1. National Mission for Clean Ganga (NMCG)
National Mission for Clean Ganga, in the year 2025, completed 39 projects, which resulted in the
completion of a cumulative total of 344 projects, so far, and also sanctioned 34 new proj3ects amounting
to ₹2,368 Crore, bringing the cumulative total to 513 projects sanctioned worth ₹42,019 Crore.
1. Nirmal Ganga:
1. Sewage Treatment Infrastructure projects
In sewerage infrastructure, 15 projects for the creation/ rehabilitation of 329 MLD sewage
treatment capacity have been sanctioned between January and December 2025. In the same period,
11 projects for the creation/ rehabilitation of 359 MLD sewage treatment capacity have been
completed. Till date, a total of 216 sewerage infrastructure projects have been sanctioned in the
Ganga Basin for the creation of 6,560 MLD sewage treatment capacity and the laying of a 5,220
km sewer network.
2. Inauguration and Laying of Foundation Stones Sewerage infrastructure projects by
Hon’ble Prime Minister
A total of 8 sewerage infrastructure projects were inaugurated worth ₹2763 crores by the Hon'ble
Prime Minister in the year 2025. i. ii. iii. iv. v. vi. vii. viii. Interception, Diversion & Sewage
Treatment Plant works at Mokama, Patna (8 MLD) Interception, Diversion & Sewage Treatment
Plant works at Fatuha, Patna (7 MLD) Begusarai STP and Sewerage Project (17 MLD) I&D works
and STP at Bakhtiyarpur (10 MLD) Bhagalpur I&D and STP Project (45 MLD) Digha STP
Facilities (100 MLD) Kankarbagh STP Facilities (56 MLD) Sewer network SPS and STP at
Munger town (30 MLD).
A total of 8 sewerage infrastructure projects were foundation stone worth ₹1347 crore by the
Hon'ble Prime Minister in the year 2025.
i. Interception & Diversion (I&D) and STP scheme at Motihari town (23 MLD)
ii. I&D and STP scheme at Raxaul town (12 MLD)
iii. I&D and STP scheme at Buxar town (51 MNLD)
iv. I&D and STP scheme at Arrah town (47 MLD)
v. I&D and STP works at Supaul (12.1 MLD)
vi. I&D and STP scheme for Jamui town (13 MLD)
vii. I&D of drains and STP works at Daudnagar (10.5 MLD)
viii. I&D and STP scheme at Katihar town (55.5 MLD)100. MLD Digha STP
3. Inauguration and Laying of Foundation Stones Sewerage infrastructure projects by
Hon’ble Prime Minister
NMCG has expanded its mandate to rejuvenate small rivers and tributaries through ecological
flow restoration, water quality improvement, wetland conservation, and community-led
interventions. Key actions include drain treatment, solid waste management, and catchment
restoration. Approved projects include:
i. Established in collaboration with DDA and CEMDE as a Knowledge cum-Skill Development
Centre.
ii. A 5 MLD CAMUS–SBT pilot project for drain treatment (₹27.12 crore), now proposed at RD
180, Madanpur Khadar Village, with NOC from Uttar Pradesh agreed in principle.
iii. Treatment of Shastri Park and Kailash Nagar Drains in Delhi through Nature-based Solutions
(NbS).
4. Monitoring of STPs and Drains of river Yamuna
NMCG in May 2025 has sanctioned a project of “Strengthening of Environmental Regulators”
to CPCB for the monitoring of STPs and drains of river Yamuna.
5. Completion of 20 MLD CETP at Jajmau
Construction of 20 MLD CETP project for Jajmau Tannery Cluster, Kanpur, UP worth Rs.
741.36 Crore has been completed and the plant is currently in the testing, commissioning and
Performance Guarantee Test Run (PGTR) phase. First time Odour Control & management
measures has been adopted.
2. Aviral Ganga
2.1 Maintaining minimum E-flow
NMCG has sanctioned three major E-flow Assessment Projects:
i. NIH Roorkee for the Son, Damodar, Chambal and Tons basins
ii. IIT Roorkee for Ghaghra and Gomti, and IIT Kanpur for Kosi, Gandak and Mahananda.
iii. Additionally, two new discharge monitoring sites are being made operational downstream of
the Hathnikund and Okhla barrages on the Yamuna.
2.2 Aquatic Biodiversity, Wetlands and Afforestation Initiatives of NMCG
i. More than 50 Lakhs native fish (Rohu, Katla, Mrigal, Kalbasu, Mahseer, Hilsa) were released to
revive riverine fisheries and strengthen ecological food chains.
ii. Floodplain wetlands across UP, Bihar, and Jharkhand were mapped, leading to prioritised lists (UP:
282; Bihar: 124).
iii. Conservation projects have begun at Kalewala Jheel, Kheduva Taal, Dahtal Reoti, and Nathmalpur
Bhagad, along with restoration of the Asan Ramsar Site.
iv. Wetland extent maps of Floodplain Wetlands of the River Yamuna in Delhi have been prepared.v. Survey for condition assessment of 217 wetlands done.
vi. The floral diversity initiative documented 1,117 plant species across 26 sites, including 935
medicinal plants of traditional and pharmaceutical relevance.
vii. Seven Biodiversity Parks (466.3 ha) were established in degraded forest areas of Uttar Pradesh.
viii. Gangetic Dolphin Conservation: Gangetic dolphin surveys covered 7,680 km across 22 rivers,
documenting 2,510 sightings and identifying high-, moderate-, and low-priority conservation
stretches, along with 95 mortality/rescue cases.
ix. India’s first Dolphin Rescue Ambulance was developed and tested, enabling safe rescue and
translocation; 8 Gangetic dolphins were rescued and released.
x. A citizen-led Soons-Saathi network (100 volunteers across 250 km), 160 trained personnel, 2,000
sensitised community members, and 15 Dolphin Clubs strengthened early reporting and
conservation outreach.
xi. Gharial Conservation: Gharial assessments across 22 rivers recorded 3,037 individuals, with
habitat models indicating only 5.6% highly suitable habitat, underscoring the need for flow
regulation and habitat protection.
xii. Comprehensive studies across the Ganga basin generated critical biodiversity data: Basin-wide
biodiversity studies recorded island nesting birds (11–12 species, 1,832 nests), water birds (41,506
individuals of 90 species), and rich fish diversity (39–83 species), including a new species record;
Maha-Kumbh 2025 monitoring documented 157 bird species along the Ganga and 79 along the
Yamuna.
3. Gyan Ganga
1. Digital portals and tools
NMCG has developed an integrated suite of digital portals and tools that greatly enhance the
planning, implementation, monitoring, and knowledge management processes for river
rejuvenation and water conservation efforts.
i. Drain Dashboard & LiDAR Mapping: Comprehensive high-resolution LiDAR mapping (1:3,000
scale) over 44,000 sq. km—supported by helicopter (2,200 sq. km) and UAV surveys (80 sq. km)—
has enabled precise assessment of drainage networks and river morphology. This forms part of
NMCG’s innovative IT-enabled river rejuvenation framework, which integrates 13 digital systems
to manage the entire lifecycle of river system management.
ii. NMCG has built a strong digital ecosystem anchored by key dashboards that enhance decision-
making, execution, and monitoring. The Drain Dashboard, Geo-PRAYAG, Waterbody
Diagnostics, and the Corona Imagery Dashboard strengthen scientific planning. For monitoring,
platforms such as Ganga Tarang, the Ganga District Performance Portal, the Real-Time Water
Quality Monitoring Network, the Satellite-Based Water Quality Network, and the E-Flow
Dashboard provide transparent, real-time insights into river health. Supporting these systems, the
AI-enabled Ganga Knowledge Portal, Bioclimatic Atlas of India, and River Atlas serve as key
knowledge repositories.
iii. Research Initiatives (2025): In 2025, NMCG sanctioned several high impact research projects to
deepen scientific understanding of river systems. These include ecological and floodplain impactstudies (IISER Bhopal), historic river mapping using Corona imagery and digitized archives
(IIT Kanpur and SAIARD Kolkata), capacity building for river conservation (INTACH), glacier–
hydroclimate assessments (NIH Roorkee), SONAR-based riverbed mapping in Uttar Pradesh
(UP Remote Sensing Centre), and managed aquifer recharge studies along paleo-channels in the
Ganga–Yamuna Doab (UPGWB & NGRI).
iv. Ganga Pulse Public Portal: The Ganga Pulse Public Portal offers real-time, accessible
monitoring of STPs across the five Ganga basin states— Uttarakhand, Uttar Pradesh, Bihar,
Jharkhand, and West Bengal. Displaying key parameters such as pH, BOD, COD, and TSS at both
inlet and outlet points, the portal provides a clear picture of wastewater quality improvements
after treatment. By placing this data in the public domain, NMCG has significantly enhanced
transparency, accountability, and oversight of wastewater treatment infrastructure under the
Namami Gange programme. (www.gangapulse.in)
2. Urban River Management Plans (URMPs)
i. Riversensitive governance was strengthened in Ganga Basin States through the initiation of Urban
River Management Plans (URMPs) as below:
a. Uttarakhand - Gangotri-Yamunotri, Haridwar, Rishikesh, Haldwani Kathgodam, and
Ramnagar
b. Uttar Pradesh - Bijnor, Gorakhpur, Mirzapur, MathuraVrindavan, and Shahjahanpur
c. Bihar - Bhagalpur, Buxar, Chapra, Munger, and Gaya
d. Jharkhand - Ranchi, Dhanbad, Sahibganj-Rajmahal, Adityapur, and Chas
e. West Bengal - Siliguri, Durgapur, Asansol, Howrah, and Nabadwip
ii. Capacity Building & Planning: In 2025, a robust foundation was established for mainstreaming
river-sensitive planning into urban governance through training, frameworks, and national-level
policy guidance. Key workshops and seminars in Ahmedabad (Feb), Patna & Delhi (May), Delhi
(June), and Chennai (Sept) advanced eco-friendly waterfront design and nature-based solutions,
enabled integration of river considerations into master plans, and promoted multi-dimensional
approaches for urban water management — collectively strengthening institutional capacity and
embedding ecological integrity into river city governance nationwide.
4. Arth Ganga:
Arth Ganga emphasizes ecologically conscious development, livelihood generation, and community
participation while ensuring the health and vitality of the Ganga river.
1. Zero budget Natural Farming
NMCG conducts natural farming trainings through state agencies, DGCs, SPMGs, and NCONF.
Two model farms have been established (Haridwar & Sambhal) to demonstrate practices. A
WALAMTARI research project assesses impacts on water, energy, soil, and productivity.
4.2 Cultural and Heritage Tourism
Dolphin safaris, eco-tourism sites, and homestays promoted under WII and HESCO projects.
i. INTACH carried out heritage mapping across 51 districts, producing Samagrata and Samakshata.
ii. Pilot Arth Ganga Trails in Kannauj and Bhagalpur to showcase cultural, ecological, and tourism
assets.3. Safe Reuse of Treated Water (SRTW)
NMCG issued the National Framework for reuse of treated wastewater. Uttarakhand & Uttar
Pradesh are in the final stages of development of state policies on SRTW aligned to National
Framework. This exercise has been initiated in other Ganga main stem states.
City level reuse plans are being developed for Prayagraj, Varanasi, Agra & Kanpur.
4. Livelihood Linkages
i. Jalaj Project (WII): Dolphin safaris, homestays, livelihood centers; training in local product
development (Prasad, incense, jute bags, millet foods, stitching, beautician skills).
ii. HESCO Initiatives: One Arth Ganga Centre and three Ganga Resource Centre’s delivering ~300
trainings benefiting ~30,000 people.
iii. Awareness and marketing centres set up at Chheoki Railway Station (Prayagraj) and Dilli Haat,
New Delhi.
iv. Parmarth Niketan conducts Aarti training and awareness programs. IIPA (Phase-II) organized ~150
programs with schools, DGCs, and stakeholders, including e-learning modules and certificate
courses on river management.
5. Jan Ganga:
1. Maha-Kumbh
i. NMCG’s interventions at Maha Kumbh 2025 included riverfront development, real-time water
quality monitoring, strengthened waste management, and large-scale awareness campaigns. A
network of 1,500 Ganga Sewa Doots promoted proper waste disposal, sanitation, plastic-free
practices, and community participation, while the Paint-My-City Campaign converted city walls
into impactful artworks on cleanliness, sustainability, and the cultural significance of the Ganga.
ii. Public engagement was further elevated through the Namami Gange Pavilion, featuring live data,
demonstrations, and educational exhibits. A wide range of IEC activities—exhibitions, street plays,
awareness sessions, and cleanliness drives—reinforced sustained behavioral change among
pilgrims.
2. Global Outreach
India’s global leadership in river-sensitive urban development was prominently highlighted in
2025. At the World Economic Forum (WEF) in Davos (January 2025), flagship initiatives such
as River Cities Alliance (RCA) were positioned international as benchmarks, reinforcing India’s
role in advancing water security. Later, at the World Water Week in Stockholm (August 2025),
the RCA’s cohosted session “River Cities Reimagined” catalyzed dialogue on basinsensitive urban
planning, resulting in deeper engagement with global experts and institutions and strengthening
India’s influence in shaping international urban water agendas.3. School Outreach Programs
i. A large-scale cleanliness drive, ‘Ek Din, Ek Ghanta, Ek Saath’, was conducted on 25 September
2025 at Kalindi Kunj, Delhi, led by Hon’ble Union Minister of Jal Shakti, with wide participation
from officials, students, NGOs, and local communities.
ii. The Swachhta Hi Sewa fortnight (17 Sept–2 Oct 2025) spanned 5 Ganga basin states, covering
139 districts and engaging around 10 lakh students along with local communities.
4. Special Campaign
i. Namami Gange conducted a month-long cleanliness and awareness campaign (2–31 October
2025) across Ganga Basin States, engaging students, youth groups, spiritual leaders,
environmentalists, and local communities to promote environmental and river-cleaning initiatives.
ii. The campaign successfully strengthened youth involvement, reaching about 7 lakh students across 5
Ganga Basin States.
5. Community Outreach Programs
i. International Day of Yoga 2025: ‘Ghat Par Yoga’ was organized by DGCs across Ganga Basin
States, and with over 1000 participants in Delhi alone, achieving strong public and youth
engagement.
ii. Ganga Utsav 2025: The 9th edition was celebrated with the main event in Ayodhya, alongside
multiple partner-led activities such as an international conference at IIT-BHU and a riverathon,
engaging communities across all 5 Ganga Basin States.
iii. Yamuna Awareness & Cleanliness Campaign: Namami Gange, in partnership with NGOs, has
launched a year-long public awareness and cleanliness campaign along the Yamuna in Delhi to
deepen people–river connect and build a sense of responsibility and ownership. This major
initiative supports the Hon’ble Minister of Jal Shakti Shri C.R. Paatil’s call of “Ek Din, Ek
Ghanta, Ek Saath.” To further boost public participation, a dedicated portal has been
developed, enabling citizens to easily register and join these campaigns.
6. Finance:
The Finance Wing achieved significant progress across multiple areas, including the successful
adoption of the Hybrid Treasury Single Account (TSA) system, ensuring just-in-time fund releases
across all programme levels. It also facilitated the refund of unutilized grants and accrued interest,
strengthened financial governance through a major reduction in pending Utilization Certificates
and improved reporting, and ensured the timely laying of audited annual accounts in Parliament.
Key income tax-related issues were fully resolved, granting unconditional income-tax exemption to
NMCG. To reinforce financial discipline, the Finance Wing implemented strong internal controls,
including periodic internal audits, quarterly CA audits, Audit/Budget Review Committee
meetings, and 12 dedicated reviews with State Finance Teams in FY 2024–25.
2. National Water Mission (NWM)To address the adverse impacts of climate change on water resources, NWM was set up under the National
Action Plan on Climate Change (NAPCC) by the Government of India on 30th June 2008. One of the
main objectives of the mission is to ensure integrated water resource management, which would help
conserve water, minimise wastage and ensure more equitable distribution both across and within States.
The five goals of the mission are as follows:
Comprehensive water database in the public domain
Assessment of the impact of climate change on water resources
Promotion of citizen and state actions for water conservation, augmentation and preservation and
focused attention to vulnerable areas, including overexploited areas
Increasing water use efficiency by 20%
Promotion of basin-level integrated water resources management.
NWM has been making progress toward achieving the above five goals through the implementation of
various strategies and action points prescribed in the Mission Document. The mission, through its goals,
adopts an integrated, holistic approach to water.
Activities and new initiatives taken during the year
“Jal Shakti Abhiyan- Catch the Rain (JSA: CTR)” 2025 campaign: Jal Shakti Abhiyan-I (JSA-I) was
conducted in 2019 in 1,592 blocks out of 2,836 blocks in 256 water stressed districts of the country and
was expanded as “Jal Shakti Abhiyan: Catch the Rain” (JSA: CTR) with the tagline “Catch the Rain,
Where It Falls, When It Falls”. in 2021, 2022, 2023 and 2024 to cover all the blocks of all districts (rural
as well as urban areas) across the country. “Jal Shakti Abhiyan: Catch the Rain” (JSA: CTR) 2025
campaign, the Sixth in the series of JSAs, was launched on World Water Day in Panchkula, Haryana with
special theme of “Jal Sanchay Jal Bhagidar-Jan Jagrukta Ki Or”, by Hon'ble Chief Minister of Haryana on
22.03.2025 in all districts (rural as well as urban areas) of the country for implementation from 22th
March, 2025 to 30th November, 2025 - the pre-monsoon and monsoon period. The event was attended by
esteemed dignitaries, including Shri C. R. Patil, Hon’ble Minister of Jal Shakti; Smt. Shruti Choudhary,
Hon’ble Minister for Irrigation & Water Resources, Haryana.
Jal Shakti Abhiyan, a flagship campaign of the National Water Mission, involves inter-sectoral
convergence of all development programmes like MGNREGS, AMRUT, Repair, Renovation and
Restoration Scheme, Water Shed Development Scheme, Per Drop More Crop, etc.
Focused interventions of the campaign: The focused interventions of the campaign include (1) water
conservation and rainwater harvesting; (2) enumerating, geo-tagging & making inventory of all water
bodies; preparation of scientific plans for water conservation based on it; setting up of Jal Shakti Kendras
in all districts; (4) intensive afforestation; and (5) awareness generation. Apart from the above five focused
intervention, JSA-CTR 2025 has a distinctive emphasis on following key aspects this year (i) Continuation
of JSJB activities (ii) Jal-Jangal-Jan: Ek Prakritik Bandhan: Abhiyan, activities like mapping of forest
springs, catchment area protection in forest land, forest community engagement by MoEFCC and States in
13 major river basins of the country (Jhelum, Chenab, Ravi, Beas, Sutlej, Yamuna, Brahmaputra, Luni,
Narmada, Mahanadi, Godavari, Krishna and Cauvery) in partnership with Ministry of Environment,
Forest and Climate Change.
This year, the campaign also focuses on 148 groundwater-stressed districts identified by the Central
Ground Water Board (CGWB), including 102 over-exploited, 22 critical, and several high-extraction
districts. These areas demand urgent, targeted, and sustained interventions
Appointment of Central Ministries/ Departments Nodal Officers and State Nodal Officers: For
seamless coordination and better implementation of the campaign, Nodal Officers from the Central
Ministries/ Departments concerned and State Nodal Officers from each State/ UT have been appointed.Orientation of CNOs and TOs: To discuss the modalities related to the field visits of CNOs and TOs, a
workshop-cum-orientation programme was organised on 8 th May, 2025, at Dr Ambedkar International
Centre (DAIC), New Delhi, for the Central Nodal Officers and Technical Officers appointed for JSA:
CTR-2025. The workshop was chaired by the Hon'ble Minister for Jal Shakti. Among other officials, the
meeting was also attended by the Secretary, DoWR, RD & GR, Secretary, Additional Secretary and
Mission Director, National Water Mission, Ministry of Jal Shakti. During the workshop, presentations
were made on 'Introduction of JSA: CTR – 2025 and Role of CNOs and TOs'. The workshop highlighted
the roles of CNOs and SNOs during their visit to the allotted districts.
Meetings with DM/DCs/Municipal Administrators:
The National Water Mission webinar session on “Best Practices of Water management: Dialogues
with DMs” began on 7th August 2020. NWM has so far organised 62 Sessions, “Dialogues with
District & Municipal Administrators‘' on Best Practices of Water management.
Water Talks:
A monthly 'Water Talk' lecture series is an important activity undertaken by the NWM to stimulate
awareness, build capacities of stakeholders and encourage people to become active participants to
sustain life by saving water on earth. Leading water experts are invited to present inspiring and
broadening perspectives on current water issues in the country. 'Water Talk' series was launched on
22nd March 2019 on the occasion of World Water Day. NWM has so far organised 63 'Water-
Talks' on a wide range of topics related to the water sector, featuring speakers from NGOs to
grassroots workers.
Progress under Jal Shakti Abhiyan: Catch the Rain-2025:
As per the information uploaded by various stakeholders on the JSA: CTR portal
(jsactr.mowr.nic.in) the JSA: CTR initiative has facilitated the creation of more than 1.94 crore
water conservation structures since its inception.During the period 22 March 2025 to 30 November
2025, the campaign added25-lakh water conservation works across the country and these efforts
are part of an intensified drive to strengthen local water security and promote sustainable resource
management. So far, 640 districts have prepared detailed water conservation plans, marking a
significant step toward coordinated and longterm water resource development.
Launch of “Jal Sanchay Jan Bhagidari” Initiative:
Jal Sanchay Jan Bhagidari” initiative under the Jal Shakti Abhiyan: Catch the Rain (JSA: CTR)
campaign has been launched in Surat on 6th September, 2024, with a virtual address by the
Hon’ble Prime Minister, emphasising the importance of jan bhagidari in water conservation. This
initiative embodies a pledge for united action from all stakeholders, including government bodies,
industries, local authorities, philanthropists, resident welfare associations (RWAs) and individuals
to have a special focus on constructing artificial recharge structures/borewell recharge/recharge
shafts among other activities, which will increase storage capacity and help to augment
groundwater recharge.
The key objective of the Jal Sanchay Jan Bhagidari initiative is to ensure that every drop of water
is conserved through collective efforts, following a wholeof-society and whole-of-government
approach. By promoting community ownership, the initiative seeks to develop cost-effective, local
solutions tailored to specific water challenges across different regions. To further strengthen the
JSA:CTR, the Jal Sanchay Jan Bhagidari (JSJB) campaign was launched in September 2024, with
a goal to build 1 million groundwater recharge structures by 31st May 2025 was not only met but
significantly surpassed with 2.7 million structures uploaded in the year 2024. For the year 2025,
the target has been revised to 10 million. JSJB’s success is built on a convergent funding modelcombining MGNREGA, AMRUT, PMKSY , and private sector participation including CSR,
philanthropy, and crowdfunding.
Furthermore, the amendment to Schedule-I of MGNREGA dated 23 September 2025 designates
water-stressed regions as priority areas, enabling enhanced allocations, with approximately
₹32,000 crore expected to be invested in water conservation works during 2025–26. The Dynamic
Ground Water Resources Assessment Report of the Central Ground Water Board (CGWB)
designates assessment units (Blocks) as Over-exploited, Critical, Semi-critical, or Safe, and these
classifications must guide priority interventions. Accordingly, the District Programme Coordinator
or Programme Officer must ensure that a minimum share of project costs in each category is
devoted specifically to water conservation, water harvesting, and other waterrelated works with at
least 65% in Over-exploited and Critical rural blocks, 40% in Semi-critical blocks, and 30% in
Safe blocks.
Financial assistance to districts for GIS Mapping of Water Bodies and for preparation of Scientific
Plans:
A financial grant of up to Rs 2.00 lakh to each district is provided in two instalments of Rs 1.00
lakh each to meet part of the expenditure in undertaking GIS mapping of water bodies and
preparation of scientific action plan under JSA: CTR campaign. GIS Mapping of water bodies of a
district depends on many factors such as area, geographic characteristics, etc. Further, the task
requires hiring technical man-power for its completion. The financial grant of Rs 2.00 lakh was to
encourage the district authorities to undertake the activity and was meant to cover only a part of the
cost. The first instalment of Rs. 1.00 lakh each has been released to 623 districts to date. The
second instalment of Rs 1.00 lakh has been released to 235 districts.
Jal Shakti Kendras
Jal Shakti Kendra is one of the most focused interventions of the “Jal Shakti Abhiyan: Catch the
Rain” campaign. The rationale for forming a JSK in each district of the country is to establish a
localised centre that can help the local population with solutions to all water-related activities. As
water issues are impacted by the work of various Departments in the State Governments (e.g.,
Agriculture, Irrigation, Water Resources, Public Health Engineering, Land Resources, Soil &
Water Conservation, Environment, Forest & Climate Change, Rural Development), the Jal Shakti
Kendras are expected to provide a single platform to synergize data flows with different
organizations and make the information available to the local population. JSK will help people
gather and disseminate information related to any water-related issue.
Accordingly, it has been proposed to the States to set up Jal Shakti Kendras in every district of the
country. All State Governments have been requested to set up 'Jal Shakti Kendras' in every district
headquarters as a part of the campaign. As per the information available on the 'Jal Shakti
Abhiyan: Catch the Rain' portal (jsactr.mowr.gov.in), 712 Jal Shakti Kendras (JSKs) have been set
up in various States/UTs.2nd All India State Water Ministers’ Conference from 18th – 19th February 2025 at Udaipur,
Rajasthan:
National Water Mission, Ministry of Jal Shakti organised the 2nd All India State Water Ministers’
Conference with theme “India@2047 – A Water Secure Nation” The 2 nd All India State Water
Ministers’ Conference 2025 was a landmark event, bringing together top policymakers and experts
to shape India’s water security vision. With strategic discussions, technology-driven solutions, and
collaborative decision making, the conference aims to ensure sustainable water resource
management for future generations.
Departmental Summit on “Vision for Sujalam Bharat”
In line with the Hon. Prime Minister’s address during the Fourth National Conference of Chief
Secretaries, the Government of India has adopted a transformative approach to governance, one
that emphasizes coherence, collaboration, capacity building, evidence-based decision-making, and
systemic reforms. As part of this initiative, Six Departmental Summits are planned for 2025–26.
Each summit will be led by a designated Nodal Ministry and will convene officials from both
Central and State Governments. In this context, the Ministry of Jal Shakti (Department of Water
Resources, River Development & Ganga Rejuvenation) planned to organise the Departmental
Summit on “Vision for Sujalam Bharat” with DDWS, MoRD and MoHUA under the guidance of
NITI Aayog. The Summit serves as a national platform for deliberations on sustainable water
management, resilience, and governance toward Viksit Bharat @2047.
To address key challenges in water management and possible solutions, six interlinked thematic
areas were identified for focused deliberation. Each theme was guided by a designated Thematic
Lead, supported by State Nodal Officers and subject experts. During September–October 2025, the
Thematic Leads conducted six workshops—five virtual and one physical—which collectively
engaged more than 2,800 participants.
The two-day departmental summit organized from 28 th to 29 th November, 2025 at Bharat
Mandapam, New Delhi, chaired by Hon’ble MoJS, on "Vision for Sujalam Bharat" deliberated on
six key themes: Rejuvenation of Rivers and Springs; Sustainability of Drinking Water Sources;
Technology for Efficient Water Management; Water Conservation and Groundwater Recharge;
Greywater Management and Reuse; and Community and Institutional Engagement for Behavioural
Change. The event brought together approximately 300 participants from various States and Union
Territories, including senior officials from partner ministries, the Ministry of Housing and Urban
Affairs (MoHUA), the Ministry of Rural Development (MoRD), as well as middle-level and
grassroots implementers from the Water Resources, Public Health Engineering (PHED), Rural
Development, and Irrigation departments and representatives from Civil Society Organizations,
nongovernmental organisations (NGOs), and Panchayati Raj Institutions.Invitation to Sarpanches to participate in Flag Hosting Ceremony at Red Fort on 15 th August 2025
On the occasion of79 th Independence Day celebration 2025, 100 Sarpanches along with their
spouses were invited to participate in Flag Hosting Ceremony at Red Fort on 15 th August 2025.
These Sarpanches have been selected for their exceptional contribution to building the nation and
securing India’s future by conserving water and making Swachh Sujal Gaon a reality led from the
grassroots. On the eve of Independence Day 2025, Booklet (Voices from Field) “Jal Shakti
Abhiyan: Catch the Rain, 2025” was also released. This booklet profiles Sarpanches from across
States and Union Territories who have set inspiring examples through community participation,
innovation and tireless commitment.
Through their leadership, these Sarpanches are reviving rivers and ponds, conserving every drop of
rain, improving rural health and hygiene, and inspiring communities to take ownership of their
resources. They are not only conserving water, but they are also safeguarding India’s ecological
heritage and securing a prosperous, resilient, and self-reliant future for generations to come. The
event was a salute to India’s new-age Nation Builders.
Invitation to Water Warriors to participate as Special Guests to join Republic Day Celebrations,
2025.
For the first time, best performing water warriors who have taken exemplary initiatives to save
water were invited to special guests to witness the Republic Day Parade 2025 at Kartavya Path in
the national capital. A total of 100 water warriors from Department of Water Resources (35 from
NWM) along with their spouses, who have demonstrated transformative actions on the ground in
water conservation with the active involvement of local communities, from various States and
Union Territories were invited to attend the Republic Day Parade. Hon’ble Minister Shri Patil
congratulated and motivated the water warriors to continue adopting innovative practices towards
water conservation & management. He urged them to continue to serve both the nation and their
communities, creating a lasting impact. Hon’ble Minister of Jal Shakti Shri C.R. Paatil also hosted
a lunch for the water warriors at PSOI, New Delhi.
National Level Workshop / Conference: BWUE has conducted a national workshop on 27.01.2025 titled
"Water Use Efficiency: Strategies for a Sustainable Future" with focus on the domestic water sector in
collaboration with the Indian Plumbing Association (IPA). Also, organised a national conference on
12.03.2025 titled “Water Sustainability Conference 2025” with a focus on industrial water use efficiency
in collaboration with The Energy and Resources Institute (TERI), and recommendations of the
workshop/conference have been forwarded to concerned Ministries / industries for taking further
necessary action.Other Workshop / Conference: A Stakeholder Consultation Workshop on “Enhancing Water Use
Efficiency: RO-based Water Purification Systems with Focus on Domestic, Industrial, and Commercial
Sectors” with RO manufacturers and suppliers was organized by the Bureau of Water Use Efficiency, held
on 05.06.2025, and records of the meeting have been forwarded to concerned Ministries / RO industries
for taking further necessary.
A meeting with various Ministries to discuss sustainable groundwater management under the
various schemes/programmes in the Central Ministries on groundwater extraction and recharge
was organized by the Bureau of Water Use Efficiency, held on 04.07.2025, and records of the
meeting have been forwarded to concerned Ministries / Departments for taking further necessary
action.
A Stakeholder Conference on "Enhancing Water Use Efficiency in Air Conditioners” (focus on
domestic, commercial and industrial use) with AC manufacturers was organized by the Bureau of
Water Use Efficiency, held on 05.08.2025.
First Regional Conference on “Enhancing Water Use Efficiency in Irrigation Sector” was organized on
22nd November, 2025 at NIAM Campus, Jaipur, Rajasthan to promote water use efficiency in irrigation
through technological innovations, effective implementation of existing policy provisions, and adoption of
best practices in agriculture and irrigation by States. A total of about 150 participants attended, including
representatives from line Ministries and the States of Rajasthan, Himachal Pradesh, Uttarakhand, Punjab,
Haryana, Karnataka, Jammu & Kashmir and Leh (100), agricultural scientists (30), and NGOs and
progressive farmers (20). Farmers and NGOs also participated actively in the deliberations.
IEC Plans & ActivitiesNWM successfully implemented impactful IEC initiatives across digital and mass communication
platforms. A key highlight was the digital campaign on IRCTC, where a 300x250 mm banner ran
continuously for six months and received over 21.86 crore views, spreading awareness on
rainwater harvesting.
Further, audio announcements on Rainwater Harvesting and Jal Shakti Abhiyan were broadcasted
233 times across 189 railway stations, reaching more than 50 crore people, as reported by NFDC.
Innovative ongoing activities include interactive water conservation games to promote behavioural
change and community engagement. Additionally, the Radio Talk Show series features local Water
Warriors, with amplification support from popular RJs helping extend campaign reach through
both radio and social media platforms.
Preparation of State Specific Action Plans for water Sector:
NWM envisaged developing a State Specific Action Plan (SSAP) for the water sector covering
irrigation, industry, domestic and waste water of a State/UT. NWM is providing financial
assistance of Rs. 50 Lakh to major States and Rs. 30 Lakh to minor States/UTs as a grant for
formulation of SSAPs for the water sector. NWM engaged two nodal agencies to coordinate and
monitor SSAP formulation. North Eastern Regional Institute of Water and Land Management
(NERIWALM), Tezpur, Assam, is coordinating & monitoring SSAP formulation for 19 States and
National Institute of Hydrology (NIH), Roorkee, Uttarakhand, is doing so for the remaining 16
States/UTs. So far, 35 States/ UTs have signed MoUs with the Nodal Agencies. 32 States/UTs have
submitted the first draft status report. 16 States/UTs have submitted the second phase of the
Interim Report. 03 States, namely Uttar Pradesh, Maharashtra & Gujarat, have submitted the Final
SSAP Report and have been approved by the Competent Authority.
HRD & Capacity Building and Mass Awareness Programmes:
Goal - III of NWM envisages ‘Promotion of citizen and state actions for water conservation,
augmentation and preservation, and focused attention to vulnerable areas including over-exploited
areas.’ Capacity building of organisations associated with water resources development and
management is one of the action points under strategy 3.1 (b) of this Goal. In this direction, the
National Water Mission provides grants to various Central/State Government Organisations and
academic institutions of national repute across the nation for conducting training & capacity
building programs. This year, training proposals submitted by WALMI Dharwad, NERIWALM
Tezpur, WALAMTARI Hyderabad, CWRDM Kerala, NIH Roorkee, and ICAR-IISWC
Bhubaneswar have been approved (Nov 2025) for this purpose.
Setting up of Bureau of Water Use Efficiency (BWUE):
Fulfilling the requirement of one of the goals of NWM, a Bureau has been set up under the scheme
“National Water Mission” in October 2022, for Promotion, Regulation, and Control of efficient use
of water in Irrigation, Industrial and Domestic sectors in India to increase water use efficiency. The
proposed Bureau will serve as a facilitator in promoting the improvements in water use efficiency
across various sectors, namely irrigation, drinking water supply, power generation, industries, etc.
The Bureau may engage with multiple stakeholders in developing standards, implementing them,
preparing case studies, making necessary regulatory directions to promote water-use efficiency,
assessing water footprint and water auditing, showcasing national/ international best practices and
evolving innovative mechanisms to secure community participation.
Water Heritage Structures:As part of Azadi Ka Amrit Mahotsav, the National Water Mission identified 75 ancient water
conservation structures across the Country and declared them as "Water Heritage Structures."
Details of these Water Heritage Structures can be seen on the Jal-Itihas subportal under the India-
WRIS portal.
Baseline Studies:
To evaluate water use efficiency of the major/medium irrigation projects, National Water Mission
(NWM) has completed 17 baseline studies through 3 premier institutes namely Water and Land
Management Training and Research Institute (WALAMTARI), Hyderabad, Water and Land
Management Institute (WALMI), Aurangabad, Centre for Water Resources Development and
Management (CWRDM), Kozhikode. The overall project efficiency of the studied projects comes
out at 38% (the group weighted average on culturable command area basis).
Benchmark Studies:
To enhance water use efficiency in some of the water intensive industries viz. Thermal Power
plants, Textile, Pulp & Paper and Steel Industry, NWM had awarded a benchmarking study to The
Energy and Resources Institute (TERI) regarding “Benchmarking Industrial Water Use to Assist
Policy for Enhancing Industrial Water Use Efficiency in India”. The study focuses on two
industrial sectors viz. Thermal Power Plants & Textile Industries in Phase-I and Pulp & Paper and
Steel Industries in Phase-II. TERI has submitted its final report on both Phase I (Thermal Power
Plants, Textile Industries) and Phase II (Pulp & Paper and Steel Industries).
Mandating Low Flow Fixtures:
Water scarcity and insecurity has become a crucial issue worldwide with consistent increase in
global water withdrawals in the last century and it is predicted that more than half of the global
population will be living in water-stressed areas by 2050. The standards, IS 17650 (Part 1) and IS
17650 (Part 2) cover additional requirements for assessment and water efficiency rating of the
sanitary wares (such as water closets, squatting pans, flush valves, flushing cisterns and urinals)
and sanitary fittings [such as faucets (taps) and showerheads] for their performance based on water
efficiency. Department for Promotion of Industry and Internal Trade (DPIIT) has been requested to
consider Water Use Efficiency as additional criteria in the scope of Quality Control Orders issued
by them after due stakeholders' consultation process. Also, a research study has been proposed to
be conducted in residential, commercial and institutional establishments to assess the quantum of
water savings by deploying low flow fixtures (conforming to BIS code IS-17650 Part1 & Part-2).
Mission Lifestyle for Environment (LiFE):
The National Water Mission organised field visits and social media campaigns as part of Mission
LiFE (Lifestyle for Environment) outreach activities for mass mobilisation ahead of World
Environment Day 2024. These efforts aimed to raise awareness about sustainable lifestyles and
promote public engagement in environmental conservation.The NWM also organised a plantation
drive under the "Ek Ped Maa Ke Naam 2.0" Campaign launched by the Hon’ble Prime Minister on
29th November, 2024, at the National Zoological Park in Delhi. Around 2000 trees were planted
across the country in collaboration with various NGOs and partner organisations, with active
support from the National Water Mission.
3. National Water Development Agency (NWDA)
Inter-Linking of Rivers Project:National Water Development Agency (NWDA) has been entrusted with the work of Interlinking of Rivers
(ILR) under National Perspective Plan (NPP) formulated by Government of India. NWDA has identified
30 inter-basin water transfer links (16 under Peninsular and 14 under Himalayan component) under NPP.
NWDA has completed Detailed Project Reports (DPRs) of 14 link projects under NPP including one Intra-
State link project, Feasibility Reports (FRs) of 26 link projects and Pre-Feasibility Reports of all the 30
link projects.
Five link projects have been identified as Priority links viz.; Ken-Betwa Link Project, Modified Parbati-
Kalisindh-Chambal (MPKC) Link Project and Godavari-Cauvery Link Project {comprised of three
projects: Godavari (Inchampalli)-Krishna (Nagarjunasagar) link, Krishna (Nagarjunasagar)-Pennar
(Somasila) link and Pennar (Somasila)-Cauvery (Grand Anicut) link}.
System studies of four link projects viz. Manas-Sanksoh-Teesta-Ganga (MSTG) link, Ganga-Damodar-
Subernarekha (GDS) link, Subernarekha-Mahanadi (SM) link and Farakka-Sunderbans (FS) link have
been initiated and the work of these four links has been awarded to IIT, Guwahati, NIT, Patna, NIT,
Warangal and NIH, Roorkee respectively. The draft final reports of all four link projects have been
submitted by the respective Institutes. Awarding of work for system studies of southern linkage may be
taken up after finalization of quantity of water that can be transferred from MSTG, GDS, FS and SM link
projects to Mahanadi river, as per system studies.
1. Ken-Betwa Link Project (KBLP) is the first Interlinking of Rivers (ILR) Project of NPP that is
under implementation.
Project is planned to provide annual irrigation of 10.62 lakh ha, out of which 8.11 lakh ha in
Madhya Pradesh and 2.51 lakh ha in Uttar Pradesh (mostly in Bundelkhand region) and provide
drinking water supply to a population of about 62 lakh people in both the States (MP- 41 lakh &
UP-21 lakh). Project will generate 103 MW of Hydro and 27 MW of Solar power.
Govt. of India has approved the implementation of KBLP with an estimated cost of Rs. 44605 crore
(year 2020-21 price level) with central support of Rs. 36290 crore through a Special Purpose
Vehicle viz.; Ken Betwa Link Project Authority (KBLPA).
Initial focus is on land acquisition, R&R and EMP of the project.
Work of main component viz.; Daudhan dam has been awarded to M/s NCC Ltd. on 28.11.2024 and
preliminary work is under progress.
A Project Management Consultant has been hired for implementation of project. The work has been
awarded to JV of M/s Tractebel Engineering Pvt. Ltd. & M/s LEA Associates South Asia Pvt. Ltd.
on 30.05.2025. Contract Agreement was signed on 24.06.2025.
Land Acquisition work is under progress.
100% land under submergence has been transferred to WRD, MP.
State specific projects are also under progress.
Project is planned to be completed in period of 8 years i.e. upto March, 2030.
2. Modified Parbati-Kalisindh-Chambal (PKC) Link Project (Integration of PKC & ERCP)
With a view to optimize the utilization of water of the Chambal River System and based on
deliberations with Rajasthan and Madhya Pradesh, at various platforms, a proposal of Modified
Parbati-Kalisindh-Chambal (Modified PKC) link, incorporating the components as proposed by
Govt. of MP in Kuno, Parbati and Kalisindh sub-basins along with components of ERCP has been
framed. Modified PKC link has been made a part of NPP of ILR and has been declared as a priority
interlinking project by Special Committee for Interlinking of Rivers (SCILR) in its 20th meeting
held in December, 2022.
Draft PFR of Modified PKC link and a draft MoU for preparing the DPR of the Modified PKC link
was circulated to both the States in January, 2023.The persistent efforts of Govt. of India has led to signing of MoU by both these States with Ministry
of Jal Shakti (MoJS), Govt. of India (GoI) on 28.01.2024 in New Delhi in the presence of Hon’ble
Chief Ministers of both the States, for preparation of its DPR followed by signing of MoA on
05.12.2024 for implementation of link project.
Preparation of DPRs of its components by both the States have been completed by both the States
and have been uploaded on e-PAMS Portal of CWC for appraisal.
After technical and cost appraisal of the project by CWC, proposal would be put up for PIB and
Cabinet approval.
The project will provide benefits to MP extending annual irrigation to command area of about 6
lakh ha by about 1815 MCM water and drinking water supply of about 71 MCM to the districts of
Shivpuri, Gwalior, Bhind, Morena, Sheopur, Shajapur, Rajgarh, Guna, Ratlam, Ujjain, Dhar, Sehore,
Mandsaur, Dewas and Agar Malwa.
The Project is planned to provide drinking water of about 1744 MCM to targeted population of 21
districts of Eastern Rajasthan (Jhalawar, Baran, Kota, Bundi, Tonk, Sawai Madhopur, Gangapur
city, Dausa, Karauli, Dholpur, Bharatpur, Deeg, Alwar, Khairthal-Tijara, Kotputali - Behror, Jaipur
urban, Jaipur rural, Dudu, Ajmer, Beawar, Kekri) and en-route towns, tanks and villages as well as
to meet industrial water demand of about 205 MCM for Delhi Mumbai Industrial Corridor (DMIC)
and other industries. There is also provision of about 1360 MCM water irrigating more than 2.5 lakh
ha of new command area as well as stabilizing the existing command area of about 1.5 lakh ha in
Rajasthan.
3. Godavari-Cauvery (G-C) Link Project (comprising of 3 link systems)
Modified proposal for transfer of 4189 MCM of water from Godavari along with supplementation
in Krishna basin through Bedti Varda link (524 MCM) has been studied by NWDA.
Draft DPR of the modified revised proposal has circulated to the concerned State/UT during Jan.,
2024.
Draft MoA has been prepared for implementation of the project and circulated to concerned
State/UT for perusal and observation during April, 2024.
Concerted efforts are being made for building up consensus amongst the States/UT for signing of
MoA for the early implementation of this link project.
Six Consultation meetings for arriving at a consensus among party States have been held so far and
the last meeting was held on 22.08.2025.
4. Kosi-Mechi Intra-State Link Project of Govt. of Bihar
Kosi-Mechi Interlinking River Project under Himalayan Component of NPP was taken up for
studies by NWDA and its Pre-Feasibility Report (PFR) was completed in year 1997 but as the link
project entirely lies in Nepal so due to international issues, preparation of its Feasibility Report was
dropped. As requested by State of Bihar, the study of Kosi-Mechi Intra-State link which starts from
existing Hanuman Nagar Barrage and benefits Bihar was undertaken by NWDA, as for this, an
agreement with Nepal was not needed.
Present proposal is an extension of EKMC upto river Mechi, a tributary of river Mahananda. The
aim of extension of 76.20 km of EKMC upto Mechi river and remodelling of existing EKMC 41.30
km is mainly to provide irrigation benefits to the water scarce Mahananda basin command in the
districts of Araria, Kishanganj, Purnea and Katihar during Kharif season depending upon the
pondage available in Hanuman Nagar barrage. The total length of the link canal including the length
of existing EKMC is 117.50 km.
PFR of Kosi-Mechi Intra-State Link Project was prepared by NWDA in June, 2009. subsequently,
on request of Govt. of Bihar, its DPR was prepared and sent to State Govt. in March, 2014 and
further revised in year, 2017.All statutory clearances have been obtained from various Ministries/Departments.
Govt. of Bihar during March, 2022 has requested NWDA to prepare the Working DPR of the link
project. MoU has been signed on 24.12.2022 between NWDA & WRD, Govt. of Bihar for
preparation of Working DPR of link project in two Phases (Phase-I & II).
Remodeling of Existing Eastern Kosi Main Canal (EKMC): 41.30 Km
Construction of new link canal system: 76.20 Km (RD 41.30 km to 117.50 Km)
NWDA has updated the revised cost of this Link Project at 2022-23 PL in December, 2022. The cost
of the link project as Rs. 6282.32 crore has been approved by the Technical Advisory Committee of
DoWR,RD&GR in its 155th meeting held on 08.03.2024.
Investment Clearance has been accorded by DoWR,RD&GR, MoJS on 22.05.2024.
PIB Note of Kosi-Mechi Intra-State Link Project has been submitted and as per minutes of PIB
meeting held on 21.11.2024, the proposal has been recommended for inclusion under PMKSY-
AIBP.
In accordance with the decisions taken in the meeting of the Cabinet Committee on Economic
Affairs held on 28.03.2025 for inclusion of projects under PMKSY-AIBP, approval for inclusion of
Kosi-Mechi Intra-State Link Project of Bihar under the PMKSY-AIBP Programme of
DoWR,RD&GR has been accorded.
The report on remodeling works (Phase-I) was completed by NWDA and submitted to State Govt.
on 30.06.2025.
DPR of Phase-II is likely to be completed by September, 2026.
Project is scheduled to be completed by March, 2029.
5. 9th India International Water Week (IIWW) – 2026
IWW was conceptualized and organized for the first time in 2012, the Ministry of Jal Shakti,
Government of India is organizing Water Week biannually. It comprises Conference, Exhibition and
a Study Tour.
Eight editions of event have been organized in 2012, 2013, 2015, 2016, 2017, 2019, 2022 and 2024.
The 8th India Water Week-2024 was successfully organized at Bharat Mandapam, New Delhi
during September 17-21, 2024 and the event was inaugurated by Hon’ble President of India.
With the approval of Hon'ble Minister of Jal Shakti, it has been now decided to organize “India
Water Week” as “India International Water Week”.
9th India International Water Week – 2026 with theme "Climate Resilient Water Management"
from September 22-26, 2026 at Bharat Mandapam, New Delhi and focus on theme and
International issues in field of water.
4. Central Water Commission (CWC)
1. Evaporation-transpiration (ET) Based Irrigation Performance Assessment Tools
Globally, irrigation accounts for nearly 70% of freshwater withdrawals, and in India, the share is
about 80% and employs nearly half of the workforce, making a significant contribution to GDP.
Over the last few decades, rapid population growth, urbanization, and climate variability have
exerted tremendous pressure on available water resources, necessitating a shift toward scientific
water management and data-driven irrigation performance assessment (IPA). Irrigation
Performance Assessment (IPA) is a systematic process used to evaluate how effectively, efficiently,
and equitably an irrigation system delivers water to agricultural fields to meet crop water
requirements. It provides essential feedback for improving management practices, optimizing
water allocation, and ensuring sustainability of irrigation infrastructure.Traditionally, irrigation performance was evaluated using various indicators viz. the system
performance, agro-economic impacts, socio-economic impact, environmental impacts & economic
evaluations. These assessments were based on field surveys, manual discharge measurements, and
crop-cutting experiments—methods that were often time-consuming, subjective, and spatially
limited. With growing complexity in water management and the expansion of major and medium
irrigation projects, such conventional techniques have become insufficient to represent the true
picture of system performance across vast commands. Having an extensive network, assessing
releases and usage data for irrigation infrastructure and water use efficiency remains a significant
challenge in this sector. Therefore, there was a need to develop a tool using available ready to use
remote sensing (RS) products for assessing the performance of these irrigation schemes,
benchmarking the schemes and further to plan the corrective measures for projects with low
performance/WUE.
Thus, on the initiative of DoWR, RD and GR, MoJS, two ET based tools for performance
assessment of Irrigation projects with Remote sensing and Satellite input have been developed by
CWC, NWIC& World Bank Team. This endeavor encompasses two primary objectives: first, to
develop a generic performance assessment system for benchmarking irrigation systems at the
national level; second, to conduct a scheme-level performance assessment for selected irrigation
systems, offering a higher resolution analysis.
Two tools have been developed by CWC in collaboration with the World Bank and National
Institute of Hydrology (NIH) namely EQIPA (Evapotranspiration based Quick Irrigation
Performance Assessment) & EDIPA (Evapotranspiration based Detailed Irrigation Performance
Assessment. The E-DIPA tool provides in-depth assessments of irrigation systems by analyzing
spatial and temporal variations in evapotranspiration across irrigated areas within command
regions. Both tools address key performance aspects, including equitable water distribution,
reliability of service (related to irrigation scheduling), and adequacy (Quantum of water supplied
with respect to potential). By leveraging these insights, water managers can make data-driven
decisions to optimize resource utilization and improve irrigation system efficiency. Satellite
products like WaPOR by FAO, Sentinel-1 and Sentinel-2by ESA, Landsat 30m etc. were used in
developing the ET based tools.
During 2nd State Water Ministers’ conference held at Udaipur in Feb, 2025 theversion-1 of the
EQIPA tool was launched and state wise results generated from EQIPA tool were shared with the
states for their inputs and further improvement in tools. Virtual meetings were held with 15 states
in Jan-Feb 2025 in which the tool was demonstrated to the states. For capacity building of the
different stakeholders, different training programs have been organized regularly in which
245 officers have been trained for ET based Irrigation Performance Assessment Tools till
November-2025. These officers are not only from CWC but state govt. engineers, PhD scholars
from states like Odisha, Maharashtra, Gujarat, Assam, Andhra Pradesh, Karnataka, Punjab,
Telangana have also been trained.
CWC with the help of World Bank and NIH has developed a CWC Geo Crop Application to
create a crop library for whole country as supervised classification will give better understanding
of the results and will help make the tool more competent and robust.
2. Support for Irrigation Modernization Program (SIMP):
Central Water Commission (CWC), DoWR, RD & GR has taken up an initiative Support for
Irrigation Modernization Program (SIMP) with technical assistance from the Asian Development
Bank (ADB) to modernize Major/Medium Irrigation (MMI) projects in the country.SIMP is proposed to be taken up in 4 phases. SIMP Phase-1 concluded on 31.12.2021 under which
4 MMI projects have been identified for inclusion under 1st batch of projects for preparation of
Irrigation Modernization Plans (IMPs) out of the 57 proposals received from 14 States and 2 UTs.
The entire process including the preparation of IMPs, Detailed Project Report (DPRs), detailed
designs and final implementation/ project execution is expected to be completed by Phase-4.
Implementation of the project would lie with the concerned States who would have an option to
either fund it from their own resources or they can avail loan facility from ADB or any other
financial institutions.
SIMP Phase-2 was initiated from November 2022. Irrigation Modernization Plan (IMP) of four
projects namely Vani vilasa Sagara Project, Karnataka, Palkhed Project Maharashtra, Purna
Project, Maharashtra and Loharu Lift Irrigation Project, Haryana have been prepared. As a 1st step
for preparation of IMPs, FAO developed RAP-MASSCOTE (Rapid Appraisal Procedure- Mapping
System and Services for Canal Operation Techniques) workshops were organized to assess the
present status of the identified four projects. The findings of RAP MASSCOTE workshops and
issues related to Batch 1 SIMP projects were discussed in a mid-term workshop organized by ADB
and CWC on 09.06.2023 at New Delhi.
For capacity building under SIMP phase-II, the following activities were organized:
a. From 6th to 10th November 2023, a five days training on modernization and design of
Pipe Distribution Networks (PDN) was organized at Panchkula/ Chandigarh. 22
Engineers from Karnataka, Maharashtra, Haryana, Punjab and CWC participated in the
training.
b. On 15th and 20th December 2023, a Webinar on Irrigation Modernization and Design
of PDN Systems was organized.
c. A Training on Asset Management Planning for Irrigation Schemes was held from 8 to
12 January 2024 at WALMI, Aurangabad.
d. A training on new technologies in Agriculture and Water Practices was held from 22 to
25 January 2024 at HIRMI, Kurukshetra, Haryana.
The Preliminary Project Reports (PPR) of all the four projects has been submitted by ADB
consultants to the concerned project authorities for approval of state Govt. PPRs are yet to be
approved by Planning/WRD of the states for further submission to DEA. After necessary approval
from DEA, action for phase-3 will be taken up for preparation of DPRs.
3. National Task Force for Integrated Water Resources Development and Management
The Department of Water Resources, RD & GR, Ministry of Jal Shakti, Government of India has
constituted a National Task Force for Integrated Water Resources Development and Management
(NTFIWRDM), 2024 vide O.M. dated 25.11.2024 under the chairmanship of Shri Ramesh Chand,
Hon’ble Member, Niti Aayog; comprising of distinguished Members viz. Secretary/Additional
Secretary of various Ministries, Heads of various Govt. Departments and Senior officials from
various organizations. Chief Engineer (BPMO), Central Water Commission is the Member-
Secretary of the NTFIWRDM.
The first meeting of the NTFIWRDM was held on 21st January 2025 under the chairmanship of
Prof. Ramesh Chand, Member, NITI Aayog to deliberate on the terms of reference, organizational
setup and various proposed activities of the national task force. Based on the recommendation of
NTFIWRDM, a core group was constituted under the chairmanship of Prof. Ramesh Chand,
Member, NITI Aayog to
i. Formulate proposals for various thematic Working Groupsii. Prepare and finalize a detailed work plan in line with the terms of reference of the
NTFIWRDM and
iii. Review and recommend proposals and matters of NTFIWRDM.
The first meeting of the core group was held on 31/01/2025, during which the following eight (08)
working groups, comprising of eminent experts to address specific aspects of water sector were
finalized, and their objectives/key activities were also identified:
1. Water Resources Supply and Demand Scenario Group
2. Integrated Water Resources Management Group
3. Water Governance Group
4. Water Infrastructure Assessment Group
5. Water Services Delivery Group
6. Water Use Efficiency Group
7. Environmental and Ecological Group
8. Data, Technology and Innovation Group
The second meeting of the core group was held on 18/07/2025 to review the progress of all the
working groups.
The respective working groups are conducting meetings and undertaking activities aligned with
their thematic areas. The status of the meetings of the working groups is as under:
S. Name of Working Status of Working Group as on 27.11.2025
No. Group
1. Water Resources Four(04) meetings were held under the working group on
Supply and Demand 03.04.2025,09.06.2025,01.09.2025 and 21.11.2025,
Scenario
respectively
2. Integrated Water Three (03) meetings were held under the working group on
Resources 02.04.2025,10.06.2025 and 18.08.2025, respectively.
Management
3. Water Governance Four (04) meetings were held under the working group on
26.05.2025,17.07.2025, 03.09.2025 and 24/10/2025,
respectively.
4. Water Infrastructure Three (03) meetings were held under the working group on
Assessment 05.05.2025,16.05.2025 and 29.08.2025, respectively.
5. Water Services Two (02) meetings were held under the working group on
Delivery 24.04.2025 and 09.07.2025, respectively.
6. Water Use Two (02) meetings were held under the working group on
04.04.2025 and 29.07.2025, respectively.
Efficiency7. Environmental and Five (05) meetings were held under the working group on
Ecological 03.06.2025, 02.08.2025, 23/09/2025, 01/10/2025 and10.10.2025,
respectively.
8. Data, Technology Three (03) meetings were held under the working group on
and Innovation 30.04.2025,08.08.2025 and 09.10.2025, respectively.
Further, various working groups are in the process of framing their draft interim reports.
4. CWC Activities under National Hydrology Project (NHP) (w.r.t. EMO)
Central Water Commission has taken up sedimentation assessment studies of selected reservoirs
located all over the country using Hydrographic Survey. During the Year 2021- 24, under National
Hydrology Project (NHP) Phase-I, sedimentation assessment study for 32 reservoirs have been
completed in all respect. During the Year 2023-25 under phase –II, sedimentation studies in respect
of 87 reservoirs located in 10 States (Rajasthan, Gujarat, Uttar Pradesh, Uttarakhand, Madhya
Pradesh, Maharashtra, Andhra Pradesh, Kerala, Telangana, and Odisha) had been taken up through
outsourcing. Studies in respect of 84 out of 87 reservoirs have been completed in all respect and
the works of the remaining 03 reservoirs was withdrawn due to various reasons.
Reservoir Sedimentation Studies using Hydrographic survey for 32 & 84 reservoirs under National
Hydrology Project under Phase I & II respectively, have been completed across the country and
their reports published.
5. The important publication released during October 2025:- "Water Sector at a Glance
2024"
M&CC Dte
CWC was monitoring 902 Glacial Lakes & Water Bodies having size greater than 10 ha on
monthly basis during monsoon season (June to October) every year through remote sensing as per
NRSC inventory 2011 till 2024. From 2025, CWC has increased monitoring to 2843 Glacial Lakes
and Water Bodies as per NRSC published Glacial Lake Atlas (GLA) of Indian Himalayan River
Basins in the year 2023 under National Hydrology Project (NHP). Of these, 2485 are Glacial
Lakes and 358 are Water Bodies. Total 681 Glacial lakes located in India, out of which, Ladakh
hosts 179 lakes, J&K 76, Himachal Pradesh 17, Uttarakhand 13, Sikkim 72 and Arunachal Pradesh
324.
RC Dte
The Technical Guidelines on Flood Plain Zoning 2025, issued by Central Water Commission under
Ministry of Jal Shakti during August 2025. (copy attached)
CM Dte
This Directorate published the Guidelines for Preparation of DPR for Salinity Ingress Management
Projects in Coastal Areas in May 2025.
The guidelines provide a structured approach for developing technically sound and climate-
resilient interventions to address salinity intrusion in coastal regions. They emphasize the use of
salinity control structures, groundwater recharge measures, and nature-based solutions such as
mangrove restoration. This initiative will support states and UTs in preparing effective DPRs and
strengthen institutional capacity for safeguarding coastal communities and ecosystems.6. CWC Activities under National Hydrology Project (NHP):
a. Study on “Physical based Mathematical Modelling for estimation of Sediment Rate and
Sediment Transport in Seven River Basin” has been completed.
b. Consultancy services for Development of Decision Support System near to real time for
Integrated Reservoir Operation System of Ganga Basin” has been completed.
c. Study of the issue of floods and siltation in river Ganga due to Farakka Barrage in the
State of Bihar has been completed.
d. Early Flood Warning System Including Inundation Forecast in Ganga Basin is in
progress.
e. Reservoir Sedimentation Studies using Hydrographic survey for 32 reservoirs in Phase-
I and 84 reservoirs in Phase-II has been completed under NHP
f. Extended Hydrological Prediction (multi week forecast) for Yamuna, Narmada and
Cauvery basins is in progress.
g. Supply, Installation, Testing & Commissioning (SITC) of 103 Nos. ADCP for the
measurement of discharge at the HO sites of CWC has been completed
h. Supply, Installation, Testing & Commissioning (SITC) of 32 velocity radar sensors for
modernization of discharge observations has been completed.
a. Real Time Data Acquisition System (RTDAS) for Narmada Control Authority (NCA)
and Arunachal Pradesh comprising of network of 48 & 50 nos hydro meteorological
Stations respectively has been commissioned.
2. Flood forecasting activities:
In the year 2025, 10 new stations (Inflow) have started functioning. Currently CWC is providing
flood forecast at 350 stations (200-level forecasting stations & 150-inflow forecasting stations).
During the period from 1st April to 30.10.2025, 11581 (i.e. 6538 Level and 5043 Inflow) forecasts
were issued, out of which 11096 (95.81%) forecasts were found within the accuracy limit (±0.15m
for level forecast and ±20% for inflow forecast).During flood season, CWC operates the Central
Flood Control Room on 24x7 basis at its headquarter in New Delhi and 36 Divisional Flood
Control Rooms spread throughout the country for monitoring flood situation. On an average, about
10,000 forecasts are issued during flood season every year by the CWC. Normally, these forecasts
are issued 6 to 30 hours in advance, depending upon the river terrain and location of the flood
forecasting sites and their base stations. In addition to conventional flood forecasting techniques,
mathematical model forecasting based on rainfall-run off methodology is being used for some
areas. This has enabled CWC to issue 7-day advance flood advisory.
Automated online 7-day flood advisory for all the level and inflow forecasting stations is
maintained. “Flood Situation for next seven days” in respect of stations likely to be above warning
level has been added in the “Daily Flood Situation Report cum Advisory” based on the 7-day
advisory.
In 2025, CWC began issuing flood advisories and warnings through its YouTube channel, “CWC
Flood Updates.” By using YouTube, CWC aims to reach the public faster, more widely, and in a
more user-friendly format.
NRSC has developed Spatial Flood Early Warning Systems for the Godavari and Tapi Rivers under
NHP. Further, C-DAC, with the support of CWC, has developed an Inundation Forecast Model for
the Mahanadi Basin The solution for mentioned basins was also rolled out during the 2025
monsoon season. The inundation forecast outputs of the above Mahanadi, Godavari and Tapi River
Basin models are available on newly developed Unified Dissemination Portal C-Flood (https://inf.
cwc.gov.in/) inaugurated by Hon'ble Minister of Jal Shakti.CWC has also initiated the in-house development of Inundation Forecast Models for the all the
regions where high-resolution Digital Elevation Model (DEM) are available. Till now, inundation
forecast model for 26 Flood Forecasting stations have been developed and their outputs have been
made live on https://aff.india-water.gov.in/inundation.php portal. CWC further plans to cover all
the existing 200 Level Forecasting stations for inundation forecasting in future subjected to
availability of High-Resolution DEM.
8. Flood Management Wing (FM):
The “Flood Management Programme (FMP)” and “River Management Activities and Works
related to Border Areas" (RMBA) under operation during XII Five Year Plan were merged as
"Flood Management and Border Areas Programme" (FMBAP) for the period 2017-18 to 2019-20
and further extended up-to March, 2021. Cabinet further approved the continuation of FMBAP
scheme during 2021-22 to 2025-26 with an outlay of Rs. 4100 Crore (FMP-Rs. 2940 Crore and
RMBA – Rs. 1160 Crore). Since the inception of FMBAP (till March 2025), Central Assistance of
Rs. 7228 crores have been released to States/UTs under FMP component of Flood Management &
Border Area Programme (FMBAP) scheme and Central Assistance of Rs. 1477 crores have been
released to UTs/States under RMBA component of FMBAP scheme.
A. Expert Level Mechanism (ELM)
During the visit of the Hon’ble President of the People’s Republic of China to India on November
20-23, 2006, it was agreed to set up an Expert-Level Mechanism to discuss interaction and
cooperation on provision of flood season hydrological data, emergency management and other
issues regarding trans- border Rivers as agreed between them. Accordingly, the two sides have set
up the Joint Expert Level Mechanism through a Joint Declaration by both the countries. The ELM
meetings are held alternately in India and China every year. Sixteen meetings of ELM have been
held so far. The 16 meeting of ELM was held in New Delhi during 22nd and 23rd April 2025. The
GoI delegation was led by Shri S.K. Sinha, Commissioner (B&B), DoWR, RD & GR, Ministry of
Jal Shakti and the Chinese delegation was led by Mr. Hao Zhao, Director General of the
International Economic & Technical Cooperation and Exchange Centre, Ministry of Water
Resources, People’s Republic of China. Representatives of Ministry of External Affairs (MEA),
Central Electricity Authority (CEA) and Central Water Commission (CWC) had also participated
in the meeting.
B. Joint Experts Team (JET) on Flood Forecasting:
A Joint Experts Team (JET) consisting of senior officials from the Government of India and Royal
Government of Bhutan(RGoB) continuously reviews the progress and other requirements of a
network of 36 hydro-meteorological sites located in the catchments of trans-border rivers
Puthimari, Pagladiya, Sankosh, Manas, Raidak, Torsa, Aie and Jaldhaka. So far, JET has met 39
times alternately in India and Bhutan since its reconstitution in 1992 and the last JET meeting i.e.
The 39th meeting of Joint Expert Team (JET) was held during 8th - 9th October 2025 at Paro,
Bhutan. The Indian delegation was led by Shri Subhrangshu Biswas, Chief Engineer,
Teesta&Bagarathi-Damodar Basin Organisation (T&BDBO), Central Water Commission, GoI and
the Bhutanese delegation was led by Mr. Karma Dupchu, Director, National Centre for Hydrology
and Meteorology (NCHM), RGoB.
C. National Committee on Seismic Design Parameters:
The National Committee on Seismic Design Parameters (NCSDP) was constituted by erstwhile
MoWR order dated 21st October,1991. Member (DCR), CWC is the chairman of the committee
with other experts from various engineering disciplines from different technical institutions andGovernment organizations as its members. Director (FECSA), CWC is the Member Secretary of
NCSDP.
The main objective of NCSDP is to recommend the site-specific seismic design parameters for
water resource projects received from the dam owners. Further, it recommends attenuation
relationships, derive Maximum Credible Earthquake (MCE), finalize recommendation on
Controlling Maximum Credible Earthquake (CMCE) as well as Design Basis Earthquakes (DBE).
The 39th meeting of NCSDP was held on 24.04.2025 at CWC, New Delhi under the Chairmanship
of Member (DCR) wherein twelve projects were cleared. The 40th meeting of NCSDP was held on
24.07.2025 at CWC, New Delhi under the Chairmanship of Member (DCR) wherein one project
was cleared. Further, the Guideline for Preparation and Submission of Site-Specific Seismic Study
Report of River Valley Project to National Committee on Seismic Design Parameters was revised
in the 40th NCSDP meeting and third revision of guidelines was published in August 2025.
9. Technical examination of instrumentation aspects of the projects
Detailed Project Report (DPR/Pre-DPR) of 5 projects and construction stage drawings of 2
projects (Lakhwar and Polavaram) in various States/countries namely Andhra Pradesh, Arunachal
Pradesh, Gujarat, Sikkim Uttarakhand and Nepal were cleared with respect to instrumentation
aspects.
SN Name of the Project state wise State
1. Polavaram Irrigation Project Andhra Pradesh
2. Subansiri Upper Hydroelectric Project (1605 Arunachal Pradesh
MW)
3. Oju Hydroelectric project (2220 MW) Arunachal Pradesh
4. Flood Mitigation works for Dholera Special Gujarat
Investment Region (DSIR) at Ahmedabad
(Gujarat).
5. Teesta-III HE Project (1200MW) Sikkim
6. Lakhwar MPP Uttarakhand
7. Upper Karnali HEP (900 MW) Nepal
10. Other Seismic works:
The ongoing work on the technical evaluation and critical examination of the web-based tools,
Seismic Hazard Assessment Information System (SHAISYS) and Seismic Hazard Assessment of
North and North East India (SHANNEI), being developed by IIT Roorkee and CWPRS Pune,
respectively, under DRIP is of significant importance and is being diligently carried out.
Additional Inputs:Guidelines for Assessment of GLOF specific to river valley Projects in Indian
Himalayan region
CWC has released “Guidelines for Assessment of GLOF specific to river valley Projects in Indian
Himalayan region” in July 2025. The guidelines provide a comprehensive framework for
identifying vulnerable glacial lakes, estimating breach parameters and volumes, and simulating
GLOF scenarios using appropriate hydraulic models. This document outlines a comprehensive
methodology—starting from glacial lake inventory and criticality analysis to simulation of GLOF
scenarios and sensitivity analyses. They aim to ensure uniformity and scientific rigor in GLOF
assessment practices across the country.
11. DAM REHABILITATION AND IMPROVEMENT PROJECT (DRIP) Phase-II and III.
Dam Rehabilitation and Improvement Project (DRIP) is an externally aided project with financial
assistance from the World Bank, targeting rehabilitation of some of the selected dams of the
Country along with accompanying institutional strengthening component.
Based on the success of DRIP Phase- I, Ministry of Jal Shakti initiated another externally funded
scheme, DRIP Phase-II and Phase-III. The Union Cabinet has approved the Scheme on October 29,
2020.
The scheme has provision for rehabilitation of 736 dams located in 19 States (Andhra Pradesh,
Chhattisgarh, Goa, Gujarat, Jharkhand, Karnataka, Kerala, Madhya Pradesh,Maharashtra, Manipur,
Meghalaya, Odisha, Punjab, Rajasthan, Tamil Nadu, Telangana, Uttar Pradesh, Uttarakhand, West
Bengal, and three Central Agencies (Central Water Commission, Bhakra Beas Management Board,
and Damodar Valley Corporation). It is a State Sector Scheme with Central component, with
duration of 10 years, to be implemented in two Phases i.e. Phase- II and Phase-III, each of six
years duration with an overlap of two years. The budget outlay is Rs 10,211 Cr (Phase II: Rs 5107
Cr; Phase III: Rs 5104 Cr) with rehabilitation provision of 736 dams. Out of this cost, Rs. 7,000
crore is an external loan and Rs. 3,211 crores would be borne by the respective participating States
and the three Central agencies. The funding pattern of scheme is 80:20 (Special Category States),
70:30 (General Category States) and 50:50 (Central Agencies). The scheme also has provision of
Central Grant of 90% of loan amount for special category States (Manipur, Meghalaya and
Uttarakhand). The DRIP Phase-II and III Scheme is 10 years duration, proposed to be implemented
in two Phases, each of six-year duration with two years overlapping. Each Phase has external
assistance of US$ 500 M. The Phase-II of the scheme is being co-financed by World Bank and
Asian Infrastructure Investment Bank (AIIB), with funding of US$ 250 million each. The loan
agreement by World Bank was signed on August 04, 2021 with 10 States (Gujarat, Kerala, MP,
Maharashtra, Manipur, Meghalaya, Rajasthan, Odisha, Tamil Nadu, and Chhattisgarh) and became
effective from 12th October, 2021. In addition to 10 States, four States (Uttarakhand, Uttar
Pradesh, West Bengal and Karnataka) have been notified by World Bank for inclusion under this
scheme in June 2022 and their loan declared effective in January 2023. Another 4 agencies (DVC,
BBMB, Punjab and Telangana) have been onboarded and their loan has been made effective on
October, 2025.
The loan agreement by AIIB was signed on 19th May, 2022 with 10 States (Gujarat, Kerala, MP,
Maharashtra, Manipur, Meghalaya, Rajasthan, Odisha, Tamil Nadu, and Chhattisgarh) and
declared effective on 29th December, 2022 by AIIB.
Important project achievements include approval of PSTs of 162 dams costing Rs 4548.73 Cr by
the World Bank. The contract(s) amounting approximately Rs 2776 Cr have been awarded by
various Implementing Agencies and an amount of Rs 1931 Cr spent as on 15.11.2025 on variousproject activities including dam rehabilitation, institutional strengthening and project management
activities
4th meeting of Technical Committee of DRIP Phase II and III and World Bank Implementation and
Support Mission was held during 03rd to 04th March 2025 under the chairmanship of Member
(DCR), CWC at Shillong, Meghalaya in which Nodal officer and Project Director of DRIP IAs
participated. Deliberations in respect of technical matters pertaining to implementation of the
scheme were held during the meeting.
The 2nd Meeting of Executive Committee of ICED, IIT Roorkee was held on 10th March 2025.
A National Level Training Program on “Dam Safety Act-2021 Overview: Public Safety Around
Dams” was organized by CPMU in collaboration with Uttarakhand (UJVNL) during 07-08 May,
2025 at Dehradun, Uttarakhand.
2nd Meeting of Executive Committee of ICED, IISc, Bengaluru was held at ICED, IISc,
Bengaluru on 25th June 2025.
World Bank Implementation Support Mission of DRIP Phase II were held during 13th to 15th
October, 2025 at Indore, Madhya Pradesh.
3rd meeting of National Level Steering Committee (NLSC) on DRIP Phase-II and III chaired by
Secretary, DoWR, RD and GR were held on 30.10.2025 at New Delhi to discuss the progress and
issues of DRIP Scheme.
3rd Meeting of the Advisory Board of the Institutions for Centre of Excellence in Dam Safety
(ICED) were held on 31.10.2025 at New Delhi.
5th meeting of Technical Committee of DRIP Phase II and III was held on 25.11.2025 under the
chairmanship of Member (DCR), CWC at New Delhi in hybrid mode in which Nodal officer and
Project Director of DRIP IAs participated. Deliberations in respect of technical matters pertaining
to implementation of the scheme were held during the meeting.
One of the significant activities under DRIP is Institutional Capacity building. Based upon the need
assessment, tailor made training programmes are being conducted with participation of not only
DRIP Implementing agencies but also other stakeholders associated with Dam Safety. During
2025, 13 nos. of training programmes were organised under DRIP apart from ongoing M Tech
Programme on Dam Safety by IIT Roorkee and IISc Bangalore.
Ø Hydrological Studies: The success of a project is largely governed by the hydrological inputs.
The success of a project is largely governed by the hydrological inputs. The Hydrological Studies
Organization (HSO), a specialized unit under Design and Research (D&R) Wing of CWC, carries
out hydrological studies in respect of the water resources projects in the country. The inputs in
Detailed Project Report (DPR) or Pre- Feasibility (PFR) stage are made available in the form of:
Water availability/yield studies.
Design flood estimation.
Sedimentation studies.
Diversion flood studies.
The country has been divided into 7 zones and further into 26 hydro- meteorologically
homogeneous sub-zones and flood estimation models are developed for each subzone to compute
the design flood in ungauged catchments. So far, flood estimation reports covering 24 sub-zones
have been published. During the year 2025- 26, technical examinations of hydrological aspects of
DPRs in respect of 138 projects have been carried out in CWC. Out of this, 55 projects have been
cleared, and comments were issued for 59 projects. Rest of the projects are under examination:Some of the major works carried out during this period are:
Damring Irrigation Project, North Garo Hills, Meghalaya.
Madhura Irrigation Project, Cacher, Assam.
Design Flood Studies for various structures under the MSTG Link (NWDA Project).
Shyampur Barrage Major Micro Irrigation Project.
Nainagarh Barrage Major Micro Irrigation Project.
Dhanwadi Major Irrigation Project.
Kateela-Pawa Major Micro Irrigation Project.
Sonpura Major Micro Irrigation Project.
Lakhundar Complex Major Micro Irrigation Project.
Kalisindh Complex irrigation project.
Ranjit Sagar complex major micro irrigation project.
Hydrological studies of Khudirampur Dam, Andaman & Nicobar.
Hydrological studies of SMC Barrage project, Gujarat.
Design flood of Proposed Barmul dam, Odisha.
Ø Technical Assistance / Advice tendered:
HSO has provided secretariat assistance to various technical/ expert committees for undertaking
special studies on various aspects related to water resources development and management. Some of
the important contributions during the year 2025- 26 are as under:
Climate adaptation in Vennar Sub-basin in Cauvery Delta project-2.
Hydrological aspects of the proposed Korang Nallah Dam, Andaman & Nicobar.
Sectional Committee WRD-31 on Urban Flooding constituted by of Bureau of Indian Standards for
the “Standardization related to assessment, planning and design for urban flooding and
recommendations for mitigation and management of urban floods” under the chairmanship of Chief
Engineer, Hydrological Studies Organization.Central Water Commission and Indian Institute of
Technology Roorkee signed a Memorandum of Understanding (MoU) on Urban Flooding.
The urban Hydrology Assessment study of pilot city has been considered under the collaborative
initiative of phase-III of „India-EU Water Partnership between European Union and the Ministry of
Jal Shakti, Government of India.
Planning and Design of Water Resources Projects
CWC is actively associated with design of majority of the mega water resources
projects in India and neighboring countries, viz., Nepal and Bhutan by way of
design consultancy or in the technical appraisal of the projects. At present CWC
is provided design consultancy to
83 projects. Out of this, 27 projects (including 3 from neighboring countries) are
at construction stage, 39 projects (including 2 from neighboring countries) are at
DPR stage and 17 projects involve special problems.
Technical Examination of Instrumentation aspects of the projects: Hydroelectric project:-
Detailed Project Report (DPR)/ construction drawings of 29 river valley projects
in various States/ countries namely Andhra Pradesh, Arunachal Pradesh,
Gujarat, Himachal Pradesh, Madhya Pradesh, Meghalaya, Odisha, Sikkim
Uttarakhand, West Bengal, Jammu & Kashmir, Bhutan and Nepal were
examined, out of which 4 projects have been cleared with respect to
instrumentation aspects and remaining 25 projects are at various stages of
examination.Pumped storage Project:-
Detailed Project Report (DPR)/ construction drawings of 46 river valley projects
in various States/ countries namely Andhra Pradesh, Chhattisgarh, Gujarat,
Jharkhand, Karnataka, Madhya Pradesh, Maharashtra, Odisha, Rajasthan, Tamil
Nadu and Uttar Pradesh were examined, out of which 8 projects have been
cleared.
5. Central Ground Water Board (CGWB)
National Aquifer Mapping and Management Programme(NAQUIM)
Central Ground Water Board (CGWB) is implementing National Aquifer Mapping and Management
program (NAQUIM), which envisages mapping of aquifers (water bearing formations), their
characterization and development of Aquifer Management Plans to facilitate sustainable management of
ground water resources. Out of 32 lakh sq km of the entire country, entire mappable area of 25 sq lakh km
has been covered under this programme. NAQUIM outputs are shared with various stakeholders including
the District Authorities. Building on the experiences of the NAQUIM, the NAQUIM 2.0 has been initiated
from the year 2023-24 which emphasizes on detailed mapping and implementable management plans for
identified priority areas. CGWB has completed 68 such studies (covering nearly 40,000 sq km) in year
2024 and 35 studies (covering nearly 21,524 sq km) in 2025.
In order to create infrastructure for data generation under NAQUIM, a Project has been approved by the
Public Investment Board (PIB) with an outlay of Rs. 805 Cr for implementation by CGWB during the
period 2022-2026. As of now, tenders amounting approximately Rs. 602 Cr have been awarded.
One of the component of the project involves the construction of 7000 piezometers and the installation of
Digital Water Level Recorders with telemetry devices for strengthening and automation of groundwater
monitoring networks in the country. Construction of piezometers for strengthening groundwater
monitoring has been initiated in 23 states (Andhra Pradesh, Telangana, Tamil Nadu, Kerala, Gujarat,
Maharashtra, Rajasthan, Madhya Pradesh, Chhattisgarh, Uttar Pradesh, Bihar, Jharkhand, West Bengal,
Odisha, Delhi, Haryana, Punjab, Himachal Pradesh, Uttarakhand, Assam, Meghalaya, Arunachal Pradesh
and Jammu & Kashmir). A total of 4853 piezometers have been constructed till date.
Another component of the project involves construction of 1135 wells {Exploratory Wells (EW) and
Observation Wells (OW)} for completing the data gap in the NAQUIM project area for which work has
been initiated under all awarded packages in 11 states (Andhra Pradesh, Karnataka, Gujarat, Rajasthan,
Madhya Pradesh, Chhattisgarh, Uttar Pradesh, Bihar, West Bengal, Odisha, Assam). A total of 908 wells
(EW/OWs) have been constructed till date.
Ground Water Resources
The Ground Water Resource Assessment for the water year 2025 was carried out jointly by Central
Ground Water Board (CGWB) and States/UTs, through the web-based automated application “INDIA-
GROUNDWATER RESOURCE ESTIMATION SYSTEM (IN-GRES) for the entire country. The
assessment provides the state wise ground water resource scenario and insights required to adopt an
integrated and sustainable ground water management in the Country.
As per GWRA-2025, the total annual groundwater recharge in the country has been assessed as 448.52
bcm. Keeping an allocation for natural discharge, the annual extractable ground water resource has been
assessed as 407.75 bcm which is 1.56 bcm increase as compared to the 2024 assessment. The annual
groundwater extraction is 247.22 bcm which indicates an increase of 1.58 bcm as compared to the 2024
assessment. The average stage of groundwater extraction for the country as a whole works out to be about
60.63 % showing a marginal increase by 0.16 % as compared to 2024 (60.47%).Out of the total 6762 assessment units (Blocks/ Mandals/ Talukas) in the country, 730 units in various
States/ UTs (10.80%) have been categorized as ‘Over-exploited’ indicating ground water extraction
exceeding the annual replenished ground water recharge. In, 201 (2.97 %) assessment units, the stage of
groundwater extraction is between 90-100% and have been categorized as ‘Critical’. There are 758 (11.21
%) “Semi-critical’’ units, where the stage of ground water extraction is between 70 % and 90 % and 4946
(73.14 %) ‘Safe’ units, where the stage of Ground water extraction is less than 70 %. Apart from these,
there are 127(1.88%) assessment units, which have been categorized as ‘Saline’ as major part of the
ground water in phreatic aquifers in these units is brackish or saline. The percentage of Over-exploited and
Critical administrative units are more than 25% of the total units in the State/UT of Punjab, Rajasthan,
Haryana, Delhi and Tamil Nadu.
Key Highlights:
1. Total GW Recharge has increased by 1.62 bcm in comparison to the year 2024 and 16.52 bcm
in comparison to the year 2017.
2. Recharge from Tanks, Ponds and Water Conservation Structures (WCS) has shown a
consistent increase in the last six assessments (2017 to 2025). In the year 2025, it has
increased by 1.59 bcm w.r.t. 2024.
3. With respect to the year 2017, there is an increase of 12.93 bcm in recharge from Tanks,
Ponds & WCS (from 13.98 bcm in 2017 to 26.91 bcm in 2025).
4. Total Annual Extraction has increased by around 1.57 bcm wrt 2024. The increase is mainly
due to increase in ground water extraction particularly in Telangana, Tamil Nadu, Madhya
Pradesh, Gujarat, Bihar & Assam States.
5. There is increase in % of Assessment Units under Safe Category (from 62.64% in 2017 to
73.14 % in 2025).
6. There is consistent decrease in % of Assessment Units under Over-Exploited Category (from
17.24 % in 2017 to 10.80 % in 2025).
The Union Minister for Jal Shakti released “National Compilation of Dynamic Ground Water Resources
of India 2025” on 18th November, 2025.
Artificial Recharge Activities
Groundwater augmentation through artificial recharge in identified water stressed areas of
Rajasthan,comprising Jodhpur, Jaisalmer, Alwar, Jhunjhunu & Sikar districts of Rajasthan has been taken
up in three phases under the GWMR Scheme
Phase-1: Two large dams have been constructed :
Zoned Earth Fill Dam with Clay Core, Indroka, Mandore, JodhpurConcrete Gravity Dam, Bastawa Mata, Balesar, Jodhpur.
Phase 2: 83 WHS (Stone Masonary Check Dams (MCD), Anicuts, Concrete Check Dams (CCD &
Recharge shafts) have been constructed in certain water stressed blocks of Jodhpur, Jaisalmer and
Sikar district.
Phase 3: 49 WHS (Check Dam, Anicut, Model Talab) have been constructed in certain water
stressed blocks in Jodhpur, Jaisalmer, Sikar, Jhunjhunu and Alwar districts of Rajasthan for
augmenting groundwater resources.
AR project in Kala Amb Valley, Sirmaur District, HP:
07 Check Dams and 12 Recharge well in Kala Amb Valley, Sirmaur district, H.P proposed and
tendering process in progress.
Aquifer Management for Augmentation and Sustainability of Urban Water Supply- Faridabad
CGWB had undertaken a study on augmentation of water supply to Faridabad city through sustainable
groundwater development in the active Yamuna floodplain, as per the Memorandum of Understanding
(MoU) signed between CGWB and the Faridabad Metropolitan Development Authority (FMDA).
After detailed field investigations, data analysis, and interpretation, a comprehensive report in line with
the objectives of the MoA was prepared by CGWB during AAP 2024-25. The report, including detailed
management strategies, was shared with the Chief Executive Officer (CEO), Shri Shyamal Mishra, on
27.05.2025 for implementation. Considering the concerns related to groundwater in the study area, the
MoA has been extended for a further period of two years for detailed investigation and refinement of the
proposed management strategies
Leveraging advanced technologies for improving NAQUIM studies
Central Ground Water Board has signed a MoU with Space Application Centre (SAC), Ahmedabad to
promote application of remote sensing in NAQUIM studies on 10th July 2025.
Ground Water Quality Analysis
The comprehensive assessment of Ground Water Quality conducted by the Central Ground Water Board
(CGWB) provides valuable insights that can guide remedial actions and inform future planning by various
stakeholders. The Union Minister of Jal Shakti, Shri C.R. Patil, released the Annual Ground Water Quality
Report–2025 on 18 November 2025 during the 6th National Water Awards held at Vigyan Bhawan, New
Delhi. The report presents a comprehensive nationwide assessment of groundwater quality based on the
Standard Operating Procedure (SOP) adopted by CGWB in 2023. The report evaluates a broad spectrum
of inorganic water quality parameters relevant to drinking and agricultural use. These include majorphysico-chemical parameters—Ca²⁺, Mg²⁺, Na⁺, K⁺, Total Hardness, CO₃²⁻, HCO₃⁻, Cl⁻, SO₄²⁻, F⁻,
PO₄³⁻, and NO₃⁻—as well as key trace elements such as Arsenic (As), Iron (Fe), Manganese (Mn), Zinc
(Zn), Copper (Cu), Uranium (U) and Lead (Pb).
Key Highlights:
Some regions face sporadic contamination of nitrates, fluoride, and arsenic.
94.3% of groundwater samples are classified as excellent for irrigation based on Sodium Adsorption
Ratio indices.
Monsoon recharge showed mixed effects—improving water quality in some areas while increasing
concentrations in others, depending on local aquifer conditions and contamination levels.
CGWB conducted detailed hotspot studies at 340 locations for Arsenic, Uranium, Nitrate, Electrical
Conductivity and Fluoride, assessing contaminant spread through 2 km × 2 km grid sampling.
CGWB issues fortnightly Groundwater Quality Alerts to States and concerned agencies to facilitate
early action, public health protection, and rapid response to contamination events.
The report also discusses mitigation measures for arsenic, fluoride, nitrate and other key
contaminants.
Regulation of Ground Water extraction
The primary role of Central Ground Water Authority (CGWA) is to regulate groundwater resource
exploitation in the country. The Authority has been regulating groundwater development and management
by way of issuing ‘No Objection Certificates’ for groundwater extraction to industries, infrastructure
projects, Mining Projects, registration of drilling rigs etc., as per the notified guidelines in this connection.
Development of a new portal for NoC issuance to ground water users i.e. BhuNeer APP, which is an
advanced version of the application processing software of CGWA for issuing NOC to ground water users
of Industries, Infrastructure & Mining projects and Bulk Water Supply. The motto of developing this
portal is to provide users a smooth experience with new features and functionalities.CGWA continued to evaluate applications received from Industries/ Infrastructure Units / Mining Projects
for grant of NOC for groundwater withdrawal as per provisions of the notified guidelines. During the year
2025, total 4294 applications were received for Fresh NOC/ Renewal of NOC. Out of which 3616 NOCs/
Renewal of NOCs were issued. In addition, a total of 8221 NOCs are issued in exempted category. A total
of 994 applications were rejected. As per requirement for processing of NOCs, total 65 Meetings of Expert
Appraisal Committees (Internal/ External) were held during this period.
Rajiv Gandhi National Ground Water Training & Research Institute (RGNGWTRI)
Rajiv Gandhi National Ground Water Training & Research Institute (RGNGWTRI) is the training wing of
Central Ground Water Board, Department of Water Resources, River Development and Ganga
Rejuvenation, Ministry of Jal Shakti, Govt. of India. The institute implements a three-tier training
programme [Tier I(National & International level), II(State & District Level), III(Block & Village Level)].
Tier-I training programs are carried out at National Level and International Level from RGNGWTRI
itself.
RGNGWTRI started conducting One Year Duration Induction Level Training Courses for the newly
recruited Scientific Officers (Group A& B) of CGWB from 2023-24. All the newly recruited officers are
joining RGNGWTRI for undergoing the induction training and are then posted to different field
formations after successful completion of the training.
The Tier II trainings are conducted in different states through the region offices of CGWB. Objective of
such trainings is to enhance the knowledge and technical skills of groundwater professionals and to
disseminate the outputs of scientific studies carried out by CGWB. Target group includes professionals
from State Government Departments, NGOs, PRIs, Industries and other stakeholders.
The Tier III trainings are conducted at block/village level through the region offices of CGWB. Objective
of such trainings is to make the participants aware about Local groundwater issues, basic skills like water
level measurement and to disseminate outputs of scientific studies carried out by CGWB. Target group
includes farmers, persons from PRIs, RWAs, NGOs, students, and other direct stakeholders.
Major achievements of RGNGWTRI during the period Jan 2025 to Nov 2025
1. Trainings and Webinars:
i. Tier 1 Training Programs : During the period of January 2025 – November 2025, a total of
63 Tier-I trainings were organized, which were attended by 2165 Participants.
ii. Tier II Trainings: A total of 10 Tier-II training programs were conducted which were
attended by 383 Participants including 152 female participants.iii. Tier III Trainings: A total of 32 Tier-III training programs were conducted which were
attended by 4103 Participants including 1500 Female participants.
2. Collaborative Studies : Under collaborative studies a study on “Developing an Earthquake Early
warning system from aquifer responses from Easter Himalayan Regions” was undertaken in
collaboration with CGWB-NER, Geological Survey of India and National Centre of Seismology. A
Multilateral MoU on this was signed on 10th November 2025.
2. Publication : As a part of our publication initiatives, the 34th Volume of the Internal Research
Journal of Bhujal News was published in November 2025. The 2nd Volume of the Rajbhasa
Magazine - Prasikshan Bharti too was published in September 2025.
6. Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)
The Government of India on 27.07.2016 approved funding of the 99 prioritized irrigation projects (and 7
phases) with an estimated balance cost of Rs. 77,595 Crore (Central share- Rs. 31,342 crores; State share-
Rs. 46,253 crores) for completion in phases. The works include both the AIBP and CAD works. Funding
arrangement for both Central Assistance (CA) and State Share made through NABARD under Long Term
Irrigation Fund (LTIF). Targeted Irrigation Potential to be created under the scheme is 34.63 Lakh ha. An
expenditure of Rs. 71,724.35 crore (up to March 2025) has been reported to be incurred by the concerned
State Governments on these projects since 2016-17. In January 2020, Ministry of Finance conveyed the
continuation of ongoing centrally sponsored scheme up-to 31.03.2021.Physical Progress: Against the target of 34.63 Lakh Ha, Irrigation Potential of about 26.71 Lakh ha. Has
been created through AIBP works of the prioritized projects during 2016-17 to 2024-25. The potential
created during 2025-26 shall be available only after the end of cropping season.
Project Completed under PMKSY-AIBP: AIBP works of 66 prioritized projects out of identified 99
projects (and 7 phases) were reported to be completed till date.
Implementation of PMKSYAIBP (including CADWM) during 2021-26:
The Government of India has approved implementation of Pradhan Mantri Krishi Sinchayee Yojana
(PMKSY) for 2021-26 with an outlay of Rs. 93,068 Crore on date 15-Dec-2021 to benefit about 22 Lakh
farmers. The Union Cabinet has approved central support of Rs. 37,454 Crore to States and Rs. 20434.56
Crore of debt servicing for loan availed by Government of India for irrigation development during
PMKSY 2016-21. Accelerated Irrigation Benefit Programme, ‘Har Khet Ko Paani’ and watershed
irrigation potential creation targeted during 2021-26 under AIBP is 13.88 Lakh hectare along with focused
completion of 60 ongoing projects including their 30.23 lakh hectare command area development. 10
additional projects have also been taken up till date. Additionally, two national projects, namely Renukaji
Dam Project (Himachal Pradesh) and Lakhwar Multipurpose Project (Uttarakhand) have also been
included for central funding of 90% of works of water component under the scheme.
A slew of innovative measures and modification have been made to improve implementation and
maximize benefits, such as:
Inclusion of new major/medium (MMI) projects as well as funding of National Projects under AIBP.
Financial progress requirement is dropped for inclusion of a project under AIBP, and only physical
progress of 50% to be considered.
Advanced stage (50% physical progress) criteria are relaxed for projects having command area and
50% or more in drought Prone Area Programme (DPAP), tribal, Desert Development Programme
(DDP), Flood prone, Tribal area, left wing extremism affected area, Koraput, Balangir and
Kalahandi region of Madhya Pradesh and Uttar Pradesh, as also for Extension Renovation
Modernization (ERM) projects and also for States with net irrigation below national average.
Reimbursement is allowed for due central assistance in subsequent year also.
Project completion permitted with physical progress of 90% or more.
Online Management Information System (MIS) has been developed for monitoring of the projects.
A nodal officer for each of the 99 priority projects has been identified who updates the physical and
financial progress of the project regularly in the MIS.
GIS based Application has been developed for geo-tagging of project components. Remote Sensing
Techniques have been used for digitization of the canal network of the projects. Further, the
Cropped Area Estimation in the command of 99 priority projects is being carried out annually
through remote sensing.
To resolve the issue of Land Acquisition (LA) and increase water conveyance efficiency, use of
Underground Pipeline (UGPL) has been actively promoted. Guidelines for Planning and Design of
Piped Irrigation Network were released by this Ministry in July, 2017.
Pari-passu implementation of Command area development works in the commands of these projects
is envisaged to ensure that the irrigation Potential Created could be utilized by the farmers.
New Guidelines bringing focus on Participatory Irrigation Management (PIM) have been brought
out.
Further, transfer of control and management of irrigation system to the Water users’ Association
(WUA) has been made necessary condition for the acceptance of CADWM completion.
The Financial Progress under PMKSY-AIBP is as follows:Funds Released 2016-17 to 2025-26 (so Total
2024-25 far)
Central Assistance for AIBP projects 20,009.44 997 21,006.44
including special & National Projects
State Share 35,106.29 0 35,106.29
Total 55,115.73 997 56,112.73
Special Package for Maharashtra: A Special Package approved on 18.07.2018 which provides Central
Assistance (CA) to complete 83 Surface Minor Irrigation (SMI) projects and 8 Major / Medium Irrigation
Projects in drought prone districts in Vidarbha and Marathwada and rest of Maharashtra in phases up to
2023-24 (extended till March-25). The overall balance cost of the said projects as on 1.4.2018 is estimated
to be Rs. 13651.61 crore. Total CA is estimated to be Rs. 3831.41 Crore including reimbursement for
expenditure during 2017-18. Balance potential of 3.77 Lakh Ha would be created on completion of these
schemes. CA of Rs. 3023.95 crores have been released under the scheme so far.
Under the scheme, 67 SMI and 3 MMI projects have been reported to be completed by the State
Government of Maharashtra. Overall irrigation potential or 2.16 Lakh ha. has been reported to be created
through all these projects during 2019-19 to 2024-25. Further potential created during 2025-26 shall be
available only after the end of cropping season.
7. Atal Bhujal Yojana (Atal Jal)
The Atal Bhujal Yojana (Atal Jal) was conceived as a pilot scheme for participatory groundwater
management, implemented in seven States viz. Gujarat, Haryana, Karnataka, Madhya Pradesh,
Maharashtra, Rajasthan, and Uttar Pradesh for a period of five years from 1st April 2020. After slight
extension, the Scheme’s tenure has now ended.
The Scheme marked a paradigm shift from groundwater development to groundwater management,
emphasizing a community-based approach. Its salient features included participatory groundwater
monitoring, public disclosure of groundwater data, preparation and implementation of Gram Panchayat
(GP)-level Water Security Plans (WSPs), capacity building, and targeted Information, Education and
Communication (IEC) activities.
Atal Jal was the first Central Sector Scheme to focus primarily on demand-side interventions for
groundwater conservation. The GP-level WSPs, containing detailed water budgets and proposals for both
demand- and supply-side interventions, were implemented through convergence with ongoing schemes.
Demand-side measures included micro-irrigation, crop diversification, and piped water conveyance.
Supply-side measures included construction of check dams, farm ponds, recharge shafts, and other
artificial recharge and water conservation structures.
Atal Bhujal Yojana substantially improved the capacity of States for ground water governance through
strengthening of institutions dealing with ground water management, improving ground water monitoring
networks, creation of awareness among the public on the importance and criticality of ground waterresources and building the capacity of the grass root level stakeholders to plan and utilize the available
resources in a judicious manner. It also successfully addressed the gender perspective by including large
number of women in all activities of the scheme.
Key Achievements
Public disclosure of groundwater data in all Atal Jal GPs through various mode viz. central and state web
portals, display board at each GP, social media, wall paintings, brochures, public meetings, and the Atal
Jal mobile application.
Innovative information dissemination mechanisms adopted by States, including Groundwater Data
Information Dissemination Centers, QR codes, and social media platforms.
Community-led Water Budgets and WSPs prepared for all 8,203 GPs and updated annually.
Strengthened groundwater monitoring systems at the GP level with installation of Digital Water Level
Recorders, water level indicators, rain gauges, water quality testing kits, and flow meters. Piezometers
were also constructed for regular water level monitoring.
Extensive capacity-building efforts: More than 1.27 lakh GP-level trainings, along with 95 state-level, 576
district-level, and 1,307 block-level training sessions conducted.
Interactive learning sessions through ‘Water Games’, training through Satellite Communication
(SATCOM) covering a vast geographic area in Karnataka, mass awareness on Water Security Planning
(WSP) through live broadcasts ‘Vande Gujarat’ making groundwater knowledge accessible, relatable, and
scalable even in remote rural areas
Innovative IEC campaigns carried out across States, including narrowcasting in Haryana, delivering
educational content through folk performances in Karnataka, Jal Dindis in Maharashtra, and Ratri
Choupals in Rajasthan to promote sustainable groundwater management.
Convergence expenditure of over Rs. 4,730 crore achieved towards implementation of WSP interventions.
About 9 lakh hectares brought under efficient water-use practices such as drip, sprinkler, underground
pipeline irrigation, mulching, crop diversification, direct seeded rice, zero tillage practice etc., directly
benefitting more than 10 lakh farmers
Monitoring of around 70,000 wells at GP level, with data shared publicly.
Mapping of over 90,000 existing water conservation and artificial recharge structures.
Improvement in groundwater levels observed in 4665 GPs across 180 blocks.
Financial progress: Since inception, a total of Rs. 3,524.34 Crore has been released to the States, of which
Rs. 3,505.57 (99.5%) Crore has been utilized.
8. Minor Irrigation Statistics: Progress under the scheme “Irrigation Census”
1. Background
"Irrigation Census" is a centrally sponsored scheme with 100% Central funding through which State
Statistical Cells constituted under different States/UTs are also supported. Under this scheme, Minor
Irrigation (MI) Census, Census of Water Bodies, Census of Springs and Census of Major & Medium
Irrigation (MMI) projects are conducted. The broad objectives of scheme are as follows:
To build up a comprehensive and reliable database in the irrigation and water sector for effective
planning and policymaking including water use efficiency, water budgeting etc.
To provide statistical frame of irrigation schemes/ waterbodies/ spring for carrying out future
surveys.To build a national level database of Major and Medium Irrigation Projects since water resources
projects are planned, formulated, implemented and maintained by the State Governments.
2. Chronology
So far, six censuses have been conducted with reference years 1986-87, 1993-94, 2000-01, 2006-07,
2013-14 and 2017-18 respectively.
The First Census of Water Bodies was conducted in the States/UTs along with Sixth Minor
Irrigation Census with reference year 2017-18.
The scope of Irrigation census scheme has been enlarged by including st Census of Springs and 1st
Census of Major & Medium Irrigation (MMI) projects along with 7th Minor Irrigation (MI) Census
and 2nd Census of Water Bodies with Reference year 2023-24. The field work of these censuses is
progressing in States/UTs.
3. Brief on census
Minor Irrigation (MI) Census: The MI census is covering all ground water and surface water
schemes which are mostly under private ownership with Culturable Command Area up to 2000 ha.
In this census, detailed information on various parameters like irrigation sources (dug well, shallow
tube well, medium tube well, deep tube well, surface flow and surface lift schemes), irrigation
potential created (IPC), potential utilized (IPU), ownership, holding size of land by owner, devices
used for lifting water, sources of energy, energy conserving devices such as sprinkler and drip
irrigation, use of non-conventional energy sources such as solar pumps, wind mills etc is collected.
Census of Water Bodies: The census inter-alia collects information on all important aspects like type
of water body, ownership, condition, cost of construction, status of encroachments, use, storage
capacity, status of filling up of storage etc. The census covers rural as well as urban areas and also
takes into account all types of uses of Water Bodies like Irrigation, Industry, Pisciculture, Domestic/
Drinking, Recreation, Religious purpose, Ground Water Recharge and other uses. In this census, all
natural or man-made units bounded on all sides with some or no masonry work used for storing
water for irrigation or other purposes (e.g. industrial, pisciculture, domestic/drinking, recreation,
religious, ground water recharge etc.) will be treated as water bodies.
Census of Springs: A spring is a focused discharge of naturally occurring groundwater on the Earth's
surface. In general springs can be seen either as a free flow or seep spring. The spring census inter-
alia collects information on type and nature of Spring, discharge of water, colour/smell/
taste/temperature/usage of spring water etc
Census of Major & Medium Irrigation (MMI) projects: This Census is the complete enumeration of
all completed as well as ongoing Major & Medium irrigation projects of India. A scheme having
Culturable Command Area more than 10000 hectares (CCA>10,000 ha) are classified as Major
Irrigation Project and those schemes having CCA more than 2,000 ha and up to 10,000 Ha are
classified as Medium Irrigation Projects. In MMI census, information like nature of project, gross
command area, culturable command area, irrigation potential created, irrigation potential utilized,
location, design features of project, status of Water User Associations etc is collected.
4. Key features of 7th Minor Irrigation (MI) Census, 2nd Census of Water Bodies, 1st Census of
Springs and 1st Census of Major & Medium Irrigation (MMI) projects
Paperless and end to end digital solution:
Mobile application for data collection and
Web application for management and validation processes
Ground truthing of data on 3.58 million wetlands/water bodies generated by Space Application
Centre (SAC) using multi-date and multi-seasonal Resourcesat-2/2A LISS-IV datasets of 2018-19timeframe.
Recording Latitude, Longitude and images of all schemes
Pre-population of previous census data (th MI and 1st Water body Census) using LGD codes in the
mobile application during data collection
Use of reverse GIS technology for ensuring accurate recording of Latitude/Longitude of all scheme
wherever village boundaries are available
5. Progress under "Irrigation Census" during 2025
Launch of four censuses namely, 7th Minor Irrigation (MI) census, 2nd census of water bodies, 1st
census of Major & Medium Irrigation (MMI) projects and 1st census of Springs by Hon'ble Minister of
Jal Shakti on 03.04.2025. The filed work of the censuses is underway in States/UTs.
9. Flood Management Wing (FM)
Flood Management and Border Areas Programme (FMBAP):
The “Flood Management Programme"(FMP) and “River Management Activities and Works related to
Border Areas" (RMBA) under operation during XII Five Year Plan were merged as "Flood Management
and Border Areas Programme" (FMBAP) for the period 2017-18 to 2019-20 and further extended up-to
March, 2021. Cabinet further approved the continuation of FMBAP scheme during 2021-22 to 2025-26
with an outlay of Rs. 4100 Crore (FMP-Rs. 2940 Crore and RMBA – Rs. 1160 Crore).
Since the inception of FMBAP (till March 2025), Central Assistance of Rs. 7260.50 crores have been
released to States/UTs under FMP component of Flood Management & Border Area Programme
(FMBAP) scheme and Central Assistance of Rs. 1477.15 crores have been released to UTs/States under
RMBA component of FMBAP scheme.
Completion of balance works of North Koel Reservoir Project:
DoWR, RD & GR has taken up the long pending project for completion of balance works of North Koel
Reservoir Project, Bihar and Jharkhand. In August, 2017 the Union Cabinet has approved the proposal for
balance works of North Koel Reservoir Project at an estimated cost of Rs. 1622.27 crore during three
financial years from the start of the project. Subsequently, at the request of both State Governments,
certain other components were found necessary to be included in the project. Complete lining of Right
Main Canal (RMC) and Left Main Canal (LMC) was also regarded essential from technical considerations
to derive envisaged irrigation potential. Thus, the works of Gaya distribution system, lining of RMC and
LMC, remodeling of enroute structures, construction of a few new structures and one-time Special
Package for R&R of Project Affected Families (PAFs) were to be provided in the updated cost estimate.
Accordingly, Revised Cost Estimate of the project was prepared. Out of the cost of balance works of Rs.
2430.76 crore, the Central would provide Rs.1836.41 crore. The Cabinet Committee on Economic Affairs
(CCEA) has given its approval to the proposal to complete the balance works of North Koel Reservoir
Project at a revised Cost of Rs. 2,430.76 crore on 04.10.2023. Project will provide irrigation benefit to
114,021 hectares of land annually in drought prone areas of Aurangabad and Gaya districts of Bihar and
Palamau and Garwa districts of Jharkhand. CCEA also approved the execution of balance works of the
project on turnkey basis by M/s WAPCOS Ltd., a CPSU under DoWR, RD & GR as Project Management
Consultant (PMC). 10% works on dam & appurtenant, 100% works of Mohammad Ganj barrage, 86%
works on Left Main Canal, 67% work on LMC distribution (Kandi distributary) and 38% works on Right
Main Canal (Jharkhand Portion from Ch. 0.00 to 31.40 Km), 45% works on Right Main Canal (Bihar
Portion from Ch. 31.40 to 68.37 Km) and 15% works on Right Main Canal (Bihar Portion from 75.39 Km
to 109.09 Km) have been completed.
10. National River Conservation Directorate (NRCD)Cleaning of river is a continuous process and Government of India is supplementing the efforts of the
State Governments in addressing the challenges of pollution of river by providing financial and technical
assistance. Assistance is provided to State Government for abatement of pollution in identified stretches of
various rivers (excluding river Ganga and its tributaries) under the Centrally Sponsored Scheme of
National River Conservation Plan (NRCP) on cost sharing basis between the Central & State Government
for taking up various pollution abatement works relating to interception & Diversion of raw sewage,
constructions of sewerage system, setting up of sewage treatment plants, low cost sanitation, river
front/bathing ghat development, etc.
Schemes taken-up under NRCP programme are aimed primarily at reduction in pollution load in rivers.
Apart from improvement in water quality of rivers leading to better public health and ecology of the river
systems, the pollution abatement works taken up under NRCP help to improve the aesthetics & sanitation
in the towns and in maintaining a cleaner environment.
The objective of National River Conservation Plan (NRCP) is to improve water quality of rivers except
Ganga and its tributaries, to the prescribed standards by reducing pollution load entering the rivers through
implementation of pollution abatement works in various towns mainly along identified polluted stretches
of rivers in the country along with controlling of their sources of pollution such as Industrial through
Central Pollution Control Board/ State Pollution Control Board/Pollution Control Committee.
Achievements and initiatives under NRCD (01.01.2025 – 31.10.2025)
The project ‘Rehabilitation of the Sewerage System of Singtam Town for Pollution Abatement of
River Tista in Sikkim’ has been sanctioned at an estimated cost of Rs. 39.03 crore. which includes
creation of sewage treatment capacity of 3 mld along with allied sewerage works.
Central Assistance amounting to Rs.595 crore released to various State Governments/Agencies for
implementation of projects under NRCP.
Subsequent to the introduction of NRCP SNA SPARSH, all the SLS have been mapped and 14
Mother Sanctions have been issued, releasing an amount of Rs. 80 crore to the State/UTs
Government for the implementation of pollution abatement schemes under NRCP.
Second Meeting of the Stakeholder Advisory Committee (SAC) was held on 26.09.2025 under the
Chairmanship of Secretary, DoWR, RD&GR at Indian Institute of Science (IISc), Bengaluru,
Karnataka under the project Condition Assessment and Management Plan (CAMP) of Six Rivers
Basin (Cauvery, Periyar, Narmada, Mahanadi, Godavari and Krishna).
Under the Condition Assessment and Management Plan (CAMP) project Consortium Institutes have
submitted the target deliverables during the period.
Two Central Monitoring Committee meetings for review of action plans implementation for
restoration of identified polluted river stretches across all States/UT in the country have been held
under the Chairmanship of Secretary, DoWR, RD & GR.
One review meeting for the project of ‘Pollution abatement and conservation of River Nag at
Nagpur, Maharashtra’ sanctioned at a cost of Rs.1,926.99 crore with Japan International
Cooperation Agency has been held under the chairmanship of Hon'ble Minister of Jal Shakti on
10.09.2025. In addition, review meetings of the ongoing projects are held from time to time, at the
level of Secretary, DoWR, RD & GR / Project Director, NRCD/Joint Secretary, NRCD. Besides,
Two Project Steering Committee meetings have been held at the level of Project Director, NRCD
for the JICA (Japan International Cooperation Agency) assisted project for pollution abatement of
Mula-Mutha river at Pune sanctioned for Rs. 990.26 crore, which includes creation of sewage
treatment capacity of 396 mld along with allied sewerage works.
The project “Assessment of ecological status of 7 rivers viz. Narmada, Mahanadi, Godavari,
Cauvery, Periyar, Pamba and Barak for conservation planning” has been entrusted to Wild LifeInstitute of India (WII) at a sanctioned cost of Rs. 24.56 crore in September, 2020. The project
broadly aims to spearhead river conservation in above seven Indian rivers for biodiversity
conservation and maintenance of ecosystem services. WII has completed the ecological assessment
of River Narmada and Mahanadi. Draft assessment report has also been prepared for river Cauvery
and Pamba.
Following stakeholder Consultation Workshop on Guidelines for National River Conservation Plan
and DPR Preparation held on 06th May, 2024 in the presence of Secretary, DoWR, RD & GR, the
existing guidelines for the NRCP have been comprehensively revised to reflect current requirements
and improvements, and the updated version is presently in the approval stage.
Under the ongoing technical cooperation project ‘Capacity Enhancement for Management of
Sewage Sludge (Bio-Solids) in India’ supported by the Government of Japan, the JICA expert team
has completed and finalized the draft guidelines for the effective disposal and management of
sewage sludge. To ensure wider awareness and stakeholder engagement, the finalized guidelines
were disseminated through four zonal workshops organized across the country in April and May
2025.
Pollution Abatement of River Mula–Mutha, Pune, Maharashtra, and the project “Pollution
Abatement and Conservation of River Zuari, Goa”: Construction of sewage treatment infrastructure
has achieved 85% completion against the annual target.
11. External Affairs and International Cooperation (EA & IC)
DoWR, RD & GR has signed Memorandum of Understandings (MoUs) with different countries on
cooperation in the field of water resources management and development. For effective implementation of
activities under the various signed MoUs, to enhance the collaboration under the MoU, certain activities
were undertaken, the details of which is as following: -
i. MoC with Nepal: A Memorandum of Understanding (MoU) between India and Nepal was
signed on 03.03.2025 for a period of five years by Hon'ble Ministers of both sides. The MoU
covers cooperation in groundwater monitoring and management, artificial recharge, rainwater
harvesting, aquifer mapping, sharing of best practices from India’s Clean India Mission,
technical support and training for Nepali personnel, and assistance for developmental projects
in Nepal’s Water, Sanitation and Hygiene (WASH) sector.
The first Joint Working Group meeting under the MoU was held on 20.06.2025. Both sides
reaffirmed their commitment to strengthening bilateral cooperation in the WASH sector under
the framework of the MoU between India and Nepal. Nepal acknowledged the relevance of
India’s initiatives and models and sought technical and institutional support in priority areas
such as arsenic mitigation, aquifer mapping, groundwater recharge, check dam design, faecal
sludge management, adopting ODF+ sustainability models, and capacity building using the
Training of Trainers (ToT) approach. India agreed in principle to support these areas and
emphasized the importance of identifying priority actions to move the collaboration forward.
It was agreed that Nepal would share detailed proposals outlining its requirements for further
deliberation. The Indian side supported the proposal for expert visits to Nepal for on-ground
assessment and also encouraged continued engagements through virtual discussions.
Opportunities to frame small grant- based projects under High Impact Community
Development Projects (HICDPs) were highlighted, alongside collaboration in capacity
building through Indian institutions such as NIH, NWDA and CGWB. The meeting
concluded with mutual appreciation and a shared commitment to continued partnership for
sustainable WASH development.ii. MoC with Japan (DDWM): The Memorandum of Cooperation (MoC) between India and
Japan was signed on 19.03.2022 in the area of Water Resources for two years and had expired
on 19.03.2024. The MoU has been renewed and signed on 20.08.2025 for a further period of
2 years.
iii. MoU with Morocco: The MoU between India and Morocco on cooperation in the field of
water resources was signed on 14.12.2017, and four JWG meetings were subsequently held
on 03.07.2018, 18.06.2019, 13.07.2021, and 20.09.2024. The 5th JWG meeting was held in
Morocco on 05.06.2025, during which both sides identified priority areas for collaboration
such as dam management, extreme events, irrigation governance, and capacity building. They
also agreed to enhance exchange of expertise, explore training opportunities for water
professionals, and further strengthen cooperation under the MoU. It was mutually agreed that
the 6th JWG meeting will be held in India in February–March 2026, with dates to be finalized
through diplomatic channels.
iv. MoU with the Netherlands: The MoU between India and the Netherlands was signed on
27.06.2017 for cooperation in the field of Water Management. This existing MoU was
replaced with "STRATEGIC PARTNERSHIP ON WATER (SPW) document signed between
India - Netherlands on 29.03.2022". A Centre of Excellence (CoE) has been established at IIT
Delhi by NMCG in collaboration with the Netherlands, based on a jointly developed concept
note modeled on the Smart Lab on Clean Rivers at IIT-BHU, Varanasi. The concept note was
approved by the Secretary, DoWR, RD & GR in the presence of the Ambassador of the
Netherlands on 21 March 2025, and the proposal received approval in the 61st Executive
Committee meeting of NMCG.
The first meeting of the Project Review Committee (PRC) for the CoE was held at NMCG on 09
September 2025. The PRC gave in-principle approval to the Digital Twin proposal and recommended
expanding its scope to address broader Namami Gange themes such as flood prediction, river flow
assessment, and river morphology. It advised involving relevant end-users early, incorporating climate
change projections, and reviewing past studies by institutions like CWC and CGWB.
12. Brahmaputra & Barak (B&B) Wing
Achievements of the Brahmaputra Board1. Preparation and Updation of Master Plans
The Brahmaputra Board continued its mandate of preparing comprehensive master plans for flood control,
erosion mitigation, and integrated basin management in the North-Eastern Region.
1.1 Master Plans Undertaken (New/Continuing)
Preparation of following master plans continued during 2025:
Manipur: Manipur River
1.2 Updation of approved Master Plans continued during 2025:
The Board continued updating master plans for:
Tripura: Haora, Muhuri, Gumti
1.3 The European Union has initiated preparation of a comprehensive master plan for the entire
Barak Basin, including tributaries from Meghalaya.
1.4 Following special studies continued during 2025:
i. Study on soil erosion & flood problem in Barak Basin by NIT Silchar- Completed
ii. Sedimentation study on Siang & Dibang Basin by IIT Guwahati
iii. Comprehensive assessment of riverbank erosion and prioritization of mitigation strategies
for the Brahmaputra River Basin by IIT Guwahati
iv. Formulation of policy for riverine islands by INTAC
2. Scientific Dissemination and Water Management Practices
2.1 Indigenous Water Management Systems
Improvement of “Dong” water management system of the Bodo tribes in Baksa district, Assam, is
underway.
Development of three-tier farming system for augmentation of water resources in Choumoukedima
& Peren Districts of Nagaland
3. Springshed Management Initiatives are taken up for a sustainable and climate resilient source of
water in lean season for the springs under stress.
Execution continued during 2025:
Mizoram: Dakla and Dialdawk
4. Bio-Engineering Measures for Flood and Erosion Control
A major pilot project for riverbank erosion protection at Kordoiguri, Majuli Island, initiated in
2022–23, was completed in 2024–25. Performance evaluation was carried out by Guwahati
University.
5. Anti-Erosion and Flood Management Schemes
5.1 Arunachal Pradesh Schemes
Mirem, Miglung & Remi Villages (East Siang): Completed in March 2025 with expenditure of
Rs. 18.90 crore ; protects 260 ha and 2,705 people.
Oyan & Sile Villages (East Siang): completed in 2025–26 at a cost of ₹16.67 crore; protects 315
ha and 2,534 people.
5.2 Assam SchemesNeamatighat (Jorhat): Scheme of ₹22.93 crore; work foreclosed after 70.23% progress with
expenditure of ₹13.11 crore (2025–26). Will protect 293.8 ha and 10,000 people.
6. Rejuvenation of NEHARI (North Eastern Hydraulic and Allied Research Institute)
Capacity Building Programmes during 2025:
As per expanded mandate to NEHARI by Ministry for capacity building of Engineers and officers of
North eastern Region, NEHARI organized training programmes in following subjects in collaboration
with NIH, CGWB, IIT Guwahati, NWA Pune, NESAC, CWPRS Pune, and CSMRS New Delhi.
Soil investigation for river Flood Management Source Sustainability (JJM)
engineering
Project management & quality Model Study Springshed Management
control
BRAHMA Model by IIT DPR Prep (Theory) Project Management (Theory)
Guwahati
GIS & Remote Sensing E-Procurement / GeM Flood Plain Zoning & EAMS
North – East Division
i. INDIA-CHINA COOPERATION
Expert Level Mechanism (ELM)
During the visit of the Hon’ble President of the People’s Republic of China to India on November 20-23,
2006, it was agreed to set up an Expert-Level Mechanism to discuss interaction and cooperation on
provision of flood season hydrological data, emergency management and other issues regarding trans-
border Rivers as agreed between them. Accordingly, the two sides have set up the Joint Expert Level
Mechanism through a Joint Declaration by both the countries.
The ELM meetings are held alternately in India and China every year. Sixteen meetings of ELM have
been held so far. The 16th meeting of ELM was held at New Delhi, India during 22nd – 23rd April, 2025.
The GoI delegation was led by Shri S.K. Sinha, Commissioner (B&B), DoWR, RD & GR, Ministry of
Jal Shakti and the Chinese delegation was led by Mr. Hao Zhao, Director General of the International
Economic & Technical Cooperation and Exchange Centre, Ministry of Water Resources, People’s
Republic of China. Representatives of Ministry of External Affairs (MEA), Central Electricity Authority
(CEA) and Central Water Commission (CWC) had also participated in the meeting.
ii. INDIA-BHUTAN COOPERATION
A. Joint Group of Expert (JGE) on Flood Management:
A Joint Group of Expert (JGE) on Flood Management has been constituted between India and Bhutan to
discuss and assess the probable causes and effects of the recurring floods and erosion in the southern
foothills of Bhutan and adjoining plains in India and recommend to both Governments appropriate and
mutually acceptable remedial measures. Eleven meetings of JGE have been held so far. The 11th meeting
was held at Paro, Bhutan during 14-15 May 2025. The GoI delegation was led by Shri S. K. Sinha,
Commissioner (B&B), Department of Water Resources, River Development & Ganga Rejuvenation
(DoWR, RD& GR), Ministry of Jal Shakti, GoI and the RGoB delegation was led by Mr. Karma
Dupchu, Director, National Centre for Hydrology and Meteorology (NCHM), RGoB.B. Joint Technical Team (JTT) on Flood Management:
In accordance with the decision taken during the first meeting of JGE, a Joint Technical Team (JTT) on
Flood Management between the two countries was constituted. The purpose of JTT is to assess the field
situation and provide technical support to JGE on flood management. Eight meetings of JTT have been
held so far. The 8th meeting of JTT was held during 18th–20th November, 2024 at Chalsa, Jalpaigudi, West
Bengal. The Indian delegation was led by Shri G.L. Bansal, Chief Engineer, Brahmaputra Basin
Organisation (BBO), Central Water Commission, GoI and the Bhutanese delegation was led by Dr.
Singay Dorji, Chief of Meteorological Services Division (MSD), National Centre for Hydrology and
Meteorology, RGoB.
C. Joint Experts Team (JET) on Flood Forecasting:
A Joint Experts (JET) consisting of senior officials from the Government of India and Royal Government
of Bhutan (RGoB) continuously reviews the progress and other requirements of a network of 36 hydro-
meteorological sites located in the catchments of trans-border rivers Puthimari, Pagladiya, Sankosh,
Manas, Raidak, Torsa, Aie and Jaldhaka. So far, JET has met 39 times alternately in India and Bhutan
since its reconstitution in 1992 and the last JET meeting i.e. 39th meeting was held at Paro, Bhutan during
8th - 9th October, 2025. The Indian delegation was led by Shri Subhrangshu Biswas, Chief Engineer,
Teesta & Bagarathi-Damodar Basin Organisation (T&BDBO), Central Water Commission, GoI and the
Bhutanese delegation was led by Mr. Karma Dupchu, Director, National Centre for Hydrology and
Meteorology (NCHM), RGoB.
13. NERIWALM
North Eastern Regional Institute of Water and Land Management (NERIWALM) under the Ministry of
Jal Shakti continued to serve eight states of the North East India through its mandate of capacity
building and skill enhancement in water and land management. During the year 2025 (January to
November), the institute organized 60 training programmes benefitting 2259 trainees. 10 Nos. of
trainings are planned to organize in the month of December, 2025 which will thus achieve the target of
70 Nos. These training were organized based on the training needs assessment done jointly by
NERIWALM & NIH for the 8 states of NE region. Among these are induction training for newly
recruited CGWB officials, DPR preparation for Multipurpose projects, RS& GIS application for
irrigation command area, advanced techniques in irrigation management, irrigation management in PPP
mode, micro irrigation, water quality and multiple cropping and water management which were
organized across the NE states.
In research and development, the institute has currently undergoing 14 projects, out which 08 Nos.
funded by state and central government department and 06 Nos. by NERIWALM. Key initiatives
included the preparation of State-Specific Action Plans for 19 states, comprehensive, study on
sustainable development of irrigation sector in Assam, concurrent evaluations of irrigation projects in
Assam, LiDAR and bathymetric survey of Tuirial dam, Mizoram , assessment of real economic impact
on Indian side during lean season of diversion of Brahmaputra water by China, provision of rainwater
harvesting/ water conservation infrastructure at RIPANS, Mizoram, traditional water management
practices in Northeast states, livelihood problems and probable lasting solutions for displaced people due
to bank erosion in Brahmaputra valley and hydrogeomorphic & social aspects of dam in lower reaches of
Ranganadi HPP, Arunachal Pradesh.
NERIWALM’s academic program also attracted overwhelming response and successfully enrolled of 18
students in the M.Tech course on Water Resource Management for 2025-26 session. The entrance
examination of 05 seats of Ph.D. scholars is due soon.
The institute further strengthened its credentials by developing 02 (two) e-learning modules viz.
Warabandi System and Watershed Management for i-GOT platform.
14. National Hydrology Project (NHP)National Hydrology Project (NHP), with support from the World Bank, envisages establishing a system
for timely and reliable water resources data acquisition, storage, collation and management. It has pan-
India coverage with 48 Implementing Agencies (IAs) {12 from Central Government (including 3
fromRiver Basin Organisations) and 36 from States/ UTs}. It will also provide tools and systems for
informed decision making for water resources assessment, planning and management. The National
Hydrology Project has been approved with an outlay of Rs. 3,679.77 Crore as a Central Sector Scheme
with 100% grant to State Governments and Central Implementing Agencies. The project originally had a
duration of 8 years from 2016-17 to 2023-24. However, Department of Expenditure, Ministry of Finance
has accorded approval for extension of project till Sept-2025 within the same allocation.
Broad objectives of NHP include:
a) To improve the extent, quality, and accessibility of water resources information;
b) To create decision support system for floods and basin level resource assessment/planning;
and
c) To strengthen the capacity of targeted water resources professionals and institutions in
India.
Under the ongoing NHP, 23562 Real Time Data Acquisition System (RTDAS) surface water and ground
water stations have already been installed in the country. Besides, 53 Supervisory Control and Data
Acquisition (SCADA) packages have been commissioned; 5667 piezometers constructed; 134 water
quality labs were constructed/upgraded/strengthened and put into operation; high-resolution DEMs, CORS
network as well as Geoid model have also been developed. Furthermore, Bathymetric surveys of 464
important reservoirs of the country covering 162 BCM have also been taken up under NHP of which 446
surveys have already been completed.
Further 37 State Data Centres /Regional data centres / knowledge centres, etc. have been completed under
the ongoing NHP. The need for development & maintenance of appropriate institutional framework both
at the Central as well as State level for water resources information system intended for collection,
collation and dissemination of the database was given shape in the ongoing NHP. As envisaged in the
Cabinet note, the National Water Resources Informatics Centre (NWIC) has been created in 2018 and is
now functional. Additionally, the formation of the State Water Informatics Centres for development of
respective State Water Resources Information Systems was expedited in the ongoing NHP. Till date 23
SWICs have already been formed with a few more under process. The information system covering hydro-
meteorological, hydro-geological, sedimentation, morphological and water quality data is also important
in the context of various studies being done under NHP which include IT Applications, Digital Products,
geospatial hydro products, etc
15. Farakka Barrage Project
Major achievements:
Replacement of 11 nos. of Head Regulator gates is in progress.
Repainting of hoist bridge, gantry cranes of main barrage & Head regulators is in progress.
Supply of Services of manpower for operation and regulation of all gates of Main Barrage and Head
Regulator gates of Farakka Barrage round the clock.
Annual Maintenance of 108 nos. Main Barrage gates and its Hoist machineries & embedded parts is
operational.
Balance work of fish lock gate is under progress.
Anti-erosion works at upstream left bank of river Ganga near Shimultola, Atatola & Birnagar area in
11 no. reaches between Ch 20.00 m to Ch 40.00 m and Ch 80.00 m to Ch 220.00 m, Ch 380.00 m toCh 440.00 m, Ch 500.00 m to Ch 620.00 m and Ch 660.00 m to 740.00 m, Ch 840.00 m to Ch
900.00 m, Ch 980.00 m to 1200.00 m, Ch 1200.00 m to Ch 2420.00 is completed.
Special repair and renovation of CISF unit Office cum Barrack, CISF Mess, pump rooms, existing
boundary walls and construction of new camp office, 3 nos. toilets block at Khejuriaghat is
completed.
Bank protection measures in 1 no. reach on the Downstream Right bank of Farakka Barrage is
completed.
Repair & maintenance of longitudinal drain, cleaning of culverts and cleaning of jungle on the left
bank of Feeder Canal is completed.
Construction of boundary wall near Bay 109 workshop is completed & bedside petrol pump near
NH-34 at mouza Srimanatapur, New Farakka is in progress.
Repairing of Left bank upstream guide bund inspection road from Afflux Bund to stack yard is
completed.
Repairing of guide bund inspection road over the right bank upstream of Farakka Barrage from New
Farakka to Ganga Bhawan of NTPC Ltd is completed.
Decorative lighting, high mast lighting, street lighting have been installed in right guide bund
inspection road, internal roads, Gandhi Ghat of FBP to promote Dam Tourism.
Repairing of Control Room and other beautification works is under progress.
Repairing of Feeder Canal inspection road in different stretches is in progress.
Repairs of approach roads at different regulators is completed.
Repair/ renovation of different CISF outpost is under progress.
Renovation of warehouse to convert into DGR Security Barracks is completed.
Special repair/renovation of office building (OB) no -1 & 2 for division office (part) is completed
and OB no -2 CISF Barrack is under progress.
Special repair of gallery and painting of stadium in FBP Township is in progress.
Renovation of Children Park at FBP Township is completed.
Identification, Demarcation and Mutation of FBP Land as per acquisition plan/LR Mouza map of
the whole area alignment/ perimeter alignment in all stretches of FBP is in progress.
Second phase of supply, installation, testing & commissioning of CCTV Surveillance system for
Farakka Barrage Township is completed.
The installation of LAN, along with the supply of hardware and internet, at Farakka Barrage Project
is completed and is now fully operational.
The implementation of e-office at FBP is in advance stage, streamlining administrative processes
and enhancing efficiency, transparency, and digital governance.
The Dam Safety Unit (DSU) is created as per Dam Safety Act 2021.
Dedicated Social Media Executive / social media Handler for handling the official social media
platforms of FBP is engaged and official social media platforms are fully active.
16. Central Water & Power Research Station (CWPRS)
The Central Water and Power Research Station (CWPRS), Pune, established in 1916 is the leading
national hydraulic research institute under the Ministry of Jal Shakti, Department of Water Resources,
River Development and Ganga Rejuvenation (MoJS, DoWR, RD&GR), New Delhi. CWPRS is the
principal central agency to cater to the research and development (R&D) needs of hydraulics and allied
disciplines for evolving safe and economical designs of hydraulic structures involved in water resources
projects, river engineering, power generation and coastal engineering projects. The research activities at
CWPRS can be grouped into seven major disciplines as listed below.
River Engineering: River Engineering mainly deals with river training and bank protection works,
hydraulic design of barrages and bridges, and location and design of water intakes usingmorphological studies. Field studies for measuring water and sediment discharge in rivers and
canals are also conducted.
River and Reservoir Systems Modelling: Hydrologic and meteorological studies are conducted to
estimate extreme values of various parameters such as rainfall, temperature and humidity. Flood
estimation and forecast, reservoir sedimentation and water quality studies are carried out using
mathematical models and field surveys.
Reservoir and Appurtenant Structures: Spillways and Energy Dissipators are studied on physical
models. Water conductor systems including head race and tail race channels/tunnels and surge shafts
are studied on both physical and mathematical models. Studies are carried out on physical models
for desilting basins, sedimentation and flushing through reservoirs, sediment exclusion devices.
Sedimentation in reservoirs is also assessed through remote sensing.
Coastal and Offshore Engineering: This discipline deals with optimization of location, length and
alignment of breakwaters, jetties, berths, approach channel, turning circle etc. for development of
ports and harbours. Estimation of siltation in harbours, their disposal and sand bypassing, location
of sand trap and hot water recirculation studies are carried out using both physical and mathematical
models. Suggesting suitable coastal protection measures based on locally available materials is an
important activity of the group.
Foundation and Structures: Laboratory and field tests are carried out to determine soil, rock and
concrete properties. Mathematical modelling as well as experimental studies are conducted for
studying the stability and structural safety of dams and appurtenant structures. Field studies are
carried out for assessing the health of hydraulic structures and suggesting suitable repairing
measures.
Applied Earth Sciences: Seismic surveillance of river-valley projects, assessment of site-specific
design seismic parameters, controlled blasting studies for civil engineering construction sites,
evaluation of quality of concrete and masonry is done by non-destructive methods and estimation of
elastic properties for foundation of massive structures for geophysical methods are the main
activities of this group.
Instrumentation, Calibration and Testing Facilities: Hydraulic Instrumentation is used for data
collection on physical hydraulic models. Field data collection is carried out on coastal parameters
like water level, velocity, waveheight etc. A Random Sea Wave Generation (RSWG) system is used
for wave flumes and basins. Dam instrumentation is provided on prototype. Current meter and flow
meter calibration facilities are also available, which are used extensively.
The significant contributions of CWPRS during the year 2025 (Upto 25th November) include:
133 Technical reports were published on the various significant studies of carried out.
57 Research Papers published in various National/International Conferences and Journals
615 Personnel were trained in various areas of activities of CWPRS
39 Training programs were organized by CWPRS for dissemination of research findings.
131 Research Studies amounting to Rs.36.20 crore were awarded to CWPRS under Deposit Works.
CWPRS Scientists participated as an expert in 79 various Technical Committee Meetings and High
Level Meetings.
MoU with RITES Ltd
CWPRS entered into a MoU with RITES Ltd on 18th February 2025. This MOU is expected to benefit
either organization by way of complementing-capabilities and thereby broaden the spectrum of services
deliverable in the sector of coastal engineering. The MOU intends to outline shared objectives, establish a
framework for cooperation, and identify specific projects in the field of Marine/ Coastal/ River
Engineering sectors at both domestic and abroad level where combined expertise could be leveraged for
mutual benefit. As per the prevailing mandate, CWPRS cannot participate in any bidding processinvolving various projects of national and international domains, which are being awarded based on the
global tendering. Since majority of port/power developmental projects are being taken up by private
entrepreneurs on BOT/ BOOT basis, wherein many projects require a pre-feasible / techno-viable studies
to be carried out, are seldom referred to CWPRS, since they are awarded to various firms based on their
participation in the bidding process. In this scenario, a collaboration with a GoI-CPSE such as RITES
which is actively engaged in acquiring projects, in the field of CWPRS’s core expertise, through bidding
process both in national and international market, would certainly boost up the operations of CWPRS in a
large scale, providing it the much needed platform to leave its glorious footprints even in the international
arena.
MoU with Defence Institute of Advance Technology (DIAT), Pune
CWPRS entered into a MoU with DIAT on 18th November 2025. The MoU focuses on technology
upgradation of CWPRS in the fields of advanced high sensitive instrumentation and incorporation of
AI/ML aspects to various water resources with emphasis on structural safety assessment of Dams,
Academic upgradation of CWPRS Officials by way of acquiring higher qualifications such as M.Tech./
Ph.D. Further, CWPRS looks forward to undertake joint research projects sponsored by other departments
such as DST / DAE/ DoS etc. and Industry, so as to emerge as mentor for startups that may emanate there-
from. Exposure to CWPRS Officials to capacity building measures initiated by DIAT in the fields of
relevance such as advance levels of instrumentation and AI/ML has significant potential to offer
predictions beyond conventional modelling techniques. Reciprocal access to facilities under either
organizations for the development of knowledge base in the field of water resources and allied sectors is
also one of the prospective outcome of the MoU.
MoU with Visvesaraya National Institute of Technology (VNIT), Nagpur
CWPRS will also be entering into a MoU with VNIT on 01st December 2025. The MoU is aimed at
Scholastic upgradation of CWPRS Researchers in the fields of Environmental, Geo-technical and Water
Resources Engineering and Water Quality Assessment, Applied Earth Sciences, Foundation & Structures,
Hydraulic Research in Water Resources, Structural Monitoring, and Remote Sensing - by way of acquiring
higher qualifications such as M.Tech./ Ph.D. CWPRS proposed to undertake joint research projects
sponsored by other departments such as DST / DAE/ DoS etc. and Industry, so as to emerge as mentor for
startups that may emanate there-from through this MoU. Exposure to CWPRS and VNIT Researchers to
Capacity Building Measures initiated jointly in the fields of relevance and thus aims to enhance skills and
develop human resources among engineers and technocrats, while also sensitizing dam owners, regulators,
and policymakers to the importance of dam safety.
2nd meeting of the Steering Committee of CWPRS
The Steering Committee of CWPRS has been constituted by DoWR,RD&GR to oversee, review and
provide guidance to CWPRS on various operational, policy and strategic matters aimed at enhancing its
capabilities. The 2nd meeting of the Steering Committee was held on 09th June 2025 at CWPRS under
Chairpersonship of Ms. Debashree Mukherjee, IAS, Secretary, DoWR,RD & GR, MoJS. Shri Subodh
Yadav, Additional Secretary, Dept. of WR, RD and GR, MoJS, Senior officers from Government of
Gujarat, Kerala, Telangana and representatives from CWC, IMD, NIOT, DIAT, CSMRS are the Members
of the Committee and were present during the meeting.
Visit of Shri C. R. Patil, Hon’ble Minister of Jal Shakti
Shri C. R. Paatil, Hon’ble Minister, Ministry of Jal Shakti accompanied by Shri Murlidhar Mohol,
Hon’ble Minister of State for Civil Aviation and Ministry of Cooperation, Shri Mukeshbhai Patel, Hon’ble
Minister of State for Water Resources, Gujarat Government, Hon’ble Pro. Smt. Medha Kulkarni, Memberof Parliament and Ms. Debashree Mukherjee, IAS, Secretary, DoWR, RD & GR along with Shri Pradeep
Kumar Agarwal, Joint Sectretary (NRCD), MoJS visited CWPRS on 17th June 2025
Hon’ble Minister of Jal Shakti appreciated the studies being carried out by CWPRS. During this visited,
he witnessed the hydraulic model of proposed barrage at Rundh-Bhata across river Tapi During. Further,
he inaugurated the Hangar for Kalpasar Dam Studies. The Dam Rehabilitation Centre developed at
CWPRS under the Plan Scheme ‘R&D in Water Sector’ was inaugurated at the hands of Hon’ble Minister
of Jal Shakti.
Establishment of Domain Specific Research Cells
To address emerging challenges in the water sector and enhance its multidisciplinary capabilities, CWPRS
has constituted four focused Cells —in addition to its existing divisions.
Climate Resilience and Adaptation Cell
Artificial Intelligence & Data Analytics Cell
GLOF Risk Assessment & Mitigation Cell
Coastal Aquifer Salinity Management Cell
These Cells aim to drive targeted research, predictive modelling and technical innovation in critical areas
of national relevance. While the Climate Change and AI-ML Cells focus on resilience and data-driven
solutions, the GLOF and Coastal Salinity Cells cater to region-specific risk mitigation and advisory
support.
National Workshop on “Managing Aging and Distressed Hydro Power Projects: Challenges &
Opportunities”
A National Seminar on “Managing Aging and Distressed Hydro Power Projects – Challenges and
Opportunities” was organized at CWPRS during 11–12 September 2025. The objective of the seminar was
to provide a common platform for engineers, researchers, dam safety professionals and hydropower
stakeholders to discuss the challenges faced by aging infrastructure and to explore opportunities for
rehabilitation, safety improvement and technological advancements. A total of 105 participants attended
the seminar, representing major central and state organizations, dam authorities, hydropower utilities,
engineering consultants, academic institutions and research bodies. Their active participation reflected the
importance of the subject and the need for coordinated efforts in strengthening dam safety in the country.
Technical sessions were conducted on both days, during which subject experts delivered presentations on
structural condition assessment, seepage diagnosis, cracking and deformation issues, seismic evaluation,
hydraulic machinery performance, instrumentation practices and rehabilitation strategies for aging dams.
Several case studies related to prominent hydropower and dam projects were discussed, providing
practical insights into the challenges faced during field investigation, monitoring and remedial works. The
sessions facilitated detailed interaction among participants and helped in disseminating updated technical
knowledge relevant to dam safety and hydropower infrastructure.
National Workshop for Stake Holders of CWPRS
A Stakeholder Workshop on “Role of CWPRS in Dam Safety and Rehabilitation – Building Strategic
Partnerships” was conducted by CWPRS, in Hybrid mode (online and offline) on 29th October 2025. An
overwhelming response of 468 registrations was received from diverse sectors including Government,
Public, Autonomous and Private organizations. A total of 41 delegates attended the workshop physically at
CWPRS. The Inauguration function was graced by Chief Guest Shri V. L. Kantha Rao, IAS, Secretary
(DoWR, RD & GR), Ministry of Jal Shakti in online mode. The daylong event comprised of technical
sessions by CWPRS scientists showcasing capabilities in various domains of dam safety. Interaction
sessions with delegates were included to foster a collaborative environment. An exhibition stall displaying
advanced equipment for dam monitoring and data collection was set up at the workshop venue.7th National National Conference on Coastal, Harbour and Ocean Engineering
The 7th National Conference on Coastal, Harbour and Ocean Engineering (INCHOE-2025), themed
“Climate-Resilient Blue Economy,” was organized by CWPRS on 6–7 November 2025. The event was
held under the guidance and support of Shri V. L. Kantha Rao, IAS, Secretary (DoWR, RD & GR), MoJS
and Chief Patron, INCHOE 2025 and Dr. Prabhat Chandra, Director, CWPRS and Patron, INCHOE 2025,
in association with the Indian Society for Hydraulics (ISH). The conference brought together more than
150 delegates from academia, research institutions, industry, consulting organizations and major ports to
share knowledge, highlight innovations and strengthen professional collaboration in coastal and maritime
engineering. In addition to this, an exhibition by seven technology providers, presentations from nine
sponsors and six technical sessions in which 68 full-length research papers were presented, covering
themes such as port and harbour engineering, ocean and offshore systems, coastal data analytics,
environmental management and disaster-resilient coastal infrastructure was the main features of the
conference. Innovative ideas presented included AI and machine-learning tools for coastal modelling,
green port initiatives, hybrid protection systems, advanced simulation tools, river-ocean interaction studies
and climate change impacts on tropical cyclones.
17. 6th National Water Awards
Hon’ble President of India, Smt. Droupadi Murmu, conferred the 6th National Water Awards, 2024 along-
with Jal Sanchay Jan Bhagidari (JSJB) at Vigyan Bhawan in New Delhi. 46 winners, including joint
winners across 10 categories of 6th National Water Award were awarded for their exemplary work in the
field of water conservation and management. Each award winner was conferred with a citation and a
trophy as well as cash prizes in certain categories. Details of winners are available on https://jalshakti-dow
r.gov.in/.
18. Narmada Control Authority
1. In the year 2025, the Narmada basin experienced good rains and the utilizable flow for the year
2025-26 has been assessed by Narmada Control Authority as 43.41 MAF, 55% more than the 28
MAF as per NWDT award based on the 75% dependable flow. Out of which 34.46 MAF is
shareable utilizable flow between the Party States. The States wise quantum of utilizable flow
allocated to Madhya Pradesh 22.46 MAF, Gujarat 11.08 MAF, Rajasthan 0.62 MAF and
Maharashtra 0.31 MAF.
Narmada Main Canal is the biggest concrete lined irrigation contour canal in the world. It off-takes
from Sardar Sarovar Dam in Gujarat and after traversing a distance of about 458.318 km enters at
Gujarat - Rajasthan border. The canal extends 74 km further in the State of Rajasthan to irrigate areas
in Barmer and Jalore districts of Rajasthan. Narmada Main Canal (NMC) with head discharge of
1133.55 cumecs has potential to irrigate 17.92 lakh ha annually in Gujarat and to carry Rajasthan's
share of 616 MCM (0.5 MAF) to irrigate 2.46 lakh ha of full CCA in Barmer and Jalore districts of
Rajasthan.
The Government of Gujarat, out of their allocated share of 9.0 MAF, has made a provision of 0.86
MAF (1060.8 MCM) for Narmada Canal based on drinking water supply project covering about 75%
population of the State through a State wide Drinking Water Grid benefiting 10453 villages and 190
towns, in addition to provide 0.20 MAF (246.7 MCM) for Industrial use in the State. Flood protection
of 210 villages and Bharuch city is an added advantage of the project.
2. In Sardar Sarovar Project, the River Bed Power House (RBPH) of 6 units of 200 MW (1200 MW) is
functioning and 54,676.180 MUs power has been generated since commissioning in 2004.Canal
Head Power House (CHPH) 5 units of 50 MW (250 MW) is also running and 14,396.530 MUs ofpower generated since its commissioning in 2005. Total power generation through both the power
houses of SSP is 69,072.710 MUs.
3. During the meeting of Sardar Sarovar Reservoir Regulation Committee (SSRRC), the
demands/releases of the Party States i.e. Madhya Pradesh, Gujarat, Maharashtra and Rajsthan was
discussed and accordingly Reservoir Operation Table (RoT) for the monsoon period (July to
October-2025) and for the non-monsoon period-2025-26 (November to June) for Sardar Sarovar
Dam was finalized.
4. Launch and Strategic Progress of the Environmental Flow (E-Flow) Reassessment Study for
the Narmada River downstream to Garudeshwar Weir of Sardar Sarovar Project
The Environment & Rehabilitation (E&R) Wing of NCA has successfully facilitated the initiation of a
scientifically robust, multidisciplinary Environmental Flow (e-flow) reassessment study for the
Narmada River, downstream to Sardar Sarovar Dam, covering the stretch from Garudeshwar to
Bhadbhut. This is the first comprehensive review since the original NWDT Award, aligning with
post-project ecological realities, climate resilience, and sustainable river management.
A Multidisciplinary Expert Committee has been constituted, comprising specialists from the National
Institute of Hydrology (NIH), Roorkee; Central Water Commission (CWC); National Mission for
Clean Ganga (NMCG); ICAR–Central Inland Fisheries Research Institute (ICAR–CIFRI),
Barrackpore; representatives from the four Party States; and Members of NCA, to guide and oversee
the study.
ICAR–Central Inland Fisheries Research Institute (ICAR–CIFRI) has been entrusted with executing
the 9-month technical study by SSNNL (Govt of Gujarat), applying hydrodynamic modeling, river
cross-sectional analysis, habitat simulation, aquatic species–flow linkages, and season-wise flow
assessment to determine optimal ecological flows.
Preliminary observations indicate that the currently stipulated 600 cusecs of e-flow (for all seasons)
may be hydrologically and ecologically inadequate, particularly in addressing salinity ingress from
the sea, which has already impacted several downstream villages, estuarine ecology, and traditional
fisheries.
Once concluded, this initiative will enable informed decision-making for:
a) Restoration of riverine and estuarine ecosystems downstream to Sardar Sarovar Dam.
b) Improvement of fish breeding habitats, aquatic biodiversity, and sediment management.
c) Reduction of salinity ingress from the sea.
d) Strengthened compliance with national environmental policies.
The study has also fostered cooperative federalism, bringing Party States and scientific institutions to
a common platform for a consensus-based, science-driven governance approach.
This initiative lays the foundation for a transformative shift - from flow allocation based solely on
irrigation, drinking water and hydropower demand to a balanced regime that integrates ecological
viability, community sustenance, and long-term river health.
19. Ganga Flood Control Authority (GFCC)
GFCC was established in 1972 with its head quarter at Patna. The Commission is headed by a chairman
with two full time Members and other supporting officers and staff. The representatives of concerned
Central Ministries and Departments as well as the Engineer-in-Chief/Chief Engineers of the Ganga
basin States are part-time members/ permanent invites.
The Commission has been assigned the following tasks:Preparation and updation of comprehensive plans for flood management of the river systems in the
Ganga basin.
Phasing/sequencing of programme of implementation of works included in the basin-wise plans.
Providing technical guidance to the 11 Ganga basin States, namely, West Bengal, Bihar, Jharkhand,
Uttar Pradesh, Uttarakhand, Chhattisgarh, Madhya Pradesh, Delhi, Haryana, Himachal Pradesh and
Rajasthan on flood management.
According techno- economic appraisal and clearance to flood management schemes of the Ganga
basin States with an estimated cost of more than Rs. 12.5 crore and up to Rs. 25 crore, except for
schemes of the States of Haryana, Uttar Pradesh and Delhi on the river Yamuna in the reach from
Tajewala to Okhla Barrage. The schemes with estimated cost of more than Rs. 25 crore are
appraised by GFCC and their techno-economic clearance is accorded by TAC-MoWR.
Monitoring the execution of the important flood management schemes, particularly those receiving
central assistance under Flood Management and Border Area Programme or being executed under
Central Sector.
Assessment of adequacy of the water ways under the existing road and rail bridges and additional
waterways required to be provided for reducing the drainage congestion to reasonable limits.
Performance evaluation of major flood management measures executed by the States including the
inter-State flood management schemes.
Achievements during 2025-26:
Maintenance of Flood Protection Works of Kosi and Gandak Projects: The flood protection
works on river Kosi and Gandak are being carried out based on site inspection after every flood
season and on recommendations of Kosi High Level Committee (KHLC) and Gandak High Level
Standing Committee (GHLSC) respectively. The expenditure incurred on maintenance of the flood
protection works executed in Nepal portion is being reimbursed by Government of India after
utilization certificate of the same is received from the State Government of Bihar for Kosi and
Government of Uttar Pradesh for Gandak, respectively. Visit of GHLSC and KHLC for
recommending flood management works to be undertaken before 2026 flood were held during 15-
18 November, 2025 and 20-23 November, 2025 respectively.
Updating of comprehensive Plan for Flood Management: Comprehensive plan for flood
management for all the 23 river systems of the Ganga basin were prepared between 1975 and 1990.
The work of updating these comprehensive plans has been taken up from time to time due to
changes in hydro-meteorological and morphological data in the basin with passage of time.
During the year 2025-26, GFCC has planned to prepare the Risk based Comprehensive Plan for flood
management in Ganga basin with state-of-the-art technology in collaboration with NIH, IIT Roorkee,
CDAC and other institutions/ organizations. Proposal for preparation of risk based comprehensive
plan in respect of Gandak, Burhi Gandak and Ramganga basins in collaboration with NIH, CDAC,
IIT Roorkee respectively are under process.
Further, updating of Comprehensive Plans using conventional method have also been initiated in
respect of Kosi, Kamla, Damodar and Gomti rivers. For smooth collection and compilation of data,
committees have been constituted for above mentioned four rivers in which apart from GFCC
officials, representative from concerned state governments have been included. The concerned States
have also been requested to supply the data available under their domain.
Assessment of the adequacy of existing waterways under road and rail bridges: Adequacy of
waterways under existing road and rail bridges for all the 23 river systems of the Ganga basin have been
assessed except Main Ganga stem from Rudraprayag to Badrinath & Rudrapryag to Kedarnath. Here it is
mentioned that the Main Ganga stem has been divided into 5 reaches:- a) Rudraprayag to Badrinath &
Rudrapryag to Kedarnath, b) Rudrapryag to Haridwar, c) Haridwar to Buxar, d) Buxar to Sahebganj ande) Sahebganj to Outfall. During the year 2025-26, work for preparation of adequacy report for the reach
from Rudraprayag to Haridwar has been prepared and the same is under finalization. Further, Survey for
Rudraprayag to Badrinath is under progress and proposal for survey from Rudraprayag to Kedarnath has
been submitted to DoWR,RD&GR for approval. Also, proposal for survey for updating adequacy report of
Kamla and Bagmati rivers has been submitted to DoWR,RD and GR for approval.
Ganga Flood Control Commission (GFCC) Meeting: A total of 55 meetings of the GFCC (Ganga
Flood Control Commission) have been held till date. The most recent, the 55th meeting took place on May
15, 2025 at Ganga Bhawan in Patna, under the Chairmanship of Chairman, GFCC in the presence of the
member states of GFCC and the invitees and special invitees.
Ganga Flood Control Board (GFCB) Meeting: A total of 18 meetings of the GFCB (Ganga Flood
Control Board) have been held till date. The most recent, the 18th meeting of the Ganga Flood Control
Board was held on 19.12.2024 at New Delhi under the Chairmanship of Hon’ble Minister of Jal Shakti in
which various issues relating to floods and its management in Ganga basin States were discussed and
necessary decisions were taken for implementation.
Embankment Management System (EMS): GFCC has initiated the development of a web-based
Embankment Management System (EMS) with state-of-the-art technologyfor whole Ganga Basin in
coordination with all the 11 Ganga Basin States. The EMS is aimed at establishing a data-driven
framework for embankment monitoring and management. The system envisages a comprehensive digital
inventory of all embankments in the basin, integrating field data, remote sensing inputs, river behavior
dynamics and socio-economic interactions through GIS-based analytics. Incorporating state-of-the-art
predictive modelling as its core feature, the system will facilitate vulnerability assessment, condition
monitoring and proactive maintenance planning. In this regard, a concept note has been prepared and
shared with IIT Roorkee and IIT Patna for sending proposal for development of Embankment
Management System in collaborative mode.
Techno-economic Appraisal of Flood Management Schemes: All together 42 nos. of flood management
projects, including spillover of 39 nos. projects from previous years, of Ganga Basin States were appraised
in GFCC during the period April 2025 to October 2025. Out of which, 02 nos. projects have been
included by IMC of DoWR, RD& GR for financial assistance under FMBAP and 03 nos. projects have
been submitted for consideration of IMC. Also, Investment Clearance has been accorded to 03 nos.
projects by ICC of DoWR, RD & GR and 01 nos. project has been accepted by the Advisory Committee
of DoWR, RD & GR. At present, 01 no. project is under examination in GFCC and compliance to the
observations of GFCC in respect of 27 nos. projects is awaited from the State Governments.
20. Research And Development in Water Sector
R&D Division, under National Water Mission, is involved in coordination and implementation of
activities under the component “Research & Development Programme in Water Sector” of the Scheme
“Research and Development Programme in Water Sector and Implementation of National Water Mission”.
Four premier organisations under the Department, which carry out research of applied nature and provide
solutions through the specific research activities, are funded under the scheme. These organisations are as
under:
1. Central Water and Power Research Station, Pune
2. Central Soil and Material Research Station, New Delhi
3. National Institute of Hydrology, Roorkee
4. Central Water Commission, New Delhi
During the year 2025 (Jan to Oct) the following physical Achievements made by these four apex
organizations of the Department under R&D Scheme:
1. Publication of research/ technical reports – 274 Nos.2. Organisation of Trainings and workshops - 72 Nos.
3. Training of people for capacity building- 2777 persons
4. Publication of high impact technical report & research papers – 11 Nos.
Other Achievements under the R&D scheme during the year:
17 proposals were recommended by Expert Committee constituted for funding to seminar/workshop
under the R&D programme.
Third party evaluation of the Scheme has been done and draft report has been received.
Draft Guideline for Bharat Water Innovation Network (Bharat WIN) has been prepared.
EFC for FY 2026-31 is prepared and submitted for approval.
21. Polavaram Irrigation Project
Polavaram Irrigation Project was declared as National Project under Section 90 of AP Reorganization Act,
2014, which came into force on 1st March 2014. The project with 2467.50 m of earth-cum-rock fill dam
and 1121.20 m long spillway aims at irrigating 2.91 Lakh ha in erstwhile East Godavari, Visakhapatnam,
West Godavari and Krishna districts besides several other benefits envisaged by it. Central Government is
funding 100% of the remaining cost of the irrigation component of the project, as on 01.04.2014.
Government of Andhra Pradesh is executing the irrigation component of the project on behalf of
Government of India. The approved cost of the Project as per Revised Cost Committee (RCC) is Rs
29,027.95 cr at 2013-14 PL and Rs 47,725.74 crat 2017-18 PL up to FRL i.e. EL +45.72 m. After
declaration as National Project, a sum of Rs.15,605.96 cr has been released for execution of Polavaram
Irrigation Project up to June 2024.
The Union Cabinet has approved the revised cost of the PIP in its meeting held on 28.08.2024, with water
storage upto EL + 41.15 m at a cost of Rs. 30,436.95 cr with balance central grant for the project limited
to Rs. 12,157.53 cr. In accordance to the Union cabinet approval, MoJS released an amount of Rs 5,052.71
Cr as advance payment in two tranches for the FY 2024-25 on account of execution of Phase-I of PIP. A
sum of Rs. 20,658.67 Cr has been released by the Ministry of Jal Shakti for the period 01.04.2014 to
31.10.2025 which includes advance released in FY 2024-25.
As reported by Water Resource Department, Government of Andhra Pradesh, an expenditure of Rs
20,532.38 cr has been incurred on the project works up to 31.10.2025, after declaration of Polavaram