES
As at
Particulars
Fiscal 2025 Fiscal 2024 Fiscal 2023
A) Bank Guarantees 1,113.16 792.27 595.55
Total 1,113.16 792.27 595.55
As certified by Rishi Kapoor & Company, Chartered Accountants pursuant to their certificate dated August 04,
2025 vide UDIN 25455362BMGILN1743.
OFF-BALANCE SHEET ARRANGEMENTS
We do not have any off-balance sheet arrangements, derivative instruments or other relationships with other
entities that would have been established for the purpose of facilitating off-balance sheet arrangements.
RELATED PARTY TRANSACTIONS
We enter into various transactions with related parties in the ordinary course of business. These transactions
principally include purchase of materials and equipment from entities where any of our KMPs or their relatives
have control or significant influence and sale of services to our group Companies/joint ventures, interest expense
paid and unsecured loan taken/repaid from related parties and entities where any of our KMPs or their relatives
have control or significant influence, remuneration paid to KMPs, SMPs and relatives, investment in our joint
ventures, expenses incurred on behalf of joint ventures.
473For further details, kindly refer “Restated Consolidated Financial Information – Annexure 44 – Related Party
Transactions” on page 395.
AUDITOR’S OBSERVATIONS
There are no audit qualifications which have not been given effect in the restated consolidated financial
information.
KEY RATIOS
For details in respect of key ratios, kindly refer “Restated Consolidated Financial Information” beginning on
page 331.
SIGNIFICANT DEPENDENCE ON SINGLE OR FEW CUSTOMERS
Our business is substantially dependent on WWTPs and WSSPs in India awarded by government authorities and
other entities funded by the central and/ or state governments. We derive almost all of our revenue from contracts
awarded by government entities. Our business could be materially and adversely affected if there are adverse
changes in the policies and delays in awarding contracts by these authorities, among other risks.
We bid for WWTPs and WSSPs funded by the Central and State Governments and derive our revenues from the
contracts awarded to us. Any reduction in budgetary allocation to this sector may affect the number of projects
that the government authorities/bodies may plan to develop in a particular period. Our business is directly and
significantly dependent on projects awarded by them.
EXTENT TO WHICH MATERIAL INCREASES IN NET SALES OR REVENUE ARE DUE TO
INCREASEDSALES VOLUME, INTRODUCTION OF NEW PRODUCTS OR SERVICES OR
INCREASED SALES PRICES
Our business has been affected with uncertainties described in the section “Risk Factors” on page 39. Changes in
revenue in the last three Fiscals are as described in “– Results of Operations Information for the Fiscal 2025
compared with Fiscal 2024 and Fiscal 2024 compared with Fiscal 2023”.
COMPETITIVE CONDITIONS
We expect competition in our industry from existing and potential competitors to intensify. For further details on
competitive conditions that we face across our various business segments, kindly refer “Our Business”, “Industry
Overview” and “Risk Factors” beginning on pages 228, 152 and 39, respectively.
NEW PRODUCT OR BUSINESS SEGMENTS
As on the date of this Draft Red Herring Prospectus, there are no new products or business segments that have or
are expected to have a material impact on our business prospects, results of operations or financial condition.
FUTURE RELATIONSHIP BETWEEN COSTS AND INCOME
Other than as described in “Risk Factors”, “Our Business” and “Management’s Discussion and Analysis of
Financial Conditions and Results of Operations” beginning on pages 39, 228 and 444, respectively, to our
knowledge there are no known factors that might affect the future relationship between costs and revenue.
KNOWN TRENDS OR UNCERTAINTIES
Our business has been subject, and we expect it to continue to be subject, to significant economic changes arising
from the trends identified above in “Management’s Discussion and Analysis of Financial Conditions and Results
of Operations – Significant Factors Affecting our Results of Operations” and the uncertainties described in “Risk
Factors” beginning on pages 444 and 39 respectively. To our knowledge, except as discussed in this Draft Red
Herring Prospectus, there are no known trends or uncertainties that have or had or are expected to have a material
adverse impact on sales, revenue or income of our Company from continuing operations.
474SIGNIFICANT ECONOMIC CHANGES THAT MATERIALLY AFFECT OR ARE LIKELY TO
AFFECTINCOME FROM CONTINUING OPERATIONS
Our business has been subject, and we expect it to continue to be subject, to significant economic changes that
materially affect or are likely to affect income from continuing operations identified above in “Management’s
Discussion and Analysis of Financial Condition and Results of Operations – Significant Factors Affecting our
Results of Operations” and the uncertainties described in “Risk Factors” beginning on pages 444 and 39
respectively.
CHANGES IN THE ACCOUNTING POLICIES, IF ANY, IN THE FISCAL 2025, 2024 AND 2023 AND
THEIR EFFECT ON OUR PROFITS AND RESERVES
There have been no changes in our accounting policies in the last three financial years except adoption of Indian
Accounting Standard for the purpose of preparation of Restated Consolidated Financial Statement.
UNUSUAL OR INFREQUENT EVENTS OR TRANSACTIONS
Except as described in this Draft Red Herring Prospectus, to our knowledge, there have been no unusual or
infrequent events or transactions that have in the past or may in the future affect our business operations or future
financial performance.
QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISKS
The Company’s principal financial liabilities comprise loans, borrowings and trade and other payables. The
main purpose of these financial liabilities is to finance the Company’s operations. The Company’s principal
financial assets include loans, trade and other receivables, and cash and cash equivalents that derive directly
from its operations. The Company also holds investments in Partnership Firms.
The Company is exposed to market risk, credit risk and liquidity risk. The Company’s senior management
oversees the management of these risks. The Company’s senior management ensures that the Company’s
financial risk activities are governed by appropriate policies and procedures and that financial risks are
identified, measured and managed in accordance with the Company’s policies and risk objective. The Board
of Directors reviews and agrees policies for managing each of these risks, which are summarised below.
(a) Market risk
Market risk is the risk that the fair value of future cash flows of a financial instrument will fluctuate because
of changes in market prices. Market risk comprises three types of risk: interest rate risk, currency risk and
other price risk, such as equity price risk. Financial instruments affected by market risk include loans and
borrowings.
The Company has no direct exposure to foreign currency risk.
-Interest rate risk
Interest rate risk is the risk that the fair value or future cash flows of a financial instrument will fluctuate because
of changes in market interest rates. The Company's exposure to the risk of changes in market interest rates
relates primarily to the Company’s long-term debt obligations with floating interest rates. The Company
manages its interest rate risk by having a balanced portfolio of fixed and variable rate loans and borrowings.
The Company’s policy is to borrow funds at fixed and floating rate of interest.
Interest rate sensitivity
The following table illustrates the sensitivity of profit and equity to a reasonably possible change in interest
rates of +/- 1%. These changes are considered to be reasonably possible based on observation of current market
475conditions. Sensitivity calculations are based on an annualised interest cost on the borrowings at floating rate
as of the reporting dates March 31, 2025, March 31, 2024 and March 31, 2023. All other variables are held
constant.
(₹ in millions)
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Interest rates- increase by 1% (6.01) (5.72) (3.80)
Interest rates- decrease by 1% 6.01 5.72 3.80
(b) Credit risk
Credit risk is the risk that counterparty will not meet its obligations under a financial instrument or customer
contract, leading to a financial loss. The Company is exposed to credit risk from its operating activities
(primarily trade receivables) and from its financing activities, including investments, deposits with banks and
financial institutions and other financial instruments.
(i) Trade receivables
Customer credit risk is managed by the Company’s established policies, procedures and controls relating to
customer credit risk management. Credit quality of a customer is assessed based on an individual credit limits
and are defined in accordance with management's assessment of the customer. Outstanding customer
receivables are regularly monitored. The concentration of credit risk is limited due to the fact that the customer
base is large. An impairment analysis is performed at each reporting date using a provision matrix to measure
expected credit losses. The Company uses ageing buckets and provision matrix for the purpose of computation
of expected credit loss. The provision rates are based on past trend of recoverability. The calculation reflects
the probability-weighted outcome, the time value of money and reasonable and supportable information that is
available at the reporting date about past events, current conditions and forecasts of future economic conditions.
The Company makes provision of expected credit losses on trade receivables using a provision matrix. The
provision matrix is based on its historical observed default rates, adjusted for forward looking estimates. At
every reporting date, the historical observed default rates are updated and Company makes appropriate
provision wherever outstanding is for longer period and involves higher risk
(₹ in millions)
The movement in provision for expected credit loss for trade receivables are as follows:
Particulars Amount
Balance as at March 31,2022 1.62
Add: Additions during the year 0.46
Less: Utilised during the year -
Balance as at March 31,2023 2.08
Add: Additions during the year 0.44
Less: Utilised during the year -
Balance as at March 31,2024 2.53
Add: Additions during the year 0.16
Less: Utilised during the year -
Balance as at March 31,2025 2.68
Credit risk from balances with banks is managed by the management in accordance with the Company’s policy.
Investments of surplus funds are made only with approved counterparties based on limits defined by the
management. The limits are set to minimise the concentration of risks and therefore mitigate financial loss
through counterparty’s potential failure to make payments.
476(c) Liquidity risk
Liquidity risk is the risk that the Company may encounter difficulty in meeting its present and future obligations
associated with financial liabilities that are required to be settled by delivering cash or another financial asset.
The Company’s objective is to maintain a balance between continuity of funding and flexibility through the
use of bank overdrafts, bank loans and finance leases. The Company closely monitors its liquidity position and
deploys a robust cash management system. It aims to minimise these risks by generating sufficient cash flows
from its current operations, which in addition to the available cash and cash equivalents and sufficient
committed fund facilities, will provide liquidity. The liquidity risk is managed on the basis of expected maturity
dates of the financial liabilities. The carrying amounts are assumed to be reasonable approximation of fair
value.
(₹ in millions)
The table below summarises the maturity profile of the Company’s financial liabilities based on
contractual undiscounted payments.
Next 12
Particulars 1 to 5 years > 5 years Total
months
March 31,2025
Borrowings 605.94 268.36 - 874.30
Lease liabilities - - - -
Trade payables 125.03 - - 125.03
Other financial liabilities 422.40 - - 422.40
March 31,2024
Borrowings 528.58 272.53 - 801.11
Lease liabilities - - - -
Trade payables 210.63 - - 210.63
Other financial liabilities 416.84 47.07 - 463.91
March 31,2023
Borrowings 282.24 225.80 - 508.04
Lease liabilities - - - -
Trade payables 286.21 - - 286.21
Other financial liabilities 276.58 - - 276.58
B) Capital management
For the purpose of the Company’s capital management, capital includes issued equity capital, securities
premium and all other equity reserves attributable to the equity holders. The primary objective of the
Company’s capital management is to maximise the shareholder value. The Company manages its capital
structure and makes adjustments in light of changes in economic conditions and the requirements of the
financial covenants. The Company monitors capital using a gearing ratio, which is net debt divided by total
capital plus net debt. The Company’s policy is to keep the gearing ratio between 0% and 25%. The Company
includes within net debt, interest bearing loans and borrowings, less cash and cash equivalents.
477(₹ in millions)
As at
Particulars
31-Mar-25 31-Mar-24 31-Mar-23
Borrowings [including current borrowings (refer
874.30 801.11 508.04
Annexure 24 and 27)]
Less: Cash and cash equivalents (refer Annexure 17) 5.13 11.22 27.16
Net debt (A) 869.17 789.89 480.89
Equity (refer Annexure 22 and 23) 1,199.83 917.78 727.34
Total capital (B) 1,199.83 917.78 727.34
Capital and net debt (C = A+B) 2,069.00 1,707.67 1,208.23
Gearing ratio (D = A/C) 0.42 0.46 0.40
The Company's objectives when maintaining capital are:
(a) to safeguard the entity's ability to continue as a going concern, so that it can continue to provide returns
for shareholders and benefits for other stakeholders, and
(b) to provide an adequate return to shareholders by pricing products and services commensurately with the
level of risk
478SECTION VI – LEGAL AND OTHER INFORMATION
OUTSTANDING LITIGATION AND MATERIAL DEVELOPMENTS
Except as disclosed in this section, as on the date of this Draft Red Herring Prospectus, there are no outstanding
(i) criminal proceedings (including first information reports); (ii) actions taken by regulatory or statutory
authorities (including show cause notices); (iii) claims related to direct and indirect taxes in a consolidated
manner giving the number of cases and total amount involved; or (iv) other outstanding litigation/ arbitration
proceedings as determined to be material by our Board pursuant to the Materiality Policy, in accordance with the
SEBI ICDR Regulations, in each case involving our Company, our Promoters, and our Directors (collectively, the
“Relevant Parties” and individually, each “Relevant Party”, as applicable). Further, there are no disciplinary
actions including penalties imposed by SEBI or Stock Exchanges against our Promoters in the last five Financial
Years, including any outstanding action and, there is no pending litigation involving our Group Companies, the
adverse outcome of which may have a material impact on our Company. Further, except as disclosed in this
section, there are no criminal proceedings involving and actions by regulatory and statutory authorities against
our Key Managerial Personnel and Senior Management. In addition, there is no pending litigation involving our
Group Companies, the adverse outcome of which may have a material impact on our Company.
Pursuant to the Materiality Policy adopted by our Board of Directors on May 29, 2025, for the purposes of (iv)
above, any outstanding litigation involving the Relevant Parties (including tax matters mentioned in point (iii)
above), has been considered ‘material’ and accordingly individually disclosed in this Draft Red Herring
Prospectus where the monetary amount of claim/ amount in dispute, to the extent quantifiable exceeds, (a) five
percent of the value of profit after tax for the most recent financial year, as per the Restated Consolidated Financial
Information, being ₹ 14.10 million; or; or (b) one percent of net worth as at the end of the most recent financial
year, as per the Restated Consolidated Financial Information, being ₹ 12.00 million; whichever is lower; or (c)
where the monetary liability is not quantifiable, the matter is considered material in view of its potential impact
on our business, operations, prospects, or reputation.
Further, notices received from third parties (excluding statutory/regulatory/tax authorities or notices threatening
criminal action) have not been evaluated for materiality until such time that any of the Relevant Parties are
impleaded as defendants in litigation proceedings before a judicial forum.
The lower of the thresholds specified in (a) and (b) above shall be referred to as the “Materiality Threshold”.
Accordingly, the materiality threshold for disclosures under this section, being the lowest out of the thresholds
mentioned in points (a), and (b) is ₹ 12.00 million.
Further, litigation/ arbitration proceedings where the decision in one case is likely to affect the decision in similar
cases, even though the amount involved in an individual litigation may not exceed the Materiality Threshold shall
also be considered material litigation in relation to the Relevant Parties.
Further, any outstanding civil litigation/ arbitration proceedings involving the Relevant Parties wherein the
monetary liability is not quantifiable, or does not exceed the Materiality Threshold, shall be considered ‘material’
and shall be disclosed in this Draft Red Herring Prospectus, if the outcome of such litigation could have a material
adverse effect on the business, operations, performance, prospects, financial position or reputation of our
Company.
For the above purposes, pre-litigation notices received by the Relevant Parties from third parties (excluding
notices from statutory, regulatory or tax authorities or notices threatening criminal action) shall not be evaluated
for materiality until such persons are impleaded as defendants or respondents in proceedings before any
judicial/arbitral forum or is notified by any governmental, statutory, or regulatory authority of any such
proceeding that may be commenced.
Except as stated in this section, there are no outstanding dues to material creditors of our Company. In terms of
the Materiality Policy, outstanding dues to any creditor of our Company having a monetary value which is equal
to or exceeds five percent of the Company’s trade payables based on the Restated Consolidated Financial
479Information, shall be considered as ‘material’. Accordingly, as on March 31, 2025, any outstanding dues
exceeding ₹ 12.00 million have been considered as material outstanding dues for the purposes of identification of
material creditors and related information in this section.
Further, for outstanding dues to any party which is a micro, small or a medium enterprise (“MSME”), the
disclosure will be based on information available with our Company regarding status of the creditor as defined
under Section 2 of the Micro, Small and Medium Enterprises Development Act, 2006, as amended read with the
rules and notification thereunder.
All terms defined in a particular litigation disclosure pertain to that litigation only.
I. Litigation involving our Company
A. Litigation against our Company
i. Criminal proceedings
Nil
ii. Material civil proceedings
Nil
iii. Actions by statutory or regulatory authorities
Nil
B. Litigation by our Company
i. Criminal proceedings
1. Our Company has filed criminal complaints under Section 138 of the Negotiable Instruments Act, 1881
before the Hon’ble Special NI Court, Additional Hon’ble Court Room No. 01, Gautam Buddha Nagar,
against M/s Rakesh Kumar and Rakesh Kumar (collectively, the “Accused”), in relation to dishonour of
cheques issued towards machine rental dues. The details of the proceedings are as follows:
a. In complaint bearing number 37/2024, the dishonoured cheque (Cheque No. 761138 dated September
30, 2020) was issued towards rental dues of ₹ 0.30 million for a sensor paver machine. The matter is
currently pending for recording of complainant evidence;
b. In complaint bearing number 40/2024, the dishonoured cheque (Cheque No. 761139 dated September
30, 2020) was issued for an amount of ₹ 0.15 million towards rental of an RTR 250-PTR machine. The
matter is currently pending for recording of complainant evidence;
c. In complaint bearing number 41/2024, the dishonoured cheque (Cheque No. 761137 dated September
30, 2020) was issued for ₹ 0.15 million towards rental of an RTR 250-PTR machine. The matter is
currently pending for recording of complainant evidence;
d. In complaint bearing number 42/2024, the dishonoured cheque (Cheque No. 761136 dated August 30,
2020) was issued for ₹0.30 million towards rental of a sensor paver machine. The matter is currently
pending for recording of complainant evidence.
2. FIR bearing no. 0234/2025 was registered on May 05, 2025, at Police Station, Kotputli, Rajasthan, pursuant
to a complaint filed by our Company through its authorised representative, Mahendra Kumar Sharma,
alleging that an amount of ₹ 1.82 million was erroneously transferred to the account of Mr. Dholaram Saini,
proprietor of Paptan Timbers, instead of the intended supplier, CRM Polymers. Despite repeated requests,
the accused failed to refund the full amount, returning only ₹ 0.20 million. Following refusal by local police
to register the complaint, the Company approached the Hon’ble Court of the Additional Chief Judicial
Magistrate – I, Kotputli, which directed registration of the FIR. The matter has been registered under
480Sections 318(4), 318(1), 317(5), 317(2), 316(1), and 191(2) of the Bharatiya Nyaya Sanhita, 2023, and is
currently under investigation.
ii. Material civil proceedings
1. Writ Petition No. 34903 of 2021, has been filed before the Hon’ble High Court of Allahabad by M/s
Ultratech Engineers (the business of which has since been taken over by our Company) against Uttar
Pradesh Jal Nigam and its officials, seeking recovery of outstanding dues amounting to ₹17.30 million
(excluding interest) in respect of construction works executed under Contract Agreement No.
2/GM/YPCU/2010-11, pertaining to the Agra Sewerage Scheme Phase I, Package ‘A’. Due to non-
compliance of the order dated March 22, 2022, a contempt application (Contempt Application No. 1522 of
2023) was filed, pursuant to which partial payment was made, and the contempt application is currently
pending adjudication.
2. Writ Petition No. 34905 of 2021 was filed by our Company before the Hon’ble High Court of Allahabad
against Uttar Pradesh Jal Nigam and its officials in relation to outstanding dues of ₹ 21.70 million (exclusive
of interest) under Contract Agreement No. 01/GM/2011-12 for the design, construction, and commissioning
of a 3 MLD sewerage treatment plant and related infrastructure at Pilkhuwa. Although the project was
completed and acknowledged through an experience certificate dated February 4, 2019, due to non-
compliance with the order dated March 22, 2022, a contempt application (Contempt Application No. 1520
of 2023) was filed. Subsequent to this, partial payments were made and the contempt application was
dismissed vide order dated August 2, 2023, based on the Respondents’ submission that the entire amount
had been paid. However, the Hon’ble Court granted liberty to seek recall in the event of non-compliance,
and accordingly, a recall application was filed, which was allowed vide order dated March 10, 2025 and
the case has been restored to its original number and is currently pending adjudication.
3. Our Company has initiated arbitration proceedings bearing Case No. 02 of 2021 before the Sole Arbitrator
(Retd. Justice Mahendra Maheshwari), in connection with disputes arising under a contract awarded by the
Rajasthan Urban Infrastructure Development Project (RUIDP) and Nagar Nigam Udaipur for construction
of a sewer system at Ayad River, Udaipur. The claims filed by our Company, aggregating to approximately
₹ 109.21 million, pertain to delays attributable to the Respondents, illegal deductions, non-recording of
executed works, and losses incurred on account of idle manpower and equipment. The proceedings are
presently in abeyance under Section 29A of the Arbitration and Conciliation Act, 1996, owing to expiry of
the stipulated timeline for passing the arbitral award. Our Company is in the process of taking necessary
steps for revival of the proceedings and amendment of claims based on the Respondents’ admitted delays.
II. Material Tax Litigation involving our Company
A. Tax Litigation by our Company
1. Our Company has filed a writ petition before the Hon’ble High Court of Rajasthan (Jaipur Bench ‘D.B.’)
being Civil Writ Petition (Filing No. CW/10144/2025; registration pending), challenging the ruling dated
November 13, 2024, passed by the Appellate Authority for Advance Ruling, Rajasthan, which denied
exemption from levy of GST in respect of sanitation and sewerage works undertaken under the AMRUT
2.0 scheme for the Kota project, as claimed under Entry 3B of Notification No. 12/2017-CT (Rate), as
amended. The petition also impugnes parallel coercive measures initiated by the GST authorities, including
issuance of repeated summons, inspections, and recovery of ₹ 36.90 million (inclusive of ₹ 21.70 million
towards interest). The matter is currently pending adjudication.
2. Our Company has filed a writ petition before the Hon’ble High Court of Rajasthan (Jaipur Bench ‘D.B.’),
being Civil Writ Petition No. 7862/2025, challenging the order dated November 11, 2024, passed by the
Appellate Authority for Advance Ruling, Rajasthan, which denied exemption from levy of GST in respect
481of sanitation and sewerage services rendered under a contract awarded by the Municipal Council, Kotputli,
under the AMRUT 2.0 scheme. The petition also impugnes parallel coercive measures initiated by the GST
authorities, including issuance of repeated summons, inspections, and recovery of ₹ 36.90 million,
(inclusive of ₹ 21.70 million towards interest) which has been deposited under protest. The matter is
currently pending adjudication.
3. Our Company has filed a writ petition before the Hon’ble High Court of Rajasthan (Jaipur Bench ‘D.B.’,
being Civil Writ Petition No. 7962/2025, challenging the order dated November 22, 2024, passed by the
Appellate Authority for Advance Ruling, Rajasthan, which denied exemption from GST on sanitation
services rendered under a contract awarded by Nagar Nigam Bikaner, through RUDISCO, under the
AMRUT 2.0 scheme. The petition also challenges associated enforcement proceedings, including issuance
of summons and coercive recovery measures aggregating to ₹ 36.90 million (inclusive of ₹ 21.70 million
towards interest) which has been deposited under protest. The matter is currently pending adjudication.
4. Our Company has filed a writ petition before the Hon’ble High Court of Rajasthan (Jaipur Bench ‘D.B.’),
being Civil Writ Petition No. CW/11423/2025, challenging the order dated June 19, 2025, passed by the
Appellate Authority, State Tax, Jaipur-II, which confirmed a demand of interest amounting to ₹ 21.70
million on retrospective tax payments, despite the dispute being interpretational in nature. The petition also
challenges associated recovery proceedings, including the issuance of a recovery notice dated July 14,
2025, under Section 79 of the RGST Act, as being premature and contrary to CBIC Circular No.
224/18/2024-GST, in view of the non-constitution of the GST Appellate Tribunal. The matter is currently
pending adjudication.
5. For Financial Year 2018–19, the Office of the Joint Commissioner, SGST, Jaipur, raised a demand of ₹ 0.97
million (comprising ₹ 0.46 million each towards CGST and SGST, and ₹ 0.05 million as penalty) against
our Company for alleged excess availment of Input Tax Credit (“ITC”) in Form GSTR-3B vis-à-vis GSTR-
2A, primarily on account of non-filing of returns by certain vendors. The allegation of incorrect tax rate
was dropped during adjudication. An appeal has been filed before the GST Appellate Authority, Jaipur
(ARN: AD0807240152473), along with a pre-deposit of ₹ 0.05 million. The appeal has been admitted and
is currently pending.
B. Tax Proceedings against our Company
Aggregate amount involved
Particulars Number of cases
(₹ in million)
Direct tax 03 8.63
Indirect tax 03 22.71
Total 06 31.34
As certified by Rishi Kapoor & Company, Chartered Accountants pursuant to their certificate dated August
04, 2025 vide UDIN 25455362BMGILN1743.
III. Litigations Involving Our Promoters
A. Litigation against our Promoters
i. Criminal Proceedings
1. A criminal case is pending before the Hon’ble Chief Judicial Magistrate, Jaunpur, in connection with FIR
No. 393 of 2023 dated December 13, 2023, registered at Police Station Kotwali, Jaunpur, against our
Promoter, Mr. Sanjay Tyagi; Mr. Vinay Kumar Shukla, Vice President - Engineering of our Company and
other officials of the Company, under Sections 283, 290, 431 and 304A of the Indian Penal Code, 1860.
The FIR pertains to an incident involving the death of a worker during sewer excavation works in Jaunpur
482city. A charge sheet dated March 19, 2024, has been filed. Bail has been granted to all accused. The matter
is currently pending.
2. Another criminal case is pending before the Hon’ble Chief Judicial Magistrate, Jaunpur, in connection with
FIR No. 513 of 2023 dated October 02, 2023, registered at Police Station Line Bazar, Jaunpur, against our
Promoter, Mr. Sanjay Tyagi; Mr. Fatehchand Sharma, Senior Vice President – Business Development at
our Company and other officials of the Company, under Sections 283, 290 and 431 of the Indian Penal
Code, 1860. The FIR alleges that inadequate barricading and safety measures at an excavation site led to
an accident involving a motorcyclist. While the FIR did not explicitly name Mr. Sanjay Tyagi and referred
to the “owner of M/s Techno” as unknown, his name was subsequently included in the charge sheet dated
November 24, 2023. Bail has been granted to all accused. The matter is currently pending.
3. A further criminal case is pending before the Hon’ble Chief Judicial Magistrate, Jaunpur, in connection
with FIR No. 191 of 2021 dated August 12, 2021, registered at Police Station Line Bazar, Jaunpur, against
our Promoter, Mr. Sanjay Tyagi, under Sections 3 and 5 of the Prevention of Damage to Public Property
Act, 1984. The FIR was lodged pursuant to a complaint by the Executive Engineer, U.P. Jal Nigam, alleging
that the contractor failed to carry out road restoration works following sewer line laying operations. A
charge sheet was filed on May 14, 2023. Bail has been granted. The matter is currently pending.
ii. Material civil proceedings
Nil
iii. Actions by statutory or regulatory authorities
Nil
B. Litigation by our Promoters
i. Criminal proceedings
Nil
ii. Material civil proceedings
Nil
C. Tax Proceeding against our Promoters
Aggregate amount involved
Particulars Number of demands
(₹ in million)
Direct tax 1 0.061*
Indirect tax Nil Nil
Total 1 0.061
*Rectification application under Section 154 of the Income-tax Act, 1961, was filed by Mrs. Rekha Tyagi
(Promoter) on April 25, 2022, in respect of a demand of ₹ 0.061 million for the of Assessment Year 2008–
09. A reminder request was filed on January 10, 2023. The same is currently pending before the Income
Tax Department.
IV. Litigations involving our Directors
A. Litigation against our Directors
i. Criminal Proceedings
4831. For three litigations related to our Managing Director, Sanjay Tyagi, kindly refer “Outstanding Litigations
and Material Developments – Litigation involving our Promoters- Litigation against our promoters-
Criminal Proceedings” beginning on page 482.
ii. Material civil proceedings
Nil
iii. Actions by statutory or regulatory authorities
Nil
B. Litigation by our Directors
i. Criminal proceedings
Nil
ii. Material civil proceedings
Nil
C. Tax Proceeding against our Directors
1. For details of a tax proceeding involving Ms. Rekha Tyagi, who is also a Promoter of our Company, please
refer to the disclosure under the section “Tax Proceedings against our Promoters” beginning on page 483.
V. Litigations involving our Key Managerial Personnel (“KMPs”) and Senior Management Personnel
(“SMPs”)
A. Litigation against our KMP’s and SMP’s
i. Criminal Proceedings
For three litigations related to our Managing Director, Sanjay Tyagi, kindly refer “Outstanding Litigations
and Material Developments – Litigation involving our Promoters- Litigation against our promoters-
Criminal Proceedings” beginning on page 482.
For criminal proceedings involving Mr. Vinay Kumar Shukla, Vice President – Engineering, and Mr.
Fatehchand Sharma, Senior Vice President – Business Development, kindly refer “Outstanding Litigations
and Material Developments – Litigation involving our Promoters – Litigation against our Promoters –
Criminal Proceedings” beginning on page 482.
ii. Actions by statutory or regulatory authorities
Nil
B. Litigation by our KMP’s and SMP’s
i. Criminal proceedings
Nil
VI. Litigation involving our Subsidiaries
As on the date of this Draft Red Herring Prospectus, our Company does not have any subsidiary.
484VII. Litigation involving our Material Group Companies
As on the date of this Draft Red Herring Prospectus, there are no pending litigation proceedings involving
our Group Companies which will have a material impact on our Company.
VIII. Outstanding dues to creditors
In terms of the Materiality Policy, the creditors to whom the amount due by our Company exceeds five
percent of the total trade payables (i.e., five percent of ₹ 125.03 million, which is ₹ 6.25 million) of our
Company as per the Restated Consolidated Financial Statements have been considered as Material
Creditors of our Company for the purposes of disclosure in this Draft Red Herring Prospectus. Details of
outstanding dues owed to Material Creditors, MSME creditors and other creditors of our Company based
on such determination, as on March 31, 2025, are disclosed below:
Amount involved
Type of Creditor* Number of Creditors
(₹ in million)
Outstanding dues to micro, small and 144 26.03
medium enterprises excluding Material
Creditors
Outstanding dues to MSME (material 2 94.83
creditors)
Outstanding dues to other creditors 58 4.17
Total 204 125.03
As certified by Rishi Kapoor & Company, Chartered Accountants pursuant to their certificate dated August
04, 2025 vide UDIN 25455362BMGIKZ5805.
The details pertaining to outstanding dues to the Material Creditors, along with names and amounts
involved for each such Material Creditor are available on the website of our Company at
www.technocraftventures.com.
It is clarified that such details available on our Company’s website do not form a part of this Draft Red
Herring Prospectus and should not be deemed to be incorporated by reference. Anyone placing reliance on
any source of information including our Company’s website would be doing so at their own risk.
IX. Material Developments
Except as otherwise disclosed in “Management’s Discussion and Analysis of Financial Conditions and
Results of Operations” beginning on page 444 there have been no material developments, since the date of
the last financial statements disclosed in this Draft Red Herring Prospectus, which materially and adversely
affect, or are likely to affect, our operations or our profitability taken as a whole or the value of our
consolidated assets or our ability to pay our liabilities within the next 12 months.
485GOVERNMENT AND OTHER STATUTORY APPROVALS
Our business and operations require various approvals, licenses, registration, and permits issued by relevant
governmental and regulatory authorities of the jurisdictions in which we operate under applicable law. Set out
below is a list of all material and necessary approvals, licenses, registrations and permits obtained by our
Company for the purposes of undertaking its business activities and operations and except as mentioned below,
no further material approvals are required for carrying on our present business activities. Certain approvals,
licenses, registrations and permits may expire periodically in the ordinary course of business and applications for
renewal of such expired approvals are submitted in accordance with applicable requirements and procedures. For
details in connection with the applicable regulatory and legal framework, kindly refer, “Key Industry Regulations
and Policies” beginning on page 287.
Further, for details of risk associated with not obtaining or delay in obtaining the requisite approvals, kindly refer
“Risk Factor No. 24 - We require certain approvals and licenses in the ordinary course of business and are
required to comply with certain rules and regulations to operate our business, and the failure to obtain, retain
and renew such approvals and licences in timely manner or comply with such rules and regulations or at all may
adversely affect our operations” beginning on page 56. For Offer related approvals, kindly refer “Other
Regulatory and Statutory Disclosures” beginning on page 492 and for incorporation details of our Company,
kindly refer “Our History and Certain Corporate Matters” beginning on page 297.
The main objects clause of the Memorandum of Association and objects incidental to the main objects enable our
Company to undertake its existing business activities.
I. Material approvals obtained by our Company
A. Incorporation details of our Company
1. Certificate of Incorporation dated October 21, 1998, issued by the RoC, NCT of Delhi & Haryana under
the name ‘Technocraft Construction Private Limited’.
2. Fresh Certificate of Incorporation dated February 09, 2024, pursuant to change of name, issued by the
Registrar of Companies, NCT of Delhi & Haryana consequent upon change in name from ‘Technocraft
Construction Private Limited’ to ‘Technocraft Ventures Private Limited’.
3. Fresh Certificate of Incorporation dated June 11, 2024, issued by RoC, Central Processing Centre,
consequent upon conversion to public company and change of name from ‘Technocraft Ventures
Private Limited’ to ‘Technocraft Ventures Limited’.
4. The Corporate Identity Number (“CIN”) of our Company is U70101DL1998PLC096763.
B. Tax related approvals obtained by our Company
1. The Permanent Account Number of our Company is AAACT6428Q.
2. The Tax Deduction Account number of our Company is MRTT00774E.
3. Goods and Services Tax (“GST”) registrations for payments under various central and state GST
legislations as follows:
Name of state Registration Number
New Delhi 07AAACT6428Q1ZS
Uttar Pradesh 09AAACT6428Q1ZO*
486Uttar Pradesh 09AAACT6428Q2ZN **
Uttarakhand 05AAACT6428Q2ZV
Rajasthan 08AAACT6428Q1ZQ
*GST registration for Regular GST
**GST Registration for Input Service Distributor (ISD)
C. Material approvals obtained in relation to the business and operations of our Company
To carry on our operations, our Company requires various approvals, licenses and registrations under several
central or state-level acts, rules and regulations. The list of the material approvals required by us is provided
below:
1. Udyam registration certificate bearing number UDYAM-UP-29-0002572 dated August 29, 2020,
issued by the Ministry of Micro, Small and Medium Enterprises.
2. LEI Code number 335800O7SSVJ9YRIIO96 issued by Legal entity Identifier India Limited.
3. DLB Registration bearing number CI/DLB/Civil Work/2024-25/AA-26 dated August 08, 2024, issued
by Government of Rajasthan.
4. Public Health Engineering Department Certificate bearing number F.6(1028)ACE(U)/PHED/En./AA-
600/2024-25 dated December 03, 2024, issued by Government of Rajasthan.
5. Certificate of electrical contractor’s license bearing number HDR-362 dated November 25, 2024,
issued by Electrical Inspector to Government of Uttarakhand.
6. Public Work Department Registration bearing number 384 ROAD/CATEGORY (A) 2018 dated
September 14, 2022, issued by Office of Chief Engineer, Uttar Pradesh.
7. Electrical Contractor's License dated February 14, 2023, bearing number 11879, issued by the Electrical
Inspectorate department, Rajasthan.
8. Contractor Registration dated July 02, 2024, bearing number PWD240071319 issued by Office of Chief
Engineer Registration Public Works Department, Centralized Contractor Registration Cell.
9. Contractor Registration dated January 14, 2025, bearing number PWD250075926 issued by
Government of Uttar Pradesh.
10. Fire NOC bearing UID number UPFS/2022/52851/GBN/GAUTAM BUDDH NAGAR/15710/CFO
dated June 26, 2025 valid until July 08, 2028 issued by Chief Fire Officer.
11. Certificate of registration with ISO 9001: 2015 for Quality Management System bearing number
305025011155Q dated January 11, 2025, issued by the QRO Certification LLP.
12. Certificate of registration with ISO 14001: 2015 Environmental Management System bearing number
305025011156E dated January 11, 2025, issued by the QRO Certification LLP.
13. Certificate of registration with ISO 45001: 2018 Occupational Health and Safety Management System
bearing number 305025011157HS dated January 11, 2025, issued by the QRO Certification LLP.
487D. Labour related approvals obtained by our Company
1. Form No. 5A bearing code MRMRT1423136000 dated January 20, 2025, issued by the Employees’
Provident Fund Organization under the provisions of Employees’ Provident Fund and Miscellaneous
Provisions Act, 1952.
2. Certificates of registration bearing code 67000588900001009 dated February 01, 2016, issued by Sub-
Regional Office, Employees’ State Insurance Corporation under the Employees’ State Insurance Act,
1948.
3. Registration Certificate of Shop or Commercial Establishment under the U.P. Dookan Aur Vanijya
Adhishthan Adhiniyam, 1962 bearing number UPSA10736351 dated January 22, 2025, for the office
at Techno Tower B 137, Sector-2, near Sector-15 Metro Station, Noida-201301, Gautam Buddha Nagar.
II. Intellectual Property of our Company
As on the date of this Draft Red Herring Prospectus, our Company does not have any registered Intellectual
properties.
For risks associated with intellectual property, kindly refer, “Risk Factor No. 39 - We may not be able to
successfully protect our brand name and trademark, which may adversely affect our business, reputation,
and competitive position.” beginning on page 63.
III. Material Approvals applied for but not received by our Company
Except as disclosed below, there are no material approvals which our Company has applied for but not
received, as on the date of this Draft Red Herring Prospectus:
1. Registration of Trademark of our Logo- dated January 10, 2025, under class 37 bearing
application number 6798628.
IV. Material Approvals that have expired and for which renewal applications have been made
There are no material approvals that have expired and for which renewal applications have been made as on
the date of this Draft Red Herring Prospectus.
V. Material Approvals required but yet to be obtained or applied for by our Company
There are no material approvals required but yet to be obtained or applied for by our Company as on the date
of this Draft Red Herring Prospectus.
488OUR GROUP COMPANIES
In terms of the SEBI ICDR Regulations and the applicable accounting standards, for the purpose of identification
of “group companies”, our Company has considered (i) such companies (other than promoter(s) and subsidiaries
with which there were related party transactions during the period for which Restated Consolidated Financial
Information is disclosed in this Draft Red Herring Prospectus, as covered under applicable accounting standards,
and (ii) any other companies which are considered ‘material’ by our Board of Directors.
In respect of item (ii) above, our Board in its meeting held on May 29, 2025, has considered and adopted the
Materiality Policy, inter alia, for identification of companies that shall be considered material and shall be
disclosed as a group company in this Draft Red Herring Prospectus. In terms of the Materiality Policy, a company
shall be considered ‘material’ and will be disclosed as a group company in the Offer Documents, if a company is
a member of the promoter group in terms of Regulation 2(1)(pp) of the SEBI ICDR Regulations, and has entered
into one or more transactions with our Company in the most recent completed financial year (i.e. Fiscal 2025)
(covered in the Restated Consolidated Financial Information included in the Offer Documents) that cumulatively
exceed 10% of the total restated Consolidated revenues of the Company, as per the Restated Consolidated
Financial Information of the Company for the most recent financial year.
Accordingly, based on the parameters outlined above, as on the date of this Draft Red Herring Prospectus the
following Companies have been identified as our group companies (“Group Companies”):
1. VVIP Infratech Limited (Listed Company)
2. Technocraft Developers Private Limited
3. Technoultra Engineers Private Limited
A. Details of our Group Companies
1. VVIP Infratech Registered Office
Limited
The registered office of VVIP Infratech Limited is situated at Fifth Floor,
VVIP Style, Nh-58 Raj Nagar Extension, Ghaziabad, Uttar Pradesh-
201017, India.
Financial Information
Information with respect to reserves (excluding revaluation reserves), sales,
profit after tax, earnings per share, diluted earnings per share and net asset
value, derived from the audited Consolidated financial statements of VVIP
Infratech Limited for the financial years 2024–25, 2023–24, and 2022–23,
is available on the Company’s website at www.vvipinfra.com.
2. Technocraft Developers Registered Office
Private Limited
The registered office of Technocraft Developers Private Limited is situated
at S-550/51, Office No. 214, First Floor, School Block, Shakarpur, Delhi-
110092, India.
Financial Information
Information with respect to reserves (excluding revaluation reserves), sales,
profit after tax, earnings per share, diluted earnings per share and net asset
value, derived from the audited standalone financial statements of
Technocraft Developers Private Limited for the financial years 2024-25,
2023-24 and 2022-23, is available on our Company’s website at
www.technocraftventures.com, since Technocraft Developers Private
Limited does not maintain a separate website.
4893. Technoultra Engineers Registered Office
Private Limited
The registered office of Technoultra Engineers Private Limited is situated
at S-550/51, Office No. 214, First Floor, School Block, Shakarpur, Delhi-
110092, India.
Financial Information
Information with respect to reserves (excluding revaluation reserves), sales,
profit after tax, earnings per share, diluted earnings per share and net asset
value, derived from the audited standalone financial statements of
Technoultra Engineers Private Limited for the financial years 2024–25,
2023–24, and 2022–23, is available on our Company’s website at
www.technocraftventures.com, since Technoultra Engineers Private
Limited does not maintain a separate website.
Our Company has provided the links to the website solely to comply with the requirements specified under the
SEBI ICDR Regulations. Such financial information of the Group Companies and other information provided
on our Company’s website does not constitute a part of this Draft Red Herring Prospectus. The information
provided on the website given above should not be relied upon or used as a basis for any investment decision.
Neither our Company nor the BRLM or the Promoter Selling Shareholder nor any of their respective directors,
employees, affiliates, associates, advisors, agents or representatives accept any liability whatsoever for any loss
arising from any information presented or contained in the website given above.
Interests of Group Companies in our Company
(a) In the promotion of our Company.
Our Group Companies do not have any interest in the promotion of our Company.
(b) In the properties acquired or proposed to be acquired by our Company in the past three years before filing
this Draft Red Herring Prospectus or proposed to be acquired by our Company.
Our Group Companies are not interested in the properties acquired by our Company in the three years immediately
preceding the filing of this Draft Red Herring Prospectus or proposed to be acquired by our Company.
(c) In transactions for acquisition of land, construction of building and supply of machinery.
Our Group Companies are not interested in any transaction entered into by our Company pertaining to acquisition
of land, construction of building and supply of machinery, etc.
Business interests or other Interests in our Company.
Other than 3,60,000 Equity Shares held by Technocraft Developers Private Limited in our Company and except
as stated in “Restated Consolidated Financial Information – Related Party Transactions” beginning on page
395, our Group Companies do not have or currently propose to have any business or other interest in our
Company.
Related Business Transactions
Except as set forth in “Restated Consolidated Financial Information – Related Party Transactions” beginning on
page 395, no other related party transactions have been entered into between our Group Companies and our
Company.
490Common pursuits amongst the Group Companies with our Company
As of the date of this Draft Red Herring Prospectus, our Group Companies are authorized under its constitutional
documents, to engage in similar line of business as our Company and may undertake such business in the future.
Our Company and our Group Companies shall adopt necessary procedures and practices as permitted by law to
address any instances of conflict of interest, if and when they may arise.
Litigations
Except as disclosed in “Outstanding Litigations and Material Developments” beginning on page 479, there are no
litigations involving our Group Companies which may have a material impact on our Company.
Other confirmations
Our Group Companies does not have any conflict of interest with our suppliers/vendors and third-party service
providers which are crucial for the operations of our Company.
Our Group Companies does not have any conflict of interest with the lessors of immovable properties which are
crucial for the operations of our Company.
As on date of this Draft Red Herring Prospectus, no debt securities issued by any of our Group Companies are
listed on any stock exchange in India or abroad.
Except VVIP Infratech Limited, that is listed on SME platform of BSE Limited, none of our Group Companies
have equity securities listed on any stock exchange in India or abroad.
Except VVIP Infratech Limited, which undertook a public issue, none of our Group Companies have made any
public issue, rights issue or composite issue (as defined under the SEBI ICDR Regulations) of securities in the
three years preceding the date of this Draft Red Herring Prospectus.
491OTHER REGULATORY AND STATUTORY DISCLOSURES
Authority for the Offer
Corporate Approvals
1. Our Board has authorised the Offer by a resolution passed in their meeting held on May 29, 2025.
2. Our Shareholders have authorised the Offer by a special resolution passed at their Extra-Ordinary
General Meeting held on June 02, 2025.
3. Further, our Board has taken on record the consent of the Promoter Selling Shareholder to participate in
the Offer for Sale pursuant to its resolution dated June 05, 2025.
4. This Draft Red Herring Prospectus was approved by IPO Committee and our Board by resolution dated
August 08, 2025.
Approval from the Promoter Selling Shareholder
The Promoter Selling Shareholder has confirmed and consented to offer the following as part of the Offered Shares
pursuant to the Offer for Sale:
Aggregate proceeds
Aggregate number of
from the sale of
Date of corporate Equity Shares of face
Promoter Selling Date of Equity Shares
authorization/board value of ₹ 10 each
Shareholder consent letter forming part of the
resolution being offered in the
Offer for Sale (₹ in
Offer for Sale
million) (up to)
Kartikey
Up to 2,376,000 Equity
Constructions June 05, 2025 June 05, 2025 [●]
Shares
(Partnership Firm)
The Promoter Selling Shareholder has confirmed that it is in compliance with Regulation 8 of the SEBI ICDR
Regulations and has held the Offered Shares for at least one year prior to the date of filing this Draft Red Herring
Prospectus.
In-principle Approvals
Our Company has received in-principle approvals from BSE and NSE for the listing of the Equity Shares pursuant
to their letters dated [●] and [●], respectively.
Prohibition by the SEBI or other regulatory or governmental authorities
Our Company, the Promoter Selling Shareholder, our Promoters, our Directors, the members of the Promoter
Group and the persons in control of our Company are not prohibited from accessing the capital markets and are
not debarred from buying, selling or dealing in securities under any order or direction passed by SEBI or any other
securities market regulator in any jurisdiction or any other authority/ court.
None of the companies with which our Promoters or Directors are associated with as promoters, directors or
persons in control have been debarred from accessing capital markets under any order or direction passed by SEBI
or any other authorities. Our Company, Promoters or Directors have neither been declared as Wilful Defaulters
or Fraudulent Borrowers by any bank or financial institution or consortium thereof in accordance with the
guidelines on Wilful Defaulters or Fraudulent Borrowers issued by the RBI.
492Compliance with the Companies (Significant Beneficial Ownership) Rules, 2018
Our Company, our Promoters, the Promoter Selling Shareholder and the members of the Promoter Group,
severally and not jointly, confirm that they are in compliance with the Companies (Significant Beneficial
Ownership) Rules, 2018, as amended, to the extent applicable thereto in respect of its respective holding in our
Company, as on the date of this Draft Red Herring Prospectus.
Directors associated with the Securities Market
None of our Directors are, in any manner, associated with the securities market and there is no outstanding
action(s) that has been initiated by SEBI against any of our Directors in the five years preceding the date of this
Draft Red Herring Prospectus.
Eligibility for the Offer
Our Company is eligible for the Offer in accordance with the eligibility criteria provided in Regulation 6(1) of the
SEBI ICDR Regulations, and is in compliance with the conditions specified therein in the following manner:
• Our Company has net tangible assets of at least ₹30.00 million, calculated on a restated consolidated basis,
in each of the preceding full financial years ended March 31, 2025, March 31, 2024 and March 31, 2023 of
which not more than 50% are held as monetary assets;
• Our Company has an average operating profit of at least ₹150.00 million, calculated on a restated
consolidated basis, during the preceding three financial years ended March 31, 2025, March 31, 2024, and
March 31, 2023 with operating profit in each of these preceding three years;
• Our Company has a net worth of at least ₹ 10.00 million in each of the three preceding full financial years
ended March 31, 2025, March 31, 2024 and March 31, 2023calculated on a restated consolidated basis; and
• Our Company has not changed its name within the last one year except for the change of status to public
limited company from private limited company.
Set forth below are our Company’s operating profit, net tangible assets, monetary assets, monetary assets as a
percentage of our net tangible assets and net worth, derived from our Restated Consolidated Financial Information
included in this Draft Red Herring Prospectus.
(₹ in million, unless otherwise stated)
Financial year Financial year Financial year
Particulars ended March 31, ended March 31, ended March 31,
2025 2024 2023
Net tangible assets* (₹ in million) 1145.20 863.45 672.39
Monetary assets** (₹ in million) 140.43 87.10 135.26
Monetary assets as a % of net tangible assets
12.26 10.09 20.12
(%)
Operating profit*** (₹ in million) 463.64 327.93 208.13
Average operating profit (₹ in million) 333.23
Net worth**** (₹ in million) 1,199.83 917.78 727.34
As certified by Rishi Kapoor & Company, Chartered Accountants pursuant to their certificate dated August 04,
2025 vide UDIN 25455362BMGILV2635.
Notes:
*” Net tangible assets” mean the sum of all net assets of the issuer, excluding intangible assets as defined in Indian
Accounting Standard (Ind AS) 38, issued by the Institute of Chartered Accountants of India.
493**For the purpose of the above computation, “Monetary assets” is computed by adding “Cash and Cash
Equivalents and Bank Balances other than Cash and Cash Eqvivalents”.
*** For the purpose of the above computation, “Operating profit” means the profit before finance costs, other
income and tax expense.
**** “Net worth means the aggregate value of the paid-up share capital, equity suspense account and all reserves
created out of the profits and securities premium account and debit or credit balance of profit and loss account
after deducting the aggregate value of the accumulated losses, debit or credit balance of common control
adjustment deficit account, deferred expenditure and miscellaneous expenditure not written off, as per the audited
balance sheet, but does not include reserves created out of revaluation of assets, write-back of depreciation and
amalgamation.
Our Company confirms that it is in compliance with the conditions specified in Regulation 7(1) of the SEBI ICDR
Regulations, to the extent applicable, and will ensure compliance with the conditions specified in Regulation 7(2)
of the SEBI ICDR Regulations.
Further, in terms of Regulation 49(1) of the SEBI ICDR Regulations, our Company and the Promoter Selling
Shareholder shall ensure that the number of Allottees shall not be less than 1,000, failing which, the entire
application money will be refunded forthwith, in accordance with the SEBI ICDR Regulations and applicable
laws. The Promoter Selling Shareholder shall be liable to reimburse our Company for any interest paid by it on
behalf of the Promoter Selling Shareholder on account of any delay with respect to Allotment of the Offered
Shares offered by the Promoter Selling Shareholder in the Offer for Sale.
If our Company does not Allot Equity Shares pursuant to the Offer within three Working Days from the Bid/Offer
Closing Date or within such timeline as prescribed by the SEBI, it shall repay without interest all monies received
from bidders, failing which interest shall be due to be paid to the Bidders at the rate of 15% per annum for the
delay period. For the avoidance of doubt, subject to applicable law, a Promoter Selling Shareholder shall not be
responsible to pay interest for any such delay, except to the extent such delay is solely and directly attributable to
an act or omission of such Promoter Selling Shareholder.
Further, our Company confirms that it is not ineligible to make the Offer in terms of Regulation 5 of the SEBI
ICDR Regulations, to the extent applicable. Our Company is in compliance with the conditions specified in
Regulation 5 and Regulation 7(1) of the SEBI ICDR Regulations, as follows:
(a) Our Company, the Promoter Selling Shareholder, our Promoters, the members of our Promoter Group,
and our Directors are not debarred from accessing the capital market by SEBI;
(b) None of our Promoters or our Directors are promoters or directors of companies which are debarred from
accessing the capital markets by SEBI;
(c) None of our Company, our Promoters or our Directors have been categorized as a Wilful Defaulter or a
Fraudulent Borrower;
(d) None of our Promoters and our Directors are Fugitive Economic Offenders;
(e) There are no outstanding warrants, options or rights to convert debentures, loans or other instruments
convertible into, or which would entitle any person any option to receive Equity Shares, as on the date
of this Draft Red Herring Prospectus;
(f) There are no outstanding stock appreciation rights granted to employees pursuant to a stock appreciation
right scheme by our Company as on the date of this Draft Red Herring Prospectus;
(g) Our Company along with Registrar to the Offer has entered into tripartite agreement dated December 03,
2024 with NSDL and tripartite agreement dated July 18, 2025 with CDSL, for dematerialisation of the
Equity Shares;
494(h) The Equity Shares of our Company held by our Promoters are in the dematerialised form;
(i) All the Equity Shares are fully paid-up and there are no partly paid-up Equity Shares as on the date of
filing of this Draft Red Herring Prospectus; and
(j) As the Net Proceeds through fresh issue of equity shares will not be utilised for financing a specific
project, the requirement to make firm arrangement of finance through verifiable means towards at least
75% of the stated means of finance is not applicable to this Offer.
DISCLAIMER CLAUSE OF THE SEBI
IT IS TO BE DISTINCTLY UNDERSTOOD THAT SUBMISSION OF THIS DRAFT RED HERRING
PROSPECTUS TO SEBI SHOULD NOT, IN ANY WAY, BE DEEMED OR CONSTRUED THAT THE
SAME HAS BEEN CLEARED OR APPROVED BY SEBI. SEBI DOES NOT TAKE ANY
RESPONSIBILITY EITHER FOR THE FINANCIAL SOUNDNESS OF ANY SCHEME OR THE
PROJECT FOR WHICH THE OFFER IS PROPOSED TO BE MADE OR FOR THE CORRECTNESS
OF THE STATEMENTS MADE OR OPINIONS EXPRESSED IN THIS DRAFT RED HERRING
PROSPECTUS. THE BRLM, KHAMBATTA SECURITIES LIMITED HAS CERTIFIED THAT THE
DISCLOSURES MADE IN THIS DRAFT RED HERRING PROSPECTUS ARE GENERALLY
ADEQUATE AND ARE IN CONFORMITY WITH THE SECURITIES AND EXCHANGE BOARD OF
INDIA (ISSUE OF CAPITAL AND DISCLOSURE REQUIREMENTS) REGULATIONS, 2018, AS
AMENDED. THIS REQUIREMENT IS TO FACILITATE INVESTORS TO TAKE AN INFORMED
DECISION FOR MAKING AN INVESTMENT IN THE PROPOSED OFFER.
IT SHOULD ALSO BE CLEARLY UNDERSTOOD THAT WHILE THE COMPANY IS PRIMARILY
RESPONSIBLE FOR THE CORRECTNESS, ADEQUACY AND DISCLOSURE OF ALL RELEVANT
INFORMATION IN THIS DRAFT RED HERRING PROSPECTUS, AND THE PROMOTER SELLING
SHAREHOLDER IS RESPONSIBLE ONLY FOR THE STATEMENT SPECIFICALLY CONFIRMED
OR UNDERTAKEN BY IT IN THIS DRAFT RED HERRING PROSPECTUS IN RELATION TO THE
PORTION OF THE OFFERED SHARES. THE BRLM IS EXPECTED TO EXERCISE DUE
DILIGENCE TO ENSURE THAT THE COMPANY AND THE PROMOTER SELLING
SHAREHOLDER DISCHARGE THEIR RESPECTIVE RESPONSIBILITIES ADEQUATELY IN THIS
BEHALF AND TOWARDS THIS PURPOSE, THE BRLM HAS FURNISHED TO SEBI, A DUE
DILIGENCE CERTIFICATE DATED AUGUST 08, 2025 IN THE FORMAT PRESCRIBED UNDER
SCHEDULE V (FORM A) OF THE SECURITIES AND EXCHANGE BOARD OF INDIA (ISSUE OF
CAPITAL AND DISCLOSURE REQUIREMENTS) REGULATIONS, 2018, AS AMENDED.
THE FILING OF THIS DRAFT RED HERRING PROSPECTUS DOES NOT, HOWEVER, ABSOLVE
THE COMPANY FROM ANY LIABILITIES UNDER THE COMPANIES ACT, 2013 OR FROM THE
REQUIREMENT OF OBTAINING SUCH STATUTORY AND/OR OTHER CLEARANCES AS MAY BE
REQUIRED FOR THE PURPOSE OF THE OFFER. SEBI FURTHER RESERVES THE RIGHT TO
TAKE UP, AT ANY POINT OF TIME, WITH THE BRLM, ANY IRREGULARITIES OR LAPSES IN
THIS DRAFT RED HERRING PROSPECTUS.
All legal requirements pertaining to the Offer will be complied with at the time of filing the Red Herring
Prospectus with the RoC in terms of Section 32 of the Companies Act, 2013. All legal requirements pertaining to
the Offer will be complied with at the time of registration of the Prospectus with the RoC in terms of Sections 26,
30, 32, 33(1) and 33(2) of the Companies Act, 2013.
Disclaimer from our Company, our Promoters, our Directors, the Promoter Selling Shareholder and the
BRLM
Our Company, our Promoters, our Directors, the Promoter Selling Shareholder, and the BRLM accept no
responsibility for statements made otherwise than in this Draft Red Herring Prospectus or in the advertisements
495or any other material issued by or at our Company’s instance and anyone placing reliance on any other source of
information, including our Company’s website i.e., www.technocraftventures.com the respective websites of the
Promoter Group, the Promoter Selling Shareholder or any affiliate of our Company, as applicable, would be doing
so at his or her own risk.
It is clarified that the Promoter Selling Shareholder accepts and/or undertake no responsibility for any statements
made or undertakings provided other than those specifically made or undertaken by such Promoter Selling
Shareholder in relation to itself and/or the respective portion of the Equity Shares offered by it through the Offer
for Sale.
The BRLM accept no responsibility, save to the limited extent as provided in the Offer Agreement and as will be
provided for in the Underwriting Agreement.
All information shall be made available by our Company, the Promoter Selling Shareholder, (to the extent that
the information pertain to its portion of the Offered Shares) and the BRLM to the public and investors at large
and no selective or additional information would be available for a section of the investors in any manner
whatsoever, including at road show presentations, in research or sales reports, at Bidding Centres or elsewhere.
The Bidders will be required to confirm and will be deemed to have represented to our Company, the Promoter
Selling Shareholder, Underwriters and their respective directors, officers, agents, affiliates, and representatives,
as applicable that they are eligible under all applicable laws, rules, regulations, guidelines and approvals to acquire
the Equity Shares and will not issue, sell, pledge, or transfer the Equity Shares to any person who is not eligible
under any applicable laws, rules, regulations, guidelines and approvals to acquire the Equity Shares. Our
Company, the Promoter Selling Shareholder, the Underwriters and each of their respective directors, officers,
agents, affiliates, and representatives, as applicable, accept no responsibility or liability for advising any investor
on whether such investor is eligible to acquire the Equity Shares.
The BRLM and its respective associates and affiliates, in their capacity as principal or agents, may engage in
transactions with, and perform services for, our Company, the Promoter Selling Shareholder, our Group
Companies, and their respective directors and officers, partners, trustees, affiliates, associates or third parties, as
applicable in the ordinary course of business and have engaged, or may in the future engage, in commercial
banking and investment banking transactions with our Company, the Promoter Selling Shareholder, and our
Group Companies, and each of their respective directors and officers, partners, trustees, affiliates, associates or
third parties, as applicable for which they have received, and may in the future receive, compensation.
Disclaimer in respect of jurisdiction
The Offer is being made in India to persons resident in India (including Indian nationals resident in India who are
competent to contract under the Indian Contract Act, 1872, as amended, HUFs, companies, corporate bodies and
societies registered under the applicable laws in India and authorised to invest in shares, Indian Mutual Funds
registered with the SEBI, VCFs, AIFs, public financial institutions as specified in Section 2(72) of the Companies
Act, 2013, scheduled commercial banks, state industrial development corporation, permitted national investment
funds, NBFCs registered with RBI, Indian financial institutions, commercial banks, regional rural banks, co-
operative banks (subject to RBI permission), or trusts under applicable trust law and who are authorised under
their constitution to hold and invest in shares, multilateral and bilateral development financial institutions, state
industrial development corporations, insurance companies registered with IRDAI, provident funds (subject to
applicable law) and pension funds, National Investment Fund, permitted insurance companies , insurance funds
set up and managed by the army, navy or air force of the Union of India and insurance funds set up and managed
by the Department of Posts, India) and permitted Non-Residents including FPIs and Eligible NRIs, AIFs and other
eligible foreign investors, if any, provided that they are eligible under all applicable laws and regulations to
purchase the Equity Shares.
496This Draft Red Herring Prospectus does not constitute an invitation to subscribe to, offer to sell or purchase the
Equity Shares in the Offer in any jurisdiction, including India. Any person into whose possession this Draft Red
Herring Prospectus comes is required to inform him or herself about, and to observe, any such restrictions. Any
dispute arising out of the Offer will be subject to the jurisdiction of appropriate court(s) in Mumbai only. No action
has been or will be taken to permit a public offering in any jurisdiction where action would be required for that
purpose, except that this Draft Red Herring Prospectus has been filed with SEBI for its observations. Accordingly,
the Equity Shares represented hereby may not be offered or sold, directly or indirectly, and this Draft Red Herring
Prospectus may not be distributed, in any jurisdiction, except in accordance with the legal requirements applicable
in such jurisdiction. Neither the delivery of this Draft Red Herring Prospectus, nor any offer or sale hereunder,
shall, under any circumstances, create any implication that there has been no change in our affairs or in the affairs
of the Promoter Selling Shareholder from the date hereof or that the information contained herein is correct as of
any time subsequent to this date. Invitations to subscribe to or purchase the Equity Shares in the Offer will be
made only pursuant to the Red Herring Prospectus if the recipient is in India or the preliminary offering
memorandum for the Offer, which comprises the Red Herring Prospectus and the preliminary international wrap
for the Offer, if the recipient is outside India.
No person outside India is eligible to Bid for Equity Shares in the Offer unless that person has received the
preliminary offering memorandum for the Offer, which contains the selling restrictions for the Offer
outside India.
Eligibility and Transfer Restrictions
The Equity Shares have not been and will not be registered under the U.S. Securities Act of 1933, as amended or
any other applicable law of the United States and, unless so registered, may not be offered or sold within the
United States except pursuant to an exemption from, or in a transaction not subject to, the registration requirements
of the U.S. Securities Act and applicable state securities laws. Accordingly, the Equity Shares are being offered
and sold outside the United States in reliance on Regulation S and the applicable laws of the jurisdiction where
those offers and sales occur.
The Equity Shares have not been and will not be registered, listed or otherwise qualified in any other jurisdiction
outside India and may not be offered or sold, and Bids may not be made by persons in any such jurisdiction,
except in compliance with the applicable laws of such jurisdiction.
Disclaimer Clause of BSE
As required, a copy of this Draft Red Herring Prospectus has been submitted to BSE. The disclaimer clause as
intimated by BSE to us, post scrutiny of this Draft Red Herring Prospectus, shall be included in the Red Herring
Prospectus and the Prospectus prior to the RoC filing.
Disclaimer Clause of the NSE
As required, a copy of this Draft Red Herring Prospectus has been submitted to NSE. The disclaimer clause as
intimated by NSE to us, post scrutiny of this Draft Red Herring Prospectus, shall be included in the Red Herring
Prospectus and the Prospectus prior to the RoC filing.
Listing
The Equity Shares issued pursuant to the Red Herring Prospectus and the Prospectus are proposed to be listed on
BSE and NSE. Applications will be made to the Stock Exchanges for obtaining permission for listing and trading
of the Equity Shares. [●] will be the Designated Stock Exchange with which the Basis of Allotment will be
finalised.
497If the permission to deal in and for an official quotation of the Equity Shares is not granted by the Stock Exchanges,
our Company shall forthwith repay, without interest, all monies received from the applicants in pursuance of the
Red Herring Prospectus in accordance with applicable law.
The Promoter Selling Shareholder, undertake to provide such reasonable assistance as may be requested by our
Company, to the extent such assistance is required from such Promoter Selling Shareholder in relation to its
portion of the Offered Shares to facilitate the process of listing and commencement of trading of the Equity Shares
on the Stock Exchanges within such time prescribed by SEBI.
Our Company shall ensure that all steps for the completion of the necessary formalities for listing and
commencement of trading of Equity Shares at the Stock Exchanges are taken within three Working Days of the
Bid/Offer Closing Date or such other period as may be prescribed by the SEBI. If our Company does not Allot
Equity Shares pursuant to the Offer within such timeline as prescribed by SEBI, it shall repay without interest all
monies received from Bidders, failing which interest shall be due to be paid to the Bidders at the rate of 15% per
annum for the delayed period or such other rate prescribed by SEBI.
Consents
Consents in writing of (a) the Promoter Selling Shareholder, our Promoters, our Directors, our Company Secretary
and Compliance Officer, our Key Managerial Personnel and Senior Management, the Statutory Auditor & Peer
Review Auditor, the Legal Counsel to our Company, Independent Practising Company Secretary, Independent
Chartered Engineer, Crisil, the Bankers to our Company, the Book Running Lead Manager and Registrar to the
Offer, to act in their respective capacities, have been obtained and such consents have not been withdrawn as on
the date of this Draft Red Herring Prospectus; and (b) the Syndicate Members, Monitoring Agency, Bankers to
the Offer, Sponsor Bankers, Underwriter to act in their respective capacities, will be obtained and filed along with
a copy of the Red Herring Prospectus with the RoC, as required under Sections 26 and 32 of the Companies Act,
2013 and such consents shall not be withdrawn up to the time of delivery of the Red Herring Prospectus for filing
with the RoC.
Experts
Except as stated below, our Company has not obtained any expert opinions:
Our Company has received written consent dated August 04, 2025 from our Statutory Auditor Rishi Kapoor &
Company, Chartered Accountant, holding a valid peer review certificate from ICAI to include their name in this
Draft Red Herring Prospectus in their capacity as an expert in respect of their examination report on the Restated
Consolidated Financial Information dated July 12, 2025 and the Statement of Special Tax Benefits dated August
04, 2025, included in this Draft Red Herring Prospectus and such consent has not been withdrawn as of the date
of this Draft Red Herring Prospectus.
Our Company has received written consent dated July 18, 2025 from Y. P. & Associates, Independent Chartered
Engineer bearing firm registration number M1488451 to include their name as required under Section 26(5) of the
Companies Act, 2013 read with SEBI ICDR Regulations, in this Draft Red Herring Prospectus, and as an “expert”
as defined under section 2(38) of the Companies Act, 2013 in relation to certifications and confirmations dated
August 05, 2025 issued by them in their capacity as the Independent Chartered Engineer.
Our Company has received written consent dated July 05, 2025 from R & D, Practicing Company Secretary to
include their name in this Draft Red Herring Prospectus in their capacity as an “expert” in respect of certificate
issued by them in their capacity as the independent Practising Company Secretary to our Company submitted for
the purposes of this offer and such consent has not been withdrawn as of the date of this Draft Red Herring
Prospectus.
Such consents have not been withdrawn as on the date of this Draft Red Herring Prospectus. It is clarified, the
term “expert” shall not be construed to mean an “expert” as defined under the U.S. Securities Act.
498Particulars regarding public or rights issues by our Company during the last five years
Our Company has not undertaken any public or rights issues (as defined under the SEBI ICDR Regulations)
during the five years immediately preceding the date of this Draft Red Herring Prospectus.
Commission or brokerage on previous issues in the last five years
Since this is the initial public offering of the Equity Shares of our Company, no sum has been paid or is payable
as commission or brokerage for subscribing to or procuring or agreeing to procure subscription for any of the
Equity Shares in the five years preceding the date of this Draft Red Herring Prospectus.
Observations by regulatory authorities
There are no findings or observations pursuant to any inspections by SEBI or any other regulatory authority
(including IRDAI) in India which are material and are required to be disclosed, or the non- disclosure of which
may have a bearing on the investment decision of prospective investors in the Offer.
Capital issue during the previous three years by listed Subsidiary, Group Companies and associates of our
Company
Our Company does not have any subsidiaries or associates but we have invested in a partnership firm namely
TESPL LRS TCPL JV. Except for VVIP Infratech Limited, which undertook a Public Issue, the details of which
are set out in the chapter titled “Group Companies” beginning on page 489, none of our Group Companies have
undertaken capital issues during the previous three years.
Capital issue during the preceding three years by our Company
Except as disclosed in the chapter titled “Capital Structure- Notes to the Capital Structure- Equity Share Capital
history of our Company” beginning on page 101, our Company has not undertaken any capital issue in the last three
years preceding the date of this Draft Red Herring Prospectus. Except VVIP Infratech Limited, none of our Group
Companies are listed on the Stock Exchanges. Further, VVIP Infratech Limited is forming part of our group
companies due to the related party transactions in the past three financial years however, our Company and
Promoters do not have any control or voting rights in this group company. Furthermore, as on the date of this
Draft Red Herring Prospectus, our Company does not have any subsidiary or associates, but we have invested in
a partnership firm namely TESPL LRS TCPL JV
Performance vis-à-vis objects – Public/ rights issue of our Company, listed subsidiaries / listed promoter of
our Company
Our Company has not undertaken any public issue/ rights issue in the five years preceding the date of this Draft
Red Herring Prospectus. Furthermore, as on the date of this Draft Red Herring Prospectus, our Company does not
have a corporate promoter or subsidiary.
499PAST PRICE INFORMATION OF PAST ISSUES HANDLED BY KHAMBATTA SECURITIES LIMITED (BRLM)
FOR MAIN BOARD IPOs
Opening
Issue
Issue size Price on +/- % change in closing price, [+/- % change in closing
Sr. No. Issue Name Price Listing date
(₹in Crores) Listing Date benchmark
(in ₹)
(in ₹)
30th calendar 90th calendar 180th calendar
days from listing days from listing days from listing
+43.10 +100.81 +82.39
1. EMS Limited 321.25 211 September 21, 2023 282.05
[-1.01] [+8.67] [+11.72]
Vibhor Steel Tubes +74.60 +76.42 +68.64
2. 72.17 151 February 20, 2024 425.00
Limited [-1.61] [+1.82] [+11.05]
Sources: All share price data is taken from www.nseindia.com and www.bseindia.com
SME IPOs
+/- % change in
+/- % change in +/- % change in
closing price, [+/-
closing price, [+/- % closing price, [+/- %
Issue Size Opening %
Issue Price change in closing change in closing
Sr. No. Issue Name** (₹ in Listing Date Price on change in closing
(in ₹) benchmark]- 90th benchmark]- 180th
Crores) Listing Date benchmark]- 30th
calendar days from calendar days from
calendar days from
listing listing
listing
Gayatri Rubbers and Chemicals +21.17 +42.17 +93.17
1. 4.58 30.00 February 07, 2023 35.00
Limited [+0.19] [+1.96] [10.13]
-0.30 -3.54 +35.35
2. Vels Films International Limited 33.74 99.00 March 22, 2023 101.00
[+2.76] [+9.35] [17.73]
+62.33 +50.08 +85.00
3. Quality Foils (India) Limited 4.52 60.00 March 24, 2023 100.00
[+4.01] [+11.28] [18.82]
500Quicktouch Technologies +121.97 +129.51 +344.10
4. 9.33 61.00 May 02, 2023 92.00
Limited [+2.13] [+8.26] [+4.96]
+74.50 +144.55 +136.63
5. De Neers Tools Limited 22.99 101.00 May 11, 2023 190.00
[+1.46] [+6.96] [+6.09]
September 06, -11.50 -19.83 -15.00
6. Sahaj Fashions Limited 13.96 30.00 31.00
2023 [-0.33] [+5.49] [+14.11]
+135.75 +83.38 +255.12
7. Divine Power Energy Limited 22.75 40.00 July 02, 2024 162.75
[+2.98] [+8.52] [-1.29%]
+15.25 [29.94] -17.97
8. Jungle Camps India Limited 29.42 72.00 December 17, 2024 136.80
[-4.91] [-0.08] [1.57]
+0.07 -1.36
9. P S Raj Steels Limited* 28.28 140.00 February 19, 2025 145.00 -
[- 0.04] [+8.78%]
-37.37
10. Icon Facilitators Limited# 19.11 91.00 July 01, 2025 90.00 - -
[-2.65]
*P S Raj Steels Limited was listed on February 19, 2025 therefore 180 days are not applicable.
# Icon Facilitators Limited was listed on July 01, 2025, therefore 90 days and 180 days are not applicable.
Sources: All share price data is taken from www.nseindia.com and www.bseindia.com
Note:
i. BSE SENSEX and CNX Nifty are considered as the Benchmark Index.
ii. Prices on BSE/NSE are considered for all of the above calculations.
iii. In case 30th/90th/180th day is not a trading day, closing price on BSE/NSE of the next trading day has been considered
iv. In case 30th/90th/180th days, scrips are not traded then last trading price has been considered.
v. Designated Stock Exchange as disclosed by the respective Issuer at the time of the issue has been considered for disclosing the price information.
vi. The 30th, 90th and 180th calendar day computation includes the listing day. If either of the 30th, 90th or 180th calendar days is a trading holiday, the previous trading day
is considered for the computation. We have taken the issue price to calculate the % change in closing price as on 30th, 90th and 180th day. We have taken the closing price
of the applicable benchmark index as on the listing day to calculate the % change in closing price of the benchmark as on 30th, 90th and 180th day.
vii. Restricted to last ten equity IPOs.
501SUMMARY STATEMENT OF DISCLOSURE PRICE INFORMATION OF PAST ISSUES DURING CURRENT
FINANCIAL YEAR AND TWO FINANCIAL YEARS PRECEDING THE CURRENT FINANCIAL YEAR
HANDLED BY KHAMBATTA SECURITIES LIMITED.
Nos. of IPOs Nos. of IPOs Nos. of IPOs Nos. of IPOs
trading at trading at trading at trading at
discount premium discount premium
Total
on as on 30th on as on 30th as on 180th as on 180th
Tot Fund
calendar days calendar days calendar days calendar days
al s
Finan from from from from
no. raise
cial listing date listing date listing date listing date
of d
Year Le Le Le Le
IP (₹
Ov Betw ss Ov Betw ss Ov Betw ss Ov Betw ss
Os Cror
er een tha er een tha er een tha er een tha
es)
50 25%- n 50 25%- n 50 25%- n 50 25%- n
% 50% 25 % 50% 25 % 50% 25 % 50% 25
% % % %
2025-
1* 19.11 - 1 - - - - - - - - - -
26
2024-
3 80.45 - - - - - 3 - - 1 1 - -
25
2023- 439.7
5 - - 1 3 1 - - - 1 4 - -
24 0
*Icon Facilitators Limited was listed on July 01, 2025, therefore 180 days are not applicable.
Track record of past issues handled by the BRLM
For details regarding track record of the Book Running Lead Manager to the Offer as specified in the Circular
reference no. CIR/MIRSD/1/2012 dated January 10, 2012 issued by the SEBI, please refer the website of the Book
Running Lead Manager at www.khambattasecurities.com for Khambatta Securities Limited.
Stock Market Data of Equity Shares
This being an initial public offer of the Equity Shares of our Company, the Equity Shares are not listed on any
stock exchange as on the date of this Draft Red Herring Prospectus, and accordingly, no stock market data is
available for the Equity Shares.
Mechanism for redressal of investor grievances
The Registrar Agreement provides for retention of records with the Registrar to the Offer for a minimum period
of eight years from the date of listing and commencement of trading of the Equity Shares on the Stock Exchanges,
in order to enable the investors to approach the Registrar to the Offer for redressal of their grievances.
In terms of SEBI ICDR Master Circular and subject to applicable law, any ASBA Bidder whose Bid has not been
considered for Allotment, due to failure on the part of any SCSB, shall have the option to seek redressal of the
same by the concerned SCSB within three months of the date of listing of the Equity Shares. SCSBs are required
to resolve these complaints within 15 days, failing which the concerned SCSB would have to pay interest at the
rate of 15% per annum for any delay beyond this period of 15 days. Further, the investors shall be compensated
by the SCSBs in accordance with SEBI circular SEBI ICDR Master Circular in the events of delayed unblock for
cancelled/withdrawn/deleted applications, blocking of multiple amounts for the same UPI application, blocking
of more amount than the application amount, delayed unblocking of amounts for non-allotted/partially-allotted
applications, for the stipulated period, and such compensation to investors shall be computed from T+3 day. In an
event there is a delay in redressal of the investor grievance in relation to unblocking of amounts, the SCSBs and
the Book Running Lead Manager shall compensate the investors at the rate higher of ₹100 or 15% per annum of
the application amount for the period of such delay. Further, in terms of April 20, 2022 Circular the payment of
502processing fees to the SCSBs shall be undertaken pursuant to an application made by the SCSBs to the BRLM,
and such application shall be made only after (i) unblocking of application amounts for each application received
by the SCSB has been fully completed, and (ii) applicable compensation relating to investor complaints has been
paid by the SCSB.
Separately, pursuant to the SEBI ICDR Master Circular, the following compensation mechanism has become
applicable for investor grievances in relation to Bids made through the UPI Mechanism for public issues opening
on or after May 01, 2021, for which the relevant SCSBs shall be liable to compensate the investor:
Scenario Compensation amount Compensation period
Delayed unblock for ₹100 per day or 15% per annum From the date on which the request
Cancelled/withdrawn/deleted of the Bid Amount, whichever is for cancellation/withdrawal/deletion
applications higher is placed on the bidding platform of
the Stock Exchanges till the date of
actual unblock
Blocking of multiple amounts for the 1. Instantly revoke the blocked From the date on which multiple
same Bid made through the UPI funds other than the original Bid amounts were blocked till the date
Mechanism Amount; of actual unblock.
and
2. ₹100 per day or 15% per
annum of the total cumulative
blocked amount except the
original Bid Amount,
whichever is higher
Blocking more amount than the Bid 1. Instantly revoke the From the date on which the funds to
Amount difference amount, i.e., the the excess of the Bid Amount
blocked amount less the Bid were blocked till the date of actual
Amount; and unblock
2. ₹100 per day or 15% per
annum of the difference
amount, whichever is higher
Delayed unblock for non ₹100 per day or 15% per annum From the Working Day subsequent
Allotted/partially Allotted applications of the Bid Amount, whichever is to the finalisation of the Basis of
higher Allotment till the date of actual
unblock
All Offer related grievances, other than those of Anchor Investors may be addressed to the Registrar to the Offer
with a copy to the relevant Designated Intermediary with whom the ASBA Form was submitted, giving full details
such as name of the sole or First Bidder, ASBA number, Bidder’s DP ID, Client ID, PAN, address of Bidder,
number of Equity Shares applied for, ASBA Account number in which the amount equivalent to the Bid Amount
was blocked or the UPI ID (for UPI Bidders), date of ASBA Form, and the name and address of the relevant
Designated Intermediary where the Bid was submitted. Further, the Bidder shall enclose the Acknowledgment
Slip or the application number from the Designated Intermediary in addition to the documents or information
mentioned hereinabove. All grievances relating to Bids submitted through Registered Brokers may be addressed
to the Stock Exchanges with a copy to the Registrar to the Offer.
All Offer related grievances of the Anchor Investors may be addressed to the Registrar to the Offer, giving full
details such as the name of the sole or first Bidder, Anchor Investor Application Form number, Bidders’ DP ID,
Client ID, PAN, date of the Anchor Investor Application Form, address of the Bidder, number of the Equity Shares
applied for, Bid Amount paid on submission of the Anchor Investor Application Form and the name and address
503of the BRLM where the Anchor Investor Application Form was submitted by the Anchor Investor.
In case of any delay in unblocking of amounts in the ASBA Accounts exceeding two Working Days from the Bid/
Offer Closing Date, the Bidder shall be compensated at a uniform rate of ₹100 per day or 15% per annum of the
Bid Amount, whichever is higher, for the entire duration of delay exceeding two Working Days from the Bid/
Offer Closing Date by the intermediary responsible for causing such delay in unblocking. The BRLM shall, in
their sole discretion, identify and fix the liability on such intermediary or entity responsible for such delay in
unblocking.
The Registrar to the Offer shall obtain the required information from the SCSBs and Sponsor Banks for addressing
any clarifications or grievances of ASBA Bidders. Our Company, the BRLM and the Registrar to the Offer accept
no responsibility for errors, omissions, commission of any acts of SCSBs, including any defaults in complying
with its obligations under applicable SEBI ICDR Regulations. Bidders can contact the Company Secretary and
Compliance Officer, the BRLM and/or the Registrar to the Offer in case of any pre-Offer or post-Offer related
problems such as non-receipt of letters of Allotment, non-credit of Allotted Equity Shares in the respective
beneficiary account, non-receipt of refund orders or non-receipt of funds by electronic mode, etc.
For helpline details of the Book Running Lead Manager pursuant to the SEBI Circular SEBI/HO/CFD/DIL-
2/OW/P/2021/2481/1/M dated March 16, 2021, kindly refer “General Information – Book Running Lead
Manager” beginning on page 93.
Further, the Bidder shall also enclose a copy of the Acknowledgement Slip duly received from the concerned
Designated Intermediary in addition to the information mentioned hereinabove.
Disposal of investor grievances by our Company
Our Company shall, post the filing of this Draft Red Herring Prospectus, apply for the authentication on the
SCORES in terms of the SEBI circular no. CIR/OIAE/1/2014 dated December 18, 2014, read with the SEBI
circular no. SEBI/HO/OIAE/IGRD/CIR/P/2019/86 dated August 02, 2019, the SEBI circular no.
SEBI/HO/OIAE/IGRD/CIR/P/2021/642 dated October 14, 2021, the SEBI circular no.
SEBI/HO/OIAE/IGRD/P/CIR/2022/0150 dated November 07, 2022, and the SEBI circular
SEBI/HO/OIAE/IGRD/CIR/P/2023/156 dated September 20, 2023, in relation to redressal of investor grievances
though SCORES.
Our Company estimates that the average time required by our Company or the Registrar to the Offer or the relevant
Designated Intermediary, for the redressal of routine investor grievances shall be 7 Working Days from the date
of receipt of the complaint. In case of non-routine complaints and complaints where external agencies are
involved, our Company will seek to redress these complaints as expeditiously as possible.
Our Company has not received any investor complaint during the three years preceding the date of this Draft Red
Herring Prospectus. Further, no investor complaint in relation to our Company is pending as on the date of this
Draft Red Herring Prospectus.
Our Company has also appointed Mr. Saket Surolia as the Company Secretary and Compliance Officer for the
Offer and he may be contacted in case of any pre-offer or post-offer related problems. For details, kindly refer
“General Information – Company Secretary and Compliance Officer” beginning on page 92.
Our Company has also constituted a Stakeholders Relationship Committee to review and redress the shareholders’
and investors’ grievances, such as transfer of Equity Shares, non-recovery of balance payments, declared
dividends, approve subdivision, consolidation, transfer, and issue of duplicate shares. For more information,
kindly refer “Our Management –Committees of our Board - Stakeholders’ Relationship Committee” beginning
on page 315.
504Other confirmations
No person connected with the Offer, except for fees or commission for services rendered in relation to the Offer,
shall offer any incentive, whether direct or indirect, in any manner, whether in cash or kind or services or otherwise,
to any Bidder for making a Bid.
Exemption from complying with any provisions of SEBI ICDR Regulations
As on date of this Draft Red Herring Prospectus, our Company has not applied for or received any exemption from
the SEBI from complying with any provisions of securities laws.
505SECTION VII – OFFER RELATED INFORMATION
TERMS OF THE OFFER
The Equity Shares being offered, transferred and allotted in the Offer will be subject to the provisions of the
Companies Act, 2013, the SEBI ICDR Regulations, the SCRA, the SCRR, the Memorandum of Association, the
Articles of Association, the SEBI Listing Regulations, the terms of this Draft Red Herring Prospectus, the Red
Herring Prospectus, and the Prospectus, the Bid cum Application Form, the Revision Form, the Abridged
Prospectus and other terms and conditions as maybe incorporated in the CAN/Allotment Advice and other
documents and certificates that may be executed in respect of the Offer. The Equity Shares shall also be subject to
all applicable laws, guidelines, rules, notifications and regulations relating to the offer of capital, offer for sale, and
listing and trading of securities, offered from time to time by SEBI, GoI, the Stock Exchanges, the RoC, the
Reserve Bank of India and, or, other authorities, as in force on the date of the Offer and to the extent applicable or
such other conditions as may be prescribed by such SEBI, GoI, the Stock Exchanges, the RoC, the RBI, and/or
other authorities while granting its approval for the Offer.
The Offer
The Offer is through a fresh offer by our Company and an Offer for Sale by the Promoter Selling Shareholder.
The details in relation to the expenses for the offer, kindly refer ‘‘Objects of the Offer’ beginning on page 121.
Ranking of the Equity Shares
The Equity Shares being offered offer/Allotted and transferred pursuant to the Offer will be subject to the
provisions of the Companies Act, 2013, the Memorandum of Association, the Articles of Association, and will
rank pari passu in all respects with the existing Equity Shares of our Company, including in respect of rights to
receive dividends and other corporate benefits, if any, declared by our Company after the date of Allotment as
per the applicable laws.
Mode of payment of Dividend
Our Company will pay dividends, if declared, to the Shareholders, as per the provisions of the Companies Act
2013, the SEBI Listing Regulations, the Memorandum of Association and the Articles of Association, and any
guidelines or directives that may be offered by the Government of India in this respect or any other applicable
law. Any dividends declared after the date of Allotment (including pursuant to the transfer of Equity Shares in
the Offer for Sale) in the Offer, will be payable to the Allottees who have been Allotted Equity Shares in the
Offer, for the entire year, in accordance with applicable laws. For further details, kindly refer ‘Dividend Policy’
and ‘Description of Equity Shares and Terms of the Articles of Association’ beginning on pages 330 and 548,
respectively.
Face Value, Price Band and Offer Price
The face value of each Equity Share is ₹ 10 each, and the Offer Price at the lower end of the Price Band is ₹ [●]
per Equity Share and at the higher end of the Price Band is ₹ [●] per Equity Share. The Anchor Investor Offer
Price is ₹ [●] per Equity Share.
The Price Band and the minimum Bid Lot will be decided by our Company, in consultation with the Book
Running Lead Manager and shall be published at least 2 Working Days prior to the Bid/Offer Opening Date,
advertised by our Company in all editions of the [●], an English language national daily newspaper with wide
circulation, all editions of [●], a Hindi language national daily newspaper with wide circulation and all editions
of [●], a Hindi regional daily newspaper with wide circulation (Hindi being the regional language of Delhi,
where our Registered Office is located) shall be made available to the Stock Exchanges for the purpose of
uploading the same on their websites. The Price Band, along with the relevant financial ratios calculated at the
Floor Price and at the Cap Price shall be pre-filled in the Bid cum Application Forms available at the respective
506websites of the Stock Exchanges. The Offer Price shall be determined by our Company, in consultation with the
BRLM, after the Bid/Offer Closing Date, on the basis of assessment of market demand for the Equity Shares
offered by way of the Book Building Process.
At any given point in time there will be only one denomination for the Equity Shares.
Compliance with disclosure and accounting norms
Our Company shall comply with all disclosures and accounting norms as specified by SEBI from time to time.
Rights of the Equity Shareholders
Subject to the applicable laws, rules, regulations and guidelines and the Articles of Association, our Shareholders
shall have the following rights:
• Right to receive dividends, if declared;
• Right to attend general meetings and exercise voting rights, unless prohibited by law;
• Right to vote on a poll either in person or by proxy or e-voting, in accordance with the provisions of the
Companies Act, 2013;
• Right to receive offers for rights shares and be allotted bonus shares, if announced;
• Right to receive surplus on liquidation, subject to any statutory and preferential claim being satisfied;
• Right of free transferability of their Equity Shares, subject to applicable laws including any RBI rules
and regulations, subject to foreign exchange regulations and other applicable laws; and
• Such other rights, as may be available to a shareholder of a listed public company under the Companies
Act, the SEBI Listing Regulations, Memorandum of Association and Articles of Association and other
applicable laws.
For a detailed description of the main provisions of the Articles of Association of our Company relating to voting
rights, dividend, forfeiture and lien, transfer, transmission and/or consolidation/splitting, kindly refer
‘Description of Equity Shares and Terms of the Articles of Association’ beginning on page 548.
Joint Holders
Subject to the provisions contained in the Articles of Association of our Company, where two or more persons
are registered as the holders of the Equity Shares, they will be deemed to hold such Equity Shares as joint tenants
with benefits of survivorship.
The Equity Shares have not been and will not be registered, listed or otherwise qualified in any other
jurisdiction outside India and may not be offered or sold, and Bids may not be made by persons in any
such jurisdiction, except in compliance with the applicable laws of such jurisdiction.
Allotment only in dematerialised form
Pursuant to Section 29 of the Companies Act 2013, and the SEBI ICDR Regulations, the Equity Shares shall be
allotted only in dematerialised form. Hence, the Equity Shares offered through the Red Herring Prospectus can
be applied for in dematerialised form only. As per the SEBI ICDR Regulations, the trading of the Equity Shares
shall only be in dematerialised form. In this context, the following agreements have been signed among our
Company, the respective Depositories, and the Registrar to the Offer:
507• Tripartite Agreement dated December 03, 2024 between NSDL, our Company and Registrar to the Offer;
and
• Tripartite Agreement dated July 18, 2025 between CDSL, our Company and Registrar to the Offer.
Market Lot and Trading Lot
Since trading of the Equity Shares is in dematerialised form, the tradable lot is one Equity Share. Allotment in
the Offer will be only in electronic form in multiples of [●] Equity Share subject to a minimum Allotment of [●]
Equity Shares. For the method of Basis of Allotment, kindly refer ‘Offer Procedure’ beginning on page 520.
Jurisdiction
Exclusive jurisdiction for the purpose of the Offer is with the competent courts/authorities in Mumbai.
Nomination facility to investors
In accordance with Section 72 of the Companies Act, 2013, read with the Companies (Share Capital and
Debentures) Rules, 2014, as amended, the Sole Bidder, or the First Bidder along with other joint Bidders, may
nominate any one person in whom, in the event of the death of Sole Bidder or in case of Joint Bidders, death of
all the Bidders, as the case may be, the Equity Shares Allotted, if any, shall vest to the exclusion of all other
persons, unless the nomination is varied or cancelled in the prescribed manner. A person, being a nominee,
entitled to the Equity Shares by reason of the death of the original holder(s), shall be entitled to the same
advantages to which he or she would be entitled if he or she were the registered holder of the Equity Share(s).
Where the nominee is a minor, the holder(s) may make a nomination to appoint, in the prescribed manner, any
person to become entitled to Equity Share(s) in the event of his or her death during the minority. A nomination
shall stand rescinded upon a sale/ transfer/ alienation of Equity Share(s) by the person nominating. A nomination
may be cancelled or varied by nominating any other person in place of the present nominee, by the holder of the
Equity Shares who has made the nomination, by giving a notice of such cancellation or variation to our Company
in the prescribed form. A buyer will be entitled to make a fresh nomination/ cancel nomination in the manner
prescribed. Fresh nomination can be made only on the prescribed form available on request at our Registered
Office or to the Registrar and Transfer Agents of our Company.
Further, any person who becomes a nominee by virtue of the provisions of Section 72 of the Companies Act,
2013, as amended, shall upon the production of such evidence as may be required by our Board, elect either:
a) to register himself or herself as the holder of the Equity Shares; or
b) to make such transfer of the Equity Shares, as the deceased holder could have made.
Further, our Board may, at any time, give notice requiring any nominee to choose either to be registered himself
or herself or to transfer the Equity Shares, and if the notice is not complied with within a period of 90 days, our
Board may thereafter withhold payment of all dividends, interests, bonuses or other monies payable in respect
of the Equity Shares, until the requirements of the notice have been complied with.
Since the Allotment of Equity Shares in the Offer will be made only in dematerialized form, there is no
requirement to make a separate nomination with our Company. Nominations registered with respective Depository
Participant of the Bidder would prevail. If the Bidder wants to change the nomination, they are requested to inform
their respective Depository Participants.
Our Company shall comply with such disclosures and accounting norms as may be specified by SEBI
from time to time.
508BID/OFFER PERIOD
BID/OFFER OPENS ON* [●]
BID/OFFER CLOSES ON**^ [●]
* Our Company in consultation with the BRLM, may consider participation by Anchor Investors. The Anchor
Investor Bidding Date will be one Working Day prior to the Bid/ Offer Opening Date in accordance with the SEBI
ICDR Regulations.
** Our Company in consultation with the BRLM, may consider closing the Bid/ Offer Period for QIBs one Working
Day prior to the Bid/ Offer Closing Date in accordance with the SEBI ICDR Regulations.
^ UPI mandate end time and date shall be at 5:00 pm on Bid/ Offer Closing Date.
An indicative timetable in respect of the Offer is set out below:
Event Indicative Date
Finalisation of Basis of Allotment with the Designated Stock Exchange On or about [●]
Initiation of refunds (if any, for Anchor Investors)/unblocking of funds from On or about [●]
ASBA Account*
Credit of Equity Shares to demat accounts of Allottees On or about [●]
Commencement of trading of the Equity Shares on the Stock Exchanges On or about [●]
* In case of any delay in unblocking of amounts in the ASBA Accounts (including amounts blocked through the
UPI Mechanism) exceeding 2 Working Days from the Bid/ Offer Closing Date, the Bidder shall be compensated
at a uniform rate of ₹ 100 per day or 15% per annum of the Bid Amount, whichever is higher, for the entire
duration of delay exceeding two Working Days from the Bid/Offer Closing Date by the intermediary responsible
for causing such delay in unblocking in accordance with applicable law. The BRLM shall, in their sole discretion,
identify and fix the liability on such intermediary or entity responsible for such delay in unblocking. Further,
investors shall be entitled to compensation in the manner specified in the SEBI Master Circular no.
SEBI/HO/MIRSD/POD-1/P/CIR/2024/37 dated May 07, 2024 in case of delays in resolving investor grievances
in relation to blocking/unblocking of fund and the provisions shall also be deemed to be incorporated in the
deemed agreement of the Company with the SCSBs to the extent applicable. The BRLM shall, in their sole
discretion, identify and fix the liability on such intermediary or entity responsible for such delay in unblocking.
For the avoidance of doubt, the provisions of the SEBI Master Circular no. SEBI/HO/MIRSD/POD-
1/P/CIR/2024/37 dated May 07, 2024 shall be deemed to be incorporated in the agreements to be entered into by
and between the Company and the relevant intermediaries, to the extent applicable.
The processing fees for applications made by UPI Bidders using the UPI Mechanism may be released to the
remitter banks (SCSBs) only after such banks provide a written confirmation on compliance with the SEBI master
circular (SEBI/HO/CFD/PoD-1/P/CIR/2024/0154 2023) dated November 11, 2024.
The above timetable is indicative and does not constitute any obligation or liability on our Company or the
Promoter Selling Shareholder or the BRLM.
Whilst our Company shall ensure that all steps for the completion of the necessary formalities for the listing and
the commencement of trading of the Equity Shares on the Stock Exchanges are taken within three Working Days
of the Bid/Offer Closing Date or such period as may be prescribed by SEBI, with reasonable support and co-
operation of the Promoter Selling Shareholder, as may be required in respect of its respective portion of the Offered
Shares, the timetable may be extended due to various factors, such as extension of the Bid/Offer Period by our
Company in consultation with the BRLM, revision of the Price Band or any delay in receiving the final listing and
trading approval from the Stock Exchanges or delay in receipt of final certificates from SCSBs, etc. Our Company
shall within two days from the closure of the Bid/Offer, refund the subscription amount received in case our
Company fails to obtain listing or trading permission from the Stock Exchanges for the Equity Shares. The
commencement of trading of the Equity Shares will be entirely at the discretion of the Stock Exchanges and in
accordance with the applicable laws.
509The Promoter Selling Shareholder confirms that it shall extend reasonable support and co-operation to our
Company, as may be required solely in relation to its Offered Shares, in accordance with applicable law, to facilitate
the process of listing and commencement of trading of the Equity Shares on the Stock Exchanges within three
Working Days from the Bid/Offer Closing Date or such time as prescribed by SEBI.
SEBI vide the SEBI ICDR Master Circular has reduced the post offer timeline for IPO. The revised timeline of
T+3 days has been made applicable in two phases, i.e., voluntary for all public offers opening on or after September
01, 2023 and mandatory on or after December 01, 2023. Accordingly, the Offer will be made under UPI Phase III
on mandatory basis, subject to the timing of the Offer and any circulars, clarification or notification offered by the
SEBI from time to time, including with respect to SEBI ICDR Master Circular.
In terms of the UPI Circulars, in relation to the Offer, the BRLM will be required to submit reports of compliance
with timelines and activities prescribed by SEBI in connection with the allotment and listing procedure within
three Working days of Bid/Offer Closing Date or such time prescribed by SEBI, identifying non-adherence to
timelines and processes and an analysis of entities responsible for the delay and the reasons associated with it.
Any circulars or notifications from SEBI after the date of this Draft Red Herring Prospectus may result in changes
to the listing timelines. Further, the offer procedure is subject to change basis any revised SEBI circulars to this
effect.
Submission of Bids (other than Bids from Anchor Investors):
Bid/ Offer Period (except the Bid/Offer Closing Date)
Submission and revision in Bids Only between 10.00 a.m. and 5.00 p.m. IST
Bid/ Offer Closing Date*
Submission of electronic applications (Online ASBA through Only between 10.00 a.m. and up to 5.00 p.m.
3-in-1 accounts) - For Retail Individual Bidders IST
Submission of electronic applications (Bank ASBA through Only between 10.00 a.m. and up to 4.00 p.m.
Online channels like internet banking, mobile banking and IST
Syndicate UPI ASBA applications where Bid Amount is up to
₹0.50 million)
Submission of electronic applications (Syndicate non-retail, Only between 10.00 a.m. and up to 3.00 p.m.
non-individual applications) IST
Submission of physical applications (Bank ASBA) Only between 10.00 a.m. and up to 1.00 p.m.
IST
Submission of physical applications (Syndicate non-retail, Only between 10.00 a.m. and up to 12.00 p.m.
non-individual applications where Bid Amount is more than IST
₹0.50 million)
Modification/ revision/cancellation of Bids
Upward revision of Bids by QIBs and Non-Institutional Only between 10.00 a.m. and up to 5.00 p.m. IST
Bidders categories# on Bid/ Offer Closing Date
Upward or downward Revision of Bids or cancellation of Bids Only between 10.00 a.m. and up to 5.00 p.m. IST
by RIBs
* UPI mandate end time and date shall be at 5:00 pm on Bid/ Offer Closing Date.
# QIBs and Non-Institutional Bidders can neither revise their bids downwards nor cancel/withdraw their bids.
On the Bid/Offer Closing Date, the Bids shall be uploaded until:
a) 4.00 p.m. IST in case of Bids by QIBs and Non-Institutional Bidders, and
b) Until 5.00 p.m. IST or such extended time as permitted by the Stock Exchanges, in case of Bids by Retail
Individual Bidders.
510On Bid/Offer Closing Date, extension of time may be granted by Stock Exchanges only for uploading Bids
received by Retail Individual Bidders after taking into account the total number of Bids received up to closure of
timings for acceptance of Bid cum Application Forms as stated herein and as reported by the BRLM to the Stock
Exchanges.
The Registrar to the Offer shall submit the details of cancelled/withdrawn/deleted applications to the SCSB’s on
daily basis within 60 minutes of the Bid closure time from the Bid/ Offer Opening Date till the Bid/Offer Closing
Date by obtaining such information from the Stock Exchanges. The SCSBs shall unblock such applications by the
closing hours of the Working Day and submit the confirmation to the BRLM and the RTA on a daily basis as per
the format prescribed in SEBI ICDR Master Circular.
To avoid duplication, the facility of re-initiation provided to Syndicate Members shall preferably be allowed only
once per bid/batch and as deemed fit by the Stock Exchanges, after closure of the time for uploading Bids.
It is clarified that Bids shall be processed only after the application monies are blocked in the ASBA
Account and Bids not uploaded on the electronic bidding system or in respect of which the full Bid Amount
is not blocked by SCSBs or not blocked under the UPI Mechanism in the relevant ASBA Account, as the
case may be, would be rejected.
Due to limitation of time available for uploading the Bids on the Bid/Offer Closing Date, Bidders are advised to
submit their Bids 1 day prior to the Bid/Offer Closing Date and, in any case, no later than 12:00 p.m. (Indian
Standard Time) on the Bid/Offer Closing Date. Any time mentioned in this Draft Red Herring Prospectus is IST.
Bidders are cautioned that, in the event a large number of Bids are received on the Bid/Offer Closing Date, some
Bids may not get uploaded due to lack of sufficient time. Such Bids that cannot be uploaded will not be considered
for allocation under the Offer. Bids will be accepted on the Stock Exchange platform only during Working Days,
during the Bid/ Offer Period. The Designated Intermediaries shall modify select fields uploaded in the Stock
Exchange Platform during the Bid/ Offer Period till 5:00 pm on the Bid/ Offer Closing Date after which the Stock
Exchange(s) send the bid information to the Registrar to the Offer for further processing. Further, as per letter no.
list/SMD/SM/2006 dated July 03, 2006 and letter no. NSE/IPO/25101 dated July 06, 2006 offered by the BSE
Limited (“BSE”) and the National Stock Exchange of India Limited (“NSE”) respectively, Bids and any revisions
in Bids shall not be accepted on Saturdays, Sundays and public/ bank holidays as declared by the Stock Exchanges.
Bids by ASBA Bidders shall be uploaded by the relevant Designated Intermediary in the electronic system to be
provided by the Stock Exchanges.
Our Company in consultation with the BRLM, reserves the right to revise the Price Band during the Bid/Offer
Period, in accordance with the SEBI ICDR Regulations. The revision in the Price Band shall not exceed 20% on
either side, i.e., the Floor Price may move up or down to the extent of 20% of the Floor Price and the Cap Price
will be revised accordingly, but the Floor Price shall not be less than the face value of the Equity Shares. In all
circumstances, the Cap Price shall be less than or equal to 120% of the Floor Price. Provided that, the Cap Price
of the Price Band shall be at least 105% of the Floor Price.
In case of any revision in the Price Band, the Bid/Offer Period shall be extended by at least three additional
Working Days following such revision of the Price Band, subject to the Bid/Offer Period not exceeding 10
Working Days. In cases of force majeure, banking strike or similar circumstances, our Company in
consultation with the BRLM, may, for reasons to be recorded in writing, extend the Bid/Offer Period for a
minimum of one Working Day, subject to the Bid/Offer Period not exceeding 10 Working Days. Any revision
in Price Band, and the revised Bid/Offer Period, if applicable, shall be widely disseminated by notification
to the Stock Exchanges, by issuing a public notice, and also by indicating the change on the website of the
BRLM and at the terminals of the members of the Syndicate and by intimation to the Designated
Intermediaries and the Sponsor Bank(s), as applicable. In case of revision of Price Band, the Bid Lot shall
remain the same.
None of our Company or any member of the Syndicate is liable for any failure in uploading the Bids due to faults
in any software or hardware system or blocking of application amount by SCSBs on receipt of instructions from
511the Sponsor Bank due to any errors, omissions, or otherwise non-compliance by various parties involved in, or any
other fault, malfunctioning or breakdown in the UPI Mechanism.
In case of discrepancy in data entered in the electronic book vis-à-vis data contained in the Bid cum Application
Form for a particular Bidder, the details as per the Bid file received from the Stock Exchanges shall be taken as
the final data for the purpose of Allotment.
Minimum Subscription
On the date of closure of the Offer, in case our Company does not receive (i) minimum subscription of 90% of the
(Fresh Issue, (ii) Offer equivalent to at least the minimum number of securities as specified under the terms of
Rule 19(2)(b) of the SCRR including devolvement of Underwriter, and (iii) or if the subscription level falls below
the thresholds mentioned above after the Bid/Offer Closing Date on account of withdrawal of applications; or after
technical rejections; or if the listing or trading permission is not obtained from the Stock Exchanges for the Equity
Shares being offered pursuant to the Offer, our Company shall forthwith refund/ unblock the entire subscription
amount received, within the time as prescribed under the law. If there is a delay beyond such timeline, our
Company shall pay interest as prescribed under applicable law i.e. as per Section 39(5) of the Companies Act,
2013, where there is a default under sub-section (3) (i.e., delay in refund of subscription not meeting minimum
subscription threshold), the company and its officers in default are liable to a penalty of ₹1,000 for each day of
default or ₹1,00,000, whichever is less..
The Promoter Selling Shareholder shall be liable to refund money raised in the Offer only to the extent of the
Equity Shares offered by the Promoter Selling Shareholder in the Offer, together with any interest on such money,
as required under applicable law, to the Bidder, provided the Promoter Selling Shareholder shall not be responsible
to pay such interest unless such delay is solely by, or is directly attributable to, an act or omission of the Promoter
Selling Shareholder in relation to its portion of the Offered Shares and in such case our Company shall be
responsible to pay such interest. All refunds made, interest borne, and expenses incurred (with regard to payment
of refunds) by our Company on behalf of the Promoter Selling Shareholder (only to the extent of its portion of the
Offered Shares) will be adjusted or reimbursed by the Promoter Selling Shareholder to the Company as agreed
between our Company and the Promoter Selling Shareholder in writing, in accordance with applicable law.
Undersubscription, if any, in any category except the QIB portion, would be met with spill-over from the other
categories at the discretion of our Company, in consultation with the Book Running Lead Manager, and the
Designated Stock Exchange.
Further, our Company shall ensure that the number of Bidders to whom the Equity Shares will be Allotted shall
not be less than 1,000 in compliance with Regulation 49(1) of the SEBI ICDR Regulations, failing which the entire
application money shall be unblocked in the respective ASBA Accounts of the Bidders. In case of under-
subscription in the Offer, Equity Shares up to 90% of the Fresh Issue (“Minimum Subscription”) will be issued
prior to the sale of Equity Shares in the Offer for Sale, provided that the balance subscription in the Offer will be
met in the following order of priority (i) through the sale of the Offered Shares being offered by the Promoter
Selling Shareholder in the Offer for Sale on a proportionate basis, and (ii) through the issuance of balance part of
the Fresh Issue. The balance Equity Shares of the Fresh Issue (i.e., 10% of the Fresh Issue) will be offered only
once the entire portion of the Offered Shares is Allotted in the Offer.
Arrangement for Disposal of Odd Lots
Since our Equity Shares will be traded in dematerialised form only and the market lot for our Equity Shares will
be 1 Equity Share, no arrangements for disposal of odd lots are required.
New Financial Instruments
Our Company is not issuing any new financial instruments through this Offer.
512Restrictions on Transfer and Transmission of Equity Shares
Except for lock-in of pre-offer equity shareholding, minimum Promoter’s contribution and Anchor Investor lock-
in, in the Offer, as detailed in “Capital Structure” beginning on page 100 and except as provided in our articles as
detailed in “Description of Equity Shares and Terms of the Articles of Association” beginning on page 548, there
are no restrictions on transfers and transmission of shares/debentures and on their consolidation/splitting.
Option to receive Equity Shares in Dematerialized Form
Allotment of Equity Shares to successful Bidders will only be in the dematerialized form. Bidders will not have
the option of Allotment of the Equity Shares in physical form. The Equity Shares on Allotment will be traded only
in the dematerialized segment of the Stock Exchanges. However, the Equity Shares may be rematerialized
subsequently to Allotment of the Equity Shares in the Offer, subject to applicable laws.
Authority for the Offer
The Offer has been authorised by our Board of Directors pursuant to the resolution passed at its meeting dated
May 29, 2025 and by our Shareholders pursuant to a special resolution passed at their meeting dated June 02, 2025.
This Draft Red Herring Prospectus has been approved by our Board pursuant to its resolution dated August 08,
2025 for filing with SEBI and Stock Exchanges.
Withdrawal of the Offer
The Offer shall be withdrawn in the event the requirement of the minimum subscription as prescribed under
Regulation 45 of the SEBI ICDR Regulations is not fulfilled.
Our Company in consultation with the BRLM, and the Promoter Selling Shareholder to the extent of its portion
of the Offered Shares, reserve the right to not proceed with the entire or portion of the Offer, in whole or in part
thereof, after the Bid/Offer Opening Date but before the Allotment. In such an event, our Company would issue a
public notice in the newspapers in which the pre-offer and price band advertisement advertisements were
published, within two days of the Bid/Offer Closing Date or such other time as may be prescribed by SEBI,
providing reasons for not proceeding with the Offer and inform the Stock Exchanges promptly on which the Equity
Shares are proposed to be listed. The BRLM, through the Registrar to the Offer, shall notify the SCSBs and the
Sponsor Bank(s) (in case of UPI Bidders using the UPI Mechanism), to unblock the bank accounts of the ASBA
Bidders and the Escrow Collection Bank to release the Bid Amounts to the Anchor Investors, within one Working
Day from the date of receipt of such notification. Our Company shall also inform the Bankers to the Offer to
process refunds to the Anchor Investors, as the case may be. The notice of withdrawal will be issued in the same
newspapers where the pre-offer advertisements have appeared and the Stock Exchanges will also be informed
promptly.
Notwithstanding the foregoing, the Offer is also subject to (i) filing of the Red Herring Prospectus by our Company
with the RoC; and (ii) obtaining the final listing and trading approvals of the Stock Exchanges, which our Company
shall apply for after Allotment and within three Working Days of the Bid/Offer Closing Date or such other time
period as prescribed under Applicable Law and also inform the Bankers to the Offer to process refunds to the
Anchor Investors, as the case may be. If our Company, in consultation with the BRLM, withdraws the Offer after
the Bid/Offer Closing Date and thereafter determine that they will proceed with an issue or offer for sale of the
Equity Shares, our Company shall file a fresh Draft Red Herring Prospectus with SEBI and the Stock Exchanges.
513OFFER STRUCTURE
The Offer is of up to 11,881,000 Equity Shares of face value of ₹10 each, for cash at a price of ₹[●] per Equity Share
(including a share premium of ₹[●] per Equity Share) aggregating up to ₹ [●] million comprising a Fresh Issue of
up to 9,505,000 Equity Shares, aggregating up to ₹ [●] million by our Company and an Offer for Sale of up to
2,376,000 Equity Shares, aggregating up to ₹ [●] million by the Promoter Selling Shareholder. The Offer is being
made through the Book Building Process.
In terms of Rule 19(2)(b) of the SCRR, the Offer is being made through the Book Building Process, in compliance
with Regulation 31 of the SEBI ICDR Regulations.
Non-Institutional
Particulars QIBs (1) Retail Individual Bidders
Bidders
Number of Equity Not more than [●] Equity Not less than [●] Equity Not less than [●] Equity
Shares of face value of Shares of face value of ₹10 Shares of face value of Shares available for
₹10 each available for each ₹10 each aggregating to ₹ allocation or the Offer less
Allotment/allocation (2) [●] million available for allocation to QIB Bidders
allocation or the Offer and Non-Institutional
less allocation to QIB Bidders
Bidders and RIBs
Percentage of Offer Size Not more than 50% of the Not less than 15% of the Not less than 35% of the
available for Allotment Offer shall be available for Offer or the Offer less Offer or the Offer less
or allocation allocation to QIB Bidders. allocation to QIB allocation to QIB Bidders
However, up to 5% of the Bidders and RIBs shall and Non-Institutional
Net QIB Portion will be be available for Bidders will be available for
available for allocation allocation, subject to the allocation.
proportionately to Mutual following:
Funds only. Mutual Funds (i) One-third of the
participating in the Mutual Non-Institutional
Fund Portion will also be Category shall be
eligible for allocation in the reserved for Bidders
remaining Net QIB with a Bid size of more
Portion. than ₹ 0.20 million and
up to ₹ 1.00 million and
The unsubscribed portion (ii) two-thirds of the
in the Mutual Fund Non-Institutional
Portion will be added to Category shall be
the Net QIB Portion. reserved for Bidders
with a Bid size of more
than ₹ 1.00 million.
Provided that the
unsubscribed portion in
either
of categories the sub
specified above may be
allocated to Bidders in
the other
sub-category of NIIs
Provided that the
unsubscribed portion in
either of the sub-
categories specified above
514may be allocated to
applicants in the other
sub-category of Non-
Institutional Bidders
Basis of Proportionate as follows The Equity Shares The allotment to each RIB
Allotment/Allocation if (excluding the Anchor available for allocation shall not be less than the
respective category is Investor Portion): to NIBs under the Non- minimum Bid lot, subject to
oversubscribed* Institutional Category availability of Equity
(a) (a) up to [●] Equity Shares shall be subject to the Shares in Retail Category
of face value of ₹10 each following: and the remaining available
shall be available foa)r (a) One-third of the Non- Equity Shares if any, shall be
allocation on a Institutional Category allotted on a proportionate
proportionate basis to will be available for basis. For details, kindly
Mutual Funds only; and allocation to Bidders refer “Offer Procedure”
with a Bid size of more beginning on page 520.
(b) (b) Balance [●] Equity than ₹0.20 million and
Shares of face value of ₹10 up to ₹1.00 million;
each shall be available fbo)r (b) Two-thirds of the
allocation on a Non-Institutional
proportionate basis to all Category will be
QIBs, including Mutual available for allocation
Funds receiving allocation to Bidders with a Bid
as per (a) above. size of more than
₹1.00 million. Provided
(c) Up to 60% of the QIB that the unsubscribed
Portion (of up to [●] Equity portion in either of the
Shares of face value of ₹10 aforementioned sub-
each) may be allocated on a categories may be
discretionary basis to allocated to Bidders in
Anchor Investors of which the other sub- category
one-third shall be available of NIBs in accordance
for allocation to Mutual with SEBI ICDR
Funds only, subject to valid Regulations.
Bid received from Mutual The allotment of Equity
Funds at or above the Shares to each NIB shall
Anchor Investor Allocation not be less than the
Price. minimum NIBs Bid size,
subject to availability in
the Non-Institutional
category, and the
remainder, if any, shall
be allotted on a
proportionate basis in
accordance with the
conditions specified in
Schedule XIII to the
SEBI ICDR
Regulations. For details,
kindly refer “Offer
Procedure” beginning
on page 520.
515Mode of Bidding^ Only through the ASBA process (including the UPI Mechanism, as applicable)
(except for Anchor Investors).
SEBI through its circular (SEBI/HO/CFD/DIL2/CIR/P/2022/45) dated April 05,
2022, has prescribed that all individual investors applying in initial public offerings
opening on or after May 01, 2022, where the application amount is up to ₹0.50
million, shall use UPI. Individual investors bidding under the Non-Institutional
Portion bidding for more than ₹0.20 million and up to ₹0.50 million shall be required
to use the UPI Mechanism.
Minimum Bid S u c h n u m b e r o f E q u i t y S u c h n u m b e r o f E q u i t y [ ● ] E q u i t y S h a r e s o f f a c e
Shares in multiples of [●] Shares in multiples of value of ₹10 each and in
Equity Shares of face [●] Equity Shares such multiples of [●] Equity
value of ₹10 each such that that the Bid Amount Shares of face value of ₹10
the Bid Amount exceeds exceeds ₹0.20 million. each thereafter.
₹0.20 million.
Maximum Bid Such number of Equity Such number of Equity Such number of Equity
Shares in multiples of [●] Shares in multiples of Shares in multiples of [●]
Equity Shares of face [●] Equity Shares not Equity Shares of face value
value of ₹10 each so that exceeding the size of the of ₹10 each so that the Bid
the Bid does not exceeding Offer, (excluding the Amount does not exceed
the size of the Offer, QIB portion) subject to ₹0.20 million.
(excluding the Anchor l imits applicable to the
portion) subject to Bidder.
applicable limits to each
Bidder.
Mode of Allotment Compulsorily in dematerialised form
Bid Lot [●] Equity Shares and in multiples of [●] Equity Shares thereafter
Allotment Lot [●] Equity Shares of face value of ₹ 10 each and in multiples of one Equity Share
thereafter
Trading Lot One Equity Share
Who can Apply (3)(4)(5) Public financial Resident Indian Resident Indian
institutions specified in individuals, HUFs (in individuals, HUFs (in the
Section 2(72) of the the name of Karta), name of the Karta) and
Companies Act 2013, FPIs companies, corporate Eligible NRIs.
registered with SEBI (other bodies, Eligible NRIs,
than individuals, corporate scientific institutions,
bodies and family offices), societies and trusts and
scheduled commercial FPIs who are
banks, mutual funds individuals, corporate
registered with SEBI, bodies and family
venture capital funds offices which are re-
registered with the SEBI, categorised as category
FVCIs, Alternative II FPI (as defined in the
Investment Funds, SEBI FPI Regulations)
multilateral and bilateral and registered with
development financial SEBI.
institutions, state industrial
development corporations,
insurance companies
registered with the
Insurance Regulatory and
516Development Authority
(“IRDAI”), provident
funds (subject to
applicable law) with a
minimum corpus of
₹250.00 million, pension
funds with a minimum
corpus of ₹250.00 million
registered with the Pension
Fund Regulatory and
Development Authority
established under
subsection (1) of section 3
of the Pension Fund
Regulatory and
Development Authority
Act, 2013, the National
Investment Fund set up by
the GoI through resolution
F.No.2/3/2005-DD-II dated
November 23, 2005, the
insurance funds set up and
managed by the army, navy,
or air force of the Union of
India and insurance funds set
up and managed by the
Department of Posts, India
and Systemically Important
Financial Companies
(“NBFCs”) in accordance
with applicable laws.
Terms of Payment In case of Anchor Investors: Full Bid Amount shall be payable by the Anchor
Investors at the time of submission of their Bids (4)
In case of all other Bidders: Full Bid Amount shall be blocked by the SCSBs in the
bank account of the ASBA Bidders, or by the Sponsor Bank(s) through the UPI
Mechanism (other than Anchor Investors), that is specified in the ASBA Form
at the time of the submission of the ASBA Form.
* Assuming full subscription in the Offer
^ SEBI vide the SEBI ICDR Master Circular, has mandated that ASBA applications in public issues shall be
processed only after the application monies are blocked in the bank accounts of the investors. Accordingly, Stock
Exchanges shall, for all categories of investors viz. QIBs, NIBs and RIBs and also for all modes through which
the applications are processed, accept the ASBA applications in their electronic book building platform only with
a mandatory confirmation on the application monies blocked.
(1)Our Company, in consultation with the Book Running Lead Manager (“BRLM”) may allocate up to 60% of
the QIB Portion to Anchor Investors at the Anchor Investor Offer Price, on a discretionary basis subject to there
being (i) a maximum of two Anchor Investors, where allocation in the Anchor Investor Portion is up to
₹100,000,000 (ii) minimum of two and maximum of 15 Anchor Investors, where the allocation under the Anchor
Investor Portion is more than ₹ 100,000,000 but up to ₹2,500,000,000 under the Anchor Investor Portion,
subject to a minimum Allotment of ₹50,000,000 per Anchor Investor, and (iii) in case of allocation above
₹2,500,000,000 under the Anchor Investor Portion, a minimum of five such investors and a maximum of 15
Anchor Investors for allocation up to ₹2,500,000,000 and an additional 10 Anchor Investors for every additional
517₹2,500,000,000 or part thereof will be permitted, subject to minimum allotment of ₹50,000,000 per Anchor
Investor. An Anchor Investor will make a minimum Bid of such number of Equity Shares, that the Bid Amount is
at least ₹100,000,000. One-third of the Anchor Investor Portion will be reserved for domestic Mutual Funds,
subject to valid Bids being received at or above the price at which allocation is made to Anchor Investors, which
price shall be determined by the Company, in consultation with the BRLM.
(2) Subject to valid Bids being received at or above the Offer Price. This Offer is made through the Book Building
Process in accordance with the Rule 19(2)(b) of the SCRR and, Regulation 6(1) of the SEBI ICDR Regulations,
wherein not more than 50% of the Offer shall be available for allocation on a proportionate basis to QIBs. Such
number of Equity Shares representing 5% of the Net QIB Portion shall be available for allocation on a
proportionate basis to Mutual Funds only. The remainder of the Net QIB Portion shall be available for allocation
on a proportionate basis to QIB, Bidders (other than Anchor Investors) including Mutual Funds, subject to valid
Bids being received from them at or above the Offer Price. However, if the aggregate demand from Mutual Funds
is less than 5% of the Net QIB Portion, the balance Equity Shares available for allocation in the Mutual Fund
Portion will be added to the remaining Net QIB Portion for proportionate allocation to all QIBs. Further, , not
less than 15% of the Offer shall be available for allocation to Non-Institutional Investors of which (a) one-third
portion shall be reserved for applicants with application size of more than ₹ 200,000 and up to ₹1,000,000; and
(b) two- thirds portion shall be reserved for applicants with application size of more than ₹ 1,000,000, provided
that the unsubscribed portion in either of such sub-categories may be allocated to applicants in the other sub-
category of NIBs, subject to valid Bids being received at or above the Offer Price and not less than 35% of the
Offer shall be available for allocation to RIBs, in accordance with the SEBI ICDR Regulations, subject to valid
Bids being received at or above the Offer Price.
(3) In the event that a Bid is submitted in joint names, the relevant Bidders should ensure that the depository account
is also held in the same joint names and the names are in the same sequence in which they appear in the Bid cum
Application Form. The Bid cum Application Form should contain only the name of the First Bidder whose name
should also appear as the first holder of the beneficiary account held in joint names. The signature of only such
First Bidder would be required in the Bid cum Application Form and such First Bidder would be deemed to have
signed on behalf of the joint holders.
(4) Full Bid Amount shall be payable by the Anchor Investors at the time of submission of the Anchor Investor
Application Forms, provided that any difference between the Anchor Investors Allocation Price and the Anchor
Investor Offer Price, shall be payable by the Anchor Investor Pay-in Date as mentioned in the Confirmation of
Allotment Note. For details of terms of payment of applicable to Anchor Investors, kindly refer “Offer Procedure”
beginning on page 520.
(5) Bids by FPIs with certain structures as described under “Offer Procedure – Bids by FPIs” beginning on page
529 and having the same PAN may be collated and identified as a single Bid in the Bidding process. The Equity
Shares Allocated and Allotted to such successful Bidders (with the same PAN) may be proportionately
distributed.
Bidders will be required to confirm and will be deemed to have represented to our Company, the Underwriters,
their respective directors, officers, agents, affiliates and representatives that are eligible under applicable law,
rules, regulations, guidelines and approvals to acquire the Equity Shares.
Subject to valid Bids being received at or above the Offer Price, undersubscription, if any, in any category except
the QIB Portion, would be met with spill-over from the other categories or a combination of categories at the
discretion of our Company in consultation with the BRLM, and the Designated Stock Exchange, on proportionate
basis at the discretion of our Company in consultation with the BRLM, and the Designated Stock Exchange,
subject to applicable law. Under-subscription, if any, in the QIB Portion would not be allowed to be met with
spill-over from other categories or a combination of categories. For further details, kindly refer “Terms of the
Offer” beginning on page 506.
518In case of any revision in the Price Band, the Bid/ Offer Period shall be extended for at least three additional
Working Days after such revision of the Price Band, subject to the total Bid/ Offer Period not exceeding ten
Working Days. Any revision in the Price Band, and the revised Bid/ Offer Period, if applicable, shall be widely
disseminated by notification to the Stock Exchanges by issuing a public notice and also by indicating the change
on the website of the BRLM and at the terminals of the members of the Syndicate. In case of discrepancy in the
data entered in the electronic book vis-à-vis the data contained in the physical Bid cum Application Form for a
particular Bidder, the details as per the Bid file received from the Stock Exchanges may be taken as the final data
for the purpose of Allotment.
519OFFER PROCEDURE
All Bidders should read the General Information Document which highlights the key rules, processes and
procedures applicable to public Offers prepared and issued in accordance with the circular no.
SEBI/HO/CFD/DIL1/CIR/P/2020/37 dated March 17, 2020 and the UPI Circulars (the “General Information
Document”), which highlights the key rules, processes and procedures applicable to public issues in general in
accordance with the provisions of the Companies Act, 2013 the SCRA, the SCRR and the SEBI ICDR Regulations.
which is part of the abridged prospectus accompanying the Bid cum Application Form. The General Information
Document is available on the websites of the Stock Exchanges and the BRLM. Please refer to the relevant
provisions of the General Information Document, which are applicable to the Offer, especially in relation to the
process for Bids by UPI Bidders through the UPI Mechanism. The investors should note that the details and
process provided in the General Information Document should be read along with this section.
Additionally, all Bidders may refer to the General Information Document for information in relation to: (i)
category of investors eligible to participate in the Offer; (ii) maximum and minimum Bid size; (iii) price discovery
and allocation; (iv) payment instructions for ASBA Bidders; (v) issuance of CAN and Allotment in the Offer; (vi)
general instructions (limited to instructions for completing the Bid cum Application Form); (vii) submission of Bid
cum Application Form; (x) other instructions (limited to joint bids in cases of individual, multiple bids and
instances when an application would be rejected on technical grounds); applicable provisions of the Companies
Act, 2013 relating to punishment for fictitious applications;. (x) mode of making refunds; (xi) Designated Date;
(xii) interest in case of delay in Allotment or refund; and (xiii) disposal of applications.
SEBI through its circular no. SEBI/HO/CFD/DIL2/CIR/P/2018/138 dated November 01, 2018 read with its
circular no. SEBI/HO/CFD/DIL2/CIR/P/2019/50 dated April 03, 2019, has introduced an alternate payment
mechanism using Unified Payments Interface (UPI) and consequent reduction in timelines for listing in a phased
manner. UPI has been introduced in a phased manner as a payment mechanism in addition to ASBA for
applications by Retail Individual Bidders through intermediaries from January 01, 2019, The UPI Mechanism for
Retail Individual Bidders applying through Designated Intermediaries, in phase I, was effective along with the
prior process and existing timeline of T+6 days. (“UPI Phase I”). until June 30, 2019.
Subsequently, for applications by Retail Individual Bidders through Designated Intermediaries the process of
physical movement of forms from Designated Intermediaries to SCSBs for blocking of funds was discontinued,
and RIIs submitting their ASBA Forms through Designated Intermediaries (other than SCSBs) were allowed to
only the UPI Mechanism with a timeline of T+6 days pursuant to SEBI ICDR Master Circular (UPI Phase II).
public Offers opening on or after September 01, 2023, and (ii) mandatory on or after December 01, 2023 (“T+3
Circular”). Accordingly, the Offer will be undertaken pursuant to the processes and procedures under UPI Phase
III on a mandatory basis, subject to any circulars, clarification or notification offered by the SEBI pursuant to the
T+3 Notification.
In terms of Regulation 23(5) and Regulation 52 of SEBI ICDR Regulations, the timelines and processes mentioned
in SEBI RTA Master Circular, shall continue to form part of the agreements being signed between the
intermediaries involved in the public issuance process and book running lead manager(s) shall continue to
coordinate with intermediaries involved in the said process.
In case of any delay in unblocking of amounts in the ASBA Accounts (including amounts blocked through the UPI
Mechanism) exceeding two Working Days from the Bid/ Offer Closing Date, the Bidder shall be compensated in
accordance with applicable law. The BRLM shall, in their sole discretion, identify and fix the liability on such
intermediary or entity responsible for such delay in unblocking. Further, Investors shall be entitled to
compensation in the manner specified in the SEBI ICDR Master Circular, in case of delays in resolving investor
grievances in relation to blocking/unblocking of funds.
Bidders are advised to make their independent investigations and ensure that their Bids are submitted in
accordance with Applicable Laws and did not exceed the investment limits or maximum number of the Equity
Shares that can be held by them under applicable law or as specified in this Draft Red Herring Prospectus, the
520Red Herring Prospectus and the Prospectus. Further, our Company, the Promoter Selling Shareholder and the
Syndicate are not liable for any adverse occurrence’s consequent to the implementation of the UPI Mechanism
for application in this Offer.
Pursuant to circular no. NSDL/CIR/II/28/2023 dated August 08, 2023, issued by NSDL and circular no.
CDSL/OPS/RTA/POLCY/2023/161 dated August 08, 2023, issued by CDSL, our Company may request the
Depositories to suspend/ freeze the ISIN in the depository system till the listing/ trading effective date. Pursuant
to the aforementioned circulars, our Company may request the Depositories to suspend/ freeze the ISIN in the
depository system from or around the date of the Red Herring Prospectus till the listing and commencement of
trading of our Equity Shares. The shareholders who intend to transfer the pre-offer shares may request our
Company and/ or the Registrar for facilitating the transfer of shares under suspended/ frozen ISIN by submitting
requisite documents to our Company and/ or the Registrar. Our Company and/ or the Registrar would then send
the requisite documents along with applicable stamp duty and corporate action charges to the respective
depository to execute the transfer of shares under suspended ISIN through corporate action. The transfer request
shall be accepted by the Depositories from our Company till one day prior to Bid/ Offer Opening Date.
Book Building Procedure
The Offer is being made in terms of Rule 19(2)(b) of the SCRR, read with Regulation 31 of the SEBI ICDR
Regulations. The Offer is being made through the Book Building Process, in compliance with Regulation 6(1) of
the SEBI ICDR Regulations wherein not more than 50% of the Offer shall be available for allocation on a
proportionate basis to Qualified Institutional Buyers , provided that our Company, in consultation with the BRLM,
may allocate up to 60% of the QIB Portion to Anchor Investors and the basis of such allocation will be on a
discretionary basis by our Company in consultation with the BRLM, of which one-third shall be reserved for the
domestic Mutual Funds, subject to valid Bids being received from the domestic Mutual Fund sat or above Anchor
Investor Allocation Price. in accordance with the SEBI ICDR Regulations. In the event of under-subscription or
non-allocation in the Anchor Investor Portion, the balance Equity Shares shall be added to the Net QIB Portion.
(other than the Anchor Investor Portion). Further, 5% of the Net QIB Portion shall be available for allocation on
a proportionate basis only to Mutual Funds subject to valid Bids being received at or above the Offer Price, and
the remainder of the Net QIB Portion shall be available for allocation on a proportionate basis to all QIBs (other
than Anchor Investors), including Mutual Funds, subject to valid Bids being received at or above the Offer Price.
However, if the aggregate demand from Mutual Funds is less than 5% of the Net QIB Portion, the balance Equity
Shares available for allocation in the Mutual Fund Portion will be added to the remaining QIB Portion for
proportionate allocation to QIBs. Further, not less than 15% of the Offer shall be available for allocation to NIIs
(out of which: (a) one-third of the portion available to NIIs will be for allocation to Bidders with a Bid size of
more than ₹ 200,000 and up to ₹ 1,000,000 ; and two-thirds of the Non-Institutional Category will be available
for allocation to Bidders with Bid size of more than ₹ 1,000,000 and under-subscription in either of these two
sub- categories of Non-Institutional Category may be allocated to Bidders in the other sub-category of Non-
Institutional Category). Further, not less than 35% of the Offer shall be available for allocation to RIIs, in
accordance with the SEBI ICDR Regulations, subject to valid Bids being received from them at or above the Offer
Price.
Subject to valid Bids being received at or above the Offer Price, undersubscription, if any, in any category, except
in the QIB Portion, would be allowed to be met with spill-over from any other category or a combination of
categories, at the discretion of our Company in consultation with the BRLM. and the Designated Stock Exchange
subject to applicable laws. However, under-subscription, if any, in the QIB Portion, will not be allowed to be met
with spill-over from other categories or a combination of categories.
Investors must ensure that their Permanent Account Number is linked with Aadhaar and are in compliance with
the notification issued by Central Board of Direct Taxes on February 13, 2020, and press release dated June 25,
2021 and September 17, 2021, CBDT circular no.7 of 2022, dated March 30, 2022, read with press release dated
March 28, 2023, read with subsequent circulars issued in relation thereto.
521The Equity Shares, on Allotment, shall be traded only in the dematerialised segment of the Stock Exchanges.
Bidders should note that the Equity Shares will be Allotted to all successful Bidders only in dematerialised
form. The Bid cum Application Forms which do not have the details of the Bidders’ depository account,
including DPID Client ID PAN and UPI ID (in case of UPI Bidders using the UPI Mechanism), as applicable,
shall be treated as incomplete and will be rejected. Bidders will not have the option of being Allotted Equity
Shares in physical form. However, they may get the Equity Shares rematerialized subsequent to the
Allotment of the Equity Shares in the Offer, subject to applicable laws.
Phased implementation of UPI
SEBI has issued UPI Circulars in relation to streamlining the process of public Offer, inter alia of equity shares.
Pursuant to the SEBI circular bearing number SEBI/HO/CFD/DIL2/CIR/P/2018/138 dated November 01, 2018,
SEBI circular bearing number SEBI/HO/CFD/DIL2/CIR/P/2019/50 dated April 3, 2019, SEBI circular bearing
number SEBI/HO/CFD/DIL2/CIR/P/2019/76 dated June 28, 2019, SEBI circular bearing number
SEBI/HO/CFD/DIL2/CIR/P/2019/85 dated July 26, 2019, SEBI circular bearing number
SEBI/HO/CFD/DIL2/CIR/P/2020/50 dated March 30, 2020 (“Previous UPI Circulars”) Pursuant to the UPI
Circulars, the UPI Mechanism has been introduced in a phased manner as a payment mechanism (in addition to
mechanism of blocking funds in the account maintained with SCSBs under ASBA) for applications by UPI
Bidders through Designated Intermediaries with the objective to reduce the time duration from public Offer
closure to listing from six Working Days to up to three Working Days. The SEBI ICDR Master Circular has
reduced the time period for listing of equity shares pursuant to a public issue from six Working Days to three
Working Days. The timeline was applicable on a voluntary basis for public issues opening on or after September
1, 2023, and has been made applicable on a mandatory basis for public issues opening on or after December 1,
2023. Considering the time required for making necessary changes to the systems and to ensure complete and
smooth transition to the UPI payment mechanism, the UPI Circulars have introduced the UPI Mechanism in three
phases in the following manner:
Phase I: This phase was applicable from January 01, 2019, until March 31, 2019, or the floating of five main
board public Offers, whichever was later. Subsequently, the timeline for implementation of Phase I was extended
till June 30, 2019. Under this phase, an RII had the option to submit the ASBA Form with any of the Designated
Intermediary and use his / her UPI ID for the purpose of blocking of funds. The time duration from public Offer
closure to listing to be six Working Days.
Phase II: This phase became applicable from July 01, 2019. and was to initially continue for a period of three
months or floating of five main board public issues, whichever was later. The SEBI ICDR Master Circular
extended the timeline for implementation of UPI Phase II until further notice. Under this phase, submission of the
ASBA Form by RIIs through Designated Intermediaries (other than SCSBs) to SCSBs for blocking of funds was
discontinued and replaced by the UPI payment Mechanism. However, the time duration from public Offer closure
to listing continued to be six Working Days during this phase.
Phase III: This phase had become applicable on a voluntary basis for all Offers opening on or after September
01, 2023; and has become applicable on a mandatory on or after December 01, 2023, vide the SEBI ICDR Master
Circular (“T+3 Notification”). In this phase, the time duration from public issue closure to listing has been reduced
to three Working Days. The Offer shall be undertaken pursuant to the processes and procedures as notified in the
T+3 Notification as applicable, subject to any circulars, clarification or notification Offered by SEBI from time to
time, including any circular, clarification or notification which may be Offered by SEBI.
The processing fees for applications made by UPI Bidders may be released to the SCSBs only after such banks
provide a written confirmation, in compliance with the SEBI RTA Master Circular in a format as prescribed by
SEBI, from time to time, and such payment of processing fees to the SCSBs shall be made in compliance with
circulars prescribed by SEBI and applicable law.
522All SCSBs offering facility of making application in public issues shall also provide facility to make application
using UPI. Our Company will be required to appoint one of the SCSBs as the Sponsor Bank(s) to act as a conduit
between the Stock Exchanges and NPCI in order to facilitate collection of requests and / or payment instructions
of the UPI Bidders.
Pursuant to the UPI Circulars, SEBI has set out specific requirements for redressal of investor grievances for
applications that have been made through the UPI Mechanism.
The requirements of the UPI Circular include, appointment of a nodal officer by the SCSB and submission of their
details to SEBI, the requirement for SCSBs to send short message service (“SMS”) alerts for the blocking and
unblocking of UPI mandates, the requirement for the Registrar to submit details of cancelled, withdrawn or deleted
applications, and the requirement for the bank accounts of unsuccessful Bidders to be unblocked no later than one
Working Day from the date on which the Basis of Allotment is finalised. Failure to unblock the accounts within
the timeline would result in the SCSBs being penalised under the relevant securities law.
Further, in terms of the UPI Circulars, the payment of processing fees to the SCSBs shall be undertaken pursuant
to an application made by the SCSBs to the Book Running Lead Manager, and such application shall be made only
after: (i) unblocking of application amounts for each application received by the SCSB has been fully completed,
and (ii) applicable compensation relating to investor complaints has been paid by the SCSB.
For further details, refer to the General Information Document available on the Stock Exchanges and the BRLM.
Further, pursuant to ICDR Master Circular, all individual investors applying in public Offers where the application
amount is up to ₹ 0.50 million shall use the UPI Mechanism and shall provide their UPI ID in the Bid cum
Application Form submitted with any of the entities mentioned herein below:
i. a syndicate member;
ii. a stockbroker registered with a recognised stock exchange (and whose name is mentioned on the website
of the stock exchange as eligible for this activity);
iii. a depository participant (whose name is mentioned on the website of the stock exchange as eligible for
this activity); or
iv. a registrar to an Offer and share transfer agent (whose name is mentioned on the website of the stock
exchange as eligible for this activity).
Additionally, if there is any delay in the redressal of investors’ complaints, the relevant SCSB as well as the post
Offer BRLM, will be required to compensate the concerned investor.
Electronic registration of Bids
(i) The Designated Intermediary may register the Bids using the online facilities of the Stock Exchanges. The
Designated Intermediaries can also set up facilities for off-line electronic registration of Bids, subject to the
condition that they may subsequently upload the off-line data file into the online facilities for Book Building
on a regular basis before the closure of the Offer, subject to applicable laws.
(ii) On the Bid/Offer Closing Date, the Designated Intermediaries may upload the Bids till such time as may be
permitted by the Stock Exchanges and as disclosed in the Red Herring Prospectus.
(iii) Only Bids that are uploaded on the Stock Exchanges Platform are considered for allocation/Allotment. The
Designated Intermediaries are given till 5:00 pm on the Bid/Offer Closing Date to modify select fields
uploaded in the Stock Exchange Platform during the Bid/Offer Period after which the Stock Exchange(s)
send the bid information to the Registrar to the Offer for further processing.
523Bid cum Application Form
Copies of the Bid cum Application Form (other than for Anchor Investors) and the abridged prospectus will be
available with the Designated Intermediaries at the Bidding Centres and our Registered Office. An electronic copy
of the Bid cum Application Form will also be available for download on the websites of the BSE Limited (“BSE”)
(www.bseindia.com) and the National Stock Exchange of India Limited (“NSE”) (www.nseindia.com) at least
one day prior to the Bid/Offer Opening Date.
Copies of the Anchor Investor Application Form will be available at the offices of the Book Running Lead
Manager.
All Bidders (other than Anchor Investors) shall mandatorily participate in the Offer only through the ASBA
process. UPI Bidders shall Bid in the Offer through the UPI Mechanism UPI Bidders bidding using the UPI
Mechanism must provide the UPI ID in the relevant space provided in the Bid cum Application Form and the Bid
cum Application Form that does not contain the UPI ID are liable to be rejected.
ASBA Bidders (including UPI Bidders using UPI Mechanism, as applicable) must provide either: (i) the bank
account details and authorisation to block funds in their respective ASBA Accounts or (ii) the UPI ID, as
applicable, in the relevant space provided in the ASBA Form. The ASBA Form that does not contain such details
are liable to be rejected. Applications made by the UPI Bidders using third-party bank account or using third-
party linked bank account UPI ID are liable for rejection. Anchor Investors are not permitted to participate in the
Offer through the ASBA process.
UPI Bidders bidding using the UPI Mechanism may also apply through the SCSBs and mobile applications using
the UPI handles as provided on the website of SEBI.
ASBA Bidders shall ensure that the Bids are made on ASBA Forms bearing the stamp of the relevant Designated
Intermediary submitted at the relevant Bidding Centers only (except in case of electronic ASBA Forms) and the
ASBA Forms not bearing such specified stamp are liable to be rejected. UPI Bidders may submit their ASBA
Forms, including details of their UPI IDs, to the Syndicate, sub-syndicate members, Registered Brokers, RTA or
CDPs. RIIs authorizing an SCSB to block the Bid Amount in the ASBA Account may submit their ASBA Forms
with the SCSB. (except UPI Bidders). The ASBA Bidders, including UPI Bidders, shall ensure that they have
sufficient credit balance such that an amount equivalent to full Bid Amount can be blocked therein at the time of
submitting the Bid. As the application made by an ASBA Bidder shall only be processed after the Bid amount is
blocked in the ASBA account of the investor’s bank account, pursuant to SEBI ICDR Master Circular.
For all initial public offerings opening on or after September 01, 2022, as specified in SEBI pursuant to the SEBI
ICDR Master Circular, the ASBA applications in public issues shall be processed only after the application monies
are blocked in the investor’s bank accounts. Stock Exchanges shall accept the ASBA applications in their
electronic book-building platform only with a mandatory confirmation on the application monies blocked. /This
circular shall be applicable for all categories of investors, viz. Retail, QIB, NII, and other reserved categories,
and also for all modes through which the applications are processed. Since the Offer is made under Phase III of
the UPI Circulars, ASBA Bidders may submit the ASBA Form in the manner below:
(i) RIIs and NIIs (other than NIIs using UPI Mechanism) may submit their ASBA Forms with SCSBs
(physically or online, as applicable), or online using the facility of linked online trading, demat and bank
account (3 in 1 type accounts), provided by certain brokers.
(ii) UPI Bidders may submit their ASBA Forms with the Syndicate, sub-syndicate members, Registered Brokers,
RTA or CDPs or online using the facility of linked online trading, demat and bank account (3 in 1 type
accounts), provided by certain brokers.
524(iii) QIBs and NIIs (not using the UPI Mechanism) may submit their ASBA Forms with SCSBs, Syndicate, sub-
syndicate members, Registered Brokers, RTA or CDPs.
(iv) ASBA Bidders are also required to ensure that the ASBA Account has sufficient credit balance as an amount
equivalent to the full Bid Amount, which can be blocked by the SCSB or the Sponsor Bank(s), as applicable,
at the time of submitting the Bid. To ensure timely information to investors, SCSBs are required to send
SMS alerts to investors informing them about Bid Amounts blocked/unblocked including details as
prescribed in Annexure II of SEBI ICDR Master Circular.
The prescribed color of the Bid cum Application Form for the various categories is as follows:
Colour of Bid cum
Category
Application Form*
Resident Indians including resident QIBs, Non-Institutional Bidders, Retail
[●]
Individual Bidders and Eligible NRIs applying on a non-repatriation basis(1)
Non-Residents including FPIs, Eligible NRIs applying on a repatriation basis,
[●]
FVCIs and registered bilateral and multilateral institutions(1)
Anchor Investors(2) [●]
* Excluding the electronic Bid cum Application Form
(1)Electronic Bid cum Application forms and the abridged prospectus will also be available for download
on the websites of the Stock Exchanges www.nseindia.com and www.bseindia.com).
(2)Bid cum Application Forms for Anchor Investors will be made available at the offices of the BRLM.
In case of ASBA Forms, the relevant Designated Intermediaries shall upload the relevant bid details in the electronic
bidding system of the Stock Exchanges and the Stock Exchanges shall accept the ASBA applications in their
electronic bidding system only with a mandatory confirmation on the application monies blocked. For RIIs using
the UPI Mechanism, the Stock Exchanges shall share the Bid details (including UPI ID) with the Sponsor Banks
on a continuous basis to enable the Sponsor Banks to initiate UPI Mandate Request to UPI Bidders for blocking of
funds.
In case of ASBA Forms, the relevant Designated Intermediaries shall capture and upload the relevant bid details
(including UPI ID in case of ASBA Forms under the UPI Mechanism) in the electronic bidding system of the
Stock Exchanges.
The Sponsor Banks will undertake a reconciliation of Bid responses received from Stock Exchanges and sent to
NPCI and will also ensure that all the responses received from NPCI are sent to the Stock Exchanges platform
with detailed error code and description, if any. Further, the Sponsor Banks will undertake reconciliation of all Bid
requests and responses throughout their lifecycle on a daily basis and share reports with the BRLM. In the format
and within the timelines as specified under the UPI Circulars. Sponsor Banks and Offerer banks shall download
UPI settlement files and raw data files from the NPCI portal after every settlement cycle and do a three-way
reconciliation with UPI switch data, Core Banking System (“CBS”) data and UPI raw data. NPCI is to coordinate
with Offer banks and Sponsor Banks on a continuous basis.
For ASBA Forms (other than UPI Bidders using UPI Mechanism) Designated Intermediaries (other than SCSBs)
shall submit/deliver the ASBA Forms to the respective SCSB where the Bidder has an ASBA bank account and
shall not submit it to any non-SCSB bank or any Escrow Collection Bank(s). Stock Exchanges shall validate the
electronic bids with the records of the CDP for DP ID / Client ID and PAN, on a real time basis and bring
inconsistencies to the notice of the relevant Designated Intermediaries, for rectification and re-submission within
the time specified by Stock Exchanges. Stock Exchanges shall allow modification of either DP ID / Client ID or
PAN ID, bank code and location code in the Bid details already uploaded.
525For UPI Bidders using UPI Mechanism, the Stock Exchanges shall share the Bid details (including UPI ID) with
the Sponsor Banks on a continuous basis through API integration to enable the Sponsor Banks to initiate UPI
Mandate Request to RIIs for blocking of funds. The Sponsor Banks shall initiate request for blocking of funds
through NPCI to RIIs, who shall accept the UPI mandate request for blocking of funds on their respective mobile
applications associated with UPI ID linked bank account In accordance with BSE Circular No: 20220803-40 and
NSE Circular No: 25/2022, each dated August 3, 2022, for all pending UPI Mandate Requests, the Sponsor Banks
shall initiate requests for blocking of funds in the ASBA Accounts of relevant Bidders with a confirmation cut-
off time of 5.00 pm on the Bid/Offer Closing Date (“Cut- Off Time”). Accordingly, UPI Bidders Bidding using
the UPI Mechanism should accept UPI mandate requests for blocking of funds prior to the Cut-Off Time, and all
pending UPI mandate requests at the Cut-Off Time shall lapse. To ensure timely information to investors, SCSBs
shall send SMS alerts as specified in the SEBI. ICDR Master Circular, as amended. The NPCI shall maintain an
audit trail for every bid entered in the Stock Exchanges bidding platform, and the liability to compensate UPI
Bidders (using the UPI Mechanism) in case of failed transactions shall be with the concerned entity (i.e. the
Sponsor Banks, NPCI or the bankers to an issue) at whose end the lifecycle of the transaction has come to a halt.
The NPCI shall share the audit trail of all disputed transactions/ investor complaints to the Sponsor Banks and the
bankers to an Offer.
The Sponsor Banks and the issuer banks shall provide the audit trail to the BRLM for analysing the same and
fixing liability. For ensuring timely information to investors, SCSBs shall send SMS alerts as specified in circulars
prescribed by SEBI/from time to time.
The processing fees for applications made by the UPI Bidders using the UPI Mechanism may be released to the
SCSBs only after such SCSBs provide a written confirmation in compliance with the SEBI IRTA Master Circular,
in a format prescribed by SEBI or applicable law.
Pursuant to NSE circular dated August 03, 2022, the following is applicable to all initial public offers opening on
or after September 01, 2022:
(i) Cut-off time for acceptance of UPI Mandate shall be up to 5:00 pm on the initial public offer closure date and
the existing process of UPI bid entry by syndicate members, registrars to the offer and depository participants
shall continue till further notice.
(ii) There shall be no T+1 mismatch modification session for PAN-DP mismatch and bank/ location code on T+1
day for already uploaded bids. The dedicated window provided for mismatch modification on T+1 day shall
be discontinued.
(iii) Bid entry and modification/ cancellation (if any) shall be allowed in parallel to the regular bidding period up
to 5.00 pm. on the initial public offer closure day;
(iv) Exchanges shall display bid details of only successful ASBA blocked applications, i.e. applications with the
latest status as RC 100–Block Request Accepted by Investor Client.
The Sponsor Banks shall host a web portal for intermediaries (closed user group) from the date of Bid/Offer
Opening Date till the date of listing of the Equity Shares with details of statistics of mandate blocks/unblocks
performance of apps and UPI handles, downtime/network latency (if any) across intermediaries, and any such
processes having an impact/bearing on the Offer Bidding process.
526The Equity Shares have not been and will not be registered, listed or otherwise qualified in any other
jurisdiction outside India and may not be offered or sold, and Bids may not be made by persons in any such
jurisdiction, except in compliance with the applicable laws of such jurisdiction.
Participation by the Promoters and Promoter Group of our company, BRLM and the Syndicate Members
and their associates and affiliates, and the persons related thereto.
The Book Running Lead Manager and the Syndicate Members shall not be allowed to purchase the Equity Shares
in this Offer in any manner, except towards fulfilling their respective underwriting obligations. However, the
respective associates and affiliates of the BRLM. and the Syndicate Members may bid for Equity Shares in the
Offer, either in the QIB Portion or in the Non- Institutional Category as may be applicable to such Bidders, and
such subscription may be on their own account or on behalf of their clients. All categories of investors, including
associates or affiliates of the BRLM. and Syndicate Members shall be treated equally for the purpose of allocation
to be made on a proportionate basis.
Except as stated below, neither the BRLM nor any persons related to the BRLM can apply in the Offer under the
Anchor Investor Portion:
(i) mutual funds sponsored by entities which are associate of the BRLM;
(ii) insurance companies promoted by entities which are associate of the BRLM;
(iii) Alternate Investment Funds, sponsored by the entities which are associate of the BRLM;
(iv) Foreign Portfolio Investors other than individuals, corporate bodies and family offices sponsored by the
entities which are associate of the BRLM. or
(v) pension funds (registered with the Pension Fund Regulatory and Development Authority established under
sub-section (1) of section 3 of the Pension Fund Regulatory and Development Authority Act, 2013) sponsored
by entities which are associate of the BRLM;
Except to the extent of the Offered Shares, our Promoters and the members of our Promoter Group will not
participate in the Offer. Further, persons related to our Promoters and Promoter Group shall not apply in the Offer
under the Anchor Investor Portion.
For the purposes of the above, a QIB who has the following rights shall be deemed to be a person related to our
Promoters or Promoter Group:
1. rights under a shareholders’ agreement or voting agreement entered into with our Promoters or Promoter Group;
2. veto rights; or
3. right to appoint any nominee director on the Board.
Further, an Anchor Investor shall be deemed to be an “associate of the BRLM” if:
(i) either of them controls, directly or indirectly through its subsidiary or holding company, not less than 15% of
the voting rights in the other; or
(ii) either of them, directly or indirectly, by itself or in combination with other persons, exercises control over
the other; or
(iii) there is a common director, excluding nominee director, amongst the Anchor Investors and the Book Running
Lead Manager.
Bids by Mutual Funds
With respect to Bids by Mutual Funds, a certified copy of their SEBI registration certificate must be lodged along
with the Bid cum Application Form. Failing this, our Company, in consultation with the BRLM reserve subject to
applicable laws.
527Bids made by asset management companies or custodians of Mutual Funds shall specifically state the names of
the concerned schemes for which such Bids are made.
In case of a Mutual Fund, a separate Bid can be made in respect of each scheme of the Mutual Fund registered with
the SEBI and such Bids in respect of more than one scheme of a Mutual Fund will not be treated as multiple Bids,
provided that the Bids clearly indicate the scheme concerned for which the Bid has been made.
No Mutual Fund scheme shall invest more than 10% of its net asset value (“NAV”) in equity shares or equity-
related instruments of any single company, provided that the limit of 10% shall not be applicable for investments
in case of index funds, sector or industry schemes. No Mutual Fund under all its schemes should own more than
10% of any company’s paid-up share capital carrying voting rights.
Bids by Eligible NRIs
Eligible NRIs may obtain copies of Bid cum Application Form from the Designated Intermediaries. Eligible NRI
Bidders bidding on a repatriation basis by using the Non-Resident forms should authorise their SCSB (if they are
Bidding directly through the SCSB or confirm or accept the UPI Mandate Request (in case of UPI Bidders Bidding
through the UPI Mechanism) to block their Non-Resident External (“NRE”) accounts (including UPI ID, if
activated), or foreign currency non-resident accounts (“FCNR Accounts”), and eligible NRI Bidders bidding on
a non-repatriation basis by using resident forms should authorise their respective SCSBs (if they are Bidding
directly through SCSB) or confirm or accept the UPI Mandate Request (in case of UPI Bidders Bidding through
the UPI Mechanism) to block their Non-Resident Ordinary (“(NRO)”) accounts for the full Bid Amount, at the
time of the submission of the Bid cum Application Form. NRIs applying in the Offer through the UPI Mechanism
are advised to enquire with the relevant bank, whether their account is UPI linked, prior to submitting a Bid cum
Application Form.
Eligible NRIs Bidding on non-repatriation basis are advised to use the Bid cum Application Form for residents
([●] in colour). Eligible NRIs Bidding on a repatriation basis are advised to use the Bid cum Application Form
meant for Non- Residents ([●] in colour).
Participation of Eligible NRIs in the Offer shall be subject to the FEMA NDI Rules. Only Bids accompanied by
payment in Indian rupees or fully convertible foreign exchange will be considered for allotment
In accordance with the FEMA NDI Rules, the total holding by any individual NRI, on a -repatriation basis, shall
not exceed 5% of the total paid-up Equity Share capital on a fully diluted basis or shall not exceed 5% of the paid-
up value of each series of debentures or preference shares or share warrants issued by an Indian company and the
total holdings of all NRIs and Overseas Citizen of India (“OCI”) put together shall not exceed 10% of the total
paid-up Equity Share capital on a fully diluted basis or shall not exceed 10% of the paid-up value of each series
of debentures or preference shares or share warrant. Provided that the aggregate ceiling of 10% may be raised to
24% if a special resolution to that effect is passed by the general body of the Indian company.
NRIs will be permitted to apply in the Offer through Channel I or Channel II (as specified in the UPI Circulars).
Further, subject to applicable law, NRIs may use Channel IV (as specified in the UPI Circulars) to apply in the
Offer, provided the UPI facility is enabled for their NRE/ NRO accounts.
For details of restrictions on investment by NRIs, kindly refer “Restrictions on Foreign Ownership of Indian
Securities” beginning on page 546.
Participation of Eligible NRIs in the Offer shall be subject to the FEMA NDI Rules.
528Bids by HUFs
Bids by HUFs should be made in the individual name of the Karta. The Bidder should specify that the Bid is being
made in the name of the HUF in the Bid cum Application Form/ as follows: ‘Name of sole or first bidder: XYZ
Hindu Undivided Family applying through XYZ, where XYZ is the name of the Karta’’. Bids by HUFs maybe
considered at par with Bids from individuals.
Bids by FPIs
In terms of the SEBI FPI Regulations, the offer of Equity Shares to a single FPI or an investor group (which means
the same multiple entities registered, FPIs and having common ownership directly or indirectly of more than 50%
or common control) must be below 10% of our post-Offer Equity Share capital. Further, in terms of the FEMA
NDI Rules, the total holding by each FPI, of an investor group, shall be below 10% of the total paid-up Equity
Share capital of our Company on a fully diluted basis and the aggregate limit for FPI investments shall be the
sectoral caps applicable to our Company, which is 100% of the total paid-up Equity Share capital of our Company
on a fully diluted basis. In case the total holding of an FPI or investor group increases beyond 10% of the total
paid-up Equity Share capital of our Company, on a fully diluted basis, the total investment made by the FPI or
investor group will be re-classified as FDI subject to the conditions as specified by SEBI and the RBI in this regard
and our Company and the investor will be required to comply with applicable reporting requirements. Further, the
total holdings of all FPIs put together, with effect from April 1, 2020, can be up to the sectoral cap applicable to
the sector in which our Company operates (i.e., up to 100%). In terms of the FEMA NDI Rules, for calculating
the aggregate holding of FPIs in a company, holding of all registered FPIs shall be included. Bids by FPIs which
utilise the multi-investment manager structure, submitted with the same PAN but with different beneficiary
account numbers, Client IDs and DP IDs may not be treated as multiple Bids.
In case of Bids made by FPIs, a certified copy of the certificate of registration Offered under the SEBI FPI
Regulations is required to be attached to the Bid cum Application Form, failing which our Company in
consultation with BRLM, reserves the right to reject any Bid without assigning any reason applicable laws.
FPIs are permitted to participate in the Offer subject to compliance with conditions and restrictions which may be
specified by the Government from time to time. In terms of the FEMA NDI Rules, for calculating the aggregate
holding of FPIs in a company, holding of all registered FPIs shall be included.
To ensure compliance with the above requirement, SEBI, pursuant to its circular dated July 13, 2018, has directed
that at the time of finalisation of the Basis of Allotment, the Registrar shall: (i) use the PAN Offered by the Income
Tax Department of India for checking compliance for a single FPI; and (ii) obtain validation from Depositories
for the FPIs who have invested in the Offer to ensure there is no breach of the investment limit, within the timelines
for Offer procedure, as prescribed by SEBI from time to time.
Subject to compliance with all applicable Indian laws, rules, regulations, guidelines and approvals in terms of
Regulation 21 of the SEBI FPI Regulations, an FPI may Offer, subscribe to, or otherwise deal in offshore derivative
instruments, (as defined under the SEBI FPI Regulations as any instrument, by whatever name called, which is
issued overseas by a FPI against securities held by it in India, as its underlying) directly or indirectly, only in the
event (i) such offshore derivative instruments are issued only by persons registered as category I FPIs; (ii) such
offshore derivative instruments are issued only to persons eligible for registration as category I FPIs; (iii) such
offshore derivative instruments are issued after compliance with ‘know your client’ norms; and (iv) such other
conditions: as may be specified by SEBI from time to time.
In case the total holding of an FPI increases beyond 10% of the total paid-up Equity Share capital, on a fully
diluted basis or 10% or more of the paid-up value of any series of debentures or preference shares or share warrants
issued that may be issued by our Company, the total investment made by the FPI will be re-classified as FDI
subject to the conditions as specified by SEBI and the RBI in this regard and our Company and the investor will
529be required to comply with applicable reporting requirements.
An FPI issuing offshore derivative instruments is also required to ensure that any transfer of offshore derivative
instruments Offered by or on behalf of it, subject to, inter alia the following conditions:
(i) such offshore derivative instruments are transferred to persons subject to fulfilment of SEBI FPI
Regulations; and
(ii) prior consent of the FPI is obtained for such transfer, except when the persons to whom the offshore
derivative instruments are to be transferred are pre-approved by the FPI.
The FPIs who wish to participate in the Offer are advised to use the Bid cum Application Form for non-residents.
Bids received from FPIs, bearing the same PAN shall be treated as multiple Bids and are liable to be rejected,
except for Bids from FPIs that utilize the multiple investment manager structure in accordance with SEBI master
circular bearing reference number SEBI/HO/AFD-2/CIR/P/2022/175 dated December 19, 2022, provided such
Bids have been made with different beneficiary account numbers, Client IDs and DP IDs;
Accordingly, it should be noted that multiple Bids received from FPIs, who do not utilize the multiple investment
managers (“MIM”) Structure, and bear the same PAN, are liable to be rejected. In order to ensure valid Bids, FPIs
making multiple Bids using the same PAN, and with different beneficiary account numbers, Client IDs and DP
IDs, are required to provide a confirmation in the Bid cum Application Forms that the relevant FPIs making
multiple Bids utilize the MIM Structure. In the absence of such confirmation from the relevant FPIs, such multiple
Bids shall be rejected.
Further, in the following cases, Bids by FPIs shall not be treated as multiple Bids
(i) FPIs that utilise the MIM structure, indicating the name of their respective investment managers in such
confirmation
(ii) Offshore derivative instruments which have obtained separate FPI registration for ODI and proprietary
derivative investments;
(iii) Sub-funds or separate class of investors with segregated portfolio who obtain separate FPI registration;
(iv) FPI registrations granted at investment strategy level/sub-fund level where a collective investment scheme
or fund has multiple investment strategies/sub-funds with identifiable differences and managed by a single
investment manager.
(v) Multiple branches in different jurisdictions of foreign bank registered as FPIs;
(vi) Government and Government-related investors registered as Category 1 FPIs; and
(vii) Entities registered as collective investment scheme having multiple share classes.
Participation of FPIs in the Offer shall be subject to the FEMA NDI Rules.
The Bids belonging to any of the above mentioned seven structures and having same PAN may be collated and
identified as a single Bid in the Bidding process. The Equity Shares allotted in the Bid may be proportionately
distributed to the Applicant FPIs (with same PAN).In order to ensure valid Bids, FPIs making multiple Bids using
the same PAN, and with different beneficiary account numbers, Client IDs and DP IDs, are required to provide a
confirmation along with each of their Bid cum Application Forms that the relevant FPIs making multiple Bids
utilize any of the above-mentioned structures and indicate the name of their respective investment managers in such
530confirmation. In the absence of such compliance from the relevant FPIs, such multiple Bids shall be rejected.
Please note that in terms of the General Information Document, the maximum Bid by any Bidder including QIB
Bidder should not exceed the investment limits prescribed for them under applicable laws. Further, MIM Bids by
an FPI Bidder utilising the MIM Structure shall be aggregated for determining the permissible maximum Bid.
Further, please note that as disclosed in this Draft Red Herring Prospectus read with the General Information
Document, Bid Cum Application Forms are liable to be rejected in the event that the Bid in the Bid cum
Application Form “exceeds the Offer size and/or investment limit or maximum number of the Equity Shares that
can be held under applicable laws or regulations or maximum amount permissible under applicable laws or
regulations, or under the terms of the Red Herring Prospectus.”
For example, an FPI must ensure that any Bid by a single FPI and/ or an investor group (which means the same
multiple entities having common ownership directly or indirectly of more than 50% or common control)
(collective, the “FPI Group”) shall be below 10% of the total paid-up Equity Share capital of our Company on a
fully diluted basis. Any Bids by FPIs and/ or the FPI Group (including but not limited to (a) FPIs Bidding through
the MIM Structure; or (b) FPIs with separate registrations for offshore derivative instruments and proprietary
derivative instruments) for 10% or more of our total paid-up post Offer Equity Share capital shall be liable to be
rejected.
Bids by SEBI registered Alternative Investment Funds (“AIF”), Venture Capital Funds (“VCF”) and
Foreign Venture Capital Investors (“FVCI”)
SEBI VCF Regulations, as amended, inter alia prescribe the investment restrictions on VCFs, registered with SEBI.
SEBI AIF Regulations prescribe, amongst others, the investment restrictions on AIFs. SEBI FVCI Regulations
prescribe the investment restrictions on FVCIs. Post the repeal of the SEBI VCF Regulations, the venture capital
funds which have not re-registered as an AIF under the SEBI AIF Regulations shall continue to be regulated by
the SEBI VCF Regulations until the existing fund or scheme managed by the fund is wound up and such fund
shall not launch any new scheme after the notification of the SEBI AIF Regulations.
Accordingly, the holding in any company by any individual VCF or FVCIs registered with SEBI should not
exceed 25% of the corpus of the VCF or FVCI. Further, VCFs and FVCIs can invest only up to 33.33% of the
investible funds in various prescribed instruments, including in public offering.
Category I and II AIFs cannot invest more than 25% of the investible funds in one investee company directly or
through investment in the units of other AIFs. A Category III AIF cannot invest more than 10% of the investible
funds in one investee company directly or through investment in the units of other AIFs. AIFs which are authorised
under the fund documents to invest in units of AIFs are prohibited from offering their units for subscription to
other AIFs. A VCF registered as a Category I AIF, as defined in the SEBI AIF Regulations, cannot invest more
than one-third of its investible funds by way of subscription to an initial public offering of a venture capital
undertaking whose shares are proposed to be listed. Additionally, the VCFs which have not re-registered as an
AIF under the SEBI AIF Regulations shall continue to be regulated by the SEBI VCF Regulations until the
existing fund or scheme managed by the fund is wound up and such funds shall not launch any new scheme after
the notification of the SEBI AIF Regulations.
All non-resident investors should note that refunds (in case of Anchor Investors), dividends and other
distributions, if any, will be payable in Indian Rupees only and net of bank charges and commission.
Our Company or the BRLM. will not be responsible for loss, if any, incurred by the Bidder on account of
conversion of foreign currency.
Participation of AIFs, VCFs and FVCIs shall also be subject to the FEMA Rules.
531Further, the shareholding of VCFs, category I AIFs or category II AIFs and FVCIs holding equity shares of a
company prior to an initial public offering being undertaken by such company, shall be exempt from lock-in
requirements, provided that such equity shares shall be locked in for a period of at least six months from the date
of purchase by the venture capital fund or alternative investment fund or foreign venture capital investor.
There is no reservation for Eligible NRI Bidders, AIFs, FPIs and FVCIs. All Bidders will be treated on the same
basis with other categories for allocation
Bids by Limited Liability Partnerships
In case of Bids made by limited liability partnerships registered under the Limited Liability Partnership Act, 2008,
a certified copy of certificate of registration Offered under the Limited Liability Partnership Act, 2008, must be
attached to the Bid cum Application Form. Failing this, our Company in consultation with the BRLM reserve the
right to reject any Bid without assigning any reason thereof.
Bids by Banking Companies
In case of Bids made by banking companies registered with the RBI, certified copies of: (i) the certificate of
registration Offered by the RBI, and (ii) the approval of such banking company’s investment committee is required
to be attached to the Bid cum Application Form, failing this, our Company in consultation with BRLM, reserves
the right to reject any Bid without assigning any reason thereof, subject to applicable law.
The investment limit for banking companies in non-financial services companies as per the Banking Regulation
Act, 1949, as amended (the “(Banking Regulation Act),”) and Master Direction - Reserve Bank of India (Financial
Services provided by Banks) Directions, 2016, as amended, is 10% of the paid-up share capital of the investee
company or 10% of the bank’s own paid-up share capital and reserves, whichever is lower. Further, the aggregate
equity investments in subsidiaries and other entities engaged in financial and non-financial services, including
overseas investments, cannot exceed 20% of the bank’s paid-up share capital and reserves. A banking company
would be permitted to invest in excess of 10% but not exceeding 30% of the paid-up share capital of such investee
company if: (a) the investee company is engaged in non-financial activities in which banking companies are
permitted to engage under the Banking Regulation Act; or (b) the additional acquisition is through restructuring
of debt, or to protect the bank’s interest on loans/investments made to a company, provided that the bank is required
to submit a time-bound action plan for disposal of such shares (in this sub-clause (b)) within a specified period to
the RBI. A banking company would require a prior approval of the RBI to make investment in excess of 30% of
the paid-up share capital of the investee company, investment in a subsidiary and a financial services company
that is not a subsidiary (with certain exceptions prescribed), and investment in a non-financial services company
in excess of 10% of such investee company’s paid-up share capital as stated in the Reserve Bank of India
(Financial Services provided by Banks) Directions, 2016, as amended. Bids by banking Companies should not
exceed the investment limits prescribed for them under the applicable laws.
Bids by SCSBs
SCSBs participating in the Offer are required to comply with the terms of the circulars bearing numbers
CIR/CFD/DIL/12/2012 and CIR/CFD/DIL/1/2013 dated September 13, 2012, and January 2, 2013, respectively,
Offered by SEBI. Such SCSBs are required to ensure that for making applications on their own account using
ASBA, they should have a separate account in their own name with any other SEBI registered SCSBs. Further,
such account shall be used solely for the purpose of making application in public Offers and clear demarcated funds
should be available in such account for such Bids.
Bids by Insurance Companies
In case of Bids made by insurance companies registered with the IRDAI, a certified copy of certificate of
532registration Offered by IRDAI must be attached to the Bid cum Application Form. Failing this, the Company in
consultation with BRLM, reserves the right to reject any Bid without assigning any reason thereof.
The exposure norms for insurers are prescribed under the (“IRDAI Investment Regulations”) the IRDAI master
circular bearing reference no. equity shares of a company, the entire group of the investee company, the industry
sector in which the investee company operates.
Insurance companies participating in the Offer are advised to refer to the IRDAI Investment Regulations for
specific investment limits applicable to them and shall comply with all applicable regulations, guidelines and
circulars Offered by IRDAI from time to time.
Bids by Provident Funds/Pension Funds
In case of Bids made by NBFC-SI, a certified copy of the certificate of registration Offered by the RBI, a certified
copy of its last audited financial statements on a consolidated basis and a net worth certificate from its statutory
auditor(s), must be attached to the Bid-cum Application Form. Failing this, our Company, in consultation with
Book Running Lead Manager, reserves the right to reject any Bid, without assigning any reason thereof. NBFCs-
SI participating in the Offer shall comply with all applicable regulations, guidelines and circulars Offered by RBI
from time to time.
Bids under Power of Attorney
In case of Bids made pursuant to a power of attorney by limited companies, corporate bodies, registered societies,
Eligible FPIs, AIFs, Mutual Funds, insurance companies, NBFC-SI, insurance funds set up by the army, navy or
air force of the India, insurance funds set up by the Department of Posts, India or the National Investment Fund
and provident funds with a minimum corpus of ₹ 250 million (subject to applicable laws) and pension funds with
a minimum corpus of ₹ 250 million, a certified copy of the power of attorney or the relevant resolution or authority,
as the case may be, along with a certified copy of the memorandum of association and articles of association
and/or bye laws must be lodged along with the Bid cum Application Form. Failing this, our Company, in
consultation with BRLM, reserves the right to accept or reject any Bid in whole or in part, in either case, without
assigning any reason thereof.
Our Company, in consultation with the BRLM, in their absolute discretion, reserve the right to relax the above
condition of simultaneous lodging of the power of attorney along with the Bid cum Application Form,
Bids by Anchor Investors
In accordance with the SEBI ICDR Regulations, in addition to details and conditions mentioned in this section the
key terms for participation by Anchor Investors are provided below:
(a) Anchor Investor Application Forms will be made available for the Anchor Investor Portion at the offices of
the BRLM.
(b) The Bid must be for a minimum of such number of Equity Shares so that the Bid Amount exceeds
₹100,000,000. A Bid cannot be submitted for over 60% of the QIB Portion. In case of a Mutual Fund, separate
bids by individual schemes of a Mutual Fund will be aggregated to determine the minimum application size
of ₹100,000,000
(c) One-third of the Anchor Investor Portion will be reserved for allocation to domestic Mutual Funds.
(d) Bidding for Anchor Investors will open one Working Day before the Bid/Offer Opening Date and will be
completed on the same day.
533(e) Our Company may finalise allocation to the Anchor Investors and the basis of such allocation will be on a
discretionary basis by our Company in consultation with the BRLM, provided that the minimum number of
Allottees in the Anchor Investor Portion will not be less than:
i. maximum of two Anchor Investors, where allocation under the Anchor Investor Portion is up to
₹100,000,000
ii. minimum of two and maximum of 15 Anchor Investors, where the allocation under the Anchor Investor
Portion is more than ₹100,000,000 but up to ₹ 2,500,000,000 subject to a minimum Allotment of ₹
50,000,000 per Anchor Investor; and
iii. in case of allocation above ₹ 2,500,000,000 under the Anchor Investor Portion, a minimum of five such
investors and a maximum of 15 Anchor Investors for allocation up to ₹ 2,500,000,000 and an additional 10
Anchor Investors for every additional ₹ 2,500,000,000 subject to minimum Allotment of ₹ 50,000,000 per
Anchor Investor.
(f) Allocation to Anchor Investors will be completed on the Anchor Investor Bidding Date. The number of
Equity Shares allocated to Anchor Investors and the price at which the allocation is made, will be made
available in the public domain by the BRLM before the Bid/Offer Opening Date, through intimation to
the Stock Exchanges.
(g) Anchor Investors cannot withdraw or lower the size of their Bids at any stage after submission of the
Bid.
(h) If the Offer Price is greater than the Anchor Investor Allocation Price, the additional amount being the
difference between the Offer Price and the Anchor Investor Offer Price will be payable by the Anchor
Investors on the Anchor Investor Pay-in Date specified in the CAN. If the Offer Price is lower than the
Anchor Investor Offer Price, Allotment to successful Anchor Investors will be at the higher price.
(i) 50% of the Equity Shares Allotted to the Anchor Investors in the Anchor Investor Portion shall be locked
in for a period of 90 days from the date of Allotment and the remaining 50% of the Equity Shares Allotted
to Anchor Investors in the Anchor Investor Portion shall be locked in for a period of 30 days from the
date of Allotment.
(j) Neither the BRLM nor any associate of the BRLM (except Mutual Funds sponsored by entities which
are associates of the BRLM or insurance companies promoted by entities which are associate of BRLM or
AIFs sponsored by the entities which are associate of the BRLM or FPIs, other than individuals, corporate
bodies and family offices sponsored by the entities which are associate of the and BRLM) nor the
Promoters, Promoter Group or any person related to the Promoters or members of the Promoter Group
shall apply under the Anchor Investors category.
(k) Bids made by QIBs under both the Anchor Investor Portion and the QIB Portion will not be considered
multiple Bids.
For more information, please read the General Information Document.
Bids by Systemically Important Non-Banking Financial Companies
In case of Bids made by Systemically Important Non-Banking Financial Companies registered with RBI, certified
copies of: (i) the certificate of registration issued by RBI certified copy of certificate from a chartered accountant
certifying the corpus of the provident fund/ pension fund must be attached to the Bid cum Application Form. Failing
this, our Company, in consultation with BRLM, reserves the right to reject any Bid, without assigning any reason
thereof, subject to applicable law. NBFC-SI participating in the Offer shall comply with all applicable regulations,
534guidelines and circulars issued by RBI from time to time.
The investment limit for Systemically Important Non-Banking Financial Companies shall be as prescribed by RBI
from time to time.
The above information is given for the benefit of the Bidders. Our Company, the Promoter Selling
Shareholder and the BRLM are not liable for any amendments or modification or changes in applicable
laws or regulations, which may occur after the date of this Draft Red Herring Prospectus, when filed.
Bidders are advised to make independent investigations and ensure that any single Bid from them does not
exceed the applicable investment limits or maximum number of the Equity Shares that can be held by them
under applicable laws or regulation and as specified in the Red Herring Prospectus, when filed.
Information for Bidders
The relevant Designated Intermediary will enter a maximum of three Bids at different price levels opted in the
Bid cum Application Form and such options are not considered as multiple Bids. It is the Bidder’s responsibility
to obtain the acknowledgment slip from the relevant Designated Intermediary. The registration of the Bid by the
Designated Intermediary does not guarantee that the Equity Shares shall be allocated/Allotted. Such
Acknowledgement Slip will be non-negotiable and by itself will not create any obligation of any kind. When a
Bidder revises his or her Bid, he /she shall surrender the earlier Acknowledgement Slip and may request for a
revised acknowledgment slip from the relevant Designated Intermediary as proof of his or her having revised the
previous Bids. In relation to electronic registration of Bids, the permission given by the Stock Exchanges to use
their network and software of the electronic bidding system should not in any way be deemed or construed to
mean that the compliance with various statutory and other requirements by our Company and/or the BRLM. are
cleared or approved by the Stock Exchanges; nor does it in any manner warrant, certify or endorse the correctness
or completeness of compliance with the statutory and other requirements, nor does it take any responsibility for
the financial or other soundness of our Company, the management or any scheme or project of our Company; nor
does it in any manner warrant, certify or endorse the correctness or completeness of any of the contents of this
Draft Red Herring Prospectus or the Red Herring Prospectus; nor does it warrant that the Equity Shares will be
listed or will continue to be listed on the Stock Exchanges.
The Offer shall be opened after at least three Working Days from the date of filing of the Red Herring Prospectus
with the RoC.
General Instructions
Please note that QIBs and Non-Institutional Investors are not permitted to withdraw their Bid(s) or lower the size
of their Bid(s) (in terms of quantity of Equity Shares or the Bid Amount) at any stage. Retail Individual Investors
can revise or withdraw their Bid(s) until the Bid/Offer Closing Date. Anchor Investors are not allowed to withdraw
or lower the size of their Bids after the Anchor Investor Bidding Date.
Do’s:
1. Check if you are eligible to apply as per the terms of the Red Herring Prospectus and under applicable
law, rules, regulations, guidelines and approvals.
2. All Bidders (other than Anchor Investors) should submit their Bids through the ASBA process only;
3. Ensure that you have Bid within the Price Band;
4. Read all the instructions carefully and complete the Bid cum Application Form in the prescribed form;
5355. Ensure that you (other than the Anchor Investors) have mentioned the correct details of ASBA Account
(i.e. bank account number or UPI ID, as applicable) in the Bid cum Application Form if you are not a UPI
Bidder bidding using the UPI Mechanism in the Bid cum Application Form and if you are a UPI Bidder
using the UPI Mechanism ensure that you have mentioned the correct UPI ID (with maximum length of
45 characters including the handle) in the Bid cum Application Form;
6. Ensure that your Bid cum Application Form bearing the stamp of a Designated Intermediary is submitted
to the Designated Intermediary at the Bidding Centre within the prescribed time
7. UPI Bidders in the Offer to ensure that they shall use only their own ASBA Account or only their own
bank account linked UPI ID which is UPI 2.0 certified by NPCI to make an application in the Offer and
not ASBA Account or bank account linked UPI ID of any third party;
8. UPI Bidders using UPI Mechanism through the SCSBs and mobile applications shall ensure that the
name of the bank appears in the list of SCSBs which are live on UPI, as displayed on the SEBI website.
UPI Bidders shall ensure that the name of the app and the UPI handle which is used for making the
application appears in Annexure ‘A’ to the SEBI circular no. SEBI/HO/CFD/DIL2/COR/P/2019/85
dated July 26, 2019;
9. Ensure that you have funds equal to the Bid Amount in the ASBA Account maintained with the SCSB,
before submitting the ASBA Form to any of the Designated Intermediaries.
10. Ensure that you use only your own bank account linked UPI ID (only for UPI Bidders using the UPI
Mechanism) to make an application in the Offer;
11. Ensure that the signature of the first bidder in case of joint Bids, is included in the Bid cum Application
Forms. If the first bidder is not the ASBA Account holder, ensure that the Bid cum Application Form is
also signed by the ASBA Account holder;
12. If the first Bidder is not the bank account holder, ensure that the Bid cum Application Form is signed by
the account holder. Ensure that you have an account with an SCSB and have mentioned the correct bank
account number in the Bid cum Application Form (for all Bidders other than UPI Bidders bidding using
the UPI Mechanism);
13. Ensure that the names given in the Bid cum Application Form is/are the same as the names in which the
beneficiary account is held with the Depository Participant. In case of joint Bids, the Bid cum Application
Form should contain the name of only the first bidder whose name should also appear as the first holder
of the beneficiary account held in joint names;
14. Ensure that you request for and receive a stamped acknowledgement counterfoil or acknowledgment
specifying the application number as a proof of having accepted Bid cum Application Form for all your
Bid options from the concerned Designated Intermediary;
15. Ensure that you submit the revised Bids to the same Designated Intermediary, through whom the original
Bid was placed and obtain a revised acknowledgment;
16. Except for Bids: (i) on behalf of the Central or State Governments and the officials appointed by the courts,
who, in terms of the SEBI circular no. MRD/Dop/Cir-20/2008 dated June 30, 2008, may be exempt from
specifying their PAN for transacting in the securities market, (ii) submitted by investors who are exempt
from the requirement of obtaining/specifying their PAN for transacting in the securities market, and (iii)
Bids by persons resident in the state of Sikkim, who, in terms of a SEBI circular no. MRD/DoP/SE/Cir-
8 /2006 dated July 20, 2006, may be exempted from specifying their PAN for transacting in the securities
536market, all Bidders should mention their PAN allotted under the IT Act. The exemption for the Central
or the State Government and officials appointed by the courts and for investors residing in the State of
Sikkim is subject to (a) the Demographic Details received from the respective depositories confirming
the exemption granted to the beneficiary owner by a suitable description in the PAN field and the
beneficiary account remaining in ‘active status’; and (b) in the case of residents of Sikkim, the address
as per the Demographic Details evidencing the same. All other applications in which PAN is not
mentioned will be rejected;
17. FPIs making MIM Bids using the same PAN, and different beneficiary account numbers, Client IDs and
DP IDs, are required to submit a confirmation that their Bids are under the MIM structure and indicate
the name of their investment managers in such confirmation which shall be submitted along with each of
their Bid cum Application Forms. In the absence of such confirmation from the relevant FPIs, such MIM
Bids shall be rejected;
18. Ensure that thumb impressions and signatures other than in the languages specified in the Eighth
Schedule to the Constitution of India are attested by a Magistrate or a Notary Public or a Special
Executive Magistrate under official seal;
19. Ensure that the category and the investor status is indicated in the Bid cum Application Form to ensure
proper upload of your Bid in the electronic Bidding system of the Stock Exchanges;
20. Ensure that in case of Bids under power of attorney or by limited companies, corporates, trust, etc.,
relevant documents including a copy of the power of attorney, if applicable, are submitted;
21. Ensure that Bids submitted by any person outside India is in compliance with applicable foreign and
Indian laws;
22. However, Bids received from FPIs bearing the same PAN shall not be treated as multiple Bids in the
event such FPIs utilise the MIM Structure and such Bids have been made with different beneficiary
account numbers, Client IDs and DP IDs;
23. Since the Allotment will be in dematerialised form only, ensure that the depository account is active, the
correct DP ID, Client ID, UPI ID (for UPI Bidders bidding through UPI mechanism) and the PAN are
mentioned in their Bid cum Application Form and that the name of the Bidder, the DP ID, Client ID, UPI
ID (for UPI Bidders bidding through UPI mechanism) and the PAN entered into the online initial public
offerings (“IPO”) system of the Stock Exchanges by the relevant Designated Intermediary, as applicable,
matches with the name, DP ID, Client ID, UPI ID (for UPI Bidders bidding through UPI mechanism)
and PAN available in the Depository database;
24. In case of QIBs and NIBs, ensure that while Bidding through a Designated Intermediary, the ASBA Form
is submitted to a Designated Intermediary in a Bidding Centre and that the SCSB where the ASBA
Account, as specified in the ASBA Form, is maintained has named at least one branch at that location
for the Designated Intermediary to deposit ASBA Forms (a list of such branches is available on the website
of SEBI at http://www.sebi.gov.in);
25. Ensure that you have correctly signed the authorisation/undertaking box in the Bid cum Application
Form or have otherwise provided an authorisation to the SCSB or the Sponsor Banks, as applicable, via
the electronic mode, for blocking funds in the ASBA Account equivalent to the Bid Amount mentioned
in the Bid cum Application Form at the time of submission of the Bid. In case of UPI Bidder Bidding
through the UPI Mechanism, ensure that you authorise the UPI Mandate Request raised by the Sponsor
Banks for blocking of funds equivalent to Bid Amount and subsequent debit of funds in case of
Allotment;
53726. UPI Bidders who wish to Bid using the UPI Mechanism, should submit Bid with the Designated
Intermediaries, pursuant to which the UPI Bidder should ensure acceptance of the UPI Mandate Request
received from the Sponsor Bank(s) to authorise blocking of funds equivalent to the revised Bid Amount
in the UPI Bidder’s ASBA Account;
27. Ensure that the Demographic Details are updated, true and correct in all respects;
28. The ASBA Bidders shall use only their own bank account or only their own bank account linked UPI ID
for the purposes of making Application in the Offer, which is UPI 2.0 certified by NPCI;
29. The ASBA Bidders shall ensure that bids above ₹ 500,000 are uploaded only by the SCSBs;
30. Bidders (except UPI Bidders Bidding through the UPI Mechanism) should instruct their respective banks
to release the funds blocked in the ASBA account under the ASBA process. In case of UPI Bidders, once
the Sponsor Banks issues the Mandate Request, the UPI Bidders would be required to proceed to
authorise the blocking of funds by confirming or accepting the UPI Mandate Request to authorise the
blocking of funds equivalent to application amount and subsequent debit of funds in case of Allotment,
in a timely manner.
31. UPI Bidders shall ensure that details of the Bid are reviewed and verified by opening the attachment in
the UPI Mandate Request and then proceed to authorise the UPI Mandate Request using his/her UPI PIN.
Upon the authorisation of the mandate using his/her UPI PIN, a UPI Bidder may be deemed to have verified
the attachment containing the application details of the UPI Bidder in the UPI Mandate Request and have
agreed to block the entire Bid Amount and authorised the Sponsor Bank to block the Bid Amount
mentioned in the Bid Cum Application Form; and
32. UPI Bidding using the UPI Mechanism should mention valid UPI ID of only the Bidder (in case of single
account) and of the First Bidder (in case of joint account) in the Bid cum Application Form;
33. Investors must ensure that their PAN is linked with Aadhaar and are in compliance with the Central
Board of Direct Taxes notification dated February 13, 2020, and press releases dated June 25, 2021, and
September 17, 2021;
34. UPI Bidders using the UPI Mechanism who have revised their Bids subsequent to making the initial Bid
should also approve the revised UPI Mandate Request generated by the Sponsor Banks to authorise
blocking of funds equivalent to the revised Bid Amount and subsequent debit of funds in case of
Allotment in a timely manner.
35. Bids by Eligible NRIs HUFs and any individuals, corporate bodies and family offices which are
recategorized as category II FPI and registered with SEBI for a Bid Amount of less than ₹ 200,000 would
be considered under the Retail Category for the purposes of allocation and Bids for a Bid Amount
exceeding ₹200,000 would be considered under the Non-Institutional Category for allocation in the
Offer; and
36. Ensure that you have accepted the UPI Mandate Request received from the Sponsor Banks prior to 12:00
p.m. of the Working Day immediately after the Bid/ Offer Closing Date;
37. Ensure that Anchor Investors submit their Bid cum Application Forms only to the BRLM.
The Bid cum Application Form is liable to be rejected if the above instructions, as applicable, are not complied
with. Application made using incorrect UPI handle or using a bank account of an SCSB or SCSBs which is not
mentioned in the Annexure ‘A’ to the SEBI circular no. SEBI/HO/CFD/DIL2/CIR/P/2019/85 dated July 26, 2019
538is liable to be rejected.
Don’ts:
1. Do not Bid for lower than the minimum Bid Lot;
2. Do not submit a Bid using UPI ID, if you are not a UPI Bidder;
3. Do not Bid for a Bid Amount exceeding ₹ 0.20 million (for Bids by Retail Individual Investors);
4. Do not Bid on another Bid cum Application Form and the Anchor Investor Application Form, as the case
may be, after you have submitted a Bid to any of the Designated Intermediary;
5. Do not Bid/revise the Bid amount to less than the floor price or higher than the cap price;
6. Do not pay the Bid Amount in cheques, demand drafts or by cash, money order, postal order or by stock
invest;
7. Do not send Bid cum Application Forms by post; instead submit the same to the Designated Intermediary
only;
8. Do not Bid at Cut-off Price (for Bids by QIBs and Non-Institutional Investors);
9. Do not instruct your respective banks to release the funds blocked in the ASBA Account under the ASBA
process;
10. Do not submit the Bid for an amount more than funds available in your ASBA account;
11. Do not submit Bids on plain paper or on incomplete or illegible Bid cum Application Forms or on Bid cum
Application Forms in a colour prescribed for another category of a Bidder;
12. Do not fill up the Bid cum Application Form such that the Equity Shares Bid for, exceeds the Offer size
and/or investment limit or maximum number of the Equity Shares that can be held under applicable laws
or regulations or maximum amount permissible under applicable laws or regulations, or under the terms
of the Red Herring Prospectus;
13. Do not Bid for Equity Shares more than specified by the respective Stock Exchanges for each category;
14. In case of ASBA Bidders (other than UPI Bidders using UPI mechanism), do not submit more than one
Bid cum Application Form per ASBA Account;
15. If you are UPI Bidder and are using UPI mechanism, do not submit more than one Bid cum Application
Form for each UPI ID;
16. Do not make the Bid cum Application Form using third party bank account or using third party linked
bank account UPI ID;
17. Anchor Investors should not bid through the ASBA process;
18. Do not submit the Bid cum Application Form to any non-SCSB bank or our Company;
19. Do not Bid on another Bid cum Application Form and the Anchor Investor Application Form, as the case
539may be, after you have submitted a Bid to any of the Designated Intermediaries;
20. Do not submit the General Index Register (“GIR”) number instead of the PAN;
21. Anchor Investors should submit Anchor Investor Application Form only to the BRLM;
22. Do not submit a Bid cum Application Form with third party ASBA Bank Account or UPI ID (in case of
Bids submitted by UPI Bidder using the UPI Mechanism)
23. Do not Bid on a Bid cum Application Form that does not have the stamp of the relevant Designated
Intermediary;
24. If you are a QIB, do not submit your Bid after 3 p.m. on the QIB Bid/Offer Closing Date;
25. Do not withdraw your Bid or lower the size of your Bid (in terms of quantity of the Equity Shares or the
Bid Amount) at any stage, if you are a QIB or a Non-Institutional Bidder. RIB may revise or withdraw
their Bids on or before the Bid/Offer Closing Date;
26. Do not submit Bids to a Designated Intermediary at a location other than the Specified Locations. If you
are a UPI Bidder using UPI Mechanism, do not submit the ASBA Form directly with SCSBs;
27. Do not submit the ASBA Forms to any Designated Intermediary that is not authorised to collect the
relevant ASBA Forms or to our Company;
28. If you are a UPI Bidder which is submitting the ASBA Form with any of the Designated Intermediaries
and using your UPI ID for the purpose of blocking of funds, do not use any third party bank account or
third party linked bank account UPI ID;
29. UPI Bidders Bidding through the UPI Mechanism using the incorrect UPI handle or using a bank account
of an SCSB and/ or mobile applications which are not mentioned in the list provided on the SEBI website
are liable to be rejected;
30. Do not submit a Bid cum Application Form with third party ASBA Bank Account or UPI ID (in case of
Bids submitted by UPI Bidders).
31. UPI Bidders Bidding through the UPI Mechanism using the incorrect UPI handle or using a bank account
of an SCSB or a banks which is not mentioned in the list provided in the SEBI website is liable to be
rejected;
32. Do not submit more than one Bid cum Application Form for each UPI ID in case of UPI Bidders Bidding
using the UPI Mechanism;
33. Do not Bid if you are an OCB; and
34. In case of ASBA Bidders (other than 3 in 1 Bids) Syndicate Member shall ensure that they do not upload
any bids above ₹500,000.
The Bid cum Application Form is liable to be rejected if the above instructions, as applicable, are not
complied with.
Bids by persons for whom PAN details have not been verified and whose beneficiary accounts are “suspended for
credit” in terms of SEBI circular CIR/MRD/DP/ 22 /2010 dated July 29, 2010;
540Further, in case of any pre-offer or post-offer related Offers regarding share certificates/demat credit/refund
orders/unblocking etc., investors shall reach out to the Company Secretary and Compliance Officer, and the
Registrar to the Offer. For details of the Company Secretary and Compliance Officer, and the Registrar to the
Offer, kindly refer ‘General Information’ beginning on page 94.
In case of any delay in unblocking of amounts in the ASBA Accounts (including amounts blocked through the
UPI Mechanism) exceeding two Working Days from the Bid/ Offer Closing Date, the Bidder shall be compensated
at a uniform rate of ₹100.00 per day or 15.00% per annum of the Bid Amount, whichever is higher for the entire
duration of delay exceeding two Working Days from the Bid/ Offer Closing Date by the intermediary responsible
for causing such delay in unblocking. The BRLM. shall, in their sole discretion, identify and fix the liability on
such intermediary or entity responsible for such delay in unblocking. Further, Bidders shall be entitled to
compensation in the manner specified in the SEBI ICDR Master Circular (SEBI/HO/CFD/PoD-
1/P/CIR/2024/0154 2023) dated November 11, 2024, in case of delays in resolving investor grievances in relation
to blocking/unblocking of funds.
For details of grounds for technical rejections of a Bid cum Application Form, kindly refer the General Information
Document.
Names of entities responsible for finalising the Basis of Allotment in a fair and proper manner
The authorised employees of the Designated Stock Exchange, along with the BRLM. and the Registrar, shall
ensure that the Basis of Allotment is finalised in a fair and proper manner in accordance with the procedure
specified in SEBI ICDR Regulations.
Method of allotment as may be prescribed by SEBI from time to time
Our Company will not make any Allotment in excess of the Equity Shares offered through the Offer through the
Offer document except in case of oversubscription for the purpose of rounding off to make Allotment, in
consultation with the Designated Stock Exchange. Further, upon oversubscription, an Allotment of not more than
1% of the Offer to public may be made for the purpose of making Allotment in minimum lots.
The allotment of Equity Shares to Bidders other than to the Retail Individual Investors, Non-Institutional Investors
and Anchor Investors shall be on a proportionate basis within the respective investor categories and the number
of securities allotted shall be rounded off to the nearest integer, subject to minimum allotment being equal to the
minimum application size as determined and disclosed.
The allotment of Equity Shares to each Retail Individual Investor shall not be less than the minimum Bid Lot,
subject to the availability of shares in Retail Individual Investor category, and the remaining available shares, if
any, shall be allotted on a proportionate basis.
The allotment to each Non-Institutional Investors shall not be less than the minimum application size, subject to
the availability of Equity Shares in the Non-Institutional Portion, and the remaining Equity Shares, if any, shall
be allotted on a proportionate basis.
The Allotment of Equity Shares to Anchor Investors shall be on a discretionary basis. The Equity Shares available
for allocation to Non-Institutional Investors under the Non-Institutional Portion, shall be subject to the following,
and in accordance with the SEBI ICDR Regulations: (i) one-third of the portion available to Non-Institutional
Investors shall be reserved for Non-Institutional Investors with an application size of more than ₹ 0.20 million
and up to ₹ 1 million, and (ii) two-third of the portion available to Non- Institutional Bidders shall be reserved for
Non-Institutional Investors with application size of more than ₹ 1 million, provided that the unsubscribed portion
in either of the aforementioned sub-categories may be allocated to applicants in the other sub-category of Non-
Institutional Investors.
541Payment into Escrow Account(s) for Anchor Investors
Our Company, in consultation with the BRLM, in their absolute discretion, will decide the list of Anchor Investors
to whom the CAN will be sent, pursuant to which the details of the Equity Shares allocated to them in their
respective names will be notified to such Anchor Investors. Anchor Investors are not permitted to Bid in the Offer
through the ASBA process. Instead, Anchor Investors should transfer the Bid Amount (through direct credit, RTGS,
or NEFT) to the Escrow Accounts. The payment instruments for payment into the Escrow Account(s) should be
drawn in favour of:
1. In case of resident Anchor Investors: [●]
2. In case of Non-Resident Anchor Investors: [●]
Anchor Investors should note that the escrow mechanism is not prescribed by SEBI and has been established as
an arrangement between our Company, the Promoter Selling Shareholder, the Syndicate, the Bankers to the Offer
and the Registrar to the Offer to facilitate collections from Anchor Investors.
Pre-Offer and Price Band Advertisement
Subject to Section 30 of the Companies Act, 2013, our Company shall, after filing the Red Herring Prospectus
with the RoC, publish a pre-offer and price band advertisement, in the form prescribed under the SEBI ICDR
Regulations, in all editions of [●] (a widely circulated English national daily newspaper), all editions of [●] (a
widely circulated Hindi national daily newspaper) and all editions of [●] (a widely circulated Hindi national daily
newspaper, Hindi being the regional language of Delhi, where our Registered Office is located).
In the pre-Offer advertisement, our Company shall state the Bid/Offer Opening Date and the Bid/Offer Closing
Date. This advertisement, subject to the provisions of Section 30 of the Companies Act, 2013, shall be in the
format prescribed in Part A of Schedule X of the SEBI ICDR Regulations.
The information set out above is given for the benefit of the Bidders/applicants. Our Company, the
Promoter Selling Shareholder, severally and not jointly and the Book Running Lead Manager are not liable
for any amendments or modification or changes in applicable laws or regulations, which may occur after
the date of this Draft Red Herring Prospectus. Bidders/applicants are advised to make their independent
investigations and ensure that the number of Equity Shares Bid for do not exceed the prescribed limits
under applicable laws or regulations.
In accordance with RBI regulations, Overseas Corporate Body (“OCB”) cannot participate in the Offer.
Allotment Advertisement
The Allotment Advertisement shall be uploaded on the websites of our Company, the BRLM and the Registrar to
the Offer, before 9:00 p.m. IST, on the date of receipt of the final listing and trading approval from all the Stock
Exchanges where the Equity Shares are proposed to be listed, provided such final listing and trading approval
from all the Stock Exchanges is received prior to 9:00 p.m. IST on that day. In an event, if final listing and trading
approval from all the Stock Exchanges is received post 9:00 p.m. IST on the date of receipt of the final listing and
trading approval from all the Stock Exchanges where the equity shares of the Issuer are proposed to be listed, then
the Allotment Advertisement shall be uploaded on the websites of our Company, the BRLM and the Registrar to
the Offer, following the receipt of final listing and trading approval from all the Stock Exchanges;
Our Company, the BRLM and the Registrar to the Offer shall publish an allotment advertisement not later than
one Working Day after the commencement of trading, disclosing the date of commencement of trading in all
editions of [●] (a widely circulated English national daily newspaper), all editions of [●] (a widely circulated
Hindi national daily newspaper) and all editions of [●] (a widely circulated Hindi national daily newspaper Hindi
542being the regional language of Delhi, where our Registered Office is located).
Signing of the Underwriting Agreement and Filing with the RoC
1. Our Company, the Promoter Selling Shareholder, the Registrar to the Offer and the Underwriters intend to
enter into an Underwriting Agreement after the finalisation of the Offer Price but prior to the filing of the
Prospectus.
2. After signing the Underwriting Agreement, the Prospectus will be filed with the RoC in accordance with
applicable law. The Prospectus will contain details of the Offer Price, the Anchor Investor Offer Price, the
Offer size, and underwriting arrangements and will be complete in all material respects.
Offer Impersonation
Attention of the Bidders is specifically drawn to the provisions of sub-section (1) of Section 38 of the Companies
Act which is reproduced below:
‘Any person who –
1. makes or abets making of an application in a fictitious name to a company for acquiring, or subscribing for,
its securities; or
2. makes or abets making of multiple applications to a company in different names or in different combinations
of his name or surname for acquiring or subscribing for its securities; or otherwise induces directly or
indirectly a company to allot, or register any transfer of, securities to him, or to any other person in a
fictitious name, shall be liable for action under Section 447.’
shall be liable for action under Section 447.”
The liability prescribed under Section 447 of the Companies Act for fraud involving an amount of at least ₹ 1
million or 1% of the turnover of the company, whichever is lower, includes imprisonment for a term which shall
not be less than 6 months extending up to 10 years and fine of an amount not less than the amount involved in the
fraud, extending up to 3 times such amount (provided that where the fraud involves public interest, such term
shall not be less than 3 years). Further, where the fraud involves an amount less than ₹ 1 million or 1% the turnover
of the company, whichever is lower, and does not involve public interest, any person guilty of such fraud shall be
punishable with imprisonment for a term which may extend to 5 years or with fine which may extend to ₹ 5
million or with both.
Undertakings by our Company
Our Company undertakes the following:
• the complaints received in respect of the Offer shall be attended to by our Company expeditiously and
satisfactorily;
• all steps for completion of the necessary formalities for listing and commencement of trading at all the
Stock Exchanges where the Equity Shares are proposed to be listed are taken within such other time
period as may be prescribed by the SEBI or applicable law will be taken;
• the funds required for making refunds/unblocking (to the extent applicable) as per the mode(s) disclosed
shall be made available to the Registrar to the Offer by our Company;
• if Allotment is not made within the prescribed timelines under applicable laws, the entire subscription
543amount received will be refunded/unblocked within the time prescribed under applicable laws. If there
is a delay beyond such prescribed time, our Company shall pay interest prescribed under the Companies
Act, 2013, the SEBI ICDR Regulations and other applicable laws for the delayed period;
• where refunds (to the extent applicable) are made through electronic transfer of funds, a suitable
communication shall be sent to the Applicant within time prescribed under applicable laws, giving details
of the bank where refunds shall be credited along with amount and expected date of electronic credit of
refund;
• where release of block on the applicable amount for unsuccessful Bidders or part of the application
amount in case of proportionate Allotment, a suitable communication shall be sent to the applicants;
• adequate arrangements shall be made to collect ASBA applications;
• that if our Company or the Promoter Selling Shareholder do not proceed with the Offer after the Bid/Offer
Closing Date but prior to Allotment, the reason thereof shall be given by our Company as a public notice
within two days of the Bid/Offer Closing Date. The public notice shall be issued in the same newspapers
where the pre-Offer and price band advertisement was published. The Stock Exchanges shall be informed
promptly;
• that if our Company and/or the Promoter Selling Shareholder withdraw the Offer after the Bid/Offer Closing
Date, our Company shall be required to file a fresh offer document with SEBI, in the event our Company
or the Promoter Selling Shareholder subsequently decide to proceed with the Offer;
• Except for (i) the issuance of Equity Shares pursuant to exercise of options vested and/or granted under
the ESOP Scheme; and (ii) Pre-IPO Placement, no further issue of Equity Shares shall be made till the
Equity Shares offered through the Red Herring Prospectus are listed or until the Bid monies are
unblocked in ASBA Account/refunded on account of non-listing, under-subscription, etc.; and
• adequate arrangements shall be made to collect all Bid cum Application Forms from Bidders.
Undertakings by the Promoter Selling Shareholder
The Promoter Selling Shareholder, specifically undertakes and/or confirms the following in respect of itself as a
Promoter Selling Shareholder and fits respective portion of the Offered Shares:
• that the Offered Shares are eligible for being offered in the Offer for Sale in terms of Regulation 8 of the
SEBI ICDR Regulations and are in dematerialised form;
• he/ she is the legal and beneficial owner of its respective portion of the Offered Shares with valid and
marketable title, and shall be transferred pursuant to the Offer, free and clear of any encumbrances;
• he/ she shall transfer its respective portion of the Offered Shares in an escrow demat account in
accordance with the Share Escrow Agreement;
• he/ she shall not offer any incentive, whether direct or indirect, in any manner, whether in cash or kind
or services or otherwise to any Bidder for making a Bid in the Offer;
• his/ her respective portion of the Offered Shares are fully paid and are in dematerialized form; and
• he/ she shall not have recourse to the proceeds from the Offer for Sale until receipt by our Company of
the final listing and trading approvals from the Stock Exchanges in accordance with applicable law.
544Utilisation of proceeds from the Offer
Our Board certifies that:
all monies received out of the Offer shall be credited/transferred to a separate bank account other than the bank
account referred to in sub-section (3) of Section 40 of the Companies Act, 2013;
details of all monies utilised out of the Fresh Issue shall be disclosed, and continue to be disclosed till the time
any part of the Fresh Issue proceeds remains unutilised, under an appropriate head in the balance sheet of our
Company indicating the purpose for which such monies have been utilised; and
details of all unutilised monies out of the Fresh Issue, if any shall be disclosed under an appropriate separate head
in the balance sheet indicating the form in which such unutilised monies have been invested.
545RESTRICTIONS ON FOREIGN OWNERSHIP OF INDIAN SECURITIES
Foreign investment in Indian securities is regulated through the Industrial Policy, 1991 of the Government of India
and FEMA. While the Industrial Policy, 1991 prescribes the limits and the conditions subject to which foreign
investment can be made in different sectors of the Indian economy, FEMA regulates the precise manner in which
such investment may be made. While as per the Industrial Policy, 1991, foreign investment is permitted (except in
the prohibited sectors) in Indian companies, either through the automatic route or the approval route, depending
upon the sector in which foreign investment is sought to be made but the foreign investor is required to follow
certain prescribed procedures for making such investment. The RBI and the concerned ministries/departments are
responsible for granting approval for foreign investment.
The Government has from time to time made policy pronouncements on FDI through press notes and press
releases. The Department for Promotion of Industry and Internal Trade, Ministry of Commerce and Industry,
Government of India (earlier known as Department of Industrial Policy and Promotion) (“DPIIT”), issued the FDI
Policy, which is in effect from October 15, 2020, which subsumes and supersedes all previous press notes, press
releases and clarifications on FDI issued by the DPIIT that were in force and effect prior to October 15, 2020. The
FDI Policy will be valid until the DPIIT issues an updated circular. FDI in companies engaged in sectors/ activities
which are not listed in the FDI Policy is permitted up to 100% of the paid-up share capital of such company under
the automatic route, subject to compliance with certain prescribed conditions. The FDI Policy will be valid and
remain in force until superseded in totality or in part thereof. For further details, kindly refer “Key Industry
Regulations and Policies” beginning on page 287.
The transfer of shares between an Indian resident and a non-resident does not require the prior approval of the
RBI, provided that (i) the activities of the investee company are under the automatic route under the FDI policy
and transfer does not attract the provisions of the Takeover Regulations; (ii) the non-resident shareholding is within
the sectoral limits under the FDI policy; and (iii) the pricing is in accordance with the guidelines prescribed by the
SEBI/RBI. The RBI and the concerned ministries/departments are responsible for granting approval for foreign
investment under the FDI Circular and FEMA. For details of the aggregate limit for investments by NRIs and FPIs
in our Company, kindly refer “Offer Procedure – Bids by Eligible NRIs” and “Offer Procedure – Bids by FPIs”
beginning on pages 528 and 529, respectively.
FDI in companies in the service sector is permitted up to 100% of the paid-up share capital of such company under
the automatic route, subject to compliance with certain prescribed conditions. For further details, kindly refer “Key
Industry Regulations and Policies” beginning on page 287.
Further, in accordance with Note No. 3 (2020 Series), dated April 17, 2020 issued by the DPIIT and the Foreign
Exchange Management (Non-debt Instruments) Amendment Rules, 2020 which came into effect from April 22, 2020,
any investments under the foreign direct investment route by entities of a country which shares land border with India
or where the beneficial owner of an investment into India is situated in or is a citizen of any such country will require
prior approval of the Government of India. Further, in the event of transfer of ownership of any existing or future
foreign direct investment in an entity in India, directly or indirectly, resulting in the beneficial ownership falling
within the aforesaid restriction/purview, such subsequent change in the beneficial ownership will also require
approval of the Government of India. Pursuant to the Foreign Exchange Management (Non-debt Instruments) (Fourth
Amendment) Rules, 2020 issued on December 08, 2020, a multilateral bank or fund, of which India is a member,
shall not be treated as an entity of a particular country nor shall any country be treated as the beneficial owner of the
investments of such bank of fund in India. Each Bidder should seek independent legal advice about its ability to
participate in the Offer. In the event such prior approval of the GoI is required, and such approval has been obtained,
the Bidder shall intimate our Company and the Registrar to the Offer in writing about such approval along with a
copy thereof within the Bid/Offer Period.
For details of the aggregate limit for investments by NRIs and FPIs in our Company, kindly refer “Offer Procedure
– Bids by Eligible NRIs” and “Offer Procedure – Bids by FPIs” on pages 528 and 529.
546As per the existing policy of the Government of India, OCBs cannot participate in this Offer.
Foreign Exchange Laws
The foreign investment in our Company is governed by, inter alia, the FEMA, the FEMA Rules, the FDI Policy
issued and amended by way of press notes.
Pursuant to the FDI Policy, FDI of up to 100% is permitted under the automatic route in our Company.
In accordance with the FEMA Non-debt Instruments Rules, participation by non-residents in the Issue is restricted
to participation by (i) FPIs under Schedule II of the FEMA Non-debt Instruments Rules, in the Issue subject to
limit of the individual holding of an FPI below 10% of the post-offer paid-up capital of our Company and the
aggregate limit for FPI investment currently not exceeding 100% (sectoral limit); and (ii) Eligible NRIs only on
non-repatriation basis under Schedule IV of the FEMA Non-debt Instruments Rules. Further are not permitted to
participate in the Offer. As per the existing policy of the Government, OCBs cannot participate in this Offer. For
more information on bids by FPIs and Eligible NRIs, kindly refer “Offer Procedure” beginning on page 520. For
further details of the aggregate limit for investments by NRIs and FPIs in our Company, kindly refer “Offer
Procedure – Bids by NRIs” and “Offer Procedure – Bids by FPIs” beginning on pages 528 and 529, respectively.
In terms of the FEMA Non-debt Instruments Rules and the FDI Policy, a person resident outside India may make
investments into India, subject to certain terms and conditions, and further provided that an entity of a country,
which shares land border with India or where the beneficial owner of an investment into India, who is situated in
or is a citizen of any such country, shall invest only with the approval of the Government of India. Further, in the
event of transfer of ownership of any existing or future foreign direct investment in an entity in India, directly or
indirectly, resulting in the beneficial ownership falling within the above restriction/ purview, such subsequent
change in the beneficial ownership will also require approval of the Government of India. Each Bidder should seek
independent legal advice about its ability to participate in the Offer. In the event such prior approval of the
Government is required, and such approval has been obtained, the Bidder shall intimate our Company and the
Registrar in writing about such approval along with a copy thereof within the Bid/Offer Period.
The Equity Shares offered in the Issue have not been and will not be registered under the U.S. Securities
Act or any state securities laws in the United States, and may not be offered or sold within the United States,
except pursuant to an exemption from, or in a transaction not subject to, the registration requirements of
the U.S. Securities Act and applicable state securities laws in the United States. Accordingly, the Equity
Shares are being offered and sold outside the United States in offshore transactions in compliance with
Regulation S and the applicable laws of the jurisdiction where those offers and sales are made.
The Equity Shares have not been and will not be registered, listed or otherwise qualified in any other
jurisdiction outside India and were not issued or sold, and Bids were not made by persons in any such
jurisdiction, except in compliance with the applicable laws of such jurisdiction.
The above information was given for the benefit of the Bidders. The information does not purport to be a complete
analysis of the restrictions under Indian laws for the acquisition and/or transfer of securities in an Indian company
by a person resident outside India. Our Company and the BRLM are not liable for any amendments or modification
or changes in applicable laws or regulations, which may occur after the date of this Draft Red Herring Prospectus.
Bidders are advised to make their independent investigations, seek independent legal advice about its ability to
participate in the Offer and ensure that the number of Equity Shares Bid for do not exceed the applicable limits
under laws or regulations.
547SECTION VIII -DECRIPTION OF EQUITY SHARES AND TERMS OF THE ARTICLES OF
ASSOCIATION
THE COMPANIES ACT, 2013#
(COMPANY LIMITED BY SHARES)
ARTICLES OF ASSOC IATION
OF
TECHNOCRAFT VENTURES LIMITED
(EARLIER KNOWN AS TECHNOCRAFT CONSTRUCTION PRIVATE LIMITED)
PRELIMINARY
Subject as hereinafter provided the Regulations contained in Table 'F' in the First Schedule to the Companies
Act, 2013 shall apply to the Company except in so far as otherwise expressly incorporated herein below.
INTERPRETATION
1. In these regulations --
(a) the Act means the Companies Act, 2013,
(b) the seal means the common seal of the company.
2. Unless the context otherwise requires, words or expressions contained in these regulations shall bear the same
meaning as in the Act or any statutory modification thereof in force at the date at which these regulations
become binding on the company.
3. The Company is a Public Company within the meaning of Section 2(71) of the Companies Act, 2013.
SHARE CAPITAL AND VARIATION OF RIGHTS
4. Subject to the provisions of the Act and these Articles, the shares in the capital of the company shall be
under the control of the Directors who may issue, allot or otherwise dispose of the same or any of them to
such persons, in such proportion and on such terms and conditions and either at a premium or at par and at
such time as they may from time to time think fit.
5. (i) Every person whose name is entered as a member in the register of members shall be entitled to receive
within two months after incorporation, in case of subscribers to the memorandum or after allotment or within
one month after the application for the registration of transfer or transmission or within such other period as
the conditions of issue shall be provided,
#The Company vide special Resolution passed in the EGM held on January 10, 2024 adopt new set of AOA
which is in Compliance with Provisions of Companies Act 2013.
Name of the Company was changed from “Technocraft Construction Private Limited” to “Technocraft
Ventures Private Limited” vide special resolution passed by the members in the extra ordinary general meeting
held on January 10, 2024.
Further, member passed special resolution in the extra ordinary general meeting held on March 13, 2024 for
conversion of the Company from Private Limited to Limited Company.
548(a) one certificate for all his shares without payment of any charges; or
(b) several certificates, each for one or more of his shares, upon payment of twenty rupees for each certificate
after the first.
(ii) Every certificate shall be under the seal and shall specify the shares to which it relates and the amount
paid-up thereon.
(iii) In respect of any share or shares held jointly by several persons, the company shall not be bound to issue
more than one certificate, and delivery of a certificate for a share to one of several joint holders shall be
sufficient delivery to all such holders.
6. (i) If any share certificate be worn out, defaced, mutilated or torn or if there be no further space on the back
for endorsement of transfer, then upon production and surrender thereof to the company, a new certificate
may be issued in lieu thereof, and if any certificate is lost or destroyed then upon proof thereof to the
satisfaction of the company and on execution of such indemnity as the company deem adequate, a new
certificate in lieu thereof shall be given. Every certificate under this Article shall be issued on payment of
twenty rupees for each certificate.
(ii) The provisions of Articles (2) and (3) shall mutatis mutandis apply to debentures of the company.
7. Except as required by law, no person shall be recognized by the company as holding any share upon any
trust, and the company shall not be bound by, or be compelled in any way to recognize (even when having
notice thereof) any equitable, contingent, future or partial interest in any share, or any interest in any fractional
part of a share, or (except only as by these regulations or by law otherwise provided) any other rights in
respect of any share except an absolute right to the entirety thereof in the registered holder.
8. (i) The company may exercise the powers of paying commissions conferred by sub-section (6) of section
40, provided that the rate per cent or the amount of the commission paid or agreed to be paid shall be disclosed
in the manner required by that section and rules made thereunder.
(ii) The rate or amount of the commission shall not exceed the rate or amount prescribed in rules made under
sub-section (6) of section 40.
(iii) The commission may be satisfied by the payment of cash or the allotment of fully or partly paid shares
or partly in the one way and partly in the other.
9. (i) If at any time the share capital is divided into different classes of shares, the rights attached to any class
(unless otherwise provided by the terms of issue of the shares of that class) may, subject to the provisions of
section 48, and whether or not the company is being wound up, be varied with the consent in writing of the
holders of three-fourths of the issued shares of that class, or with the sanction of a special resolution passed
at a separate meeting of the holders of the shares of that class.
(ii) To every such separate meeting, the provisions of these regulations relating to general meetings shall
mutatis mutandis apply, but so that the necessary quorum shall be at least two persons holding at least one-
third of the issued shares of the class in question.
10. The rights conferred upon the holders of the shares of any class issued with preferred or other rights shall
not, unless otherwise expressly provided by the terms of issue of the shares of that class, be deemed to be
varied by the creation or issue of further shares ranking pari passu therewith.
54911. Subject to the provisions of section 55, any preference shares may, with the sanction of an ordinary resolution,
be issued on the terms that they are to be redeemed on such terms and in such manner as the company before
the issue of the shares may, by special resolution, determine.
LIEN
12. (i) The company shall have a first and paramount lien --
(a) on every share (not being a fully paid share), for all monies (whether presently payable or not) called, or
payable at a fixed time, in respect of that share; and
(b) on all shares (not being fully paid shares) standing registered in the name of a single person, for all monies
presently payable by him or his estate to the company:
Provided that the Board of directors may at any time declare any share to be wholly or in part exempt from
the provisions of this clause.
(ii) The company's lien, if any, on a share shall extend to all dividends payable and bonuses declared from
time to time in respect of such shares.
13. The company may sell, in such manner as the Board thinks fit, any shares on which the company has a lien:
Provided that no sale shall be made --
(a) unless a sum in respect of which the lien exists is presently payable; or
(b) until the expiration of fourteen days after a notice in writing stating and demanding payment of such part
of the amount in respect of which the lien exists as is presently payable, has been given to the registered
holder for the time being of the share or the person entitled thereto by reason of his death or insolvency.
14. (i) To give effect to any such sale, the Board may authorise some person to transfer the shares sold to the
purchaser thereof
(ii) The purchaser shall be registered as the holder of the shares comprised in any such transfer.
(iii) The purchaser shall not be bound to see to the application of the purchase money, nor shall his title to the
shares be affected by any irregularity or invalidity in the proceedings in reference to the sale.
15. (i) The proceeds of the sale shall be received by the company and applied in payment of such part of the
amount in respect of which the lien exists as is presently payable.
(ii) The residue, if any, shall, subject to a like lien for sums not presently payable as existed upon the shares
before the sale, be paid to the person entitled to the shares at the date of the sale.
CALLS ON SHARES
16. (i) The Board may, from time to time, make calls upon the members in respect of any monies unpaid on their
shares (whether on account of the nominal value of the shares or by way of premium) and not by the
conditions of allotment thereof made payable at fixed times:
550Provided that no call shall exceed one-fourth of the nominal value of the share or be payable at less than one
month from the date fixed for the payment of the last preceding call.
(ii) Each member shall, subject to receiving at least fourteen days’ notice specifying the time or times and
place of payment, pay to the company, at the time or times and place so specified, the amount called on his
shares.
(iii) A call may be revoked or postponed at the discretion of the Board.
17. A call shall be deemed to have been made at the time when the resolution of the Board authorizing the call
was passed and may be required to be paid by installmentss.
18. The joint holders of a share shall be jointly and severally liable to pay all calls in respect thereof.
19. (i) If a sum called in respect of a share is not paid before or on the day appointed for payment thereof, the
person from whom the sum is due shall pay interest thereon from the day appointed for payment thereof to
the time of actual payment at ten per cent per annum or at such lower rate, if any, as the Board may determine.
(ii) The Board shall be at liberty to waive payment of any such interest wholly or in part.
20. (i) Any sum which by the terms of issue of a share becomes payable on allotment or at any fixed date, whether
on account of the nominal value of the share or by way of premium, shall, for the purposes of these
regulations, be deemed to be a call duly made and payable on the date on which by the terms of issue such
sum becomes payable.
(ii) In case of non-payment of such sum, all the relevant provisions of these regulations as to payment of
interest and expenses, forfeiture or otherwise shall apply as if such sum had become payable by virtue of a
call duly made and notified.
21. The Board -
(a) may, if it thinks fit, receive from any member willing to advance the same, all or any part of the monies
uncalled and unpaid upon any shares held by him; and
(b) upon all or any of the monies so advanced, may (until the same would, but for such advance, become
presently payable) pay interest at such rate not exceeding, unless the company in general meeting shall
otherwise direct, twelve per cent per annum, as may be agreed upon between the Board and the member
paying the sum in advance.
TRANSFER OF SHARES
22. (i) The instrument of transfer of any share in the company shall be executed by or on behalf of both the
transferor and transferee.
(ii) The transferor shall be deemed to remain a holder of the share until the name of the transferee is entered
in the register of members in respect thereof.
23. The Board may, subject to the right of appeal conferred by section 58 decline to register --
(a) the transfer of a share, not being a fully paid share, to a person of whom they do not approve; or
(b) any transfer of shares on which the company has a lien.
55124. The Board may decline to recognize any instrument of transfer unless --
(a) the instrument of transfer is in the form as prescribed in rules made under sub-section (1) of section 56;
(b) the instrument of transfer is accompanied by the certificate of the shares to which it relates, and such other
evidence as the Board may reasonably require to show the right of the transferor to make the transfer; and
(c) the instrument of transfer is in respect of only one class of shares.
25. On giving not less than seven days' previous notice in accordance with section 91 and rules made thereunder,
the registration of transfers may be suspended at such times and for such periods as the Board may from time
to time determine:
Provided that such registration shall not be suspended for more than thirty days at any one time or for more
than forty-five days in the aggregate in any year.
TRANSMISSION OF SHARES
26. (i) On the death of a member, the survivor or survivors where the member was a joint holder, and his nominee
or nominees or legal representatives where he was a sole holder, shall be the only persons recognized by the
company as having any title to his interest in the shares
(ii) Nothing in clause (i) shall release the estate of a deceased joint holder from any liability in respect of any
share which had been jointly held by him with other persons.
27. (i) Any person becoming entitled to a share in consequence of the death or insolvency of a member may,
upon such evidence being produced as may from time to time properly be required by the Board and subject
as hereinafter provided, elect, either --
(a) to be registered himself as holder of the share; or
(b) to make such transfer of the share as the deceased or insolvent member could have made.
(ii) The Board shall, in either case, have the same right to decline or suspend registration as it would have
had, if the deceased or insolvent member had transferred the share before his death or insolvency.
28. (i) If the person so becoming entitled shall elect to be registered as holder of the share himself, he shall deliver
or send to the company a notice in writing signed by him stating that he so elects.
(ii) If the person aforesaid shall elect to transfer the share, he shall testify his election by executing a transfer
of the share.
(iii) All the limitations, restrictions and provisions of these regulations relating to the right to transfer and
the registration of transfers of shares shall be applicable to any such notice or transfer as aforesaid as if the
death or insolvency of the member had not occurred and the notice or transfer were a transfer signed by that
member.
29. A person becoming entitled to a share by reason of the death or insolvency of the holder shall be entitled to
the same dividends and other advantages to which he would be entitled if he were the registered holder of the
share, except that he shall not, before being registered as a member in respect of the share, be entitled in
respect of it to exercise any right conferred by membership in relation to meetings of the company
552Provided that the Board may, at any time, give notice requiring any such person to elect either to be registered
himself or to transfer the share, and if the notice is not complied with within ninety days, the Board may
thereafter withhold payment of all dividends, bonuses or other monies payable in respect of the share, until
the requirements of the notice have been complied with.
FORFEITURE OF SHARES
30. If a member fails to pay any call, or installment of a call, on the day appointed for payment thereof, the Board
may, at any time thereafter during such time as any part of the call or installment remains unpaid, serve a
notice on him requiring payment of so much of the call or installment as is unpaid, together with any interest
which may have accrued.
31. The notice aforesaid shall—
(a) name a further day (not being earlier than the expiry of fourteen days from the date of service of the
notice) on or before which the payment required by the notice is to be made; and
(b) state that, in the event of non-payment on or before the day so named, the shares in respect of which the
call was made shall be liable to be forfeited.
32. If the requirements of any such notice as aforesaid are not complied with, any share in respect of which the
notice has been given may, at any time thereafter, before the payment required by the notice has been made,
be forfeited by a resolution of the Board to that effect.
33. (i) A forfeited share may be sold or otherwise disposed of on such terms and in such manner as the Board
thinks fit.
(ii) At any time before a sale or disposal as aforesaid, the Board may cancel the forfeiture on such terms as it
thinks fit.
34. (i) A person whose shares have been forfeited shall cease to be a member in respect of the forfeited shares,
but shall, notwithstanding the forfeiture, remain liable to pay to the company all monies which, at the date of
forfeiture, were presently payable by him to the company in respect of the shares.
(ii) The liability of such person shall cease if and when the company shall have received payment in full of
all such monies in respect of the shares.
35. (i) A duly verified declaration in writing that the declarant is a director, the manager or the secretary, of the
company, and that a share in the company has been duly forfeited on a date stated in the declaration, shall be
conclusive evidence of the facts therein stated as against all persons claiming to be entitled to the share;
(ii) The company may receive the consideration, if any, given for the share on any sale or disposal thereof
and may execute a transfer of the share in favour of the person to whom the share is sold or disposed of;
(iii) The transferee shall thereupon be registered as the holder of the share; and
(iv) The transferee shall not be bound to see to the application of the purchase money, if any, nor shall his
title to the share be affected by any irregularity or invalidity in the proceedings in reference to the forfeiture,
sale or disposal of the share.
36. The provisions of these regulations as to forfeiture shall apply in the case of nonpayment of any sum which,
by the terms of issue of a share, becomes payable at a fixed time, whether on account of the nominal value
of the share or by way of premium, as if the same had been payable by virtue of a call duly made and notified.
553ALTERATION OF CAPITAL
37. The company may, from time to time, by ordinary resolution increase the share capital by such sum, to be
divided into shares of such amount, as may be specified in the resolution.
38. Subject to the provisions of section 61, the company may, by ordinary resolution, --
(a) consolidate and divide all or any of its share capital into shares of larger amount than its existing shares
(b) convert all or any of its fully paid-up shares into stock, and reconvert that stock into fully paid-up shares
of any denomination;
(c) sub-divide its existing shares or any of them into shares of smaller amount than is fixed by the
memorandum;
(d) cancel any shares which, at the date of the passing of the resolution, have not been taken or agreed to be
taken by any person.
39. Where shares are converted into stock, -
(a) the holders of stock may transfer the same or any part thereof in the same manner as, and subject to the
same regulations under which, the shares from which the stock arose might before the conversion have been
transferred, or as near thereto as circumstances admit:
Provided that the Board may, from time to time, fix the minimum amount of stock transferable, so, however,
that such minimum shall not exceed the nominal amount of the shares from which the stock arose.
(b) the holders of stock shall, according to the amount of stock held by them, have the same rights, privileges
and advantages as regards dividends, voting at meetings of the company, and other matters, as if they held
the shares from which the stock arose; but no such privilege or advantage (except participation in the
dividends and profits of the company and in the assets on winding up) shall be conferred by an amount of
stock which would not, if existing in shares, have conferred that privilege or advantage.
(c) such of the regulations of the company as are applicable to paid-up shares shall apply to stock and the
words “share” and “shareholder” in those regulations shall include “stock” and “stock-holder” respectively.
40. The company may, by special resolution, reduce in any manner and with, and subject to, any incident
authorised and consent required by law, --
(a) its share capital;
(b) any capital redemption reserve account; or
(c) any share premium account.
CAPITALISATION OF PROFITS
41. (i) The company in general meeting may, upon the recommendation of the Board, resolve --
(a) that it is desirable to capitalise any part of the amount for the time being standing to the credit of any of
the company's reserve accounts, or to the credit of the, profit and loss account, or otherwise available for
distribution; and
554(b) that such sum be accordingly set free for distribution in the manner specified in clause (ii) amongst the
members who would have been entitled thereto, if distributed by way of dividend and in the same proportions.
(ii) The sum aforesaid shall not be paid in cash but shall be applied, subject to the provision contained in clause
(iii), either in or towards --
(A) paying up any amounts for the time being unpaid on any shares held by such members respectively;
(B) paying up in full, unissued shares of the company to be allotted and distributed, credited as fully paid-up,
to and amongst such members in the proportions aforesaid;
(C) partly in the way specified in sub-clause (A) and partly in that specified in sub-clause (B);
(D) A securities premium account and a capital redemption reserve account may, for the purposes of this
regulation, be applied in the paying up of unissued shares to be issued to members of the company as fully
paid bonus shares;
(E) The Board shall give effect to the resolution passed by the company in pursuance of this regulation.
42. (i) Whenever such a resolution as aforesaid shall have been passed, the Board shall -
(a) make all appropriations and applications of the undivided profits resolved to be capitalised thereby, and
all allotments and issues of fully paid shares if any; and
(b) generally do all acts and things required to give effect thereto.
(ii) The Board shall have power --
(a) to make such provisions, by the issue of fractional certificates or by payment in cash or otherwise as it
thinks fit, for the case of shares becoming distributable in fractions; and
(b) to authorize any person to enter, on behalf of all the members entitled thereto, into an agreement with the
company providing for the allotment to them respectively, credited as fully paid-up, of any further shares to
which they may be entitled upon such capitalisation, or as the case may require, for the payment by the
company on their behalf, by the application thereto of their respective proportions of profits resolved to be
capitalised, of the amount or any part of the amounts remaining unpaid on their existing shares;
(iii) Any agreement made under such authority shall be effective and binding on such members.
BUY- BACK OF SHARES
43. Notwithstanding anything contained in these articles but subject to the provisions of sections 68 to 70 and
any other applicable provision of the Act or any other law for the time being in force, the company may
purchase its own shares or other specified securities.
GENERAL MEETINGS
44. All General Meetings other than the Annual General Meeting shall be called Extra-ordinary General
Meetings.
45. (i) The Board may whenever it thinks fit, call an Extra-ordinary General Meetings.
555(ii) If at any time directors capable of acting who are sufficient in number to form a quorum are not within
India, any director or any two members of the company may call an extraordinary general meeting in the
same manner, as nearly as possible, as that in which such a meeting may be called by the Board.
PROCEEDINGS AT GENERAL MEETINGS
46. (i) No business shall be transacted at any general meeting unless a quorum of members is present at the time
when the meeting proceeds to business.
(ii) Save as otherwise provided herein, the quorum for the general meetings shall be as provided in section
103.
47. The chairperson, if any, of the Board shall preside as Chairperson at every general meeting of the company.
48. If there is no such Chairperson, or if he is not present within fifteen minutes after the time appointed for
holding the meeting, or is unwilling to act as chairperson of the meeting, the directors present shall elect one
of their members to be Chairperson of the meeting.
49. If at any meeting no director is willing to act as Chairperson or if no director is present within fifteen minutes
after the time appointed for holding the meeting, the members present shall choose one of their members to
be Chairperson of the meeting.
ADJOURNMENT OF MEETING
50. (i) The Chairperson may, with the consent of any meeting at which a quorum is present, and shall, if so
directed by the meeting, adjourn the meeting from time to time and from place to place.
(ii) No business shall be transacted at any adjourned meeting other than the business left unfinished at the
meeting from which the adjournment took place.
(iii) When a meeting is adjourned for thirty days or more, notice of the adjourned meeting shall be given as
in the case of an original meeting.
(iv) Save as aforesaid, and as provided in section 103 of the Act, it shall not be necessary to give any notice
of an adjournment or of the business to be transacted at an adjourned meeting.
VOTING RIGHTS
51. Subject to any rights or restrictions for the time being attached to any class or classes of shares, --
(a) on a show of hands, every member present in person shall have one vote; and
(b) on a poll, the voting rights of members shall be in proportion to his share in the paid-up equity share
capital of the company.
52. A member may exercise his vote at a meeting by electronic means in accordance with section 108 and shall
vote only once.
53. (i) In the case of joint holders, the vote of the senior who tenders a vote, whether in person or by proxy, shall
be accepted to the exclusion of the votes of the other joint holders.
556(ii) For this purpose, seniority shall be determined by the order in which the names stand in the register of
members.
54. A member of unsound mind, or in respect of whom an order has been made by any court having jurisdiction
in lunacy, may vote, whether on a show of hands or on a poll, by his committee or other legal guardian, and
any such committee or guardian may, on a poll, vote by proxy.
55. Any business other than that upon which a poll has been demanded may be proceeded with, pending the
taking of the poll.
56. No member shall be entitled to vote at any general meeting unless all calls or other sums presently payable
by him in respect of shares in the company have been paid .
57. (i) No objection shall be raised to the qualification of any voter except at the meeting or adjourned meeting
at which the vote objected to is given or tendered, and every vote not disallowed at such meeting shall be
valid for all purposes.
(ii) Any such objection made in due time shall be referred to the Chairperson of the meeting, whose decision
shall be final and conclusive.
PROXY
58. The instrument appointing a proxy and the power-of-attorney or other authority, if any, under which it is
signed or a notarised copy of that power or authority, shall be deposited at the registered office of the company
not less than 48 hours before the time for holding the meeting or adjourned meeting at which the person
named in the instrument proposes to vote, or, in the case of a poll, not less than 24 hours before the time
appointed for the taking of the poll; and in default the instrument of proxy shall not be treated as valid.
59. An instrument appointing a proxy shall be in the form as prescribed in the rules made under section 105.
60. A vote given in accordance with the terms of an instrument of proxy shall be valid, notwithstanding the
previous death or insanity of the principal or the revocation of the proxy or of the authority under which the
proxy was executed, or the transfer of the shares in respect of which the proxy is given:
Provided that no intimation in writing of such death, insanity, revocation or transfer shall have been received
by the company at its office before the commencement of the meeting or adjourned meeting at which the
proxy is used.
BOARD OF DIRECTORS
61. The following are the first Directors of the Company:
1. Rekha Tyagi
2. Neeraj Tyagi
(i) The remuneration of the directors shall, in so far as it consists of a monthly payment, be deemed to accrue
from day-to-day.
(ii) In addition to the remuneration payable to them in pursuance of the Act, the directors may be paid all
travelling, hotel and other expenses properly incurred by them -
557(a) in attending and returning from meetings of the Board of Directors or any committee thereof or general
meetings of the company; or
(b) in connection with the business of the company.
62. The Board may pay all expenses incurred in getting up and registering the company.
63. The company may exercise the powers conferred on it by section 88 with regard to the keeping of a foreign
register; and the Board may (subject to the provisions of that section) make and vary such regulations as it
may thinks fit respecting the keeping of any such register.
64. All cheques, promissory notes, drafts, hundis, bills of exchange and other negotiable instruments, and all
receipts for monies paid to the company, shall be signed, drawn, accepted, endorsed, or otherwise executed,
as the case may be, by such person and in such manner as the Board shall from time to time by resolution
determine
65. Every director present at any meeting of the Board or of a committee thereof shall sign his name in a book
to be kept for that purpose.
66. (i) Subject to the provisions of section 149, the Board shall have power at any time, and from time to time,
to appoint a person as an additional director, provided the number of the directors and additional directors
together shall not at any time exceed the maximum strength fixed for the Board by the articles.
(ii) Such person shall hold office only up to the date of the next annual general meeting of the company
but shall be eligible for appointment by the company as a director at that meeting subject to the provisions of
the Act.
PROCEEDINGS OF THE BOARD
67. (i) The Board of Directors may meet for the conduct of business, adjourn and otherwise regulate its meetings,
as it thinks fit.
(ii) A director may, and the manager or secretary on the requisition of a director shall, at any time, summon
a meeting of the Board.
68. (i) Save as otherwise expressly provided in the Act, questions arising at any meeting of the Board shall be
decided by a majority of votes.
(ii) In case of an equality of votes, the Chairperson of the Board, if any, shall have a second or casting vote.
69. The continuing directors may act notwithstanding any vacancy in the Board; but, if and so long as their
number is reduced below the quorum fixed by the Act for a meeting of the Board, the continuing directors or
director may act for the purpose of increasing the number of directors to that fixed for the quorum, or of
summoning a general meeting of the company, but for no other purpose.
70. (i) The Board may elect a Chairperson of its meetings and determine the period for which he is to hold office.
(ii) If no such Chairperson is elected, or if at any meeting the Chairperson is not present within five minutes
after the time appointed for holding the meeting, the directors present may choose one of their number to be
Chairperson of the meeting.
55871. (i) The Board may, subject to the provisions of the Act, delegate any of its powers to committees consisting
of such member or members of its body as it thinks fit.
(ii) Any committee so formed shall, in the exercise of the powers so delegated, conform to any regulations
that may be imposed on it by the Board.
72. (i) A committee may elect a Chairperson of its meetings.
(ii) If no such Chairperson is elected, or if at any meeting the Chairperson is not present within five minutes
after the time appointed for holding the meeting, the members present may choose one of their members to
be Chairperson of the meeting.
73. (i) A committee may meet and adjourn as it thinks fit.
(ii) Questions arising at any meeting of a committee shall be determined by a majority of votes of the members
present, and in case of an equality of votes, the Chairperson shall have a second or casting vote.
74. All acts done in any meeting of the Board or of a committee thereof or by any person acting as a director,
shall, notwithstanding that it may be afterwards discovered that there was some defect in the appointment of
any one or more of such directors or of any person acting as aforesaid, or that they or any of them were
disqualified, be as valid as if every such director or such person had been duly appointed and was qualified
to be a director.
75. Save as otherwise expressly provided in the Act, a resolution in writing, signed by all the members of the
Board or of a committee thereof, for the time being entitled to receive notice of a meeting of the Board or
committee, shall be valid and effective as if it had been passed at a meeting of the Board or committee, duly
convened and held.
CHIEF EXECUTIVE OFFICER, MANAGER, COMPANY SECRETARY OR CHIEF FINANCIAL
OFFICER
76. Subject to the provisions of the Act, --
(i) A chief executive officer, manager, company secretary or chief financial officer may be appointed by the
Board for such term, at such remuneration and upon such conditions as it may thinks fit; and any chief
executive officer, manager, company secretary or chief financial officer so appointed may be removed by
means of a resolution of the Board;
(ii) A director may be appointed as chief executive officer, manager, company secretary or chief financial
officer
77. A provision of the Act or these regulations requiring or authorizing a thing to be done by or to a director and
chief executive officer, manager, company secretary or chief financial officer shall not be satisfied by its
being done by or to the same person acting both as director and as, or in place of, chief executive officer,
manager, company secretary or chief financial officer.
THE SEAL
78. (i) The Board shall provide for the safe custody of the seal.
(ii) The seal of the company shall not be affixed to any instrument except by the authority of a resolution of
the Board or of a committee of the Board authorised by it in that behalf, and except in the presence of at least
559two directors and of the secretary or such other person as the Board may appoint for the purpose; and those
two directors and the secretary or other person aforesaid shall sign every instrument to which the seal of the
company is so affixed in their presence.
DIVIDENDS AND RESERVE
79. The company in general meeting may declare dividends, but no dividend shall exceed the amount
recommended by the Board.
80. Subject to the provisions of section 123, the Board may from time to time pay to the members such interim
dividends as appear to it to be justified by the profits of the company.
81. (i) The Board may, before recommending any dividend, set aside out of the profits of the company such
sums as it thinks fit as a reserve or reserves which shall, at the discretion of the Board, be applicable for any
purpose to which the profits of the company may be properly applied, including provision for meeting
contingencies or for equalizing dividends; and pending such application, may, at the like discretion, either be
employed in the business of the company or be invested in such investments (other than shares of the
company) as the Board may, from time to time, thinks fit.
(ii) The Board may also carry forward any profits which it may consider necessary not to divide, without
setting them aside as a reserve
82. (i) Subject to the rights of persons, if any, entitled to shares with special rights as to dividends, all dividends
shall be declared and paid according to the amounts paid or credited as paid on the shares in respect whereof
the dividend is paid, but if and so long as nothing is paid upon any of the shares in the company, dividends
may be declared and paid according to the amounts of the shares.
(ii) No amount paid or credited as paid on a share in advance of calls shall be treated for the purposes of this
regulation as paid on the share.
(iii) All dividends shall be apportioned and paid proportionately to the amounts paid or credited as paid on
the shares during any portion or portions of the period in respect of which the dividend is paid; but if any
share is issued on terms providing that it shall rank for dividend as from a particular date such share shall
rank for dividend accordingly.
83. The Board may deduct from any dividend payable to any member all sums of money, if any, presently
payable by him to the company on account of calls or otherwise in relation to the shares of the company.
84. (i) Any dividend, interest or other monies payable in cash in respect of shares may be paid by cheque or
warrant sent through the post directed to the registered address of the holder or, in the case of joint holders,
to the registered address of that one of the joint holders who is first named on the register of members, or to
such person and to such address as the holder or joint holders may in writing direct.
(ii) Every such cheque or warrant shall be made payable to the order of the person to whom it is sent.
85. Any one of two or more joint holders of a share may give effective receipts for any dividends, bonuses or
other monies payable in respect of such share.
86. Notice of any dividend that may have been declared shall be given to the persons entitled to share therein in
the manner mentioned in the Act.
87. No dividend shall bear interest against the company.
560ACCOUNTS
88. (i) The Board shall from time to time determine whether and to what extent and at what times and places
and under what conditions or regulations, the accounts and books of the company, or any of them, shall be
open to the inspection of members not being directors.
(ii) No member (not being a director) shall have any right of inspecting any account or book or document of
the company except as conferred by law or authorised by the Board or by the company in general meeting.
WINDING UP
89. Subject to the provisions of Chapter XX of the Act and rules made thereunder --
(i) If the company shall be wound up, the liquidator may, with the sanction of a special resolution of the
company and any other sanction required by the Act, divide amongst the members, in specie or kind, the
whole or any part of the assets of the company, whether they shall consist of property of the same kind or
not.
(ii) For the purpose aforesaid, the liquidator may set such value as he deems fair upon any property to be
divided as aforesaid and may determine how such division shall be carried out as between the members or
different classes of members.
(iii) The liquidator may, with the like sanction, vest the whole or any part of such assets in trustees upon such
trusts for the benefit of the contributories if he considers necessary, but so that no member shall be compelled
to accept any shares or other securities whereon there is any liability.
INDEMNITY
90. Every officer of the company shall be indemnified out of the assets of the company against any liability
incurred by him in defending any proceedings, whether civil or criminal, in which judgment is given in his
favour or in which he is acquitted or in which relief is granted to him by the court or the Tribunal.
561SECTION IX – OTHER INFORMATION
MATERIAL CONTRACTS AND DOCUMENTS FOR INSPECTION
The copies of following documents and contracts which have been entered or are to be entered into by our Company
(not being contracts entered into in the ordinary course of business carried on by our Company) which are or may
be deemed material will be attached to the copy of the Red Herring Prospectus/ Prospectus which will be filed
with the RoC, NCT of Delhi & Haryana. Copies of the contracts and also the documents for inspection referred to
hereunder, may be inspected at the Corporate Office located at B-137, Sector-2 Noida, Gautam Buddha Nagar,
Uttar Pradesh-201301, India, between 10 a.m. to 5 p.m. IST on all Working Days and shall also be available on
www.technocraftventures.com from the date of the Red Herring Prospectus until the Bid/ Offer Closing Date
(except for such agreements executed after the Bid/ Offer Closing Date).
Any of the contracts or documents mentioned in this Draft Red Herring Prospectus may be amended or modified
at any time if required in the interest of our Company or if required by the other parties, without reference to the
Shareholders, subject to compliance of the provisions contained in the Companies Act and other applicable law.
MATERIAL CONTRACTS
1) Offer Agreement dated June 23, 2025 entered into among our Company, the Promoter Selling Shareholder
and the Book Running Lead Manager.
2) Agreement dated June 23, 2025 entered into among our Company, the Promoter Selling Shareholder and the
Registrar to the Offer.
3) Syndicate Agreement dated [●] entered into among our Company, the Promoter Selling Shareholder, the
Registrar to the Offer, the Book Running Lead Manager and Syndicate Members.
4) Cash Escrow and Sponsor Bank Agreement dated [●] entered into among our Company, the Promoter Selling
Shareholder, the Book Running Lead Manager, the Syndicate Members, Banker(s) to the Offer and the
Registrar to the Offer.
5) Share Escrow Agreement dated [●] entered into among the Promoter Selling Shareholder, our Company and
the Share Escrow Agent.
6) Underwriting Agreement dated [●] entered into among our Company, the Promoter Selling Shareholder and
the Underwriters.
7) Monitoring Agency Agreement dated [●] entered into between our Company and the Monitoring Agency.
8) Tripartite Agreement dated July 18, 2025, entered into among our Company, CDSL and the Registrar to the
Offer.
9) Tripartite Agreement dated December 03, 2024, entered into among our Company, NSDL and the Registrar to
the Offer.
MATERIAL DOCUMENTS
1) Certified true copy of the Memorandum and Articles of Association of our Company, as amended from time
to time.
2) Initial Certificate of Incorporation of ‘Technocraft Construction Private Limited’, incorporated as a private
limited company under the Companies Act, 1956, pursuant to the certificate of incorporation dated October
21, 1998, issued by the Registrar of Companies, National Capital Territory of Delhi & Haryana.
5623) Amended Certificate of Incorporation was issued by the Registrar of Companies, NCT of Delhi & Haryana
on February 09, 2024, pursuant to the change of name of our Company from ‘Technocraft Construction
Private Limited’ to ‘Technocraft Ventures Private Limited’
4) Final Certificate of Incorporation was issued by the Registrar of Companies, Central Processing Centre, on
June 11, 2024, pursuant to the change of name of our Company to ‘Technocraft Ventures Limited.
5) Resolution of the Board of Directors dated May 29, 2025, approving the Offer and other related matters.
6) Shareholders’ resolution dated June 02, 2025, approving the Offer and other related matters.
7) Consent letter dated June 05, 2025, from the Promoter Selling Shareholder consenting to participate in the
Offer for Sale.
8) Resolution of our Board of Directors dated June 05, 2025, taking on record the participation of the Promoter
Selling Shareholder in the Offer for Sale.
9) Copies of Annual Reports for the preceding three Financial Years i.e., Financial Years 2024, 2023 and 2022.
10) Resolution dated July 12, 2025 passed by our Audit Committee in relation the KPIs of our Company.
11) Resolution of the IPO Committee dated August 08, 2025 approving this Draft Red Herring prospectus.
12) Resolution of the Board of Directors August 08, 2025 approving this Draft Red Herring Prospectus.
13) The examination report dated July 12, 2025 from the Statutory Auditors on our Restated Consolidated
Financial Information.
14) Statement of Special Tax Benefits dated August 04, 2025 issued by Rishi Kapoor & Company, Chartered
Accountants.
15) Consents of our Promoters, Directors, Company Secretary and Compliance Officer, Chief Financial Officer,
Legal Counsel to the Company, Bankers to our Company, Bankers to the Offer, Refund Bank(s), Sponsor
Bank(s), the Book Running Lead Manager, Syndicate Members, Monitoring Agency, Registrar to the Offer,
Underwriter to the Offer to act in their respective capacities.
16) Consent Letter dated August 04, 2025 from Statutory Auditor, holding a valid peer review certificate from
the ICAI, to include their name as required under Section 26(5) of the Companies Act, 2013 read with SEBI
ICDR Regulations in this Draft Red Herring Prospectus and as an ‘expert’ as defined under Section 2(38) of
Companies Act, 2013 in respect of the certificates issued by them in their capacity as an independent chartered
accountant to our Company.
17) Consent dated July 18, 2025 from the Independent Chartered Engineer, Y. P. & Associates to include their
name as required under Section 26(1) of the Companies Act, 2013 in this Draft Red Herring Prospectus and
as an “expert” as defined under Section 2(38) of the Companies Act, 2013.
18) Our Company has received a written consent dated July 05, 2025, from R & D, Practising Company
Secretaries, to include their name, as required under section 26 of the Companies Act, 2013 read with SEBI
ICDR Regulations, in this Draft Red Herring Prospectus, and as an “expert” as defined under section 2(38)
of the Companies Act, 2013 in respect of certificate issued by them in their capacity as the independent
practicing company secretary to our Company, and such consent has not been withdrawn as on the date of
this Draft Red Herring Prospectus.
56319) Consent letter dated August 05, 2025 issued by CRISIL Intelligence, with respect to the Industry Report titled
“Assessment of Infrastructure Construction Industry in India with focus on Water and Wastewater
Management” dated August 05, 2025 issued by CRISIL Intelligence.
20) Certificate dated August 04, 2025 issued by Statutory Auditor certifying the KPIs of our Company.
21) Certificate dated August 04, 2025 issued by our Statutory Auditor in confirming weighted average price,
average cost of acquisition and price at which specified securities were acquired.
22) Certificate dated August 04, 2025 issued by our Statutory Auditor in relation to Basis for Offer Price.
23) Certificate dated August 04, 2025 issued by our Statutory Auditor in relation to Financial Indebtedness.
24) Certificate dated August 04, 2025 issued by our Statutory Auditor in relation to capitalization statement.
25) The Managing Director Agreement between our Company and Sanjay Tyagi dated April 14, 2025.
26) The Whole -Time Director and Chief Financial Officer Agreement between our Company and Kartikey Tyagi
dated June 01, 2025.
27) The Executive Director Agreement between our Company and Rekha Tyagi dated June 01, 2025.
28) Due Diligence certificate dated August 08, 2025 addressed to SEBI from the Book Running Lead Manager.
29) In-principle approvals dated [●] and [●], issued by BSE and NSE, respectively.
30) Final observation letter bearing number [●] dated [●] issued by SEBI.
Any of the contracts or documents mentioned in this Draft Red Herring Prospectus may be amended or
modified at any time if so, required in the interest of our Company or if required by the other parties, with the
approval of the Shareholders subject to compliance of the provisions contained in the Companies Act and
other relevant statutes.
564DECLARATION
I hereby certify and declare that all relevant provisions of the Companies Act, 2013 and the rules, guidelines and
regulations issued by the Government of India or the guidelines and regulations issued by SEBI, established under
Section 3 of the SEBI Act as the case may be, have been complied with and no statement, disclosure and
undertaking made in this Draft Red Herring Prospectus is contrary to the provisions of the Companies Act, the
SEBI Act, the SCRA, the SCRR, each as amended or rules made or guidelines or regulations issued thereunder,
as the case may be. I further certify that all statements, disclosures and undertakings in this Draft Red Herring
Prospectus are true and correct.
SIGNED BY THE MANAGING DIRECTOR OF OUR COMPANY
___________________________________
Sanjay Tyagi
Designation: Managing Director
Place: Noida, Uttar Pradesh
Date: August 08, 2025
565DECLARATION
I hereby certify and declare that all relevant provisions of the Companies Act, 2013 and the rules, guidelines and
regulations issued by the Government of India or the guidelines and regulations issued by SEBI, established under
Section 3 of the SEBI Act as the case may be, have been complied with and no statement, disclosure and
undertaking made in this Draft Red Herring Prospectus is contrary to the provisions of the Companies Act, the
SEBI Act, the SCRA, the SCRR, each as amended or rules made or guidelines or regulations issued thereunder,
as the case may be. I further certify that all statements, disclosures and undertakings in this Draft Red Herring
Prospectus are true and correct.
SIGNED BY THE WHOLE-TIME DIRECTOR AND CHIEF FINANCIAL OFFICER OF OUR
COMPANY
___________________________________
Kartikey Tyagi
Designation: Whole-Time Director and Chief Financial Officer
Place: Noida, Uttar Pradesh
Date: August 08, 2025
566DECLARATION
I hereby certify and declare that all relevant provisions of the Companies Act, 2013 and the rules, guidelines and
regulations issued by the Government of India or the guidelines and regulations issued by SEBI, established under
Section 3 of the SEBI Act as the case may be, have been complied with and no statement, disclosure and
undertaking made in this Draft Red Herring Prospectus is contrary to the provisions of the Companies Act, the
SEBI Act, the SCRA, the SCRR, each as amended or rules made or guidelines or regulations issued thereunder,
as the case may be. I further certify that all statements, disclosures and undertakings in this Draft Red Herring
Prospectus are true and correct.
SIGNED BY THE EXECUTIVE DIRECTOR OF OUR COMPANY
___________________________________
Rekha Tyagi
Designation: Executive Director
Place: Noida, Uttar Pradesh
Date: August 08, 2025
567DECLARATION
I hereby certify and declare that all relevant provisions of the Companies Act, 2013 and the rules, guidelines and
regulations issued by the Government of India or the guidelines and regulations issued by SEBI, established under
Section 3 of the SEBI Act as the case may be, have been complied with and no statement, disclosure and
undertaking made in this Draft Red Herring Prospectus is contrary to the provisions of the Companies Act, the
SEBI Act, the SCRA, the SCRR, each as amended or rules made or guidelines or regulations issued thereunder,
as the case may be. I further certify that all statements, disclosures and undertakings in this Draft Red Herring
Prospectus are true and correct.
SIGNED BY THE INDEPENDENT DIRECTOR OF OUR COMPANY
___________________________________
Mukesh Kumar Garg
Designation: Independent Director
Place: Noida, Uttar Pradesh
Date: August 08, 2025
568DECLARATION
I hereby certify and declare that all relevant provisions of the Companies Act, 2013 and the rules, guidelines and
regulations issued by the Government of India or the guidelines and regulations issued by SEBI, established under
Section 3 of the SEBI Act as the case may be, have been complied with and no statement, disclosure and
undertaking made in this Draft Red Herring Prospectus is contrary to the provisions of the Companies Act, the
SEBI Act, the SCRA, the SCRR, each as amended or rules made or guidelines or regulations issued thereunder,
as the case may be. I further certify that all statements, disclosures and undertakings in this Draft Red Herring
Prospectus are true and correct.
SIGNED BY THE INDEPENDENT DIRECTOR OF OUR COMPANY
___________________________________
Bhawna Saunkhiya
Designation: Independent Director
Place: Ghaziabad, Uttar Pradesh
Date: August 08, 2025
569DECLARATION
I hereby certify and declare that all relevant provisions of the Companies Act, 2013 and the rules, guidelines and
regulations issued by the Government of India or the guidelines and regulations issued by SEBI, established under
Section 3 of the SEBI Act as the case may be, have been complied with and no statement, disclosure and
undertaking made in this Draft Red Herring Prospectus is contrary to the provisions of the Companies Act, the
SEBI Act, the SCRA, the SCRR, each as amended or rules made or guidelines or regulations issued thereunder,
as the case may be. I further certify that all statements, disclosures and undertakings in this Draft Red Herring
Prospectus are true and correct.
SIGNED BY THE INDEPENDENT DIRECTOR OF OUR COMPANY
___________________________________
Shruti Gupta
Designation: Independent Director
Place: Ludhiana, Punjab
Date: August 08, 2025
570DECLARATION
I hereby certify and declare that all relevant provisions of the Companies Act, 2013 and the rules, guidelines and
regulations issued by the Government of India or the guidelines and regulations issued by SEBI, established under
Section 3 of the SEBI Act as the case may be, have been complied with and no statement, disclosure and
undertaking made in this Draft Red Herring Prospectus is contrary to the provisions of the Companies Act, the
SEBI Act, the SCRA, the SCRR, each as amended or rules made or guidelines or regulations issued thereunder,
as the case may be. I further certify that all statements, disclosures and undertakings in this Draft Red Herring
Prospectus are true and correct.
SIGNED BY THE COMPANY SECRETARY & COMPLIANCE OFFICER OF OUR COMPANY
___________________________________
Saket Surolia
Designation: Company Secretary & Compliance Officer
Place: Noida, Uttar Pradesh
Date: August 08, 2025
571DECLARATION
We, Kartikey Constructions (Partnership Firm), hereby confirm that all statements, disclosures, and undertakings
specifically made or confirmed by us in this Draft Red Herring Prospectus about or in relation to ourselves as a
Promoter Selling Shareholder and our portion of the Offered Shares, are true and correct. We assume no
responsibility for any other statements, disclosures, or undertakings, including any of the statements, disclosures,
or undertakings made or confirmed by or relating to the Company or any other Selling Shareholder(s) or any other
person(s) in this Draft Red Herring Prospectus.
FOR KARTIKEY CONSTRUCTIONS (PARTNERSHIP FIRM)
___________________________________
Authorised Signatory
Sanjay Tyagi
Place: Noida, Uttar Pradesh
Date: August 08, 2025
572