See Full Document Text
Status: This is the original version (as it was originally made). This
item of legislation is currently only available in its original format.
STATUTORY INSTRUMENTS
2026 No. 667
INFRASTRUCTURE PLANNING
The Sunnica Energy Farm (Amendment) Order 2026
Made - - - - 21st May 2026
Coming into force - - 22nd May 2026
An application has been made, under paragraph 2 of Schedule 6 to the Planning Act 2008(1), to
the Secretary of State in accordance with the Infrastructure Planning (Changes to, and Revocation
of, Development Consent Orders) Regulations 2011(2) (“the 2011 Regulations”) for non-material
changes to the Sunnica Energy Farm Order 2024(3).
The Secretary of State, having considered the application, the responses to the publicity and
consultation required by Regulations 6 and 7 of the 2011 Regulations, has decided to make the
changes on terms that in the opinion of the Secretary of State are not materially different from those
proposed in the application.
Accordingly, the Secretary of State, in exercise of the powers conferred by paragraphs 2(1) and (9)
of Schedule 6 to the Planning Act 2008, makes the following Order.
Citation and commencement
1. This Order may be cited as the Sunnica Energy Farm (Amendment) Order 2026 and comes
into force on 22nd May 2026.
Amendment to the Sunnica Energy Farm Order 2024
2. The Sunnica Energy Farm Order 2024 (“the 2024 Order”) is amended as follows.
Amendments to Schedule 10 of the 2024 Order
3. In Schedule 10, omit the following rows in the table—
access and rights of 2.3 6 24/03/2023
way plans
(1) 2008 c. 29. Paragraph 2 was amended by paragraph 4 of Schedule 8 to the Marine and Coastal Access Act 2009 (c. 23),
by paragraphs 1 and 72 of Schedule 13 and Schedule 25(2) of the Localism Act 2011 (c. 20), and by section 28 of the
Infrastructure Act 2015 (c. 7).
(2) S.I. 2011/2055. Relevant amendments to this instrument were made by S.I. 2012/635, S.I. 2012/2654, S.I. 2012/2732, S.I.
2013/552, S.I. 2013/755, S.I. 2015/760, S.I. 2017/314, S.I. 2017/524, S.I. 2018/378 and S.I. 2019/734.
(3) S.I. 2024/802 as amended by S.I. 2024/1154.Document Generated: 2026-06-22
Status: This is the original version (as it was originally made). This
item of legislation is currently only available in its original format.
book of reference 4.3 9 30/08/2023
land and Crown land 2.1 6 30/01/2023
plans
traffic regulation 2.4 3 30/01/2023
measures plans –
temporary road
closures
works plans 2.2 5 03/03/2023
and replace with the following rows—
access and rights of 2.3 7 27/11/2025
way plans
book of reference 4.3 10 27/11/2025
land and Crown land 2.1 6 30/01/2023
plans – sheets 1–19
and 21–22
land and Crown land 2.1 7 27/11/2025
plans – sheet 20
traffic regulation 2.4 4 27/11/2025
measures plans –
temporary road
closures
works plans 2.2 6 27/11/2025
Signed by the authority of the Secretary of State for Energy Security and Net Zero
David Wagstaff
Deputy Director, Energy Infrastructure Planning
21st May 2026 Department for Energy Security and Net Zero
2Document Generated: 2026-06-22
Status: This is the original version (as it was originally made). This
item of legislation is currently only available in its original format.
EXPLANATORY NOTE
(This note is not part of the Order)
This Order amends the Sunnica Energy Farm Order 2024, a development consent order under the
Planning Act 2008, following an application made in accordance with the Infrastructure Planning
(Changes to, and Revocation of, Development Consent Orders) Regulations 2011 for a non-material
amendment under paragraph 2 of Schedule 6 to the Planning Act 2008. This Order amends
Schedule 10 of the 2024 Order relating to certified documents.