The following draft regulations, which the Central Electricity Authority proposes to make in exercise of the powers conferred by clause (e) of sub section (2) of section 177 of the Electricity Act, 2003 (36 of 2003), and in supersession of the Central Electricity Authority

Issued by Central Electricity Authority · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** The "Central Electricity Authority (Technical Standards for Connectivity to the Grid) Regulations, 2026" establishes updated technical requirements for connecting various entities to the Indian electricity grid, superseding the 2007 regulations. These draft standards apply to generating stations, transmission utilities, and bulk consumers to ensure grid stability, security, and power quality. Stakeholders are invited to submit objections or suggestions within thirty days of the notification date (July 31, 2026). **Key Points / Main Content** **General Connectivity Requirements** * **Responsibility:** Requesters and users are solely responsible for the planning, design, and safe operation of their equipment. * **Site Responsibility Schedule (SRS):** Every connection point must have an SRS documenting ownership, control, and maintenance responsibilities. * **Cybersecurity:** Users must comply with Authority-mandated cybersecurity guidelines and standards for communication systems. **Synchronous Generating Stations** * **Capacity:** Stations must be capable of delivering the Maximum Continuous Rating (MCR) minus auxiliary consumption at the Point of Interconnection (PoI). * **Voltage Ride-Through:** Units must remain connected during symmetrical and asymmetrical voltage disturbances (LVRT and HVRT) as per specified curves. * **Frequency Response:** Units must operate within 47.5 to 52 Hz and provide primary frequency response (PFR) with specified droop characteristics (3–6% for thermal, 0–10% for hydro). **Asynchronous and Inverter-Based Resources (IBR)** * **Reactive Power Support:** Wind, solar, and energy storage systems must provide dynamic reactive power support even at zero active power levels. * **Priority Modes:** During disturbances, units must be capable of switching between "Active Current Priority Mode" and "Reactive Current Priority Mode." * **Grid Forming (GFM) Control:** IBR units with GFM control must provide near-instantaneous frequency and voltage support and support islanded operation. **HVDC and FACTS Devices** * **Stability:** HVDC systems must find stable operation points after changes in the network and recover rapidly from transient faults. * **Power Quality:** These systems must include active filtering to manage background harmonics at the PoI. **Bulk Consumers and Distribution Systems** * **Power Factor:** Consumers at 33 kV or above must maintain a power factor within ± 0.95 at the PoI. * **Capacity Thresholds:** Inverter-interfaced bulk consumers with a capacity of 50 MW or above must comply with specific ride-through and active power control requirements. **Connectivity Procedure and Power Quality** * **Registration:** All generating units must register on the CEA’s "e-GEN" portal to receive a Unique Registration Number. * **Simulation Models:** Requesters must submit mathematical models (Static, PDT, EMT, and Harmonic) at least 12 months before physical interconnection. * **Limits:** Strict limits are set for Total Harmonic Distortion (THD), voltage unbalance (maximum 3.0%), flicker, and DC injection (not to exceed 0.5% of rated output). **Impact Analysis** **Generators (Thermal, Hydro, RE, and ESS)** * **Impact:** They must meet more stringent dynamic performance standards, including specific voltage and frequency ride-through capabilities and automated power control. * **Action Required:** Register units on the e-GEN portal, provide validated mathematical simulation models, and ensure hardware meets updated LVRT/HVRT specifications. **Transmission Utilities (CTU and STU)** * **Impact:** They are responsible for overseeing the technical integration and ensuring that new connections do not adversely affect grid reliability. * **Action Required:** Conduct interconnection studies, specify fault level conditions, and publish proformas for the Site Responsibility Schedule (SRS). **Bulk Consumers (33 kV and above)** * **Impact:** Large consumers are now subject to grid-discipline standards similar to generators, particularly regarding power factor and disturbance ride-through. * **Action Required:** Install adequate reactive compensation to maintain the required power factor and ensure equipment can handle voltage phase angle changes. **Load Despatch Centres (NLDC, RLDC, and SLDC)** * **Impact:** Increased oversight role in monitoring compliance during first-time energization (FTE) and commercial operation. * **Action Required:** Scrutinize simulation models, witness trial runs, and issue certificates of successful trial operation before commercial operation declaration (COD).

Key Entities Referenced

Central Electricity Authority (Technical Standards for Connectivity to the Grid) Regulations, 2026: The primary draft policy establishing technical requirements and procedures for connecting generating stations, energy storage systems, and bulk consumers to the Indian power grid. Electricity Act, 2003: The central legislation (specifically Section 177) that empowers the Central Electricity Authority to frame regulations regarding grid connectivity and technical standards. Central Electricity Authority (CEA): The statutory regulator and primary subject of the policy responsible for specifying technical standards and overseeing grid integration requirements. Load Despatch Centres (NLDC/RLDC/SLDC): The regulatory bodies at national, regional, and state levels responsible for operational oversight, trial runs, and ensuring compliance during the grid connectivity process. Central Electricity Authority (Technical Standards for Connectivity to the Grid) Regulations, 2007: The predecessor policy document which these new regulations seek to supersede and replace.
Official Source Record View Original Source →
See Full Document Text
रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99 सी.जी.-डी.एल.-अ.-04082026-275152 xxxGIDHxxx CG-DL-E-04082026-275152 xxxGIDExxx असाधारण EXTRAORDINARY भाग III—खण् ड 4 PART III—Section 4 प्राजधकार स ेप्रकाजित PUBLISHED BY AUTHORITY स.ं 485] नई दिल्ली, िुक्रिार, िुलाई 31, 2026/श्रािण 9, 1948 ष 22, 1947 No. 485] NEW DELHI, FRIDAY, JULY 31, 2026/SHRAVAN 9, 1948 s 1947 केंद्रीय जिद्यतु प्राजधकरण अजधसचू ना नई दिल्ली, 31, िलु ाई, 2026 सं. 12/X/STD(CONN)/GM/CEA.— जिद्युत अजधजनयम, 2003 (2003 का 36) की धारा 177 की उपधारा (2) के खडं (e) द्वारा प्रित्त िजियों का प्रयोग करत े हुए तथा केंद्रीय जिद्युत प्राजधकरण (जिड से कनेजटिजििी के जलए तकनीकी मानक) जिजनयम, 2007 तथा उसके संिोधनों का (ऐसे जनरसन से पूिव दकए गए अथिा दकए िाने से रह गए कायों के संबंध में छोड़कर), अजधक्रमण करते हुए, केंद्रीय जिद्युत प्राजधकरण जिन जनम्नजलजखत प्रारूप जिजनयमों को बनाने का प्रस्ट्ताि करता ह,ै उन्ह ें उि अजधजनयम की धारा 177 की उपधारा (3) के अधीन यथापेजित, इसके द्वारा प्रभाजित होन े की संभािना िाले सभी व्यजियों की िानकारी के जलए प्रकाजित दकया िाता है; और एतद्द्वारा सूचना िी िाती ह ै दक उि प्रारूप जिजनयमों पर उस तारीख से तीस दिनों की अिजध की समाजि के पश्चात जिचार दकया िाएगा, जिस तारीख से सरकारी रािपत्र म ेंयथाप्रकाजित इस अजधसूचना की प्रजतयां िनता के जलए उपलब्ध कराई िाती ह।ैं जिजनर्िवष्ट अिजध की समाजि स े पूिव उि प्रारूप जिजनयमों के संबंध में दकसी भी व्यजि स े प्राि होने िाल े आिपे ों अथिा सुझािों पर केंद्रीय जिद्युत प्राजधकरण द्वारा जिचार दकया िाएगा। 5964 GI/2026 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] उि प्रारूप जिजनयमों के संबंध म ें आिपे अथिा सुझाि, यदि कोई हों, मख्ु य अजभयंता, जिजध प्रभाग, 6िां तल, केंद्रीय जिद्युत प्राजधकरण, सेिा भिन, आर. के. परु म, नई दिल्ली – 110066, अथिा ई-मले : celegal-cea@gov.in पर भेि े िा सकते ह।ैं प्रारूप जिजनयम 1. सजं िि िीषकव और प्रारंभ: - (1) इन जिजनयमों को केंद्रीय जिद्युत प्राजधकरण (जिड से कनेजटिजििी के जलए तकनीकी मानक) जिजनयम, 2026 कहा िा सकता ह।ै (2) ये जिजनयम रािपत्र म ेंइनके प्रकािन की जतजथ से लाग ूहोंगे। 2. पररभाषाएं: - (1) इन जिजनयमों म,ें िब तक संिभव अन्यथा अपेजित न हो: - (i) " अजधजनयम " से तात्पयव जिद्युत अजधजनयम, 2003 (संख्या 36 िषव 2003) से ह;ै (ii) "एजटिि करंि प्राथजमकता मोड" का अथ व एक ऐसा मोड ह ै जिसमें एजटिि करंि आउिपुि (Ip) को प्राथजमकता िी िाती ह ै और उस े िनरेटिंग स्ट्िेिन की पूरी करंि रेटिंग (अथातव अजधकतम करंि एसी, Imax) उपलब्ध होती ह,ै िबदक ररएजटिि करंि आउिपिु (Iq) सीजमत होती ह।ै (iii) "उपयुि लोड जडस्ट्पैच सेंिर" से तात्पयव राष्ट्रीय लोड जडस्ट्पचै सेंिर (एनएलडीसी), िेत्रीय लोड जडस्ट्पैच सेंिर (आरएलडीसी), राज्य लोड जडस्ट्पैच सेंिर (एसएलडीसी), या एररया लोड जडस्ट्पैच सेंिर से ह,ै िैसा भी मामला हो; (iv) "एररया लोड जडस्ट्पैच सेंिर" से तात्पयव राज्य द्वारा दकसी जििेष िेत्र में लोड जडस्ट्पैच और जनयंत्रण के जलए स्ट्थाजपत केंद्र से ह;ै (v) "उपयुि पारेषण उपयोजगता" से तात्पयव केंद्रीय पारेषण उपयोजगता या राज्य पारेषण उपयोजगता से है, िैसा भी मामला हो; (vi) “अससंक्रोनस िनरेटिंग स्ट्िेिन” से तात्पयव एक ऐसे िनरेटिंग स्ट्िेिन से ह ै जिसमें अससंक्रोनस िनरेटिंग यूजनि(ओं) िाजमल ह;ैं (vii) “अससंक्रोनस िनरेटिंग यूजनि” से तात्पयव एक ऐसी िनरेटिंग यजू नि से ह,ै िो ससंक्रोनस िनरेटिंग यूजनि नहीं ह।ै (viii) "स्ट्िचाजलत उत्पािन जनयंत्रण (एिीसी)" का अथ व ह ै कुल पािर पलांि आउिपुि, िाई-लाइन पािर फ्लो और पािर जसस्ट्िम फ्रीक्वेंसी के अनुसार चयजनत उत्पािन इकाई (इकाइयों) के पािर आउिपुि को जिजनयजमत करन े की िमता; (ix) "जिरिि मानक (बीएस)" से तात्पयव जिरिि मानक संस्ट्थान द्वारा अनुमोदित मानकों और जिजिष्टताओं से है; (x) " बल्क कंज्यूमर " से तात्पयव ऐसे उपभोिा से ह ै िो 33 केिी या उससे अजधक िोल्िेि पर जिद्युत् आपूर्तव प्राि करता ह;ै (xi) “सह-जस्ट्थत उत्पािन स्ट्िेिन” का अथ व ह ै िो या िो स े अजधक उत्पािन स्ट्िेिन, जिनमें ऊिाव भंडारण प्रणाली भी िाजमल ह,ै जिन्ह ें अलग-अलग सुजिधाओं के रूप में संचाजलत और जनयंजत्रत दकया िाता ह ै और िो एक ही पॉइंि ऑफ इंिरेस्ट्ि (PoI) के पीछे िुड़ ेहोते ह;ैं (xii) “कलेटिर जसस्ट्िम” से तात्पयव उत्पािन इकाई(यों) के संयोिन में उपयोग दकए िान े िाले उपकरण और प्रणाजलयों से ह।ै इसमें उत्पािन इकाई(यों) और पीओआई के बीच जस्ट्िच-जगयर, केबल, रांसजमिन लाइनें, रांसफामवर और ररएजटिि कम्पेनसेटिंग जडिाइस आदि िाजमल ह;ैं[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 3 (xiii) दकसी जत्र-फेि प्रणाली म ें दकसी स्ट्थान पर "अथ व फॉल्ि फैटिर" का अथ व ह,ै अथ व फॉल्ि (िो एक या अजधक चरणों को प्रभाजित करता ह)ै के िौरान एक सही फेि पर उच्चतम रूि मीन स्ट्क्वायर (आरएमएस) फेि-िू-अथ व पािर फ्रीक्वेंसी िोल्िेि और उस चयजनत स्ट्थान पर फॉल्ि के जबना प्राि होने िाले आरएमएस फेि-िू-अथ व पािर फ्रीक्वेंसी िोल्िेि का अनपु ात; (xiv) "ऊिा व प्रबंधन प्रणाली" (ईएमएस) का अथ व ह ै एक संपणू व प्रणाली जिसमें जिद्युत प्रणाली के संचालन को सुगम बनान,े सुरिा, जिश्वसनीयता और जमतव्यजयता बनाए रखने के जलए सॉफ्ििेयर िाजमल होता है; (xv) “इिेंि लॉसगंग फैजसजलिीि” स ेतात्पयव ररल ेऔर अन्य उपकरणों के संचालन के कालानुक्रजमक क्रम को ररकॉड व करन े के जलए प्रिान दकए गए उपकरण से ह;ै (xvi) जिद्युत प्रणाली के संिभव म ें "ऊिाव भंडारण प्रणाली (ईएसएस)" का अथव एक ऐसी फैजसजलिी ह ै िहां जिद्युत ऊिाव को ऊिाव के दकसी ऐसे रूप में पररिर्तवत दकया िाता ह ै जिस े संिहीत दकया िा सकता ह,ै और बाि में इसे पनु ः जिद्युत ऊिाव म ें पररिर्तवत करके जिड में िापस डाला िा सकता ह,ै िैस े दक बैिरी ऊिाव भंडारण प्रणाली (बीईएसएसएस) और पंप स्ट्िोरेि पलांि (पीएसपी); (xvii) “ऊिाव भडं ारण प्रणाली (ईएसएस) इकाई” का अथव ह ै (a) एक पािर स्ट्िेिन के भीतर प्राइम मूिर से िड़ु ा जिद्युत िनरेिर, साथ ही पािर स्ट्िेिन पर जस्ट्थत ि े सभी संयंत्र और उपकरण िो जििेष रूप स ेपंप स्ट्िोरेि पलांि (पीएसपी) के मामले म ेंउस िनरेिर के संचालन से संबंजधत ह;ैं या (b) बैिरी ऊिाव भडं ारण प्रणाली (बीईएस) के संबंध म ें अन्य उपकरणों के साथ इन्ििवर के तहत िड़ु ेबैिरी मॉड्यलू ; (xviii) “ फैजसजलिी” स े तात्पय व एक जिजिष्ट प्रकार के उपकरण या प्रजतष्ठान स े ह ै िो जिद्युत ् उत्पािन, पारेषण या जितरण म ें भूजमका जनभाता ह;ै (xix) "फास्ट्ि फ्रीक्वेंसी ररस्ट्पांस" का अथ व ह ै आिृजत्त जिचलन घिना के अरेसस्ट्िंग चरण के िौरान मापी गई या िेखी गई आिृजत्त में पररितवन के ििाब में जिड में इंिेटि की गई एजटिि पािर, तादक आिृजत्त नादिर या आिृजत्त के पररितवन की प्रारंजभक िर में सधु ार दकया िा सके; (xx) “प्रथम ऊिावकरण” का अथ व ह ै दकसी नए या संिोजधत जिद्युत प्रणाली तत्ि का प्रारंजभक ऊिाकव रण (परीिण, चाल ू करने और/या जिड के साथ एकीकरण के जलए), िो उपयुि लोड जडस्ट्पैच केंद्र द्वारा तैयार की गई प्रदक्रया के अनुसार दकया िाता ह;ै (xxi) फ्लेजटसबल एसी रांसजमिन जसस्ट्िम (FACTS) से तात्पयव प्रत्यािती करंि रांसजमिन जसस्ट्िम से ह ै जिसम ें जनयंत्रणीयता बढाने और जिद्युत ् हस्ट्तांतरण िमता को बढाने के जलए पािर इलेटरॉजनक-आधाररत और अन्य जस्ट्थर जनयंत्रक िाजमल होत े ह;ैं (xxii) "आिृजत्त" का अथ वह ैप्रजत सेकंड प्रत्यािती चक्रों की संख्या [हर्ट्जव (Hz)] म ेंव्यि की िाती ह;ै (xxiii) “उत्पािन इकाई” का अथ वह ै (a) दकसी जिद्युत उत्पािन केंद्र की एक इकाई जिसमें जिद्युत िनरेिर एक प्राइम मूिर से िड़ु ा होता है, साथ ही उस िनरेिर के संचालन से संबंजधत सभी संयंत्र और उपकरण िाजमल होत े ह;ैं4 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] या सौर फोिोिोजल्िक प्रौद्योजगकी पर आधाररत जिद्युत् उत्पािन स्ट्िेिन के संबंध में इन्ििवर, उससे िुड़े फोिोिोजल्िक मॉड्यूल और अन्य उपकरण; या (b) पिन ऊिा वपर आधाररत उत्पािन स्ट्िेिन के संिभव में, संबंजधत उपकरणों सजहत एक पिन िरबाइन िनरेिर; (xxiv) “जिड फॉर्मिंग (िीएफएम)” का अथव ह ै एक ऐसा जनयंत्रण िो आंतररक िोल्िेि फेिर को जस्ट्थर या लगभग जस्ट्थर बनाए रखता ह,ै िो उप-िजणक से िजणक समय सीमा में जस्ट्थर रहता ह;ै (xxv) 'एचिीडीसी प्रणाली' स े तात्पय व एक ऐसी जिद्युत प्रणाली स े ह ैिो िो या िो स े अजधक प्रत्यािती करंि (एसी) बसों के बीच उच्च-िोल्िेि प्रत्यि करंि के रूप म ेंऊिाव का स्ट्थानातं रण करती ह;ै (xxvi) "एचिीडीसी कन्ििवर स्ट्िेिन" एक एचिीडीसी जसस्ट्िम का जहस्ट्सा ह ै जिसमें एक ही स्ट्थान पर स्ट्थाजपत एक या अजधक एचिीडीसी कन्ििवर, भिन, ररएटिर, दफल्िर, ररएजटिि पािर जडिाइस, जनयंत्रण, जनगरानी, सुरिात्मक, मापन और सहायक उपकरण िाजमल होते ह;ैं (xxvii) “हाइजिड िनरेटिंग स्ट्िेिन” का अथ व ह ै एक िनरेटिंग स्ट्िेिन जिसमें ससंक्रोनस और अससंक्रोनस िनरेटिंग यूजनि (यूजनिों) का संयोिन होता ह,ै जिसमें ऊिा व भंडारण प्रणाली हो भी सकती ह ै और नहीं भी, जिसे एक ही पॉइंि ऑफ इंिरेस्ट्ि (PoI) के पीछे एक एकल िनरेटिंग स्ट्िेिन के रूप में जनयंजत्रत और संचाजलत दकया िाता ह;ै (xxviii) “आईईसी मानक” स ेतात्पयव अतं रावष्ट्रीय जिद्युत प्रौद्योजगकी आयोग द्वारा प्रकाजित मानक से ह;ै (xxix) "भारतीय मानक" (आईएस) से तात्पयव भारतीय मानक ब्यूरो द्वारा जनर्िवष्ट मानकों से है; (xxx) "संस्ट्थाजपत िमता" (a) कोयला, जलग्नाइि, गैस इंिन और िल जिद्युत स्ट्िेिनों के मामले म,ें इसका अथ व ह ै उत्पािन स्ट्िेिन की सभी इकाइयों की नाम पलेि िमताओं का योग या उत्पािन स्ट्िेिन की अजधकतम सतत रेटिंग; या (b) पिन ऊिा व उत्पािन स्ट्िेिनों और इनििवर का उपयोग करन े िाल े उत्पािन स्ट्िेिनों के मामल े में, इसका अथ व ह ै पिन िबावइन या सौर ऊिाव उत्पािन इकाई (इकाइयों) की नाम पलेि िमताओं का योग, िैसा भी मामला हो; या (c) ESS के मामल े में इसका अथ व ह ै कनेटिेड लोड को प्रिान की िाने िाली रेिेड पीक कैपेजसिी (MW) और ऊिा व िमता (MWh); (xxxi) "इनििवर" से तात्पयव एक ऐस ेउपकरण से ह ैिो प्रत्यि करंि को प्रत्यािती करंि म ेंपररिर्तवत करता ह;ै (xxxii) “इन्ििवर आधाररत संसाधन (आईबीआर)” से तात्पयव जिद्युत के दकसी भी स्रोत से ह ै िो पािर इलेटरॉजनक इंिरफेस के माध्यम से जिड से िड़ु ा होता है, और इसमें एक या अजधक आईबीआर इकाइयााँ िाजमल होती ह ैं िो प्राथजमक ऊिाव स्रोत या ऊिाव भंडारण प्रणाली से एजटिि पािर का जनयावत करने में सिम होती ह ैंऔर एक संिाहक प्रणाली या एक पूरक उपकरण भी आईबीआर का जहस्ट्सा हो सकता है; (xxxiii) आईबीआर जनरंतर रेटिंग (आईसीआर): आईबीआर संयंत्र की जस्ट्थर-अिस्ट्था, जनरंतर एजटिि पािर रेटिंग िो आईबीआर स्ट्िामी द्वारा पीओआई पर गारंिीकृत होती ह;ै[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 5 (xxxiv) “इनििवर-आधाररत संसाधन सयं ंत्र (आईबीआर संयंत्र)” का अथव ह ै एक या एक स े अजधक आईबीआर इकाइयों और संभितः पूरक उपकरणों का एक समूह, िो एक सामान्य फैजसजलिी-स्ट्तरीय जनयंत्रक द्वारा संचाजलत होता है, साथ ही एक संिाहक प्रणाली भी होती ह,ै तादक पीओआई पर प्रििनव आिश्यकताओं को प्राि दकया िा सके; (xxxv) “इनििवर आधाररत संसाधन इकाई (आईबीआर इकाई)” का अथ व ह ै एक व्यजिगत इनििवर उपकरण या एक ही पीओआई के पीछे एक साथ िड़ु े कई इनििवरों का समूह और िाइप III पिन िरबाइन िनरेिर के जलए, स्ट्िय ं पिन िरबाइन, डबल-फेड िनरेिर, रोिर-सर्कवि इनििवर और तीन-िाइंसडंग यूजनि रांसफामवर, यदि मौिूि हो, तो एक आईबीआर इकाई बनात े ह;ैं (xxxvi) “इनििवर-इंिरफेस्ट्ड बल्क कंज्यूमर” स े तात्पय व ऐसे बल्क कंज्यूमर स े ह ै िो लोड को जिद्युत् की आपूर्तव के जलए इलेटरॉजनक आधाररत कन्ििवस वके माध्यम स े जिद्युत् प्राि करता ह;ै (xxxvii) "आइसोलेिर" से तात्पयव जिद्युत प्रणाली के एक भाग को िेष प्रणाली से अलग करने के जलए उपयोग दकए िान े िाले उपकरण से ह;ै (xxxviii) "लाइन-कम्यूिेड कन्ििवर (एलसीसी)" आधाररत एचिीडीसी कन्ििवर का अथ व ह ै एक ऐसा कन्ििवर िो एसी जसस्ट्िम के लाइन िोल्िेि पर जनभवर करता ह ै जिससे कन्ििवर िड़ु ा होता ह ै तादक एक जस्ट्िसचंग जडिाइस से उसके पड़ोसी जडिाइस में कम्यूिेिन को प्रभाजित दकया िा सके और यह ऐसे जस्ट्िसचंग जडिाइस का उपयोग करता ह ै िो या तो अजनयंजत्रत होते ह ैं (िैसे डायोड) या जिन्ह ेंकेिल जनयंत्रण दक्रया द्वारा चाल ू दकया िा सकता ह ै (बंि नहीं दकया िा सकता), िैसे थायररस्ट्िर; (xxxix) “ऑपरेटिंग मोड” से तात्पय व आईबीआर या आईबीआर संयत्रं के संचालन के उस मोड स े ह ै िो सामान्य या असामान्य पररजस्ट्थजतयों के िौरान प्रििनव को जनधावररत करता है; (xl) "ओिरिूि" का अथ व ह ै अजधकतम जसस्ट्िम आउिपुि म ें स े अंजतम जस्ट्थर अिस्ट्था मान को घिाकर प्राि मान को जसस्ट्िम आउिपुि म ें िास्ट्तजिक पररितवन (अथावत, इसके प्रारंजभक मान से अंजतम जस्ट्थर मान तक) से जिभाजित करना, िब अंजतम जस्ट्थर मान पररभाजषत जस्ट्थरीकरण बैंड के भीतर हो, और इसे अंजतम जस्ट्थर अिस्ट्था मान के प्रजतित के रूप म ेंव्यि करना; (xli) "पॉइंि ऑफ़ इंिरकनेटिन (पीओआई)" से तात्पयव जिड पर जस्ट्थत एक ऐसे सबंि ु से ह,ै जिसम ें एक सब-स्ट्िेिन या जस्ट्िचयाडव िाजमल ह,ै िहा ं अनुरोधकताव/उपयोगकताव की फैजसजलिी और जिड के बीच इंिरकनेटिन स्ट्थाजपत होता ह ै और िहां अनुरोधकता/व उपयोगकता व के जलए जिड में डाली गई या जिड से जनकाली गई जिद्युत ् को स्ट्पष्ट रूप से मापा िा सकता ह;ै (xlii) '' पािर फैटिर'' का अथ वह ैएसी पािर पररपथ में िोल्िेि और करंि के बीच जिद्युत कोण का कोसाइन; (xliii) "प्राथजमक ऊिाव स्रोत" से तात्पयव उन ऊिाव स्रोतों से ह ै िसै े दक फोिोिोजल्िक आईबीआर के मामले म ें सौर जिदकरण, पिन िरबाइन िनरेिर के मामल े में तात्काजलक पिन ऊिाव (दकसी दिए गए िण म ें हिा की गजत द्वारा जनधावररत), बैिरी ऊिा व भंडारण प्रणाली (बीएसई) के मामल े में संिजहत रासायजनक ऊिाव, और पंप स्ट्िोरेि पलािं (पीएसपी) के मामले म ेंसंिजहत संभाजित ऊिाव;6 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (xliv) “प्राथजमक आिृजत्त प्रजतदक्रया (पीएफआर)” का अथ व ह ै आिृजत्त जिचलन को जस्ट्थर करन े के जलए ड्रॉप जििेषताओं के आधार पर जिद्युत् उत्पािन का तत्काल और स्ट्िचाजलत समायोिन; (xlv) "सुरिा प्रणाली" से तात्पय व उस उपकरण से ह ै जिसके द्वारा जिड म ें असामान्य जस्ट्थजतयों का पता लगाया िाता ह ै और ऑपरेिर के हस्ट्तिेप के जबना फाल्ि जनिारण, सदक्रयण सकं ेत या संकेत िुरू दकए िाते ह;ैं (xlvi) “ररएजटिि करंि प्रायोररिी मोड” का अथ व ह ै एक ऐसा मोड जिसमें ररएजटिि करंि आउिपुि (Iq) को प्राथजमकता िी िाती ह ै और िनरेटिंग स्ट्िेिन की पूरी करंि रेटिंग (अथातव अजधकतम करंि एसी, Imax) इसके जलए उपलब्ध होती ह,ै िबदक एजटिि करंि आउिपुि (Ip) सीजमत होता ह;ै (xlvii) "प्रजतदक्रया समय (T )" से तात्पयव दकसी पररभाजषत स्ट्थान पर मापी गई प्रणाली मात्रा में चरणबद्ध पररितवन react से लेकर उसी पररभाजषत स्ट्थान पर प्रणाली के आउिपुि म ें जनयंत्रण प्रयास की दििा म ें मापन े योग्य पररितनव होन े तक की अिजध से ह;ै (xlviii) एसी जिद्युत प्रणाली के संबंध में "ररएजटिि पािर" का अथ व ह,ै रूि मीन स्ट्क्वायर (आरएमएस) िोल्िेि, रूि मीन स्ट्क्वायर (आरएमएस) करंि और िोल्िेि फेिर और करंि फेिर के बीच जिद्युत फेि कोण के साइन का गणु नफल, जिसे िोल्ि-एम्पीयर ररएजटिि (VAr) में मापा िाता ह;ै (xlix) “आिेिक” म ें एक उत्पािन कंपनी, कैजपिि उत्पािन संयंत्र, ऊिाव भंडारण प्रणाली, पारेषण लाइसेंसधारी (केंद्रीय पारेषण उपयोजगता और राज्य पारेषण उपयोजगता के अलािा), जितरण लाइसेंसधारी, या बल्क कंज्यूमर िाजमल ह ै िो अपन े नए या जिस्ट्ताररत जिद्युत संयंत्र या सबस्ट्िेिन या पारेषण लाइन या 33 केिी और उससे ऊपर के िोल्िेि स्ट्तर पर दकसी भी जिद्युत प्रणाली तत्ि के जलए जिड स े कनेटिन की मांग कर रहा ह;ै (l) “राइड-थ्र”ू का अथ व ह ै जनर्िष्टव सीमाओं के भीतर िोल्िेि या आिृजत्त संबंधी गड़बजड़यों को सहन करने और जनर्िष्टव अनुसार संचालन िारी रखन े की िमता; (li) “िृजद्ध समय (T )” से तात्पयव दकसी प्रणाली के आउिपुि को अपेजित आउिपुि पररितनव के 10% से 90% तक rise पहुचं ने म ेंलगन े िाले समय से ह;ै (lii) "SCADA" का अथ व ह ै पयविेिी जनयंत्रण और डेिा अजधिहण प्रणाली िो संचार सलंक के माध्यम से िरू स्ट्थ स्ट्थानों से डेिा प्राि करती ह ै और जनगरानी, पयविेिण, जनयंत्रण और जनणवय समथवन के जलए केंद्रीकृत जनयंत्रण स्ट्थान पर इसे संसाजधत करती ह;ै (liii) "सेिसलंग बैंड" से तात्पयव मल्ू य पररितवन के आसपास के उस ित्रे से ह ै िहां दकसी पररभाजषत स्ट्थान पर मापी गई जसस्ट्िम मात्रा में चरणबद्ध पररितवन के बाि जसस्ट्िम आउिपुि को जस्ट्थर होना आिश्यक होता ह;ै (liv) "सेिसलंग िाइम" से तात्पयव दकसी पररभाजषत स्ट्थान पर मापी गई जसस्ट्िम मात्रा में चरणबद्ध पररितवन स े लेकर उसी पररभाजषत स्ट्थान पर जसस्ट्िम के अंजतम मान पररितनव के आसपास एक जनर्िवष्ट सेिसलगं बैंड के भीतर जसस्ट्िम के आउिपुि के जस्ट्थर होन े तक की अिजध से ह;ै (lv) "साइि कॉमन ड्राइंग" से तात्पयव दकसी कनेटिन साइि के जलए तैयार की गई ड्राइंग से है, िो कनेटिन साइि का लेआउि, इलेजटरकल लेआउि, कॉमन प्रोिेटिन और कंरोल ड्राइंग और कॉमन सर्िवसेि को ििावती है; (lvi) "साइि ररस्ट्पॉजन्सजबजलिी िेड्यलू " (एसआरएस) का अथव ह,ै पीओआई आई पर उपकरणों के स्ट्िाजमत्ि, जनयंत्रण, संचालन और रखरखाि की जिम्मेिारी को सीमांदकत करने िाला एक िेड्यलू ; (lvii) "स्ट्िेप ररस्ट्पॉन्स" का अथ व ह ै दकसी जसस्ट्िम का आउिपुि िो समय के फलन के रूप में होता ह ै िब इनपुि भी समय का स्ट्िेप फंटिन होता ह;ै[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 7 (lviii) "स्ट्िेप ररस्ट्पांस िाइम" से तात्पयव दकसी पररभाजषत स्ट्थान पर मापी गई जसस्ट्िम मात्रा में चरणबद्ध पररितवन और जसस्ट्िम के आउिपुि के अपेजित आउिपुि पररितवन के 90% तक पहुचं ने के बीच के समय से है, जिसमें दकसी भी तरह की अजतिृजद्ध नहीं होती ह;ै (lix) “पूरक उपकरण: का अथ व ह ै दकसी फैजसजलिी के भीतर कोई भी उपकरण, जिसका उपयोग केिल इन जिजनयमों म ें जनर्िवष्ट कुछ या सभी तकनीकी आिश्यकताओं के अनुपालन को प्राि करने के जलए दकया िाता ह;ै (lx) “ससंक्रोनस िनरेटिंग स्ट्िेिन” से तात्पयव एक ऐसे िनरेटिंग स्ट्िेिन से ह ैजिसमें ससंक्रोनस िनरेटिंग यूजनि (इकाइयााँ) िाजमल ह;ैं (lxi) “ससंक्रोनस िनरेटिंग यूजनि” स े तात्पयव एक ऐसी िनरेटिंग यूजनि से ह ै िो जिद्युत ऊिा व उत्पन्न कर सकती ह,ै इस प्रकार दक उत्पन्न िोल्िेि की आिृजत्त, िनरेिर की गजत और नेििकव िोल्िेि एक जस्ट्थर अनुपात म ें हों और इस प्रकार ससंक्रोनस हों; (lxii) "ससंक्रोनस कंडेंसर यूजनि" का अथव ह ै एक ऐसी इकाई िो संरचना में ससंक्रोनस िनरेटिंग यूजनि के समान होती ह ै और िो जिद्युत प्रणाली की आिृजत्त के समतुल्य गजत से संचाजलत होती ह ै तादक िोल्िेि को जिजनयजमत करन,े पािर फैटिर को बेहतर बनान े और आिश्यक यांजत्रक िड़त्ि प्रिान करन े के जलए ररएजटिि पािर को गत्यात्मक रूप से उत्पन्न या अििोजषत दकया िा सके, और जस्ट्थर अिस्ट्था म ें संचालन के िौरान, इकाई के भीतर होन े िाली लॉस के अलािा न तो एजटिि पािर उत्पन्न करती ह ैऔर न ही उसका उपभोग करती है; (lxiii) "कुल हामोजनक जिरूपण" (िीएचडी) का अथव ह ै िोल्िेि या करंि तरंग रूप (िो आििव रूप से साइनसोइडल होना चाजहए) के जिरूपण का एक माप और यह सभी िोल्िेि या करंि हामोजनटस के िगों के योग का िगवमूल ह ै जिसे मौजलक के पररमाण के प्रजतित के रूप में व्यि दकया िाता ह;ै (lxiv) "संचरण प्रणाली" स ेतात्पयव सचं रण लाइनों और उप-स्ट्िेिनों के नेििकव से ह;ै (lxv) “िाइप िेस्ट्ि” का अथव ह ै दकसी जनजश्चत जडजाइन के अनुसार जनर्मवत एक या अजधक उपकरणों का परीिण करना, तादक यह प्रिर्िवत दकया िा सके, या ऐसी िानकारी प्रिान की िा सके जिसका उपयोग यह सत्याजपत करने के जलए दकया िा सके दक जडजाइन इस मानक में जनर्िष्टव आिश्यकताओं को परू ा करता है; (lxvi) "अंडर फ्रीक्वेंसी ररल"े स े तात्पय व एक ऐसे ररल े स े ह ै िो तब सदक्रय होता ह ै िब जसस्ट्िम की आिृजत्त एक पूिव जनधावररत मान स े नीच े जगर िाती ह;ै (lxvii) “उपयोगकता”व में एक उत्पािन कंपनी, कैजपिि उत्पािन संयत्रं , ऊिाव भडं ारण प्रणाली, पारेषण लाइसेंसधारी (केंद्रीय पारेषण उपयोजगता और राज्य पारेषण उपयोजगता के अलािा), जितरण लाइसेंसधारी, या बल्क कंज्यूमर िाजमल ह ै जिसका जिद्युत संयंत्र या सबस्ट्िेिन या पारेषण लाइन या कोई भी जिद्युत प्रणाली तत्ि 33 केिी और उससे ऊपर के िोल्िेि स्ट्तर पर जिड स ेिुड़ा हुआ है; (lxviii) "िोल्िेि सोस व कन्ििवसव (िीएससी)" स े तात्पय व एक ऐस े कन्ििवर स े ह ै जिसमें एक िबरन कम्यूिेिेड जडिाइस (उिाहरण के जलए, आईिीबीिी) आधाररत सेल्फ-कम्यूिेिेड कन्ििवर होता ह ै िो डीसी कैपेजसिर िोल्िेि से एसी िोल्िेि उत्पन्न करने म ेंसिम होता ह;ै8 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (lxix) "िोल्िेि असंतलु न" का अथव ह ै उच्चतम और जनम्नतम लाइन िोल्िेि के बीच का जिचलन, जिसे तीनों फेजों के औसत लाइन िोल्िेि से जिभाजित दकया िाता ह;ै (lxx) “पिन िरबाइन िनरेिर (डब्ल्यिू ीिी)” से तात्पय व एक आईबीआर इकाई से ह ै िो पिन की गजति ऊिाव को जिद्युत ऊिाव में पररिर्तवत करती ह;ै (2) इस जिजनयम म ें प्रयुि अन्य सभी िब्ि, पि, पररभाषाए ाँ और प्रतीक, िो इन जिजनयमों म ें पररभाजषत नहीं ह,ैं उनका िही अथ वहोगा िो जफ्लकर या प्राजधकरण द्वारा प्रकाजित दकसी अन्य जिजनयम में दिया गया ह।ै 3. जिजनयमों की प्रयोज्यता: - ये जनयम सभी उपयोगकतावओं, अनुरोधकताओंव , केंद्रीय पारेषण उपयोजगता, उपयुि लोड जडस्ट्पैच सेंिर और राज्य पारेषण उपयोजगता पर लागू होंगे। अध्याय 1 सामान्य कनजे टिजििी आिश्यकताएाँ 4. अनुरोधकता/व उपयोगकता व अपन े उपकरणों की योिना, जडिाइन, जनमावण, जिश्वसनीयता, सुरिा और सुरजित संचालन के जलए जिम्मेिार होगा, िो जनमावण, संचालन और रखरखाि, कनेजटिजििी और अन्य िैधाजनक प्रािधानों के जनयमों के अधीन होगा। 5. नए कनेटिन से जिड पर कोई प्रजतकूल प्रभाि नहीं पड़गे ा। जिड केंद्रीय जिद्युत प्राजधकरण (जिड मानक) के लाग ू जिजनयमों के अनुसार जनधावररत जिश्वसनीयता, सुरिा और गणु ित्ता के साथ कायव करना िारी रखगे ा। हालांदक, इन जिजनयमों को अनरु ोधकता/व उपयोगकता व के संयंत्र और उपकरणों की सुरिा के जलए आधार नहीं बनाया िा सकता ह।ै 6. दकसी भी अनरु ोधकताव को पहल े से ही उन मानकों और ितों के बारे म ें पता होना आिश्यक ह ै जिन्ह ेंउसके जसस्ट्िम को जिड में एकीकृत करन े के जलए पूरा करना होगा। 7. अनुरोधकता/व उपयोगकता व उपयिु लोड जडस्ट्पैच सेंिर द्वारा तय की गई प्रदक्रया के अनुसार लोड िेसडंग, उत्पािन म ें िृजद्ध या कमी, आइलैंसडंग, ब्लकै स्ट्िािव, स्ट्िािव-अप जिद्युत प्रिान करना और बहाली िैस े आकजस्ट्मक कायों म ें भाग लेगा। 8. अनुरोधकता/व उपयोगकता व को पररचालन आिश्यकताओं के कारण आिश्यक समझे िान े िाले िॉिव सर्कवि स्ट्तर, सुरिा समन्िय और अन्य तकनीकी कारणों के संबंध म ेंअपने उपकरण में संिोधन करना होगा। 9. साइि उत्तरिाजयत्ि अनुसूची: (1) प्रत्येक कनेटिन सबंि ु के जलए एक साइि उत्तरिाजयत्ि अनुसचू ी (एसआरएस) उस फैजसजलिी का संचालन करने िाले अनुरोधकता/व उपयोगकताव द्वारा भरी िाएगी िहां कनेटिन हो रहा ह।ै (2) उपयुि पारेषण उपयोजगता या जितरण लाइसेंसधारी अनरु ोधकताव/उपयोगकताव द्वारा भरे िाने िाले साइि उत्तरिाजयत्ि अनुसूची (एसआरएस) के जलए प्रपत्र प्रकाजित करेगा। (3) साइि उत्तरिाजयत्ि अनुसूची में जनम्नजलजखत िानकारी िाजमल की िाएगी, अथावत ् — (i) जिद्युत उपकरणों की सेिाओं और आपूर्तव की अनुसूची; (ii) िरू संचार और मापन उपकरणों की अनुसूची; और (iii) प्रत्येक संयंत्र और उपकरण पर लाग ूहोने िाल ेसुरिा जनयम। (4) कनेटिन स्ट्थल पर स्ट्थाजपत प्रत्येक उपकरण के जलए साइि उत्तरिाजयत्ि अनुसूची में जनम्नजलजखत िानकारी भी प्रिान की िाएगी, िैसे दक: —[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 9 (i) उपकरणों का स्ट्िाजमत्ि; (ii) उपकरणों के जनयंत्रण की जिम्मिे ारी; (iii) उपकरणों के रखरखाि की जिम्मेिारी; (iv) उपकरणों के संचालन की जिम्मेिारी; (v) साइि का प्रबंधक; (vi) कायवस्ट्थल पर व्यजियों की सरु िा से संबंजधत सभी मामलों की जिम्मेिारी; और (vii) कायवस्ट्थल पर उपकरणों की सुरिा से संबंजधत सभी मामलों की जिम्मेिारी। 10. कनेटिन साइि पर पहुचं : अनुरोधकता व या उपयोगकताव, िैसा भी मामला हो, िो जिद्युत संयंत्र का स्ट्िामी ह,ै उस े लाइसेंसधारी या उपयिु पारेषण उपयोजगता या उपयुि लोड जडस्ट्पैच सेंिर को, जिसके उपकरण कनेटिन स्ट्थल पर स्ट्थाजपत ह ैंया स्ट्थाजपत दकए िाने का प्रस्ट्ताि ह,ै उपकरण की स्ट्थापना, संचालन और रखरखाि आदि के जलए उजचत पहुचं और अन्य आिश्यक सुजिधाएं प्रिान करनी होंगी। 11. साइि कॉमन ड्रॉइंग्स: जिस सबस्ट्िेिन में कनेटिन स्ट्थाजपत दकया िा रहा है, उसके स्ट्िामी द्वारा प्रत्येक कनेटिन सबंि ु के जलए साइि कॉमन ड्राइंग तैयार की िाएगी। 12. साइबर सुरिा: (1) अनुरोधकता/व उपयोगकताव को प्राजधकरण द्वारा जिद्युत िेत्र में संचार प्रणाली के जलए जनधावररत साइबर सुरिा दििाजनिेिों, जिजनयमों और तकनीकी मानकों का अनुपालन करना होगा। (2) अनुरोधकता/व उपयोगकता व को केंद्र सरकार, सीईआरिी-इन, एनएससीएस, एनसीआईआईपीसी द्वारा समय- समय पर िारी दकए गए साइबर सुरिा दििाजनिेिों/आिेिों का भी पालन करना होगा। 13. अनुरोधकता/व उपयोगकता व अपनी फैजसजलिी के संबंध म ें एकल पंजि योिनाबद्ध आरेख तयै ार करेगा और उस े उपयुि लोड जडस्ट्पैच सेंिर, उपयुि रांसजमिन यूरिजलिी या लाइसेंसधारी को उपलब्ध कराएगा जिसके माध्यम से उसका जसस्ट्िम िुड़ा हुआ ह।ै 14. अनुरोधकता/व उपयोगकता व को उपकरण की स्ट्थापना और उसके संचालन एिं रखरखाि के संबंध म ें उद्योग की सिोत्तम प्रथाओं और लागू उद्योग मानकों का पालन करना होगा। 15. ओिरहडे लाइनों और केबलों सजहत उपकरण संबंजधत भारतीय मानकों का अनुपालन करेंग े और भारतीय मानक की अनुपजस्ट्थजत में, अतं राष्ट्रव ीय जिद्युत-तकनीकी आयोग मानक, जिद्युत और इलेटरॉजनक इंिीजनयर संस्ट्थान मानक, यूरोपीय मानक का उनके प्रकि होने के क्रम में अनुपालन करेंग,े िब तक दक अन्यथा उल्लेख न दकया गया हो: बिते दक िब भी दकसी अंतरावष्ट्रीय जिद्युत-तकनीकी आयोग मानक, जिद्युत एि ं इलेटरॉजनक अजभयंता संस्ट्थान मानक, यूरोपीय मानक का पालन दकया िाता है, तो उि मानक को िास्ट्तजिक रूप से अपनाने से पहले भारत म ें प्रचजलत प्रणाली आिृजत्त, प्रणाली िोल्िेि, पररिेि तापमान, आद्रवता और अन्य जस्ट्थजतयों के जलए आिश्यक सुधार या संिोधन दकए िाएगं े।10 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] 16. उपकरण को इन जिजनयमों और प्राजधकरण द्वारा प्रकाजित अन्य तकनीकी जिजनयमों में जनर्िवष्ट प्रािधानों के अनुसार आिश्यकताओं को परू ा करना होगा। 17. इन जिजनयमों में जनर्िष्टव प्रािधानों के अनपु ालन के जलए, संबजं धत फैजसजलिी के जडिाइन और संचालन में हिा, तूफान, बाढ, जबिली जगरन,े ऊंचाई, तापमान की चरम सीमा, बफव िमन,े संिषू ण, प्रिषू ण और भूकंप के प्रभािों पर जिचार दकया िाना चाजहए। 18. इन जिजनयमों म ें जनजहत सभी प्रािधानों का अनुपालन और पालन फैजसजलिी द्वारा पीओआई पर दकया िाएगा। 19. जनर्िवष्ट पयाविरणीय पररजस्ट्थजतयों में, फैजसजलिी के भीतर रासं फामवर सजहत जिजभन्न उपकरणों की नेम पलेि रेटिंग का उपयोग, इन जिजनयमों में जनर्िवष्ट प्रािधानों के साथ पीओआई पर अनुपालन का आकलन करत े समय दकया िाएगा। 20. संचालन म ें कोई सिं ाहक प्रणाली सीमा, आंतररक नेििकव सीमा, जनयंत्रण प्रणाली सीमा, सुरिा प्रणाली, पयाविरणीय जस्ट्थजतयां या अन्य कोई सीजमत करने िाला उपकरण नहीं होना चाजहए िो फैजसजलिी को इन जिजनयमों में जनर्िवष्ट PoI पर तकनीकी आिश्यकताओं को परू ा करने से रोके। अध्याय – II िनरेिर और ईएसएस के जलए आिश्यकताएाँ ससक्रं ोनस िनरेटिंग स्ट्िेिन एजटिि पािर िमता 21. उत्पािन स्ट्िेिन, पीओआई (PoI) पर उत्पािन इकाई (इकाइयों) की अजधकतम सतत रेटिंग (MCR) िमता म ें स े घोजषत सहायक खपत को घिाकर प्राि योग के बराबर ऊिाव प्रिान करने म ेंसिम होना चाजहए। 22. जिद्युत् उत्पािन केंद्र म ेंस्ट्िचाजलत सुजिधाएं उपलब्ध कराई िाएंगी। ररएजटिि पािर िमता 23. उत्पािन स्ट्िेिन म ें गत्यात्मक रूप से जभन्न ररएजटिि पािर िजतपूर्त व की आपूर्त व और अििोषण करन े की िमता होनी चाजहए, िो उत्पािन इकाई (इकाइयों) की जिलंजबत (अजत-उत्तेजित) जस्ट्थजत में एमसीआर िमता के योग के 61.97% (0.85 पािर फैटिर) से लेकर उत्पािन स्ट्िेिन की अिणी (अल्प-उत्तेजित) जस्ट्थजत में एमसीआर िमता के योग के 32.87% (0.95 पािर फैटिर) के अनरूु प हो। इसके अजतररि, यह भी प्रािधान ह ै दक उपरोि प्रििवन जनरंतर आधार पर नाममात्र िोल्िेि के ±10% के उतार- चढाि, आिृजत्त के +4% और -5% के उतार-चढाि तथा संयिु िोल्िेि और आिृजत्त के ±5% के उतार-चढाि के साथ प्रिान दकया िाएगा। हालांदक, गैस िबावइनों के जलए, उपरोि प्रििवन जनरंतर आधार पर िोल्िेि के ±5% के उतार-चढाि के साथ प्रिान दकया िाएगा। िोल्िेि जिघ्न राइड थ्र ू 24. िनरेटिंग स्ट्िेिन आईईसी 60034 के अनुसार िॉिव सर्कवि अनपु ात के जलए संचाजलत होने म ेंसिम होना चाजहए। 25. िनरेटिंग स्ट्िेिन को PoI पर 0.9 pu से 1.1 pu की िोल्िेि रेंि में लगातार संचाजलत होना चाजहए और िनरेटिंग यूजनि (यूजनिों) की MCR िमता का योग प्रिान करने में सिम होना चाजहए। 26. दकसी भी अिजध के िोल्िेि जिघ्न, जिसके िौरान लाग ू िोल्िेि जनरंतर संचालन ित्रे के भीतर रहता ह,ै के कारण िनरेटिंग स्ट्िेिन या यूजनि (यूजनिों) को ररप नहीं करना चाजहए। िनरेटिंग स्ट्िेिन या यूजनि (यूजनिों) ऐसे दकसी[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 11 भी जिघ्न के िौरान चाल ू रहगें े और जिघ्न स े पहल े के एजटिि पािर स्ट्तर या उपलब्ध एजटिि पािर, िो भी कम हो, की आपूर्त व िारी रखगें े। 27. जिद्युत् उत्पािन केंद्र म ें उपयोग दकए िाने िाल े सभी तात्काजलक अंडर/ओिर िोल्िेि सुरिा तंत्रों में दफ़ल्िर की गई मात्राओं का उपयोग दकया िाएगा तादक िांजछत उपकरण और जसस्ट्िम को सुरिा प्रिान करते समय गलत संचालन की संभािना कम हो सके। कोई भी तात्काजलक अडं र/ओिर िोल्िेि सरु िा तंत्र, जिससे परू े जिद्युत् उत्पािन केंद्र के जिद्युत उत्पािन म ें बाधा उत्पन्न होन े की संभािना हो, उसमें कम से कम एक चक्र (मलू आिृजत्त का) मापन सिंडो का उपयोग दकया िाएगा तादक ऐसी संभािना और जिड पर संबंजधत प्रभाि को कम दकया िा सके। लो िोल्िेि राइड थ्र ू(एलिीआरिी) 28. जिड से िड़ु ा िनरेटिंग स्ट्िेिन, दकसी भी या सभी फेजों पर PoI पर अडं र िोल्िेि की जस्ट्थजत (समजमत या असमजमत अडं र िोल्िेि की जस्ट्थजत) के अनरूु प अिजध तक जिड स े िुड़ा रहगे ा, िैसा दक जचत्र 1 म ें िक्र की मोिी रेखा द्वारा ििावया गया ह।ै Vt: िास्ट्तजिक िोल्िेि; Vn: नाममात्र िोल्िेि— जचत्र 1. ससक्रं ोनस िनरेटिंग स्ट्िेिन के जलए जनम्न िोल्िेि राइड थ्रू आिश्यकताएाँ नोि: संबंजधत िोल्िेि, PoI पर संगत नाममात्र िोल्िेि के सापेि, फेि-िू-फेि या फेि-िू-िाउंड िोल्िेि के सबस े कम पररमाण िाले मौजलक आिजृत्त फेिर घिक के बराबर होगा, िो भी कम हो। यदि िोल्िेि ऊपर जचत्र 1 में ििावई गई जनरंतर संचालन सीमाओं स े बाहर ह,ै तो िनरेटिंग स्ट्िेिन की प्रजतदक्रया जस्ट्थर रहगे ी। बिते दक कम िोल्िेि राइड थ्र ू जस्ट्थजतयों के िौरान, िनरेटिंग स्ट्िेिन म ें आईईसी 60034 के अनुसार ओिरलोड (करंि) िमता होनी चाजहए। हाई िोल्िेि राइड थ्र ू(एचिीआरिी)12 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] 29. जिड से िड़ु ा िनरेटिंग स्ट्िेिन, दकसी भी या सभी फेजों (समजमत या असमजमत ओिरिोल्िेि जस्ट्थजतयों) पर, PoI पर ओिरिोल्िेि की अिजध के जलए जिड से िुड़ा रहगे ा, िसै ा दक जचत्र 2 में िक्र की मोिी रेखा द्वारा ििावया गया ह।ै जचत्र 2. ससक्रं ोनस िनरेटिंग स्ट्िेिन के जलए उच्च िोल्िेि राइड थ्र ूआिश्यकताएाँ नोि: संबंजधत िोल्िेि, फेि-स-ेफेि और फेि-स-ेिाउंड िोल्िेि के सबसे बड़े पररमाण िाल ेमौजलक आिृजत्त फेिर घिक के बराबर होगा, िो भी मान PoI पर संबंजधत नाममात्र िोल्िेि के सापेि अजधक हो। यदि िोल्िेि ऊपर जचत्र 2 में ििावई गई जनरंतर संचालन सीमाओं स े बाहर ह,ै तो िनरेटिंग स्ट्िेिन की प्रजतदक्रया जस्ट्थर रहगे ी। मल्िीपल फॉल्ि राइड थ्र ू(एमएफआरिी) 30. जिड से िड़ु ा िनरेटिंग स्ट्िेिन, एलिीआरिी िमता के अनुसार, दकसी भी 5 जमनि की अिजध के भीतर 0.9 pu स े कम िोल्िेि के 15 बार तक लगातार होन े िाल े जििोभों के िौरान जिड स ेिुड़ा रहगे ा: बिते दक इस अिजध के िौरान िनरेटिंग स्ट्िेिन कम स ेकम 0.5 पीयू से कम िोल्िेि जिघ्न के जलए चालू रहगे ा: इसके अलािा, यह भी प्रािधान ह ै दक एकाजधक एलिीआरिी जस्ट्थजतयों के िौरान, उत्पािन स्ट्िेिन को एलिीआरिी जस्ट्थजतयों म ेंजनर्िष्टव प्रििवन आिश्यकताओं को पूरा करना होगा। 31. कई िोल्िेि गड़बजड़यों का आकलन करत े समय, स्ट्िचाजलत री-टलोि प्रोिेटिन स्ट्कीम के संचालन के बाि पुनः स्ट्थाजपत होन े िाली फाल्ि को एक अलग िोल्िेि गड़बड़ी के रूप में जगना िाएगा। आिजृ त्त फॉल्ि राइड थ्र ू 32. िनरेटिंग स्ट्िेिन 47.5 स े 52 हर्ट्जव की आिृजत्त सीमा म ें संचाजलत होन े म ें सिम होना चाजहए और 49.5 हर्ट्जव स े 50.5 हर्ट्जव की आिृजत्त सीमा में िनरेटिंग यूजनि (यूजनिों) की एमसीआर िमता का योग जनरंतर रूप स े प्रिान करने म ेंसिम होना चाजहए। बिते दक उत्पािन स्ट्िेिन इस उपखंड म ें जनजहत अपन े प्रििवन को (+/-) 10% तक के िोल्िेि पररितवन के साथ भी बनाए रखन े में सिम होगा: इसके अलािा, िल जिद्युत उत्पािन स्ट्िेिनों के मामल े में 52 हर्ट्ि व से ऊपर की ओिर-फ्रीक्वेंसी सेटिंग्स रखन े का प्रािधान होगा।[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 13 एजटिि पािर जनयत्रं ण 33. पॉइंि ऑफ़ इंिरकनेटिन (PoI) पर जस्ट्थत 100 मेगािाि और उससे अजधक की कुल िमता िाली उत्पािन इकाई (इकाइयों) म ें एजटिि पािर उत्पािन को बिलने के जलए, िैसा भी मामला हो, राज्य लोड जडस्ट्पैच सेंिर या िेत्रीय लोड जडस्ट्पैच सेंिर स ेजसग्नल प्राि करन े का प्रािधान होगा। 34. िमता की परिाह दकए जबना सभी उत्पािन इकाइयों में आिृजत्त को जनयंजत्रत करने के जलए उपयुि गजत/भार जििेषताओं िाले इलेटरॉजनक रूप से जनयंजत्रत गिर्नगिं जसस्ट्िम होने चाजहए। थमवल उत्पािन इकाई (इकाइयों) के गिनवरों का ड्रूप एमसीआर का 3 से 6% होगा और पीएसपी सजहत िल जिद्युत उत्पािन इकाई (इकाइयों) का ड्रूप एमसीआर का 0 से 10% होगा। 35. गिनवर को 50.00 हर्ट्िव की संिभव आिृजत्त के संबंध में सेि दकया िाएगा और डेड बैंड के बाहर की प्रजतदक्रया आिृजत्त में कुल पररितवन के संबंध में होगी। िनरेटिंग यूजनि या फ्रीक्वेंसी कंरोलर का अतं र्नजव हत डेड बैंड (+/-) 0.03 हर्ट्ि वस े अजधक नहीं होना चाजहए। 36. Theप्राथजमक प्रजतदक्रया संबंधी आिश्यकताए ाँ नीचे िी गई िेबल 1 म ें उजल्लजखत होंगी: िेबल 1. प्राथजमक प्रजतदक्रया आिश्यकताएाँ प्रकार प्रजतदक्रया सीमा कोयला, जलग्नाइि और गैस आधाररत तापीय ऊिाव एमसीआर का (+/-) 5% उत्पािन इकाई िल जिद्युत उत्पािन इकाई और ऑन-स्ट्रीम पीएसपी एमसीआर का (+/-) 10%(रेिेड हडे की उपलब्धता इकाई के अधीन) ऑफ-स्ट्रीम पीएसपी यूजनि एमसीआर का (+/-) 10%(रेिेड हडे की उपलब्धता के अधीन)अल्प अिजध के जलए 37. िब आिृजत्त संिभव आिृजत्त स े जिचजलत होती ह,ै तो उत्पािन इकाई अपने प्रचालन स्ट्तर/ एमसीआर के ±5% या ±10% तक की िमता के अनुसार तत्काल प्राथजमक प्रजतदक्रया िेगी: बिते दक उत्पािन इकाई/स्ट्िेिन के न्यनू तम तकनीकी स्ट्तर तक ही उत्पािन को सीजमत रखा िाए। 38. उत्पािन इकाई की रैंप िर केंद्रीय जिद्युत प्राजधकरण (जिद्यतु संयंत्रों और जिद्युत लाइनों के जनमावण के जलए तकनीकी मानक) के प्रचजलत जिजनयमों के अनुसार होगी। ररएजटिि पािर जनयत्रं ण 39. पॉइंि ऑफ़ इंिरकनेटिन (PoI) पर जस्ट्थत 100 मेगािाि और उससे अजधक की कुल िमता िाली उत्पािन इकाई (इकाइयों) म,ें जस्ट्थजत के अनुसार, ररएजटिि पािर उत्पािन को बिलन े के जलए राज्य लोड जडस्ट्पैच सेंिर या िेत्रीय लोड जडस्ट्पैच सेंिर स ेजसग्नल प्राि करन े का प्रािधान होगा। 40. प्रत्येक िनरेटिंग यूजनि के जलए उत्तेिना प्रणाली में यह गणु होंगे:14 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (1) इसमें अत्याधुजनक उत्तेिना प्रणाली होगी; (2) इसमें स्ट्िचाजलत िोल्िेि रेगलु ेिर (एिीआर) होना चाजहए। बिते दक 100 मगे ािाि या उससे अजधक रेटिंग िाली उत्पािन इकाई म ें जडजििल जनयंत्रण और स्ट्ितंत्र इनपुि और स्ट्िचाजलत चेंिओिर िाले िो अलग-अलग चैनलों के साथ स्ट्िचाजलत िोल्िेि रेगुलेिर होना चाजहए; और (3) इसम ें एक उत्तेिना जनयंत्रण प्रणाली होनी चाजहए िो एमसीआर िमता पर संचालन करते समय स्ट्िेिर को नाममात्र िोल्िेि के 110% पर लगातार संचाजलत करन े म ें सिम हो। 41. 50 मेगािाि और उससे अजधक की रेिेड िमता िाली िल जिद्युत उत्पािन इकाई में ससंक्रोनस कंडेंसर मोड म ें संचाजलत होने की सुजिधा होनी चाजहए। 42. 100 मेगािाि और उससे अजधक िमता िाली उत्पािन इकाई के स्ट्िचाजलत िोल्िेि रेगुलेिर में जनम्नजलजखत िमताओं िाला पािर जसस्ट्िम स्ट्िेबलाइिर (पीएसएस) िाजमल होना चाजहए: (1) प्रत्येक इनपुि के जलए िो िॉिआउि दफल्िर, आिश्यकता पड़ने पर उनम ें से एक को बायपास करने की िमता के साथ; (2) पयािव (और कम स े कम िो) लीड-लगै रांसफर फंटिन ब्लॉक (या समतल्ु य संख्या में कॉम्पलटे स पोल और िीरो) समायोज्य गेन और िाइम-कांस्ट्िेंि के साथ, िनरेटिंग यूजनि के कारण होन े िाल े फेि लैग की पूरी तरह से भरपाई करने के जलए; (3) प्रमुख चरों की जनगरानी और ररकॉर्डिंग के जलए उपकरण, जिनमें इनपुि, आउिपुि और लीड-लगै रांसफर फ़ंटिन ब्लॉक के इनपुि िाजमल ह;ैं (4) पािर जसस्ट्िम स्ट्िेबलाइिर के रांसफर फंटिन को स्ट्थाजपत करने के जलए पयावि परीिण संकेतों को इंिेटि करके, पािर जसस्ट्िम से अलग करके पािर जसस्ट्िम स्ट्िेबलाइिर का परीिण करने की अनुमजत िने े िाला उपकरण; (5) िनरेटिंग यूजनि के रोिर की गजत/िोल्िेि और एजटिि पािर/ररएजटिि पािर आउिपुि के मापन को इनपुि के रूप में जलया िाता ह;ै (6) एक आउिपुि जलजमिर, जिसे स्ट्िेिर िोल्िेि के (-)10% से (+)10% की सीमा में लगातार समायोजित दकया िा सकता ह;ै और (7) पयावि लचीलापन जिससे अिमंिन प्रििनव को अजधकतम दकया िा सके, और जस्ट्थरीकरण पररपथ आिृजत्त सीमा पर ररएजटिि और समायोज्य हो। 43. िनरेटिंग स्ट्िेिन म ें पयावि उपकरण िमताए ं और जनयंत्रण प्रणाली होनी चाजहए तादक यह सुजनजश्चत दकया िा सके दक: (1) दकसी अन्य िनरेटिंग स्ट्िेिन या उपकरण के सापेि िनरेटिंग स्ट्िेिन की िोलन आिृजत्तयों के जलए जिद्युत प्रणाली िोलनों को पयावि रूप से कम दकया िाता ह;ै (2) िनरेटिंग स्ट्िेिन के संचालन से जिद्युत प्रणाली के िोलन के दकसी भी महत्िपूणव मोड के अिमिं न में कोई कमी नहीं आती ह;ै और (3) िनरेटिंग स्ट्िेिन के संचालन से अजस्ट्थरता (िैप-चेंसिगं रांसफामवर कंरोल जसस्ट्िम की हटं िंग सजहत) उत्पन्न नहीं होती ह,ै जिससे जिड स ेिुड़ ेअन्य उपकरणों पर प्रजतकूल प्रभाि पड़े।[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 15 ससक्रं ोनस कंडेंसर 44. ससंक्रोनस कंडेंसर यूजनि को इन जिजनयमों में जनर्िवष्ट ससंक्रोनस िनरेटिंग स्ट्िेिनों पर लागू िोल्िेि जडस्ट्िबेंस राइड- थ्र,ू फ्रीक्वेंसी राइड-थ्र,ू मल्िीपल फॉल्ि राइड-थ्र ू और ररएजटिि पािर कंरोल आिश्यकताओं का अनपु ालन करना होगा। अससक्रं ोनस िनरेटिंग स्ट्िेिन एजटिि पािर िमता 45. िनरेटिंग स्ट्िेिन अनुसूची I म ें िी गई प्रदक्रया के अनुसार जनधावररत अजधकतम और न्यनू तम पररिेि तापमान के अनुसार PoI पर अपनी ICR िमता प्रिान करन े में सिम होगा। ररएजटिि पािर िमता 46. यह िमता अनुसूची I म ें िी गई प्रदक्रया के अनुसार जनधावररत अजधकतम और न्यूनतम पररिेि तापमान के अनुपालन म ेंप्रिान की िानी ह।ै 47. िनरेटिंग स्ट्िेिन को जचत्र 3 म ें ििावए गए पी-टय ू िक्र के अनुसार सभी एजटिि पािर स्ट्तरों (िून्य स्ट्तर सजहत) के जलए न्यनू तम गत्यात्मक ररएजटिि पािर िमता प्रिान करन े में सिम होना चाजहए। िनरेटिंग स्ट्िेिन को जचत्र 3 में ििावए गए पीटयू िक्र के भीतर कहीं भी संचालन करते समय गत्यात्मक रूप से पररितवनिील ररएजटिि पािर को जनरंतर अििोजषत या आपूर्तव करने म ेंसिम होना चाजहए। जचत्र 3. एजटिि पािर और प्रजतदक्रयात्मक पािर इंिटे िन के सिं भ व म ें उत्पािन स्ट्िेिन की न्यनू तम प्रजतदक्रयात्मक पािर िमता, जिस े PoI पर मापा गया ह।ै नोि — 1) ररएजटिि पािर के आिान-प्रिान के जलए उत्पािन स्ट्िेिन को जिड से एजटिि पािर का उपभोग करन े की आिश्यकता हो सकती ह,ै िब कोई उपलब्ध प्राथजमक ऊिाव स्रोत न हो। 2) जचत्र म ें इस खंड के अंतगवत अपेजित ररएजटिि पािर िमता की न्यूनतम सीमा ििावई गई ह।ै उत्पािन स्ट्िेिन की िास्ट्तजिक िमता इससे अजधक हो सकती ह।ै16 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] 3) WTG िाइप-III मिीनों को नीचे िी गई सबंिीिार रेखा के अनुसार 0.1*ICR एजटिि पािर आउिपुि के बराबर ररएजटिि पािर सहायता प्रिान करनी होगी। चार्ििंग (एजटिि पािर का अििोषण, -P) और जडस्ट्चार्ििंग (एजटिि पािर का इंिेटिन, +P) के िौरान BESS के मामले में और मोिटरंग (एजटिि पािर का अििोषण, -P) और िनरेटिंग (एजटिि पािर का इंिेटिन, +P) के िौरान पररितनव ीय-गजत PSP के मामले में अनुसरण दकया िाने िाला PQ िक्र ऊपर बताए गए िक्र के समान होगा। 48. न्यूनतम गत्यात्मक ररएजटिि पािर िमता को QV िक्र म ें ििावए अनुसार बिला िा सकता ह ै िब PoI पर िोल्िेि 0.9 प्रजत यूजनि और 1.1 प्रजत यूजनि के बीच बिलता रहता है, िहां उत्पािन स्ट्िेिन को जचत्र 4 म ें QV िक्र के भीतर कहीं भी संचालन करते समय जनरंतर ररएजटिि पािर को अििोजषत या आपूर्तव करने में सिम होना चाजहए। जचत्र 4. िोल्िेि और पीओआई पर मापी गई ररएजटिि पािर के सिं भ व म ें िनरेटिंग स्ट्िेिन की न्यनू तम ररएजटिि पािर िमता। चार्ििंग (एजटिि पािर का अििोषण, +P) और जडस्ट्चार्ििंग (एजटिि पािर का इंिेटिन, -P) के िौरान BESS के मामले में और मोिटरंग (एजटिि पािर का अििोषण, -P) और िनरेटिंग (एजटिि पािर का इंिेटिन, +P) के िौरान पररितवनीय गजत PSP के मामले में अनुसरण दकया िाने िाला QV िक्र ऊपर दिए गए िक्र के समान होगा: बिते दक उत्पािन स्ट्िेिन को अपन े एलिीआरिी और एचिीआरिी सदक्रयण सीमाओं का समन्िय इस प्रकार करना चाजहए तादक उपरोि QV िक्र आिश्यकताओं को पूरा दकया िा सके। िोल्िेि जिघ्न राइड थ्र ू 49. जिस PoI पर जिद्युत् उत्पािन स्ट्िेिन को िोड़न े का प्रस्ट्ताि ह,ै िहा ं का िॉिव सर्कवि अनुपात सामान्यतः 5 स े कम नहीं होना चाजहए। हालांदक, जिद्युत् उत्पािन स्ट्िेिन को न्यूनतम 5 के एससीआर या POI पर िास्ट्तजिक एससीआर, िोनों में स ेिो भी कम हो, पर जस्ट्थर रूप स े संचाजलत होना चाजहए। 50. िनरेटिंग स्ट्िेिन को PoI पर 0.9 pu स े 1.1 pu की िोल्िेि रेंि म ें लगातार संचाजलत होने में सिम होना चाजहए और ICR िमता प्रिान करन े में सिम होना चाजहए।[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 17 51. िनरेटिंग स्ट्िेिन में कॉजन्फ़गर करने योग्य जनम्न और उच्च िोल्िेि राइड थ्र ू सदक्रयण और जनजरक्रयण सेटिंग्स होंगी, जिनकी सीमा िोल्िेि राइड थ्र ूजस्ट्थजतयों के िौरान जस्ट्थर संयंत्र संचालन सुजनजश्चत करन े के जलए जसस्ट्िम अध्ययनों के आधार पर तय की िाएगी। 52. दकसी भी अिजध के िोल्िेि जिघ्न, जिसके िौरान लाग ू िोल्िेि जनरंतर संचालन ित्रे के भीतर रहता ह,ै के कारण िनरेटिंग स्ट्िेिन या यूजनि (यूजनिों) को ररप नहीं करना चाजहए। िनरेटिंग स्ट्िेिन या यूजनि (यूजनिों) ऐसे दकसी भी जिघ्न के िौरान चाल ू रहगें े और जिघ्न स े पहल े के एजटिि पािर स्ट्तर या उपलब्ध एजटिि पािर, िो भी कम हो, की आपूर्त व िारी रखगें े। 53. जिद्युत् उत्पािन केंद्र म ें उपयोग दकए िाने िाल े सभी तात्काजलक अंडर/ओिर िोल्िेि सुरिा तंत्रों में दफ़ल्िर की गई मात्राओं का उपयोग दकया िाएगा तादक िांजछत उपकरण और जसस्ट्िम को सुरिा प्रिान करते समय गलत संचालन की संभािना कम हो सके। कोई भी तात्काजलक अडं र/ओिर िोल्िेि सरु िा तंत्र, जिससे परू े जिद्युत् उत्पािन केंद्र के जिद्युत उत्पािन म ें बाधा उत्पन्न होन े की संभािना हो, उसमें कम से कम एक चक्र (मलू आिृजत्त का) मापन सिंडो का उपयोग दकया िाएगा तादक ऐसी संभािना और जिड पर संबंजधत प्रभाि को कम दकया िा सके। 54. िोल्िेि जिघ्न के िौरान िनरेटिंग स्ट्िेिन की ररएजटिि करंि प्रजतदक्रया को नीचे िी गई िेबल 2 म ें दिए गए जनम्नजलजखत प्रििनव जिजनिेिों को पूरा करना होगा: िेबल 2. अससक्रं ोनस िनरेटिंग स्ट्िेिन के जलए ररएजटिि करंि प्रजतदक्रया लक्ष्य सीमा परै ामीिर िाइप-III WTG स ेयिु िनरेटिंग स्ट्िेिन अन्य सभी अससक्रं ोनस िनरेटिंग स्ट्िेिन चरण प्रजतदक्रया ना ≤ 30 जमलीसेकंड समय जनपिान समय ≤ 120 एमएस ≤ 100 जमलीसेकंड उत्पािन स्ट्िेिन की अजधकतम करंि का उत्पािन स्ट्िेिन की अजधकतम करंि का सेिसलंग बडैं (-)2.5%/(+)10% (-)2.5%/(+)10% नोि: 1) माप के जलए आिश्यक समय जिलंब इस िेबल म ेंजनर्िवष्ट चरण प्रजतदक्रया समय और जनपिान समय म ें िाजमल ह।ै 2) जसस्ट्िम की जस्ट्थजतयों के कारण प्रजतदक्रया समय धीमा हो सकता ह।ै यदि ऐसा होता है, तो िनरेटिंग स्ट्िेिन के पास सेटिंग्स में आिश्यक लचीलापन होना चाजहए तादक उपयुि लोड जडस्ट्पैच सेंिर के जनिेिों के अनुसार प्रजतदक्रया समय बढाया िा सके। लो िोल्िेि राइड थ्र ू(एलिीआरिी) 55. जिड स े िुड़ा िनरेटिंग स्ट्िेिन, दकसी भी या सभी फेजों पर PoI पर अंडर िोल्िेि (समजमत या असमजमत अडं र िोल्िेि की जस्ट्थजत) के अनरूु प अिजध तक जिड स े िुड़ा रहगे ा, िैसा दक जचत्र 5 म ें िक्र की मोिी रेखा द्वारा ििावया गया ह।ै18 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] Vt: िास्ट्तजिक िोल्िेि; Vn: नाममात्र िोल्िेि— जचत्र 5. अससक्रं ोनस िनरेटिंग स्ट्िेिन के जलए जनम्न िोल्िेि राइड थ्र ूआिश्यकताएाँ नोि: संबंजधत िोल्िेि, PoI पर संगत नाममात्र िोल्िेि के सापेि, फेि-िू-फेि या फेि-िू-िाउंड िोल्िेि के सबस े कम पररमाण िाले मौजलक आिजृत्त फेिर घिक के बराबर होगा, िो भी कम हो। 56. िनरेटिंग स्ट्िेिन म ें जनम्न िोल्िेि राइड-थ्र ू घिनाओं के िौरान एजटिि करंि प्राथजमकता मोड या ररएजटिि करंि प्राथजमकता मोड में से दकसी एक को चुनने की िमता होनी चाजहए। िास्ट्तजिक समय संचालन के िौरान मोड का चयन उपयिु लोड जडस्ट्पैच सेंिर के जनििे ों के अनुसार दकया िाएगा। िनरेटिंग स्ट्िेिन जडफ़ॉल्ि रूप स े ररएजटिि करंि प्राथजमकता मोड म ेंसंचाजलत होगा। बिते दक ररएजटिि करंि प्राथजमकता मोड म,ें उत्पािन स्ट्िेिन को अजतररि ररएजटिि करंि प्रिान करनी होगी: इसके अलािा, यह भी ध्यान रखना आिश्यक ह ै दक ररएजटिि करंि प्राथजमकता मोड का अथ व यह नहीं ह ै दक एजटिि पािर (या एजटिि करंि) िून्य हो िाती ह।ै इसका अथ व यह ह ै दक ररएजटिि करंि आउिपुि (Iq) को प्रथम प्राथजमकता िी िाती ह ै और इसे उत्पािन स्ट्िेिन की पणू व करंि रेटिंग उपलब्ध होती ह,ै िबदक एजटिि करंि आउिपुि (Ip) सीजमत रहती ह।ै एजटिि करंि Ip की सीमा अससंक्रोनस िनरेटिंग स्ट्िेिन के जलए अजधकतम से न्यूनतम िून्य तक और ऊिाव भंडारण प्रणाजलयों के जलए (-) तक जभन्न होती ह,ै िहााँ Iq ररएजटिि करंि का ितवमान मान ह।ै इसके अलािा, िोल्िेि बहाल होने के 1 सेकंड के भीतर एजटिि पािर को फाल्ि-पूिव स्ट्तर के कम से कम 90% तक बहाल कर दिया िाए। एजटिि पािर ररकिरी समय को 1.0 स े 10 सेकंड की कॉजन्फ़गर करन े योग्य सीमा के भीतर समायोजित दकया िा सकता ह।ै 57. एलिीआरिी जस्ट्थजत के िौरान, िनरेटिंग स्ट्िेिन में रेिेड िमता के न्यूनतम 1.1pu की ओिरलोड (करंि) िमता होनी चाजहए और 1.1pu की आभासी करंि रेटिंग को ध्यान में रखते हुए ररएजटिि/एजटिि करंि की आपूर्तव की िानी चाजहए। 58. एलिीआरिी जस्ट्थजतयों के जलए चरण प्रजतदक्रया समय अजधकतम 30 जमलीसेकंड होना चाजहए, अथावत् िनरेटिंग स्ट्िेिन को 30 जमलीसेकंड के भीतर नेििकव म ें अजतररि ररएजटिि करंि इंिेटि करन े म ें सिम होना चाजहए। जनरंतर पररचालन सीमा के भीतर िोल्िेि की िापसी के 30 जमलीसेकंड के भीतर अजतररि ररएजटिि करंि को िापस ले जलया िाना चाजहए। ऊिाव उत्पािन केंद्र की प्रजतदक्रया को पयावि रूप से कम दकया िाना चाजहए।[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 19 59. संतुजलत फाल्ि और समजमत अजत-िोल्िेि जस्ट्थजतयों के जलए, िनरेटिंग स्ट्िेिन को PoI िोल्िेि के आधार पर िृजद्धिील धनात्मक अनुक्रम ररएजटिि करंि समथवन प्रिान करना होगा: बिते दक धनात्मक अनुक्रम ररएजटिि करंि इंिेटिन की मात्रा ररएजटिि करंि लाभ यानी एलिीआरिी “K+” कारक पर जनभवर करेगी, जिसका मान जसस्ट्िम की मिबूती और नेििकव जस्ट्थरता के आधार पर उपयिु रांसजमिन यूरिजलिी और उपयिु LDC द्वारा जसमुलेिन अध्ययनों के माध्यम से जनधावररत दकया िाएगा। एलिीआरिी “K+” कारक आमतौर पर 0 से 10 की सीमा में होगा। 60. असंतुजलत फाल्ि और असमजमत ओिर-िोल्िेि जस्ट्थजतयों के जलए, िृजद्धिील धनात्मक अनुक्रम ररएजटिि करंि के अजतररि, उत्पािन स्ट्िेिन को PoI ऋणात्मक अनुक्रम िोल्िेि पर जनभवर ऋणात्मक अनुक्रम करंि इंिेटि करनी होगी: बिते दक ऋणात्मक अनुक्रम ररएजटिि करंि इंिेटिन की मात्रा ररएजटिि करंि लाभ यानी एलिीआरिी “K-” कारक पर जनभरव होगी, जिसका मान जसस्ट्िम की मिबूती और नेििकव जस्ट्थरता के आधार पर उपयिु रांसजमिन यूरिजलिी और लोड जडस्ट्पैच सिें र द्वारा जसमुलिे न अध्ययनों के माध्यम से जनधावररत दकया िाएगा। एलिीआरिी “K-” कारक आमतौर पर 0 से 10 की सीमा में होगा। इसके अलािा, यह भी प्रािधान ह ै दक िाइप-III WTG िाल े िनरेटिंग स्ट्िेिनों से उत्पन्न होने िाली िृजद्धिील ऋणात्मक अनुक्रम करंि पूरी तरह स े जनयंत्रणीय नहीं हो सकती ह ै और इस े मिीन की गत्यात्मक ता और कनििवर जनयंत्रण के अनुसार जनयंजत्रत दकया िाएगा। 61. यदि िनरेटिंग स्ट्िेिन की आभासी करंि सीमा 1.1pu तक पहुचाँ िाती ह,ै तो धनात्मक या ऋणात्मक अनुक्रम करंि को कम दकया िाएगा, जिसमें िोनों करंिओं म ेंसमान कमी को प्राथजमकता िी िाएगी। हाई िोल्िेि राइड थ्र ू(एचिीआरिी) 62. जिड से िुड़ा िनरेटिंग स्ट्िेिन, दकसी भी या सभी चरणों (समजमत या असमजमत ओिरिोल्िेि जस्ट्थजतयों) पर, PoI पर ओिरिोल्िेि के अनुरूप अिजध के जलए जिड से िुड़ा रहगे ा, िैसा दक जचत्र 6 म ें िक्र की मोिी रेखा द्वारा ििावया गया ह:ै जचत्र 6. अससक्रं ोनस िनरेटिंग स्ट्िेिन के जलए उच्च िोल्िेि राइड-थ्र ूआिश्यकताएाँ।20 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] नोि: संबंजधत िोल्िेि, फेि-से-फेि और फेि-से-िाउंड िोल्िेि के सबसे बड़े पररमाण िाले मौजलक आिृजत्त फेिर घिक के बराबर होगा, िो भी मान PoI पर संबंजधत नाममात्र िोल्िेि के सापेि अजधक हो। 63. उच्च िोल्िेि उतार-चढाि की जस्ट्थजत में िनरेटिंग स्ट्िेिन एजटिि करंि प्राथजमकता मोड या ररएजटिि करंि प्राथजमकता मोड म ें स े दकसी एक को चनु न े म ें सिम होगा। िास्ट्तजिक समय संचालन के िौरान मोड का चयन उपयुि लोड जडस्ट्पैच सेंिर के जनिेिों के अनुसार दकया िाएगा। िनरेटिंग स्ट्िेिन जडफ़ॉल्ि रूप से ररएजटिि करंि प्राथजमकता मोड म ेंसंचाजलत होगा। बिते दक, ररएजटिि करंि प्राथजमकता मोड म,ें उत्पािन स्ट्िेिन को अजतररि ररएजटिि करंि प्रिान करनी होगी: इसके अलािा, यह भी ध्यान रखना आिश्यक ह ै दक ररएजटिि करंि प्राथजमकता मोड का अथ व यह नहीं ह ै दक एजटिि पािर (या एजटिि करंि) िून्य हो िाती ह।ै इसका अथव यह ह ै दक ररएजटिि करंि आउिपुि (Iq) को प्राथजमकता िी िाती ह ै और इसे उत्पािन स्ट्िेिन की पणू व करंि रेटिंग उपलब्ध होती ह,ै िबदक एजटिि करंि आउिपुि (Ip) सीजमत रहती ह।ै एजटिि करंि Ip के बिलाि की सीमा अससंक्रोनस िनरेटिंग स्ट्िेिन के जलए अजधकतम से न्यूनतम िन्ू य तक और ऊिा व भडं ारण प्रणाजलयों के जलए (-) तक होगी, िहााँ Iq ररएजटिि करंि का ितवमान मान ह।ै इसके अलािा, िोल्िेि बहाल होने के 1 सेकंड के भीतर एजटिि पािर को फाल्ि-पूिव स्ट्तर के कम से कम 90% तक बहाल कर दिया िाए। एजटिि पािर ररकिरी समय को 1.0 स े 10 सेकंड की कॉजन्फ़गर करन े योग्य सीमा के भीतर समायोजित दकया िा सकता ह।ै 64. एचिीआरिी जस्ट्थजत के िौरान, िनरेटिंग स्ट्िेिन म ें रेिेड िमता के न्यूनतम 1.1pu की ओिरलोड (करंि) िमता होनी चाजहए और 1.1pu की आभासी करंि रेटिंग को ध्यान में रखते हुए ररएजटिि/एजटिि करंि की आपूर्तव की िानी चाजहए। 65. उच्च िोल्िेि प्रजतदक्रया (एचिीआरिी) जस्ट्थजतयों के जलए चरण प्रजतदक्रया समय अजधकतम 30 जमलीसेकंड होना चाजहए, अथावत् िनरेटिंग स्ट्िेिन को नेििकव से 30 जमलीसेकंड के भीतर अजतररि ररएजटिि करंि को अििोजषत करने में सिम होना चाजहए। जनरंतर पररचालन सीमा के भीतर िोल्िेि की िापसी के 30 जमलीसेकंड के भीतर अजतररि ररएजटिि करंि का अििोषण भी समाि हो िाना चाजहए। ऊिाव उत्पािन केंद्र की प्रजतदक्रया को पयावि रूप से कम दकया िाना चाजहए। 66. संतुजलत फाल्ि और समजमत अजत-िोल्िेि जस्ट्थजतयों के जलए, िनरेटिंग स्ट्िेिन को PoI िोल्िेि के आधार पर िृजद्धिील धनात्मक अनुक्रम ररएजटिि करंि समथवन प्रिान करना होगा: बिते दक धनात्मक अनुक्रम ररएजटिि करंि अििोषण की मात्रा ररएजटिि करंि लाभ यानी एचिीआरिी "के+" कारक पर जनभवर करेगी, जिसका मान जसस्ट्िम की िमता और नेििकव जस्ट्थरता के आधार पर उपयुि रांसजमिन यूरिजलिी और उपयुि लोड जडस्ट्पैच सेंिर द्वारा जसमुलेिन अध्ययनों के माध्यम से जनधावररत दकया िाएगा। एचिीआरिी "के+" कारक आमतौर पर 0 से 10 की सीमा में होगा। 67. असंतुजलत फाल्ि और असमजमत ओिर-िोल्िेि जस्ट्थजतयों के जलए, िृजद्धिील धनात्मक अनुक्रम ररएजटिि करंि के अजतररि, उत्पािन स्ट्िेिन को PoI ऋणात्मक अनुक्रम िोल्िेि पर जनभरव ऋणात्मक अनुक्रम करंि को अििोजषत करना होगा: बिते दक ऋणात्मक अनुक्रम ररएजटिि करंि अििोषण की मात्रा ररएजटिि करंि लाभ यानी एचिीआरिी "के-" कारक पर जनभरव होगी, जिसका मान जसस्ट्िम की मिबूती और नेििकव जस्ट्थरता के आधार पर उपयिु रांसजमिन यूरिजलिी और लोड जडस्ट्पैच सिें र द्वारा जसमलु ेिन अध्ययनों के माध्यम स े जनधावररत दकया िाएगा। एचिीआरिी "के-" कारक आमतौर पर 0 से 10 की सीमा में होगा।[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 21 इसके अलािा, यह भी प्रािधान ह ै दक िाइप-III WTG िाल े िनरेटिंग स्ट्िेिनों से उत्पन्न होने िाली िृजद्धिील ऋणात्मक अनुक्रम करंि पूरी तरह स े जनयंत्रणीय नहीं हो सकती ह ै और इस े मिीन की गत्यात्मक ता और कनििवर जनयंत्रण के अनुसार जनयंजत्रत दकया िाएगा। 68. यदि िनरेटिंग स्ट्िेिन की आभासी करंि सीमा 1.1pu तक पहुचाँ िाती ह,ै तो धनात्मक या ऋणात्मक अनुक्रम करंि को कम दकया िाएगा, जिसमें िोनों करंिओं म ें समान कमी को प्राथजमकता िी िाएगी। मल्िीपल फॉल्ि राइड थ्र ू(एमएफआरिी) 69. जिड से िड़ु ा िनरेटिंग स्ट्िेिन, एलिीआरिी िमता के अनुसार, दकसी भी 5 जमनि की अिजध के भीतर 0.9 pu स े कम िोल्िेि के 15 बार तक लगातार होन े िाल ेजििोभों के िौरान जिड स ेिुड़ा रहगे ा: बिते दक इस अिजध के िौरान िनरेटिंग स्ट्िेिन कम स ेकम 0.5 पीयू से कम िोल्िेि जिघ्न के जलए चालू रहगे ा: इसके अलािा, यह भी प्रािधान ह ै दक एकाजधक एलिीआरिी जस्ट्थजतयों के िौरान, उत्पािन स्ट्िेिन को एलिीआरिी जस्ट्थजतयों म ेंजनर्िष्टव प्रििवन आिश्यकताओं को पूरा करना होगा। 70. कई िोल्िेि गड़बजड़यों का आकलन करत े समय, स्ट्िचाजलत री-टलोि प्रोिेटिन स्ट्कीम के संचालन के बाि पुनः स्ट्थाजपत होन े िाली फाल्ि को एक अलग िोल्िेि गड़बड़ी के रूप में जगना िाएगा। आिजृ त्त राइड थ्र ू 71. िनरेटिंग स्ट्िेिन 47.5 स े 52 हर्ट्जव की आिृजत्त सीमा म ें संचाजलत होन े म ें सिम होना चाजहए और 49.5 हर्ट्जव स े 50.5 हर्ट्ज वकी आिृजत्त सीमा म ेंजनरंतर आधार पर अपनी आईसीआर िमता प्रिान करन े म ेंसिम होना चाजहए। बिते दक उत्पािन स्ट्िेिन इस उप-खंड में जनजहत अपने प्रििनव को (+/-) 5% तक के िोल्िेि जभन्नता के साथ भी बनाए रखन े म ें सिम होगा, बिते दक समतल्ु य प्राथजमक ऊिाव स्रोत उपलब्ध हो। 72. जनधावररत आिृजत्त सीमा के भीतर, िनरेटिंग स्ट्िेिन को जबना दकसी रुकािि के काम करना होगा और आिृजत्त म ें पररितवन की जनरपेि िर (ROCOF) 5.0 हर्ट्जव/सेकंड या उससे कम होन े पर ररप नहीं होना चाजहए। ROCOF कम से कम 0.1 सेकंड की औसत अिजध में आिृजत्त में पररितवन की औसत िर होगी। 73. आिृजत्त पररितवन की िर (आरओसीओएफ) सरु िा, उत्पािन स्ट्िेिन को इन जिजनयमों में जनर्िवष्ट िोल्िेि और आिृजत्त राइड-थ्र ू आिश्यकताओं को पूरा करन े स े नहीं रोकेगी, जिसमें आरओसीओएफ राइड-थ्र ू आिश्यकताए ं भी िाजमल ह।ैं िोल्िेि फेि एंगल पररितनव राइड थ्र ू 74. िनरेटिंग यूजनि को लाग ू िोल्िेि के उप-चक्र समय सीमा के भीतर धनात्मक-अनुक्रम फेि कोण पररितवनों को सहन करना होगा, िो दक (+/-) 25 जिद्युत जडिी स े कम या बराबर हो। इसके अजतररि, िनरेटिंग यूजनि को असंतुजलत फाल्ि के उत्पन्न होन े और उनके जनिारण के कारण अलग-अलग फेि के फेि कोण में होन े िाल े दकसी भी पररितवन के जलए पररचालन म ें रहना होगा, बित े दक धनात्मक-अनुक्रम कोण पररितवन पूिोि मानिडं स े अजधक न हो। एजटिि पािर जनयत्रं ण 75. 10 मेगािाि से अजधक की स्ट्थाजपत िमता िाले और 33 केिी या उससे अजधक के िोल्िेि स्ट्तर पर संचाजलत जिद्युत् उत्पािन स्ट्िेिन:22 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (1) इसमें राज्य लोड जडस्ट्पैच सेंिर या िेत्रीय लोड जडस्ट्पैच सेंिर के जनिेिों के आधार पर संिोजधत दकए िा सकने िाले जनधावररत सबंि ुके अनुसार एजटिि पािर इंिेटिन को जनयजं त्रत करन े की सुजिधा होनी चाजहए; (2) फ्रीक्वेंसी कंरोलर को 50.00 हर्ट्िव की संिभ व फ्रीक्वेंसी के सापिे सेि दकया िाएगा और डेड बैंड के बाहर की प्रजतदक्रया फ्रीक्वेंसी में कुल पररितवन के सापेि होगी। (3) इसमें आिृजत्त जनयंत्रक होना चाजहए जिसकी ड्रूप को 1 से 6% तक जनधावररत दकया िा सके। आिृजत्त का अंतर्नवजहत डडे बैंड (+/-) 0.03 हर्ट्जव से अजधक नहीं होना चाजहए। बिते दक 0.3 हर्ट्िव से अजधक आिृजत्त जिचलन के जलए, उत्पािन स्ट्िेिन के पास अजधकतम प्रत्यािती करंि एजटिि पािर िमता के कम से कम 10% की तत्काल (1 सेकंड के भीतर) िास्ट्तजिक पािर प्राथजमक आिृजत्त प्रजतदक्रया प्रिान करने की सुजिधा होनी चाजहए। (4) आिृजत्त प्रजतदक्रया और जिजनयमन प्रणाली की पररचालन सीमा अजधकतम के 10% स े 100% तक होगी। प्रत्यािती करंि की एजटिि पािर िमता, िो सौर जिदकरण या पिन गजत के अनरूु प हो; (5) इसमें PoI पर प्रजत जमनि ± 10% स े अजधक की रैंप िर पर जिद्युत् उत्पािन की पररितनव िर को जनयंजत्रत करने की सुजिधा होनी चाजहए। 76. प्राथजमक प्रजतदक्रया की आिश्यकता नीचे िी गई िेबल 3 म ेंउजल्लजखत अनुसार होगी: िेबल 3. प्राथजमक प्रजतदक्रया आिश्यकताएाँ प्रकार प्रजतदक्रया सीमा सौर, पिन और बैिरी ऊिा व भंडारण प्रणाली आईसीआर का (+/-) 10% (BESS/बेस) 77. आिृजत्त के जिचजलत होने पर िनरेटिंग यूजनि अपनी िमता के अनुसार उनके पररचालन स्ट्तर/आईसीआर का (+/-) 10% तत्काल प्राथजमक प्रजतदक्रया िेगी । 78. लाग ू आिृजत्त म ें चरणबद्ध पररितवन के जलए उत्पािन स्ट्िेिन की समि गत्यात्मक प्राथजमक आिृजत्त प्रजतदक्रया िमता अनुसूची II म ेंजनर्िवष्ट सीमाओं के भीतर होनी चाजहए। ररएजटिि पािर जनयत्रं ण 79. 10 मेगािाि और उससे अजधक की कुल िमता िाले उत्पािन स्ट्िेिन म ें राज्य लोड जडस्ट्पैच सिें र या िेत्रीय लोड जडस्ट्पैच सेंिर स,े िैसा भी मामला हो, ररएजटिि पािर उत्पािन को बिलन े के जलए जसग्नल प्राि करने का प्रािधान होना चाजहए। 80. िनरेटिंग स्ट्िेिन को ररएजटिि पािर आउिपुि म ें पररितनव के माध्यम स े िोल्िेि जिजनयमन िमता प्रिान करनी होगी, िब भी PoI िोल्िेि जनरंतर संचालन िेत्र म ेंहो। 81. ऊिाव उत्पािन स्ट्िेिन को ररएजटिि पािर जनयंत्रण कायों के जनम्नजलजखत परस्ट्पर अनन्य पररचालन मोड की िमता प्रिान करनी होगी: (1) िोल्िेि जनयंत्रण (2) पािर फैटिर जनयंत्रण (3) ररएजटिि पािर सेि पिाइंि जनयंत्रण[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 23 ऊिाव उत्पािन केंद्र एक समय में इनम ें स े प्रत्येक मोड को सदक्रय करन े म ें सिम होना चाजहए। ऊिा व उत्पािन केंद्र उपयुि जसस्ट्िम ऑपरेिर द्वारा जनधावररत समय सीमा के भीतर सेटिंग संिोधनों और मोड चयन को लागू करने के जलए उत्तरिायी होगा। िनरेटिंग स्ट्िेिन की गत्यात्मक प्रजतदक्रया सभी जनयंत्रण मोड में जस्ट्थर होनी चाजहए और दकसी भी िोलन को सकारात्मक रूप से अिमंदित दकया िाना चाजहए। ब्लकै स्ट्िािव िमता 82. 50 मेगािाि और उससे अजधक की कुल िमता िाले बीईएस (बेजसक लोड सपलाई सेंिर) में ब्लैक स्ट्िािव सपोिव प्रिान करन े की िमता होनी चाजहए। जसस्ट्िम की आिश्यकताओं के आधार पर उपयिु लोड जडस्ट्पैच सेंिर द्वारा इस िमता का उपयोग दकया िाएगा। 83. ब्लैक स्ट्िािव कायविमता को कमीिसनंग के िौरान प्रिर्ितव दकया िाएगा और इन मानकों तथा उपयुि लोड जडस्ट्पैच सेंिर द्वारा जनर्िष्टव अन्य आिश्यकताओं के अनुसार समय-समय पर परीिण के माध्यम से सत्याजपत दकया िाएगा। जिड जनमाणव जनयत्रं ण 84. जिड फॉर्मिंग कंरोल िाले िनरेटिंग स्ट्िेिन को अससंक्रोनस िनरेटिंग स्ट्िेिन पर लाग ू सभी जिजनयमों का अनुपालन करना होगा। 85. जिड फॉर्मिंग जनयंत्रण स े लैस िनरेटिंग स्ट्िेिन लगभग तात्काजलक आिृजत्त और िोल्िेि सहायता स्ट्ितंत्र रूप स े प्रिान करेगा। प्राथजमक जनयंत्रण उद्दश्े य, कनििवर की पूण व उपलब्ध ितवमान िमता का उपयोग करत े हुए, उप- िजणक समयािजध के िौरान जनयंत्रण रणनीजतयों के माध्यम स े स्ट्थाजपत आतं ररक िोल्िेि स्रोत के िोल्िेि फेिर को जस्ट्थर बनाए रखना होगा। 86. जिड फॉर्मिंग कन्ििवसव स े लैस िनरेटिंग स्ट्िेिन, आइलडैं ेड ऑपरेिन म ें जनबावध रूप स े प्रिेि करने और उससे बाहर जनकलने म ेंसिम होना चाजहए, जिससे मुख्य जिड स े जस्ट्थर पुन: कनेटिन सुजनजश्चत हो सके। 87. जिड फॉर्मिंग जनयंत्रण स े लैस िनरेटिंग स्ट्िेिन, असंतुजलत पररजस्ट्थजतयों म ें िोल्िेि समरूपता बनाए रखन े के उद्देश्य स,े जस्ट्थर अिस्ट्था और फॉल्ि िोनों जस्ट्थजतयों के िौरान ऋणात्मक-अनुक्रम करंिओं को इंिेटि करन े म ें भी सिम होना चाजहए। 88. जिड फॉर्मिंग जनयंत्रण स े लैस िनरेटिंग स्ट्िेिन, लाग ू िोल्िेि के सापेि, एक उप-चक्र स े एक-चक्र समयसीमा के भीतर ±60 जिद्युत जडिी तक के धनात्मक-अनुक्रम फेि कोण जभन्नताओं को संभालने म ेंसिम होना चाजहए। ऊिा व भडं ारण प्रणाली (ईएसएस) 89. ईएसएस पर लाग ू होन े िाली आिश्यकताएं नीचे िी गई िेबल 4 म ें जनर्िष्टव ह:ैं िेबल 4. ईएसएस के जलए आिश्यकताएाँ जनजश्चत गजत िाला पीएसपी जनयम 21 स े 44 बेस जनयम 45 स े 88 पररितवनीय गजत पीएसपी जनयम 21 स े 23, 32 स े 44, 49 स े 55 और 6224 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] अध्याय – III एचिीडीसी जसस्ट्िम और एफएसीिीएस (फ्लजे टसबल एसी रासं जमिन जसस्ट्िम) उपकरणों के जलए आिश्यकताएाँ सामान्य आिश्यकताए ाँ 90. एचिीडीसी प्रणाली और एफएसीिीएस उपकरणों को इन जिजनयमों म ें जनर्िष्टव सभी प्रििनव आिश्यकताओं को पूरा करने के जलए जडिाइन दकया िाएगा और ि े मौिूिा जिद्युत प्रणाली के साथ सगं त होंगे। 91. एचिीडीसी सलंक का उपयोग या तो अससंक्रोनस जिडों को एक िसू रे स े िोड़ने के जलए दकया िा सकता ह ै या इस े एक एकल ससंक्रोनस एसी जिड के भीतर एम्बेड दकया िा सकता ह।ै 92. एचिीडीसी प्रणाली म ें एजटिि पािर प्रिाह और िोल्िेि स्ट्तर म ें न्यनू तम पररितवन के साथ जस्ट्थर संचालन सबंि ु खोिने की िमता होनी चाजहए, चाह े िह एचिीडीसी प्रणाली या एसी नेििकव म ें कोई भी जनयोजित या अजनयोजित पररितनव हो जिससे यह िुड़ा हुआ ह।ै 93. एचिीडीसी जसस्ट्िम के स्ट्िामी को यह सुजनजश्चत करना होगा दक दकसी भी मल्िी-िर्मवनल या एम्बेडेड एचिीडीसी जसस्ट्िम के जहस्ट्स े के रूप म ें एचिीडीसी कनििवर स्ट्िेिन के ररप होन े या जडस्ट्कनेटि होने स े पीओआई पर िजणक उतार-चढाि न हो। 94. एचिीडीसी जसस्ट्िम और एफएसीिीएस जडिाइस को एचिीडीसी जसस्ट्िम के जनकि या आसपास के नेििकव म ें एचिीएसी लाइनों पर िजणक फाल्ि का सामना करना चाजहए, और नेििकव में लाइनों के स्ट्ितः बंि होने के कारण एचिीडीसी जसस्ट्िम के दकसी भी उपकरण को नेििकव स े जडस्ट्कनेटि नहीं करना चाजहए। 95. एचिीडीसी प्रणाजलयााँ, जिनम ें डीसी ओिरहडे लाइनें भी िाजमल ह,ैं एचिीडीसी प्रणाली के भीतर िजणक फाल्ि स े िीघ्रता स े उबरन े म ें सिम होनी चाजहए। 96. उपयुि पारेषण उपयोजगता और जितरण लाइसेंसधारी PoI पर न्यूनतम और अजधकतम िॉिव सर्कवि पािर की गणना के जलए जिजध और फाल्ि-पूि व एि ं फाल्ि-पश्चात जस्ट्थजतयों को जनर्िष्टव और उपलब्ध कराएाँगे। दकसी भी कन्ििवर स्ट्िेिन (पारंपररक करंि सोसव प्रकार के जलए) पर MVA म ें फाल्ि स्ट्तर और LCC आधाररत एचिीडीसी बाइपोल पर पािर फ्लो का अनुपात 3.0 स े कम नहीं होना चाजहए। 97. एचिीडीसी प्रणाली और एफएसीिीएस, उपयुि पारेषण उपयोजगता और जितरण लाइससें धारी के बताय े गए िॉिव सर्कवि पािर और नेििकव जििेषताओं की जनर्िवष्ट सीमा के भीतर काम करने म ेंसिम होन े चाजहए। 98. उपयुि पारेषण उपयोजगता और जितरण लाइसेंसधारी नेििकव के व्यिहार का िणवन करन े िाले नेििकव समकि प्रिान कराएंगे, िो अनरु ोधकताव/उपयोगकता व को एचिीडीसी जसस्ट्िम और एफसीिीएस जडिाइस के िीिनकाल म ें हामोजनटस और गत्यात्मक जस्ट्थरता सजहत, लेदकन इन्हीं तक सीजमत नहीं, अपने जसस्ट्िम को जडिाइन करन े म ें सिम बनाएंगे। 99. अनुरोधकता/व उपयोगकता व को अपन े पररसर म ें पररयोिना जिजनिेिों के आधार पर एक पणू व एचिीडीसी प्रणाली और एफएसीिीएस जडिाइस जनयंत्रण और सुरिा प्रजतकृजत प्रणाली को जबना अजतरेक के, साथ ही एक िास्ट्तजिक समय जसम्युलेिर को बनाए रखना होगा। 100. एचिीडीसी जसस्ट्िम और एफएसीिीएस उपकरणों म ें बैकिाउंड हामोजनटस को जनयंजत्रत करने के जलए एजटिि दफ़ल्िटरंग की सुजिधा होनी चाजहए। पीओआई पर कम दकए िाने िाले हामोजनटस का क्रम और पररमाण उपयुि रांसजमिन यूरिजलिी द्वारा तय दकया िा सकता ह।ै 101. जिड स े कनेटि होन े स े पहल े एचिीडीसी और एफसीिीएस उपकरणों के प्रििवन का परीिण दकसी मान्यता प्राि तृतीय-पि परीिण एिेंसी द्वारा दकया िाना चाजहए। 102. ईएमिी मॉडसलगं चरण और िास्ट्तजिक समय जसमुलिे न के िौरान एचिीडीसी और एफएसीिीएस उपकरणों के गत्यात्मक प्रििनव परीिण के मूल्यांकन के जलए जसस्ट्िम अध्ययन कम स े कम िो नेििकव जस्ट्थजत, अथातव ् पीक और ऑफ-पीक, को ध्यान म ेंरखत े हुए दकया िाएगा।[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 25 103. आस-पास के एचिीडीसी जसस्ट्िम, एफएसीिीएस जडिाइस, िनरेटिंग स्ट्िेिन (अससंक्रोनस और ससंक्रोनस) और पारंपररक एसी उपकरणों के बीच परस्ट्पर दक्रया के जलए जसस्ट्िम अध्ययन सीआईिीआरई तकनीकी िोिर (िीबी- 934) (आस-पास के िीएससी-एचिीडीसी कन्ििवसव, एफएसीएिीएस जडिाइस, एचिी पािर इलेटरॉजनक जडिाइस और पारंपररक एसी उपकरणों के बीच परस्ट्पर दक्रया) के अनरूु प दकया िाना चाजहए। ररएजटिि पािर िमता 104. िीएससी आधाररत एचिीडीसी प्रणाली (िोनों कन्ििवर जसरों पर) रेिेड पािर िमता के 32.87% के अनरूु प पीओआई पर गत्यात्मक रूप से ररएजटिि पािर की आपूर्त व और अििोषण करने म ें सिम होनी चाजहए। यह िमता अनुसूची I म ें िी गई प्रदक्रया के अनुसार जनधावररत अजधकतम और न्यूनतम पररिेि तापमान के अनुपालन में प्रिान की िानी चाजहए। 105. जचत्र 7 में ििावए गए पीटय ू िक्र के अनुसार, िीएससी एचिीडीसी प्रणाली सभी एजटिि पािर स्ट्तरों (िून्य स्ट्तर सजहत) के जलए न्यूनतम गत्यात्मक ररएजटिि पािर िमता प्रिान करने म ें सिम होनी चाजहए। िीएससी एचिीडीसी प्रणाली जचत्र 7 में ििावए गए पीटयू िक्र के भीतर कहीं भी संचालन करते समय गत्यात्मक रूप से पररितवनिील ररएजटिि पािर को जनरंतर अििोजषत या आपूर्तव करने म ेंसिम होनी चाजहए। जचत्र 7. एजटिि पािर और ररएजटिि पािर के सिं भ वम ेंएचिीडीसी प्रणाली की PoI पर मापी गई न्यनू तम ररएजटिि पािर िमता। नोि — 1) ररएजटिि पािर के आिान-प्रिान के जलए िीएससी एचिीडीसी प्रणाली को जिड स ेलॉस भरपाई बाबत एजटिि पािर का उपभोग करने की आिश्यकता हो सकती ह।ै 2) यह जचत्र इस खंड द्वारा आिश्यक ररएजटिि पािर िमता की न्यूनतम सीमा ििावता ह।ै िीएससी एचिीडीसी प्रणाली की िास्ट्तजिक िमता इससे अजधक हो सकती है। बिते दक चार्ििंग (एजटिि पािर का अििोषण, -P) और जडस्ट्चार्ििंग (एजटिि पािर का इंिेटिन, +P) के िौरान अनुसरण दकया िाने िाला PQ िक्र ऊपर बताए गए िक्र के समान होगा।26 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] 106. न्यूनतम गत्यात्मक ररएजटिि पािर िमता को टयूिी िक्र म ें ििावए अनुसार बिला िा सकता ह ै िब PoI पर िोल्िेि 0.9 प्रजत इकाई और 1.1 प्रजत इकाई के बीच बिलता रहता ह,ै िहां िीएससी एचिीडीसी प्रणाली जचत्र 8 में टयूिी िक्र के भीतर कहीं भी संचाजलत होने पर जनरंतर ररएजटिि पािर को अििोजषत या आपूर्तव करने म ें सिम होनी चाजहए: जचत्र 8. पीओआई पर मापी गई िोल्िेि और ररएजटिि पािर के सिं भ व म ें िीएससी एचिीडीसी प्रणाली की न्यनू तम ररएजटिि पािर िमता। बिते दक चार्ििंग (एजटिि पािर का अििोषण, -P) और जडस्ट्चार्ििंग (एजटिि पािर का इंिेटिन, +P) के िौरान अनुसरण की िान े िाली QV िक्र ऊपर बताए अनुसार ही होगी। िोल्िेि जिघ्न राइड थ्र ू 107. एचिीडीसी जसस्ट्िम और FACTS जडिाइस को PoI पर 0.9 pu से 1.1 pu की AC िोल्िेि रेंि में लगातार संचाजलत होना चाजहए और रेिेड आउिपुि िने े म ेंसिम होना चाजहए। 108. एचिीडीसी स्ट्िेिन और एफएसीिीएस उपकरणों म ें कॉजन्फ़गर करन े योग्य जनम्न और उच्च िोल्िेि राइड थ्र ू एजटििण और जनजरक्रयता सेटिंग्स होंगी, जिनकी सीमा िोल्िेि राइड थ्र ू जस्ट्थजतयों के िौरान जस्ट्थर संयंत्र संचालन सुजनजश्चत करन े के जलए जसस्ट्िम अध्ययनों के आधार पर तय की िाएगी। 109. एचिीडीसी जसस्ट्िम और एफएसीिीएस जडिाइस म ें उपयोग दकए िाने िाले सभी तात्काजलक अंडर/ओिर िोल्िेि सुरिा उपकरणों में दफ़ल्िर की गई मात्राओं का उपयोग दकया िाएगा तादक िांजछत उपकरण और जसस्ट्िम को सुरिा प्रिान करत े समय गलत संचालन की संभािना कम हो सके। ऐसे दकसी भी तात्काजलक अडं र/ओिर िोल्िेि सुरिा उपकरण (उपकरणों) म,ें जिसस े संपूण व एचिीडीसी जसस्ट्िम के पािर आउिपुि म ें जिघ्न उत्पन्न होन े की संभािना हो, जिड पर इसके प्रभाि और इस संभािना को कम करन े के जलए कम स े कम एक चक्र (मौजलक आिृजत्त का) मापन सिंडो का उपयोग दकया िाएगा। 110. िीएससी एचिीडीसी प्रणाली और एफएसएिी उपकरण ररएजटिि करंि प्रजतदक्रया को नीचे िी गई िेबल 5 म ें िर्णवत जनम्नजलजखत प्रििवन जिजिष्टताओं को परू ा करना होगा: िेबल 5. एचिीडीसी प्रणाली और एफएसीिीएस के जलए ररएजटिि करंि प्रजतदक्रया लक्ष्य सीमा[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 27 परै ामीिर िीएससी एचिीडीसी जसस्ट्िम और तथ्य चरण प्रजतदक्रया ≤ 30 जमलीसेकंड समय जनपिान समय ≤ 100 जमलीसेकंड सेिसलंग बडैं एचिीडीसी जसस्ट्िम और एफएसीिीएस अजधकतम करंि का (-)2.5%/(+)10% नोि: 1) माप के जलए आिश्यक समय जिलंब इस िेबल म ेंजनर्िवष्ट चरण प्रजतदक्रया समय और जनपिान समय म ें िाजमल ह।ै (b) जसस्ट्िम की जस्ट्थजतयों के अनुसार प्रजतदक्रया समय धीमा हो सकता ह।ै यदि ऐसा है, तो एचिीडीसी जसस्ट्िम और एफएसीिीएस में सेटिंग्स में आिश्यक लचीलापन होना चाजहए तादक उपयिु लोड जडस्ट्पैच सेंिर के जनिेिों के अनुसार प्रजतदक्रया समय बढाया िा सके। लो िोल्िेि राइड थ्र ू(एलिीआरिी) 111. जिड से िुड़ े िीएससी एचिीडीसी जसस्ट्िम और FACTS जडिाइस, दकसी भी या सभी फेजों पर PoI पर अंडर िोल्िेि (समजमत या असमजमत अंडर िोल्िेि की जस्ट्थजत) के अनुरूप अिजध तक जिड से िड़ु े रहगें े, िैसा दक जचत्र 9 में िक्र की मोिी रेखा द्वारा ििावया गया ह।ै Vt: िास्ट्तजिक िोल्िेि; Vn: नाममात्र िोल्िेि— जचत्र 9. िीएससी एचिीडीसी प्रणाली और एफएसीिीएस उपकरणों के जलए जनम्न िोल्िेि राइड थ्र ूआिश्यकताएाँ नोि: संबंजधत िोल्िेि, PoI पर संगत नाममात्र िोल्िेि के सापेि, फेि-िू-फेि या फेि-िू-िाउंड िोल्िेि के सबस े कम पररमाण िाले मौजलक आिजृत्त फेिर घिक के बराबर होगा, िो भी कम हो। हाई िोल्िेि राइड थ्र ू(एचिीआरिी)28 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] 112. जिड से िड़ु े िीएससी एचिीडीसी जसस्ट्िम और एफएसी उपकरण, पीओआई पर दकसी भी या सभी चरणों (समजमत या असमजमत ओिरिोल्िेि जस्ट्थजतयों) पर ओिरिोल्िेि की अिजध के जलए जिड स े िुड़े रहगें े, िैसा दक जचत्र 10 में िक्र म ेंमोिी रेखा द्वारा ििावया गया है: जचत्र 10: िीएससी एचिीडीसी प्रणाली और एफएसीिीएस उपकरणों के जलए उच्च िोल्िेि राइड-थ्रू आिश्यकताएाँ। नोि: संबंजधत िोल्िेि, फेि-से-फेि और फेि-से-िाउंड िोल्िेि के सबसे बड़े पररमाण िाले मौजलक आिृजत्त फेिर घिक के बराबर होगा, िो भी मान PoI पर संबंजधत नाममात्र िोल्िेि के सापेि अजधक हो। मल्िीपल फॉल्ि राइड थ्र ू(एमएफआरिी) 113. जिड स े िुड़ े एचिीडीसी जसस्ट्िम और एफएसी उपकरण, एलिीआरिी िमता के अनुसार, दकसी भी 5 जमनि की अिजध के भीतर 0.9 पीय ूसे कम िोल्िेि के 15 बार तक लगातार होन े िाले व्यिधानों के जलए जिड से िड़ु े रहगें :े बिते दक ऐसी अिजध के िौरान एचिीडीसी जसस्ट्िम और एफएसीिीएस उपकरण कम से कम 06, 0.5 पीयू स े कम िोल्िेि जिघ्न के जलए िुड़ ेरहगें े: इसके अलािा, यह भी प्रािधान ह ै दक एकाजधक एलिीआरिी जस्ट्थजतयों के िौरान, एचिीडीसी जसस्ट्िम और FACTS उपकरण एलिीआरिी जस्ट्थजतयों म ेंजनर्िवष्ट प्रििनव आिश्यकताओं को पूरा करेंगे। 114. कई िोल्िेि गड़बजड़यों का आकलन करत े समय, स्ट्िचाजलत री-टलोि प्रोिेटिन स्ट्कीम के संचालन के बाि पुनः स्ट्थाजपत होन े िाली फाल्ि को एक अलग िोल्िेि गड़बड़ी के रूप में जगना िाएगा। आिजृ त्त फॉल्ि राइड थ्र ू 115. एचिीडीसी जसस्ट्िम और एफएसीिीएस 47.5 से 52.5 हर्ट्ि व की आिृजत्त सीमा म ें संचाजलत होने म ें सिम होन े चाजहए और 48.5 हर्ट्ि व स े 51 हर्ट्ि व की आिृजत्त सीमा म ेंरेिेड आउिपुि प्रिान करने म ेंसिम होने चाजहए। बिते दकएचिीडीसी प्रणाली और तथ्ययह उपखंड म ें जनजहत अपन े प्रििनव को (+/-) 5% तक के िोल्िेि पररितवन के साथ भी बनाए रखन े में सिम होगा। 116. जनर्िवष्ट आिृजत्त सीमा के भीतर, एचिीडीसी प्रणाली और एफएसीिीएस उपकरण आिृजत्त में होने िाल े उन उतार- चढािों के जलए जनजरक्रय नहीं होंगे जिनका आिृजत्त पररितनव जनरपेि िर (आरओसीओएफ) 5.0 हर्ट्ि/वसेकंड स े कम या उसके बराबर हो। आरओसीओएफ कम से कम 0.1 सके ंड की औसत अिजध म ें आिृजत्त पररितवन की औसत िर होगी।[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 29 बिते एचिीडीसी का उपयोग करके ब्लैक स्ट्िािव ऑपरेिन के िौरान, आरओसीओएफ झले न े की िमता अजधक हो सकती ह।ै 117. आिृजत्त पररितवन की िर (आरओसीओएफ) सुरिा, एचिीडीसी प्रणाली और एफएसीिीएस उपकरणों को इन जिजनयमों में जनर्िष्टव िोल्िेि और आिृजत्त राइड-थ्र ू आिश्यकताओं को परू ा करन े स े नहीं रोकेगी, जिसमें आरओसीओएफ राइड-थ्र ूआिश्यकताएं भी िाजमल ह।ैं िोल्िेि फेि एंगल पररितनव राइड थ्र ू 118. The िीएससी एचिीडीसी प्रणाली और एफएसीिीएस िोल्िेि के उप-चक्र-स-े चक्र समय सीमा के भीतर धनात्मक-अनुक्रम फेि कोण पररितवन (+/-) 25 जिद्युत जडिी से कम या बराबर को सहन कर सकता ह।ै इसके अजतररि, असंतुजलत फाल्ि के उत्पन्न होन े और उनके जनिारण के कारण व्यजिगत चरणों के फेि कोण म ें होन े िाले दकसी भी पररितवन के जलए यह संचालन म ें बना रहगे ा, बिते दक धनात्मक-अनुक्रम कोण पररितनव पूिोि मानिंड स ेअजधक न हो। एजटिि पािर जनयत्रं ण 119. िीएससी एचिीडीसी प्रणाली उपयुि लोड जडस्ट्पैच सेंिर स े जनिेि प्राि होने पर प्रत्येक दििा म ें अपनी अजधकतम एचिीडीसी एजटिि पािर संचरण िमता तक प्रेजषत एजटिि पािर को समायोजित करने म ें सिम होनी चाजहए। पािर म ें पररितवन के जलए न्यूनतम चरण आकार अजधकतम रेिेड पािर का 1% होना चाजहए। 120. एलसीसी आधाररत एचिीडीसी सलंक म,ें एक दििा म ें अजधकतम एजटिि पािर संचरण िमता स े िसू री दििा म ें अजधकतम एजटिि पािर संचरण िमता तक पािर स्ट्थानांतरण 60 जमनि के भीतर संभि होना चाजहए। एलसीसी आधाररत एचिीडीसी बैक-िू-बकै स्ट्िेिनों के जलए, यह अिजध 30 जमनि होनी चाजहए। िीएससी एचिीडीसी को प्रजतदिन कम स े कम 2 स्ट्थानांतरण संचालन के जलए जडजाइन दकया िाना चाजहए। िीएससी आधाररत एचिीडीसी प्रणाली म ें एक दििा म ें अजधकतम एजटिि पािर संचरण िमता स े िसू री दििा म ें अजधकतम एजटिि पािर संचरण िमता तक तत्काल स्ट्थानांतरण करन े की िमता होनी चाजहए। 121. एचिीडीसी प्रणाली सभी पररजस्ट्थजतयों म ें एजटिि पािर म ें होने िाल े बिलािों की रैंसपंग िर को ऊपर/नीचे की दििा म ें कम स ेकम 10% प्रजत जमनि की िर स े समायोजित करने म ेंसिम होनी चाजहए। 122. प्रत्येक पोल की सतत और िजणक ओिरलोड िमता को तकनीकी जिजिष्टताओं म ेंजनर्िवष्ट दकया िाएगा। 123. ऐस े स्ट्थानों के जलए जडजाइन दकया गया एचिीडीसी जसस्ट्िम, िहां कम िड़त्ि/आइलैंसडगं जस्ट्थजतयां संभि ह,ैं आिृजत्त पररितवनों के ििाब म ें कृजत्रम िड़त्ि प्रिान करने म ें सिम होना चाजहए, िो आिृजत्त के पररितवन की िर को सीजमत करने के जलए एजटिि पािर को तेिी स े समायोजित करके कम या उच्च आिृजत्त जस्ट्थजतयों म ें सदक्रय हो। 124. एचिीडीसी प्रणाली म ें एक स्ट्ितंत्र जनयंत्रण मोड होना चाजहए िो एचिीडीसी कनििवर स्ट्िेिन के एजटिि पािर आउिपुि को एचिीडीसी प्रणाली के सभी कनेटिन सबंिओंु पर आिृजत्तयों के आधार पर समायोजित कर सके, तादक जस्ट्थर प्रणाली आिृजत्तयों को बनाए रखा िा सके। आिृजत्त जनयंत्रण की सेटिंग्स को उपयुि लोड जडस्ट्पैच सेंिर की अनुिंसा पर बिला िा सकेगा। ररएजटिि पािर जनयत्रं ण 125. िब भी पीओआई िोल्िेि जनरंतर संचालन की सीमा में हो, िीएससी एचिीडीसी जसस्ट्िम और एफएसीिीएस जडिाइस ररएजटिि पािर आउिपुि में पररितवन के माध्यम से िोल्िेि जिजनयमन िमता प्रिान करेंगे।30 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] 126. िीएससी एचिीडीसी प्रणाली और एफएसीिीएस उपकरण ररएजटिि पािर जनयंत्रण कायों के जनम्नजलजखत परस्ट्पर अनन्य संचालन मोड की िमता प्रिान करेंगे: (1) िोल्िेि जनयंत्रण (2) ररएजटिि पािर सेि पिाइंि जनयंत्रण िीएससी एचिीडीसी जसस्ट्िम और FACTS जडिाइस एक समय में इनमें से प्रत्येक मोड को सदक्रय करने म ेंसिम होने चाजहए। िीएससी एचिीडीसी जसस्ट्िम और FACTS जडिाइस, जसस्ट्िम ऑपरेिर द्वारा जनधावररत समय सीमा के भीतर सेटिंग संिोधनों और मोड चयन को लागू करन ेके जलए जिम्मेिार होंगे। सभी जनयंत्रण मोड म ेंिीएससी एचिीडीसी प्रणाली और एफएसीिीएस उपकरणों की गत्यात्मक प्रजतदक्रया जस्ट्थर होनी चाजहए और दकसी भी िोलन को सकारात्मक रूप स ेअिमंदित दकया िाना चाजहए। 127. िीएससी एचिीडीसी जसस्ट्िम और एफएसीिीएस उपकरण, संबंजधत रांसजमिन यूरिजलिी और लोड जडस्ट्पैच सेंिर द्वारा जनर्िवष्ट अजतररि जनयंत्रण मोड म ेंसंचाजलत होने म ेंसिम होने चाजहए। पािर ऑजसलिे न डैसम्पगं 128. एचिीडीसी और एफएसीिीएस उपकरणों को अपने जनयंत्रणों म ें एक पािर ऑजसलिे न डैसम्पंग (पीओडी) फ़ंटिन को लाग ू करना चाजहए, जिसे पािर जसस्ट्िम ऑजसलिे न को कम करन े के जलए ट्यून दकया िा सकता ह।ै 129. एचिीडीसी प्रणाली म ें सबससंक्रोनस िॉिवनल इंिरेटिन (एसएसिीआई) डैसम्पंग जनयत्रं ण के संबंध म ें िॉिवनल आिृजत्तयों के पािर डैसम्पंग म ें योगिान करन े की िमता होनी चाजहए। उपयिु रांसजमिन यरू िजलिी अपन े नेििकव म ें उपकरण और संबंजधत जसस्ट्िम जस्ट्थजतयों स े संबंजधत इनपिु पैरामीिर, िहां तक उपलब्ध हों, प्रिान करेगी। एसएसिीआई अध्ययन अनुरोधकता/व उपयोगकताव द्वारा दकए िाएंगे। ब्लकै स्ट्िाि व िमता 130. िीएससी एचिीडीसी जसस्ट्िम के िोनों कन्ििवर स्ट्िेिनों के जलए ब्लैक स्ट्िािव िमता उपलब्ध होनी चाजहए। रांसजमिन सर्िवस प्रोिाइडर (TSP) िोनों दििाओं म ें ब्लैक स्ट्िािव करन े के जलए आिश्यक अजतररि उपकरण जनधावररत करेगा और उपलब्ध कराएगा। इसम ें ब्लैक स्ट्िािव करने के जलए आिश्यक सभी हाडविेयर और जनयंत्रण काय व िाजमल होंगे। अध्याय – IV बल्क कंज्यमू र और जितरण प्रणाजलयों के जलए आिश्यकताएाँ सामान्य आिश्यकताए ाँ 131. बल्क कंज्यूमर अपने िनरेिर या दकसी अन्य स्रोत स े स्ट्िचाजलत जनयंत्रणों से या मन्ै युअल जनयंत्रणों से पारेषण या जितरण प्रणाली को पािर इंिटे ि नहीं करेगा, िब तक दक पारेषण या जितरण लाइसेंसधारी के साथ कनेटिन समझौते में जििेष रूप स ेइसका प्रािधान न हो। 132. जिस PoI पर इन्ििवर-इंिरफेस्ट्ड बल्क कंज्यूमर को कनेटि करन े का प्रस्ट्ताि ह,ै िहा ं िॉिव सर्कवि रेजियो (एससीआर) सामान्यतः 5 स े कम नहीं होना चाजहए। इन्ििवर-इंिरफेस्ट्ड बल्क कंज्यूमर को न्यूनतम 5 के एससीआर या PoI पर िास्ट्तजिक एससीआर, िोनों म ें स े िो भी कम हो, पर जस्ट्थर रूप से संचाजलत होना चाजहए। 133. िोल्िेि-जिघ्न राइड-थ्र,ू आिृजत्त राइड-थ्र ू और िोल्िेि-फेि-एंगल राइड-थ्र ू आिश्यकताएं पीओआई पर 50 मेगािाि या उससे अजधक की िमता िाले इन्ििवर-इंिरफेस्ट्ड बल्क उपभोिाओं पर लागू होंगी।[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 31 ररएजटिि पािर िमता 134. The इन्ििवर-इंिरफेस्ट्ड बल्क उपभोिा रेिेड पािर िमता के 32.87% (0.95pf लैसगगं /लीसडंग) के अनुरूप PoI पर गत्यात्मक रूप से जभन्न ररएजटिि पािर की आपूर्तव और अििोषण करने में सिम होना चाजहए। इन्ििवर- इंिरफेस्ट्ड बल्क उपभोिा को यह िमता अनुसूची I में िी गई प्रदक्रया के अनुसार जनधावररत अजधकतम और न्यूनतम पररिेि तापमान के अनुपालन में प्रिान की िानी ह।ै 135. इनििवर स े िड़ु े बल्क कंज्यूमर को सभी एजटिि पािर स्ट्तरों (इनििवर स े िुड़े बल्क कंज्यूमर द्वारा िून्य जिद्युत खपत सजहत) के जलए न्यूनतम गत्यात्मक ररएजटिि पािर िमता प्रिान करन े म ें सिम होना चाजहए, िैसा दक जचत्र 11 म ें ििावए गए पीटयू िक्र के अनुसार ह।ै इनििवर स े िड़ु े बल्क कंज्यूमर को जचत्र 11 म ेंपीटयू िक्र के भीतर कहीं भी संचालन करते समय जनरंतर ररएजटिि पािर को अििोजषत या आपूर्तव करन े म ें सिम होना चाजहए। जचत्र 11. PoI पर मापी गई एजटिि पािर और ररएजटिि पािर की खपत के सिं भ व म ें इन्ििवर-इंिरफेस्ट्ड बल्क उपभोिा की न्यनू तम ररएजटिि पािर िमता नोि – 1) ररएजटिि पािर के आिान-प्रिान के जलए इन्ििवर-इंिरफेस्ट्ड बल्क उपभोिा को जिड से एजटिि पािर खपत करने दक िरुरत पर सकती ह ै। 2) जचत्र म ेंइस मानक द्वारा आिश्यक ररएजटिि पािर िमता की न्यूनतम सीमा ििावई गई ह।ैइन्ििवर-इंिरफ़ेस्ट्ड बल्क उपभोिाओं दक िास्ट्तजिक िमता इससे अजधक हो सकती ह।ै 136. जचत्र 12 म ें दिखाए गए QV िक्र के अनुसार, इन्ििवर-इंिरफेस्ट्ड बल्क उपभोिा की न्यूनतम गत्यात्मक ररएजटिि पािर िमता को बिला िा सकता ह,ै िब PoI पर िोल्िेि 0.9 प्रजत इकाई और 1.1 प्रजत इकाई के बीच बिलता ह,ै िहां इन्ििवर-इंिरफेस्ट्ड बल्क उपभोिा को QV िक्र के भीतर कहीं भी संचालन करते समय लगातार ररएजटिि पािर को अििोजषत या आपूर्त व करन े में सिम होना चाजहए।32 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] जचत्र 12. PoI पर मापी गई िोल्िेि और ररएजटिि पािर के सिं भ व म ें इन्ििवर-इंिरफेस्ट्ड बल्क उपभोिा की न्यनू तम ररएजटिि पािर िमता। 137. जितरण लाइसेंसधारी को अपन े जसस्ट्िम म ें ररएजटिि पािर की आिश्यकता को परू ा करने के जलए पयावि ररएजटिि िजतपूर्त व प्रिान करनी होगी तादक पािर फैटिर ± 0.95 के भीतर बना रह।े 138. इन्ििवर-इंिरफेस्ट्ड बल्क कंज्यूमर के अलािा अन्य बल्क कंज्यूमर को अपने जसस्ट्िम म ें पयावि ररएजटिि कंपनसेिन प्रिान करना होगा तादक PoI पर यूजनिी पािर फैटिर बनाए रखा िा सके। बिते दक इन्ििवर-इंिरफेस्ट्ड बल्क कंज्यूमर के अलािा अन्य बल्क कंज्यूमर के पास उपयुि लोड जडस्ट्पैच सेंिर के जनिेिों के अनुसार ± 0.95 की सीमा म ें पािर फैटिर बनाए रखने की िमता होनी चाजहए। िोल्िेि जिघ्न राइड थ्र ू 139. इन्ििवर-इंिरफेस्ट्ड बल्क उपभोिा PoI पर 0.9 pu से 1.1 pu की िोल्िेि सीमा में जनरंतर संचाजलत होने म ें सिम होना चाजहए और रेिेड पािर खींचने में सिम होना चाजहए। 140. इनििवर-इंिरफेस्ट्ड बल्क कंज्यमू र म ें कॉजन्फ़गर करने योग्य लो और हाई िोल्िेि राइड थ्र ू एजटििेिन और डीएजटििेिन सेटिंग्स होंगी, जिनकी रेंि जसस्ट्िम स्ट्िडी के आधार पर तय की िाएगी तादक िोल्िेि राइड थ्र ू जस्ट्थजतयों के िौरान पलांि का जस्ट्थर संचालन सुजनजश्चत हो सके। 141. इन्ििवर-इंिरफ़ेस्ट्ड बल्क उपभोिा के द्वारा िांजछत उपकरण और जसस्ट्िम को सुरिा प्रिान करत े समय त्रुरिपूण व संचालन की संभािना को कम करन े के जलए दफ़ल्िर की गई मात्राओं का उपयोग दकया िाएगा। दकसी भी तात्काजलक अंडर/ओिर िोल्िेि सुरिा प्रणाली, जिससे इन्ििवर से िड़ु े सभी बल्क कंज्यमू र की जिद्युत् आपूर्त व बाजधत होने की संभािना हो, को जिड पर इसके प्रभाि और ऐसी संभािना को कम करन े के जलए कम स े कम एक चक्र (मलू आिृजत्त का) मापन सिंडो का उपयोग करना चाजहए। 142. इन्ििवर-इंिरफेस्ट्ड बल्क कंज्यूमर की ितवमान प्रजतदक्रया को नीचे िी गई िेबल 6 में िर्णतव जनम्नजलजखत प्रििवन जिजिष्टताओं को पूरा करना होगा:[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 33 िेबल 6: ररएजटिि करंि प्रजतदक्रया लक्ष्य सीमाइन्ििवर-इंिरफ़ेस्ट्ड बल्क उपभोिा परै ामीिर इन्ििवर-इंिरफेस िाल ेबल्क कंज्यमू र चरण प्रजतदक्रया समय ≤ 30 जमलीसेकंड जनपिान समय ≤ 100 जमलीसेकंड इनििवर-इंिरफेस्ट्ड बल्क उपभोिा की सेिसलंग बडैं अजधकतम करंि का (-)2.5%/(+)10% नोि: 1) माप के जलए आिश्यक समय जिलंब इस िेबल में जनर्िष्टव चरण प्रजतदक्रया समय और जनपिान समय में िाजमल ह।ै 2) जसस्ट्िम की जस्ट्थजतयों के कारण प्रजतदक्रया समय धीमा हो सकता ह।ै यदि ऐसा ह,ै तो इन्ििवर- इंिरफ़ेस्ट्ड बल्क उपभोिा उपयिु लोड जडस्ट्पैच सेंिर के जनििे ों के अनुसार प्रजतदक्रया समय बढाने के जलए सेटिंग्स में आिश्यक लचीलापन होना चाजहए। लो िोल्िेि राइड थ्र ू(एलिीआरिी) 143. जिड स े िुड़ा इन्ििवर-इंिरफेस्ट्ड बल्क उपभोिा, दकसी एक या सभी फेसो (समजमत या असमजमत अडं र िोल्िेि जस्ट्थजतयों) पर PoI पर अडं र िोल्िेि की अिजध के जलए जिड से िुड़ा रहगे ा, िैसा दक जचत्र 13 में िक्र की मोिी रेखा द्वारा ििावया गया ह।ै Vt: िास्ट्तजिक िोल्िेि; Vn: नाममात्र िोल्िेि—34 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] इंिरफेस िाल ेबल्क कंज्यमू र उपकरणों के जलए जनम्न िोल्िेि राइड थ्र ूआिश्यकताएाँ नोि: संबंजधत िोल्िेि, PoI पर संगत नाममात्र िोल्िेि के सापेि, फेि-िू-फेि या फेि-िू-िाउंड िोल्िेि के सबस े कम पररमाण िाले मौजलक आिजृत्त फेिर घिक के बराबर होगा, िो भी कम हो। 144. इन्ििवर से िुड़ े बल्क उपभोिा में जनम्न िोल्िेि राइड थ्र ू घिनाओं के िौरान एजटिि करंि प्राथजमकता मोड या ररएजटिि करंि प्राथजमकता मोड म ें स े दकसी एक को चनु न े की िमता होनी चाजहए। िास्ट्तजिक समय संचालन के िौरान मोड का चयन उपयुि लोड जडस्ट्पैच सेंिर के जनिेिों के अनुसार दकया िाएगा। इन्ििवर से िुड़े बल्क उपभोिा जडफ़ॉल्ि रूप से ररएजटिि करंि प्राथजमकता मोड म ेंसंचाजलत होंगे। बिते दक, ररएजटिि करंि प्राथजमकता मोड में, इन्ििवर-इंिरफेस्ट्ड बल्क उपभोिा को अजतररि ररएजटिि करंि प्रिान करनी होगी: इसके अलािा, यह भी ध्यान रखना आिश्यक ह ैदक ररएजटिि करंि प्रायोररिी मोड का अथव यह नहीं ह ैदक एजटिि पािर (या एजटिि करंि) िन्ू य हो िाती ह।ै इसका अथ व यह ह ै दक ररएजटिि करंि आउिपुि (Iq) को पहली प्राथजमकता िी िाती ह ै और इन्ििवर-इंिरफेस्ट्ड बल्क कंज्यूमर की पूरी करंि रेटिंग इसके जलए उपलब्ध होती ह,ै िबदक एजटिि करंि आउिपुि (Ip) सीजमत रहता ह।ै इन्ििवर-इंिरफेस्ट्ड बल्क कंज्यूमर के जलए एजटिि करंि Ip की रेंि िन्ू य से (-) तक होती ह,ै िहााँ Iq ररएजटिि करंि का ितमव ान मान ह।ै इसके अलािा, िोल्िेि बहाल होने के 1 सेकंड के भीतर एजटिि पािर को फाल्ि-पूिव स्ट्तर के कम से कम 90% तक बहाल कर दिया िाए। एजटिि पािर ररकिरी समय को 1.0 स े 10 सेकंड की कॉजन्फ़गर करन े योग्य सीमा के भीतर समायोजित दकया िा सकता ह।ै 145. एलिीआरिी जस्ट्थजत के िौरान, इन्ििवर-इंिरफेस्ट्ड बल्क कंज्यूमर म ें रेिेड िमता के न्यूनतम 1.1pu की ओिरलोड (करंि) िमता होनी चाजहए और 1.1pu की आभासी करंि रेटिंग को ध्यान में रखते हुए ररएजटिि करंि की आपूर्तव की िानी चाजहए। 146. एलिीआरिी जस्ट्थजतयों के जलए स्ट्िेप ररस्ट्पांस िाइम अजधकतम 30 जमलीसेकंड होना चाजहए, यानी इन्ििवर स े िुड़ा बल्क कंज्यूमर 30 जमलीसेकंड के भीतर नेििकव म ें अजतररि ररएजटिि करंि इंिेटि करन े में सिम होना चाजहए। जनरंतर ऑपरेटिंग रेंि म ें िोल्िेि की िापसी के 30 जमलीसेकंड के भीतर अजतररि ररएजटिि करंि को िापस ल े जलया िाना चाजहए। इनििवर से िुड़ े बल्क कंज्यूमर की प्रजतदक्रया को पयावि रूप से अिमंिन दकया िाना चाजहए। 147. संतुजलत फाल्ि और समजमत ओिर-िोल्िेि जस्ट्थजतयों के जलए, इन्ििवर-इंिरफेस्ट्ड बल्क कंज्यूमर को PoI िोल्िेि के आधार पर िृजद्धिील धनात्मक अनुक्रम ररएजटिि करंि समथनव प्रिान करना चाजहए: बिते दक धनात्मक अनुक्रम ररएजटिि करंि इंिेटिन की मात्रा ररएजटिि करंि लाभ यानी एलिीआरिी “K+” कारक पर जनभवर करेगी, जिसका मान जसस्ट्िम की िमता और नेििकव जस्ट्थरता के आधार पर उपयुि रांसजमिन यूरिजलिी और उपयुि लोड जडस्ट्पैच सेंिर द्वारा जसमुलेिन अध्ययनों के माध्यम से जनधावररत दकया िाएगा। एलिीआरिी “K+” कारक आमतौर पर 0 से 10 की सीमा में होगा। 148. असंतुजलत फाल्ि और असमजमत ओिर-िोल्िेि जस्ट्थजतयों के जलए, िृजद्धिील धनात्मक अनुक्रम ररएजटिि करंि के अजतररि, इन्ििवर-इंिरफेस्ट्ड बल्क उपभोिा को PoI ऋणात्मक अनुक्रम िोल्िेि पर जनभवर ऋणात्मक अनुक्रम करंि इंिेटि करनी चाजहए: बिते दक ऋणात्मक अनुक्रम ररएजटिि करंि इंिेटिन की मात्रा ररएजटिि करंि लाभ यानी एलिीआरिी “K-” कारक पर जनभवर करेगी, जिसका मान जसस्ट्िम की िमता और नेििकव जस्ट्थरता के आधार पर उपयुि रांसजमिन यूरिजलिी और लोड जडस्ट्पैच सिें र द्वारा जसमुलिे न अध्ययनों के माध्यम से जनधावररत दकया िाएगा। एलिीआरिी “K-” कारक आमतौर पर 0 से 10 की सीमा में होगा।[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 35 149. यदि इन्ििवर-इंिरफेस्ट्ड बल्क कंज्यूमर की आभासी करंि सीमा 1.1pu तक पहुचाँ िाती ह,ै तो या तो धनात्मक या ऋणात्मक अनुक्रम करंि को कम दकया िाएगा, जिसमें िोनों करंिओं म ेंसमान कमी को प्राथजमकता िी िाएगी। हाई िोल्िेि राइड थ्र ू(एचिीआरिी) 150. जिड से िड़ु ा इन्ििवर-इंिरफेस्ट्ड बल्क उपभोिा, दकसी भी या सभी चरणों (समजमत या असमजमत ओिरिोल्िेि जस्ट्थजतयों) पर, PoI पर ओिरिोल्िेि के अनरूु प अिजध के जलए जिड से िड़ु ा रहगे ा, िसै ा दक जचत्र 14 में िक्र की मोिी रेखा द्वारा ििावया गया ह।ै जचत्र 14. इन्ििवर-इंिरफेस्ट्ड बल्क कंज्यमू र के जलए उच्च िोल्िेि राइड-थ्र ूआिश्यकताएाँ। नोि: संबंजधत िोल्िेि, फेि-स-ेफेि और फेि-स-ेिाउंड िोल्िेि के सबसे बड़े पररमाण िाल ेमौजलक आिृजत्त फेिर घिक के बराबर होगा, िो भी मान PoI पर संबंजधत नाममात्र िोल्िेि के सापेि अजधक हो। 151. इनििवर से िड़ु े बल्क उपभोिा म ें उच्च िोल्िेि उतार-चढाि की जस्ट्थजत म ें एजटिि करंि प्राथजमकता मोड या ररएजटिि करंि प्राथजमकता मोड म ें स े दकसी एक को चनु न े की िमता होनी चाजहए। िास्ट्तजिक समय संचालन के िौरान मोड का चयन उपयिु लोड जडस्ट्पैच सेंिर के जनिेिों के अनुसार दकया िाएगा। इनििवर से िड़ु े बल्क उपभोिा जडफ़ॉल्ि रूप से ररएजटिि करंि प्राथजमकता मोड म ेंसंचाजलत होंगे। बिते दक, ररएजटिि करंि प्राथजमकता मोड में, इन्ििवर-इंिरफेस्ट्ड बल्क उपभोिा को अजतररि ररएजटिि करंि प्रिान करनी होगी: इसके अलािा, यह भी ध्यान रखना आिश्यक ह ैदक ररएजटिि करंि प्रायोररिी मोड का अथव यह नहीं ह ैदक एजटिि पािर (या एजटिि करंि) िन्ू य हो िाती ह।ै इसका अथ व यह ह ै दक ररएजटिि करंि आउिपुि (Iq) को पहली प्राथजमकता िी िाती ह ै और इन्ििवर-इंिरफेस्ट्ड बल्क कंज्यूमर की पूरी करंि रेटिंग इसके जलए उपलब्ध होती है, िबदक एजटिि करंि आउिपुि (Ip) सीजमत रहता ह।ै इन्ििवर-इंिरफेस्ट्ड बल्क कंज्यूमर के जलए एजटिि करंि Ip की रेंि िन्ू य से (-) तक होती ह,ै िहााँ Iq ररएजटिि करंि का ितमव ान मान ह।ै इसके अलािा, िोल्िेि बहाल होने के 1 सेकंड के भीतर एजटिि पािर को फाल्ि-पूिव स्ट्तर के कम से कम 90% तक बहाल कर दिया िाए। एजटिि पािर ररकिरी समय को 1.0 स े 10 सेकंड की कॉजन्फ़गर करन े योग्य सीमा के भीतर समायोजित दकया िा सकता ह।ै36 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] 152. एचिीआरिी जस्ट्थजत के िौरान, इन्ििवर-इंिरफेस्ट्ड बल्क कंज्यूमर म ें रेिेड िमता के न्यूनतम 1.1pu की ओिरलोड (करंि) िमता होनी चाजहए और 1.1pu की आभासी करंि रेटिंग को ध्यान में रखते हुए ररएजटिि करंि को अििोजषत दकया िाना चाजहए। 153. एचिीआरिी जस्ट्थजतयों के जलए स्ट्िेप ररस्ट्पांस िाइम अजधकतम 30 जमलीसेकंड होना चाजहए, यानी इन्ििवर स े िुड़ा बल्क कंज्यूमर नेििकव को 30 जमलीसेकंड के भीतर अजतररि ररएजटिि करंि प्रिान करने म ें सिम होना चाजहए। जनरंतर पररचालन सीमा के भीतर िोल्िेि की िापसी के 30 जमलीसेकंड के भीतर अजतररि ररएजटिि करंि का अििोषण भी िापस ले जलया िाना चाजहए। इनििवर से िुड़े बल्क कंज्यूमर की प्रजतदक्रया को पयावि रूप स े अिमंिन दकया िाना चाजहए। 154. संतुजलत फाल्ि और समजमत ओिर-िोल्िेि जस्ट्थजतयों के जलए, इन्ििवर-इंिरफेस्ट्ड बल्क कंज्यूमर को PoI िोल्िेि के आधार पर िृजद्धिील धनात्मक अनुक्रम ररएजटिि करंि समथनव प्रिान करना चाजहए: बिते दक धनात्मक अनुक्रम ररएजटिि करंि अििोषण की मात्रा ररएजटिि करंि लाभ यानी एचिीआरिी "के+" कारक पर जनभवर करेगी, जिसका मान जसस्ट्िम की मिबूती और नेििकव जस्ट्थरता के आधार पर उपयिु रांसजमिन यूरिजलिी और उपयिु एलडीसी द्वारा जसमुलेिन अध्ययनों के माध्यम से जनधावररत दकया िाएगा। एचिीआरिी "के+" कारक आमतौर पर 0 से 10 की सीमा म ें होगा। 155. असंतुजलत फाल्ि और असमजमत ओिर-िोल्िेि जस्ट्थजतयों के जलए, िृजद्धिील धनात्मक अनुक्रम ररएजटिि करंि के अजतररि, इन्ििवर-इंिरफेस्ट्ड बल्क उपभोिा को PoI ऋणात्मक अनुक्रम िोल्िेि पर जनभवर ऋणात्मक अनुक्रम करंि को अििोजषत करना होगा: बिते दक ऋणात्मक अनुक्रम ररएजटिि करंि अििोषण की मात्रा ररएजटिि करंि लाभ यानी एचिीआरिी "के-" कारक पर जनभवर करेगी, जिसका मान जसस्ट्िम की िमता और नेििकव जस्ट्थरता के आधार पर उपयुि रांसजमिन यूरिजलिी और लोड जडस्ट्पैच सिें र द्वारा जसमलु ेिन अध्ययनों के माध्यम स े जनधावररत दकया िाएगा। एचिीआरिी "के-" कारक आमतौर पर 0 से 10 की सीमा में होगा। 156. यदि इन्ििवर-इंिरफेस्ट्ड बल्क कंज्यूमर की आभासी करंि सीमा 1.1pu तक पहुचाँ िाती ह,ै तो या तो धनात्मक या ऋणात्मक अनुक्रम करंि को कम दकया िाएगा, जिसमें िोनों करंिओं म ेंसमान कमी को प्राथजमकता िी िाएगी। मल्िीपल फॉल्ि राइड थ्र ू(एमएफआरिी) 157. जिड से िड़ु े इन्ििवर-इंिरफेस्ट्ड बल्क उपभोिा, एलिीआरिी िमता के अनुसार, दकसी भी 5 जमनि की अिजध के भीतर 0.9 पीयू स ेकम िोल्िेि जिघ्न की 15 श्रृंखलाओं तक जिड से िड़ु े रहगें :े बिते दक इस अिजध के िौरान इन्ििवर-इंिरफेस्ट्ड बल्क उपभोिा कम से कम 06 0.5 pu स े कम िोल्िेि जिघ्न के जलए िुड़ ेरहगें :े इसके अलािा, यह भी प्रािधान ह ै दक एकाजधक एलिीआरिी जस्ट्थजतयों के िौरान, इन्ििवर-इंिरफेस्ट्ड बल्क उपभोिाओं को एलिीआरिी जस्ट्थजतयों म ेंजनर्िवष्ट प्रििनव आिश्यकताओं को पूरा करना होगा। 158. कई िोल्िेि जिघ्न का आकलन करत े समय, स्ट्िचाजलत री-टलोि प्रोिेटिन स्ट्कीम के संचालन के बाि पुनः स्ट्थाजपत होने िाली फाल्ि को एक अलग िोल्िेि जिघ्न के रूप में जगना िाएगा। आिजृ त्त राइड थ्र ू 159. The इन्ििवर-इंिरफेस्ट्ड बल्क उपभोिा 47.5 से 52 हर्ट्ज व की आिृजत्त सीमा में काय व करने म ें सिम होना चाजहए और 49.5 हर्ट्ज व से 50.5 हर्ट्ज व की आिृजत्त सीमा म ें जनरंतर आधार पर जनधावररत पािर प्राि करने म ें सिम होना चाजहए। इसके अलािा, बित े दक इन्ििवर-इंिरफेस्ट्ड बल्क उपभोिा इस उपखंड म ें जनजहत अपने प्रििवन को (+/-) 5% तक के िोल्िेि पररितनव के साथ भी बनाए रखने म ेंसिम होगा।[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 37 160. जनर्िवष्ट पररचालन आिृजत्त सीमा के भीतर, इन्ििवर-इंिरफेस्ट्ड बल्क उपभोिा आिृजत्त म ें होने िाल े उन उतार- चढािों के जलए ररप दकय े जबना राइड-थ्र ू करेंगे जिनकी आिृजत्त म ें पररितवन की जनरपेि िर (ROCOF) 5.0 हर्ट्ज/व सेकंड स े कम या उसके बराबर हो। ROCOF कम स े कम 0.1 सेकंड की औसत अिजध म ें आिृजत्त म ें पररितवन की औसत िर होगी। 161. आरओसीओएफ सुरिा इन्ििवर-इंिरफेस्ट्ड बल्क उपभोिा को इन जिजनयमों म ें जनर्िष्टव िोल्िेि और आिृजत्त राइड- थ्र ूआिश्यकताओं को परू ा करने स े बाधा नहीं िगें ी, जिसम ेंआरओसीओएफ राइड-थ्र ूआिश्यकताएं भी िाजमल ह।ैं िोल्िेि फेि एंगल पररितनव राइड थ्र ू 162. इन्ििवर स े िुड़ े बल्क कंज्यूमर, लाग ू िोल्िेि के उप-चक्र समय सीमा के भीतर (+/-) 25 जिद्युत जडिी स े कम या बराबर के धनात्मक- अनुक्रम फेि कोण पररितनव ों को सहन कर सकेंगे। इसके अजतररि, इन्ििवर से िड़ु े बल्क कंज्यूमर, असंतुजलत फाल्ि के उत्पन्न होन े और उनके जनिारण के कारण व्यजिगत चरणों के फेि कोण म ें होन े िाल े दकसी भी पररितवन के बाििूि पररचालन में बन े रहगें े, बित े दक धनात्मक- अनुक्रम कोण पररितवन पूिव जनधावररत मानिंड स ेअजधक न हो। एजटिि पािर जनयत्रं ण 163. बल्क कंज्यूमर को PoI पर जिद्युत् की खपत म ें पररितनव की िर को जनयंजत्रत करन े की सुजिधा से लैस होना चाजहए, जिसकी रैंप िर प्रजत जमनि ± 10% से अजधक नहीं होनी चाजहए। जिद्युत् का समायोिन दकसी भी ऑपरेटिंग पॉइंि से संभि होना चाजहए। बिते दक जिड ऑपरेिर के जनििे ों के कारण जिद्युत् म ें होन े िाले पररितवन की िर ± 20% प्रजत जमनि से अजधक नहीं होनी चाजहए। 164. पीओआई पर 50 मेगािाि और उससे अजधक की कुल िमता िाल े बल्क कंज्यूमर को एजटिि पािर सहायता म ें बिलाि के जलए राज्य लोड जडस्ट्पैच सेंिर या िेत्रीय लोड जडस्ट्पचै सेंिर से जसग्नल प्राि करने का प्रािधान होगा। 165. बल्क कंज्यूमर के पास कम से कम चालीस (40) प्रजतित के न्यूनतम पािर स्ट्तर के साथ लचीली संचालन िमता होनी चाजहए। ररएजटिि पािर जनयत्रं ण 166. पीओआई पर 50 मगे ािाि और उससे अजधक की कुल िमता िाल े बल्क कंज्यूमर को, िैसा भी मामला हो, ररएजटिि पािर उत्पािन म ें बिलाि के जलए राज्य लोड जडस्ट्पचै सेंिर या िेत्रीय लोड जडस्ट्पैच सेंिर स े जसग्नल प्राि करने का प्रािधान होगा। 167. बल्क कंज्यूमर को जनरंतर संचालन के जलए आिश्यक सीमा म ें होने पर ररएजटिि पािर आउिपुि म ें पररितवन करके िोल्िेि जिजनयमन िमता प्रिान करनी होगी। 168. बल्क कंज्यूमर को ररएजटिि पािर जनयंत्रण कायों के जनम्नजलजखत परस्ट्पर अनन्य संचालन मोड की िमताएं प्रिान करनी होंगी: (1) िोल्िेि जनयंत्रण (2) पािर फैटिर जनयंत्रण (3) ररएजटिि पािर सेि पॉइन् ि् जनयंत्रण38 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] बल्क कंज्यूमर इनमें स े प्रत्येक मोड को एक समय म ें एजटिि करने म ें सिम होगा। बल्क कंज्यूमर जसस्ट्िम ऑपरेिर द्वारा जनधावररत समय सीमा के भीतर सेटिंग संिोधनों और मोड चयन को लाग ू करन े के जलए जिम्मेिार होगा। सभी जनयंत्रण मोड म ें बल्क कंज्यूमर की गत्यात्मक प्रजतदक्रया जस्ट्थर होनी चाजहए और दकसी भी िोलन को सकारात्मक रूप से अिमंदित दकया िाना चाजहए। अध्याय – V कनजे टिजििी प्रदक्रया सामान्य आिश्यकताए ाँ 169. राज्य पारेषण उपयोजगता, अपने जिद्युत तंत्र से संपकव करने के जलए दकसी भी आिेिक के आिेिन की स्ट्िीकृजत के तीस दिनों के भीतर केंद्रीय पारेषण उपयोजगता और प्राजधकरण को सूजचत करेगी। 170. अनुरोधकता व या उपयोगकताव, िैसा भी मामला हो, अपनी िमता के उत्पािन इकाई(यों) या स्ट्िेिन को प्राजधकरण के ई-िने पोिवल पर पंिीकृत करिाएगा और ऑनलाइन िनरेि दकया गया एक जिजिष्ट पंिीकरण नंबर प्राि करेगा: बिते दक दकसी भी उत्पािन इकाई या उत्पािन स्ट्िेिन को जिजिष्ट पंिीकरण संख्या के जबना जिड से कनेजटिजििी प्रिान नहीं की िाएगी। 171. उपयुि पारेषण उपयोजगता या जितरण लाइसेंसधारी यह सुजनजश्चत करेगा दक जिड से कनेजटिजििी से पहले, इन जिजनयमों में जनर्िवष्ट कनेजटिजििी संबंधी सभी प्रािधानों का अनुपालन अनुरोधकता वद्वारा दकया िाए। 172. हाइजिड िनरेटिंग स्ट्िेिन को इन जिजनयमों में जनर्िवष्ट समकाजलक और अससंक्रोनस िनरेटिंग स्ट्िेिन पर लाग ू प्रासंजगक जिजनयमों का अनुपालन करना होगा, िो दक संबंजधत स्ट्िेिनों के जलए अलग-अलग रूप से जनधावररत ह:ैं बिते दक ससंक्रोनस और अससक्रं ोनस िनरेटिंग स्ट्िेिन एक िसू रे की इन जिजनयमों म ें जनर्िष्टव संबंजधत अनुपालनों को पूरा करने की िमता म ेंबाधा न डालें। 173. हाइजिड िनरेटिंग स्ट्िेिन को हाइजिड िनरेटिंग स्ट्िेिन का एकीकृत जसमुलेिन मॉडल और अध्ययन उपयिु रांसजमिन यूरिजलिी या जडस्ट्रीब्यूिन लाइसेंसधारी को प्रस्ट्तुत करना होगा। 174. योग्य समन्िय एिेंसी (टयूसीए)/लीड िनरेिर/पाकव डेिलपर सह-जस्ट्थत िनरेटिंग स्ट्िेिन में प्रत्येक िनरेटिंग स्ट्िेिन के जसमुलेिन मॉडल के भंडार के रूप में कायव करेगा। 175. टयूसीए/लीड िेनरेिर/पाकव डेिलपर, जसमुलेिन अध्ययन के जलए अनुरोधकताव को एक ही स्ट्थान पर जस्ट्थत सभी िनरेटिंग स्ट्िेिनों की चाल ूिमता के जसमुलेिन मॉडल प्रिान करेगा। 176. उपयुि पारेषण उपयोजगता या जितरण लाइसेंसधारी, उपयिु लोड जडस्ट्पैच सेंिर के परामि व स,े केंद्रीय जिद्युत प्राजधकरण को सूजचत करते हुए समय-समय पर अनुपालन सत्यापन दििाजनिेि प्रकाजित करेगा। अनुपालन सत्यापन दििाजनिेिों म ें तकनीकी डेिा प्रस्ट्तुत करने की आिश्यकताएं, अनुरोधकताव द्वारा प्रस्ट्तुत दकए िाने िाल े ररपोिव/प्रमाणपत्र/मॉडल की सचू ी, साइि परीिणों की सूची, अनुपालन सत्यापन अध्ययनों की सूची और पररिश्ृ य, तथा मॉडल प्रस्ट्ततु करन े की आिश्यकताए ं िाजमल होंगी। 177. संबंजधत लोड जडस्ट्पैच सेंिर को एफिीई के जलए तौर-तरीकों और नए या संिोजधत पािर जसस्ट्िम एजलमेंि के एकीकरण को किर करन े िाली एक जिस्ट्तृत प्रदक्रया प्रकाजित करनी होगी। केंद्रीय जिद्युत प्राजधकरण को सूजचत करते हुए इस प्रदक्रया में जिड के साथ एकीकरण के जलए आिश्यक ित ें जनर्िवष्ट की िाएंगी, िैसे दक सुरिा, िेलीमेरी और संचार प्रणाली; मीिटरंग; िैधाजनक स्ट्िीकृजतयां, जसस्ट्िम अध्ययन के जलए डेिा िमा करने की समयसीमा, सत्यापन संयंत्र जसमुलेिन मॉडल के जलए साइि परीिणों की सूची आदि। चाल ू होने के बाि जनगरानी संबंधी आिश्यकताएाँ:[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 39 बिते यदि एसएलडीसी द्वारा ऐसी कोई प्रदक्रया नहीं अपनाई िाती ह,ै तो एनएलडीसी की प्रदक्रया प्रभािी होगी। 178. उपयुि पारेषण उपयोजगता या जितरण लाइसेंसधारी को अतं सिंबंध अध्ययन की प्रदक्रयाओं के जलए एक जिस्ट्तृत प्रदक्रया प्रकाजित करनी होगी। कनजे टिजििी चरण 179. अनुरोधकता/व उपयोगकता,व उपयुि पारेषण उपयोजगता और जितरण लाइसेंसधारी को अनसु ूची III म ें दिए गए फ्लोचािव म ेंजनजहत कनेजटिजििी चरणों का पालन करना होगा। उत्पािन इकाई(यों) की सिे ाजनिृजत्त, रेटिंग म ेंिजृ द्ध और रेटिंग म ेंकमी 180. प्राजधकरण द्वारा समय-समय पर िारी दकए गए दििाजनििे जिद्युत् उत्पािन के पारंपररक स्रोतों, अथावत ् कोयला/जलग्नाइि, डीिल, गैस आधाररत जिद्युत् संयंत्रों और बड़े िल जिद्युत संयंत्रों (25 मगे ािाि से ऊपर) पर उत्पािन इकाई (इकाइयों) की सेिाजनिृजत्त, रेटिंग में िृजद्ध और रेटिंग में कमी के संबंध म ेंलागू होंगे। 181. उत्पािन इकाई(यों) की रेटिंग बढाने और घिान े के जलए भी इन जिजनयमों में जनर्िष्टव जिड कनेजटिजििी प्रदक्रया और आिश्यकताओं का पालन दकया िाएगा। अध्याय – VI जिद्यतु ्की गणु ित्ता सामान्य आिश्यकताए ाँ 182. उपयोगकता/व अनुरोधकताव को यह सुजनजश्चत और सत्याजपत करना होगा दक फैजसजलिी को PoI पर हामोजनक करंि जिरूपण सीमाओं के अनपु ालन म ेंजडिाइन, जनर्मवत और कॉजन्फ़गर दकया गया ह।ै 183. जसस्ट्िम अध्ययन के आधार पर, अनुरोधकताव की फैजसजलिी (आंजिक या पणू व िमता) के एफिीई से पहल े हामोजनक दफल्िर स्ट्थाजपत दकए िाएंगे। हामोजनक करंि जिरूपण सीमाए ाँ 184. मापन पद्धजत आईईसी 61000-4-7 टलास I और आईईसी 61000-4-30 टलास A का पालन करेगी तथा हामोजनक जिरूपण योगिान को मापने के जलए सांजख्यकीय पद्धजत आईईईई मानक 519 का पालन करेगी। 185. उत्पािन के प्रत्येक 10% के जलए िसू रे स े 50िें हामोजनटस स्ट्तर तक के मापन डेिा को उपयोगकता/व अनुरोधकता व द्वारा नीच े िी गई िेबल 7 म ेंप्रिान दकया िाएगा: िेबल 7: हामोजनक करंि जिरूपण डेिा का प्रारूप हामो आिजृ त्त पर पीसीसी हामोजनक करंि (प्रत्यके पष्ठृ भजू म िोल्िेि जनक आिजृ त्त जनभरव हामोजनक स्ट्तर पर चरण – A, B, C के जलए) हामोजनटस क्रम प्रजतबाधा िॉि व सर्कवि G B जडिी स्ट्तर परर मूलधन [-] हर्ट्ि व पररमाण माण म ें फेि (चाल (ससे फेि (एमिीए) का % कता) पिेंस) (म ें या R या X40 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] %) (प्रजत (ररए रोध) टिेंस) 2 100 3 150 4 200 … उपयोगकता/व अनुरोधकता व को माप के साथ-साथ जनम्नजलजखत िानकारी भी प्रस्ट्ततु करनी होगी: (1) परीिण जिस 3-फेि िॉिव सर्कवि स्ट्तर (केिीए) पर दकया गया था (2) परीिण के िौरान पष्ठृ भूजम िोल्िेि हामोजनटस (प्रजतित म ेंऔर 50िें हामोजनटस/िीएचडी तक) अंतर-हामोजनटस और उच्च आिजृ त्त हामोजनटस के जलए भी इसी प्रकार के प्रारूप का उपयोग दकया िा सकता ह।ै 186. PoI पर हामोजनक करंि जिरूपण सीमाए,ं प्रयोज्यता के अनुसार निीनतम IEEE 519 मानक या निीनतम IEEE 2800 के अनरूु प होंगी। िोल्िेि असतं लु न 187. 33 kV और उससे ऊपर के िोल्िेि स्ट्तर पर PoI पर िोल्िेि असंतुलन 3.0% स े अजधक नहीं होना चाजहए। 188. मापन पद्धजत आईईसी 61000-4-7 टलास I और आईईसी 61000-4-30 टलास A का पालन करेगी तथा िोल्िेि असंतलु न को मापन े के जलए सांजख्यकीय पद्धजत आईईसी 61000-3-13 का पालन करेगी। जफ्लकर (जझलजमलाहि) 189. फैजसजलिी आईईसी 61000-3-7 में जनर्िष्टव सीमाओं स ेपरे जफ्लकर उत्पन्न नहीं करेगी। 190. मापन पद्धजत आईईसी 61000-4-7 टलास I और आईईसी 61000-4-30 टलास A का पालन करेगी तथा जफ्लकर को मापन े के जलए सांजख्यकीय पद्धजत आईईसी 61000-3-7 का पालन करेगी। 191. बार-बार होने िाले स्ट्िेप पररितवनों के जलए िोल्िेि उतार-चढाि की अनुमेय सीमा 1.5% ह ै और स्ट्िेप पररितवनों के अलािा कभी-कभार होने िाले उतार-चढाि के जलए अजधकतम अनुमेय सीमा 3% ह।ै प्रत्यि धारा ( डीसी ) की अनमु ये सीमा 192. फैजसजलिी द्वारा PoI पर रेिेड आउिपुि के 0.5% से अजधक डीसी करंि इंिेटि नहीं दकया िाएगा। 193. मापन पद्धजत आईईसी 61000-4-7 टलास I और आईईसी 61000-4-30 टलास A के अनुरूप होगी।[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 41 अध्याय – VII डेिा सचं ार और आिान-प्रिान 194. प्राजधकरण अनुपालन जनगरानी दििाजनिेि प्रकाजित करेगा जिसमें डेिा िमा करन े के प्रारूप, साइि परीिण आदि िैसी आिश्यकताओं को िाजमल दकया िाएगा; जिद्युत् प्रणाली स े फैजसजलिी के िुड़न े के बाि इन जिजनयमों के अनरूु पता बनाए रखन े के जलए जिम्मेिाररयां और गैर-अनपु ालन के जलए की िान े िाली कारविाई। 195. हामोजनक कंिेंि जिकृजतयों का मापन, जिसमें कुल करंि जिरूपण और व्यजिगत हामोजनक क्रम जिरूपण, डीसी इंिेटिन और जफ्लकर िाजमल ह,ैं उपयोगकता/व अनुरोधकताव द्वारा संबंजधत पिों की उपजस्ट्थजत में िषव में कम स े कम एक बार दकया िाएगा और इसके जलए सांकेजतक जतजथ कनेटिन समझौते में उजल्लजखत होगी। बिते दक िार्षवक माप के अजतररि, यदि जितरण लाइसेंसधारी या पारेषण लाइसेंसधारी या उत्पािन कंपनी, िसै ा भी मामला हो, हामोजनक सामिी या डीसी-इंिेटिन या जफ्लकर या अन्य जिद्युत् गणु ित्ता मापिंडों को मापना चाहती ह,ै तो िह िसू रे पि को जलजखत रूप म ें सूजचत करेगी और माप 5 कायव दििसों के भीतर दकया िाएगा। 196. िार्षवक माप की ररपोिव उपयिु जनकाय, पारेषण उपयोजगता या जितरण लाइसेंसधारी और उपयुि लोड जडस्ट्पैच सेंिर को प्रस्ट्तुत की िाएगी। । 197. अनुरोधकता/व उपयोगकताव को अपने जसस्ट्िम के जनयंत्रण और िेली-मीिटरंग सुजिधाओं को संबंजधत राज्य या िेत्र के स्ट्िचाजलत उत्पािन जनयंत्रण, स्ट्िचाजलत लोड िेसडगं , जििेष सुरिा प्रणाली, ऊिाव प्रबंधन प्रणाली (ईएमएस) और पयविेिी जनयंत्रण और डेिा अजधिहण प्रणाली (एससीएडीए) म ेंएकीकृत करन े की व्यिस्ट्था करनी होगी। 198. अनुरोधकता/व उपयोगकता व उत्पािन इकाई(यों) के उत्तेिना प्रणाली/पािर पलांि कंरोलर म ें प्रिान दकए गए पािर जसस्ट्िम स्ट्िेबलाइिर, एचिीडीसी में पािर ऑजसलेिन डैसम्पगं कंरोलर (पीओडी) और एफएसीएिी उपकरणों के ट्यूसनंग के जलए िेत्रीय जिद्युत सजमजत/उपयुि लोड जडस्ट्पैच सिें र के साथ सहयोग करेगा। 199. अनुरोधकता/व उपयोगकता व को िेत्रीय जिद्युत सजमजत द्वारा अनुमोदित उत्पािन इकाई(यों) और पारेषण लाइनों के संबंध में राज्य और िेत्र की समजन्ित जिद्युत् किौती योिना का पालन करना होगा। 200. अनुरोधकता/व उपयोगकताव को उपयुि पारेषण उपयोजगता या पारेषण लाइसेंसधारी, उपयिु लोड प्रेषण केंद्र, उपयुि िेत्रीय जिद्युत सजमजत और प्राजधकरण द्वारा प्रणाली अध्ययन के जलए या जिद्युत प्रणाली में ररसपंग या जिघ्न के जिश्लेषण को सुजिधािनक बनाने के जलए गरित दकसी भी सजमजत द्वारा आिश्यक डेिा प्रिान करना होगा; 201. अनुरोधकता/व उपयोगकता व को जिड से अंतसिंबंध की अनुमजत िने े हते ु, उपयुि पारेषण उपयोजगता या लाइसेंसधारी या उत्पािन स्ट्िेिन, जिसके जसस्ट्िम से अंतसिंबंध प्रस्ट्ताजित ह,ै द्वारा अपेजित डेिा उपलब्ध कराना होगा; सूचना आिान-प्रिान का ब्यौरा, जिसमें डेिा की एक सिीक सूची िाजमल है, उपयुि पारेषण उपयोजगता या जितरण लाइसेंसधारी द्वारा जनर्िष्टव की िाएगी। 202. अनुरोधकता/व उपयोगकता व को ध्िजन और डेिा संचार तथा ऑनलाइन पररचालन डेिा के हस्ट्तांतरण के जलए आिश्यक सुजिधाएं प्रिान करनी होंगी, िैस े दक िोल्िेि, आिृजत्त, लाइन प्रिाह, िेकर और आइसोलेिर की जस्ट्थजत और उपयुि लोड जडस्ट्पैच सेंिर द्वारा जनधावररत अन्य पैरामीिर। 203. अनरु ोधकता/व उपयोगकता वअपन े अजधकार िेत्र म ेंमीिर और सचं ार प्रणाली को अच्छी जस्ट्थजत में बनाए रखगे ा।42 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] 204. डेिा और संचार प्रणाजलयााँ केंद्रीय जिद्युत प्राजधकरण (जिद्युत प्रणाली संचालन म ें संचार प्रणाली के जलए तकनीकी मानक) जिजनयम अनुसार उपलब्ध कराई िाएंगी। 205. प्रचजलत केंद्रीय जिद्युत प्राजधकरण (मीिरों की स्ट्थापना और संचालन) जिजनयमों म ें जनर्िवष्ट अनुसार मीिटरंग की व्यिस्ट्था की िाएगी। 206. जिद्युत प्रणाली के सभी तत्िों के जलए उपयोगकताव द्वारा प्रत्यके 5 िष व म ें एक बार आिजधक परीिण दकए िाएंग,े तादक जसमुलेिन अध्ययनों के जलए उपयोग दकए गए गजणतीय मॉडलों की िुद्धता सुजनजश्चत की िा सके और इन जिजनयमों का अनुपालन सुजनजश्चत दकया िा सके। परीिण ररपोिव और मॉडल उपयुि पारेषण उपयोजगता और उपयुि लोड जडस्ट्पैच सेंिर को प्रस्ट्तुत दकए िाएगं े। । इन जिजनयमों के दकसी भी उल्लंघन की सूचना संबंजधत रांसजमिन यूरिजलिी और उपयिु लोड जडस्ट्पैच सेंिर द्वारा प्राजधकरण को िी िाएगी । 207. अनुरोधकता/व उपयोगकताव को 220 केिी और उससे ऊपर के जिड स े िड़ु े अपने संयंत्र की फाल्ि ररकॉर्डिंग और गत्यात्मक जसस्ट्िम व्यिहार जनगरानी संबंधी िानकारी उपयिु लोड जडस्ट्पैच सेंिर को प्रिान करनी होगी, िैसा दक नीच े िेबल 8 म ेंजनर्िवष्ट ह:ै िेबल 8: सयं त्रं के फाल्ि ररकॉडरव और गत्यात्मक व्यिहार जनगरानी के जलए जिजनिेि क्रमाकं मागं जिजनिेि 1 पूिव-घिना बफर/पूिव-ररगर (फाल्ि) 1 सेकंड तक (तरंगरूप) 2 घिना के बाि की ररकॉर्डिंग/ररगर के ≥10 सेकंड (तरंगरूप) बाि (त्रुरि) 3 नमूना िर ≥12.8 दकलोहर्ट्जव 4 संिहण मेमोरी 1 िीबी या अजधक 5 हामोजनटस मॉजनिटरंग 100िें क्रम (पररमाण) 6 हामोजनक फेि एंगल का मापन और आिश्यक जिश्लेषण 7 प्राथजमक आिृजत्त इस े 10 मगे ाहर्ट्िव स े बेहतर आिृजत्त ररजॉल्यूिन के साथ एक चक्र उच्च गजत आिृजत्त रीसडगं प्रिान करनी चाजहए। 8 प्रजतदक्रया समय 10 जमलीसेकंड या उससे तेज ऐस े सभी उपकरणों म ेंिैजश्वक सामान्य समय संिभव के जलए समय तुल्यकालन सुजिधा उपलब्ध कराई िाएगी। अध्याय – VIII सरु िा 208. अनुरोधकता/व उपयोगकताव को िेत्रीय जिद्युत सजमजत और उपयुि लोड जडस्ट्पैच केंद्रों के साथ सुरिा समन्िय और अपन ेसुरिा ररल ेकी सेटिंग के जलए सहयोग करना होगा। 209. ससंक्रोनस िनरेटिंग स्ट्िेिनों म ें िनरेिर रांसफामवर िाइंसडगं म ें कम िोल्िेि िाले जसरे पर डल्े िा कनेटिन और उच्च िोल्िेि िाले जसरे पर स्ट्िार कनेटिन होना चाजहए। उच्च िोल्िेि िाले जसरे के स्ट्िार सबिं ु को प्रभािी ढंग स े (मिबूत रूप स)े अथ व दकया िाना चाजहए तादक अथव फॉल्ि फैटिर 1.4 या उससे कम हो। 210. प्रत्येक उत्पािन इकाई म ें मानक सुरिा व्यिस्ट्था होनी चाजहए िो इकाई को न केिल इकाई के भीतर और स्ट्िेिन के भीतर होने िाली फाल्ि स े बजल्क पारेषण लाइनों म ें होने िाली फाल्ि स े भी बचाए। 100 मेगािाि स े अजधक रेिेड िमता िाली उत्पािन इकाइयों के जलए, िो स्ट्ितंत्र डायरेटि करंि (डीसी) आपूर्तव स े संचाजलत होने िाले िो[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 43 स्ट्ितंत्र ररप कॉइल सेि पर काय व करने िाल े िो स्ट्ितंत्र सुरिा सेि प्रिान दकए िाएंगे। इन सुरिा व्यिस्ट्थाओं म ें लोकल िेकर बैक-अप (एलबीबी) सुरिा भी िाजमल होगी, लेदकन यह केिल इसी तक सीजमत नहीं होगी। 211. बुजनयािी इन्सुलेिन स्ट्तर और इन्सुलेिन समन्िय: िनरेटिंग स्ट्िेिनों, लाइनों और सब-स्ट्िेिनों के जलए जिजभन्न उपकरणों के बेजसक इंसुलेिन लिे ल (बीआईएल) और सिव अरेस्ट्िर की रेटिंग का जनधारव ण जनम्नजलजखत प्राथजमकता क्रम के अनुसार दकया िाएगा, अथावत्: — (1) िनता और पररचालन कर्मवयों की सुरिा सुजनजश्चत करना; (2) संयंत्र को स्ट्थायी िजत से बचाना; (3) महगं े उपकरणों की फेजलयर को रोकना; (4) जिद्युत् सर्कवि व्यिधानों को कम करना; और (5) उपभोिाओं को जिद्युत् आपूर्त वमें होने िाली रुकाििों को कम से कम करना। (6) अनुरोधकता/व उपयोगकता व और जिड स े संबंजधत कनेटिन सबंि ु के िोनों ओर उपकरण और लाइनों का इन्सुलेिन समन्िय पूरा दकया िाएगा और यह समन्िय उपयिु रांसजमिन यूरिजलिी द्वारा दकया िाएगा। 212. सुरिा प्रणाली को जिजभन्न असामान्य पररजस्ट्थजतयों म ें फाल्ि का जिश्वसनीय रूप से पता लगाने और उपकरण या प्रणाली को स्ट्िचाजलत रूप से अलग करन े के जलए उपयिु साधन और स्ट्थान प्रिान करन े के जलए जडजाइन दकया िाना चाजहए। सुरिा प्रणाली को सुरिा िेत्र के भीतर जिद्युत प्रणाली फाल्ि का पता लगान े म ें सिम होना चाजहए। सुरिा प्रणाली को उपकरण जिफलताओं या ओपन फेि जस्ट्थजतयों िैसी असामान्य पररचालन जस्ट्थजतयों का भी पता लगाना चाजहए। 213. जिद्युत प्रणाली के प्रत्येक तत्ि को अपेजित जिश्वसनीयता, चयनात्मकता, गजत, भेिभाि और संिेिनिीलता िाल े मानक सुरिा प्रणाली द्वारा संरजित दकया िाएगा। यदि उपयोगकताव/अनुरोधकताव की प्रणाली में दकसी सुरिा ररले की जिफलता स े जिड पर महत्िपूणव प्रभाि पड़ता है, तो मुख्य सुरिा के अजतररि एक अजतररि सुरिा प्रणाली को बैकअप सुरिा के रूप में िोड़ा िाएगा। 214. जिड म ें प्रिान की गई सुरिा प्रणाजलयों के बाििूि, अनरु ोधकताव/उपयोगकताव को जिड में उत्पन्न होन े िाली फाल्ि से अपन ेजसस्ट्िम की सुरिा के जलए आिश्यक सरु िा उपाय प्रिान करन े होंगे। 215. जसस्ट्िम में होने िाली गड़बजड़यों को रोकने के जलए लोड िेसडगं , िोल्िेि अजस्ट्थरता, कोणीय अजस्ट्थरता, िनरेिन बैक डाउन या आइलैंसडगं स्ट्कीम िैसी सुरिा योिनाएं भी प्रिान करने की आिश्यकता हो सकती ह।ै 216. संरिण समन्िय संबंधी मुद्दों को िेत्रीय जिद्युत सजमजत द्वारा अंजतम रूप दिया िाएगा। 217. अनुरोधकता/व उपयोगकता व अपन े कमवचाररयों के संिभ व और उपयोग के जलए जिजभन्न मानकों के अनुरूप सुरिा जनयमािली जिकजसत करेगा। 218. जितरण प्रणाजलयों और बल्क कंज्यूमर के जलए, िेत्रीय जिद्युत सजमजत में जलए गए जनणवय के अनुसार, जिड आिृजत्त में जगरािि की जस्ट्थजत म ें जिड सुरिा सुजनजश्चत करन े के जलए आकजस्ट्मक जस्ट्थजत में स्ट्िचाजलत लोड जनयंत्रण हते ु आिृजत्त और डीएफ/डीिी (समय के साथ आिृजत्त में पररितवन की िर) ररले का उपयोग दकया िाएगा। 219. जिड स े िड़ु ी रांसजमिन लाइनें और सब-स्ट्िेिन सामान्य कनेजटिजििी ितों के अजतररि जनम्नजलजखत का भी पालन करेंग:े (1) सबस्ट्िेिन पर पारेषण लाइनों और उपकरणों की सरु िा केंद्रीय जिद्युत प्राजधकरण (जिद्यतु संयंत्रों और जिद्युत लाइनों के जनमावण के जलए तकनीकी मानक) जिजनयमन की अनसु ूची-V के अनुसार प्रिान की िाएगी।44 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (2) सर्कवि िेकर, आइसोलेिर और अन्य सभी जिद्युत िाहक उपकरण सामान्य और आपातकालीन लोड करंिओं को जबना दकसी िजत के िहन करने म ें सिम होने चाजहए। य े उपकरण अतं र-राज्यीय और इंरास्ट्िेि जिद्युत संचरण प्रणाली पर जिद्युत हस्ट्तांतरण की िमता को सीजमत करने िाला कारक नहीं बनन े चाजहए। (3) सभी सर्कवि िेकर और अन्य फॉल्ि इंिरसपिंग जडिाइस दकसी भी फॉल्ि के जलए फॉल्ि करंि को सुरजित रूप स े बाजधत करन े म ें सिम होन े चाजहए। सर्कवि िेकर म ें फॉल्ि को जटलयर करने म ें िानबूझकर समय जिलंब दकए जबना यह िमता होनी चाजहए। न्यूनतम फॉल्ि इंिरसपिंग आिश्यकता संबंजधत रांसजमिन यूरिजलिी द्वारा जनर्िष्टव की िानी चाजहए। सर्कवि िेकर अन्य सभी आिश्यक जस्ट्िसचंग कायों को करने म ें सिम होना चाजहए, िैसे दक कैपेजसरिि करंि जस्ट्िसचंग, लोड करंि जस्ट्िसचंग और आउि-ऑफ-स्ट्िेप जस्ट्िसचंग। सर्कवि िेकर को जिड म ें कहीं और लग े उपकरणों को नुकसान पहुचाँ ाने िाले िजणक ओिर-िोल्िेि उत्पन्न दकए जबना सभी आिश्यक कायों को पूरा करना चाजहए। सर्कवि िेकर की िॉिव सर्कवि िमता प्राजधकरण द्वारा अंजतम रूप दिए गए अल्पकाजलक और भािी रांसजमिन योिनाओं पर आधाररत होगी। (4) प्रभािी रूप स ेअर्थगिं दकए गए जसस्ट्िम के जलए अथव फॉल्ि फैटिर 1.4 स ेअजधक नहीं होना चाजहए। (5) सबस्ट्िेिन के सहायक उपकरणों को जिद्युत् की आपूर्तव इस प्रकार होगी: (i) प्रत्यािती करंि (एसी) आपूर्तव के जलए (नए सबस्ट्िेिन पर लागू): (a) 220 केिी और उससे ऊपर:िो स्ट्ितंत्र स्रोतों स े िो उच्च तनाि (HT) आपूर्त व की व्यिस्ट्था की िाएगी। ये िोनों स्रोत इस प्रकार होन े चाजहए दक िोनों स्रोतों म ें एक साथ जिद्युत् किौती न हो। इन िो उच्च तनाि आपूर्तवयों म ें स े एक िसू रे के जलए स्ट्िैंडबाय के रूप म ें रहगे ी। इसके अजतररि, उपयुि िमता िाल े डीिल िनरेटिंग (DG) स्रोत स े आपातकालीन आपूर्तव भी प्रिान की िाएगी। बिते दक अससंक्रोनस िनरेटिंग स्ट्िेिन अपनी सहायक आपूर्त व आिश्यकताओं के जलए उपयिु िमता का िसू रा डीिल उत्पािन (डीिी) स्रोत स्ट्थाजपत कर सकता ह।ै (b) 66 केिी और 220 केिी स ेनीचे: इसम ें एक एचिी आपूर्तव और एक डीिल िनरेटिंग स्रोत होगा। (c) 33 केिी और 66 केिी स ेनीच:े एक ही एचिी आपूर्तव होगी। (ii) प्रत्यि करंि (डीसी) आपूर्तव के जलए (नए उप-स्ट्िेिनों पर लागू): 132 केिी और उससे अजधक के पारेषण प्रणाली के उप-स्ट्िेिन और सभी उत्पािन स्ट्िेिनों के उप-स्ट्िेिन: इसम ें बैिरी के िो सेि होंगे, जिनम ें स ेप्रत्येक के साथ उसका अपना चािवर होगा। 132 केिी स ेनीच ेके सबस्ट्िेिनों के जलए: बैिरी और चािवर का एक ही सेि होगा। अध्याय – IX जमजश्रत 220. जनरसन एि ंबचत: (1) केंद्रीय जिद्युत प्राजधकरण (जिड स े कनेजटिजििी के जलए तकनीकी मानक) जिजनयम, 2007, िो लाग ू ह,ैं एतद्द्वारा रद्द दकए िाते ह।ैं (2) ऐसे जनरसन के बाििूि, रद्द जिजनयमों के तहत दकया गया या दकया िान े का आिजयत कोई भी काय व इन जिजनयमों के प्रासंजगक प्रािधानों के तहत दकया गया या दकया िाने का आिजयत माना िाएगा। 221. करिनाई िरू करन ेकी िजि यदि इन जिजनयमों के प्रािधानों को लाग ू करन े में कोई करिनाई उत्पन्न होती है, तो प्राजधकरण स्ट्िय ं या दकसी संस्ट्था द्वारा उसके समि दकए गए आिेिन पर, जफ्लकर के प्रािधानों या प्राजधकरण द्वारा जनर्िवष्ट अन्य जिजनयमों के प्रािधानों के साथ असंगत न होन े िाल े ऐस े प्रािधान आिेि द्वारा बना सकता है, िो इन[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 45 जिजनयमों के उद्देश्यों को लाग ूकरने म ेंआने िाली करिनाई को िरू करन े के जलए आिश्यक प्रतीत हों। 222. जिजथल करन ेकी िजि: (1) प्राजधकरण, आिेि द्वारा और जलजखत रूप में ििव दकए िाने िाले कारणों के आधार पर, प्राजधकरण को सौंप े गए मामलों के संबंध में इन जिजनयमों के दकसी भी प्रािधान में मामले-िर-मामले के आधार पर छूि ि े सकता ह।ै (2) प्राजधकरण जफ्लकर की धारा 70 की उपधारा (9) के तहत दकसी भी मामले से जनपि सकता ह ै या दकसी भी िजि का प्रयोग कर सकता ह ै जिसके जलए कोई जिजनयम नहीं बनाए गए हैं, और प्राजधकरण जफ्लकर के प्रािधानों के अनुसार ऐसे मामलों, िजियों और कायों से जनपि सकता ह।ै 223. जनयमों का प्रितनव : (1) संबंजधत पारेषण उपयोजगता और जितरण लाइसेंसधारी दकसी भी आिेिक को कनेजटिजििी प्रिान करन े से पहले इन जिजनयमों का अनुपालन सुजनजश्चत करेंगे और साथ ही संबंजधत लोड जडस्ट्पैच सेंिर को ररपोिव भी प्रस्ट्तुत करेंगे। (2) िेत्रीय लोड जडस्ट्पैच सेंिर और राज्य लोड जडस्ट्पैच सेंिर जिड की घिना/बाधा/घिना के 7 दिनों के भीतर िास्ट्तजिक समय संचालन के िौरान दकसी भी उपयोगकताव द्वारा इन जिजनयमों के गैर-अनुपालन की जस्ट्थजत की ररपोिव केंद्रीय जिद्युत प्राजधकरण को िेंगे। (3) उपयोगकताव को जिड की घिना/बाधा/घिना के 3 दिनों के भीतर इन जिजनयमों के अनपु ालन न करने के कारणों सजहत जिस्ट्तृत ररपोिव और अनुपालन न करन े की जस्ट्थजत स े जनपिन े के जलए जनयोजित सुधारात्मक उपायों को संबंजधत एलडीसी को प्रस्ट्तुत करना होगा। (4) प्राजधकरण दकसी उपयोगकता व या अनरु ोधकताव द्वारा इन जिजनयमों के अनुपालन न करने के मामल े का संज्ञान ल े सकता ह ैऔर इस संबंध म ें नाजमत दकसी अजधकारी या एिेंसी को िांच करन े और प्राजधकरण को ररपोिव प्रस्ट्ततु करने का जनिेि िे सकता ह।ै प्राजधकरण उजचत पारेषण उपयोजगता को इन जिजनयमों म ें जनजहत दकसी भी प्रािधान का अनुपालन न करने पर उपयोगकताव को जिड से तब तक जडस्ट्कनेटि करन े का जनिेि ि ेसकता ह ैिब तक दक उपयोगकताव इन जिजनयमों का अनुपालन नहीं कर लते ा। (5) इन जिजनयमों में जनजहत प्रािधानों या इन जिजनयमों के अनुरूप दकसी भी आिेि, जनिेिों का अनुपालन न करने पर जफ्लकर की धारा 146 के अनुसार कारविाई की िाएगी। अनसु जू चयों अनसु चू ी I 1. फैजसजलिी म ें मिीनों के जडिाइन के जलए जिचार दकए िाने िाल े अजधकतम और न्यनू तम संभाजित पररिेि तापमान का आकलन करने के जलए जनम्नजलजखत प्रदक्रया का पालन दकया िाना ह:ै (1) भारत मौसम जिज्ञान जिभाग (आईएमडी), पणु े (पृथ्िी जिज्ञान मंत्रालय, भारत सरकार) की िेबसाइि स े प्रासंजगक तापमान डेिा प्राि करें। आईएमडी पूरे भारत के जलए माजसक तापमान स े संबंजधत डेिाबेस रखता ह ै और िनरेटिंग स्ट्िेिन के जनकितम आईएमडी मापन केंद्र द्वारा िि व दकए गए चरम तापमान (दकसी माह का उच्चतम अजधकतम और न्यूनतम तापमान) को नोि दकया िाना चाजहए। आईएमडी डेिा उपलब्ध न होने की जस्ट्थजत म,ें आिेिक दकसी प्रजतजष्ठत मौसम सेिा प्रिाता या आस-पास के निीकरणीय ऊिाव पररयोिना के दकसी मौसम केंद्र स े46 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] तापमान डेिा प्राि कर सकता ह।ै तापमान डेिा का स्रोत और मौसम केंद्र का स्ट्थान आिेिक द्वारा संबंजधत पारेषण उपयोजगता और एलडीसी को प्रस्ट्तुत दकए िाने िाल े आिेिन म ेंििावया िाना चाजहए। (2) दकसी जििेष आईएमडी स्ट्िेिन के जलए अजधकतम तापमान जनम्न सलंक का उपयोग करके पाया िा सकता ह:ै https://cdsp.imdpune.gov.in/home_lab_2.php#extremes (3) ऊपर दिए गए सलंक म ें दकसी जििेष महीन े का अजधकतम और न्यनू तम तापमान (अब तक िि व दकया गया उच्चतम और जनम्नतम तापमान) दिया गया ह।ै (4) अनुरोधकताव िषव के प्रत्येक महीने के अजधकतम और न्यूनतम तापमानों की एक सारणी बनाएगा और उस सारणी स े 12 महीनों म ेंसे उच्चतम और जनम्नतम तापमान का चयन करेगा। (5) उच्चतर चरम सीमा के जलए, उपरोि प्रदक्रया द्वारा प्राि तापमान म ें 1℃ का मार्िवन िोड़ा िाएगा और इस े (जनकितम उच्च पूणािंक तक) गोल दकया िाएगा और उच्चतर चरम सीमा पर RE िनरेिर के जडिाइन तापमान के रूप म ेंमाना िाएगा। (6) इसी प्रकार, जनम्नतम चरम सीमा के जलए, उपरोि प्रदक्रया द्वारा प्राि तापमान म ें स े 1℃ की सीमा घिा िी िाएगी और इस े (जनकितम जनम्नतम पणू ािंक तक) पूणािंदकत दकया िाएगा और जनम्नतम चरम सीमा पर फैजसजलिी के जडिाइन तापमान के रूप म ेंमाना िाएगा। (7) अनुरोधकता व अनुपालन पर जिचार करन े के जलए हलफनाम े के तहत ऊपर बताए गए अनसु ार संपूण व मूल्यांकन प्रदक्रया और डेिा को चरणबद्ध तरीके स े प्रस्ट्तुत करेगा। 2. प्राजधकरण इस अनुसूची के पैरा 1 म ें िी गई प्रदक्रया के अनुसार सभी स्ट्थानों के पररिेि तापमान प्रकाजित करेगा। इस े प्रत्येक जित्तीय िषव के पहल े सिाह म ें संिोजधत दकया िाएगा तादक आईएमडी द्वारा इस उद्देश्य के जलए उपलब्ध कराए िान े िाल े अजधकतम तापमान आंकड़ों के आधार पर दकसी भी अद्यतन को ििावया िा सके। बिते दक िब तक नया डेिा अपडेि नहीं हो िाता, तब तक फैजसजलिी म ें मिीनों के जडिाइन के जलए अनुरोधकता व द्वारा सीईए की िेबसाइि पर उपलब्ध निीनतम डेिा का संिभव जलया िाएगा। अनसु चू ी II पीएफआर के जलए प्रजतदक्रया लक्ष्य सीमा पैरामीिर प्रजतदक्रया लक्ष्य उपलब्ध सेटिंग्स की श्रेजणया ं जमन अजधकतम समय की प्रजतदक्रया 0.5 सेकंड 0.20 (डब्ल्यूिीिी के जलए 1 0.5) िृजद्ध समय 4.0 सेकंड 2.0 (डब्ल्यूिीिी के जलए 20 4.0) जनपिान समय 10 सेकंड 10 30 अिमंिन अनुपात 0.3 0.2 1.0 सेिसलंग बडैं अजधकतम (पररितवन का 1 5 2.5% या उत्पािन प्रणाली[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 47 की जनरंतर रेटिंग का 0.5%) नोि:- 1) जस्ट्थर और अिमंदित प्रजतदक्रया को प्रजतदक्रया समय पर प्राथजमकता िी िाएगी। यानी, यदि यह दिखाया िाता ह ै दक लागू पररजस्ट्थजतयों म ें जस्ट्थर और अिमंदित प्रजतदक्रया को प्राथजमकता िी िाएगी।उत्पािन स्ट्िेिनऔर िी गई जिड जिससेउत्पािन स्ट्िेिनयदि यह िुड़ा हुआ ह,ै तो जस्ट्थर प्रजतदक्रया के जलए प्रजतदक्रया समय की आिश्यकता होती ह ै िो ऊपर िी गई िेबल म ें पररभाजषत ऊपरी सीमा के करीब हो, तो जस्ट्थर और मंि प्रजतदक्रया प्रिान करने के जलए इस े प्राथजमकता िी िाती ह।ै 2) गत्यात्मक प्रजतदक्रया जििेषताओं को ओपन-लूप आधार पर पररभाजषत दकया िाता ह,ै िो प्रभािी मामला होता ह ै िब जसस्ट्िम की िड़ता आईबीआर रेटिंग की तलु ना म ें पररमाण के क्रम म ें बड़ी होती ह।ै 3) प्रजतदक्रया समय तब िरूु होता ह ै िब PoI पर मापी गई लागू आिृजत्त लागू PFR डडे बडैं स े बाहर जिचजलत हो िाती ह।ै 4)उत्पािन स्ट्िेिनप्राथजमक ऊिाव स्रोत की उपलब्धता के िौरान पीएफआर को बनाए रखन े म ेंसिम होना चाजहए। 5) आईईईई 2800 (संिोजधत रूप म)ें के अनुसार अिमंिन अनुपात संबंधी िानकारी िेखें। अनसु चू ी III कनेजटिजििी प्रदक्रया के जलए फ्लोचािव चरण ए 1. अनुरोधकताव को अंतसिंबंध अध्ययन हते ु योिना चरण में ही उपयुि पारेषण उपयोजगता से संपकव करने का अनुरोध करना होगा। यदि अनरु ोधकताव दकसी जितरण प्रणाली से अंतसिंबंध चाहता ह,ै तो ऐसा अनुरोध जितरण लाइसेंसधारी से दकया िाएगा।48 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] 2. अनुरोधकता व को उपयिु पारेषण उपयोजगता या जितरण लाइसेंसधारी द्वारा जनधावररत आिश्यकताओं के अनुसार उपकरण/ फैजसजलिी का गजणतीय मॉडल प्रस्ट्तुत करना होगा। 3. उपयुि पारेषण उपयोजगता या जितरण लाइसेंसधारी को अतं सिंबंध अध्ययन करना होगा तादक PoI, आिश्यक अंतसिंबंध सुजिधाएं और अंतसिंबधं को समायोजित करन े के जलए मौिूिा जिड म ें आिश्यक सिं ोधन (यदि कोई हो) जनधावररत दकए िा सकें। अध्ययन में पारेषण प्रणाली की िमता, िजणक जस्ट्थरता, िोल्िेि जस्ट्थरता, हाजन, िोल्िेि जिजनयमन, हामोजनटस, िोल्िेि जफ्लकर, जिद्युत चुम्बकीय िजणक पररितवन, मिीन गत्यात्मकता, फेरोरेिोनेंस, मीिटरंग आिश्यकताए,ं सुरिात्मक ररलेइंग, सबस्ट्िेिन िाउंसडंग और फॉल्ि ड्यूिी िैसे पहलुओं पर भी जिचार दकया िा सकता ह।ै चरण बी 4. उपयुि पारेषण उपयोजगता या जितरण लाइसेंसधारी, पष्ठृ भजू म नेििकव डेिा, पष्ठृ भूजम हामोजनक जिरूपण स्ट्तर, जिसमें प्रजतबाधा बहुभुि िाजमल ह,ैं सजहत जिड िानकारी तैयार करेगा और अनरु ोधकता व को कनेजटिजििी के अंजतम अनुिान के समय तकनीकी कनेटिन डेिा तैयार करने के जलए अनरु ोधकताव को प्रिान करेगा। 5. अनुरोधकताव को संपूणव तकनीकी कनेटिन डेिा प्रस्ट्तुत करना होगा और यह िचन िेना होगा दक प्रस्ट्तुत दकया गया फैजसजलिी जसमुलेिन मॉडल डिे ा सिीक ह ैऔर िास्ट्तजिक फैजसजलिी प्रजतदक्रया का प्रजतजनजध ह:ै बिते दक यदि चरणबद्ध रूप स ेचालू करन े की योिना बनाई गई ह,ै तो फैजसजलिी की चरण िमता के जलए संपूण व तकनीकी कनेटिन डेिा ही प्रस्ट्ततु दकया िाएगा। 6. अनुरोधकता व को दकसी फैजसजलिी म ें मौिूि प्रत्येक प्रकार के इन्ििवर / WTG / SVG / FACTS उपकरणों के जलए जनम्नजलजखत िस्ट्तािेि प्रस्ट्तुत करने होंगे: (1) िाइप िेस्ट्ि ररपोिव (2) अनुपालन जििरण (एसओसी) (3) मापन ररपोिव 7. अनुरोधकता व को फैजसजलिी जसमुलेिन मॉडल मानक प्रारूपों म ें प्रस्ट्तुत करन े होंगे िो परस्ट्परसंचालनीय हों और उपयुि रांसजमिन यूरिजलिी और लोड जडस्ट्पैच सेंिर द्वारा उपयोग दकए िाने िाले जसमुलेिन सॉफ़्ििेयर म ें पररिर्तवत दकए िा सकें। प्रस्ट्तुत दकए िाने िाल े जसमुलेिन मॉडल नीच े दिए गए ह:ैं (1) जस्ट्थर मॉडल (2) डायनाजमक फेिर-डोमेन रांजिएंि (पीडीिी) मॉडल (3) गत्यात्मक जिद्युत चुंबकीय िजणक (ईएमिी) मॉडल (4) हामोजनक मॉडल - हामोजनक अध्ययनों के जलए, संयंत्र का आिृजत्त पर जनभवर नॉिवन समतल्ु य (एफडीएनई) मॉडल प्रिान दकया िाएगा। अनुरोधकताव यह सुजनजश्चत करेगा दक प्रस्ट्ततु मॉडल फाइलें अनुपालन सत्यापन दििाजनिेिों म ें उजल्लजखत मॉडल सबजमिन और संगतता आिश्यकताओं का पालन करती ह।ैं 8. अससंक्रोनस िनरेटिंग स्ट्िेिन के मामल े म,ें अनरु ोधकता व को जिड के साथ भौजतक अतं सिंबंध से कम स े कम 12 महीने पहल े तकनीकी कनटे िन डेिा प्रस्ट्तुत करना होगा। चरण सी 9. उपयुि पारेषण उपयोजगता या जितरण लाइसेंसधारी प्रस्ट्तुत डेिा और मॉडल साझा दकए िाएंगेउपयुिएलडीसी और िह समानांतर रूप स े प्रस्ट्ततु आंकड़ों की िांच करेंगे। 10. संबंजधत एलडीसी अपनी रिपपजणयााँ अिेजषत करेगा।उपयुि पारेषण उपयोजगता या जितरण लाइसेंसधारीऔर यह इन जिजनयमों के अनुपालन न होने के संबंध म ेंअपनी रिपपजणयों को अनरु ोधकताव को सूजचत करेगा।[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 49 11. उपयुि पारेषण उपयोजगता या जितरण लाइसेंसधारीतकनीकी कनेटिन संबंधी जििरणों की सूचना िारी की िाएगी और आईएसिीएस जिड के साथ भौजतक अतं सिंबंध स्ट्थाजपत करने के जलए अनुरोधकता व के साथ कनेजटिजििी समझौता पर हस्ट्तािर दकए िाएंगे। 12. कनेटिन समझौते म ेंउस कनेटिन पर लाग ूहोने िाली सामान्य और जिजिष्ट तकनीकी ितें िाजमल होंगी। 13. अनुरोधकताव के जसस्ट्िम का जिड से प्रत्येक कनेटिन अनरु ोधकताव और जिड के बीच एक कनेजटिजििी समझौते द्वारा किर दकया िाएगा। (1) अंतरराज्यीय पारेषण प्रणाली या अतं रराज्यीय पारेषण प्रणाली से कनेटिन के मामल े म ें उपयिु पारेषण उपयोजगता; (2) जितरण लाइसेंसधारी के जसस्ट्िम से अतं सिंबंध की जस्ट्थजत म ेंजितरण लाइसेंसधारी; और (3) रांसजमिन लाइसेंसधारी और उपयुि रांसजमिन यूरिजलिी, रांसजमिन लाइसेंसधारी के साथ अंतसिंबंध की जस्ट्थजत में (जत्रपिीय समझौता)। चरण डी 14. आिेिक को प्रथम समय ऊिावकरण (एफिीई) के जलए इस िचन के साथ आिेिन करना होगा दक प्रस्ट्तुत फैजसजलिी जसमुलेिन मॉडल डिे ा सिीक ह ै और उपयिु प्राजधकरण द्वारा अनुमोदित कनेटिन के संबंध में कोई जभन्नता नहीं ह।ै पारेषण उपयोजगता या जितरण लाइसेंसधारी. चरण ई 15. संबंजधत एलडीसी आिेिन की िांच करेगा और यदि अनुमोदित संयंत्र नेििकव िोपोलॉिी या जसमुलेिन मॉडल म ें कोई पररितनव होता ह,ै तोउपयुिएलडीसी प्रस्ट्तुत डेिा और मॉडल को उपयुि संस्ट्थाओं के साथ साझा करेगा।पारेषण उपयोजगता या जितरण लाइसेंसधारी. 16. उपयुि पारेषण उपयोजगता या जितरण लाइसेंसधारीऔरउपयुिएलडीसी द्वारा प्रस्ट्तुत आकं ड़ों की समानांतर िांच की िाएगी। 17. उपयुि पारेषण उपयोजगता या जितरण लाइसेंसधारी िारी करेगायदि इन जिजनयमों म ें जनजहत सभी लाग ू प्रािधानों का अनुपालन दकया िाता ह,ै तो कनेटिन जििरण को संिोजधत दकया िाएगा। चरण एफ 18. उपयुि एलडीसी को एफिीई (पूणवकाजलक कमवचारी) प्रिान करने स े पहल े सीईए (जिड स े कनेजटिजििी के जलए तकनीकी मानक) का अनुपालन सुजनजश्चत करना होगा। चरण िी 19. संबंजधत आरएलडीसी/एसएलडीसी स े पूिव अनुमजत प्राि करने के बाि, अनरु ोधकताव को सीओडी स े पहले परीिण और पूण व लोड परीिण सजहत, चालू करने की अिजध के िौरान जिड के साथ जिद्युत् का आिान-प्रिान करन े की अनुमजत िी िाएगी। 20. अनुरोधकता व को संयंत्र जसमुलिे न मॉडल के साइि परीिण सत्यापन के जलए जिड के साथ भौजतक अतं सिंबंध स्ट्थाजपत करन े की प्रदक्रया िुरू करनी होगी। 21. अनुरोधकता व को अनुपालन सत्यापन दििाजनिेिों के अनुसार उत्पािन स्ट्िेिन का परीिण करना होगा: बिते दक यदि दकसी उत्पािन स्ट्िेिन म ें मौिूिा िमता म ें नई िमता िोड़ी िाती ह,ै तो संपूणव िमता के जलए एकीकृत परीिण दकया िाएगा। 22. अनुरोधकताव परीिण पररणाम और अंजतम मान्य जसमुलिे न मॉडल को उपयिु लोड जडस्ट्पैच सिें र को प्रस्ट्ततु करेगा।50 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] 23. The उपयुिलोड जडस्ट्पैच सेंिर, साइि परीिण पररणामों के आधार पर मान्य जसमुलिे न मॉडल की प्रजतदक्रया की िांच करेगा और दकसी भी जिसंगजत की जस्ट्थजत में अनुरोधकताव को अपनी रिपपजणयां भेिगे ा। 24. साइि परीिणों के आधार पर जसमुलेिन मॉडल के सत्यापन के बाि, अनुरोधकता व को रायल रन के जलए सूचना जमलने स ेपहल े जनम्नजलजखत जििरण प्रस्ट्तुत करने होंग:े जििरण इकाइयों जिद्युत् उत्पािन स्ट्िेिन की स्ट्थाजपत िमता मेगािाि जिद्युत् उत्पािन स्ट्िेिन की स्ट्थाजपत िमता एमिीए एमसीआर मेगािाि संख्या x इकाई आकार नहीं x MW िंडी िरुु आत के जलए आिश्यक समय जमनि िाम व स्ट्िािव के जलए आिश्यक समय जमनि हॉि स्ट्िािव के जलए आिश्यक समय जमनि िंडी पररजस्ट्थजतयों म ेंसंयुि चक्र संचालन के जलए आिश्यक समय जमनि गम व पररजस्ट्थजतयों म ें संयुि चक्र संचालन के जलए आिश्यक समय जमनि िमता बढाना % प्रजत जमनि िमता को कम करना % प्रजत जमनि न्यूनतम अस्ट्िीकृजत स्ट्तर एमसीआर का % न्यूनतम अस्ट्िीकृजत स्ट्तर मेगािाि (बस को छोड़कर) इन्ििवर लोसडंग अनुपात (डीसी/एसी िमता) टयूसीए का नाम (िहां लाग ू हो) पूणव िलािय स्ट्तर (एफआरएल) मीिर जडिाइन प्रमुख मीिर न्यूनतम जनकासी स्ट्तर (एमडीडीएल) मीिर जडिाइन हडे पर पानी छोड़ा गया एम3 / एमडब्ल्य ू इकाई-िार जनजषद्ध ित्रे मेगािाि 25. परीिण चलान े की सूचना (1) परीिण चलान े या परीिण चलान े की पुनरािृजत्त के जलए अपन े उत्पािन स्ट्िेिन या उसकी दकसी इकाई का प्रस्ट्ताि करने िाला अनरु ोधकताव संबंजधत आरएलडीसी और उत्पािन स्ट्िेिनों के लाभार्थयव ों, जिनम ें मध्यस्ट्थ खरीििार भी िाजमल ह,ैं को कम स े कम सात (7) दिन का नोरिस िेगा, िहां भी इनकी पहचान की गई हो। बिते दक यदि असफल परीिण के अड़तालीस (48) घंिों के भीतर िोबारा परीिण दकया िाना हो, तो नए नोरिस की आिश्यकता नहीं होगी। (2) परीिण के जलए अपनी पारेषण प्रणाली या उसके दकसी तत्ि का प्रस्ट्ताि करने िाला आिेिक संबंजधत आरएलडीसी, सीिीयू, ित्रे के जितरण लाइसेंसधाररयों और अंतसिंबंध प्रणाली के स्ट्िामी को कम स े कम सात दिन का नोरिस िगे ा। (3) संबंजधत आरएलडीसी अनुरोजधत जतजथ स े परीिण चलाने की अनुमजत िगे ा, या प्रणाली संबंधी दकसी भी बाधा की जस्ट्थजत म,ें परीिण चलान े की प्रस्ट्ताजित जतजथ स े सात (7) दिनों के भीतर परीिण िुरू करन े की अनुमजत िेगा। परीिण चलाना संबंजधत आरएलडीसी द्वारा जनधावररत और सूजचत समय और जतजथ स ेिुरू होगा। चरण एच 26. िनरेटिंग यूजनि का परीिण सचं ालन[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 51 (1) तापीय ऊिाव उत्पािन इकाई का परीिण जनम्नजलजखत प्रािधानों के अनुसार दकया िाएगा: (क) थमवल िनरेटिंग यूजनि को जनधावररत ईंधन पर एमसीआर पर लगातार बहत्तर (72) घंिे तक चालू रखना होगा: बिते: (i) परीिण की अिजध म ें तिनुसार िृजद्ध के साथ संजिि बाधा या भार में कमी की अनुमजत होगी; (ii) परीिण अिजध के िौरान औसत भार, बाधा की अिजध को छोड़कर, लेदकन संबंजधत जिस्ट्ताररत अिजध को िाजमल करत े हुए, एमसीआर स े कम नहीं होना चाजहए, इस ित व के साथ बाधा या आंजिक लोसडगं की अनुमजत िी िा सकती ह;ै (iii) चार (4) घंिे स ेअजधक का संचयी बाधा परीिण रन को िोहराने के जलए कहगे ा। (ख) यदि परीिण के आधार पर कोई तापीय ऊिाव उत्पािन इकाई एमसीआर के अनुरूप इकाई िमता प्रिर्िवत करने म ें जिफल रहती ह,ै तो अनुरोधकता व के पास उत्पािन इकाई की िमता को कम करन े या पनु ः परीिण करन े का जिकल्प होता ह।ै यदि अनुरोधकताव इकाई िमता को कम करन े का जनणवय लेता ह,ै तो प्राथजमक प्रजतदक्रया को पूरा करने के जलए ऐसी जस्ट्थजत म ें कम की गई िमता प्रिर्िवत िमता के 95% स े अजधक नहीं होगी। (2) िल जिद्युत उत्पािन इकाई का परीिण जनम्नजलजखत प्रािधानों के अनुसार दकया िाएगा: (a) एमसीआर म ेंिल जिद्युत उत्पािन इकाई बारह (12) घंिे तक जनरंतर पररचालन म ेंरहगे ी: बिते: (i) परीिण की अिजध म ें तिनुसार िृजद्ध के साथ संजिि बाधा या भार में कमी की अनुमजत होगी; (ii) परीिण अिजध के िौरान औसत भार, बाधा की अिजध को छोड़कर लेदकन, संबंजधत जिस्ट्ताररत अिजध सजहत, एमसीआर स े कम नहीं होना चाजहए, इस ित व के साथ बाधा या आंजिक लोसडगं की अनुमजत िी िा सकती ह;ै (iii) चार (4) घंिे स ेअजधक का संचयी बाधा परीिण चलाने की पनु रािृजत्त की मांग करेगा; (iv) यदि अपयावि िलािय या तालाब स्ट्तर या अपयावि प्रिाह के कारण एमसीआर का प्रििवन करना संभि नहीं ह,ै तो सीओडी घोजषत दकया िा सकता ह,ै इस ित व के अधीन दक सीओडी के बाि पयावि पानी उपलब्ध होन े पर इस े तुरंत प्रिर्ितव दकया िाएगा। बिते दक यदि ऐसा उत्पािन स्ट्िेिन पयावि पानी उपलब्ध होने पर एमसीआर प्रिर्िवत करने म ेंसिम नहीं ह,ै तो अनरु ोधकता व इस खडं के उप-खंड (बी) के अनुसार िमता को कम करेगा, और ऐसी कमी सीओडी स े प्रभािी होगी। (b) यदि परीिण के आधार पर कोई िल जिद्युत उत्पािन इकाई एमसीआर के अनुरूप इकाई िमता प्रिर्ितव करन े म ें जिफल रहती ह,ै तो अनुरोधकता व के पास िमता को कम करने या पुनः परीिण करने का जिकल्प होगा। यदि अनुरोधकता व इकाई िमता को कम करन े का जनणवय लते ा ह,ै तो ऐसे मामलों म ें कम की गई िमता प्राथजमक प्रजतदक्रया के जलए प्रिर्िवत िमता के 90% से अजधक नहीं होगी। (3) पिन/सौर/ईएसएस/हाइजिड िनरेटिंग स्ट्िेिन का परीिण संचालन52 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (a) सौर इन्ििवर यूजनिों का परीिण न्यूनतम 50 मेगािाि की कुल िमता के जलए दकया िाएगा: बिते दक 50 मगे ािाि स े अजधक िमता िाली पररयोिना के मामले म,ें िेष िमता के जलए परीिण अजधकतम चार चरणों म ें दकया िाएगा, जिसम ें न्यूनतम िमता 5 मगे ािाि होगी: इसके अलािा, 50 मगे ािाि स े कम िमता िाली सौर इनििवर इकाइयों के जलए परीिण चलाने की अनुमजत उस िमता के जलए िी िाएगी जिसके जलए संबंजधत इकाई को कनेजटिजििी प्रिान की गई ह।ै (b) इस खंड के उपखडं (क) के अंतगवत आने िाली सौर इन्ििवर इकाई(यों) के सफल परीिण संचालन का अथ व ह ै दक आिश्यक मीिटरंग प्रणाली, पािर पलांि जनयंत्रक, िेलीमेरी और सुरिा प्रणाली के चालू रहने के िौरान सूयोिय स े सूयावस्ट्त तक संचयी रूप स े कम स े कम चार (4) घंिे तक जिद्युत् और संचार जसग्नल का प्रिाह होना। अनुरोधकता व परीिण संचालन के िौरान इकाई(यों) के आउिपुि को ररकॉडव करेगा और दिन के िौरान साइि पर िि व दकए गए तापमान और सौर जिदकरण तथा पलांि जडजाइन मापिडं ों के साथ इसके प्रििवन की पुजष्ट करेगा। बिते: (i) यदि दिन के सौर जिदकरण के अनुरूप प्रििवन स्ट्तर स े नीच े का आउिपुि प्राि होता ह,ै तो परीिण को िोहराना आिश्यक होगा; (ii) यदि अपयावि सौर जिदकरण के कारण संयंत्र की रेिेड िमता को प्रिर्िवत करना संभि नहीं ह,ै तो सीओडी घोजषत दकया िा सकता ह,ै इस ित व के अधीन दक सीओडी की जतजथ स े एक िष व के भीतर, पयावि सौर जिदकरण उपलब्ध होन े पर इस ेतुरंत प्रिर्िवत दकया िाना चाजहए। बिते दक यदि ऐसा उत्पािन स्ट्िेिन सी.ओ.डी. के बाि पयािव सौर जिदकरण उपलब्ध होने पर रेिेड िमता प्रिर्िवत करने म ें सिम नहीं ह,ै तो अनरु ोधकताव इस अनुसूची के पैरा 26 के खंड (3) के उप-खंड (एच) के अनुसार िमता को कम करेगा। (c) कम स े कम 50 मेगािाि की कुल िमता िाल े पिन िरबाइनों का परीिण दकया िाएगा: बिते दक 50 मगे ािाि स े अजधक िमता िाली पररयोिना के मामले म,ें 50 मगे ािाि स े अजधक िमता िाले पिन िरबाइनों के जलए परीिण रन कम स े कम 5 मेगािाि के बैच आकार म ेंदकया िाएगा: इसके अलािा, िीएनए जिजनयमों के जिजनयम 4.1 के खंड (ई) के अंतगवत आने िाली संस्ट्थाओं के जलए 50 मेगािाि स े कम िमता िाल े पिन िरबाइनों के जलए परीिण चलान े की अनुमजत उस िमता के जलए िी िाएगी जिसके जलए ऐसी संस्ट्था को कनजे टिजििी प्रिान की गई ह।ै (d) इस खंड के उपखंड (ग) के अतं गवत आन े िाले पिन िरबाइन(ओं) के सफल परीिण संचालन का अथव ह,ै आिश्यक मीिटरंग प्रणाली, पािर पलांि जनयंत्रक, िेलीमेरी और सुरिा प्रणाली के चाल ू रहने के िौरान, पिन उपलब्धता की अिजध म ें एक ही दिन म ें संचयी आधार पर कम स े कम चार (4) घंिे की अिजध के जलए जिद्युत प्रिाह और संचार संकेत का प्रिाह। अनुरोधकताव परीिण संचालन के िौरान इकाई(यों) के आउिपुि को ररकॉड व करेगा और दिन के िौरान साइि(यों) पर िि व की गई पिन गजत और संयंत्र जडिाइन मापिडं ों के साथ इसके प्रििवन की पुजष्ट करेगा। बिते - (i) यदि उस दिन की हिा की गजत के अनुरूप प्रििनव स्ट्तर स े नीचे का आउिपुि प्राि होता ह,ै तो परीिण को िोहराना आिश्यक होगा;[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 53 (ii) यदि अपयावि पिन िगे के कारण संयंत्र की रेिेड िमता का प्रििवन करना संभि न हो, तो सीओडी घोजषत दकया िा सकता ह,ै बिते दक सीओडी की जतजथ स े एक िषव के भीतर पयावि पिन िेग उपलब्ध होन े पर तरु ंत इसका प्रििवन दकया िाए: बिते दक यदि ऐसा उत्पािन स्ट्िेिन सीओडी के बाि पयावि पिन िगे उपलब्ध होन े पर रेिेड िमता का प्रििनव करन े म ें सिम न हो, तो अनुरोधकताव इस अनुसूची के पैरा 26 के खडं (3) के उपखंड (h) के अनुसार िमता को कम करेगा। (e) एक स्ट्िैंडअलोन ऊिाव भंडारण प्रणाली (ईएसएस) के सफल परीिण रन का अथव ह ै जडिाइन िमताओं के अनुसार ऊिा व को चाि व करन े और जडस्ट्चािव करन े का एक (1) चक्र, जिसमें आिश्यक मीिटरंग, िेलीमेरी और सुरिा प्रणाली सेिा म ें हो। (f) पंप स्ट्िोरेि पलांि के सफल परीिण संचालन का अथ व ह ै जडिाइन िमताओं के अनुसार रेिेड िल जनकासी स्ट्तर तक िबो-िनरेिर और पंसपगं मोिर मोड का एक (1) चक्र, जिसम ें आिश्यक मीिटरंग, िेलीमेरी और सुरिा प्रणाली सेिा म ें हो: बिते दक यदि िलािय म ें अपयावि िल स्ट्तर के कारण जनधावररत िल जनकासी स्ट्तर तक जडिाइन िमताओं को प्रिर्िवत करना संभि न हो, तो उपलब्ध िल जनकासी स्ट्तर पर िमताओं को प्रिर्ितव करन े के बाि सीओडी की घोषणा की िा सकती ह,ै इस ित व के अधीन दक सीओडी के बाि पयावि िलािय स्ट्तर उपलब्ध होने पर जनधावररत िल जनकासी स्ट्तर तक जडिाइन िमताओं को तरु ंत प्रिर्िवत दकया िाएगा। इसके अलािा, यदि पयावि िल उपलब्ध होने पर भी ऐसा उत्पािन स्ट्िेिन अपनी जडजाइन िमताओं को प्रिर्िवत करने में सिम नहीं होता ह,ै तो अनुरोधकताव के पास पुनः परीिण चलाने या िमता को कम करने का जिकल्प होगा। यदि अनरु ोधकताव इस अनुसूची के अनच्ु छेि 22 के खडं (2) के उपखडं (ख) के अनुसार इकाई िमता को कम करने का जनणवय लेता ह,ै तो यह कमी उत्पािन जतजथ स ेप्रभािी होगी। (g) हाइजिड जसस्ट्िम के सफल परीिण का अथ व ह ै इन जिजनयमों के लाग ू प्रािधानों के अनुसार हाइजिड जसस्ट्िम के प्रत्येक व्यजिगत स्रोत का सफल परीिण। (h) यदि परीिण के आधार पर सौर/पिन/भंडारण/हाइजिड ऊिाव उत्पािन स्ट्िेिन अपनी जनधावररत िमता को प्रिर्िवत करन े में जिफल रहता ह,ै तो आिेिक के पास या तो िोबारा परीिण करन े या न्यूनतम 50 मेगािाि या 5 मेगािाि की कुल जनधावररत िमता के अधीन िमता को कम करन े का जिकल्प होगा। (i) इन जिजनयमों म ें जनजहत प्रािधानों के बाििूि, िहां जिद्युत क्रय समझौता दकसी जिजिष्ट िमता के जलए जनधावररत ह ै जिसे सीओडी घोजषत दकया िा सकता ह,ै ऐस े जिद्युत क्रय समझौते के अनुसार उस िमता के जलए परीिण चलान े की अनुमजत िी िाएगी। 27. रांसजमिन जसस्ट्िम, एचिीडीसी जसस्ट्िम और एफएसीिीएस का रायल रन (1) दकसी पारेषण प्रणाली या उसके दकसी तत्ि के परीिण संचालन का अथ व ह,ै जिड के साथ अतं सिंबंध के माध्यम स,े प्रेषक छोर स े प्रािकता व छोर तक जिद्युत् और संचार संकेत के जनरंतर चौबीस (24) घंिे के प्रिाह के जलए, और आिश्यक मीिटरंग प्रणाली, िेलीमेरी और सुरिा प्रणाली के साथ, पारेषण प्रणाली या उसके तत्ि को उसके नाममात्र प्रणाली िोल्िेि पर सफलतापूिवक सदक्रय करना।54 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] बिते दक असाधारण पररजस्ट्थजतयों म ें और प्राजधकरण की पिू व स्ट्िीकृजत स,े एक रांसजमिन तत्ि को कम नाममात्र जसस्ट्िम िोल्िेि स्ट्तर पर सदक्रय दकया िा सकता ह:ै इसके अलािा, उपयुि एलडीसी उस जस्ट्थजत म ें चोरी-रोधी चार्ििंग की अनुमजत िे सकता ह ै िहां रांसजमिन लाइन म ेंकोई जिद्युत् नहीं बह रही हो। 28. बल्क कंज्यूमर का परीिण (1) बल्क कंज्यूमर फैजसजलिी का परीिण न्यूनतम 50 मगे ािाि की कुल िमता के जलए दकया िाएगा: बिते दक 50 मगे ािाि स े अजधक िमता िाली पररयोिना के मामले म,ें िेष िमता के जलए परीिण अजधकतम चार चरणों म ें दकया िाएगा, जिसम ें न्यूनतम िमता 5 मगे ािाि होगी: इसके अलािा, 50 मगे ािाि स े कम की कुल िमता िाली बल्क कंज्यूमर इकाई के जलए परीिण चलाने की अनुमजत उस िमता के जलए िी िाएगी जिसके जलए ऐसी इकाई को कनेजटिजििी प्रिान की गई ह।ै (2) इस खंड के उपखंड (क) के अतं गवत आने िाली बल्क कंज्यूमर फैजसजलिी के सफल परीिण सचं ालन का अथव ह ै दक आिश्यक मीिटरंग प्रणाली, बल्क कंज्यूमर जिद्युत् जनयंत्रक, िेलीमेरी और सुरिा प्रणाली के चाल ू रहन े के साथ एक ही दिन म ें संचयी आधार पर कम स े कम चार (4) घंिे तक जिद्युत् और संचार संकेत का प्रिाह होना चाजहए। अनुरोधकताव परीिण संचालन के िौरान इकाई (इकाइयों) के आउिपुि को ररकॉड व करेगा और दिन के िौरान साइि पर िि व दकए गए तापमान और सौर जिदकरण तथा बल्क कंज्यूमर जडिाइन मापिंडों के साथ इसके प्रििवन की पुजष्ट करेगा। बिते दक यदि पररणाम जनधावररत प्रििवन स्ट्तर स ेनीच े आता ह,ै तो परीिण को िोहराना आिश्यक होगा। 29. िाजणजज्यक संचालन की घोषणा स े पहल ेआिश्यक िस्ट्तािेि और परीिण (1) जनम्नजलजखत खंडों म ें जनर्िष्टव परीिण, अनुरोधकताव द्वारा एनएलडीसी और संबंजधत आरएलडीसी के समन्िय स े जनधावररत और संपन्न दकए िाएंगे, और सफल परीिण संचालन का प्रमाण पत्र अनुरोधकताव को िारी करन े स े पहल े जनर्िवष्ट प्रासंजगक ररपोिव और अन्य िस्ट्तािेि एनएलडीसी और संबंजधत आरएलडीसी को प्रस्ट्तुत दकए िाएंगे। (2) 200 मगे ािाि स े अजधक िमता िाल े सभी तापीय ऊिाव उत्पािन स्ट्िेिनों और 25 मगे ािाि स े अजधक िमता िाले िल जिद्युत उत्पािन स्ट्िेिनों को सीईए जिजनयमन (जिजनयमों) के अनुसार अपन े जसस्ट्िम के जनयंत्रण और िेलीमीिटरंग सुजिधाओं को स्ट्िचाजलत उत्पािन जनयंत्रण म ें एकीकृत करके उपयुि लोड जडस्ट्पैच सेंिर से संयंत्र के स्ट्िचाजलत संचालन को सिम करन े की पुजष्ट करन े िाल े िस्ट्तािेि प्रस्ट्ततु करने होंगे। (3) तापीय (कोयला/जलग्नाइि) ऊिा व उत्पािन स्ट्िेिनों के जलए आिश्यक िस्ट्तािेि और परीिण: (4) अनुरोधकताव इस अनुसूची के परै ा 31 के खंड (1) के अनुसार सीईए (जिड स े कनेजटिजििी के जलए तकनीकी मानक) जिजनयमों के अनुपालन की पुजष्ट करने िाला प्रमाण पत्र प्रस्ट्तुत करेगा। (a) अनुरोधकता व को जनम्नजलजखत ओईएम िस्ट्तािेज प्रस्ट्तुत करन ेहोंगे, अथावत ् (i) बॉयलर और िरबाइन के जलए स्ट्िािवअप िक्र, जिसम ें िंडी, गम व और अत्यजधक गम व जस्ट्थजतयों म ें यूजनि के िुरू होन े का समय िाजमल ह।ै (ii) िनरेिर का िमता िक्र, (iii) बॉयलर और िरबाइन की जडिाइन रैंप िर। (b) जनम्नजलजखत परीिण दकए िाएगं े: (i) जनमावण के जलए सीईए तकनीकी मानकों के अनुसार एमसीआर के पचपन (55) प्रजतित के भार पर चार (4) घंिे की जनरंतर अिजध के जलए संचालन।[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 55 (ii) एमसीआर के पचपन (55) प्रजतित स े एमसीआर तक रैंप-अप, प्रजत जमनि एमसीआर के कम स े कम एक (1) प्रजतित की रैंप िर पर, एक चरण या िो चरणों म ें (िो चरणों के बीच 30 जमनि की जस्ट्थरीकरण अिजध के साथ), और एक (1) घंिे के जलए एमसीआर पर जनरंतर संचालन। (iii) सीईए (जिद्युत संयंत्रों और जिद्युत लाइनों के जनमावण के जलए तकनीकी मानक) जिजनयमों के अनुसार िाल्ि को परू ी तरह स े खलु ा रखकर ओिरलोड िमता का प्रििवन करें और उस स्ट्तर पर कम स े कम पांच (5) जमनि तक जनरंतर सचं ालन करें। (iv) एमसीआर स े एमसीआर के पचपन (55) प्रजतित तक रैंप-डाउन, प्रजत जमनि एमसीआर के कम स े कम एक (1) प्रजतित की रैंप िर पर, एक या िो चरणों म ें (िो चरणों के बीच 30 जमनि की जस्ट्थरीकरण अिजध के साथ)। (v) 55%, 60%, 75% और 100% लोड पर ± 0.1 Hz के स्ट्िेप पररितवन के साथ एक आिृजत्त परीिण जसग्नल इंिेटि करके प्राथजमक प्रजतदक्रया प्राि की गई। (vi) ओईएम द्वारा प्रिान दकए गए िनरेिर िमता िक्र के अनुसार ररएजटिि पािर िमता, जिसम ें ओिर- एटसाइिेिन और अडं र-एटसाइिेिन जलजमिर सेटिंग्स और प्रचजलत जिड जस्ट्थजत को ध्यान म ें रखा गया ह।ै (5) िल जिद्युत उत्पािन स्ट्िेिनों, जिनम ें पंप स्ट्िोरेि िल जिद्युत उत्पािन स्ट्िेिन भी िाजमल ह,ैं के जलए आिश्यक िस्ट्तािेि और परीिण: (a) अनुरोधकता व इस अनुसूची के परै ा 31 के खंड (2) के अनुसार सीईए (जिड स े कनेजटिजििी के जलए तकनीकी मानक) जिजनयमों के अनुपालन की पुजष्ट करने िाला प्रमाण पत्र प्रस्ट्तुत करेगा। (a) अनुरोधकताव को िरबाइन जििषे ता िक्र के जलए OEM िस्ट्तािेज प्रस्ट्तुत करने होंगे जिनम ें पररचालन ित्रे और जनजषद्ध ित्रे ििावए गए हों। उत्पािन इकाई की पररचालन लचीलता प्रिर्िवत करने के जलए, इस े जनजषद्ध ित्रे के नीच ेऔर ऊपर िोनों िगह संचाजलत दकया िाना चाजहए। (b) पानी की उपलब्धता और िबाि को ध्यान म ें रखते हुए जनम्नजलजखत परीिण दकए िाएगं े: (i) पररचालन ित्रे के भीतर जिजभन्न भारों के जलए ± 0.1 हर्ट्ज व के चरण पररितवन के साथ आिजृ त्त परीिण संकेत इंिेटि करके प्राथजमक प्रजतदक्रया प्राि की गई। (ii) ओिर-एटसाइिेिन और अंडर-एटसाइिेिन जलजमिर सेटिंग्स को ध्यान म ें रखत े हुए िनरेिर िमता िक्र के अनुसार ररएजटिि पािर िमता। (iii) िहां भी संभि हो, ब्लैक स्ट्िािव िमता उपलब्ध कराई िाए। (iv) िहा ं भी जडिाइन दकया गया हो, ससंक्रोनस कंडेंसर मोड म ेंसंचालन। (5) गैस िरबाइन आधाररत उत्पािन स्ट्िेिनों के जलए आिश्यक िस्ट्तािेि और परीिण: a) अनुरोधकता व इस अनुसूची के परै ा 31 के खंड (1) के अनुसार सीईए (जिड स े कनेजटिजििी के जलए तकनीकी मानक) जिजनयमों के अनुपालन की पुजष्ट करने िाला प्रमाण पत्र प्रस्ट्तुत करेगा। b) अनुरोधकता व को (i) िंडी, गम व और बहुत गम व जस्ट्थजतयों म ें इकाई के प्रारंभ समय (ii) जडजाइन रैंप िर के जलए ओईएम िस्ट्तािेज प्रस्ट्तुत करन ेहोंगे। c) जनम्नजलजखत परीिण दकए िाएगं े:56 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (i) पररचालन ित्रे के भीतर जिजभन्न भारों के जलए ± 0.1 हर्ट्ज व के चरण पररितवन के साथ आिजृ त्त परीिण संकेत इंिेटि करके प्राथजमक प्रजतदक्रया प्राि की गई। (ii) ओिर-एटसाइिेिन और अंडर-एटसाइिेिन जलजमिर सेटिंग्स को ध्यान म ें रखत े हुए िनरेिर िमता िक्र के अनुसार ररएजटिि पािर िमता। (iii) िहां भी संभि हो, 100 मगे ािाि िमता तक की ब्लैक स्ट्िािव िमता। (iv) िहां भी जडिाइन दकया गया हो, ससंक्रोनस कंडेंसर मोड म ेंसंचालन। (6) पिन और सौर ऊिाव संसाधनों पर आधाररत ऊिाव उत्पािन स्ट्िेिनों के जलए आिश्यक िस्ट्ताििे और परीिण: (क) अनरु ोधकताव इस अनुसूची के परै ा 31 के खंड (4) के अनुसार सीईए (जिड स े कनेजटिजििी के जलए तकनीकी मानक) जिजनयमों के अनुपालन की पुजष्ट करन े िाला प्रमाण पत्र प्रस्ट्ततु करेगा। (ख) सीईए (जिड स े कनेजटिजििी के जलए तकनीकी मानक) जिजनयमों के अनुसार जनर्िवष्ट जतजथ के बाि चाल ू की गई इकाइयों के जलए फॉल्ि राइड थ्र ू िेस्ट्ि (एलिीआरिी और एचिीआरिी) के जलए िाइप िेस्ट्ि ररपोिव प्रस्ट्तुत की िाएगी, जिसम ें एलिीआरिी और एचिीआरिी िमता अजनिायव ह।ै (ग) PoI पर जनम्नजलजखत परीिण दकए िाएगं े: (i) सीईए (जिड स े कनेजटिजििी के जलए तकनीकी मानक) जिजनयमों के अनुसार मिीनों की आिृजत्त प्रजतदक्रया। (ii) उपलब्ध जिदकरण तीव्रता या पिन ऊिाव के आधार पर OEM रेटिंग के अनुसार ररएजटिि पािर िमता: बिते दक यदि सीओडी स े पहल े परीिण करना संभि न हो, तो अनुरोधकताव जनर्िष्टव परीिणों के जलए ऑफ़लाइन जसमुलिे न अध्ययन प्रस्ट्तुत कर सकता ह,ै बित े दक परीिण सीओडी प्राि होने की जतजथ स े एक िषव की अिजध के भीतर दकए िाएं। (7) ऊिाव भंडारण प्रणाजलयों के जलए आिश्यक िस्ट्तािेि और परीिण: (क) ईएसएस इस अनुसूची के पैरा 31 के खंड (4) के अनुसार सीईए (जिड स े कनेजटिजििी के जलए तकनीकी मानक) जिजनयमों के अनुपालन की पुजष्ट करने िाला प्रमाण पत्र प्रस्ट्तुत करेगा। (ख) PoI पर जनम्नजलजखत परीिण दकए िाएगं े: (i) जिद्युत उत्पािन िमता मगे ािाि म ेंऔर ऊिाव उत्पािन िमता मेगािाि-घंिे में। (ii) ईएसएस की आिृजत्त प्रजतदक्रया। (iii) जडिाइन के अनुसार रैंसपगं िमता। (8) एचिीडीसी रांसजमिन जसस्ट्िम के जलए आिश्यक िस्ट्तािेि और परीिण: (a) अनुरोधकता व इस अनुसूची के परै ा 31 के खडं (3) के अनुसार सीईए (जिड स े कनेजटिजििी के जलए तकनीकी मानक) जिजनयमों के अनुपालन की पुजष्ट करने िाला प्रमाण पत्र प्रस्ट्तुत करेगा। (b) रांसजमिन लाइसेंसधारी को तकनीकी जििरण प्रस्ट्तुत करन े होंगे, जिनम ें पररचालन दििाजनिेि िाजमल होंगे िैस े दक जिजभन्न पररचालन भारों पर दफ़ल्िर बैंक की आिश्यकताए ं और मोनोपोलर/या बाइपोलर कॉजन्फ़गरेिन, ररएजटिि पािर कंरोलर, रन-बैक जििेषताए,ं फ़्रीक्वेंसी कंरोलर, कम िोल्िेि संचालन मोड, सर्कवि जडजाइन पैरामीिर और पािर ऑजसलिे न डैसम्पगं , िैसा लागू हो।[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 57 (c) जनम्नजलजखत परीिण दकए िाएगं े: (i) न्यूनतम भार पर संचालन। (ii) रैंप िर। (iii) जिड की जस्ट्थजत के आधार पर ओिरलोड िमता। (iv) िहां भी संभि हो, िोल्िेि सोसव कन्ििवर (VSC) एचिीडीसी के मामल े म ेंब्लैक स्ट्िािव िमता। (v) गत्यात्मक ररएजटिि पािर समथनव (िीएससी आधाररत एचिीडीसी के मामल े म)ें (9) बल्क कंज्यूमर के जलए आिश्यक िस्ट्तािेि और परीिण (इन जिजनयमों में जनर्िवष्ट परीिणों की प्रयोज्यता के अनुसार): (a) अनुरोधकता व इस अनुसूची के परै ा 31 के खंड (5) के अनुसार सीईए (जिड स े कनेजटिजििी के जलए तकनीकी मानक) जिजनयमों के अनुपालन की पुजष्ट करने िाला प्रमाण पत्र प्रस्ट्तुत करेगा। (b) सीईए (जिड से कनेजटिजििी के जलए तकनीकी मानक) जिजनयमों के अनुसार, जनर्िष्टव जतजथ के बाि चालू की गई इकाइयों के जलए फॉल्ि राइड थ्र ू िेस्ट्ि (एलिीआरिी और एचिीआरिी) के जलए िाइप िेस्ट्ि ररपोिव प्रस्ट्तुत की िाएगी, जिसमें एलिीआरिी और एचिीआरिी िमता अजनिाय व ह।ै (c) जनम्नजलजखत परीिण PoI पर दकए िाएंगे: (i) उपलब्ध जिदकरण तीव्रता या पिन ऊिाव के आधार पर, OEM रेटिंग के अनुसार ररएजटिि पािर िमता: बिते दक यदि सीओडी स े पहल े परीिण करना संभि न हो, तो अनरु ोधकता व जनर्िवष्ट परीिणों के जलए ऑफ़लाइन जसमुलिे न अध्ययन प्रस्ट्तुत कर सकता ह,ै बित े दक परीिण सीओडी प्राि होन े की जतजथ स े एक िषव की अिजध के भीतर दकए िाएं। (10) FACTS के जलए आिश्यक िस्ट्तािेज और परीिण a. रांसजमिन लाइसेंसधारी को तकनीकी जििरण प्रस्ट्तुत करन े होंगे, जिनमें ससंगल लाइन डायिाम, V/I जििेषताए,ाँ कपसलगं रांसफामवर की रेटिंग, प्रत्येक VSC, MSR और MSC िाखा की रेटिंग, जिजभन्न ऑपरेटिंग मोड, IEEE मानक मॉडल, पािर ऑजसलेिन डैसम्पगं (POD) सिम और ट्यून दकया हुआ (यदि नहीं, तो इसके कारण) और POD के प्रििवन को मान्य करने के जलए ऑफ़लाइन जसमुलिे न-आधाररत अध्ययन के पररणाम िाजमल होंगे। b) एफएसीिीएस की पूणव ररएजटिि पािर िमता को िोनों दििाओं म,ें अथावत् अििोषण और इंिेटिन मोड म,ें सत्याजपत करने के जलए जनम्नजलजखत परीिण दकए िाएगं े: (i) पीओडी प्रििवन परीिण। (ii) गत्यात्मक प्रििवन परीिण: बिते दक यदि सीओडी स े पहल े परीिणों का संचालन संभि न हो, तो रांसजमिन लाइसेंसधारी जनर्िष्टव परीिणों के जलए ऑफ़लाइन जसमुलेिन अध्ययन प्रस्ट्तुत कर सकता ह,ै बित े दक परीिण सीओडी प्राि करने की जतजथ स े एक िषव की अिजध के भीतर दकए िाएं। 30. सफल परीिण संचालन का प्रमाण पत्र58 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (1) यदि दकसी लाभाथी द्वारा परीिण के समापन के िो (2) दिनों के भीतर संबंजधत आरएलडीसी को जलजखत रूप म,ें सभी संबंजधतों को एक प्रजत के साथ, परीिण के संबंध म ें कोई आपजत्त उिाई िाती ह,ै तो संबंजधत आरएलडीसी, ऐसी आपजत्त प्राि होन े के पांच (5) दिनों के भीतर, संबंजधत संस्ट्था और लाभार्थवयों के साथ समन्िय म,ें यह जनणवय लेगा दक परीिण सफल रहा या परीिण को िोहरान े की आिश्यकता ह।ै (2) सफल परीिण रन परू ा होने और इन जिजनयमों की अनुसूची II के अनुसार िस्ट्तािेज और परीिण ररपोिव प्राि होने के बाि, संबंजधत आरएलडीसी संबंजधत उत्पािन स्ट्िेिन, ईएसएस या पारेषण लाइसेंसधारी को, िैसा भी मामला हो, इस आिय का प्रमाण पत्र िारी करेगा, जिसकी एक प्रजत उनके संबंजधत लाभाथी(यों) और संबंजधत आरपीसी को तीन दिनों के भीतर भेिी िाएगी। 31. अनुरोधकता व द्वारा घोषणा (1) तापीय ऊिाव उत्पािन स्ट्िेिन (a) अनुरोधकता व यह प्रमाजणत करेगा दक: (i) उत्पािन स्ट्िेिन या उसकी इकाई, लागू होने के अनुसार, सीईए जिजनयमों की प्रासंजगक आिश्यकताओं और प्रािधानों को परू ा करती ह।ै (ii) मुख्य संयंत्र उपकरण और सहायक प्रणाजलयााँ, जिनम ें ईंधन तले प्रणाली, कोयला प्रबंधन सयं ंत्र, डीएम संयंत्र, पूिव-उपचार संयंत्र, अजग्निमन प्रणाली, राख जनपिान प्रणाली और कोई अन्य साइि-जिजिष्ट प्रणाली िाजमल ह,ैं चालू कर िी गई ह ैं और उत्पािन स्ट्िेिन की इकाइयों के पणू व भार संचालन म ें जनरंतर रूप स े सिम ह।ैं (iii) आपातकालीन आपूर्त व सजहत स्ट्थायी जिद्युत आपूर्तव प्रणाली और इकाई के पणू व लोड संचालन के जलए सभी आिश्यक उपकरण, जनयंत्रण और सुरिा प्रणाली तथा ऑिो लूप को सेिा म ेंडाल दिया गया ह।ै (b) इस खंड के उपखंड (क) के तहत आिश्यक प्रमाण पत्र आिेिक के सीएमडी या सीईओ या एमडी के पि स े नीच े के अजधकृत हस्ट्तािरकता व द्वारा हस्ट्तािररत होने चाजहए और सीओडी की घोषणा स े पहले संबंजधत आरएलडीसी और संबंजधत आरपीसी के सिस्ट्य सजचि को प्रस्ट्ततु दकए िान े चाजहए। (2) िल जिद्युत उत्पािन स्ट्िेिन (a) अनुरोधकता व यह प्रमाजणत करेगा दक: (i) उत्पािन स्ट्िेिन या उसकी इकाई, लाग ू होन े के अनुसार, सीईए जिजनयमन (जिजनयमों) की आिश्यकता और संबंजधत प्रािधानों को पूरा करती ह।ै (ii) मुख्य संयंत्र उपकरण और सहायक प्रणाजलयााँ, जिनम ें िल जनकासी प्रणाली, प्राथजमक और जद्वतीयक िीतलन प्रणाली, एलपी और एचपी एयर कंप्रेसर और अजग्निमन प्रणाली िाजमल ह,ैं चाल ू कर िी गई ह ैं और इकाइयों के पणू व भार संचालन म ें जनरंतर रूप स े सिम ह।ैं (iii) स्ट्थायी जिद्युत आपूर्त व प्रणाजलयों को, जिनम ें आपातकालीन आपूर्तव और सभी आिश्यक उपकरण जनयंत्रण और सरु िा प्रणाजलयााँ तथा इकाई के पूणव भार संचालन के जलए स्ट्िचाजलत लपू िाजमल ह,ैं सेिा में लगा दिया गया ह।ै (b) इस खंड के उपखडं (क) के तहत आिश्यक प्रमाण पत्र आिेिक के सीएमडी या सीईओ या एमडी के पि से नीच े के अजधकृत हस्ट्तािरकताव द्वारा हस्ट्तािररत होन े चाजहए और सीओडी की घोषणा स े पहल े संबंजधत आरएलडीसी और संबंजधत आरपीसी के सिस्ट्य सजचि को प्रस्ट्ततु दकए िान े चाजहए। (3) प्रसारण प्रणाली अनुरोधकताव को संबंजधत आरएलडीसी और संबंजधत आरपीसी के सिस्ट्य सजचि को कंपनी के सीएमडी या सीईओ या एमडी स े कम रैंक के अजधकृत हस्ट्तािरकताव द्वारा हस्ट्तािररत एक प्रमाण पत्र प्रस्ट्तुत करना होगा,[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 59 जिसम ें यह प्रमाजणत हो दक पारेषण लाइन, उप-स्ट्िेिन और संचार प्रणाली लाग ू सीईए जिजनयमन(नों) के अनुरूप ह ैंऔर अपनी पूरी िमता स े संचालन करन े म ेंसिम ह।ैं (4) पिन, सौर, भडं ारण और हाइजिड िनरेटिंग स्ट्िेिन पिन और सौर संसाधनों पर आधाररत जिद्युत् उत्पािन स्ट्िेिन, ईएसएस और हाइजिड जिद्युत् उत्पािन स्ट्िेिन को सीओडी की घोषणा स े पहले सबं ंजधत आरएलडीसी और संबंजधत आरपीसी के सिस्ट्य सजचि को सीएमडी या सीईओ या एमडी स े कम रैंक के अजधकृत हस्ट्तािरकता व द्वारा हस्ट्तािररत एक प्रमाण पत्र प्रस्ट्तुत करना होगा, जिसम ें यह प्रमाजणत हो दक उि जिद्युत् उत्पािन स्ट्िेिन या ईएसएस, जिसम ें पिन िरबाइन या सौर इनििवर या सहायक प्रणाजलयााँ िैसे मुख्य संयंत्र उपकरण िाजमल ह,ैं सीईए जिजनयमन (जनयमों) के सभी प्रासंजगक प्रािधानों का अनुपालन करता ह।ै (5) बल्क कंज्यूमर बल्क कंज्यूमर फैजसजलिी को सीओडी की घोषणा स े पहल े संबंजधत आरएलडीसी और सबं ंजधत आरपीसी के सिस्ट्य सजचि को सीएमडी या सीईओ या एमडी स े कम रैंक के अजधकृत हस्ट्तािरकता व द्वारा हस्ट्तािररत एक प्रमाण पत्र प्रस्ट्ततु करना होगा, जिसम ें यह प्रमाजणत हो दक उि बल्क कंज्यूमर फैजसजलिी, जिसम ें मुख्य बल्क कंज्यूमर उपकरण िाजमल ह,ैं न े सीईए जिजनयमन (जनयमों) के सभी प्रासंजगक प्रािधानों का अनुपालन दकया ह।ै 32. िाजणजज्यक संचालन की घोषणा (डीओसीओ) और िाजणजज्यक संचालन जतजथ (सीओडी) (1) एक िनरेटिंग स्ट्िेिन या उसकी इकाई, या एक पारेषण प्रणाली या उसका कोई तत्ि, या ईएसएस, जनम्नजलजखत तरीके स े िाजणजज्यक संचालन की घोषणा कर सकता ह ै और सीईए, संबंजधत आरएलडीसी, सबं ंजधत आरपीसी और उसके लाभार्थवयों को सूजचत कर सकता ह:ै (a) तापीय ऊिाव उत्पािन स्ट्िेिन या उसकी कोई इकाई (i) थमवल िनरेिन स्ट्िेिन की दकसी इकाई के मामल े म ें िाजणजज्यक संचालन की जतजथ, अनुरोधकताव द्वारा एमसीआर या डी-रेिेड िमता पर सफल परीिण चलान े और घोषणा प्रस्ट्तुत करन े के बाि घोजषत जतजथ होगी। (ii) जिद्युत् उत्पािन केंद्र के मामल ेम,ें केंद्र की अंजतम इकाई का सीओडी ही केंद्र का सीओडी माना िाएगा। (b) िल जिद्युत उत्पािन स्ट्िेिन (i) िल जिद्युत उत्पािन स्ट्िेिन की दकसी इकाई, जिसम ें पंपयुि भंडारण िल जिद्युत उत्पािन स्ट्िेिन भी िाजमल ह,ै के िाजणजज्यक संचालन की जतजथ िह जतजथ होगी िो उत्पािन स्ट्िेिन द्वारा एमसीआर या डी- रेिेड िमता पर सफल परीिण संचालन के बाि और घोषणा प्रस्ट्तुत करन े के बाि घोजषत की िाएगी। (ii) जिद्युत् उत्पािन केंद्र के मामल ेम,ें केंद्र की अंजतम इकाई का सीओडी ही केंद्र का सीओडी माना िाएगा। (c) प्रसारण प्रणाली (i) अंतर-राज्यीय पारेषण प्रणाली या उसके दकसी घिक के मामले म ें िाजणजज्यक संचालन जतजथ िह जतजथ होगी िो पारेषण लाइसेंसधारी द्वारा घोजषत की िाती ह,ै जिस दिन जिद्युत और संचार संकेतों को प्रषे क छोर स े प्रािकताव छोर तक प्रसाररत करने के सफल परीिण सचं ालन के बाि और घोषणा प्रस्ट्तुत करने के बाि, पारेषण प्रणाली या उसका कोई घिक 0000 बि े जनयजमत सेिा म ें होता ह।ै बिते दक संबद्ध संचरण प्रणाली (एिीएस) के दकसी संचरण तत्ि के िाजणजज्यक संचालन की जतजथ की घोषणा उि एिीएस के अंजतम तत्ि के सफल परीिण के बाि ही की िाएगी:60 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] इसके अलािा, यदि एिीएस के केिल कुछ रांसजमिन तत्िों का ही सफल परीिण चल चुका ह ै और कनेजटिजििी अनुिान प्रािकताव ऐस े तत्िों के िाजणजज्यक संचालन की मांग करता ह ै और उपयिु रांसजमिन यूरिजलिी द्वारा इस पर सहमजत िी िाती ह,ै तो एिीएस के ऐस े रांसजमिन तत्िों के िाजणजज्यक संचालन की जतजथ इस जिजनयम के अनुसार अनुरोधकताव द्वारा घोजषत की िा सकती ह।ै इसके अलािा, यदि एिीएस के केिल कुछ रांसजमिन तत्िों का ही सफल परीिण संचालन हुआ ह ै और संबंजधत िेत्रीय जिद्युत सजमजत द्वारा जिड के प्रििनव , सरु िा और संरिा म ें सुधार के जलए ऐसे रांसजमिन तत्िों के संचालन को प्रमाजणत दकया गया ह,ै तो रांसजमिन लाइसेंसधारी द्वारा इस जिजनयम के अनुसार एिीएस के ऐस े रांसजमिन तत्िों की िाजणजज्यक संचालन जतजथ घोजषत की िा सकती ह।ै इसके अलािा, यदि जिजनयजमत िैररफ तंत्र के तहत जनरपादित कोई पारेषण प्रणाली या उसका कोई तत्ि जनधावररत सीओडी (संचार संचालन जतजथ) को या उसके बाि जनयजमत सेिा स े िंजचत हो िाता ह,ै और इसका कारण पारेषण लाइसेंसधारी या उसके आपूर्तवकताव या उसके िेकेिारों के कारण नहीं ह,ै बजल्क संबंजधत उत्पािन स्ट्िेिन के चालू होने म ें िेरी या दकसी अन्य पारेषण लाइसेंसधारी की अपस्ट्रीम या डाउनस्ट्रीम पारेषण प्रणाली के चालू होने म ें िेरी के कारण ह,ै तो पारेषण लाइसेंसधारी को उजचत पारेषण उपयोजगता स े इस आिय का प्रमाण पत्र सजहत एक उपयुि याजचका के माध्यम स े आयोग स े संपकव करना होगा दक पारेषण प्रणाली लागू सीईए (जिजनयमों) के अनुसार पूण व ह,ै तादक ऐसी पारेषण प्रणाली या उसके दकसी तत्ि की िाजणजज्यक संचालन जतजथ की स्ट्िीकृजत प्राि हो सके। इसके अलािा, िैररफ आधाररत प्रजतस्ट्पधी बोली के माध्यम स े जनरपादित अतं र-राज्यीय पारेषण प्रणाली के मामल े म,ें पारेषण लाइसेंसधारी, पारेषण सेिा समझौत े के प्रािधानों के अनुसार, (क) उपयुि पारेषण उपयोजगता स े इस आिय का प्रमाण पत्र प्राि करने के बाि दक पारेषण प्रणाली बोली दििाजनिेिों और लागू सीईए जिजनयमन (जिजनयमों) के जिजनिेिों के अनुसार पणू व ह,ै और (ख) संबंजधत आरएलडीसी स े नो लोड चार्ििंग प्रमाण पत्र प्राि करन े के बाि, िहां नो लोड चार्ििंग संभि ह,ै आईिीएस की डीम्ड सीओडी घोजषत कर सकता ह।ै (ii) िैररफ आधाररत प्रजतस्ट्पधी बोली के तहत पारेषण प्रणाली के दकसी पारेषण तत्ि का सीओडी (पररिहन जतजथ जनधावरण) तभी घोजषत दकया िाएगा िब पारेषण सेिा समझौते के अनुसार सभी पूि-व आिश्यक पारेषण तत्िों का सीओडी घोजषत कर दिया गया हो। बिते दक यदि जिद्युत प्रणाली के जहत म ें दकसी पारेषण तत्ि की आिश्यकता हो, िैसा दक संबंजधत आरपीसी (आरपीसी) द्वारा प्रमाजणत दकया गया हो, तो उि पारेषण तत्ि के सीओडी की घोषणा उसके पूिव-आिश्यक पारेषण तत्िों के सीओडी की घोषणा स ेपहल े की िा सकती ह।ै (d) संचार प्रणाली दकसी संचार प्रणाली या उसके दकसी घिक के संबंध म ें िाजणजज्यक संचालन की जतजथ का अथ व अनुरोधकताव द्वारा घोजषत िह जतजथ होगी िो 0000 बि े स े िुरू होगी और जिसके बाि संबंजधत िेत्रीय लोड जडस्ट्पैच सेंिर द्वारा प्रमाजणत संबंजधत जनयंत्रण केंद्रों को ध्िजन और डेिा के हस्ट्तांतरण सजहत साइि स्ट्िीकृजत परीिण परू ा होने के बाि संचार प्रणाली या उसके घिक को सेिा म ें लाया िाएगा। (e) पिन और सौर ऊिा व संसाधनों पर आधाररत जिद्युत ् उत्पािन स्ट्िेिन; ईएसएस और हाइजिड जिद्युत् उत्पािन स्ट्िेिन (i) निीकरणीय ऊिाव उत्पािन स्ट्िेिन की उन इकाइयों के मामल े म ें िाजणजज्यक संचालन जतजथ, जिनकी कुल िमता 50 मेगािाि या उससे अजधक ह ै या इन जिजनयमों की अनुसूची II म ें जनर्िष्टव दकसी अन्य सीमा तक ह,ै का अथव उत्पािन स्ट्िेिन द्वारा सफल परीिण संचालन, घोषणा प्रस्ट्ततु करने और पीपीए के अनुसार अन्य ितों (यदि कोई हो) की पर्ू तव के बाि घोजषत जतजथ होगी।[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 61 (ii) दकसी संपूणव ऊिा व उत्पािन स्ट्िेिन के मामल े म,ें स्ट्िेिन की अंजतम इकाई की िाजणजज्यक संचालन जतजथ को स्ट्िेिन की पररचालन जतजथ (सीओडी) माना िाएगा। (f) बल्क कंज्यूमर (i) बल्क कंज्यूमर फैजसजलिी के मामले म ें िाजणजज्यक संचालन जतजथ, जिसकी कुल िमता 50 मेगािाि या उससे अजधक ह ै या इन जिजनयमों की अनुसूची II म ें जनर्िवष्ट दकसी अन्य सीमा तक ह,ै का अथव उत्पािन स्ट्िेिन द्वारा सफल परीिण सचं ालन, घोषणा प्रस्ट्तुत करने और पीपीए के अनुसार अन्य ितों (यदि कोई हो) की पूर्त व के बाि घोजषत जतजथ होगी। (ii) दकसी बल्क कंज्यूमर फैजसजलिी के मामले म,ें बल्क कंज्यूमर फैजसजलिी की अंजतम इकाई की िाजणजज्यक संचालन जतजथ को बल्क कंज्यूमर फैजसजलिी की पररचालन जतजथ माना िाएगा। श्रिण कुमार, सजचि [जिज्ञापन-III/4/असा./254/2026-27] CENTRAL ELECTRICITY AUTHORITY NOTIFICATION New Delhi, the 31st July, 2026 No. 12/X/STD(CONN)/GM/CEA.—The following draft regulations, which the Central Electricity Authority proposes to make in exercise of the powers conferred by clause (e) of sub-section (2) of section 177 of the Electricity Act, 2003 (36 of 2003), and in supersession of the Central Electricity Authority (Technical Standards for Connectivity to the Grid) Regulations, 2007 and amendments thereof, except as respects things done or omitted to be done before such supersession, are hereby published, as required under sub-section (3) of section 177 of the said Act, for the information of all persons likely to be affected thereby; and notice is hereby given that the draft regulations shall be taken into consideration after the expiry of a period of thirty days from the date on which copies of this notification, as published in the Gazette of India, are made available to the public. The objections or suggestions which may be received from any person with respect to the said draft regulations before the expiry of the period specified above shall be considered by the Central Electricity Authority. The objections or suggestions, if any, on the said draft regulations may be sent to the Chief Engineer , Legal Division, Central Electricity Authority, 6th Floor, Sewa Bhawan, R.K. Puram, New Delhi – 110066, or through e-mail: celegal- cea@gov.in . Draft Regulations 1. Short title and commencement: -62 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (3) These Regulations may be called the Central Electricity Authority (Technical Standards for Connectivity to the Grid) Regulations, 2026. (4) These Regulations shall come into force on the date of their publication in the Official Gazette. 2. Definitions: - (3) In these regulations, unless the context otherwise requires: - (i) "Act" means the Electricity Act, 2003 (No. 36 of 2003); (ii) “Active Current Priority Mode” means a mode in which the active current output (Ip) is given priority and has the full current rating of the generating station available to it (i.e., maximum current ac, Imax), while the reactive current output (Iq) is constrained. (iii) "Appropriate Load Despatch Centre" means the National Load Despatch Centre (NLDC), Regional Load Despatch Centre (RLDC) or State Load Despatch Centre (SLDC) or Area Load Despatch Centre as the case may be; (iv) "Area Load Despatch Centre" means the centre as established by the state for load despatch and control in a particular area of the state; (v) "Appropriate Transmission Utility" means the Central Transmission Utility or State Transmission Utility as the case may be; (vi) “Asynchronous Generating Station” means a generating station comprising of asynchronous generating unit(s); (vii) “Asynchronous Generating Unit” means a Generating Unit, that is not a synchronous generating unit. (viii) "Automatic Generation Control (AGC)” means capability to regulate the power output of selectable Generating unit(s) in response to total power plant output, tie-line power flow, and power system frequency; (ix) "British Standards (BS)” means those standards and specifications approved by the British Standards Institution; (x) "Bulk consumer" means a consumer who avails supply at voltage of 33 kV or above; (xi) “Co-located generating station” means two or more generating stations, including energy storage systems, that are operated and controlled as separate facility and are connected behind a single PoI; (xii) “Collector system” means equipment and systems utilized in the aggregation of generating unit(s). This includes switch-gear, cables, transmission lines, transformers, and reactive compensating devices etc. between the generating unit(s) and the PoI; (xiii) "Earth Fault Factor" at a location in a three-phase system means the ratio of the highest root mean square (r.m.s.) phase-to-earth power frequency voltage on a sound phase during a fault to earth (affecting one or more phases)to the r.m.s. phase-to-earth power frequency voltage which would be obtained at the selected location without the fault; (xiv) "Energy Management System” (EMS) means a complete system comprising software for facilitating operation of a power system, maintaining safety, reliability and economy; (xv) “Event Logging Facilities" means a device provided to record the chronological sequence of operations of the relays and other equipment; (xvi) “Energy Storage System (ESS)” in relation to the electricity system, means a facility where electrical energy is converted into any form of energy which can be stored, and subsequently reconverted into electrical energy and injected back into the grid such as Battery Energy Storage System (BESS) and Pumped Storage Plant (PSP); (xvii) “Energy Storage System (ESS) Unit” means (a) an electrical generator coupled to a prime mover within a power station together with all plant and apparatus at the power station which relate exclusively to operation of that generator in case of Pumped Storage Plants (PSP); Or (b) battery module(s) connected under an inverter along with other equipment in respect of Battery Energy Storage System (BESS); (xviii) “Facility” means a specific type of equipment or installation that plays a role in power generation, transmission, or distribution; (xix) “Fast Frequency Response” means active power injected to the grid in response to changes in measured or observed frequency during the arresting phase of a frequency excursion event to improve the frequency nadir or initial rate-of-change of frequency;[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 63 (xx) “First Time Energisation” means the initial energisation of a new or modified power-system element (for testing, commissioning and/or integration with the grid), carried out as per the procedure prepared by appropriate load despatch centre; (xxi) Flexible AC Transmission Systems (FACTS)” means alternating current transmission systems incorporating power electronic-based and other static controllers to enhance controllability and increase power transfer capability; (xxii) "Frequency" means the number of alternating cycles per second [expressed in Hertz (Hz); (xxiii) “Generating Unit” means (a) a unit of a generating station having electrical generator coupled to a prime mover within a power station together with all plant and apparatus at the power station which relate exclusively to operation of that generator; Or (b) an inverter along with associated photovoltaic modules and other equipment in respect of generating station based on solar photovoltaic technology; Or (c) a wind turbine generator with associated equipment, in respect of generating station based on wind energy; (xxiv) “Grid Forming (GFM)” means a control that maintains an internal voltage phasor that is constant or nearly constant in the sub-transient to transient time frame; (xxv) ‘HVDC system’ means an electrical power system which transfers energy in the form of high- voltage direct current between two or more alternating current (AC) buses; (xxvi) “HVDC Converter Station” is a part of an HVDC System which consists of one or more HVDC Converters installed in a single location together with buildings, reactors, filters, reactive power devices, control, monitoring, protective, measuring and auxiliary equipment; (xxvii) “Hybrid Generating Station” means a generating station comprising of a combination of synchronous and asynchronous generating unit(s), with or without energy storage systems, controlled and operated as a single generating station behind a single PoI; (xxviii) “IEC Standard" means a standard published by the International Electrotechnical Commission; (xxix) "Indian Standards" (IS) means standards specified by Bureau of Indian Standards; (xxx) “Installed capacity” (a) in case of coal, lignite, gas engines and hydro stations, means the summation of the name plate capacities of all the unit(s) of the generating station or Maximum Continuous Rating of the generating station; Or (b) in case of wind generating stations and generating stations using inverters, means the summation of the name plate capacities of wind turbines or solar generating unit(s), as the case may be; Or (c) in case of ESS means the rated Peak Capacity (MW) and energy capacity (MWh) to be delivered to the connected load; (xxxi) "Inverter" means a device that changes direct current power into alternating current power; (xxxii) “Inverter based resource (IBR)” means any source of electric power that is connected to the grid via power electronic interface, and consists of one or more IBR unit(s) capable of exporting active power from a primary energy source or energy storage system and a collector system or a supplemental device may also be part of an IBR; (xxxiii) IBR continuous rating (ICR): The steady-state, continuous active power rating of an IBR plant guaranteed by the IBR owner at the PoI; (xxxiv) “Inverter-based resource plant (IBR plant)” means a grouping of one or more IBR unit(s) and possibly supplemental device(s) operated by a common facility-level controller along with a collector system to achieve the performance requirements at the PoI; (xxxv) “Inverter based resource unit (IBR unit)” means an individual inverter device or a grouping of multiple inverters connected together behind a single PoI and for type III wind turbine generators,64 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] the wind turbine itself, the doubly-fed generator, the rotor-circuit inverter, and the three-winding unit transformer, if present, make up an IBR unit; (xxxvi) “Inverter-Interfaced Bulk Consumer” means a bulk consumer who receives power through electronic based converters for feeding the loads; (xxxvii) "Isolator” means a device for achieving isolation of one part of an electrical system from the rest of the system; (xxxviii) “Line – Commutated Converter (LCC)” based HVDC converter means a converter that relies on the line voltage of the ac system to which the converter is connected in order to affect the commutation from one switching device to its neighbor and it uses switching devices that are either uncontrolled (such as diodes) or that can only be turned on (not off) by control action, such as thyristors; (xxxix) “Operating mode” means mode of IBR or IBR plant operation that determines the performance during normal or abnormal conditions; (xl) “Overshoot” means the maximum system output minus the final steady state value, divided by the actual change in system output (i.e., from its initial value to the final settled value), when the final settled value is within the defined settling band, expressed as a percentage of final steady state value; (xli) " Point of Interconnection (PoI)" means a point on the grid, including a sub-station or a switchyard, where the interconnection is established between the facility of the requester /user and the grid and where electricity injected into or drawn from the grid can be measured unambiguously for the requester/user; (xlii) ''Power Factor" means the cosine of the electrical angle between the voltage and current complex in an AC electrical circuit; (xliii) "Primary energy source” means energy sources like solar irradiance in the case of a photovoltaic IBR, instantaneous wind energy (determined by wind speed at a given moment) in case of a wind turbine generator, stored chemical energy in case of a Battery Energy Storage System (BESS), and stored potential energy in case of Pumped Storage Plants (PSP); (xliv) “Primary frequency response (PFR)” means the immediate and automatic adjustment of power generation based on droop characteristics to stabilize the frequency deviations; (xlv) "Protection System" means the equipment by which abnormal conditions in the grid are detected and fault clearance, actuating signals or indications are initiated without the intervention by the operator; (xlvi) “Reactive Current Priority Mode” means a mode in which the reactive current output (Iq) is given priority and has the full current rating of the generating station available to it (i.e, maximum current ac, Imax), while the active current output (Ip) is constrained; (xlvii) “Reaction time (Treact)” means the duration from a step change in a system quantity measured at a defined location until the output of the system at the same defined location measurably changes in the direction of the control effort; (xlviii) "Reactive Power" means in relation to an AC electrical system, the product of root mean square (r.m.s.) voltage, root mean square (r.m.s.) current and the sine of the electrical phase angle between the voltage phasor and current phasor, as measured in volt-amperes reactive (VAr); (xlix) “Requester” includes a generating company, captive generating plant, energy storage system, transmission licensee (other than Central Transmission Utility and State Transmission Utility), distribution licensee, or bulk consumer seeking connection to the grid for its new or expanded electrical plant or Substation or Transmission line or any power system element at voltage level of 33 kV and above; (l) “Ride-through” means ability to withstand voltage or frequency disturbances within the specified limits and to continue operating as specified; (li) “Rise time (Trise)” means the time for the output of a system to go from 10% to 90% of required output change; (lii) "SCADA" means Supervisory Control and Data Acquisition System that acquires data from remote locations over communication links and processes it at centralised control location for monitoring, supervision, control as well as decision support; (liii) “Settling band” means the region around the value change where the system output is required to settle in after a step change in a system quantity measured at a defined location; (liv) “Settling time” means the duration from a step change in a system quantity measured at a defined location until the output of the system settles to within a specified settling band around its final value change at the same defined location;[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 65 (lv) "Site Common Drawing" means a drawing prepared for a connection site, which depicts layout of connection site, electrical layout, common protection and control drawings and common services; (lvi) "Site Responsibility Schedule" (SRS) means a Schedule for demarcating the ownership, responsibility for control, operation and maintenance of the equipment at the PoI; (lvii) “Step response” means the output of a system as a function of time when the input is a step function of time also; (lviii) “Step response time” means the time between the step change in a system quantity measured at a defined location and when the output of the system reaches 90% of required output change, before any overshoot; (lix) “Supplemental device: means any equipment within a facility, that is only used to obtain compliance with some or all of the technical requirements specified in these regulations; (lx) “Synchronous Generating Station” means a generating station comprising of synchronous generating unit(s); (lxi) “Synchronous Generating Unit” means a generating unit which can generate electrical energy such that the frequency of the generated voltage, the generator speed and the network voltage are in a constant ratio and thus in synchronism; (lxii) “Synchronous Condenser Unit” means a unit similar in construction to a Synchronous Generating Unit which operates at the equivalent speed of the frequency of the power system to dynamically generate or absorb reactive power to regulate voltage, improve the power factor, and provide essential mechanical inertia, and, when operating in steady state conditions, neither generates nor consumes active power other than consumption for losses within the unit; (lxiii) "Total Harmonic Distortion" (THD) means a measure of distortion of the voltage or current wave form (which shall ideally be sinusoidal) and is the square root of the sum of squares of all voltage or current harmonics expressed as a percentage of the magnitude of the fundamental; (lxiv) "Transmission System" means a network of transmission lines and sub-stations; (lxv) “Type test” means a test of one or more devices manufactured to a certain design to demonstrate, or provide information that can be used to verify, that the design meets the requirements specified in this standard; (lxvi) “Under Frequency Relay” means a relay which operates when the system frequency falls below a preset value; (lxvii) “user” includes a generating company, captive generating plant, energy storage system, transmission licensee (other than the Central Transmission Utility and State Transmission Utility), distribution licensee, or bulk consumer whose electrical plant or Substation or Transmission line or any power system element is connected to the Grid at voltage level of 33 kV and above; (lxviii) “Voltage Source Converters (VSC)” means a converter that has a forced commutated device (for example, IGBT) based self-commutated converter that is capable of generating ac voltage from dc capacitor voltages; (lxix) "Voltage Unbalance" means the deviation between highest and lowest line voltage divided by Average Line Voltage of the three phases; (lxx) “Wind turbine generator (WTG)” means an IBR unit which converts the kinetic wind energy into electric energy; (2) Any other words, terms, definitions and symbols which are used herein and not defined in these regulations shall have the same meanings respectively as assigned in the Act or any other regulation published by the Authority. 3. Applicability of the Regulations:- These regulations shall be applicable to all the users, requesters, Central Transmission Utility, appropriate Load Despatch Centre and State Transmission Utility. CHAPTER – I GENERAL CONNECTIVITY REQUIREMENTS66 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] 4. The requester/user shall be responsible for the planning, design, construction, reliability, protection and safe operation of its own equipment subject to the regulations for construction, operation and maintenance, connectivity, and other statutory provisions. 5. The new connection shall not cause any adverse effect on the grid. The grid shall continue to perform with specified reliability, security and quality as per the Central Electricity Authority (Grid Standards) Regulations in force. However, these regulations are not to be relied upon to protect the plant and equipment of the requester/ user. 6. A requester is required to be aware, in advance, of the standards and conditions his system has to meet for being integrated into the grid. 7. The requester/user shall participate in contingency operations such as load shedding, increasing or reducing generation, islanding, black start, providing start-up power and restoration as per the procedure decided by the Appropriate Load Despatch Centre. 8. The requester/ user shall carryout modifications in his equipment with respect to short circuit level, protection coordination and other technical reasons considered necessary due to operational requirements. 9. Site Responsibility Schedule: (1) A Site Responsibility Schedule (SRS) for every connection point shall be filled by the requester/user operating the facility at which connection is taking place. (2) The appropriate transmission utility or distribution licensee shall publish the proforma for Site Responsibility Schedule (SRS) to be filled by the requester/user. (3) Following information shall be included in the Site Responsibility Schedule, namely, — (i) Schedule of electrical apparatus services and supplies; (ii) Schedule of telecommunications and measurement apparatus; and (iii) Safety rules applicable to each plant and apparatus. (4) Following information shall also be furnished in the Site Responsibility Schedule for each item of equipment installed at the connection site, namely: — (i) the ownership of equipment; (ii) the responsibility for control of equipment; (iii) the responsibility for maintenance of equipment; (iv) the responsibility for operation of equipment; (v) the manager of the site; (vi) the responsibility for all matters relating to safety of persons at site; and (vii) the responsibility for all matters relating to safety of equipment at site. 10. Access at Connection Site: The requester or user, as the case may be owning the electrical plant shall provide reasonable access and other required facilities to the licensee or Appropriate Transmission Utility or Appropriate Load Despatch Centre, whose equipment is installed or proposed to be installed at the Connection Site for installation, operation and maintenance, etc. of the equipment. 11. Site Common Drawings: Site Common Drawings shall be prepared for each connection point by the owner of the Sub-station where connection is taking place. 12. Cyber security: (1) The requester/user shall comply with cyber security guidelines, regulations and the technical standards for communication system in power sector laid down by the Authority. (2) The requester/user shall also comply with cyber security guidelines/orders issued by the Central Government, CERT-In, NSCS, NCIIPC from time to time. 13. The requester/user shall prepare single line schematic diagrams in respect of its facility and make the same available to the Appropriate Load Despatch Centre, Appropriate Transmission Utility or licensee through which his system is connected. 14. The requester/user shall follow the industry best practices and applicable industry standards in respect of the equipment installation and its operation and maintenance. 15. The equipment including overhead lines and cables shall comply with the relevant Indian Standards and in absence of Indian Standard, International Electrotechnical Commission Standard, Institute of Electrical and Electronic Engineers Standard, European Norms Standard in the sequence of their appearance unless stated otherwise:[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 67 Provided that whenever an International Electrotechnical Commission Standard, Institute of Electrical and Electronic Engineers Standard, European Norms Standard is followed, necessary corrections or modifications shall be made for nominal system frequency, nominal system voltage, ambient temperature, humidity and other conditions prevailing in India before actual adoption of the said Standard. 16. The equipment shall meet the requirements in accordance with the provisions specified in these regulations and other technical regulations published by the Authority. 17. The effects of wind, storms, floods, lightening, elevation, temperature extremes, icing, contamination, pollution and earthquakes must be considered in the design and operation of the connected facilities for compliance of the provisions specified in these regulations. 18. All the provisions contained in these regulations shall be complied and met by the facility at the PoI. 19. The name plate rating, at specified environmental conditions, of various equipment including transformers within the facility shall be used while assessing the compliance at PoI with the provisions specified in these regulations. 20. There shall be no collector system limitation, internal network limitation, control system limitation, protection system, environmental conditions or other limiting device in operation that would prevent the facility from meeting the technical requirements at PoI specified in these regulations. CHAPTER – II REQUIREMENTS FOR GENERATORS AND ESS Synchronous Generating Station Active Power Capability 21. The generating station shall be capable of providing the summation of Maximum Continuous Rating (MCR) capacity of generating unit(s) minus the declared auxiliary consumption at PoI. 22. Automatic facilities shall be provided in the generating station. Reactive Power Capability 23. The generating station shall be capable of supplying and absorbing dynamically varying reactive power compensation at the PoI commensurate to 61.97% (0.85 pf) of summation of MCR capacity of generating unit(s) in lagging (over-excited) condition to 32.87% (0.95 pf) of summation of MCR capacity of generating unit(s) in leading (under-excited) condition of generating station: Provided further that the above performance shall also be provided on a continuous basis with voltage variation of ±10% of nominal, frequency variation of (+) 4% and (-)5% and combined voltage and frequency variation of ±5%. However, for gas turbines, the above performance shall be provided on a continuous basis for voltage variation of ±5%. Voltage Disturbance Ride Through 24. The generating station shall be able to operate for Short Circuit Ratio as per IEC 60034. 25. The generating station shall operate continuously in the voltage range 0.9 p.u to 1.1 p.u at the PoI and be able to deliver the summation of MCR capacity of generating unit(s). 26. Voltage disturbances of any duration, for which the applicable voltage remains within the continuous operation region, shall not cause the generating station or unit(s) to trip. The generating station or unit(s) shall remain in operation during any such disturbance, and shall continue to deliver pre-disturbance level of active power or available active power, whichever is less. 27. All instantaneous under / over voltage protection used within the generating station shall use filtered quantities to reduce the possibility of mis-operation while providing protection to the desired equipment and system. Any instantaneous under /over voltage protection(s) that has the possibility of disrupting the power output of the entire generating station shall use at least one cycle (of fundamental frequency) measurement window to reduce such possibility and the related impact on the grid. Low Voltage Ride Through (LVRT)68 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] 28. The generating station connected to the grid, shall remain connected to the grid for the duration corresponding to the under voltage at the PoI on any or all phases (symmetrical or asymmetrical under voltage conditions) as depicted by the thick line in the curve in Fig. 1 Vt : Actual Voltage; Vn: Nominal Voltage— Fig 1. Low Voltage Ride Through requirements for Synchronous Generating station Note: The relevant voltage shall be the lowest magnitude fundamental frequency phasor component of the phase-to-phase or phase-to ground voltages, whichever is less, at the PoI relative to the corresponding nominal voltage. The response of the generating station shall be stable if the voltage is outside the continuous operation limits indicated in the Fig. 1. above: Provided that during the low voltage ride through conditions, Generating Station shall have the overload (current) capability as per IEC 60034. High Voltage Ride Through (HVRT) 29. The generating station connected to the grid, shall remain connected to the grid for the duration corresponding to the overvoltage at the PoI, on any or all phases (symmetrical or asymmetrical overvoltage conditions) as depicted by the thick line in the curve in Fig. 2[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 69 Fig. 2. High Voltage Ride through requirements for synchronous generating station Note: The relevant voltage shall be the greatest magnitude fundamental frequency phasor component of the phase-to-phase and phase-to ground voltages, whichever is high, at the PoI relative to the corresponding nominal voltage. The response of the generating station shall be stable if the voltage is outside the continuous operation limits indicated in the Fig. 2 above. Multiple Fault Ride Through (MFRT) 30. The generating station connected to the grid, shall remain connected to the grid for a series of up to 15 voltage disturbance below 0.9 p.u within any 5-minute period as per the LVRT capability: Provided that during such period generating station shall remain connected for at least 06 voltage disturbance below 0.5 p.u: Provided further that during the multiple LVRT conditions, the generating station shall meet the performance requirements specified in LVRT conditions. 31. While assessing multiple voltage disturbances, a fault that is re-established following operation of automatic re-close Protection Scheme shall be counted as a separate voltage disturbance. Frequency Ride through 32. The generating station shall be capable of operating in the frequency range 47.5 to 52 Hz and be able to deliver the summation of MCR capacity of generating unit(s) in the frequency range of 49.5 Hz to 50.5 Hz on a continuous manner: Provided that the generating station shall be able to maintain its performance contained in this sub-clause even with voltage variation of up to (+/-) 10%: Provided further that there shall be a provision of keeping over-frequency settings above 52 Hz in case of hydro generating stations. Active Power Control 33. The generating unit(s) of aggregate capacity of100 MW and above at PoI shall have the provision to receive the signal from the State Load Despatch Centre or Regional Load Despatch Centre, as the case may be, for varying active power output. 34. All generating unit(s) irrespective of capacity shall have electronically controlled governing systems with appropriate speed/load characteristics to regulate frequency. The governors of thermal generating unit(s) shall have a droop of 3 to 6% of MCR and hydro generating unit(s) including PSP shall have a droop of 0 to 10% of MCR. 35. The governor shall be set with respect to a reference frequency of 50.00 Hz and response outside the dead band shall be with respect to a total change in frequency. The inherent dead band of the generating unit or frequency controller shall not exceed (+/-) 0.03 Hz. 36. The primary response requirement shall be as mentioned in Table 1 below: Table 1. Primary response requirements Type Response range Coal, Lignite & Gas based thermal generating unit (+/-) 5% of MCR Hydro generating unit and On-stream PSP unit (+/-) 10% of MCR (subject to rated head being available) Off-stream PSP unit (+/-) 10% of MCR (subject to rated head being available) for short duration 37. The generating unit shall give primary response instantaneously as per the capability upto (+/-) 5% or (+/-) 10% of their operating level/MCR, when the frequency deviates from the reference frequency: Provided that ramping down is limited to the minimum technical level of the generating unit/station. 38. The ramp rate of the generating unit shall be as per Central Electricity Authority (Technical Standards for Construction of Electrical Plants and Electric Lines) Regulations in force.70 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] Reactive Power Control 39. The generating unit(s) of aggregate capacity of 100 MW and above at PoI shall have the provision to receive the signal from the State Load Despatch Centre or Regional Load Despatch Centre, as the case may be, for varying reactive power output. 40. The excitation system for every generating unit: (1) shall have state of the art excitation system; (2) shall have Automatic Voltage Regulator (AVR). Provided that a generating unit of 100 MW rating and above shall have Automatic Voltage Regulator with digital control and two separate channels having independent inputs and automatic changeover; and (3) must have must have excitation control system that is capable of operating the stator continuously at 110% of nominal voltage when operating at the MCR capacity. 41. Hydro generating unit having rated capacity of 50 MW and above shall be equipped with facility to operate in synchronous condenser mode. 42. The Automatic Voltage Regulator of generating unit of 100 MW and above shall include Power System Stabilizer (PSS) with the following capabilities: (1) two washout filters for each input, with ability to bypass one of them if necessary; (2) sufficient (and not less than two) lead-lag transfer function blocks (or equivalent number of complex poles and zeros) with adjustable gain and time-constants, to compensate fully for the phase lags due to the Generating Unit; (3) monitoring and recording equipment for key variables including inputs, output and the inputs to the lead-lag transfer function blocks; (4) equipment to permit testing of the power system stabilizer in isolation from the power system by injection of test signals, sufficient to establish the transfer function of the power system stabilizer; (5) measurements of rotor speed/voltage and Active Power/reactive power output of the Generating Unit as inputs; (6) an output limiter, which is continually adjustable over the range of (-)10% to (+)10% of stator voltage; and (7) sufficient flexibility to enable damping performance to be maximised, with the stabilising circuit responsive and adjustable over a frequency range. 43. The Generating Station must have equipment capabilities and Control Systems sufficient to ensure that: (1) power system oscillations, for the frequencies of oscillation of the Generating Station against any other Generating Station or device, are adequately damped; (2) operation of the Generating Station does not degrade the damping of any critical mode of oscillation of the power system; and (3) operation of the Generating Station does not cause instability (including hunting of Tap-Changing Transformer Control Systems) that would adversely impact other Equipment connected to the grid.Synchronous Condenser 44. Synchronous condenser unit shall comply with the voltage disturbance ride-through, frequency ride-through, and multiple fault ride-through and reactive power control requirements applicable to synchronous generating stations as specified in these regulations. Asynchronous Generating Station Active Power Capability 45. The generating station shall be capable of providing its ICR capacity at PoI as per the maximum and minimum ambient temperature determined as per the procedure given in Schedule I. Reactive Power Capability 46. The capability is to be provided in compliance with the maximum and minimum ambient temperature determined as per the procedure given in Schedule I. 47. The generating station shall be able to provide minimum dynamic reactive power capability for all active power levels (Including at zero) as per the PQ curve in Fig. 3. The generating station shall be capable of absorbing or supplying dynamically varying reactive power continuously when operating anywhere inside the PQ curve in Fig. 3[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 71 Fig. 3. Minimum Reactive power capability of generating station in terms of active power and reactive power injection measured at PoI. NOTE — 1) Exchange of reactive power may require the generating station to consume active power from the grid due to losses when there is no available primary energy source. 2) The figure shows the minimum range for the reactive power capability required by this clause. The actual capability of generating station may be higher. 3) WTG Type-III machines shall provide reactive power support as per dotted line below 0.1*ICR active power output PQ Curve to be followed in case of BESS during charging (absorption of active power, -P) and discharging (injection of active power, +P) as well as in case of variable speed PSP during motoring (absorption of active power, -P) and generating (injection of active power, +P), shall be the same as above. 48. The minimum dynamic Reactive Power Capability may be varied as shown in the QV curve when the voltage at the PoI varies between 0.9 per unit and 1.1 per unit, where the generating station shall be capable of absorbing or supplying Reactive Power continuously when operating anywhere inside the QV curve in Fig.4.72 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] Fig. 4. Minimum Reactive power capability of generating station in terms of Voltage and reactive power measured at PoI QV Curve to be followed in case of BESS during charging (absorption of active power, +P) and discharging (injection of active power, -P) as well as in case of variable speed PSP during motoring (absorption of active power, -P) and generating (injection of active power, +P), shall be the same as above: Provided that the generating station should coordinate their LVRT and HVRT activation limits so as to achieve the above QV curve requirements. Voltage Disturbance Ride Through 49. The Short Circuit Ratio at the PoI where the generating station is proposed to be connected shall in general not be less than 5. However, the generating station shall stably operate at minimum SCR of 5 or the actual SCR at the PoI, whichever is lower. 50. The generating station shall be capable of operating continuously in the voltage range 0.9 p.u to 1.1 p.u at the PoI and be able to deliver ICR capacity. 51. The generating station shall have configurable low and high voltage ride through activation & deactivation settings, the range of which shall be decided based on system studies to ensure stable plant operation during voltage ride through conditions. 52. Voltage disturbances of any duration, for which the applicable voltage remains within the continuous operation region, shall not cause the generating station or unit(s) to trip. The generating station or unit(s) shall remain in operation during any such disturbance, and shall continue to deliver pre-disturbance level of active power or available active power, whichever is less. 53. All instantaneous under / over voltage protection used within the generating station shall use filtered quantities to reduce the possibility of mis-operation while providing protection to the desired equipment and system. Any instantaneous under /over voltage protection(s) that has the possibility of disrupting the power output of the entire generating station shall use at least one cycle (of fundamental frequency) measurement window to reduce such possibility and the related impact on the grid. 54. The generating station reactive current response during voltage disturbance ride through shall meet the following performance specifications as given in Table 2 below: Table 2. Reactive Current Response Target range for asynchronous generating station Generating Station with Type-III All other Asynchronous Generating Parameter WTGs Stations Step response time NA ≤ 30 ms Settling time ≤ 120 ms ≤ 100 ms (-)2.5%/(+)10% of generating station (-)2.5%/(+)10% of generating station Settling band maximum current maximum current Note: 1) The time delay required for the measurements is included in the step response time and settling time specified in this table. 3) System conditions may require a slower response time. If so, the generating station shall have the necessary flexibility in the settings to increase the response time as per the directions of the appropriate load despatch centre. Low Voltage Ride Through (LVRT) 55. The generating station connected to the grid, shall remain connected to the grid for the duration corresponding to the under voltage at the PoI on any or all phases (symmetrical or asymmetrical under voltage conditions) as depicted by the thick line in the curve in Fig. 5 Vt : Actual Voltage; Vn: Nominal Voltage—[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 73 Fig. 5. Low Voltage Ride Through requirements for Asynchronous Generating station Note: The relevant voltage shall be the lowest magnitude fundamental frequency phasor component of the phase-to-phase or phase-to ground voltages, whichever is less, at the PoI relative to the corresponding nominal voltage. 56. The generating station shall have the capability to select operation in either active current priority mode or reactive current priority mode during low voltage ride through events. The mode during real-time operations shall be selected as per the directions of appropriate load despatch centre. The generating station shall operate in reactive current priority mode by default: Provided that in the reactive current priority mode, the generating station shall provide incremental reactive current: Provided further that the reactive current priority mode does not necessarily mean that active power (or active current) is reduced to zero. It means that the reactive current output (Iq) is given first priority and has the full current rating of the generating station available to it while the active current output (Ip) is constrained. The active current Ip range varies from a maximum of to a minimum of zero for asynchronous generating stations and to (-) for energy storage systems, where Iq is the present value of reactive current: Provided also that, active power be restored to at least 90% of the pre-fault level within 1 second of restoration of voltage. The active power recovery time shall be adjustable within a configurable range of 1.0 to 10 seconds. 57. During LVRT condition, the generating station shall have the overload (current) capability of minimum 1.1pu of the rated capacity and the reactive/active current shall be supplied considering apparent current rating of 1.1pu. 58. The step response time for LVRT conditions shall be maximum 30 ms i.e. the generating station shall be capable of injecting the incremental reactive current within 30 ms into the network. The injection of the incremental reactive current shall also be withdrawn within 30 ms of the return of the voltage within the continuous operating range. The response of the generating station shall be adequately damped. 59. For balanced faults and symmetrical over-voltage conditions, the generating station shall provide incremental positive sequence reactive current support dependent on the PoI voltage: Provided that the quantum of positive sequence reactive current injection shall be dependent on the reactive current gain i.e. LVRT “K+” factor, value of which shall be decided through simulation studies by the appropriate transmission utility and appropriate LDC based on the system strength and network stability in the complex. The LVRT “K+” factor shall typically be in the range of 0 to 10. 60. For unbalanced faults and unsymmetrical over-voltage conditions, in addition to the incremental positive sequence reactive current, the generating station shall inject negative sequence current dependent on PoI negative sequence voltage:74 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] Provided that the quantum of negative sequence reactive current injection shall be dependent on the reactive current gain i.e. LVRT “K-” factor, value of which shall be decided through simulation studies by the appropriate transmission utility and load despatch centre based on the system strength and network stability in the complex. The LVRT “K-” factor shall typically be in the range of 0 to 10: Provided further that incremental negative sequence current from generating stations with Type-III WTG may not be completely controllable and shall be governed as per machine dynamics & converter control. 61. In the event the generating Station apparent current limit of 1.1pu is reached, either positive or negative sequence current shall be reduced with a preference to be given to equal reduction of both currents. High Voltage Ride Through (HVRT) 62. The generating station connected to the grid, shall remain connected to the grid for the duration corresponding to the overvoltage at the PoI, on any or all phases (symmetrical or asymmetrical overvoltage conditions) as depicted by the thick line in the curve in Fig 6: Fig. 6. High Voltage ride-through requirements for asynchronous generating station. Note: The relevant voltage shall be the greatest magnitude fundamental frequency phasor component of the phase-to-phase and phase-to ground voltages, whichever is high, at the PoI relative to the corresponding nominal voltage. 63. The generating station shall have the capability to select operation in either active current priority mode or reactive current priority mode during high voltage ride through events. The mode during real-time operations shall be selected as per the directions of appropriate load despatch centre. The generating station shall operate in reactive current priority mode by default: Provided that, in the reactive current priority mode, the generating station shall provide incremental reactive current: Provided further that the reactive current priority mode does not necessarily mean that active power (or active current) is reduced to zero. It means that the reactive current output (Iq) is given first priority and has the full current rating of the generating station available to it while the active current output (Ip) is constrained. The active current Ip range varies from a maximum of to a minimum of zero for asynchronous generating stations and to (-) for energy storage systems, where Iq is the present value of reactive current: Provided also that, active power be restored to at least 90% of the pre-fault level within 1 second of restoration of voltage. The active power recovery time shall be adjustable within a configurable range of 1.0 to 10 seconds. 64. During HVRT condition, the generating station shall have the overload (current) capability of minimum 1.1pu of the rated capacity and the reactive/active current shall be supplied considering apparent current rating of 1.1pu. 65. The step response time for HVRT conditions shall be maximum 30 ms i.e. the generating station shall be capable of absorbing the incremental reactive current within 30 ms from the network. The absorption of the incremental reactive current shall also be withdrawn within 30 ms of the return of the voltage within the continuous operating range. The response of the generating station shall be adequately damped.[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 75 66. For balanced faults and symmetrical over-voltage conditions, the generating station shall provide incremental positive sequence reactive current support dependent on the PoI voltage: Provided that the quantum of positive sequence reactive current absorption shall be dependent on the reactive current gain i.e. HVRT “K+” factor, value of which shall be decided through simulation studies by the appropriate transmission utility and appropriate Load Despatch Centre based on the system strength and network stability in the complex. The HVRT “K+” factor shall typically be in the range of 0 to 10. 67. For unbalanced faults and unsymmetrical over-voltage conditions, in addition to the incremental positive sequence reactive current, the generating station shall absorb negative sequence current dependent on PoI negative sequence voltage: Provided that the quantum of negative sequence reactive current absorption shall be dependent on the reactive current gain i.e. HVRT “K-” factor, value of which shall be decided through simulation studies by the appropriate transmission utility and load despatch centre based on the system strength and network stability in the complex. The HVRT “K-” factor shall typically be in the range of 0 to 10: Provided further that incremental negative sequence current from generating stations with Type-III WTG may not be completely controllable and shall be governed as per machine dynamics & converter control. 68. In the event the generating Station apparent current limit of 1.1pu is reached, either positive or negative sequence current shall be reduced with a preference to be given to equal reduction of both currents. Multiple Fault Ride Through 69. The generating station connected to the grid, shall remain connected to the grid for a series of up to 15 voltage disturbance below 0.9 p.u within any 5-minute period as per the LVRT capability: Provided that during such period generating station shall remain connected for at least 06 voltage disturbance below 0.5 p.u: Provided further that during the multiple LVRT conditions, the generating station shall meet the performance requirements specified in LVRT conditions. 70. While assessing multiple voltage disturbances, a fault that is re-established following operation of automatic re-close Protection Scheme shall be counted as a separate voltage disturbance. Frequency Ride Through 71. The generating station shall be capable of operating in the frequency range 47.5 to 52 Hz and be able to deliver its ICR capacity in the frequency range of 49.5 Hz to 50.5 Hz on a continuous basis: Provided that the generating station shall be able to maintain its performance contained in this sub-clause even with voltage variation of up to (+/-) 5% subject to availability of commensurate primary energy source. 72. Within the specified frequency range of operation, the generating station shall ride through and shall not trip for frequency excursions having an absolute rate of change of frequency (ROCOF) magnitude less than or equal to 5.0 Hz/second. ROCOF shall be the average rate of change of frequency over an averaging window of at least 0.1 second. 73. The rate of change of frequency (ROCOF) protection shall not impede the generating station from meeting the voltage and frequency ride-through requirements specified in these regulations inclusive of ROCOF ride- through requirements. Voltage Phase Angle Change Ride Through 74. The generating unit shall ride through positive-sequence phase angle changes within a sub-cycle-to-cycle time frame of the applicable voltage of less than or equal to (+/-) 25 electrical degrees. In addition, the generating unit shall remain in operation for any change in the phase angle of individual phases caused by occurrence and clearance of unbalanced faults, provided that the positive-sequence angle change does not exceed the forestated criterion. Active Power Control 75. The generating station with installed capacity of more than 10 MW connected at voltage level of 33 kV and above: (1) shall be equipped with the facility to control active power injection in accordance with a set point, capable of being revised based on directions of the State Load Despatch Centre or Regional Load Despatch Centre, as the case may be; (2) The frequency controller shall be set with respect to a reference frequency of 50.00 Hz and the response outside the dead band shall be with respect to a total change in frequency.76 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (3) shall have frequency controller with a settable droop of 1 to 6% of ICR. The inherent dead band of the of the frequency shall not exceed (+/-) 0.03 Hz: Provided that for frequency deviations in excess of 0.3 Hz, the Generating Station shall have the facility to provide an immediate (within 1 second) real power primary frequency response of at least 10% of the maximum Alternating Current active power capacity. (4) shall have the operating range of the frequency response and regulation system from 10% to 100% of the maximum Alternating Current active power capacity, corresponding to solar insolation or wind speed, as the case may be; (5) shall be equipped with the facility for controlling the rate of change of power output at a ramp rate not more than ± 10% per minute at PoI. 76. The primary response requirement shall be as mentioned in Table 3 below: Table 3. Primary response requirements Type Response range Solar, Wind and Battery Energy Storage System (+/-) 10% of ICR (BESS) 77. The generating unit shall give primary response instantaneously as per the capability upto (+/-) 10% of their operating level/ICR, when the frequency deviates from the reference frequency. 78. The overall dynamic primary frequency response capability of the generating station for a step change in applicable frequency shall be within the ranges specified in Schedule II. Reactive Power Control 79. The generating station of aggregate capacity of 10 MW and above shall have the provision to receive the signal from the State Load Despatch Centre or Regional Load Despatch Centre, as the case may be, for varying reactive power output. 80. The generating station shall provide voltage regulation capability by changes in reactive power output whenever the PoI voltage is in the continuous operation region for voltage. 81. The generating station shall provide the capabilities of the following mutually exclusive operating modes of reactive power control functions: (1) Voltage control (2) Power factor control (3) Reactive power set point control The generating station shall be capable of activating each of these modes one at a time. The generating station shall be responsible for implementing setting modifications and mode selections, as specified by the appropriate system operator within a time acceptable to the appropriate system operator. The dynamic response of the generating station in all the control modes shall be stable and any oscillations shall be positively damped. Black Start Capability 82. BESS of aggregate capacity of 50 MW and above shall be capable of providing Black Start support. This capability shall be utilized by appropriate load despatch centre based on system requirements. 83. The black start functionality shall be demonstrated during commissioning and verified periodically through testing in accordance with these standards and other requirements as specified by the appropriate Load Despatch Centre. Grid Forming Control 84. The generating station with Grid Forming control shall comply with all regulations applicable to asynchronous generating station. 85. The generating station with Grid Forming control shall independently provide near-instantaneous frequency and voltage support. The primary control objective shall be to maintain the voltage phasor of the internal voltage source, established through control strategies, as constant during the sub-transient time frame, utilizing the converter’s full available current capacity. 86. The generating station with Grid Forming converters shall be capable of seamless transition to and from islanded operation, ensuring stable reconnection to the main grid. 87. The generating station with Grid Forming control shall also be capable of injecting negative-sequence currents for the purpose of maintaining voltage symmetry under unbalanced conditions, both during steady- state and fault conditions.[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 77 88. The generating station with Grid Forming control shall be capable of riding through positive-sequence phase angle variations of up to ±60 electrical degrees within a sub-cycle to one-cycle timeframe, relative to the applicable voltage. Energy Storage System (ESS) 89. The requirements applicable to ESS are as specified in Table 4 below: Table 4. Requirements for ESS Fixed Speed PSP Regulation 21 to 44 BESS Regulation 45 to 88 Variable Speed PSP Regulation 21 to 23, 32 to 44, 49 to 55 and 62 CHAPTER – III REQUIREMENTS FOR HVDC SYSTEMS AND FACTS (FLEXIBLE AC TRANSMISSION SYSTEM) DEVICES General Requirements 90. The HVDC system and FACTS devices shall be designed to meet all performance requirements specified in these regulations and shall be compatible with the existing power system. 91. HVDC links can either be used to connect asynchronous grids with each other or can be embedded within a single synchronous AC grid. 92. The HVDC system shall be capable of finding stable operation points with a minimum change in active power flow and voltage level, during and after any planned or unplanned change in the HVDC system or AC network to which it is connected. 93. The HVDC system owner shall ensure that the tripping or disconnection of an HVDC converter station, as part of any multi-terminal or embedded HVDC system, does not result in transients at the PoI. 94. The HVDC system and FACTS devices shall withstand transient faults on HVAC lines in the network adjacent or close to the HVDC system, and shall not cause any of the equipment in the HVDC system to disconnect from the network due to auto-reclosure of lines in the network. 95. HVDC systems, including DC overhead lines, shall be capable of fast recovery from transient faults within the HVDC system. 96. The appropriate transmission utility and distribution licensee shall specify and make available the method and the pre-fault and post-fault conditions for the calculation of the minimum and maximum short circuit power at the PoI. The ratio of fault level in MVA at any of the convertor station (for conventional current source type), to the power flow on the LCC based HVDC bipole shall not be less than 3.0. 97. The HVDC system and FACTS shall be capable of operating within the range of short circuit power and network characteristics specified by the appropriate transmission utility and distribution licensee. 98. The appropriate transmission utility and distribution licensee shall provide the network equivalents describing the behavior of the network at the PoI, enabling the requester/user to design their system with regard to at least, but not limited to, harmonics and dynamic stability over the lifetime of the HVDC system and FACTS device. 99. The requester/user shall maintain a complete HVDC system and FACTS Devices control and protection replica system without redundancy along with a real time simulator based on project specification at its premises. 100. HVDC System and FACTS devices should have the feature of active filtering to manage the background harmonics. The order and magnitude of harmonics to be attenuated at PoI may be decided by appropriate transmission utility. 101. Performance of HVDC and FACTS devices shall be tested by a third-party accredited testing agency before getting connected to the Grid. 102. System studies for evaluating dynamic performance testing of HVDC and FACTS devices during EMT modelling stage and Real time Simulation shall be carried out considering at least two network cases i.e Peak and Off-peak.78 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] 103. System studies for interaction between nearby HVDC systems, FACTs devices, Generating Stations (Asynchronous and synchronous) and Conventional AC equipment should be carried out in line with CIGRE Technical Brochure (TB-934) (Interaction between nearby VSC-HVDC converters, FACTs devices, HV power electronic devices and conventional AC equipment). Reactive Power Capability 104. The VSC based HVDC system (at both converter ends) shall be capable of supplying and absorbing dynamically varying reactive power at the PoI commensurate to 32.87% of rated power capacity of the HVDC system. The capability is to be provided in compliance with the maximum and minimum ambient temperature determined as per the procedure given in Schedule I. 105. The VSC HVDC system shall be able to provide minimum dynamic reactive power capability for all active power levels (including at zero) as per the PQ curve in Fig.7. The VSC HVDC system shall be capable of absorbing or supplying dynamically varying reactive power continuously when operating anywhere inside the PQ curve in Fig. 7: Fig. 7. Minimum Reactive power capability of HVDC system in terms of active power and reactive power measured at PoI. NOTE — 1) Exchange of reactive power may require the VSC HVDC system to consume active power from the grid due to losses when there is no transfer of active power. 3) The figure shows the minimum range for the reactive power capability required by this clause. The VSC HVDC system actual capability may be higher. Provided that the PQ curve to be followed during charging (absorption of active power, -P) and discharging (injection of active power, +P) shall be the same as above. 106. The minimum dynamic Reactive Power Capability may be varied as shown in the QV curve when the voltage at the PoI varies between 0.9 per unit and 1.1 per unit, where the VSC HVDC system shall be capable of absorbing or supplying Reactive Power continuously when operating anywhere inside the QV curve in Fig. 8:[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 79 Fig. 8. Minimum Reactive power capability of VSC HVDC system in terms of Voltage and reactive power measured at PoI. Provided that the QV Curve to be followed during charging (absorption of active power, -P) and discharging (injection of active power, +P) shall be the same as above. Voltage Disturbance Ride through 107. The HVDC system and FACTS devices shall operate continuously in the AC voltage range 0.9 p.u to 1.1 p.u at the PoI and be able to deliver rated output. 108. The HVDC station and FACTS devices shall have configurable low and high voltage ride through activation & deactivation settings, the range of which shall be decided based on system studies to ensure stable plant operation during voltage ride through conditions. 109. All instantaneous under / over voltage protection used within the HVDC system and FACTS device shall use filtered quantities to reduce the possibility of mal-operation while providing protection to the desired equipment and system. Any instantaneous under /over voltage protection(s) which have the possibility of disrupting the power output of the entire HVDC system shall use at least one cycle (of fundamental frequency) measurement window to reduce such possibility and the related impact on the grid. 110. The VSC HVDC system and FACTS device reactive current response shall meet the following performance specifications as given in Table 5 below: Table 5. Reactive Current Response Target range for HVDC System and FACTS Parameter VSC HVDC System and FACTS Step response time ≤ 30 ms Settling time ≤ 100 ms Settling band (-)2.5%/(+)10% of HVDC System and FACTS maximum current Note: 1) The time delay required for the measurements is included in the step response time and settling time specified in this Table. (c) System conditions may require a slower response time. If so, the HVDC System and FACTS shall have the necessary flexibility in the settings to increase the response time as per the directions of the appropriate load despatch centre. Low Voltage Ride Through (LVRT) 111. The VSC HVDC System and FACTS Devices connected to the grid, shall remain connected to the grid for the duration corresponding to the under voltage at the PoI on any or all phases (symmetrical or asymmetrical under voltage conditions) as depicted by the thick line in the curve in Fig. 9 Vt : Actual Voltage; Vn: Nominal Voltage—80 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] Fig. 9. Low Voltage Ride Through requirements for VSC HVDC system and FACTS devices Note: The relevant voltage shall be the lowest magnitude fundamental frequency phasor component of the phase-to-phase or phase-to ground voltages, whichever is less, at the PoI relative to the corresponding nominal voltage. High Voltage Ride Through (HVRT) 112. The VSC HVDC System and FACTS Devices connected to the grid, shall remain connected to the grid for the duration corresponding to the overvoltage at the PoI, on any or all phases (symmetrical or asymmetrical overvoltage conditions) as depicted by the thick line in the curve in Fig 10: Fig. 10: High Voltage ride-through requirements for VSC HVDC system and FACTS devices. Note: The relevant voltage shall be the greatest magnitude fundamental frequency phasor component of the phase-to-phase and phase-to ground voltages, whichever is high, at the PoI relative to the corresponding nominal voltage. Multiple Fault Ride Through (MFRT) 113. The HVDC System and FACTS devices connected to the grid, shall remain connected to the grid for a series of up to 15 voltage disturbance below 0.9 p.u within any 5-minute period as per the LVRT capability: Provided that during such period HVDC System and FACTS devices shall remain connected for at least 06 voltage disturbance below 0.5 p.u: Provided further that during the multiple LVRT conditions, the HVDC System and FACTS devices shall meet the performance requirements specified in LVRT conditions.[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 81 114. While assessing multiple voltage disturbances, a fault that is re-established following operation of automatic re-close Protection Scheme shall be counted as a separate voltage disturbance. Frequency Ride through 115. HVDC system and FACTS shall be capable of operating in the frequency range 47.5 to 52.5 Hz and be able to deliver rated output in the frequency range of 48.5 Hz to 51 Hz: Provided that the HVDC system and FACTS shall be able to maintain its performance contained in this sub- clause even with voltage variation of up to (+/-) 5%. 116. Within the frequency range of operation specified, the HVDC system and FACTS devices shall ride through and shall not trip for frequency excursions having an absolute rate of change of frequency (ROCOF) magnitude less than or equal to 5.0 Hz/second. ROCOF shall be the average rate of change of frequency over an averaging window of at least 0.1 second: Provided that during black start operation using HVDC, the ROCOF withstand capability may be higher. 117. The rate of change of frequency (ROCOF) protection shall not impede the HVDC system and FACTS devices from meeting the voltage and frequency ride-through requirements specified in these regulations inclusive of ROCOF ride-through requirements. Voltage Phase Angle Change Ride Through 118. The VSC HVDC system and FACTS shall ride through positive-sequence phase angle changes within a sub- cycle-to-cycle time frame of the applicable voltage of less than or equal to (+/-) 25 electrical degrees. In addition, it shall remain in operation for any change in the phase angle of individual phases caused by occurrence and clearance of unbalanced faults, provided that the positive-sequence angle change does not exceed the forestated criterion. Active Power Control 119. The VSC HVDC system shall be capable of adjusting the transmitted active power up to its maximum HVDC active power transmission capacity in each direction following an instruction from the appropriate load despatch centre. The minimum step size for change in power shall be 1% of the maximum rated power. 120. The power reversal in LCC based HVDC links shall be possible from the maximum active power transmission capacity in one direction to the maximum active power transmission capacity in the other direction within 60 minutes. For LCC based HVDC Back-to-back stations, this duration shall be 30 minutes. The VSC HVDC shall be designed for minimum 02 reversal operations per day. VSC based HVDC System shall have the capability to transfer the maximum active power transmission capacity in one direction to the maximum active power transmission capacity in the other direction on immediate basis. 121. The HVDC system shall be capable of adjusting the ramping rate of active power variations by at least 10% per minute of active power order in upwards/downwards direction under all conditions. 122. The continuous and transient overload capability per pole shall be specified in the technical specifications. 123. The HVDC system designed for locations where low inertia/islanding situations are possible shall be capable of providing synthetic inertia in response to frequency changes, activated in low or high-frequency conditions by rapidly adjusting the active power to limit the rate of change of frequency. 124. The HVDC system shall be equipped with an independent control mode to modulate the active power output of the HVDC converter station depending on the frequencies at all connection points of the HVDC system to maintain stable system frequencies. The settings of frequency control shall be returnable to be changed on recommendation of appropriate load despatch centre. Reactive Power Control 125. The VSC HVDC system and FACTS devices shall provide voltage regulation capability by changes in reactive power output whenever the PoI voltage is in the range for continuous operation. 126. The VSC HVDC system and FACTS devices shall provide the capabilities of the following mutually exclusive operating modes of reactive power control functions: (1) Voltage control (2) Reactive power set point control The VSC HVDC system and FACTS devices shall be capable of activating each of these modes one at a time. The VSC HVDC system and FACTS devices shall be responsible for implementing setting82 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] modifications and mode selections, as specified by the appropriate system operator within a time acceptable to the appropriate system operator. The dynamic response of the VSC HVDC system and FACTS devices in all the control modes shall be stable and any oscillations shall be positively damped. 127. VSC HVDC system and FACTS devices shall be capable of operating in additional control modes as specified by the appropriate transmissions utility and load despatch centre. Power Oscillation Damping 128. HVDC and FACTS devices shall implement a power oscillation damping (POD) function in their controls, which can be tuned to reduce the power system oscillations. 129. The HVDC system shall be capable of contributing to electrical damping of torsional frequencies with regard to sub synchronous torsional interaction (SSTI) damping control. The appropriate transmission utility shall provide input parameters, to the extent available, related to the equipment and relevant system conditions in its network. The SSTI studies shall be carried out by the requester/user. Black Start Capability 130. The Black start capability shall be possible for both the converter stations of the VSC HVDC system. Transmission Service Provider (TSP) shall determine and provide any additional equipment that is required to be able to carry out black start in both directions. This shall include any hardware and all the necessary control functions to perform the black start. CHAPTER – IV REQUIREMENTS FOR BULK CONSUMERS AND DISTRIBUTION SYSTEMS General Requirements 131. The bulk consumer(s) shall not energize transmission or distribution system by injecting supply from his generators or any other source either by automatic controls or manually unless specifically provided for in the connection agreement with the Transmission or Distribution Licensee. 132. The Short Circuit Ratio at the PoI where the Inverter-interfaced bulk consumer is proposed to be connected shall in general be not less than 5. The Inverter-interfaced bulk consumer shall stably operate at minimum SCR of 5 or the actual SCR at the PoI, whichever is lower. 133. The Voltage-disturbance ride-through, frequency ride through and Voltage Phase-angle ride through requirements shall be applicable to Inverter-interfaced bulk consumers having capacity of 50 MW or above at PoI. Reactive Power Capability 134. The inverter-interfaced bulk consumers shall be capable of supplying and absorbing dynamically varying reactive power at the PoI commensurate to 32.87% (0.95pf lagging/leading) of rated power capacity of inverter-interfaced bulk consumers. The capability is to be provided in compliance with the maximum and minimum ambient temperature determined as per the procedure given in Schedule I. 135. The inverter-interfaced bulk consumers shall be able to provide minimum dynamic reactive power capability for all active power levels (including at zero power being drawn by the inverter-interfaced bulk consumers) as per the shown PQ curve in Fig. 11. The inverter-interfaced bulk consumers must be capable of absorbingor supplying Reactive Power continuously when operating anywhere inside the PQ curve in Fig. 11.[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 83 Fig. 11. Minimum Reactive power capability of inverter-interfaced bulk consumer in terms of active power and reactive power drawal measured at PoI. NOTE – 1) Exchange of reactive power may require the inverter-interfaced bulk consumers to consume active power from the grid due to losses. 2) The figure shows the minimum range for the reactive power capability required by this standard. The inverter-interfaced bulk consumers' actual capability may be higher. 136. The minimum dynamic Reactive Power Capability of the inverter-interfaced bulk consumer may be varied as shown in the QV curve in Fig. 12. when the voltage at the PoI varies between 0.9 per unit and 1.1 per unit, where the inverter-interfaced bulk consumer must be capable of absorbing or supplying Reactive Power continuously when operating anywhere inside the QV curve. Fig. 12. Minimum Reactive power capability of inverter-interfaced bulk consumer in terms of voltage and reactive power measured at PoI. 137. The distribution licensee shall provide adequate reactive compensation to meet the reactive power requirement in their system so that power factor is maintained within ± 0.95. 138. The bulk consumer other than inverter-interfaced bulk consumer shall provide adequate reactive compensation in their system so as maintain unity power factor at PoI:84 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] Provided that the bulk consumer other than inverter-interfaced bulk consumer shall have the capability to maintain power factor in the range of ± 0.95 as per the directions of appropriate load despatch centre. Voltage Disturbance Ride Through 139. The inverter-interfaced bulk consumers shall be capable of operating continuously in the voltage range 0.9 p.u to 1.1 p.u at the PoI and be able to draw rated power. 140. The inverter-interfaced bulk consumer shall have configurable low and high voltage ride through activation & deactivation settings, the range of which shall be decided based on system studies to ensure stable plant operation during voltage ride through conditions. 141. All instantaneous under / over voltage protection used within the inverter-interfaced bulk consumer shall use filtered quantities to reduce the possibility of mal-operation while providing protection to the desired equipment and system. Any instantaneous under /over voltage protection(s) which has the possibility of disrupting the power drawl of the entire inverter-interfaced bulk consumer shall use at least one cycle (of fundamental frequency) measurement window to reduce such possibility and the related impact on the grid. 142. The inverter-interfaced bulk consumer’s current response shall meet the following performance specifications as given in Table 6 below: Table 6: Reactive Current Response Target range for inverter-interfaced bulk consumer Parameter Inverter-interfaced bulk consumers Step response time ≤ 30 ms Settling time ≤ 100 ms (-)2.5%/(+)10% of inverter-interfaced Settling band bulk consumer’s maximum current Note: 1) The time delay required for the measurements is included in the step response time and settling time specified in this table. 2) System conditions may require a slower response time. If so, the inverter-interfaced bulk consumer shall have the necessary flexibility in the settings to increase the response time as per the directions of the appropriate load despatch centre. Low Voltage Ride Through (LVRT) 143. The inverter-interfaced bulk consumer connected to the grid, shall remain connected to the grid for the duration corresponding to the under voltage at the PoI on any or all phases (symmetrical or asymmetrical under voltage conditions) as depicted by the thick line in the curve in Fig. 13 Vt: Actual Voltage; Vn: Nominal Voltage— Fig. 13. Low Voltage Ride Through requirements for inverter-interfaced bulk consumer Note: The relevant voltage shall be the lowest magnitude fundamental frequency phasor component of the phase-to-phase or phase-to ground voltages, whichever is less, at the PoI relative to the corresponding nominal voltage. 144. The inverter-interfaced bulk consumer shall have the capability to select operation in either active current priority mode or reactive current priority mode during low voltage ride through events. The mode during real-time operations shall be selected as per the directions of appropriate load despatch centre. The inverter- interfaced bulk consumer shall operate in reactive current priority mode by default:[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 85 Provided that, in the reactive current priority mode, the inverter-interfaced bulk consumer shall deliver incremental reactive current: Provided further that the reactive current priority mode does not necessarily mean that active power (or active current) is reduced to zero. It means that the reactive current output (Iq) is given first priority and has the full current rating of the inverter-interfaced bulk consumer available to it while the active current output (Ip) is constrained. The active current Ip range varies from zero to (-) for inverter-interfaced bulk consumer, where Iq is the present value of reactive current: Provided also that, active power be restored to at least 90% of the pre-fault level within 1 second of restoration of voltage. The active power recovery time shall be adjustable within a configurable range of 1.0 to 10 seconds. 145. During LVRT condition, the inverter-interfaced bulk consumer shall have the overload (current) capability of minimum 1.1pu of the rated capacity and the reactive current shall be supplied considering apparent current rating of 1.1pu. 146. The step response time for LVRT conditions shall be maximum 30 ms i.e. the inverter-interfaced bulk consumer shall be capable of injecting the incremental reactive current within 30 ms into the network. The injection of the incremental reactive current shall also be withdrawn within 30 ms of the return of the voltage within the continuous operating range. The response of the inverter-interfaced bulk consumer shall be adequately damped. 147. For balanced faults and symmetrical over-voltage conditions, the inverter-interfaced bulk consumer shall provide incremental positive sequence reactive current support dependent on the PoI voltage: Provided that the quantum of positive sequence reactive current injection shall be dependent on the reactive current gain i.e. LVRT “K+” factor, value of which shall be decided through simulation studies by the appropriate transmission utility and appropriate Load Despatch Centre based on the system strength and network stability in the complex. The LVRT “K+” factor shall typically be in the range of 0 to 10. 148. For unbalanced faults and unsymmetrical over-voltage conditions, in addition to the incremental positive sequence reactive current, the inverter-interfaced bulk consumer shall inject negative sequence current dependent on PoI negative sequence voltage: Provided that the quantum of negative sequence reactive current injection shall be dependent on the reactive current gain i.e. LVRT “K-” factor, value of which shall be decided through simulation studies by the appropriate transmission utility and load despatch centre based on the system strength and network stability in the complex. The LVRT “K-” factor shall typically be in the range of 0 to 10. 149. In the event the inverter-interfaced bulk consumer apparent current limit of 1.1pu is reached, either positive or negative sequence current shall be reduced with a preference to be given to equal reduction of both currents. High Voltage Ride Through (HVRT) 150. The inverter-interfaced bulk consumer connected to the grid, shall remain connected to the grid for the duration corresponding to the overvoltage at the PoI, on any or all phases (symmetrical or asymmetrical overvoltage conditions) as depicted by the thick line in the curve in Fig 1486 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] Fig. 14. High Voltage ride-through requirements for inverter-interfaced bulk consumer. Note: The relevant voltage shall be the greatest magnitude fundamental frequency phasor component of the phase-to-phase and phase-to ground voltages, whichever is high, at the PoI relative to the corresponding nominal voltage. 151. The inverter-interfaced bulk consumer shall have the capability to select operation in either active current priority mode or reactive current priority mode during high voltage ride through events. The mode during real-time operations shall be selected as per the directions of appropriate load despatch centre. The inverter- interfaced bulk consumer shall operate in reactive current priority mode by default: Provided that, in the reactive current priority mode, the inverter-interfaced bulk consumer shall provide incremental reactive current: Provided further that the reactive current priority mode does not necessarily mean that active power (or active current) is reduced to zero. It means that the reactive current output (Iq) is given first priority and has the full current rating of the inverter-interfaced bulk consumer available to it while the active current output (Ip) is constrained. The active current Ip range varies from zero to (-) for inverter-interfaced bulk consumer, where Iq is the present value of reactive current: Provided also that, active power be restored to at least 90% of the pre-fault level within 1 second of restoration of voltage. The active power recovery time shall be adjustable within a configurable range of 1.0 to 10 seconds. 152. During HVRT condition, the inverter-interfaced bulk consumer shall have the overload (current) capability of minimum 1.1pu of the rated capacity and the reactive current shall be absorbed considering apparent current rating of 1.1pu. 153. The step response time for HVRT conditions shall be maximum 30 ms i.e. the inverter-interfaced bulk consumer shall be capable of providing the incremental reactive current within 30 ms to the network. The absorption of the incremental reactive current shall also be withdrawn within 30 ms of the return of the voltage within the continuous operating range. The response of the inverter-interfaced bulk consumer shall be adequately damped. 154. For balanced faults and symmetrical over-voltage conditions, the inverter-interfaced bulk consumer shall provide incremental positive sequence reactive current support dependent on the PoI voltage: Provided that the quantum of positive sequence reactive current absorption shall be dependent on the reactive current gain i.e. HVRT “K+” factor, value of which shall be decided through simulation studies by the appropriate transmission utility and appropriate LDC based on the system strength and network stability in the complex. The HVRT “K+” factor shall typically be in the range of 0 to 10. 155. For unbalanced faults and unsymmetrical over-voltage conditions, in addition to the incremental positive sequence reactive current, the inverter-interfaced bulk consumer shall absorb negative sequence current dependent on PoI negative sequence voltage: Provided that the quantum of negative sequence reactive current absorption shall be dependent on the reactive current gain i.e. HVRT “K-” factor, value of which shall be decided through simulation studies by the appropriate transmission utility and load despatch centre based on the system strength and network stability in the complex. The HVRT “K-” factor shall typically be in the range of 0 to 10.[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 87 156. If the inverter-interfaced bulk consumer apparent current limit of 1.1pu is reached, either positive or negative sequence current shall be reduced with a preference to be given to equal reduction of both currents. Multiple Fault Ride Through (MFRT) 157. The inverter-interfaced bulk consumers connected to the grid, shall remain connected to the grid for a series of up to 15 voltage disturbance below 0.9 p.u within any 5-minute period as per the LVRT capability: Provided that during such period inverter-interfaced bulk consumers shall remain connected for at least 06 voltage disturbance below 0.5 p.u: Provided further that during the multiple LVRT conditions, the inverter-interfaced bulk consumers shall meet the performance requirements specified in LVRT conditions. 158. While assessing multiple voltage disturbances, a fault that is re-established following operation of automatic re-close Protection Scheme shall be counted as a separate voltage disturbance. Frequency Ride through 159. The inverter-interfaced bulk consumers shall be capable of operating in the frequency range 47.5 to 52 Hz and be able to draw rated power in the frequency range of 49.5 Hz to 50.5 Hz on a continuous manner basis: Provided further that the inverter-interfaced bulk consumers shall be able to maintain its performance contained in this sub-clause even with voltage variation of up to (+/-) 5%. 160. Within the frequency range of operation specified, the inverter-interfaced bulk consumers shall ride through and shall not trip for frequency excursions having an absolute rate of change of frequency (ROCOF) magnitude that is less than or equal to 5.0 Hz/second. ROCOF shall be the average rate of change of frequency over an averaging window of at least 0.1 second. 161. The rate of change of frequency (ROCOF) protection shall not impede the inverter-interfaced bulk consumers from meeting the voltage and frequency ride-through requirements specified in these regulations inclusive of ROCOF ride-through requirements. Voltage Phase Angle Change Ride Through 162. The inverter-interfaced bulk consumers shall ride through positive-sequence phase angle changes within a sub-cycle-to-cycle time frame of the applicable voltage of less than or equal to (+/-) 25 electrical degrees. In addition, the inverter-interfaced bulk consumers shall remain in operation for any change in the phase angle of individual phases caused by occurrence and clearance of unbalanced faults, provided that the positive- sequence angle change does not exceed the forestated criterion. Active Power Control 163. The bulk consumer shall be equipped with the facility for controlling the rate of change of power drawl at PoI at a ramp rate of not more than ± 10% per minute. The power adjustment must be possible from any operating point: Provided that power changes due to instructions from the grid operator must occur at a rate not exceeding ± 20% per minute. 164. The bulk consumers with aggregated capacity of 50 MW and above at PoI shall have the provision to receive the signal from the State Load Despatch Centre or Regional Load Despatch Centre, as the case may be, for varying active power support. 165. The bulk consumers shall have flexible operation capability with minimum power level of at least forty (40) percent. Reactive Power Control 166. The bulk consumers with aggregated capacity of 50 MW and above at PoI shall have the provision to receive the signal from the State Load Despatch Centre or Regional Load Despatch Centre, as the case may be, for varying reactive power output. 167. The bulk consumer shall provide voltage regulation capability by changes in reactive power output whenever the PoI voltage is in range for the continuous operation. 168. The bulk consumer shall provide the capabilities of the following mutually exclusive operating modes of reactive power control functions: (1) Voltage control (2) Power factor control (3) Reactive power set point control88 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] The bulk consumer shall be capable of activating each of these modes one at a time. The bulk consumer shall be responsible for implementing setting modifications and mode selections, as specified by the appropriate system operator within a time acceptable to the appropriate system operator. The dynamic response of the bulk consumer in all the control modes shall be stable and any oscillations shall be positively damped. CHAPTER – V CONNECTIVITY PROCEDURE General Requirements 169. The State Transmission Utility shall inform the Central Transmission Utility and the Authority, within thirty days of acceptance of application of any requester for connectivity to its electricity system. 170. The requester or user, as the case may be, shall get its generating unit(s) or station, of such capacity, registered with e-GEN portal of the Authority and get an online generated Unique Registration Number: Provided that no generating unit(s) or generating station shall be granted connectivity with the grid without the unique registration number. 171. The appropriate transmission utility or distribution licensee shall ensure that before connectivity to the grid, all the provisions with regard to the connectivity specified in these regulations are complied with by the requester 172. Hybrid generating station shall comply with the relevant regulations applicable to synchronous and asynchronous generating stations specified in these regulations for respective stations individually at PoI: Provided that synchronous and asynchronous generating stations shall not impede each other’s capability to meet the respective compliances as specified in these regulations. 173. Hybrid generating station shall submit the integrated simulation model and study of the Hybrid generating station to appropriate transmission utility or distribution licensee. 174. The qualified coordinating agency (QCA)/Lead generator/Park Developer shall act as repository for the simulation models of each generating station in co-located generating station. 175. The QCA/Lead Generator/Park Developer shall provide the simulation models of the commissioned capacity of all the generating stations existing in a co-located generating station to the requester for simulation study. 176. The appropriate transmission utility or distribution licensee in consultation with appropriate Load Despatch Centre shall publish the compliance verification guidelines from time to time under intimation to Central Electricity Authority. The compliance verification guidelines shall contain the technical data submission requirements, list of reports/certificates/models to be submitted by the requester, list of site tests, list and scenarios of compliance verification studies, model submission requirements. 177. The appropriate Load Despatch Centre shall publish a detailed procedure covering modalities for FTE and integration of new or modified power system element under intimation to Central Electricity Authority. The procedure shall specify requirements for integration with the grid such as protection, telemetry and communication systems; metering; statutory clearances, timelines for submission of data for system study. list of site test for validation plant simulation model and post-commissioning monitoring requirements: Provided in absence of such procedure by SLDC, NLDC procedure shall prevail. 178. The Appropriate Transmission Utility or distribution licensee shall publish a detailed procedure for the modalities of interconnection study. Connectivity Stages 179. The requester/user, appropriate transmission utility and distribution licensee shall adhere to the connectivity stages contained in the flowchart provided in Schedule III. Retirement, Up-rating and De-rating of generating unit(s) 180. The guidelines issued by the Authority from time to time shall be applicable to the conventional sources of electricity generation i.e. Coal/Lignite, Diesel, Gas based power plants and Large Hydroelectric plants (above 25 MW), for the retirement, uprating & derating of generating unit(s). 181. The grid connectivity procedure and requirements specified in these regulations shall also be followed for the up-rating and de-rating of the generating unit(s).[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 89 CHAPTER – VI POWER QUALITY General Requirements 182. The user/requester must ensure and verify that the facility is designed, constructed and configured in compliance with the Harmonic current distortion limits at the PoI. 183. Harmonic filters shall be installed before FTE of facility of requester (part or full capacity) based on the system study. Harmonic Current distortion Limits 184. The measurement methodology shall follow IEC 61000-4-7 Class I and IEC 61000-4-30 Class A and the statistical methodology for measuring harmonic distortion contribution shall follow IEEE Std 519. 185. The measurement data for 2nd to 50th Harmonics level for every 10% of generation shall be provided by user/requester in the Table 7 below: Table 7: Format for Harmonic current distortion data Frequency Short Harm Background Frequ Harmonic current ( for Dependent circuit onic Voltage ency each phase – A,B,C) Harmonic level Order Harmonics Impedance (MVA) consider Phase G B ed at Magn in (condu (susep PCC itude % of Magnitu degree ctance tance) level [-] Hz fundam Phase de s ) or R or X (in ental (Resist (React %) ance) ance) 2 100 3 150 4 200 … User/requester shall also submit the following information along with the measurements: (3) 3-phase Short circuit level (KVA) at which the test was conducted (4) Background voltage harmonics during testing (in % and upto 50th harmonics/THD) Similar format may be used for inter-harmonics and high frequency harmonics also. 186. The harmonic current distortion limits at PoI shall be as per the latest IEEE 519 standard or latest IEEE 2800 as per the applicability. Voltage Unbalance 187. The voltage Unbalance at 33 kV and above shall not exceed 3.0% at PoI. 188. The measurement methodology shall follow IEC 61000-4-7 Class I and IEC 61000-4-30 Class A and the statistical methodology for measuring voltage unbalance follow IEC 61000-3-13. Flicker 189. The facility shall not introduce flicker beyond the limits specified in IEC 61000-3-7. 190. The measurement methodology shall follow IEC 61000-4-7 Class I and IEC 61000-4-30 Class A and the statistical methodology for measuring flicker shall follow IEC 61000-3-7. 191. The permissible limit of voltage fluctuation for step changes which may occur repetitively is 1.5% and for occasional fluctuations other than step changes the maximum permissible limit is 3%. DC Content 192. The facility shall not inject DC current greater than 0.5 % of the rated output at the PoI.90 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] 193. The measurement methodology shall follow IEC 61000-4-7 Class I and IEC 61000-4-30 Class A. CHAPTER – VII DATA COMMUNICATION AND EXCHANGE 194. The Authority Shall publish the Compliance Monitoring Guidelines which shall cover the requirements such as formats for data submission, site testing etc.; responsibilities and actions for non-compliance to maintain the conformity of these regulations after the facility gets connected to the power system. 195. Measurement of harmonic content distortions which includes total current distortion and individual harmonic order distortion, DC injection and flicker shall be done at least once in a year by user/requester in presence of the parties concerned and the indicative date for the same shall be mentioned in the connection agreement: Provided that in addition to annual measurement, if distribution licensee or transmission licensee or the generating company, as the case may be, desires to measure harmonic content or DC-injection or flicker or other power quality parameters, it shall inform the other party in writing and the measurement shall be carried out within 5 working days. 196. The report of the annual measurement shall be submitted to the Appropriate Transmission Utility or distribution licensee and appropriate Load Despatch Centre. 197. The requester/user shall make arrangements for integration of the controls and tele-metering features of their system into the Automatic Generation Control, Automatic Load Shedding, Special Protection System, Energy Management Systems (EMS) and Supervisory Control and Data Acquisition System (SCADA) of the respective state or region. 198. The requester/user shall cooperate with the Regional Power Committee/ appropriate Load Despatch Centre for tuning of Power System Stabilizer provided in the excitation system/Power Plant Controller of the generating unit(s), Power Oscillation Damping Controller (POD) in HVDCs and FACTS devices. 199. The requester/user shall abide by the coordinated outage plan of the state and region in respect of generating unit(s) and transmission lines as approved by the Regional Power Committee. 200. The requester/user shall furnish data as required by appropriate Transmission Utility or Transmission Licensee, Appropriate Load Despatch Centre, appropriate Regional Power Committee, and any committee constituted by the Authority for system studies or for facilitating analysis of tripping or disturbance in power system; 201. The requester/user shall furnish data as required by the Appropriate Transmission Utility or by the licensee or generating station with whose system the inter-connection is proposed, for permitting inter-connection with the grid; the content of information exchanges including a precise list of data shall be specified by the appropriate Transmission Utility or Distribution Licensee 202. The requester/user shall provide necessary facilities for voice and data communication and transfer of on-line operational data, such as voltage, frequency, line flows, and status of breaker and isolator position and other parameters as prescribed by the Appropriate Load Despatch Centre. 203. The requester/user shall maintain meters and communication system in its jurisdiction in good condition. 204. The data and communication systems shall be provided as per the Central Electricity Authority (Technical Standards for Communication System in Power System Operations) Regulations in force. 205. Metering shall be provided as specified in the Central Electricity Authority (Installation and Operation of Meters) Regulations in force. 206. Periodic tests shall be carried out once every 5 years for all power system elements by the user for ascertaining the correctness of mathematical models used for simulation studies as well as for ensuring the compliance of these regulations. The test report and models shall be submitted to appropriate transmission utility and appropriate Load Despatch Centre. Any non-compliance of these regulations shall be reported to the Authority by the appropriate transmission utility and appropriate Load Despatch Centre. 207. The requester/user shall provide to the appropriate Load Despatch Centre, the fault recording and dynamic system behavior monitoring of his plant connected to the grid at 220 kV and above, as specified in Table 8 below: Table 8: Specifications for fault recorder and dynamic behavior monitoring of plant Sr No Requirement Specification 1 Pre-event buffer/pre-trigger(fault) upto 1 second (waveform) 2 Post-event recording/post-trigger ≥10 seconds (waveform) (fault)[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 91 3 Sampling rate ≥12.8 kHz 4 Storage Memory 1 GB or more 5 Harmonics Monitoring 100th order (magnitude) 6 Harmonic Phase Angle Measurement Required and Analysis 7 Primary Frequency Should provide one cycle high speed frequency reading with a frequency resolution of better than 10 mHz. 8 Response Time 10 ms or faster All such equipment shall be provided with time synchronization facility for global common time reference. CHAPTER – VIII PROTECTION 208. The requester/user shall cooperate with the Regional Power Committee, and appropriate Load Despatch Centres for protection coordination and settings of its protective relays. 209. The generator transformer windings in synchronous generating stations shall have delta connection on low voltage side and star connection on high voltage side. Star point of high voltage side shall be effectively (solidly) earthed so as to achieve the Earth Fault Factor of 1.4 or less. 210. Every generating unit(s) shall have standard protections to protect the unit(s) not only from faults within the unit(s) and within the station but also from faults in transmission lines. For generating unit(s) having rated capacity greater than 100 MW, two independents sets of protections acting on two independent sets of trip coils fed from independent Direct Current (DC) supplies shall be provided. The protections shall include but not be limited to the Local Breaker Back-up (LBB) protection. 211. Basic Insulation Level and Insulation Co-ordination: Basic Insulation Level (BIL) of various items of equipment and ratings of surge arresters for generating stations, lines and sub-stations shall be decided on the following order of priority, namely: — (1) ensure safety to public and operating personnel; (2) avoid permanent damage to plant; (3) prevent failure of costly equipment; (4) minimise circuit interruptions; and (5) minimise interruptions of power supply to consumers. (6) Insulation co-ordination of equipment and lines on both sides of a connection point belonging to the requester/user and the grid shall be accomplished and the co-ordination shall be done by the appropriate Transmission Utility. 212. Protection system shall be designed to reliably detect faults on various abnormal conditions and provide an appropriate means and location to isolate the equipment or system automatically. The protection system must be able to detect power system faults within the protection zone. The protection system should also detect abnormal operating conditions such as equipment failures or open phase conditions. 213. Every element of the power system shall be protected by a standard protection system having the required reliability, selectivity, speed, discrimination and sensitivity. Where failure of a protective relay in the user/requester’s system has substantial impact on the grid, it shall connect an additional protection as back up protection besides the main protection. 214. Notwithstanding the protection systems provided in the grid, the requester/user shall provide requisite protections for safeguarding his system from the faults originating in the Grid. 215. Protection Scheme such as under frequency relay for load shedding, voltage instability, angular instability, generation backing down or Islanding Schemes may also be required to be provided to avert system disturbances. 216. Protection co-ordination issues shall be finalized by the Regional Power Committee. 217. The requester/user shall develop protection manuals conforming to various standards for the reference and use of its personnel.92 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] 218. For Distribution Systems and Bulk Consumers, under frequency and df/dt (rate of change of frequency with time) relays shall be employed for automatic load control in a contingency to ensure grid security under conditions of falling grid frequency in accordance with the decision taken in the Regional Power Committee. 219. The transmission lines and sub-stations connected to the grid shall comply with the following in addition to the general connectivity conditions: (1) Protection for the Transmission Lines and equipment at Substation shall be provided as per Schedule-V of Central Electricity Authority (Technical Standards for Construction of Electrical Plants and Electric Lines) Regulation in force. (2) Circuit breakers, isolators and all other current carrying equipment shall be capable of carrying normal and emergency load currents without damage. The equipment shall not become a limiting factor on the ability of transfer of power on the inter-state and intra-state transmission system. (3) All circuit breakers and other fault interrupting devices shall be capable of safely interrupting fault currents for any fault that they are required to interrupt. The circuit Breakers shall have this capability without the use of intentional time delay in clearing the fault. Minimum fault interrupting requirement need be specified by the appropriate Transmission Utility. The Circuit Breaker shall be capable of performing all other required switching duties such as, but not limited to, capacitive current switching, load current switching and out-of- step switching. The Circuit Breaker shall perform all required duties without creating transient over-voltages that could damage the equipment provided elsewhere in the grid. The short circuit capacity of the circuit breaker shall be based on short-term and perspective transmission plans as finalized by the Authority. (4) Earth Fault Factor for an effectively earthed system shall be not more than 1.4. (5) Power Supply to Sub-Station Auxiliaries, shall: (i) for alternating current (AC) supply (Applicable to new sub-station): (a) 220 kV and above: Two high tension (HT) supplies shall be arranged from two independent sources. These two sources shall be such that outage of both the sources does not occur simultaneously. One of the two high tension supplies shall be standby to the other. In addition, an emergency supply from diesel generating (DG) source of suitable capacity shall also be provided: Provided that Asynchronous Generating Station may install a second diesel generating (DG) source of suitable capacity for their auxiliary supply requirements. (b) 66 kV and below 220 kV: There shall be one HT supply and one diesel generating source. (c) 33 kV and below 66 kV: There shall be one HT supply. (ii) For direct current (DC) Supply (Applicable to new sub-stations): Sub-stations of transmission system for 132 kV and above and sub-stations of all generating stations: There shall be two sets of batteries, each equipped with its own charger. For sub-stations below 132 kV: There shall be one set of battery and charger. CHAPTER – IX MISCELLANEOUS 220. Repeal and Saving: (1) The Central Electricity Authority (Technical Standards for Connectivity to the Grid) Regulations, 2007 in force are hereby repealed. (2) Notwithstanding such repeal, anything done or purported to have been done under the repealed regulations shall be deemed to have been done or purported to have been done under the relevant provisions of these regulations. 221. Power to remove difficulty If any difficulty arises in giving effect to the provisions of these regulations, the Authority may, on its own or on an application made before it by any entity, by order, make such provisions not inconsistent with the provisions of the Act or provisions of other regulations specified by the Authority, as may appear to be necessary for removing the difficulty in giving effect to the objectives of these regulations. 222. Power to relax: (1) The Authority may, by order and for reasons to be recorded in writing, relax any of provisions of these regulations in respect of the matters referred to the Authority on case-to-case basis. (2) The Authority may deal with any matter or exercise any power under sub-section (9) of section 70 the Act for which no regulations have been framed, and the Authority may deal with such matters, powers and functions in accordance with the provisions of the Act. 223. Enforcement of regulations: (1) The appropriate Transmission Utility and distribution licensee shall ensure compliance of these[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 93 regulations before granting connectivity to any requester and shall also submit reports to the appropriate Load Despatch Centre. (2) The appropriate Regional Load Despatch Centre and State Load Despatch Centre shall report status of non-compliance of these regulations done by any user during the real time operation within 7 days of the grid incident/disturbance/event to Central Electricity Authority. (3) The user shall submit detailed report along with reasons for non-compliance to these regulations to appropriate LDC within 3 days of the grid incident/disturbance/event and planned corrective measures to address the non-compliances. (4) The Authority may take cognizance of any non-compliance case of these regulations by a user or requester and shall direct any officer or agency designated in this behalf to investigate and submit a report to the Authority. The Authority may direct the appropriate transmission utility to disconnect the user from the grid for non-compliance of any provision contained in these regulations until the user complies with these regulations. (5) The non-compliance to the provision contained in these regulations or any such order, directions in conformity with these regulations, shall be dealt as per Section 146 of the Act. SCHEDULES Schedule I 1. The following process is to be followed for assessing the maximum and minimum possible ambient temperature to be considered for design of machines in the facility: (1) Obtain relevant temperature data from the India Meteorological Department (IMD), Pune (Ministry of Earth Sciences, Government of India) website. The IMD maintains the database related to monthly temperature on a pan India basis and the temperature extremum (highest maximum & minimum ever for a month) recorded by the IMD measuring station nearest to the location of the Generating Station shall be noted. In case of non- availability of IMD data, the requester may consider the temperature data from any weather service provider of repute or, any weather station of RE project in vicinity. The source of temperature data and location of the weather station, is to be indicated by requester in submission to appropriate transmission utility and LDC. (2) The extreme temperature for a particular IMD station can be found using the following link: https://cdsp.imdpune.gov.in/home_lab_2.php#extremes (3) The above link gives the maximum and minimum temperature for a particular month (highest and lowest ever observed till date). (4) The requester shall tabulate the maximum and minimum temperatures for each month of the year and from the table, select the highest and lowest temperature amongst the 12 months. (5) For the higher extremum, a margin of 1℃ shall be added to the temperature as obtained vide the above procedure and the same shall be rounded off (to the nearest higher integer) and considered for design temperature of the RE Generator at the higher extremum end. (6) Similarly, for the lower extremum, a margin of 1℃ shall be subtracted to the temperature as obtained vide the above procedure and the same shall be rounded off (to the nearest lower integer) and considered for the design temperature of the facility at the lower extremum end. (7) The requester shall furnish the entire evaluation process & data in a stepwise manner as indicated above under Affidavit for consideration of compliance.94 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] 2. The Authority shall publish the ambient temperatures for all locations as per the procedure provided in Para 1 of this schedule. It shall be revised in first week of every financial year to reflect any updates based on the maximum temperature data to be made available by the IMD for the purpose: Provided that till such time the new data is updated, the latest one available on the website of CEA shall be referred to by the requester for design of the machines in the facility. Schedule II Response Target Range for PFR Parameter Response target Ranges of available settings Min Max Reaction time 0.5 second 0.20 (0.5 for WTG) 1 Rise Time 4.0 second 2.0 (4.0 for WTG) 20 Settling time 10 second 10 30 Damping ratio 0.3 0.2 1.0 Settling band Max (2.5% of change or 1 5 0.5% of generating system continuous rating) Note:- 1) Stable and damped response shall take precedence over response time. That is, if it is shown that for the applicable generating station and the given grid to which the generating station is connected, stable response requires a response time that is closer to the upper limit defined in above Table, then this is preferred to provide stable and damped response. 2) Dynamic response characteristics are defined on an open-loop basis, which is the effective case when the inertia of the system is orders of magnitude larger than the IBR rating. 3) The reaction time starts when the applicable frequency measured at the PoI has deviated outside of the applicable PFR deadband. 4) The generating station shall be capable of sustaining PFR for as long as the primary energy source is available. 5) Refer to informative on damping ratio as per IEEE 2800 (As amended)[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 95 A.1 Schedule III Flowchart for Connectivity Procedure Stage A 1. The requester shall make a request for connection in the planning stage to the Appropriate Transmission Utility for inter-connection studies. In case a requester is seeking inter-connection to a distribution system such a request will be made to the distribution licensee. 2. The requester shall present the mathematical model of the equipment/facility in accordance with the requirements as stipulated by the Appropriate Transmission Utility, or distribution licensee, as the case may be. 3. The Appropriate Transmission Utility or distribution licensee shall carry out the inter-connection study to determine the point of inter-connection, required inter-connection facilities and modifications required on the existing grids, if any, to accommodate the interconnection. The study may also address the transmission system capability, transient stability, voltage stability, losses, voltage regulation, harmonics, voltage flicker, electromagnetic transients, machine dynamics, ferro resonance, metering requirements, protective relaying, sub-station grounding and fault duties, as the case may be. Stage B 4. The Appropriate Transmission Utility or distribution licensee shall prepare grid information containing background Network data, background harmonic distortion levels including impedance polygons and provide it to the requester at the time of final grant of the connectivity to the requester for preparation of technical connection data by the requester. 5. The requester shall submit the complete technical connection data with the undertaking that the facility simulation model data submitted is accurate and representative of the actual facility response: Provided that the complete technical connection data for the phase capacity of the facility only shall be submitted in case phase-wise commissioning is planned. 6. The requester shall submit following documents for each make of inverter / WTG /SVG / FACTS Devices in a facility: (1) Type Test Report (2) Statement of compliance (SoC)96 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (3) Measurement Report 7. The requester shall submit the facility simulation models in standard formats which are interoperable and convertible to simulation software used by appropriate transmission utility and load despatch centre. The simulation model to be submitted are as mentioned below: (1) Static model (2) Dynamic Phasor-domain Transient (PDT) model (3) Dynamic Electromagnetic Transient (EMT) model (4) Harmonic model - For harmonic studies, frequency dependent Norton Equivalent (FDNE) model of the plant shall be provided. The requester shall ensure that the submitted model files adhere to the model submission and compatibility requirements as mentioned in compliance verification guidelines. 8. The requester shall submit the technical connection data at least 12 months before the physical interconnection with the grid in case of asynchronous generating stations. Stage C 9. The Appropriate Transmission Utility or distribution licensee shall share the submitted data and models with appropriate LDC and it shall, in parallel, examine the submitted data. 10. The appropriate LDC shall forward their comments to Appropriate Transmission Utility or distribution licensee and it shall convey the observations with respect to non-compliance of these regulations, to the requester. 11. The Appropriate Transmission Utility or distribution licensee shall issue the intimation of technical connection details and Connectivity Agreement shall be signed with the requester for physical interconnection with the ISTS Grid. 12. The connection agreement shall contain general and specific technical conditions, applicable to that connection. 13. Every connection of a requester's system to the grid shall be covered by a connectivity agreement between the requester and (1) Appropriate Transmission Utility in case of connection to Inter-state transmission system or intra state transmission system as the case may be; (2) Distribution licensee in case of inter-connection to distribution licensee's system; and (3) Transmission licensee and Appropriate Transmission Utility, in case of inter-connection to a transmission licensee (tri-partite agreement). Stage D 14. The requester shall apply for First Time Energisation (FTE) with the undertaking that the facility simulation model data submitted is accurate and there are no variations with respect to approved connection by appropriate Transmission Utility or distribution licensee. Stage E 15. The appropriate LDC shall scrutinize the application and if there is any change in the plant network topology or simulation models as approved, the appropriate LDC shall share the submitted data and models with appropriate Transmission Utility or distribution licensee. 16. Appropriate Transmission Utility or distribution licensee and appropriate LDC shall examine the submitted data in parallel. 17. Appropriate Transmission Utility or distribution licensee shall issue Revised Connection details if compliance of all applicable provisions of contained in these Regulations are met. Stage F 18. The appropriate LDC shall ensure compliance to CEA (Technical Standards for Connectivity to the Grid) before grant of FTE. Stage G 19. The requester shall be allowed to inter-change power with the grid during the commissioning period, including testing and full load testing before the COD, after obtaining prior permission of the concerned RLDC/SLDC. 20. The requester shall proceed with physical interconnection with Grid for site testing validation of plant simulation models. 21. The requester shall conduct testing of the generating station as per the compliance verification guidelines: Provided that integrated testing for the whole capacity shall be done if new capacity is added to existing capacity in a generating station.[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 97 22. The requester shall submit test results and final validated simulation model to the appropriate Load Despatch Centre. 23. The appropriate Load Despatch Centre shall examine the response of the validated simulation models against site test results and forward their comments to the requester in case of any discrepancy. 24. After validation of simulation models against site tests, the requester shall submit the following details prior to notice for trail run: Description Units Installed Capacity of generating station MW Installed Capacity of generating station MVA MCR MW Number x unit size No x MW Time required for cold start Minute Time required for warm start Minute Time required for hot start Minute Time required for combined cycle operation under cold conditions Minute Time required for combined cycle operation under warm conditions Minute Ramping up capability % per minute Ramping down capability % per minute Minimum turndown level % of MCR Minimum turndown level MW (ex-bus) Inverter Loading Ratio (DC/AC capacity) Name of QCA (where applicable) Full reservoir level (FRL) Meter Design Head Meter Minimum draw down level (MDDL) Meter Water released at Design Head M3 / MW Unit-wise forbidden zones MW 25. Notice of Trial Run (1) The requester proposing its generating station or a unit thereof for trial run or repeat of trial run shall give a notice of not less than seven (7) days to the concerned RLDC, and the beneficiaries of the generating stations, including intermediary procurers, wherever identified: Provided that in case the repeat trial run is to take place within forty-eight (48) hours of the failed trial run, fresh notice shall not be required. (2) The requester proposing its transmission system or an element thereof for trial run shall give a notice of not less than seven days to the concerned RLDC, CTU, distribution licensees of the region and the owner of the inter-connecting system. (3) The concerned RLDC shall allow commencement of the trial run from the requested date or in the case of any system constraints, not later than seven (7) days from the proposed date of the trial run. The trial run shall commence from the time and date as decided and informed by the concerned RLDC. Stage H 26. Trial Run of Generating Unit (1) Trial Run of the Thermal Generating Unit shall be carried out in accordance with the following provisions: (a) A Thermal Generating Unit shall be in continuous operation at MCR for seventy-two (72) hours on designated fuel: Provided that: (i) short interruption or load reduction shall be permissible with the corresponding increase in duration of the test; (ii) interruption or partial loading may be allowed with the condition that the average load during the duration of the trial run shall not be less than MCR, excluding the period of interruption but including the corresponding extended period; (iii) cumulative interruption of more than four (4) hours shall call for a repeat of trial run.98 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] (b) Where, on the basis of the trial run, a thermal generating unit fails to demonstrate the unit capacity corresponding to MCR, the requester has the option to de-rate the capacity of the generating unit or to go for a repeat trial run. If the requester decides to de-rate the unit capacity, the de-rated capacity in such cases shall not be more than 95% of the demonstrated capacity, to cater for primary response. (2) Trial Run of Hydro Generating Unit shall be carried out in accordance with the following provisions: (a) A Hydro Generating Unit shall be in continuous operation at MCR for twelve (12) hours: Provided that: (i) short interruption or load reduction shall be permissible with a corresponding increase in duration of the test; (ii) interruption or partial loading may be allowed with the condition that the average load during the duration of trial run shall not be less than MCR excluding period of interruption but including the corresponding extended period; (iii) cumulative interruption of more than four (4) hours shall call for a repeat of trial run; (iv) if it is not possible to demonstrate the MCR due to insufficient reservoir or pond level or insufficient inflow, COD may be declared, subject to the condition that the same shall be demonstrated immediately when sufficient water is available after COD: Provided that if such a generating station is not able to demonstrate the MCR when sufficient water is available, the requester shall de-rate the capacity in terms of sub-clause (b) of this clause, and such de-rating shall be effective from COD. (b) Where, on the basis of the trial run, a hydro generating unit fails to demonstrate the unit capacity corresponding to MCR, the requester shall have the option to either de-rate the capacity or go for a repeat trial run. If the requester decides to de-rate the unit capacity, the de-rated capacity in such cases shall not be more than 90% of the demonstrated capacity to cater for primary response. (3) Trial Run of Wind / Solar / ESS / Hybrid Generating Station (a) Trial run of the solar inverter unit(s) shall be performed for a minimum capacity aggregating to 50 MW: Provided that in the case of a project having a capacity of more than 50 MW, the trial run for the balance capacity shall be performed in a maximum of four instalments with a minimum capacity of 5 MW: Provided further that the trial run for solar inverter unit(s) aggregating to less than 50 MW shall be allowed for the capacity for which Connectivity has been granted to such entity. (b) Successful trial run of a solar inverter unit(s) covered under sub-clause (a) of this clause shall mean the flow of power and communication signal for not less than four (4) hours on a cumulative basis between sunrise and sunset in a single day with the requisite metering system, power plant controller, telemetry and protection system in service. The requester shall record the output of the unit(s) during the trial run and shall corroborate its performance with the temperature and solar irradiation recorded at site during the day and plant design parameters: Provided that: (i) the output below the corroborated performance level with the solar irradiation of the day shall call for a repeat of the trial run; (ii) if it is not possible to demonstrate the rated capacity of the plant due to insufficient solar irradiation, COD may be declared subject to the condition that the same shall be demonstrated immediately when sufficient solar irradiation is available after COD, within one year from the date of COD: Provided that if such a generating station is not able to demonstrate the rated capacity when sufficient solar irradiation is available after COD, the requester shall de-rate the capacity in terms of sub-clause (h) of clause (3) of Para 26 of this Schedule. (c) Trial run of a wind turbine(s) shall be performed for a minimum capacity aggregating to 50 MW: Provided that in the case of a project having a capacity of more than 50 MW, the trial run for wind turbine(s) above the capacity of 50 MW shall be performed in batch sizes of not less than 5 MW: Provided further that the trial run for wind turbine(s) aggregating to less than 50 MW for entities covered under clause (e) of Regulation 4.1 of the GNA Regulations, shall be allowed for the capacity for which Connectivity has been granted to such an entity. (d) Successful trial run of a wind turbine(s) covered under sub-clause (c) of this clause shall mean the flow of power and communication signal for a period of not less than four (4) hours on a cumulative basis in a single day during periods of wind availability with the requisite metering system, power plant controller, telemetry and protection system in service. The requester shall record the output of the unit(s) during the[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 99 trial run and corroborate its performance with the wind speed recorded at the site(s) during the day and plant design parameters: Provided that- (i) the output below the corroborated performance level with the wind speed of the day shall call for a repeat of the trial run; (ii) if it is not possible to demonstrate the rated capacity of the plant due to insufficient wind velocity, COD may be declared subject to the condition that the same shall be demonstrated immediately when sufficient wind velocity is available after COD, within one year from the date of COD: Provided that if such a generating station is not able to demonstrate the rated capacity when sufficient wind velocity is available after COD, the requester shall de-rate the capacity in terms of sub-clause (h) of clause (3) of Para 26 of this Schedule. (e) Successful trial run of a standalone Energy Storage System (ESS) shall mean one (1) cycle of charging and discharging of energy as per the design capabilities with the requisite metering, telemetry and protection system being in service. (f) Successful trial run of a pumped storage plant shall mean one (1) cycle of turbo-generator and pumping motor mode as per the design capabilities up to the rated water drawing levels with the requisite metering, telemetry and protection system being in service: Provided that if it is not possible to demonstrate the design capabilities up to the rated water drawing levels due to insufficient reservoir levels, the COD may be declared after demonstrating the capabilities at available water drawing levels, subject to the condition that design capabilities up to the rated water drawing levels shall be demonstrated immediately when sufficient reservoir level is available after COD: Provided further that if such a generating station is not able to demonstrate the design capabilities when sufficient water is available, the requester shall have the option to either go for a repeat trial run or de-rate the capacity. If the requester decides to de-rate the unit capacity in terms of sub-clause (b) of Clause (2) of Para 22 of this Schedule, such de-rating shall be effective from the COD. (g) Successful trial run of a hybrid system shall mean successful trial run of each individual source of the hybrid system in accordance with the applicable provisions of these regulations. (h) Where, on the basis of the trial run, solar / wind / storage / hybrid generating station fails to demonstrate its rated capacity, the requester shall have the option to either go for a repeat trial run or de-rate the capacity subject to a minimum aggregated de-rated capacity of 50 MW or 5 MW, as the case may be. (i) Notwithstanding the provisions contained in these Regulations, where Power purchase Agreement provides for a specific capacity that can be declared COD, trial run shall be allowed for such capacity in terms of such Power purchase agreement. 27. Trial Run of Transmission System, HVDC System and FACTS (1) Trial run of a transmission system or an element thereof shall mean successful energisation of the transmission system or the element thereof at its nominal system voltage through interconnection with the grid for a continuous twenty-four (24) hours flow of power and communication signal from the sending end to the receiving end and with the requisite metering system, telemetry and protection system: Provided that under exceptional circumstances and with the prior approval of Authority, a transmission element can be energized at lower nominal system voltage level: Provided further that the appropriate LDC may allow anti-theft charging where the transmission line is not carrying any power. 28. Trial Run of Bulk Consumer (1) Trial run of the Bulk Consumer facility shall be performed for a minimum capacity aggregating to 50 MW: Provided that in the case of a project having a capacity of more than 50 MW, the trial run for the balance capacity shall be performed in a maximum of four instalments with a minimum capacity of 5 MW: Provided further that the trial run for Bulk Consumer unit aggregating to less than 50 MW shall be allowed for the capacity for which Connectivity has been granted to such entity. (2) Successful trial run of a Bulk Consumer facility covered under sub-clause (a) of this clause shall mean the flow of power and communication signal for not less than four (4) hours on a cumulative basis in a single day with the requisite metering system, power bulk consumer controller, telemetry and protection system in service. The requester shall record the output of the unit(s) during the trial run and shall corroborate its100 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] performance with the temperature and solar irradiation recorded at site during the day and bulk consumer design parameters: Provided that the output below the corroborated performance level shall call for a repeat of the trial run. 29. Documents and Tests Prior to Declaration of Commercial Operation (1) The tests as specified in the following clauses shall be scheduled and carried out in coordination with NLDC and the concerned RLDC by the requester and relevant reports and other documents as specified shall be submitted to NLDC and the concerned RLDC before a certificate of successful trial run is issued to such a requester. (2) All thermal generating stations having a capacity of more than 200 MW and hydro generating stations having a capacity of more than 25 MW shall submit documents confirming the enablement of automatic operation of the plant from the appropriate load despatch centre by integrating the controls and telemetering features of their system into the automatic generation control in accordance with the CEA Regulation(s). (3) Documents and Tests Required for Thermal (coal/lignite) Generating Stations: (4) The requester shall submit a certificate confirming compliance with CEA (Technical Standards for Connectivity to the Grid) Regulations in accordance with clause (1) of Para 31 of this schedule. (a) The requester shall submit the following OEM documents, namely (i) startup curve for boiler and turbine including starting time of unit in cold, warm and hot conditions, (ii) capability curve of generator, (iii) design ramp rate of boiler and turbine. (b) The following tests shall be performed: (i) Operation at a load of fifty-five (55) percent of MCR as per the CEA Technical Standards for Construction for a sustained period of four (4) hours. (ii) Ramp-up from fifty-five (55) percent of MCR to MCR at a ramp rate of at least one (1) percent of MCR per minute, in one step or two steps (with stabilization period of 30 minutes between two steps), and sustained operation at MCR for one (1) hour. (iii) Demonstrate overload capability with the valve wide open as per the CEA (Technical Standards for Construction of Electrical Plants and electrical Lines) Regulations and sustained operation at that level for at least five (5) minutes. (iv) Ramp-down from MCR to fifty-five (55) percent of MCR at a ramp rate of at least one (1) percent of MCR per minute, in one or two steps (with stabilization period of 30 minutes between two steps). (v) Primary response through injecting a frequency test signal with a step change of ± 0.1 Hz at 55%, 60%, 75% and 100% load. (vi) Reactive power capability as per the generator capability curve as provided by OEM considering over-excitation and under-excitation limiter settings and prevailing grid condition. (5) Documents and Tests Required for Hydro Generating Stations including Pumped Storage Hydro Generating Station: (a) The requester shall submit a certificate confirming compliance with CEA (Technical Standards for Connectivity to the Grid) Regulations in accordance with clause (2) of Para 31 of this schedule. (b) The requester shall submit OEM documents for the turbine characteristics curve indicating the operating zone(s) and forbidden zone(s). In order to demonstrate the operating flexibility of the generating unit, it shall be operated below and above the forbidden zone(s). (c) The following tests shall be performed considering the water availability and head: (i) Primary response through injecting a frequency test signal with a step change of ± 0.1 Hz for various loadings within the operating zone. (ii) Reactive power capability as per the generator capability curve considering over-excitation and under-excitation limiter settings. (iii) Black start capability, wherever feasible. (iv) Operation in synchronous condenser mode wherever designed. (5) Documents and Test Required for Gas Turbine based Generating Stations: a) The requester shall submit a certificate confirming compliance with CEA (Technical Standards for Connectivity to the Grid) Regulations in accordance clause (1) of Para 31 of this schedule. b) The requester shall submit OEM documents for (i) starting time of the unit in cold, warm and hot conditions (ii) design ramp rate. c) The following tests shall be performed:[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 101 (i) Primary response through injecting a frequency test signal with a step change of ± 0.1 Hz for various loadings within the operating zone. (ii) Reactive power capability as per the generator capability curve considering over-excitation and under-excitation limiter settings. (iii) Black start capability up to 100 MW capacity, wherever feasible. (iv) Operation in synchronous condenser mode wherever designed. (6) Documents and Tests Required for the Generating Stations based on wind and solar resources: (a) The requester shall submit a certificate confirming compliance with CEA (Technical Standards for Connectivity to the Grid) Regulations in accordance clause (4) of Para 31 of this schedule. (b) Type test report for Fault Ride through Test (LVRT and HVRT) for units commissioned after the specified date as per CEA (Technical Standards for Connectivity to the Grid) Regulations mandating LVRT and HVRT capability shall be submitted. (c) The following tests shall be performed at the point of interconnection: (i) Frequency response of machines as per the CEA (Technical Standards for Connectivity to the Grid) Regulations. (ii) Reactive power capability as per OEM rating at the available irradiance or the wind energy, as the case may be: Provided that the requester may submit offline simulation studies for the specified tests, in case testing is not feasible before COD, subject to the condition that tests shall be performed within a period of one year from the date of achieving COD. (7) Documents and Tests Required for Energy Storage Systems: (a) The ESS shall submit a certificate confirming compliance with the CEA (Technical Standards for Connectivity to the Grid) Regulations in accordance with clause (4) of Para 31 of this schedule. (b) The following tests shall be performed at the point of interconnection: (i) Power output capability in MW and energy output capacity in MWh. (ii) Frequency response of ESS. (iii) Ramping capability as per design. (8) Documents and Tests Required for HVDC Transmission System: (a) The requester shall submit a certificate confirming compliance with CEA (Technical Standards for Connectivity to the Grid) Regulations in accordance with clause (3) of Para 31 of this schedule. (b) The transmission licensee shall submit technical details including operating guidelines such as filter bank requirements at various operating loads and monopolar/ or bipolar configuration, reactive power controller, run-back features, frequency controller, reduced voltage mode of operation, circuit design parameters and power oscillation damping, as applicable. (c) The following tests shall be performed: (i) Minimum load operation. (ii) Ramp rate. (iii) Overload capability, subject to grid condition. (iv) Black start capability in the case of Voltage source convertor (VSC) HVDC wherever feasible. (v) Dynamic Reactive Power Support (in the case of VSC based HVDC) (9) Documents and Tests Required for the bulk consumer (as per applicability of tests specified in these regulations): (a) The requester shall submit a certificate confirming compliance with CEA (Technical Standards for Connectivity to the Grid) Regulations in accordance with clause (5) of Para 31 of this schedule. (b) Type test report for Fault Ride through Test (LVRT and HVRT) for units commissioned after the specified date as per CEA (Technical Standards for Connectivity to the Grid) Regulations mandating LVRT and HVRT capability shall be submitted. (c) The following tests shall be performed at the point of interconnection: (i) Reactive power capability as per OEM rating at the available irradiance or the wind energy, as the case may be:102 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] Provided that the requester may submit offline simulation studies for the specified tests, in case testing is not feasible before COD, subject to the condition that tests shall be performed within a period of one year from the date of achieving COD. (10) Documents and Tests Required for FACTS a. The transmission licensee shall submit technical particulars including a single line diagram, V/I characteristics, the rating of coupling transformer, the rating of each VSC, MSR and MSC branch, different operating modes, the IEEE standard Model, Power Oscillation Damping (POD) enabled and tuned (if not, then reasons for the same) and the results of an Offline simulation-based study to validate the performance of POD. b) The following tests shall be performed to validate the full reactive power capability of FACTS in both directions i.e. absorption as well as injection mode: (i) POD performance test. (ii) dynamic performance testing: Provided that the transmission licensee may submit offline simulation studies for the specified tests, in case the conduct of tests is not feasible before COD, subject to the condition that tests shall be performed within a period of one year from the date of achieving COD. 30. Certificate of Successful Trial Run (1) In case any objection is raised by a beneficiary in writing to the concerned RLDC with a copy to all concerned regarding the trial run within two (2) days of completion of such trial run, the concerned RLDC shall, within five (5) days of receipt of such objection, in coordination with the concerned entity and the beneficiaries, decide if the trial run was successful or if there is a need for a repeat trial run. (2) After completion of a successful trial run and receipt of documents and test reports as per Schedule II of these regulations, the concerned RLDC shall issue a certificate to that effect to the concerned generating station, ESS or transmission licensee, as the case may be, with a copy to their respective beneficiary(ies) and the respective RPC, within three days. 31. Declaration by requester (1) Thermal Generating Station (a) The requester shall certify that: (i) The generating station or unit thereof meets the relevant requirements and provisions of the CEA Regulation(s), as applicable. (ii) The main plant equipment and auxiliary systems including the balance of the plant such as the fuel oil system, coal handling plant, DM plant, pre-treatment plant, fire-fighting system, ash disposal system and any other site-specific system have been commissioned and are capable of full load operation of the units of the generating station on a sustained basis. (iii) Permanent electric supply system including emergency supplies and all necessary instrumentation, control and protection systems and auto loops for full load operation of the unit has been put into service. (b) The certificates required under sub-clause (a) of this clause shall be signed by the authorized signatory not below the rank of CMD or CEO or MD of the requester and shall be submitted to the concerned RLDC and to the Member Secretary of the concerned RPC before the declaration of COD. (2) Hydro Generating Station (a) The requester shall certify that: (iv) The generating station or unit thereof meets the requirement and relevant provisions of the CEA regulation(s), as applicable. (v) The main plant equipment and auxiliary systems including the drainage de-watering system, primary and secondary cooling system, LP and HP air compressor and firefighting system have been commissioned and are capable of full load operation of units on a sustained basis. (vi) Permanent electric supply systems including emergency supplies and all necessary Instrumentations Control and Protection Systems and auto loops for full load operation of the unit are put into service. (b) The certificates required under sub-clause (a) of this clause shall be signed by the authorized signatory not below the rank of CMD or CEO or MD of the requester and shall be submitted to the concerned RLDC and to the Member Secretary of the concerned RPC before the declaration of COD. (3) Transmission system The requester shall submit a certificate signed by the authorized signatory not below the rank of CMD or CEO or MD of the company to the concerned RLDC and to the Member Secretary of the concerned RPC[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 103 before declaration of COD that the transmission line, sub-station and communication system conform to the CEA regulation(s), as applicable and are capable of operation to their full capacity. (4) Wind, Solar, Storage, and Hybrid Generating Station The generating station based on wind and solar resources, the ESS and the hybrid generating station shall submit a certificate signed by the authorized signatory not below the rank of CMD or CEO or MD to the concerned RLDC and to the Member Secretary of the concerned RPC before declaration of COD, that the said generating station or the ESS as the case may be, including main plant equipment such as wind turbines or solar inverters or auxiliary systems, as the case may be, has complied with all relevant provisions of CEA regulation(s), as applicable. (5) Bulk Consumer The Bulk Consumer facility shall submit a certificate signed by the authorized signatory not below the rank of CMD or CEO or MD to the concerned RLDC and to the Member Secretary of the concerned RPC before declaration of COD, that the said Bulk Consumer facility, including main bulk consumer equipment has complied with all relevant provisions of CEA regulation(s), as applicable. 32. Declaration of Commercial Operation (DOCO) And Commercial Operation Date (COD) (1) A generating station or unit thereof or a transmission system or an element thereof or ESS may declare commercial operation as follows and inform CEA, the concerned RLDC, the concerned RPC and its beneficiaries: (a) Thermal Generating Station or a unit thereof (i) The commercial operation date in the case of a unit of the thermal generation station shall be the date declared by the requester after a successful trial run at MCR or de-rated capacity, as the case may be, and submission of a declaration. (ii) In the case of the generating station, the COD of the last unit of the generating station shall be considered as the COD of the generating station. (b) Hydro Generating Station (i) The commercial operation date in the case of a unit of the hydro generating station including a pumped storage hydro generating station shall be the date declared by the generating station after a successful trial run at MCR or de-rated capacity, as the case may be, and submission of a declaration. (ii) In the case of the generating station, the COD of the last unit of the generating station shall be considered as the COD of the generating station. (c) Transmission System (i) The commercial operation date in the case of an Inter-State Transmission System or an element thereof shall be the date declared by the transmission licensee on which the Transmission System or an element thereof is in regular service at 0000 hours after successful trial operation for transmitting electricity and communication signals from the sending end to the receiving end and submission of a declaration: Provided that the commercial operation date of a transmission element that is a part of the Associated Transmission System (ATS) shall be declared only after a successful trial run of the last element of the said ATS: Provided further that where only some of the transmission elements of the ATS have achieved a successful trial run and the Connectivity grantee seeks commercial operation of such elements for utilization by such grantee and is agreed upon by the appropriate Transmission Utility, the commercial operation date of such transmission elements of the ATS may be declared by the requester as per this Regulation: Provided also that where only some of the transmission element(s) of the ATS have achieved a successful trial run and if the operation of such transmission elements is certified by the concerned Regional Power Committee(s) for improving the performance, safety and security of the grid, the commercial operation date of such transmission element(s) of the ATS may be declared by the transmission licensee as per this Regulation: Provided also that in case a transmission system or an element thereof executed under regulated tariff mechanism is prevented from regular service on or after the scheduled COD for reasons not attributable to the transmission licensee or its supplier or its contractors but is on account of the delay in commissioning of the concerned generating station or in commissioning of the upstream or104 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4] downstream transmission system of other transmission licensee, the transmission licensee shall approach the Commission through an appropriate petition along with a certificate from the appropriate transmission utility to the effect that the transmission system is complete as per the applicable CEA Regulation(s), for approval of the commercial operation date of such transmission system or an element thereof: Provided also that in the case of inter-State Transmission System executed through Tariff Based Competitive Bidding, the transmission licensee may declare deemed COD of the ISTS in accordance with the provisions of the Transmission Service Agreement after obtaining (a)a certificate from the appropriate Transmission Utility to the effect that the transmission system is complete as per the specifications of the bidding guidelines and applicable CEA Regulation(s) and (b) no load charging certificate from the respective RLDC, where no load charging is possible. (ii) The COD of a transmission element of the transmission system under Tariff Based Competitive Bidding shall be declared only after the declaration of the COD of all the pre-required transmission elements as per the Transmission Services Agreement: Provided that in case any transmission element is required in the interest of the power system as certified by the concerned RPC(s), the COD of the said transmission element may be declared prior to the declaration of the COD of its pre-required transmission elements. (d) Communication System Date of commercial operation in relation to a communication system or an element thereof shall mean the date declared by the requester from 0000 hours of which a communication system or element thereof shall be put into service after completion of the site acceptance test including transfer of voice and data to the respective control centres as certified by the respective Regional Load Despatch Centre. (e) Generating Stations based on Wind and Solar resources; ESS and Hybrid Generating Station (i) The commercial operation date in the case of units of a renewable generating station aggregating to 50 MW and above or such other limit as specified Schedule II of these regulations, shall mean the date declared by the generating station after undergoing a successful trial run, submission of declaration, and subject to fulfilment of other conditions, if any, as per PPA. (ii) In the case of a generating station as a whole, the commercial operation date of the last unit of the generating station shall be considered as the COD of the generating station. (f) Bulk Consumer (i) The commercial operation date in the case of a Bulk Consumer facility aggregating to 50 MW and above or such other limit as specified Schedule II of these regulations, shall mean the date declared by the generating station after undergoing a successful trial run, submission of declaration, and subject to fulfilment of other conditions, if any, as per PPA. (ii) In the case of a Bulk Consumer facility as a whole, the commercial operation date of the last unit of the Bulk Consumer facility shall be considered as the COD of the Bulk Consumer facility. SHARVAN KUMAR, Secy. [ADVT.-III/4/Exty./254/2026-27] Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.

Continue your research