Executive Summary:
The Government of National Capital Territory of Delhi, Land and Building Department, extends the time for issuance of declaration under section 19 of The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013. This extension applies to land acquisitions for Waste Water Treatment Plants (WWTP) in Kakrola, Tajpur Khurd, Bijwasan, Kazipur and Kair Villages. The new deadline for the declaration is August 27, 2017.
Key Points / Main Content:
Land Acquisition Extension:
* The appropriate government extends the deadline for issuing declarations under Section 19 of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013.
* The extension is for six months, setting the new deadline as August 27, 2017.
Project Purpose:
* The land acquisition is for the construction of Waste Water Treatment Plants (WWTP).
* These WWTPs will serve the inhabitants of Kakrola Village, Tajpur Khurd Village, Bijwasan Village, Kazipur Village and Kair Village and their adjoining areas.
Notification Details:
* The initial notifications for land acquisition were issued on 2882015, under specific notification numbers: 8216LBLA10647 (Kakrola), 8216LBLA10643 (Tajpur Khurd), 8216LBLA10641 (Bijwasan), 8216LBLA10649 (Kazipur), 8216LBLA10645 (Kair).
* The extensions were granted following approvals from the Lieutenant Governor of Delhi, after proposals were received from the concerned districts.
Impact Analysis:
DistrictSouth West:
* Impact: The District has been granted an extension to issue declarations for land acquisition related to the construction of Waste Water Treatment Plants.
* Action Required: The DistrictSouth West must ensure that all necessary declarations under Section 19 of the Act are issued by August 27, 2017, to keep the land acquisition process on track.
Land and Building Department:
* Impact: Responsible for the notification and implementation of the extension for land acquisition declarations.
* Action Required: Ensure proper documentation and adherence to the extended timelines for the land acquisition process.
Inhabitants of Kakrola, Tajpur Khurd, Bijwasan, Kazipur and Kair Villages and adjoining areas:
* Impact: Directly benefit from the construction of Waste Water Treatment Plants (WWTP) in their areas, which are contingent upon the land acquisition.
* Action Required: No immediate action, but should remain informed about the progress of the land acquisition and construction of the WWTP.
Key Entities Referenced
National Capital Territory of Delhi: A Union Territory and city in India.
The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013: An Act of the Parliament of India that regulates land acquisition and provides rules for fair compensation, rehabilitation and resettlement to affected persons.
Waste Water Treatment Plant WWTP: Infrastructure being constructed for public purpose.
Kakrola, Village: Village in Delhi where a Waste Water Treatment Plant is planned.
Tajpur Khurd Village: Village in Delhi where a Waste Water Treatment Plant is planned.
Bijwasan Village: Village in Delhi where a Waste Water Treatment Plant is planned.
Kazipur Village: Village in Delhi where a Waste Water Treatment Plant is planned.
Kair Village: Village in Delhi where a Waste Water Treatment Plant is planned.
jftLVªh la- Mh-,y-µ33002@99 Hkkjr ljdkj REGISTERED No. D.L.-33002/99
GOVERNMENT OF INDIA
vlk/kj.k
EXTRAORDINARY
çkf/dkj ls çdkf'kr
PUBLISHED BY AUTHORITY
la- 67] fnYyh] c`gLifrokj] iQjojh 23] 2017@iQkYxqu 4] 1938 ¹jk-jk-jk-{ks-fn- la- 376
No. 67] DELHI, THURSDAY, FEBRUARY 23, 2017/PHALGUNA 4, 1938 [N.C.T.D. No. 376
Hkkx—IV
PART—IV
jk"Vªh; jktèkkuh jkT; {ks=k fnYyh ljdkj
GOVERNMENT OF THE NATIONAL CAPITAL TERRITORY OF DELHI
Hkwfe ,oa Hkou foHkkx
¼Hkwfe vf/kxzg.k ’kk[kk½
vf/klwpuk,a
fnYyh] 22 Qjojh] 2017
सससस..ंं..ंंफफफफाााा.... 8888////2222////11116666////एएएएलललल एएएए(cid:2)(cid:2)(cid:2)(cid:2)डड डड बबबबीीीी////एएएएलललल एएएए////11115555555555557777....———— जब(cid:3)क, भूिम अिध(cid:8)हण, पुनवा(cid:16)स और पुनः (cid:18)थापना का उिचत
मुआवजा और पारद(cid:22)शता अिधकार अिधिनयम, 2013 (2013 का 30) क(cid:25) धारा 10(अ) क(cid:25) उपधारा (1) के खंड (ङ) के
अंतगत(cid:16) जारी अिधसूचना नंबर 8/2/16/एल एंड बी/एल ए/10647 (cid:3)दनांक 28/8/2015 के (cid:28)ारा जन काय(cid:30) के िलए गांव
ककरोला तथा स(cid:31)ब ! "े$ो म ’ अपिश( जल शोधक सयं ं$ के िनमा(cid:16)ण के िलए भूिम अिध(cid:8)हण हते ु अिधसूचना जारी क(cid:25) गयी
थी ।
और जब(cid:3)क, उ* अिधिनयम क(cid:25) धारा 19 क(cid:25) उपधारा (7) के अनुसार इस अिधिनयम क(cid:25) धारा 19 के अधीन
घोषणा +ाथिमक अिधसूचना के जारी होने से 12 महीने के अंदर जारी होनी थी।
और जब(cid:3)क, उ* अिधिनयम क(cid:25) धारा 19 के अंतगत(cid:16) घोषणा जारी करन े के िलये स(cid:31)बंिधत िजल े से समय बढ़ाने का
+(cid:18)ताव +ा, -आ था तथा धारा 19 क(cid:25) अिधसूचना का समय 6 माह के िलये माननीय उप रा/यपाल (cid:3)द1ली का आदेश पर
बढ़ा (cid:3)दया था।
और जब(cid:3)क िजला दि"ण पि3म से यह अविध और छह माह बढ़ाने का +(cid:18)ताव +ा, -आ ह ै।
1025 DG/2017 (1)2 DELHI GAZETTE : EXTRAORDINARY PART IV]
इसिलए, अब उपयु* सरकार, िजले के अनुरोध पर िवचार करत े -ए तथा उ* भूिम अिध(cid:8)हण, पुनवास(cid:16) और पुनः
(cid:18)थापना का उिचत मुआवजा और पारद(cid:22)शता अिधकार अिधिनयम, 2013 क(cid:25) धारा 19 उपधारा 7 के अंतगत(cid:16) घोषणा जारी
करन ेक(cid:25) अविध को छह माह बढ़ाने, अथा(cid:16)त ्27 अग(cid:18)त 2017 तक क(cid:25) अनुमित +दान करती ह ै।
LAND AND BUILDING DEPARTMENT
(LAND ACQUISITION BRANCH )
NOTIFICATIONS
Delhi, the 22nd February, 2017
No. F. 8/2/16/L&B/LA/15557.— Whereas, a Notification under clause (e) of sub- section 1 of section 10-A of
the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (30
of 2013), was issued vide notification No. 8/2/16/L&B/LA/10647 dated. 28/8/2015 for acquisition of land for public
purpose namely for construction of Waste Water Treatment Plant (WWTP) generated from the inhabitants of the
Kakrola, Village and adjoining areas.
And whereas, as per sub-section (7) of section 19 of the said Act, the declaration u/s 19 of this Act is to be
issued within a period of 12 months from the date of publication of preliminary notification.
And whereas, a proposal was received from concerned district for extension of time in issuance for declaration
u/s 19 of the Act, which was approved by Lt. Governor of Delhi and time for declaration was extended for Six (6)
months, and whereas a proposal has again received from District(South West) for another extension of time by Six(6)
months.
Now, therefore, the appropriate government after considering the request of District and in the exercise of
powers conferred under proviso of Sub- Section 7 of Section 19 of the Right to Fair Compensation and Transparency
in Land Acquisition, Rehabilitation and Resettlement Act, 2013, is pleased to extend the time for issuance of
declaration under section 19 of the said Act by a period of six months i.e. upto 27th August 2017.
सससस..ंं..ंंफफफफाााा.... 8888////2222////11116666////एएएएलललल एएएए(cid:2)(cid:2)(cid:2)(cid:2)डड डड बबबबीीीी////एएएएलललल एएएए////11115555555555558888....———— जब(cid:3)क, भूिम अिध(cid:8)हण, पुनवा(cid:16)स और पुनः (cid:18)थापना का उिचत
मुआवजा और पारद(cid:22)शता अिधकार अिधिनयम, 2013 (2013 का 30) क(cid:25) धारा 10अ क(cid:25) उपधारा (1) के खंड (ङ) के
अंतगत(cid:16) जारी अिधसूचना नंबर 8/2/16/एल एंड बी/एल ए/10643 (cid:3)दनांक 28/8/2015 के (cid:28)ारा जन काय(cid:30) के िलए गांव
ताजपुर खुद (cid:16) तथा स(cid:31)ब "े$! म ’ अपिश( जल शोधक सयं ं$ के िनमा(cid:16)ण के िलए भूिम अिध(cid:8)हण हते ु अिधसूचना जारी क(cid:25)
गयी थी ।
और जब(cid:3)क, उ* अिधिनयम क(cid:25) धारा 19 क(cid:25) उपधारा (7) के अनुसार इस अिधिनयम क(cid:25) धारा 19 के अधीन
घोषणा +ाथिमक अिधसूचना के जारी होने से 12 महीने के अंदर जारी होनी थी।
और जब(cid:3)क, उ* अिधिनयम क(cid:25) धारा 19 के अंतगत(cid:16) घोषणा जारी करन े के िलये स(cid:31)बंिधत िजल े से समय बढ़ान ेका
+(cid:18)ताव +ा, -आ था तथा धारा 19 क(cid:25) अिधसूचना का समय 6 माह के िलय े माननीय उप रा/यपाल (cid:3)द1ली का आदेश पर
बढ़ा (cid:3)दया था। और जब(cid:3)क िजला दि"ण पि3म से यह अविध और छह माह बढ़ाने का +(cid:18)ताव +ा, -आ ह ै ।
इसिलए, अब उपयु* सरकार, िजले के अनुरोध पर िवचार करत े -ए तथा उ* भूिम अिध(cid:8)हण, पुनवा(cid:16)स और पुनः
(cid:18)थापना का उिचत मुआवजा और पारद(cid:22)शता अिधकार अिधिनयम, 2013 क(cid:25) धारा 19 उपधारा 7 के अंतगत(cid:16) घोषणा जारी
करन ेक(cid:25) अविध को छह माह बढ़ाने, अथा(cid:16)त 27 अग(cid:18)त 2017 तक क(cid:25) अनुमित +दान करती ह ै।
No. F.8/2/16/L&B/LA/15558.— Whereas, a Notification under clause (e) of sub- section 1 of section 10-A of
the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013
(30 of 2013), was issued vide notification No. 8/2/16/L&B/LA/10643 dated. 28/8/2015 for acquisition of land forPART IV] DELHI GAZETTE : EXTRAORDINARY 3
public purpose namely for construction of Waste Water Treatment Plant (WWTP) generated from the inhabitants of the
Tajpur Khurd Village and adjoining areas .
And whereas, as per sub-section (7) of section 19 of the said Act, the declaration u/s 19 of this Act is to be
issued within a period of 12 months from the date of publication of preliminary notification,
And whereas, a proposal was received from concerned district for extension of time in issuance for declaration
u/s 19 of the Act, which was approved by Lt. Governor of Delhi and time for declaration was extended for Six (6)
months, and whereas a proposal was again received from District(South West) for another extension of time by Six(6)
months.
Now, therefore, the appropriate government after considering the request of District and in the exercise of
powers conferred under proviso of sub- section 7 of Section 19 of the Right to Fair Compensation and Transparency in
Land Acquisition, Rehabilitation and Resettlement Act, 2013, is pleased to extend the time for issuance of declaration
under section 19 of the said Act by a period of six months i.e. upto 27th August 2017.
सससस..ंं..ंंफफफफाााा.... 8888////2222////11116666////एएएएलललल एएएए(cid:2)(cid:2)(cid:2)(cid:2)डड डड बबबबीीीी////एएएएलललल एएएए////11115555555555559999....———— जब(cid:3)क, भूिम अिध(cid:8)हण, पुनवा(cid:16)स और पुनः (cid:18)थापना का उिचत
मुआवजा और पारद(cid:22)शता अिधकार अिधिनयम, 2013 (2013 का 30) क(cid:25) धारा 10अ क(cid:25) उपधारा (1) के खंड (ङ) के
अंतगत(cid:16) जारी अिधसूचना नंबर 8/2/16/एल एंड बी/एल ए/10641 (cid:3)दनांक 28/8/2015 के (cid:28)ारा जन काय(cid:30) के िलए गांव
िवजवासन तथा स(cid:31)ब "े$! म ’ अपिश( जल शोधक सयं ं$ के िनमा(cid:16)ण के िलए भूिम अिध(cid:8)हण हते ु अिधसूचना जारी क(cid:25) गयी
थी ।
और जब(cid:3)क, उ* अिधिनयम क(cid:25) धारा 19 क(cid:25) उपधारा (7) के अनुसार इस अिधिनयम क(cid:25) धारा 19 के अधीन
घोषणा +ाथिमक अिधसूचना के जारी होने से 12 महीने के अंदर जारी होनी थी।
और जब(cid:3)क, उ* अिधिनयम क(cid:25) धारा 19 के अंतगत(cid:16) घोषणा जारी करन े के िलये स(cid:31)बंिधत िजल े से समय बढ़ान ेका
+(cid:18)ताव +ा, -आ था तथा धारा 19 क(cid:25) अिधसूचना का समय 6 माह के िलय े माननीय उप रा/यपाल (cid:3)द1ली का आदेश पर
बढ़ा (cid:3)दया था। और जब(cid:3)क िजला दि"ण पि3म से यह अविध और छह माह बढ़ाने का +(cid:18)ताव +ा, -आ ह ै ।
इसिलए, अब उपयु* सरकार, िजले के अनुरोध पर िवचार करत े -ए तथा उ* भूिम अिध(cid:8)हण, पुनवा(cid:16)स और पुनः
(cid:18)थापना का उिचत मुआवजा और पारद(cid:22)शता अिधकार अिधिनयम, 2013 क(cid:25) धारा 19 उपधारा 7 के अंतगत(cid:16) घोषणा जारी
करन ेक(cid:25) अविध को छह माह बढ़ाने, अथा(cid:16)त ्27 अग(cid:18)त 2017 तक क(cid:25) अनुमित +दान करती ह ै।
No. F.8/2/16/L&B/LA/15559.— Whereas, a Notification under clause (e) of sub- section 1 of section 10-A of
the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013
(30 of 2013), was issued vide notification No. 8/2/16/L&B/LA/10641 dated. 28/8/2015 for acquisition of land for
public purpose namely for construction of Waste Water Treatment Plant (WWTP) generated from the inhabitants of the
Bijwasan Village and adjoining areas .
And whereas, as per sub-section (7) of section 19 of the said Act, the declaration u/s 19 of this Act is to be
issued within a period of 12 months from the date of publication of preliminary notification.
And whereas, a proposal was received from concerned district for extension of time in issuance for declaration
u/s 19 of the Act, which was approved by Lt. Governor of Delhi and time for declaration was extended for Six (6)
months, and whereas a proposal was again received from District(South West) for another extension of time by Six(6)
months.
Now, therefore, the appropriate government after considering the request of District and in the exercise of
powers conferred under proviso of sub- section 7 of Section 19 of the Right to Fair Compensation and Transparency in
Land Acquisition, Rehabilitation and Resettlement Act, 2013, is pleased to extend the time for issuance of declaration
under section 19 of the said Act by a period of six months i.e. upto 27th August 2017.
सससस..ंं..ंंफफफफाााा.... 8888////2222////11116666////एएएएलललल एएएए(cid:2)(cid:2)(cid:2)(cid:2)डड डड बबबबीीीी////एएएएलललल एएएए////11115555555566660000....———— जब(cid:3)क, भूिम अिध(cid:8)हण, पुनवा(cid:16)स और पुनः (cid:18)थापना का उिचत
मुआवजा और पारद(cid:22)शता अिधकार अिधिनयम, 2013 (2013 का 30) क(cid:25) धारा 10अ क(cid:25) उपधारा (1) के खंड (ङ) के
अंतगत(cid:16) जारी अिधसूचना नंबर 8/2/16/एल एंड बी/एल ए/10649 (cid:3)दनांक 28/8/2015 के (cid:28)ारा जन काय(cid:30) के िलए गांव4 DELHI GAZETTE : EXTRAORDINARY PART IV]
काजीपुर तथा स(cid:31)ब "े$! म ’ अपिश( जल शोधक सयं ं$ के िनमा(cid:16)ण के िलए भूिम अिध(cid:8)हण हते ु अिधसूचना जारी क(cid:25) गयी
थी ।
और जब(cid:3)क, उ* अिधिनयम क(cid:25) धारा 19 क(cid:25) उपधारा (7) के अनुसार इस अिधिनयम क(cid:25) धारा 19 के अधीन
घोषणा +ाथिमक अिधसूचना के जारी होने से 12 महीने के अंदर जारी होनी थी।
और जब(cid:3)क, उ* अिधिनयम क(cid:25) धारा 19 के अंतगत(cid:16) घोषणा जारी करन े के िलये स(cid:31)बंिधत िजल े से समय बढ़ान ेका
+(cid:18)ताव +ा, -आ था तथा धारा 19 क(cid:25) अिधसूचना का समय 6 माह के िलय े माननीय उप रा/यपाल (cid:3)द1ली का आदेश पर
बढ़ा (cid:3)दया था। और जब(cid:3)क िजला दि"ण पि3म से यह अविध और छह माह बढ़ाने का +(cid:18)ताव +ा, -आ ह ै ।
इसिलए, अब उपयु* सरकार, िजले के अनुरोध पर िवचार करत े -ए तथा उ* भूिम अिध(cid:8)हण, पुनवा(cid:16)स और पुनः
(cid:18)थापना का उिचत मुआवजा और पारद(cid:22)शता अिधकार अिधिनयम, 2013 क(cid:25) धारा 19 उपधारा 7 के अंतगत(cid:16) घोषणा जारी
करन ेक(cid:25) अविध को छह माह बढ़ाने, अथा(cid:16)त 27 अग(cid:18)त 2017 तक क(cid:25) अनुमित +दान करती ह ै।
No. F.8/2/16/L&B/LA/15560.— Whereas, a Notification under clause (e) of sub- section 1 of section 10-A of
the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013
(30 of 2013), was issued vide notification No. 8/2/16/L&B/LA/10649 dated. 28/8/2015 for acquisition of land for
public purpose namely for construction of Waste Water Treatment Plant (WWTP) generated from the inhabitants of the
Kazipur Village and adjoining areas .
And Whereas, as per sub-section (7) of section 19 of the said Act, the declaration u/s 19 of this Act is to be
issued within a period of 12 months from the date of publication of preliminary notification.
And whereas, a proposal was received from concerned district for extension of time in issuance for declaration
u/s 19 of the Act, which was approved by Lt. Governor of Delhi and time for declaration was extended for Six (6)
months, and whereas a proposal was again received from District(South West) for another extension of time by Six(6)
months.
Now, therefore, the appropriate government after considering the request of District and in the exercise of
powers conferred under proviso of sub- section 7 of Section 19 of the Right to Fair Compensation and Transparency in
Land Acquisition, Rehabilitation and Resettlement Act, 2013, is pleased to extend the time for issuance of declaration
under section 19 of the said Act by a period of six months i.e. upto 27th August 2017.
सससस..ंं..ंंफफफफाााा.... 8888////2222////11116666////एएएएलललल एएएए(cid:2)(cid:2)(cid:2)(cid:2)डड डड बबबबीीीी////एएएएलललल एएएए////11115555555566661111....———— जब(cid:3)क, भूिम अिध(cid:8)हण, पुनवा(cid:16)स और पुनः (cid:18)थापना का उिचत
मुआवजा और पारद(cid:22)शता अिधकार अिधिनयम, 2013 (2013 का 30) क(cid:25) धारा 10अ क(cid:25) उपधारा (1) के खंड (ङ) के
अंतगत(cid:16) जारी अिधसूचना नंबर 8/2/16/एल एंड बी/एल ए/10645 (cid:3)दनांक 28/8/2015 के (cid:28)ारा जन काय(cid:30) के िलए गांव
कैर तथा स(cid:31)ब "े$! म ’अपिश( जल शोधक सयं ं$ के िनमा(cid:16)ण के िलए भूिम अिध(cid:8)हण हते ु अिधसूचना जारी क(cid:25) गयी थी ।
और जब(cid:3)क, उ* अिधिनयम क(cid:25) धारा 19 क(cid:25) उपधारा (7) के अनुसार इस अिधिनयम क(cid:25) धारा 19 के अधीन
घोषणा +ाथिमक अिधसूचना के जारी होने से 12 महीने के अंदर जारी होनी थी।
और जब(cid:3)क, उ* अिधिनयम क(cid:25) धारा 19 के अंतगत(cid:16) घोषणा जारी करन े के िलये स(cid:31)बंिधत िजल े से समय बढ़ान ेका
+(cid:18)ताव +ा, -आ था तथा धारा 19 क(cid:25) अिधसूचना का समय 6 माह के िलय े माननीय उप रा/यपाल (cid:3)द1ली का आदेश पर
बढ़ा (cid:3)दया था। और जब(cid:3)क िजला दि"ण पि3म से यह अविध और छह माह बढ़ाने का +(cid:18)ताव +ा, -आ ह ै ।
इसिलए, अब उपयु* सरकार, िजले के अनुरोध पर िवचार करत े -ए तथा उ* भूिम अिध(cid:8)हण, पुनवा(cid:16)स और पुनः
(cid:18)थापना का उिचत मुआवजा और पारद(cid:22)शता अिधकार अिधिनयम, 2013 क(cid:25) धारा 19 उपधारा 7 के अंतगत(cid:16) घोषणा जारी
करन ेक(cid:25) अविध को छह माह बढ़ाने, अथा(cid:16)त 27 अग(cid:18)त 2017 तक क(cid:25) अनुमित +दान करती ह ै।
रा8ीय राजधानी "े$ (cid:3)द1ली के उपरा/यपाल के,
आदेश और उनके नाम पर,
आलोक शमा,(cid:16) उप सिचव (भूिम एवं भवन)PART IV] DELHI GAZETTE : EXTRAORDINARY 5
No. F.8/2/16/L&B/LA/15561.— Whereas, a Notification under clause (e) of sub- section 1 of section 10-A of
the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013
(30 of 2013), was issued vide notification No. 8/2/16/L&B/LA/10649 dated. 28/8/2015 for acquisition of land for
public purpose namely for construction of Waste Water Treatment Plant (WWTP) generated from the inhabitants of the
Kair Village and adjoining areas .
And whereas, as per sub-section (7) of section 19 of the said Act, the declaration u/s 19 of this Act is to be
issued within a period of 12 months from the date of publication of preliminary notification.
And whereas, a proposal was received from concerned district for extension of time in issuance for declaration
u/s 19 of the Act, which was approved by Lt. Governor of Delhi and time for declaration was extended for Six (6)
months, and whereas a proposal was again received from District(South West) for another extension of time by Six(6)
months.
Now, therefore, the appropriate government after considering the request of District and in the exercise of
powers conferred under proviso of Sub- Section 7 of Section 19 of the Right to Fair Compensation and Transparency
in Land Acquisition, Rehabilitation and Resettlement Act, 2013, is pleased to extend the time for issuance of
declaration under section 19 of the said Act by a period of six months i.e. upto 27th August 2017.
By Order and in the Name of Lieutenant Governor,
National Capital Territory of Delhi,
ALOK SHARMA, Dy. Secy (L&B)