Executive Summary & Key Takeaways

Executive Summary: This EEA Joint Committee Decision No. 207/2020 amends Annex IV (Energy) to the EEA Agreement to incorporate Commission Regulation (EU) 2017/2195 on electricity balancing. The regulation will not apply to Iceland and Liechtenstein. This decision emphasizes information protection and stakeholder involvement, and entered into force on December 12, 2020, or the day following the last notification to the EEA Joint Committee. Key Points / Main Content: * **Incorporation of EU Regulation:** * Commission Regulation (EU) 2017/2195 on electricity balancing is incorporated into the EEA Agreement. * **Exclusions:** * The Regulation does not apply to Iceland or Liechtenstein. * **Norway's Role:** * References to Transmission System Operators (TSOs), regulatory authorities, and stakeholders include those representing Norway. * Norway's population is considered when determining qualified majority thresholds in specific articles (Article 4(3)(b), 4(4)(b), 4(4)). * References to regions composed of Member States include Norway. * The Norwegian TSO should participate in stakeholder decision-making similarly to EU Member State TSOs. * The Norwegian regulatory authority should be involved in consultations for Union-wide proposals. * **Information Protection:** * Agreements between TSOs and/or regulatory authorities may ensure confidential or sensitive information is protected, ensuring the timely submission of necessary information. * Close cooperation between TSOs and regulatory authorities should effectively protect sensitive information. * **Stakeholder Involvement:** * Input from all main stakeholders is crucial for developing regional or EEA-wide terms, conditions, and methodologies. * **Adaptation Texts:** * Adaptation texts from Decision of the EEA Joint Committee No 93/2017 are relevant for the application of Commission Regulation EU 2017/2195 in the EEA, particularly for Articles 5, 6, and 7. Impact Analysis: * **Transmission System Operators (TSOs):** * Impact: Required to cooperate with regulatory authorities, protect sensitive information, and involve Norwegian TSO in decision-making. * Action Required: Implement measures for information protection and ensure Norwegian TSO participation. * **Regulatory Authorities:** * Impact: Required to consult and cooperate, involving the Norwegian regulatory authority in decision-making. * Action Required: Establish cooperation mechanisms with the Norwegian regulatory authority. * **Stakeholders:** * Impact: Must participate in the development of regional or EEA-wide terms, conditions, and methodologies. * Action Required: Actively engage in the development processes and provide relevant input. * **Norway:** * Impact: Norwegian TSO and regulatory authority are integrated into the decision-making processes. * Action Required: Participate in TSO cooperation, regulatory consultations, and stakeholder engagement.

Key Entities Referenced

EEA Joint Committee: The decision-making body responsible for amending the EEA Agreement. EEA Agreement: Agreement on the European Economic Area. Foundational agreement referenced in the document. Commission Regulation EU 2017/2195: Commission Regulation establishing a guideline on electricity balancing. It is the primary regulation being incorporated into the EEA Agreement. Iceland: Country within the EEA to which Commission Regulation EU 2017/2195 does not apply due to its isolated transmission system. Liechtenstein: Country within the EEA to which Commission Regulation EU 2017/2195 does not apply due to not having its own transmission electricity network. Norway: Country within the EEA whose TSO, regulatory authorities, and stakeholders are included in references to Transmission System Operators (TSOs), regulatory authorities, and stakeholders. Regulation EC No 714/2009: Regulation of the European Parliament and of the Council on conditions for access to the network for cross-border exchanges in electricity. The legal basis for Commission Regulation EU 2017/2195. Agency for the Cooperation of Energy Regulators: Agency whose role in the EEA context is relevant for the application of Commission Regulation EU 2017/2195 in the EEA.
Official Source Record View Original Source →
See Full Document Text
L 240/66 EN Official Journal of the European Union 28.9.2023 DECISION OF THE EEA JOINT COMMITTEE No 207/2020 of 11 December 2020 amending Annex IV (Energy) to the EEA Agreement [2023/2009] THE EEA JOINT COMMITTEE, Having regard to the Agreement on the European Economic Area (“the EEA Agreement”), and in particular Article 98 thereof, Whereas: (1) Commission Regulation (EU) 2017/2195 of 23 November 2017establishing a guideline on electricity balancing(1) is to be incorporated in the EEA Agreement. (2) Commission Regulation (EU) 2017/2195 does not apply to transmission systems on islands which are not connected to other transmission systems via interconnections. (3) As the transmission system of Iceland is not connected with other transmission systems, Commission Regulation (EU) 2017/2195 should not apply to Iceland. (4) Due to its small size and the limited number of electricity customers, Liechtenstein does not have its own transmission electricity network. Commission Regulation (EU) 2017/2195 should therefore not apply to Liechtenstein. (5) References to Transmission System Operators (“TSOs”), regulatory authorities and stakeholders should be understood to include the TSO, regulatory authorities and stakeholders representing Norway. (6) When jointly developing terms, conditions and methodologies pursuant to Commission Regulation (EU) 2017/2195, it is essential that all necessary information be submitted without delay. Close cooperation between TSOs and regulatory authorities should ensure that sensitive information, such as detailed information about electrical substations, exact location of underground transmission, information about control systems and detailed vulnerability analyses that can be used for sabotage, is effectively protected in the process of developing terms, conditions or methodologies. To ensure the effective implementation of Commission Regulation (EU) 2017/2195, the same level of cooperation regarding information exchange and protection of sensitive information should be established for the purposes of the cooperation with Norway. (7) Input from all main stakeholders in the development of regional or EEA-wide terms, conditions and methodologies, that could become binding through regulatory approval, is crucial for an effective regulatory cross-border framework. The TSOs and other stakeholders should therefore participate in the processes for the development of proposals for terms, conditions and methodologies as set out in the various provisions in Commission Regulation (EU) 2017/2195. The Norwegian TSO should, in particular, participate in the stakeholder decision-making in a similar manner as TSOs representing an EU Member State. (8) For regional or Union-wide proposals, where the approval of proposals from TSOs requires a decision by more than one regulatory authority, regulatory authorities should consult and closely cooperate in order to reach agreement before the regulatory authorities adopt a decision. The Norwegian regulatory authority should be involved in such cooperation. (1) OJ L 312, 28.11.2017, p. 6.28.9.2023 EN Official Journal of the European Union L 240/67 (9) As Commission Regulation (EU) 2017/2195 has been adopted on the basis of Regulation (EC) No 714/2009 of the European Parliament and of the Council of 13 July 2009on conditions for access to the network for cross-border exchanges in electricity and repealing Regulation (EC) No 1228/2003(2), the adaptation texts elaborated and adopted under Decision of the EEA Joint Committee No 93/2017 of 5 May 2017amending Annex IV (Energy) to the EEA Agreement(3) for the implementation of Regulation (EC) No 714/2009, in particular the provisions in points (1) and (5) of Article 1 thereof, which provide for adaptations concerning the role of the Agency for the Cooperation of Energy Regulators in the EEA context, are relevant for the application of Commission Regulation (EU) 2017/2195 in the EEA, in particular for the application of Article 5 (6) and (7) thereof. (10) Annex IV to the EEA Agreement should therefore be amended accordingly, HAS ADOPTED THIS DECISION: Article 1 The following is inserted after point 51 (Commission Regulation (EU) 2017/1485) of Annex IV to the EEA Agreement: ‘52. 32017 R 2195: Commission Regulation (EU) 2017/2195 of 23 November 2017establishing a guideline on electricity balancing (OJ L 312, 28.11.2017, p. 6). The provisions of the Regulation shall, for the purposes of this Agreement, be read with the following adaptations: (a) The Regulation shall not apply to Iceland and Liechtenstein. (b) In Article 4: (i) The references to “the population of the Union” in Article 4(3)(b), to “the population of the concerned area” in Article 4(4)(b) and to “the population of the participating Member States” in Article 4(4), second subparagraph, shall be understood as including the population of Norway when considering whether the relevant population threshold for attaining qualified majority is attained. (ii) The references to “regions composed of more than five Member States” in Article 4(4), first subparagraph and to “regions composed of five Member States or less” in Article 4(5) shall be read as “regions composed of more than four Union Member States and Norway” and as “regions composed of four Union Member States and Norway or less”, respectively. (c) The following shall be added to Article 11: “Agreements between TSOs and / or regulatory authorities may ensure that confidential or sensitive information is effectively protected and help guaranteeing that all information which is necessary to develop the common terms, conditions and methods is submitted without delay”.’ Article 2 The text of Regulation (EU) 2017/2195 in the Norwegian language, to be published in the EEA Supplement to the Official Journal of the European Union, shall be authentic. Article 3 This Decision shall enter into force on 12 December 2020, or on the day following the last notification to the EEA Joint Committee under Article 103(1) of the EEA Agreement*, whichever is the later. (2) OJ L 211, 14.8.2009, p. 15. (3) OJ L 36, 7.2.2019, p. 44. * Constitutional requirements indicated.L 240/68 EN Official Journal of the European Union 28.9.2023 Article 4 This Decision shall be published in the EEA Section of, and in the EEA Supplement to, the Official Journal of the European Union. Done at Brussels, 11 December 2020. For the EEA Joint Committee The President Sabine MONAUNI