Home India Ministry of New and Renewable Energy Whereas the Central Government had issued Solar Photovoltaic...
Date: 2018-04-16 Category: Extra Ordinary State: Union Government Country: India

Whereas the Central Government had issued Solar Photovoltaics Systems Devices and Components Goods

Issued by Ministry of New and Renewable Energy · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

Executive Summary: This document pertains to the Solar Photovoltaics, Systems, Devices and Components Goods Requirements for Compulsory Registration Order, 2017. It advances the date of coming into force for the order and provides a relaxation for SPV Module manufacturers to submit a self-certification until June 30, 2018, under specific conditions. The document also includes a schedule of products and their corresponding Indian Standards, along with their implementation dates. Key Points / Main Content: * **Order Amendment:** The date of coming into force of the Solar Photovoltaics Order, 2017 is advanced as per the schedule annexed to the document. * **Self-Certification for SPV Modules (Until June 30, 2018):** * SPV Module manufacturers may submit self-certification of conformity to relevant Indian or IEC standards, along with proof of sample submission to laboratories and the expected testing completion date. * Self-certification is allowed if the material has already been IEC certified, accompanied by the IEC certificate and test reports. * For imported material, self-certification can be given by either the manufacturer or the importer. * **Schedule of Products and Implementation Dates:** * Crystalline Silicon Terrestrial Photovoltaic PV modules (IS 14286:2010): April 16, 2018. * Thin Film Terrestrial Photovoltaic PV Modules (IS 16077:2013): April 16, 2018. * PV Module Safety Qualification (IS/IEC 61730 Part 1: 2004): April 16, 2018 (without fire test), July 1, 2018 (with fire test). * PV Module Safety Qualification (IS/IEC 61730 Part 2: 2004): April 16, 2018. * Power Inverter Safety (IS 16221 Part 1: 2016): April 16, 2018 (up to 100 kW), October 1, 2018 (above 100 kW). * Power Inverter Safety (IS 16221 Part 2: 2015). * Utility Interconnected Photovoltaic inverters (IS 16169:2014): April 16, 2018 (up to 100 kW), October 1, 2018 (above 100 kW). Impact Analysis: Manufacturers of SPV Modules: * Impact: Can use self-certification until June 30, 2018, under certain conditions, potentially easing the initial burden of compliance. * Action Required: Submit self-certification with required documentation (proof of sample submission or IEC certification) before the deadline. Importers of SPV Modules: * Impact: Can provide self-certification for imported materials. * Action Required: Ensure self-certification is provided with the necessary documentation. Laboratories Testing SPV Modules: * Impact: Increased workload to test SPV modules * Action Required: Complete testing of submitted samples and provide results in a timely manner Bureau of Indian Standards (BIS): * Impact: Standards referenced are key to compliance * Action Required: Stay aligned with the new order. Stakeholders including Bureau of Indian Standards: * Impact: Discussions with stakeholders informed the advanced date of the order. * Action Required: Be aware of the changes and ensure compliance with the new implementation dates for the specified products.

Key Entities Referenced

Solar Photovoltaics, Systems, Devices and Components Goods Requirements for Compulsory Registration Order, 2017: A policy document regarding compulsory registration requirements for solar photovoltaic systems, devices, and components. Bureau of Indian Standards: A standards organization involved in discussions regarding the implementation of the Solar Photovoltaics order. New Delhi: Location where the MINISTRY OF NEW AND RENEWABLE ENERGY NOTIFICATION was issued. IEC: International Electrotechnical Commission, an international standards organization. Referenced in the context of testing and certification of solar products. IS 14286 : 2010: Indian Standard for Crystalline Silicon Terrestrial Photovoltaic PV modules Design Qualification And Type Approval IS 16077 : 2013: Indian Standard for ThinFilm Terrestrial Photovoltaic PV Modules Design Qualification and Type Approval ISIEC 61730: Indian Standard for Photovoltaic PV Module Safety Qualification MINISTRY OF NEW AND RENEWABLE ENERGY: The ministry that issued the notification regarding solar photovoltaic devices and components.
Official Source Record View Original Source →
See Full Document Text
jftLVªh laö Mhö ,yö&33004@99 REGD. NO. D. L.-33004/99 vlk/kj.k EXTRAORDINARY Hkkx II—[k.M 3—mi&[k.M (ii) PART II—Section 3—Sub-section (ii) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY la- 1456] ubZ fnYyh] lkseokj] vçSy 16] 2018@pS=k 26] 1940 No. 1456] NEW DELHI, MONDAY, APRIL 16, 2018/CHAITRA 26, 1940 ननननववववीीीीनननन औऔऔऔरररर ननननववववीीीीककककररररणणणणीीीीयययय ऊऊऊऊजजजजाााा(cid:13) (cid:13) (cid:13) (cid:13) मममम(cid:16)(cid:16)ंं(cid:16)(cid:16)ंं ााााललललयययय अअअअििििधधधधससससचचूूचचूू ननननाााा नई (cid:4)द(cid:6) ली, 16 अ(cid:13)लै , 2018 ककककाााा....आआआआ.... 1111666600002222((((अअअअ))))....————यत: क(cid:21)(cid:22) सरकार (cid:26)ारा (cid:4)दनाकं 5 िसतंबर, 2017 के का.आ. 2920 (अ) के मा’य म से ''सौर (cid:13)काशवो(cid:6)ट ीय, (cid:13)णािलया ं उपकरण और संघटक माल (अिनवाय2 पंजीकरण हते ु आव6 यकताए)ं आदशे जारी (cid:4)कया था जो 5 िसतंबर, 2018 स े लागू (cid:4)कया गया था और यत:, भारतीय मानक ; यूरो (बीआईएस) सिहत िविभ= न िहतधारक? के साथ चचा 2 करन े के बाद, उAत आदशे के लागू (cid:4)कए जाने कB तारीख सलं Dन अनसु ूची म (cid:21) (cid:13)Eय ेक उEप ाद के सामन े(cid:4)कए गए उ(cid:6) लेख के अनसु ार उ=न त रहगे ी। 2. यत:, संलDन अनसु चू ी म (cid:21)उि(cid:6)ल िखत उEप ाद? के परीFण के िलए, िलए जान ेवाले समय पर िवचार करत े Gए एसपीवी मॉIूल के मामल ेम (cid:21)िविनमा2ता परीFण को पूरा (cid:4)कए जान ेकB संभािवत तारीख के साथ (cid:13)योगशालाJ को (cid:13)ितदशK (नमून?) के (cid:13)माण सिहत यह Lव -(cid:13)माणन (cid:13)Lत ुत कर सकत ेह M(cid:4)क उनके उE पाद संबिं धत भारतीय मानक? अथवा उनके आईईसी (cid:13)ितLथ ािनय? (उEE ा रवतN मानक? सिहत, य(cid:4)द कोई हो) के अनOु प ह।ै इस (cid:13)कार कB छूट 30 जून, 2018 तक लागू होगी। यह (cid:13)ावधान (cid:4)कया गया ह ै(cid:4)क िजस माल के िलए L व-(cid:13)माणन (cid:4)कया जा रहा ह,ै को पहल ेही आईईसी (cid:26)ारा (cid:13)मािणत (cid:4)कया गया हो, के मामल े म (cid:21) ऊपर खंड 2 के अतं ग2त L व-(cid:13)माणन के साथ (cid:13)ितदशK को (cid:13)L ततु करना आव6 यक नहV होगा। ऐस े मामले म(cid:21), Lव -(cid:13)माणन के िलए आईईसी (cid:13)माण पX और परीFण YरपोटK के साथ सलं Dन (cid:4)कया जाना पया2Z त होगा। आगे यह भी (cid:13)ावधान (cid:4)कया जाता ह ै (cid:4)क आयाितत साम[ी, िजसके िलए ऊपर खंड 2 के अनसु ार L व-(cid:13)माणन (cid:4)कया जा रहा ह,ै के मामले म (cid:21)िविनमा2ता अथवा आयातक (cid:26)ारा L व-(cid:13)माणन (cid:4)कया जा सकता ह।ै अअअअननननससुुससुु चचूूचचूू ीीीी (cid:18)(cid:18)(cid:18)(cid:18)....सससस..ंं..ंं उउउउ(cid:22)(cid:22)(cid:22)(cid:22)पपपपाााादददद भभभभााााररररततततीीीीयययय ममममााााननननकककक भभभभााााररररततततीीीीयययय ममममााााननननकककक ककककाााा शशशशीीीीषषषषकक(cid:13)(cid:13)कक(cid:13)(cid:13) ककककााााययययाााा(cid:29)(cid:29)(cid:13)(cid:13)(cid:29)(cid:29)(cid:13)(cid:13) ववववययययनननन कककक(cid:30)(cid:30)(cid:30)(cid:30) ििििततततििििथथथथ सससस(cid:25)(cid:25)ंं(cid:25)(cid:25)ंं ययययाााा ((((1111)))) ((((2222)))) ((((3333)))) ((((4444)))) ((((5555)))) 1. (cid:4)\Lटलाइन िसिलकॉन आईएस 14286: (cid:4)\Lटलाइन िसिलकॉन 16 अ(cid:13)ैल 2018 टेYर]ायल फोटोवो(cid:6)टेइक (पीवी) 2010 टेYर]ायल फोटोवो(cid:6)टेइक मॉIलू (पीवी) मॉIलू - िडजाइन (एसआई वफ़र आधाYरत) योDयता और अनमु ोदन (cid:13)कार 2201 GI/2018 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] (cid:18)(cid:18)(cid:18)(cid:18)....सससस..ंं..ंं उउउउ(cid:22)(cid:22)(cid:22)(cid:22)पपपपाााादददद भभभभााााररररततततीीीीयययय ममममााााननननकककक भभभभााााररररततततीीीीयययय ममममााााननननकककक ककककाााा शशशशीीीीषषषषकक(cid:13)(cid:13)कक(cid:13)(cid:13) ककककााााययययाााा(cid:29)(cid:29)(cid:13)(cid:13)(cid:29)(cid:29)(cid:13)(cid:13) ववववययययनननन कककक(cid:30)(cid:30)(cid:30)(cid:30) ििििततततििििथथथथ सससस(cid:25)(cid:25)ंं(cid:25)(cid:25)ंं ययययाााा ((((1111)))) ((((2222)))) ((((3333)))) ((((4444)))) ((((5555)))) 2. िथन (cid:4)फ(cid:6)म टेYर]ायल फोटोवो(cid:6)टेइक आईएस 16077: िथन (cid:4)फ(cid:6)म टेYर]ायल 16 अ(cid:13)ैल 2018 (पीवी) मॉIलू 2013 फोटोवो(cid:6)टेइक (पीवी) (ए-एसआई, सीआईजीएस और मॉIलू - िडजाइन योDयता सीडीटीई) और अनमु ोदन (cid:13)कार 3. पीवी मॉIलू आईएस/ आईईसी िनमा2ण के िलए 16 अ(cid:13)ैल 2018 (एसआई वफ़र और िथन (cid:4)फ(cid:6)म) 61730 फोटोवोि(cid:6)टक (पीवी) (अिa परीFण के (भाग-1): 2004 मॉIलू सुरFा योDयता िबना) भाग 1 कB आव6यकताए ँ आईएस/ आईईसी परीFण के िलए 1 जुलाई 2018 61730 फोटोवोि(cid:6)टक (पीवी) (अिa परीFण के (भाग-2): 2004 मॉIलू सुरFा योDयता साथ) भाग 2 कB आव6यकताए ँ 4. फोटोवोि(cid:6)टक िवbुत (cid:13)णाली म (cid:21) आईएस 16221 फोटोवोि(cid:6)टक िवbुत 16 अ(cid:13)ैल,2018 उपयोग के िलए िवbुत इ=वट2र ह ै (cid:13)णाली भाग 1- सामा=य (100 (cid:4)कलोवाट (भाग-1): 2016 आव6यकताJ म(cid:21) उपयोग तक के इ=वट2र के के िलए िवbुत क=वट2स2 कB िलए) सुरFा आईएस 16221 फोटोवो(cid:6)टेइक िवbुत ह ै (cid:13)णाली भाग 2 इनवट2र के 1 अAटूबर 2018 (भाग-2): 2015 िलए िवशषे आव6यकताJ (100 (cid:4)कलोवाट स े म (cid:21) उपयोग के िलए िवbुत ऊपर के इनवट2र के क=वट2स2 कB सुरFा- िलए) 5. उपयोिगता -इंटरकनेAटेड आईएस 16169: उपयोिगता-इंटरकनAे टेड 16 अ(cid:13)ैल, 2018 फोटोवोि(cid:6)टक इनवट2र 2014 फोटोवो(cid:6)टेइक इनवट2र के (100 (cid:4)कलोवाट िलए आइलdM डगं रोकथाम तक इ=वट2र के िलए) के उपाय कB जांच (cid:13)(cid:4)\या 1 अAटूबर 2018 (100 (cid:4)कलोवाट के ऊपर के इनवट2र के िलए) [फ़ा. स.ं 223/140/2017-आर एडं डी सम= वय] (cid:13)वीण कुमार, अपर सिचव MINISTRY OF NEW AND RENEWABLE ENERGY NOTIFICATION New Delhi, the 16th April 2018 S.O. 1602(E).—Whereas the Central Government had issued “Solar Photovoltaics, Systems, Devices and Components Goods (Requirements for Compulsory Registration) Order, 2017“ vide S.O 2920 (E) dated 5 September 2017 with the date of coming into force with effect from 5th September 2018. And whereas, having discussions with the various stakeholders including the Bureau of Indian Standards (BIS), the date of coming into force of the said Order stands advanced as indicated against each product in the Schedule Annexed. 2. Whereas, considering the time taken for testing of the products mentioned in the Schedule annexed, the manufacturers in the case of SPV Module may submit a self-certification that their products conform to the relevant Indian Standards or their IEC counterparts (including subsequent Standards, if any) along with proof of submission of¹Hkkx IIµ[k.M 3(ii)º Hkkjr dk jkti=k % vlk/kj.k 3 samples to the laboratories with the expected date of completion of testing. Such relaxation shall be applicable till 30th June 2018. Provided that submission of samples would not be necessary along with self-certification under Clause 2 above in case the material for which self-certification is being done has been already IEC certified. In such a case , it would be sufficient for the self certification to be accompanied by the IEC certificate and test reports Provided further that in case of imported material for which self-certification is being given as per Clause 2 above, the self-certification may be given either by the manufacturer or the importer. SCHEDULE Sl. No. Product Indian Standard Title of Indian Standard Date of Implementation Number (1) (2) (3) (4) (5) 1. Crystalline Silicon IS 14286 : 2010 Crystalline Silicon Terrestrial 16th April 2018 Terrestrial Photovoltaic Photovoltaic (PV) modules - (PV) modules Design Qualification And Type (Si wafer based) Approval 2. Thin-Film Terrestrial IS 16077 : 2013 Thin-Film Terrestrial Photovoltaic 16th April 2018 Photovoltaic (PV) (PV) Modules - Design Modules Qualification and Type Approval (a-Si, CiGs and CdTe) 3. PV Module IS/IEC 61730 (Part Photovoltaic (PV) Module Safety 16th April 2018 (without (Si wafer and Thin film) 1) : 2004 Qualification Part 1 Requirements fire test) for Construction 1st July 2018 (with fire test) Photovoltaic (PV) Module Safety IS/IEC 61730 Qualification Part 2 Requirements (Part 2) : 2004 for Testing 4. Power Inverter for use in IS 16221 Safety of Power Converters for 16th April 2018 (for photovoltaic power (Part 1) : 2016 use in Photovoltaic Power inverters upto and system Systems Part 1- General including 100 kW) Requirements 1st October 2018 (for inverters above 100 kW) IS 16221 Safety of Power Converters for (Part 2) : 2015 Use in Photovoltaic Power Systems Part 2-Particular Requirements for Inverters 5. Utility –Interconnected IS 16169 : 2014 Test Procedure of Islanding 16th April 2018 (for Photovoltaic inverters Prevention Measures for Utility-inverters upto and Interconnected Photovoltaic including 100 kW) Inverters 1st October 2018 (for inverters above 100 kW) [F. No. 223/140/2017-R&D Coord.] PRAVEEN KUMAR, Addl. Secy. Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.

Continue your research