UNIVERSITY AUTHORITIES - MANONMANIAM SUNDARANAR UNIVERSITY, TIRUNELVELI - Nominee by the Members of the Senate to the Search Committee for the Appointment of the Vice-Chancellor etc.
**Executive Summary**
This document is a notification from the Tamil Nadu Government Gazette, dated November 29, 2017. It details the Tamil Nadu Electricity Board's approved plans for establishing new electrical substations and power lines to improve electrical load capacity in several districts. Parties with grievances regarding the high-voltage power line routes must submit them within two months of the publication date. The University of Madras notifies the election of Dr. K. Tamil Selvam to the Academic Council.
**Key Points / Main Content**
* **Tamil Nadu Electricity Board Notifications:**
* Approval for establishing new substations and power lines to increase electrical load capacity.
* Project locations include:
* Madurai
* Dindigul
* Ramanathapuram
* Sivaganga
* Theni
* Nagercoil
* Tirunelveli
* Thoothukudi
* Virudhunagar districts.
* New substations and power lines installation planned for the years 2017-2018 and 2018-2019.
* Detailed information of the planned power lines/ substations, its voltage, and budget:
* Installation of cables in existing and new substations in Muthuramalingapuram and Keezhapavur
* New power lines and cable installations connecting various electrical substations in the region.
* Grievance Procedure:
* Parties with grievances regarding the power line routes can file them within two months of the publication date.
* **University of Madras Notifications:**
* Election of Dr. K. Tamil Selvam to the Academic Council.
* Term duration: October 6, 2017, to October 5, 2020, or until cessation of membership in the Senate, whichever is earlier.
**Impact Analysis**
**Tamil Nadu Electricity Board:**
* **Impact**: Required to execute the approved substation and power line projects across multiple districts.
* **Action Required**: Proceed with the approved project plans for substation and power line installation.
**Landowners/Residents near Planned Power Lines:**
* **Impact**: Potentially affected by the construction of new high-voltage power lines.
* **Action Required**: If they have grievances, submit them to the overseeing engineer within two months of the publication date.
**University of Madras Senate Members:**
* **Impact**: Informs the members of the elected member to the Academic Council.
* **Action Required**: No specific action required. A record of the election is now formalized.
Key Entities Referenced
Tamil Nadu Electricity Board: State-owned electricity utility responsible for power generation and distribution in Tamil Nadu.
Electricity Act, 2003: Indian law that consolidates laws relating to electricity and provides a framework for its development. Referenced in relation to power transmission permissions.
Madurai: Location of the General Construction Circle referenced in the notification.
University of Madras: University whose authorities and council member elections are mentioned in the document.