This document contains the Delhi Electricity Regulatory Commission's Third Amendment Regulations of 2016, effective from the date of publication in the official Gazette (April 29th, 2016). It amends the Delhi Electricity Supply Code and Performance Standards Regulations of 2007, introducing a new regulation (23A) regarding the review of sanctioned load/contract demand by licensees. The regulation outlines procedures for load revision based on maximum demand readings, including consumer notification, security deposit adjustments, and timelines for implementation.
Key Points / Main Content:
Revised Load Computation:
* Licensees must review sanctioned load/contract demand based on the highest average of maximum demand readings over four consecutive months of the previous financial year.
* The minimum sanctioned load is 1kW.
* Revised sanctioned load is rounded off to the lower integer.
Consumer Notification and Action:
* If the computed revised load exceeds the sanctioned load, the licensee must notify the consumer of the proposed increase.
* The notice must include details of readings, enhanced security deposit, and differential Service Line cum Development (SLD) charges.
* Consumers have 30 days to deposit the additional amounts, after which it may be included in the next bill.
SLD Charges:
* Differential SLD charges apply only when the service line is actually changed by the licensee.
* Differential SLD is calculated as the difference between the SLD for the proposed enhanced load and the load for which SLD has already been paid.
* SLD charges are non-refundable.
Implementation and Adjustments:
* Upward revision of sanctioned load/contract demand is applicable for all consumer categories after notice and a 30-day deposit window.
* For domestic consumers, if the computed load is less than the sanctioned load, the licensee seeks consent for load reduction.
* For domestic consumers with sanctioned load up to 5kW, load reduction is automatic if no response is received within 30 days. For loads above 5kW, reduction requires explicit consent.
* Licensees will refund the prorated security deposit in case of load reduction, by adjusting in the energy bill.
Timelines and Compensation:
* Notices for upward or downward revision of sanctioned load/contract demand must be issued by May 31st of the financial year.
* Upward revision notices cannot be issued after May 31st.
* Failure to issue a downward revision notice by May 31st results in a Rs. 500 compensation to the consumer.
* Revisions are effective from July 1st of the financial year.
* A request for any load reduction will be entertained only after six months from the date of load enhancement.
Impact Analysis:
Consumers:
* Impact: Potential changes to sanctioned load/contract demand, leading to adjusted bills, security deposits, and SLD charges. Domestic consumers may experience automatic load reduction if their usage is below their sanctioned load (if below 5kW).
* Action Required: Monitor electricity usage, respond to notices from the licensee regarding load revisions, and pay any additional security deposit or SLD charges if applicable.
Licensees:
* Impact: Required to review sanctioned loads, issue notices, adjust security deposits, and manage SLD charges according to the new regulations. Also, liable for compensation in case of failure to notify downward revisions on time.
* Action Required: Implement processes for reviewing sanctioned loads, issuing notices to consumers, adjusting security deposits, and ensuring compliance with the timelines outlined in the amendment.
Delhi Electricity Regulatory Commission:
* Impact: Oversees the implementation and enforcement of the amended regulations.
* Action Required: Monitor the effectiveness of the new regulations and address any issues or disputes that may arise.
Key Entities Referenced
Delhi Electricity Regulatory Commission: The regulatory body that issued the notification regarding amendments to the Delhi Electricity Supply Code and Performance Standards Regulations.
Electricity Act 2003: The Indian law that empowers the Delhi Electricity Regulatory Commission to make regulations regarding electricity supply and performance standards. Section 50, 57, 86 and 181 are mentioned.
Delhi Electricity Supply Code and Performance Standards Regulations. 2007: The original regulations that are being amended by this notification.
Delhi Electricity Supply Code and Performance Standards Third Amendment Regulations, 2016: The specific amendment to the existing regulations that is the subject of this notification.
National Capital Territory of Delhi: The area where the regulations apply.
Section 50 of the Electricity Act 2003: Section of the Electricity Act 2003 that grants powers to the Delhi Electricity Regulatory Commission.
Regulation 23A: A new regulation added to the Principal Regulations, concerning the review of sanctioned load/contract demand by the licensee.
New Delhi: Location of the Government of India Press, Ring Road, Mayapuri.
(cid:9)(cid:9)(cid:9)
T-rA-Te fit. 3t.kro.-33002199 'WM *Rom REGISTERED No. D.L.-33002/99
GOVERNMENT OF INDIA
AIJW14141VII
ethi, Giaxette
31/1141714
EXTRAORDINARY
R. -
Tram- 4 wrruff
PUBLISHED BY AUTHORITY
(cid:9)
11 `1!""! 1)Itt!c!74 (cid:9) ,n1A% ',J!!'iej 9, 1918(cid:9) It 161
(cid:9)
No. 1](cid:9) DELHI, FRIDAY, APRIL 29, 2016NAISAKHA 9, 1938 IN.C.T.D. No. 261
PART— III
Tncr1-47 Tr7grrA' TT WI o3-4 (cid:9)
GOVERNMENT OF. THE "NATIONAL. CAPITAL TERRITORY OF DELHI
(cid:9) RR,414.14)
81-fiRT- r
it4- -, 29 ark1•9-, 2016
W41 Fd-tsu 7-4-mTtftdr 3 alTIT99 Hilto (qcn(cid:9) v #41)TI9-) 'RI4/M, 2016
77-7. 17(85)/itft.git3,77,912015-16/1(cid:9) c.1-2/11ii.77ii. 5178/156 3
1-firfitzP-T,
2003(cid:9) tri7 57, 86 3117 181 Tifq TTR4 ti-RT 50 gi(cid:9) t 1 71-9-(cid:9) ttd 7114 T-tt. (cid:9) •WAI
ft1-9" WW,LIFIT(cid:9) git1 ft4' q77 (cid:9) qIi #ftiT 47 397779- HI-III, 2007" (3ir4 137s-4
f4ft-zr4'(cid:9) -WW4rd-- Tfqhri-
to Tif44 a-r4 417 vt.49-
(1) 7-4 f4f444 *;-t(cid:9) i4-77 (cid:9) sfiT 31-Trr- 9' 4-
1 1'11'1 (774t4T 7,:t9ft9-ff) err
2016,q•,-(cid:9)f -f 411 I
(2) 4 I(cid:9)k i en4-1 <1\31'11 # (cid:9) toctor9- (cid:9) A. 79. i„.14-)
777:: 1 Pi RV-1.1-1 471'11;114-I 23 (cid:9)
2.0 23A14Ahviv
"23A(cid:9) 1:11 I t41ci 11:n71 1.45~1 7'1(cid:9) 74:11-41r
2101 DG/2016(cid:9)(cid:9)(cid:9)
(cid:9)(cid:9)
(cid:9) (cid:9)
2 DELHI GAZETTE : EXTRAORDINARY [PART III]
ci(cid:9) 9-R-T 44T-d-TT *'7 r -ftftTr* 3 Ti-ftTr4lifl *Ni(cid:9) fWVA-Rff
1-RTIT 117 TeT7 T.TV
TcT* 4 *k-Trr:
(1) Tfqhfu-dwr<41-flquIll
(1) T-41-t--9-(cid:9) 3P- TIT Ti-ftl-r *Tr, err(cid:9) 4-114-1-11 t, 4 Tfer5-9.* -7 c.11 ,*1 tTITT, 79-111--wr
3mi7 131-t9- # 31 4-ii4 (cid:9) 191,4
f*Fit 41W1T ci+111K Teerk 41 -ef 411.
ffk—d3TF(cid:9) 4-1'141 ftRIT (cid:9) 311.77(cid:9) 411! 7)-1* 4t4 -1:6CFF (cid:9) 4 trif*-d- f*zrr
f*fe4Tr (cid:9) cr)f 3T-q-f4(cid:9) 3Trkq 4 fWffitsT" 3744 4 3rN*9-fftfr
\iqiui (3r)
f4.9-(cid:9) T-4-177 *ITT(cid:9) : 4 fd,cui)(cid:9) lid
71flii4r**M-TT \i1c14-r(cid:9) :>4 14)c-ill I(cid:9) 3117 < 5 f,1(cid:9) coe_
4'1 II 'H. „d 4-cl I(cid:9) ri 41 (cid:9) (cid:9) chi u(cid:9) . 4 !f-(cid:9) N II
(cid:9) (4) —
ftff (cid:9) F-41-t---ff *-T(cid:9) : 4 nici)cile.
6 i4mlite. atT < 7 Rmillid
71f fr-R4T 811.9d--TT 7411-(cid:9) : >
#qrfird- TItfa- *ITT Tr TuriT9'(cid:9) : 614,r1 (cid:9) a Id
\iqiut (T) —
atiT-41-fff '4-TrT(cid:9) : 4 14)41ild
: > 4
3 Rri)cild(cid:9) < Rc-.I)c-iid.
fr~rlf ;cT (cid:9)TT 74-9-(cid:9) : 3
I)(cid:9) '4.TrT --01 -1 I(cid:9) k. 1111
(2) 'RI 1- -4 4-i '1 23A (1) -t3T-TTR, (cid:9) Tt•ftRI- wt 7N-Ft-p- (cid:9) q-r (cid:9)
4 3T-R*t: (cid:9) rdzrr 41i41 4 ,,ftctiRci(cid:9) 4 .v4'411-1,1*
3747 4 9=rft4 wrfr *k-rm 9)fa -9- 4 T-41-p- *T,Trr 7,1-fkTr (cid:9) 1-4T
(cid:9)4,4-11 rI 71 f4M-Tr a(cid:9) *t1*-2q*-frf4Tr*Trrq- (cid:9) * f(cid:9) g(cid:9) , 2003
3.1q(-IN sirfk:Tfff 73riT 6117-(cid:9) 7071-17 (cid:9) 17 -4 1-Pq" ctlt(cid:9) ord(cid:9) 1411 rft4
731DTIFTr ct-1 RiftW "Sirfi* 30 ft4t(cid:9) 6-iq(cid:9) 73=cr 1,rit(cid:9) rri(cid:9) t rTift 1 rf *-T-4 4
U1) "-t; 7tiRi(cid:9) Kt 'Ch Tif4(cid:9) 1E.k--f
i(cid:9) fitc-4- i rrutI
c-1M I (cid:9) I
ql?-14(cid:9) ',`41-11-(11 ztWW1 (cid:9) T7, itTiff 74-11t(Q,W;c141) TT k.79- v3,-1 4-1 I4-i41 qr-F7
f*zu \.4 1,tyl(cid:9) cl I `44H 5-ITT 447 .11-4-1,4k-da 4Tff4.(cid:9) 1ti(cid:9) (cid:9)
PART III] DELHI GAZETTE: EXTRAORDINARY 3
.44-4 s“-c-Hidi(cid:9) c1(cid:9) w+IR 4 *1--T(cid:9) .t-11417-`4-1 N. A P+41-(-.
3dT*M-73Tmq.1.,(cid:9) ,45)11(cid:9) -q-04-1-T4-Ta4rT
*1,c141 74-17 774T ct) FOIT %T TT 3i-17:11+111
- \30-11-W7 "0"..Frifff'4,11T # Tit 4 f (cid:9) 4 6 14,111id(cid:9) 1ft * 1-:247 nt
74.117: -t-TN- Turk 4000 3l-4- ff TiTit 3P.Ti7 7000 (6 fd-,41,11e_. fkir,) —Trrk 3000
(4 (4)(4.11(cid:9) id *R17) *(cid:9) T 411T79- a, tai I 1 71TI
7FR 11-) 7D-1)-71(cid:9) 46 RM)Glie... 41-7 liTT 4 ff7:f-r (cid:9) 4 t(cid:9) 7000/-t
(cid:9) TH(cid:9) IPT TT TrdT9" ftzfr 4IT .11,i(cid:9) '41-F4 RM)cild c14) °ti4-1
1 ci ct-1 .9-17(cid:9) FR. tl 7ft 7 RMlai(cid:9) #(cid:9) rlt titJciszn 71-T P:
I 1.1,4 3T9-411 TcI4 7000/- (7 Rc-ilald,(cid:9) — TcI-4 7000/- (4-;1s 4 ft 61-4-(cid:9) ) *fkrr,
43717T9. f*TIT TM-It(cid:9) 1;fl (cid:9) 74-R.(cid:9) al 4.9 tl
(3) 4- icpri `ii? zrrTif4,r- 4(cid:9)-641 4 ,.,(110 #?1- (cid:9) eTf411:14. f4itcr (cid:9) r
iir4t- r*tt-4*,~*fi-w 114151mi
(4) EltT 41:1fr *75- 4*-1,1**.41-44(cid:9) idn,44-1rt 23A(1) H41Pirl(cid:9) zrft 19(cid:9) t
*T-41.37-8- 1-TiTzrr TifkTr (cid:9) .*rrr *,,onog ff, 4 *Tr(cid:9) M I 1ti (cid:9) ,i,11-1-1-1,1 4
ri-Tdfl *411444-1(cid:9) \iff:Ri f;N(ut Trft-4. (cid:9) k*T rch
4-1i41 TO-171r4iN(cid:9) 4-ii,41(cid:9) 3-741)-TT 41-9711R (cid:9) i1411 I
zft(cid:9) 4TIPC*‘3Lir4-1 -th1**.Rik;, "MV.:4(cid:9) atRIT W4Tr (cid:9) it 5 14K-ii(cid:9) aid set) Fel*
`4-IN e:q (cid:9) .9 -ft4 (cid:9) IH Al(cid:9) a .flf=d-14 4 io ft9).-* *97 1--t Tp-91- -37 4 Tr4 9
t 47 R.1(cid:9) `4-iIt Tom: 4 tH f*Tfr (cid:9) ; 331-T Etk-7 (cid:9) f9-47-r
(cid:9) if 5 1(cid:9)-4,..i)1 id 4 sfir*F4t-t-a- (cid:9) 'TT #17737- 1. 4 TITITffsIiri i);1 'TT *Ht)*
0111,4111
(5) '4-i k (cid:9) ** Ti-r4791- (cid:9) 9-r -49- 4-1-7* f49- a(cid:9) c *(cid:9) f4-1=k4 19h 4 ft (cid:9) ftff
:94-1141Hrl nth ?T9-41Tild 71:47f t (cid:9) ,14-n (cid:9) .-rtqt (cid:9) wf f49- 4
31-R* k 4144(cid:9) 31-Tr-4 .3,0,1 124-ff (il)91--e-r (cid:9) wr7ft 1T-t-f*, IT T C4 I(cid:9) '&1-) (cid:9) 9-Rf
f4aTit4' ,,,)41\31 TT 'cr" r(sr •qu'r \14-41 TITr tTar ,,11:,4(-1(cid:9) 3Tff oLliA(cid:9) of TT
tEHH-1(cid:9) *7T1TI
AtrA7 5 fd(cid:9) Ml lid 41' siTtfkT Fd* 1TR- TTk*f -7 Tcr4 150/ (cid:9) 14mila (cid:9)l z*1-
vn-4-J,Pi(cid:9) "'" 750 \314-11 ftzrr 4111 WI 74c4iq IITT 2 Prmila (cid:9)id 41 1ft 7t 41- 3frT (cid:9)
tl TT 3fftit q49-r A4-11 Tcr4 1200 /- (Trr4 600 / srPr (cid:9) t- TT: #) z111 I f+Tir
4N-I I qTI Te47,,(cid:9) TVT Ali I 7 (cid:9) Mlal (cid:9) #TT TA' f (cid:9) 1950/- Tri-4
TP1* cirT 4.14-47d#4-11+1 )ft7T * 411117 'TT #17 zifk 2 Rc.ilaid 4)4-+(cid:9) \midi t,(cid:9) 749111-ff(cid:9)
DELHI GAZETTE : EXTRAORDINARY [PART III]
i~M1alz ft
3ThEITT IT +Mr( I(cid:9) A+41(cid:9) q-rtiTit 774 556/ tlilA T9-4 278 /(cid:9)
q<(cid:9)
(1950 ± 7=278)
(6) 91:47M(cid:9) 1 ik-Ifk-t-RTNt1141) lifT(cid:9) 4T-Ifrifl410-fl -O-TrIcrft 4-114-1c1(cid:9) t1P-“1 9-ff
ftzri ,)-11Q4111
(7) Tzitt-ff 117 t' .611(cid:9) e rr 1rT(cid:9) 4-1 41,C1(cid:9) fkt7 61,141(cid:9) qtraTr fk-4-i-zr
(cid:9) 4,1 .T-rt
31st 4i (14) 7-rff ft-4-r ,,iw411 l .94)11 *1 TA"
Ti-qftta-
TATIT-44(cid:9) 1,44-1 i (4) 39-7-F. zrit 9 -ft-q- 31st(cid:9) cl oh Wift.
TT:4 ft #21-R-# cilz4fl(cid:9) ' prritff TEnftm *r 774 500/- (cid:9) T 11-4-rd-r9-*ti-rr1
fkvq-f -ft (cid:9) fdR(cid:9) (8) *• 39-717 ATT TIT TT4 \3,-1A-wr * 3114w-T tr-T
M 15<40-1
(8) TfEt7 WET, 'Tr Tiitu (cid:9) 441 7 1-1 cl\-1/.1 4)1 #ft4-9-*Frr(cid:9) 4-114Ni „t,(cid:9) cri
1st (cid:9) TPT-1:1- I.(cid:9) z1p,4111
I(cid:9)
k‘7)(cid:9) I(cid:9) -1(cid:9) QN rI(cid:9) •.1, a=l1 .71- 71- 1`1-1)(cid:9) •1`14-H(cid:9) r) A PT WITS 47+ ...T.TTIT}.(cid:9) ,I19 tr:: '47;7(cid:9) -41* ‘1.1 41. 7f(cid:9) 7 T- T :C"',
't 4+(cid:9) ,,t,,1
rd ului)
(cid:9) 717 it*Fit 3T411-r TFTT 11 (548)/ /2009-10/t17 #.2373/4557
f,-9-F. T 01.02.2011, Q,Lh. 7 (57) / :421-twT4t. fit? / 2011-12 / 3060 7,1, RI(cid:9) / 5005
kt, 22..11,2011, 1!,t,. 7 (57) / ft-t3TF41 (cid:9) errs,(cid:9) 2011-12 / 3060/5708 ft9t4;
11.01:2012 :31tT (cid:9) 17 (44) /tA-littsT7fil 2010-11/7it (cid:9) t. 2621 / 5897 -ft9tT
20.01.2012 4; (cid:9) 77.1' RKT (cid:9) -(cid:9) Tqfk-d-(cid:9) 7111,4I TITR Q.71(cid:9) `31iff k" A-TR-7
PILid(cid:9) TM, 4(cid:9)-1 i 41 i;) f47#1:-.49-rTe \71 4111
DELHI ELECTRICITY REGULATORY COMMISSION
NOTIFICATION
Delhi, the 29th April, 2016
. Delhi Electricity Supply Code and Performance Standards (Third Amendment) Regulations, 2016
F. 17(85)/Engg./DERC/15-1.6/Part File-215178/156.—In exercise of the powers conferred by Section 50 of
the Electricity Act 2003, read with Sections 57, 86 and 181 of the Electricity Act, the Delhi Electricity Regulatory
Commission hereby makes the following amendments in "Delhi Electricity Supply Code and Performance Standards
Regulations. 2007" (hereinafter, referred to as "the Principal Regulations"), as follows :
1.0(cid:9) Short title and commencement
(1) These regulations may be called' the Delhi Electi:icity Supply Code and Performance Standards (Third
Amendment).Regulations, 2016. -(cid:9) •
(2) These regulations shall come into effect from the date of their publication in the official Gazette.
2.0(cid:9) A new Regulation 23A shall be added after Regulation 23 of the Principal Regulations as under:
"23A Review of sanctioned load/contract demand by the licensee
The Licensee shall review the sanctioned load or the contract demand as the case may be, on the basis of Maximum
Demand readings in the following manner:PART III](cid:9)
DELHI GAZETTE : EXTRAORDINARY
5
(1)(cid:9) Computation of Revised Load:
(i)For revision of sanctioned load or contract demand as the case may be, of the consumer, the Licensee
shall take,
the highest of average of Maximum Demand readings recorded as per billing cycle covering any
four consecutive calendar months in the previous financial year i.e. from I
off to the lower integer as described in the illustration: st April to 31st March, rounded
Provided that the period for billing.
Order. cycle shall not exceed the period specified in the applicable Tariff
Illustration (a):-
Sanctioned load in previous financial year : 4kW
Highest of Average of MD readings(cid:9)
: > 4kW and < 5 kW
Rounding off for revised sanctioned load : 4 kW
Illustration (b):-
Sanctioned load in Previous financial year : 4kW
Highest of Average of MD readings(cid:9)
: > 6kW and < 7 kW
Rounding off for revised sanctioned load : 6 kW
Illustration (c):-
Sanctioned
Innd in previooq financial :yen •4kW
FiigheSi: of Average of MD readings(cid:9)
:.> 3k W and < 4 kW
Rounding off for revised sanctioned load :3 kW
(ii)The minimum sanctioned load shall be lkW.
(2)
If the computed revised load pursuant to Regulation 23A (1) exceeds the sanctioned load or contract
dernand as the case may be, the Licensee shall issue a separate notice to the consumer about the proposed
increase in sanctioned load or contract demand. The notice shall contain the details of the exact readings
in the consecutive billing cycle(S) taken,ifito consideration along with details of enhanced security deposit
and the differential Service Line cum Development (SLD) charges, if any, for such increase in sanctioned
load or the contract demand, as the case may be, in accordance with Electricity Act, 2003 to be deposited
by the consumer within 30 days from the date of receipt of notice. If the consumer fails to do so, the
additional amount may be included in the next bill, indicating the reasons for such inclusion in the bill.
Provided that differential SLD charges shall be charged from the consumers only in those cases where the
service line is actually changed by the Licensee.
Provided further that Differential-
SLD charges for enhancement of load shall, be the additional SLD
required for differential load i.e: difference between the proposed enhanced load and the load for Which the
SLD charges has already been paid.
IllustratiOn: — for enhancement of sanctioned load from 4kW to 6kW the consumer Will have to pay a
differential SLD amount of Rs.4000 i.e. Rs.7000 (corresponding to 6kW) - Rs.3000 (corresponding to
4kW).
Further, if a consumer has taken a sanctioned load of 6kW initially and have already paid a SLD of
Rs.7000/- and his sanctioned load is reduced to 4kW. Subsequently, if his load is increased to 7kW then
the differential SLD charged shall be NIL i.e. Rs.7000 (corresponding to 7kW) - Rs.7000 (already paid
corresponding to 6kW) as the SLD charges are non-refundable.
(3) The upward revision of sanctioned load or contract demand of consumers, (after issue of notice and giving 30
days time to the consumer to deposit the enhanced security deposit and the differential SLD charges, if
any) shall be applicable for all categories of consumers.
(4)
In case of domestic category consumers, if the computed load pursuant to Regulation 23A (1) is less than the
sanctioned load or contract demand as the case may be of the consumer, the 'Licensee shall seek the
consent of the consumer for load reduction through a separate notice to the consumer, giving details and
information that his maximum demand is less than the sanctioned load or contract demand.
Provided that for domestic category consumers, having the sanctioned load upto 5kW in the last billing
cycle of previous financial year, if no communication is received from them within expiry of 30 days from
the date, of the receipt of notice, the load shall be reduced automatically; and for domestic consumers
having sanctioned load more than 5kW in the last billing cycle of previous financial year, the load shall be
reduced only on receipt of consent from the consumer.
(5)
In cases of load reduction, the Licensee shall refund the pro-rata security deposit by adjusting the same in
energy bill issued in next billing cycle. In case the refund of security deposit is in excess of the energy bill,6(cid:9) DELHI GAZETTE : EXTRAORDINARY(cid:9) [PART III]
the security deposit shall be refunded in the next energy bill(s). However, the Licensee shall also adjust
the interest accrued on the amount left with Licensee at the interest rate specified for interest on security
deposit.
Illustration:-
Suppose the security deposit of Rs. 750 was deposited @ Rs..150 /kW for initial sanctioned load of 5 kW_.
Subsequently, the -load was increased by 2 kW and an additional security deposit of Rs. 1200 @
Rs. 600/kW was deposited at the applicable rates.. Therefore, the total security deposit is Rs. 1950 for a
sanctiOned load of 7. kW. Thereafter, in case, the load is reduced by 2 kW on the basis of Maximum
Demand readings, the refund of security .deposit will be Rs. 556/- @ Rs. 27,8/ kW (1950+7 = 278)
calculated on pro-rata basis.
(6) Service line cum development (SLD) charges shall not be refundable in case of load reduction or
termination of agreement.
(7) The separate notice for upward or downward revision of sanctioned load or contract demand as the case
may be, shall be issued by 31' May of the financial year. No notice for upward revision shall be issued
thereafter.
In case a notice for downward revision pursuant to sub Regulation (4) is not issued by 3151 May, the
Licensee shall pay a compensation of Rs. 500 to the affected consumer, without prejudice to the right of
consumer to reduce the load which shall be effective as per sub Regulation (8) below:
Provided that the responsibility of showing the proof that notices have been issued shall be of the
Licensee.
(8) The upward or downWard revision of sanctioned load or contract demand as the case may be, shall be
done once in a finarleiRi year and shall be made effective from is' inty of the financial year
kf (cid:9)t, If ,lie load cilham..cd by am iii;cnbcc put buaili iv RugulatiOn 23A (2), file igUucM. foi any load tcuutiiuu
shall be entertained only after expiry of six months from the date of enhancement of load.
(10) MAHENDER SINGH, Secy.]
Notes:
The directions issued by the Commission vide Letters No. F.11(548)/DERC/2009-10/C.F.No.2373/4557 dated
01.02.2011, F.7(57)/DERC/CA/2011-12/3060/5005 dated 22.11.201 I, F.7(57)/DERC/CA/201 1-12/3060/5708 dated
11.01.2012 and F.17(44)/EnggIDERC/2010-11/CF No.2621/5897 .dated 20.01.2012 stand superseded by the these
Regulations. However, the cases dealt as per these aforesaid Orders shall not be reopened.